2008, 05-15 Permit App 08001816 Cover Over SlabProject Number: 08001816 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW 18 X 32 COVER OVER 18 X 42 PARKING
SLAB
Contact: DEUBEL, MARVIN
Address: 7210 E 5TH AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right- Rear: Phone: (509) 921-5765
Group Name:
Site Information: Project Name:
Na.
Plat Key: 003063 Name: EMPIRE HEIGHTS, 02ND ADD
District: Sout
Parcel Number: 35241.3519
SiteAddress: 7210 E 5TH AVE
Block: Lot:
Location:: CSV
Zoning: MF-1 MF MDR District
Water District: 020 EAST SPOKANE
Owner: Name: DEUBEL, MARVIN
Address: 7210 E 5TH AVE
SPOKANE VALLEY, WA 99212
Hold:
Area: .00 Acres Width: 75 Depth: 125 Right Of Way (ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Date: 5/15/2008 Page 1 of 2
Review
Building Ilan Review
Released By:
Originally Released: 5/15/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 5/15/2008 By: CJJANSSE
Operator: jmm Printed By: jmm Print Date: 5/15/2008
Project Number: 08001816 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Date: 5/15/2008 Page 2 of 2
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
CARPORT OP R-3 VB COVERED 720 $10,800.00 720 $10,800.00
SLAB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Payment Summary:
Permit Type
Building Permit
Totals: 720 $10,800.00 720 $10,800.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$195.25
$4.50
$78.10
$277.85
Fee Amount Invoice Amount Amount Paid Amount Owing
$277.85 $277.85 $0.00 $277.85
$277.85 $277.85
$0.00 $277.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 5/15/2008
Spokane
jValley.
Community Development
Residential Construction
Permit Application
Permit Center RECEIVED BY
11703 E Sprague Ave, Suite OF SPOKANE VALLEY:_
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0 MAY 1. 4 2000
www. spokanevalley.org
RMIT CENTER
BY:
x
PERMIT NUMBER:.. /Si ce
PERMIT FEE:
`ew Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS:
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name://
j ��
�'4 f & . ✓----P/,!_ /
Address:
Ale i;=,,
City: 5/20,
; C izze, y State: l49. Zip: y9/
Phone: %if /
.j/ „_�� Fax:
Contact Person
Name: ,frfiN ✓ 147i�l�'�
Phone: 9 t'S
Describe the scope of work in detail:
Contractor:
Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $
,.• ewe)
pc'1G(r j s-' X `i0' Q5/46 — L,€,/�,/ I,5' x Co41Lv4.
Propose Use:
**************The followin MUST be complete: (write N/A if not annlicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
51L.
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
, AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV PATIO SQ. FTG'
7
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE:
❑ Mastercard ❑ VISA
Expires: VIN#:
Spokane 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206
♦509.688.0036 ♦ Fax: 509.688.0037 •
_#Valley®
Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
Show the height of any proposed buildings or accessory structures.
Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
Floor framing details: Joist type, size, spacing and installation details.
Roof framing plan and details
Furnace and hot water heater location
All header locations: type, size and connections
Foundation plan
Insulation information
Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One -hour separation detail: between house and garage
SXJk1�
Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
3.
lte
1
A:7
;/e. APrIA)
1 7,2/0
35-;21//, 351
o) 35-0
.5
i
5-
..Prof5 e
1
7�0 Pt•
$" ON Ce -�
3 4&'� 7/z
702/0 �' s
RAFTS Re-oul &t
PPO N
P P 1_ 4 re- o 2 LE-b 6-6e
moo
0
V./f2
"d Ci
See
details
House jr
wall
Existing
wall
Roofing material D
Sheathing `id 6 58
14ft maximum
18" minimum width
Existing
rafters
2x blocking
Nev' rafter to
existing bearing
Rafter size x / 0
spacing / "oc
2x blocking
e-
0.4
Beam size /"x 7 112
1 /8" GAP
BE VVEEN SHEATHING
Post size q x 6 (4 x 4 minimum)
spacing ? ' (6 x 6 recommended)
Pre-engineered bracket
'DES IC�i.1E-D Pot L PiJ F7
Z )" minimum depth
Existing
wall
Continuous 2x ledger
anchor by lag screws
Approved hanger
New rafter
PROVIDE DIAGRAMS AND
NGINEERING LAYOUTS FOR
ROnl: TRUSSES, BEAMS AND
TEMS PRIOR TO FRAMING
r NS
CITY copy
THIS BUILDING SUNECT
TO FIELD INSPECTION CORRECTIONS
.•••0°ValleY
REVIEWED FOR COD COMPLIANCE
SPOKANE VALLEY CIJI DING IVISION
cok
AV
V
cr,
0
�
L)
!.I
—o
Al
AAA I, _IMIRn
z F�