Loading...
2008, 05-15 Permit App 08001816 Cover Over SlabProject Number: 08001816 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW 18 X 32 COVER OVER 18 X 42 PARKING SLAB Contact: DEUBEL, MARVIN Address: 7210 E 5TH AVE C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right- Rear: Phone: (509) 921-5765 Group Name: Site Information: Project Name: Na. Plat Key: 003063 Name: EMPIRE HEIGHTS, 02ND ADD District: Sout Parcel Number: 35241.3519 SiteAddress: 7210 E 5TH AVE Block: Lot: Location:: CSV Zoning: MF-1 MF MDR District Water District: 020 EAST SPOKANE Owner: Name: DEUBEL, MARVIN Address: 7210 E 5TH AVE SPOKANE VALLEY, WA 99212 Hold: Area: .00 Acres Width: 75 Depth: 125 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Date: 5/15/2008 Page 1 of 2 Review Building Ilan Review Released By: Originally Released: 5/15/2008 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 5/15/2008 By: CJJANSSE Operator: jmm Printed By: jmm Print Date: 5/15/2008 Project Number: 08001816 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Date: 5/15/2008 Page 2 of 2 Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation CARPORT OP R-3 VB COVERED 720 $10,800.00 720 $10,800.00 SLAB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Payment Summary: Permit Type Building Permit Totals: 720 $10,800.00 720 $10,800.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $195.25 $4.50 $78.10 $277.85 Fee Amount Invoice Amount Amount Paid Amount Owing $277.85 $277.85 $0.00 $277.85 $277.85 $277.85 $0.00 $277.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 5/15/2008 Spokane jValley. Community Development Residential Construction Permit Application Permit Center RECEIVED BY 11703 E Sprague Ave, Suite OF SPOKANE VALLEY:_ Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0 MAY 1. 4 2000 www. spokanevalley.org RMIT CENTER BY: x PERMIT NUMBER:.. /Si ce PERMIT FEE: `ew Construction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name:// j �� �'4 f & . ✓----P/,!_ / Address: Ale i;=,, City: 5/20, ; C izze, y State: l49. Zip: y9/ Phone: %if / .j/ „_�� Fax: Contact Person Name: ,frfiN ✓ 147i�l�'� Phone: 9 t'S Describe the scope of work in detail: Contractor: Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ ,.• ewe) pc'1G(r j s-' X `i0' Q5/46 — L,€,/�,/ I,5' x Co41Lv4. Propose Use: **************The followin MUST be complete: (write N/A if not annlicable)********************** HEIGHT TO PEAK: DIMENSIONS: 51L. # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE , AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV PATIO SQ. FTG' 7 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check DATE: ❑ Mastercard ❑ VISA Expires: VIN#: Spokane 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • _#Valley® Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. Roof framing plan and details Furnace and hot water heater location All header locations: type, size and connections Foundation plan Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One -hour separation detail: between house and garage SXJk1� Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 3. lte 1 A:7 ;/e. APrIA) 1 7,2/0 35-;21//, 351 o) 35-0 .5 i 5- ..Prof5 e 1 7�0 Pt• $" ON Ce -� 3 4&'� 7/z 702/0 �' s RAFTS Re-oul &t PPO N P P 1_ 4 re- o 2 LE-b 6-6e moo 0 V./f2 "d Ci See details House jr wall Existing wall Roofing material D Sheathing `id 6 58 14ft maximum 18" minimum width Existing rafters 2x blocking Nev' rafter to existing bearing Rafter size x / 0 spacing / "oc 2x blocking e- 0.4 Beam size /"x 7 112 1 /8" GAP BE VVEEN SHEATHING Post size q x 6 (4 x 4 minimum) spacing ? ' (6 x 6 recommended) Pre-engineered bracket 'DES IC�i.1E-D Pot L PiJ F7 Z )" minimum depth Existing wall Continuous 2x ledger anchor by lag screws Approved hanger New rafter PROVIDE DIAGRAMS AND NGINEERING LAYOUTS FOR ROnl: TRUSSES, BEAMS AND TEMS PRIOR TO FRAMING r NS CITY copy THIS BUILDING SUNECT TO FIELD INSPECTION CORRECTIONS .•••0°ValleY REVIEWED FOR COD COMPLIANCE SPOKANE VALLEY CIJI DING IVISION cok AV V cr, 0 � L) !.I —o Al AAA I, _IMIRn z F�