2012, 09-27 Permit SW-12002288 SewerSPOKANE COUNTY BUILQING AND PLANNING
PERMIT
Application Number: SW-12002288
Permit Issued Date:
09/27/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: GRANDVIEW ACRES
Permit Type: SEWER
Primary Contact: WATSON ENTERPRISE
Applicant: WATSON ENTERPRISE
Address: 12510 S SANDS RD
VALLEYFORD, WA 99036
Phone: (509)448-9128
Email:
SITE INFORMATION:
Site Address: 11711 E TRENT AVE Owner:
Parcel Number: 45044.0921 Address:
Subdivision:
Assessor's Description:
Inspection Area:
GRANDVIEW ACRES ELY1/2 L12 B6
Phone:
Email:
CYSEWSKI LIVING TRUST, LEO J &
ANNE M
10220 LAMBS LN
MICA, WA 99023
Water District: Irvin Fire District: Spokane Valley Fire
Water District #6
Zoning: Land Area: 20480 Square Feet
CONTRACTOR INFORMATION:
General Contractor
WATSOE*082N6
WATSON ENTERPRIZE
12510 S SANDS RD
VALLEYFORD, WA 99036
509-448-9128
DETAILS'
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/27/2012 15:17:36
Printed by: IIS APPPOOLASP.NET v4.0
SPOKANE COUNTY BUILD,NG AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002288 09/27/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/27/2012 15:17:36
Printed by: IIS APPPOOLASP.NET v4.0