Loading...
2010, 04-01 Permit App 10000658 AdditionProject Number: 10000658 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: RESIDENTIAL ADDITION Setbacks: Front Site Information: Plat Key: 003063 Name: EMPIRE HEIGHTS, 02ND ADD Left: Right: Rear: Date: 4/1/2010 Page 1 of 3 Contact: R E CONSTRUCTION Address: 12406 W HIGHLAND RD C - S - Z: NINE MILE FALLS, WA 99026 Phone: (509) 953-3146 Group Name: Project Name: District: Sout Parcel Number: 35241.3519 SiteAddress: 7210 E 5TH AVE Block: Location:: CSV Zoning: MF-1 MF MDR District Water District: 020 EAST SPOKANE Lot: Owner: Name: DEUBEL, MARVIN Address: 7210 E 5TH AVE SPOKANE VALLEY, WA 99212 Hold: ❑ Area: .00 Acres Width: 75 Depth: 125 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Driveway/Approach Originally Released: 3/18/2010 By: TMELBOU Released By: PAVING NOT REQUIRED PER PLANNING DUE TO CARPORT CHANGE TO COVERED PATIO - APPROACH NOT REQUIRED PER TOM. M - MT Originally Released: Landuse/Zoning/HE Conditions Permits: 4/1/2010 By: MTURBAK Released By: Originally Released: 3/17/2010 By: mpalaniuk Operator: JD Printed By: jmm Print Date: 4/1/2010 Project Number: 10000658 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Date: 4/1/2010 Page 2 of 3 Contractor: R E Construction Firm: R E Construction Address: 12406 W Highland Rd Phone: (509) 953-3146 NINE MILE FALLS WA 99026 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation COV DECK R-3 VB COVERED 192 $2,880.00 192 $2,880.00 PATIO RES ADD R-3 VB 1ST FLOOR 1,140 $112,803.00 1,140 $112,803.00 Totals: 1,332 $115,683.00 1,332 $115,683.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,083.35 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RV W < 7999 SQ FT 1 SELECT $433.34 Pern it Total Fees: Mechanical Permit $1,521.19 Contractor: R E Construction Firm: R E Construction Address: 12406 W Highland Rd NINE MILE FALLS WA 99026 Item Description DUCT WORK SYSTEM GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT GAS LOG OR GAS INSERT Phone: (509) 953-3146 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 # OF UNITS 1 NUMBER OF 1 NUMBER OF Fee Amount $11.00 $11.00 $13.00 $3.00 $11.00 $11.00 Permit Total Fees: $60.00 Operator: JD Printed By: jmm Print Date: 4/1/2010 Project Number: 10000658 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Date: 4/1/2010 Page 3 of 3 Contractor: R E Construction Firm: R E Construction Address: 12406 W Highland Rd Phone: (509) 953-3146 NINE MILE FALLS WA 99026 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS CLOTHES WASHER MISCELLANEOUS FIXTURES WATER PIPING - DWV Units Unit Desc 1 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF Permit Total Fees: Fee Amount $6.00 $12.00 $6.00 $6.00 $6.00 $6.00 $6.00 $48.00 Notes: - A paved driveway is required for access to the additional carport. NO SEWER ABANDONMENT PERMIT REQUIRED FOR DEMO OF MANUFACTURED HOME PER ROGER RIVERS Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount $1,521.19 $60.00 $48.00 Invoice Amount $1,521.19 $60.00 $48.00 Amount Paid $4 1 4.54 $0.00 $0.00 Amount Owing $1,076.65 $60.00 $48.00 $1,629.19 $1,629.19 $444.54 $1,184.65 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/1/2010 Spokane �Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: /a — Go J� PERMIT FEE: (l New Construction Addition/Remodel Other: Accessory Bldg Deck ih SITE ADDRESS: Ff1�+ 1 A� 0 v ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: ifyi rum . ✓ �` i� �r'cav� '..� \, ' cr. Address: - i ; City:_ _ _ _ State: n Zip: Phone: j 57 - Fax: Contact Person Name: ( Airy, Phone: Contractor: Name: . --��-- lc.C.L.olns�roc- lc✓t Address: - vti. City: /' State: 1 C, Zip: Phone: q5-----Z2j zice„ Fax:L/ co 7 4, Q� 6 Contractor Lic No z k; ..c y Dae: City Business Lic. No: Describe the scope of work in/ detail: ost ofYroje • $ ff&CD°A_/,ee�,.. ry �� -, , l /J a /°l c -�i4 p u �r l/c �vti 4" F.odt— 5 �� Proposed Use: DL<J& /ivy A-- 4c 4 7/ r6 ex, 5'4Gd **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: 1(1 /( DIMENSIONS: p' /6 7 # OF STORIES: / TOTAL HABITABLE SPACE: /l �c-Vr MAIN FLOOR TO S. / / �, 0 / / % 5 /1r 2Nu FLOOR SQ. FTG: /` 4 � i/ A O /? UNFIN BASEMENT SQ. FTG: - •FTG: IMPERVIOUS -SURFACE AREA: , i V1I FINISHEID BASEMENT SQ. FTG: V", '' � GAf2 6 5^ =S" s,� _ ,ECK/COV.IPATIO SQ. FTG: �.\ ( 1� 30% SLOPES ON PROPERTY: # OF BEDROOMS: . CONSTRU TION E: _€AT SOURC SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE'.;�n,. Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 Ltk, ❑ Check ❑ Mastercard Expires: DATE: / 0 / v ❑ VISA p` �`� VIN#: �- ��,Q Pit -r RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations ❑ Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling ❑ Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing ❑ Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes ❑ Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing okane Uey Community Development Mechanical Permit � Application SITE ADDRESS: / ,.. / 0 :.3 ` Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 perm itcenter@sookaneval l ev. ore PERMIT NUMBER PERMIT FEE: n Commercial n Residential _'_Building Owner ;'; Name: Address: C ') 2) C2 +:CootractorL: L Phone: ^' r'a t 6- 7 Cs ('> Fa;c: City. State: Zip: Name: n ?_cc Address: Lei l?.-Lift I LicenseNo: IR " Contact/Project Manager-`i Phone: Cityc,2, c City Business Lie: Fax State: uu Zip: 99oy7 Name Phone: u #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDMONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) « - 3 ac5 LOG, FIREPLACE, & GAS INSERT J APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 -15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15-30 hp - 500,001 to 1,000,000 BTU BOILER COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU Over 400,000 BTU UNLISTED APPLIANCES HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM— FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE http://wwwspokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitAppli cation040309.doc Spokan` e�`'�' eve. Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenternaspokanevallev.ora PERMIT NUMBER PERMIT FEE: Community Development Plumbing Permit Application 7 /‘3 SITE ADDRESS: ❑ Commercial n Residential Building Owner Name: ter r y,� 'o ; �" ✓ 8 I Phone: y2 l5-..�- Fax: r rrt� Address: G� 72 / d .te.+ r- .L, City:.sr� % n ,a I/ is i i �a c. State: ,' ` I a- Zip: Contractor r -: J. Name: J S i yPhone: 11 Gd il- ^ry cam'!, / c7 ✓.1 9 S,2 2l� !� Pax `7 V -7-? C�` Address: , . C �? L//h / A F ! /� City: *�, r ^ /(-State:- r Zip:�`�y /' W /` JCJCo L-e G r (--,\A P=v_ %"� `<,1 �� .`, f 0C.: License No: E� 4. ?� Yss 2 L y) City Business Lic: Contact/Project Manager: Name: 114:.c. G:t)l,..' Phone: 9 ,s-13 % " ' ya' # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 1 URINALS TUBS I SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat DISHWASHER j CLOTHES WASHER V GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals I WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orgf under the quick links for Forms, Master Fee Schedule. http://www.spokanevalley.org/uploads/Community_Development/Documents/FormsBwilding/PlumbvngYermitApplication040309.doc SjUalley Site Address: 7210 E 5TH AVE Parcel Number: 35241.3519 Zoning: MF-1 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project a Previous pre-app meeting D Plan revisions Transmittal Date: Wednesday, March 10, 2010 Project Number: 10000658 Water District: EAST SPOKANE Applicant: R E CONSTRUCTION Owner: DEUBEL, MARVIN 12406 W HIGHLAND RD 7210 E 5TH AVE NINE MILE FALLS, WA 99026 SPOKANE VALLEY, WA 99212 (509) 953-3146 e-mail: e-mail: Contact: R E CONSTRUCTION Occupant: 12406 W HIGHLAND RD e-mail: NINE MILE FALLS, WA 99026 (509) 953-3146 e-mail: Contractor: R E Construction 12406 W Hicihland Rd NINE MILE FALLS WA 99026 (509) 953-3146 Arch / Engineer: e-mail: Project RESIDENTIAL ADDITION Description: QECEI1VE MAR 1 i as UOLDRH U1 APPLICATIO Building IC Landuse Engineer Utilities Health Fire Dist Assessor SITE PLAN ft PLAN Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane Valley® For City Use Only PLUS Project Number Project Address _ 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REv 9/07 SpCITI OF ok�� ane _Va11eyM Deferred Documents Response to Review Comments Revisions to Application Other (Describe Below): PERMIT CENTER Project Transmittal 11703 E Sprague Ave. Suite B-3, Spokane Valley, WA 99206 Phone: 509.720.5240 Fax: 509.688.0037 ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): ❑ PLUS Project #: E Parcel Number: ❑ Site Address: Route to (Please check all that apply): Division # of Sheets/ Type of Document) # of Copies Received by: I Building VERIFIED / INITIALS / / ❑ / / ❑ / / ❑ QC Check by: ❑ Development Engineering / / VERIFIED / INITIALS 0 / / 0 / / 0 / / ❑ QC Check by: ❑ Planning / / VERIFIED / INITIALS ❑ / / ❑ / ! QC Check by: .77— ._ ___ ________ ❑ SV Fire Department / I _-,-_-_-__- / VERIFIED /INITIALS 0 / / 0 / / 0 / / 0 QC Check by: Project Contact Information:, Name: J // Email: Phone: �-� � 0 r 5-5- Fax: Relationship to Project: ❑ Architect 0 Engineer 0 Other Design Professional 0 Contractor 0 Owner / Applicant NOTE: Bring all documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave — Suite B-3. We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted. Effective June 10, 2009 #Valley Site Address: 7210 E 5TH AVE Parcel Number: 35241.3519 Zoning: MF-1 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject Previous pre-app meeting fl Plan revisions Transmittal Date: Wednesday, March 10, 2010 Project Number: 10000658 Water District: EAST SPOKANE Applicant: R E CONSTRUCTION 12406 W HIGHLAND RD NINE MILE FALLS, WA 99026 (509) 953-3146 e-mail: Contact: R E CONSTRUCTION 12406 W HIGHLAND RD NINE MILE FALLS. WA 99026 (509) 953-3146 e-mail: Contractor: R E Construction 12406 W Highland Rd NINE MILE FALLS WA 99026 (509) 953-3146 Owner: DEUBEL, MARVIN 7210 E 5TH AVE SPOKANE VALLEY, WA 99212 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Project Description: RESIDENTIAL ADDITION Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION r SITE PLAN PLAN Please send all plan review and project comments via e-mail to the highlighted individuals. 477/ • c• `� _; - G. c. -.`> S 7 f2 7r4 rig XsLE •__ - f 3