APR-2014-0066
DE -APPROACH
PROJECT NAME: COVEY GLEN NORTH - LOT 4 BLOCK 4 APPROACH ISSUED: 08/18/2014
SITE ADDRESS: 19430 E 1ST AVE SPOKANE VALLEY EXPIRES:
PROJECT DESCRIPTION: APPROACH FOR NEW SFR
PARCEL: 55202.3004
APPLICANT: VIKING CONSTRUCTION INC
2605 W HAYDEN AVE HAYDEN ID83835
GENERAL CONTRACTOR:
OWNER: VIKING CONSTRUCTION INC
2605 W HAYDEN AVE
HAYDEN, ID 83835
VIKING BUILDERS LLC
6223 W DESCHUTES AVE
STE #309
KENNEWICK, WA 99336
509-735-9332
License: VIKINBL902C5
Expires: 02/22/2016
FEES: Paid Due
Approach $52.00 $0.00
Totals : $52.00 $0.00
CONDITIONS
* All approaches are to be inspected by the Development Engineering Inspector (John Johnson 509-599-6306) prior to
placing concrete or asphalt.
* Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100
feet of permitted work, as per RCW 19.122.033.
* Saw -cutting of existing curb in the right-of-way in order to create an approach is not allowed in Spokane Valley.
* Construct approach per Standard Plan R-110
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant / permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessary approvals before progressing beyond the point where inspections are
required and may necessitate removal of certain parts of the construction are the applicant's / permittee's
or property owner's expense.
Owne Ag_e .� ��� Date: s -\2 —\\
Staff Approval Date:
Printed by : Bryan Happeny on: 08/18/2014 02:05 PM
Page 1 of 2