2015, 02-23 Permit SW-15000116 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000116 Permit Issued Date: 02/23/2015
Expiration Date: 02/23/2016
Project Description: SEWER
Project Name: MICAVIEW
Primary Contact: C STONE EXCAVATING Applicant: C STONE EXCAVATING
Phone: 509-599-9280 Address: 12921 W SUNNYVALE DR
NINE MILE FALLS, WA 99026
Phone: 509-599-9280
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description
Inspection Area:
Zoning:
19017 E 4TH AVE
55202.0170
CORBIN ADD TO GREENACRES TR A OF SP95-
1038 AUDITORS #4077192 BK 14 PGS 9 & 10
BEING A PTN OF E 125.25FT OF S 325FT OF LT
13BLK21
: (509)-477-3675
Owner: WELSH, KELLY L & LUKAS L
Address: PO BOX 609
SPOKANE VALLEY, WA 99016
Phone:
Email:
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Land Area: 19875 Square Feet
CONTRACTOR INFORMATION:
CSTONSE916JZ, Exp. 05/14/2015
C STONE EXCAVATING
12921 W SUNNYVALE DR NINE MILE FALLS, WA
99026
509-599-9280
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 02/23/2015 10:42:08
Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000116 Permit Issued Date: 02/23/2015
Expiration Date: 02/23/2016
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/23/2015 10:42:08 Project Coordinator: Susan Clark