Loading...
2014, 10-24 Permit SW-14001579 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001579 Permit Issued Date: 10/24/2014 Expiration Date: 10/24/2015 Project Description: SEWER CONNECTION Project Name: CARNAHAN Primary Contact: ROB'S DEMOLITION Phone: 509-534-2970 Applicant: ROB'S DEMOLITION Address: Phone: Email: jay.robs@gmail.com 8420 E WOODLAND PARK DR SPOKANE, WA 99217 509-534-2970 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description Inspection Area: Zoning: 4318 E 6TH AVE 35232.4003 CARNHOPE ADD L4-5-6611 :(509)-477-3675 Owner: Address: Phone: Email: ZACHER IRREVOCABLE TRUST PO BOX 10546 SPOKANE, WA 99209 Water District: Camhope Irrigation District Fire District: Spokane Valley Fire #7 Land Area: 20250 Square Feet CONTRACTOR INFORMATION: ROBSDDI97ORR, Exp. 12/22/2015 ROB'S DEMOLITION 8420 E WOODLAND PARK DR SPOKANE, WA 99217 509-534-2970 jay.robs@gmail.com DETAILS: Class Type Quantity Unit Charge Value SEWER ABANDONMENT FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Possible FEMA Flood Zone Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 10/24/2014 10:21:24 Project Coordinator: Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001579 Permit Issued Date: 10/24/2014 Expiration Date: 10/24/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/24/2014 10:21:24 Project Coordinator: Julie Shatto