2009, 06-04 Permit App 09001596 Pole BldgProject Number: 09001596 Inv: 1
Application
1'H1S IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: POLE BUILDING- 36 X 36
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 001038 Name: GRANDVIEW ACRES
Date: 6/4/2009 Page 1 of 2
Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Phone: (509) 926-0865
Group Name:
Project Name:
District: Nort
Parcel Number: 45043.0628 Block:
SiteAddress: 10719 E TRENT AVE
Location:: CSV
Lot:
Owner: Name: BETTS, JANET R & STEPIIEN L
Address: PO BOX 11081
SPOKANE, WA 99211
Zoning: MUC Mixed Use Center District
Water District: 026 IRVIN
Area: 40,960 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information . _.._
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 6/3/2009 By: TMELBOU
Released By:
Originally Released: 6/3/2009 By: LHALSEY
Landuse/Zoning/FIE Conditions
Permits:
Released By:
In a 2008 aerial photo there is an existing structure in the approx location of new structure. The structure
is no longer standing. No record of a demolition permit.
Originally Released: 6/4/2009 By: kkendall
Operator: jmm
Printed By: jmm
Print Date: 6/4/2009
Project Number: 09001596 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Date: 6/4/2009 Page 2 of 2
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509) 926-0865
SPOKANE, WA 99212
This Application: Total Project:
Description f Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB 36 X 36 1,296 $24,624.00 1,296 $24,624.00
POLE BLDG
Totals: 1,296 $24,624.00 1,296 $24,624.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $391.25
ACCESSORY PLANS REVIEW 1 SELECT $97.81
WSBCC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $493.56
CSV Planning Division CONDITION: The 36' x 36' detached shop (Permit #09-001596) shall be
restricted to personal residential use. Any business use shall be prohibited until completion of a change
of use and commercial review.
No construction (excavation, fill, or installation of undergrounding utilities shall take place within the
overlay until consultation with the Yellowstone Pipeline is complete.
CSV Planning Division ADVISORY STATEMENT: Approximately the south 120 feet of parcel
45043.0628 is located within the Yellowstone Pipeline Overlay. The proposed 36' x 36' structure is
approximately 60 feet from the edge of the pipeline overlay.
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$493.56
$493.56
Amount Paid
$97.81
$493.56
$493.56 $97.81
Amount Owing
$395.75
$395.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 6/4/2009
Spokane
jvalley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206p $Y
(509)688-0036 FAX: (,FAME VALLEY
www.spokanevalley.aVY O
Y:
PERMIT NUMBER: 7'�
PERMIT FEE:
Iew-Construction
Accessory Bldg
on/Remodel Deck
❑ Other:
SITE ADDRESS: t I r1L fr
ASSESSORS PARCEL NO: '1`t7 9 " 462D LEGAL DESCRIPTION:
Building Owner:
Name: 517c4,i13CATS
Address: •1 0'4. \ C 1.,
� � — :
City: cc p,4<�1
State:_
Zip: ,/ Z�
Phone: C1Z$___ 7�
Fax:
Contact Person
Name:
Phone:
�14PF Pa t im-s -1 Poil
Describe the scope of work in detail:
Contractor:
Name:..
1 (L,..
...5C�"4 L. 4
Address: —400 L ci, 2 a
City: _i\ State: 1.j
Zip:Wll2
Phone: Iv. "'O A j Fax: coif
' 5761
Contractor Lic No: Exp Date:
Q�K.APP`r t $w�
I
B1i,Z! 2a\,D
City Business Lic. No:
Cost of Project: $
I / 61-'1(
` 3‘ 2c /2 Pd_iw
Proposed Use: 'Pr
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: p r
i
D�� a.: 2
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SO,
FTG: ,'xt-c
2 FLOOR SQ FTG:
�-
UNFIN BASEMENT SQ. FTG;
IMPERVIOUS SURFACE
AREA: �_
FINISHED BASEMENT
SQ. FTG: 'a
GARAGES . FTQ:
1' _C ',''
DECK/COV. PATIO SQ. FTG:
-�-
30% SLOPES ON
PROPERTY.
# OF BEDROOMS:._
QNST UCTION TYP I:�
rep,/ r� �� � t
HEAT SOURCE:
SEWER O SEPTIC
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be recessed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
DATE: C /3//0 ?
Check ❑ Mastercard ❑ VISA
Expires: VIN#:
Spokane
jValley®
For City Use Only
PLUS Project Number ` 7— / 5_
Project Address /°--
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
• Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
• Designate a specific contact person to. communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
• Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK- BUILDING FILE
REV 9/07
Pt -.ENE POST FRAME, INC. S
2ineered Pole Buildings r
ROLFE WILL ADDAMMS tO'Jt . E.
509-926-0865 • Fax 509-924-S161 or 1=866-926.0865 a y `_n14- u 0 r f ?' Z 8
Sales Manager - Owner
Visit us at
www.spokanepostframe.com
ite Plan
_,c• ,reets/alley
7•,a, eptic/sewer/draIn( leld
sting buildings
roposed building
ctbacks - front, rear, sides.
Dt. size
LCSV Planning Division CONDITION:
The 36' x 36' detached shop (Permit #09-001596)
shall be restricted to personal residential use. Any
business use shall be prohibited until completion
of a change of use and commercial review.
CSV Planning Division ADVISORY STATEMENT:
bum, 14t 4
Approximately the south 120 feet of parcel 45043.0628
is located within the Yellowstone Pipeline Overlay. No
construction (excavation, fill, or installation of underground
shall take place within the overlay until consultation with the
Yellowstone Pipeline is complete. This is an advisory statement
as the proposed 36' x 36' structure is approximately 60 feet from
the edge of the pipeline overlay.
BY:
DATE:
e1
3b(9;t-cr,'-
i�M l
SS4t
to/VOi
4*-tr-rfite
v
\jam Gl
G1�rt -uCii-
c --c- s -ZCiS