2014, 10-22 Permit App APR-2014-0113 ApproachSpokane
Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
p erm i tcen teraspokan eval l ey. org
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: 19426 E. 1ST AVENUE
START DATE:
ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: Viking Builders, LLC.
MAILING ADDRESS: 2605 W. Hayden Ave.
CITY: Hayden STATE: ID
ZIP: 83835
CONTACT PERSON NAME: Mike Smith
PHONE: 208-762-9106
FAX: 208-762-4507
CELL: 509-661-5126
CONTRACTOR NAME: Viking Builders, LLC.
MAILING ADDRESS: 2605 W. Hayden Ave.
CITY: Hayden
STATE: ID
zip: 83835
PHONE: 208-762-9106
FAX: 208-762-4507
CELL:
CONTRACTOR LICENSE #: 602-978-207
EXPIRES: 9-30-2014
CITY BUSINESS LICENSE #:
✓❑ Residential Driveway
❑✓ Existing Curb & Gutter
❑ Culvert Installation
❑ Other Conditions:
PROJECT DESCRIPTION (Please Provide Site Sketch)
E Commercial/Industrial Driveway
❑ Rural Road Section
❑ Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed.
Signature DAN THOMAS FOR VIKING BUILDERS LLC Date: 10/16/14
DE-001: V-1 Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
['Sidewalk
5 ft wide
3 ft from back of curb
❑✓ Streetside Swale
rainage Ditch
rywell (show location on sketch)
Other (please describe below)
w'
Z'
ZI
w
o;
[LI
CURB'
w
Z
5
ml
ai
o
EDGE OF
ASPHALT
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
6' FT (SEE TABLE)
CONCRETE
APPROACH
rrCURS
J RETURN
[u-4' THROAT WIDTH in FT •—•-k-4'
WING (SEE TABLE) WING
STREET NAM E
19426 E. 1ST AVENUE
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
(MAY BE LEFT OR RIGHT SIDE)
Pi FT (SEE TABLE)
ASPHALT
APPROACH
THROAT WIDTH In FT -I
(SEE TABLE)
STREET NAME
NE CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
15' RADIUS
STREET WITH ASPHALT EDGE
rP.ADIUS
J RETURN
NI I CORNER LOT,
DISTANCE FROM
RADIUS RETURN
FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to centerline of
each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min.. 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (na, r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
DE-001: V-1
Page 2 of 2