2014, 07-07 Permit SW-14001006 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001006 Permit Issued Date: 07/07/2014
Expiration Date: 07/07/2015
Project Description: SEWER CONNECTION
Project Name: CLEMENT
Primary Contact: STUHLMILLER, AARON D & STACIA L Applicant: STUHLMILLER, AARON D & STACIA L
Phone: 509-290-1092 Address: 17511 E 6TH AVE
GREENACRES, WA 99016
Phone: 509-290-1092
Email:
SITE INFORMATION:
Site Address: 17511 E 6TH AVE Owner. STUHLMILLER, AARON D & STACIA L
Parcel Number: 55192.0354 Address: 17511 E 6TH AVE
GREENACRES, WA 99016
Phone: 509-290-1092
Assessor's Description: CORBIN ADD GREENACRES TR B OF SP 96-1073 Email:
AUDITOR'S #4027081 BK 13, PG 40-41, BNG A
PTN OF LT 8, BLK 25 OF SD ADD
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 19600 Square Feet
CONTRACTOR INFORMATION:
OWNER, Exp. 12/31/2015
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS SAME, WA 00000
509-218-7562
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 07/07/2014 12:58:07
Project Coordinator: Kathy Cummings