Loading...
2014, 08-18 Permit APR-2014-0066 ApproachSpokane,. 40,001" w-J City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(a sookanevallev.orq APR-2014-0066 DE -APPROACH PROJECT NAME: COVEY GLEN NORTH - LOT 4 BLOCK 4 APPROACH ISSUED: 08/18/2014 SITE ADDRESS: 19430 E 1ST AVE SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: APPROACH FOR NEW SFR PARCEL: 55202.3004 APPLICANT: VIKING CONSTRUCTION INC 2605 W HAYDEN AVE HAYDEN ID83835 GENERAL CONTRACTOR: OWNER: VIKING CONSTRUCTION INC 2605 W HAYDEN AVE HAYDEN, ID 83835 VIKING BUILDERS LLC 6223 W DESCHUTES AVE STE #309 KENNEWICK, WA 99336 509-735-9332 License: VIKINBL902C5 Expires: 02/22/2016 FEES: Paid Due Approach $52.00 $0.00 Totals : $52.00 $0.00 CONDITIONS * All approaches are to be inspected by the Development Engineering Inspector (John Johnson 509-599-6306) prior to placing concrete or asphalt. * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * Saw -cutting of existing curb in the right-of-way in order to create an approach is not allowed in Spokane Valley. * Construct approach per Standard Plan R-110 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owne Ag_e .� ��� Date: s -\2 —\\ Staff Approval Date: Printed by : Bryan Happeny on: 08/18/2014 02:05 PM Page 1 of 2