Loading...
2008, 09-16 Permit App 08003489 GarageProject Number: 08003489 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW GARAGE 26 X 38 Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 002704 Name: UNIVERSITY PLACE Date: 9/16/2008 Page 1 of 2 Contact: OSBORN, MICHAEL & MARY Address: 10409 E 9TH AVE C - S - Z: SPOKANE VALLEY, WA 99206 Phone: (509) 844-4884 Group Name: Project Name: District: Sout Parcel Number: 45204.0334 Block: SiteAddress: 10409 E 9TH AVE Location:: CSV Lot: Owner: Name: OSBORN, MICHAEL & MARY Address: 10409 E 9TH AVE SPOKANE VALLEY, WA 99206 Zoning: R-3 SF Res District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 20,625 Sq Ft Nbr of Bldgs: 1 Review Information: Width: 0 Nbr of Dwellings: 1 Depth: 0 Right Of Way (ft): 0 Review Building Plan Review L Released By: Originally Released: 9/15/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 9/15/2008 By: jdavis Permits: Operator: jmm Printed By: JD Print Date: 9/16/2008 Project Number: 08003489 Inv: 1 Application Date: 9/16/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sa Ft Valuation Su Ft Valuation GARAGE U-1 VB 988 $18,772.00 988 $18,772.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Totals: 988 $18,772.00 988 $18,772.00 Units Unit Desc Fee Amount 1 SELECT $307.25 1 SELECT $76.81 1 SELECT $4.50 Permit Total Fees: $388.56 SEE EMAIL DATED 9/10/08 FROM SPOKANE CLEAN AIR IN FILE BEFORE ISSUING THE DEMOLITION. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $0.00 $388.56 $388.56 $388.56 $388.56 $388.56 $0.00 $388.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/16/2008 Spokane .Valleys Community Development Residential Construction Permit Application SITE ADDRESS: D `t 0q ASSESSORS PARCEL NO: Permit Center 11703 E Sprague Ave, Suite B-3 = A t p BY Spokane Valley, WA 99206;NE VALLEY (509)688-0036 FAX: (037 www.spokanevalley.org SEP 0 5 2008 Y• PERMIT NUMBER: g :7 PERMIT FEE: PEIRT1 New Construction f] Addition/Remodel Other: LEGAL DESCRIPTION: Building Owner: 1 Name: � \�,\ ,\`; . SLI p (2) 1 1 c)5) Address: i `ik\U �� C c \ . Cit3 ob+_x State: Zip: Phone: Ny R� Fax: Contact Person Name: Phone: -tidy' 213 Describe the scope of work in detail: Accessory Bldg n Deck Contractor: Name: 3n(\ ' \CD C)S- G'''L Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ �( )r -\-k('C, - 02OUL Proposed Use: OA v2 6, -' (o p **************The following MUST be complete: (write N/A if not annlicable)********************** HEIGHT TO PEAK: / ` ,DIMENSIONS: / oho -0 X. 3e -6 # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FT : eV— • `ij` ' DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION PE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application car}.pe ocessed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Check DATE: ❑ Mastercard ❑ VISA Expires: VIN#: Authorized Signature: REVISED 2/15/07 RESIDENTIAL CHECK LIST DIRECTION Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) 0 Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details O Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing 0 Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any ❑ Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing 00"4%.„,,, *Wane Valley Site Address: 10409 E 9TH AVE Parcel Number: 45204.0334 Zoning: R-3 Fire District: FD 01 Project transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project ❑ Previous pre-app meeting 0 Plan revisions ❑ Transmittal Date: Friday, September 05, 2008 Project Number: 08003489 Water District: SPO CO WATER DIST#3B Applicant: OSBORN, MICHAEL & MARY 10409 E 9TH AVE SPOKANE VALLEY, WA 99206 (509) 844-4884 e-mail: e-mail: Contact: OSBORN, MICHAEL & MARY Occupant: 10409E 9TH AVE e-mail: SPOKANE VALLEY, WA 99206 (509) 844-4884 e-mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Owner: OSBORN, MICHAEL & MARY 10409 E 9TH AVE SPOKANE VALLEY, WA 99206 U C �J f SEP 0 -_. 2008 Project NEW GARAGE 26 X 38 Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN SITE PLAN S TD S Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane Valley® For City Use Only PLUS Project Number i 3-7 Project Address "cc? C7 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevattey.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Cj/// Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Spokane ,„00Valley "T R MIT CENTER Project Transmittal 11703 E Sprague Ave. Suite B-3 Spokane Valley WA 99206 Phone: 509.688.0036 Fax: 509.688.0037 New Application/Pre-Application Response to Review Comments Revisions to Application Other (Describe Below): ❑ Provide one of the following (REQUIRED FOR ACCEPTANCE): ❑ PLUS Project #: ❑ Parcel Number: ❑ Site Address: ()- CP R Route to (Please check all that apply): Division # of Sheets/ Type of Document/ # of Copies Received by: El Building Ct 0SS S �v>,VJO�/L.� 1 /� SI�(� -,C‘N. - / f_'-, ( ' w,VERIFIED/INITIALS ❑ /..N) 'Cc- \ L."1+-4_,A_ o / ❑ ❑ / DLLs:.__A- / ❑ / / QC Check by: ❑ Development Engineering / / VERIFIED/INITIALS 0 / / 0 / / 0 / / 0 QC Check by: ❑ Planning / / VERIFIED/INITIALS ❑ / / ❑ / / ❑ / / ❑ QC Check by: El SV Fire Department / / VERIFIED/INITIALS 0 / / ❑ / / 0 / / ❑ QC Check by: Project Contact Information: Name: ? r Q Email: aC) es Phone: Fax: 5<-Lk ? •-I Relationship to Project: ❑ Architect El Engineer 0 Other Design Professional 0 Contractor CS. Owner/Applicant DATE STAMP: AOL Mail (6) Page 1 of 1 AOL I myAOL Make AOL My Home Page Check Mail I Compose Search Mail 03 Try NutriSystem ? Get 3 Free Weeks! Today on AOL New Mail (6) Old Mail Drafts Sent IMs Spam Recently Deleted Contacts Calendar My Folders Saved Mail (10) address (4) killian (6) work (2) Hi, osorn Search The Web Keep as New Reply Forward Action Delete Search Spam Demolition at 10409 E. 9th, Spokane Valley Matt Holmquist to you (cc) and permitcenter - 40 min ago More Details 20080910133555480.pdf Spokane Valley Permit Center, Please be advised that Michael and Mary Osborn (copied on this messag are not required to file a Notice of Intent (NOI) with our office for demolition of the 11'6 " x17'0 " structure at 10409 E. 9th, Spokane Valley that occurred on or before August 28, 2008, because the issue being address under Notice of Violation (NOV) 40009 (i.e., a "Notice Intent #" will not be assigned to this demolition). NOV 40009 was iss on September 3, 2008 for failing to comply with asbestos survey requirements, asbestos notification requirements, and asbestos notification period and fee requirements. As such, a civil penalty wi be assessed for these failures. Among other things, the civil penalty will include the economic benefit associated with not obtaining an asbestos survey and not submitting a NOI with the applicable fee. In lieu of a NOI #, you may reference our enforcement case (i.e., NOV #0009). Do not hesitate to contact me at 477-4727 ext. 102 if you have any questions. Thank you. Matt Prepare To Be Shocked - How lLost 55 Pounds Michael & Mary Osborn, Basic Version I Accessible Version http://webmail.aol.com/38575/aol/en-us/Suite.aspx 9/10/2008 R602.10.6.1 Absconds braced wall paeelg. Alternate braced wall panels constructed in accordance with one of the following provisions shall be permitted to replace each 4 feet (1219 mm) of braced wall panel as required by Section R602.10.4. The maximum height and minimum width of each panel shall be in accordance with Table R.602.10.6. 1. In one-ybuildings. each panel shall be sheathed on one face with 3/8-inch-minimum-thickness (9.5 mm) wood structural panel sheathing nailed with 8d common or galvanized box nails in accordance with Table R602.3(1) and blocked at all wood structural panel sheathing edges. Twe•anchor bolts installed in accordance with Figure R403.1(1) shall be provided in each panel. Anchor bolts shall be placed in from each end of the panel a horizontal distance of one- fourth the panel width. Each panel end stud shall have a tie -down device fastened to the foundation, capable of providing an uplift capacity in accordance with Table R602.10.6. The tie -down device shall be installed in accordance with the manufacturer's recommendations. The panels shall be supported directly on a foundation or on floor framing supported directly on a foundation which is continuous across the entire length of the braced wall line. This Loum.rttion shall be romfotced with not less than ore No. 4 bar top and bottom. When the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned down slab edge is permitted at door openings in the braced wall line. This continuous footing or•tumed down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped 15 inches (381 ram) with the reinforcement required in the continuous foundation located directly under the braced wall line. 2. In the first story of two-story buildinzs, each braced wall panel shall be in accordance with Item 3 above. except that the following: 2.1 The wood structural panel sheathing shall be provided on both faces; 2.2 Sheathing edge nailing spacing shall not exceed 4 inches on center; and 2.3 Anchor bolts shall be placed at the center of the panel width and in from each end of the panel a horizontal distance of one -fifth the panel width (three total). Steep capacity Per Table Footing per R403.1.4 Thesiewns installed in accordance with manufacturer DETAILS OF BRACED WALL PANEL WITH HOLD DOWNS ALTERNATIVE (DETAIL FOR SECTION RW:0.6i.1) (2) Anchor bolts — 1/2-inch diameter — at one quarter points TABLE P602.10.6 MINIMUM WIDTHS AND TIE -DOWN FORCES OF ALTERNATE BRACED WALL PANELS Min. 3/8" (10 mm) wood structural panel sheothing attached with 8d (0.131" x 2.5") nails at 6" o.c. at panel edges and 12" o.c. in field Length per Table 5.3 Curb may be required to position untreated wood minimum 8" above grade Atittbers top and bottom -`required fody,,aracing keipiereen 12" x 12' f or turned down alb at opening, if any. Reinforced with #4 bars top and bottom. SEISMIC DESIGN CATEGORY AND WINDSPEED TIE -DOWN FORCE (lb) HEIGHT OF BRACED WALL PANEL Sheathed Width eft. , it. 4" 9 ft. 2' - 8" 10 ft. 2' - 8" 11 ft. 3' - 2" 12 ft. 3' - 6" SDC A, B, and C Windspeed < 110 mph R602.10.6.1, Item 1 1800 1800 1800 2000 2200 R602.10.6.1, Item 2 3000 3000 3000 3300 3600 City of SPOKANE VALLEY BUILDING DEPARTMENT 11707 E. Sprague Avenue #105, Spokane Valley, Washington 99206 - Tel 509-668-0036 - Fax 509-688-0037 Following is a typical cross-section for a residential garage. It may not represent the proposed project If you are using this deli as a portion of your plan submittal, please complete the requested information in the boxes provided on both sides of this sheet This completed sheet, along with any additional information needs to be submitted with your aplfication and be on site at the time of inspection. PROTECTION AND OPENINGS BETWEEN DWELLINGS AND PRNATE GARAGES SHALL HAVE: 1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE CONSTRUCTION ON THE GARAGE SIDE: * 5/8' TYPE')' GYP BOARD (HABITABLE SPACE ABOVE) • 1/2' GYP BOARD (RESIDENCE/ATTIC, FLOOR/CEILING) 2) OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH SOLID WOOD DOOR, SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 3/8', OR 20 MINUTE FIRE RATED DOORS. ALTERNATE FOUNDATION FOR ACCESSORY BUILDINGS FROM 400 SQ. FT. TO 3000 SQ. FT. SECTION A -A 1 /8" GAP 3 B i vVEEN SHEATHING ROOF SHEATHING (2) 4 REBAR al 1-1 2"--I 24" MIN. 6" MIN. 24"MIN. (2) #4 REBAR SOLID -BLOCKING BETWEEN.TRUSSES NOTE: Diagonal wall bracing required on each comer and every 25 feet of wall. Waits within 3 feet of a property line or within 6 feet of a dwelling must be 1 hour rated. (5/8" type x gypsum sheathing on both sides of wall). Openings are not permitted in these walls. Garages over 3,000 sq. ft require protection when closer than 20 feet to the property line. Parapets may be required. ENGINEERED TRUSS OR RAFTER SIZE AND SPACING x @24"O.C. ROOFING MATERIAL ROOFING PAPER / WALL SHEATHING - SIDING 8' MIN. DOUBLE TOP PLATE WALL HEIGHT 2x 7 PRESSURE TREATED ZSOLE PLATE I( 3-1/2* CONCRETE SLAB 24" MIN. Fz-1 6"x12' FOOTING ANCHOR BOLTS 1t2"x 91M►N. (7" INTO CONCRETE) 6' O. C. OR APPROVED ANCHOR INSTALLED PER MANUFACTURER. Non Itemized QUOTE Estimate DATE09/11/08 I'AGt 1 REQ. QUOTE DATE / / ORDER DATE / / ORDER # QUOTE # I 081826 P110 10310 E MONTGOMERY DR SPOKANE VAI I.FY, WASHINGTON 99206 PHONE: (509) 924-2420 FAX: (509) 924-2583 s 0 L D OSBORN, MIKE T (509) 844-4884 s H x P T 0 10409 E. 9TH SPOKANE VALLEY, WA BUILDING DEPARTMENT Unassigned DELIVERY DATE , / / DATE OF INVOICE I / / ORDERED BY CUSTOMER ACCT # 000002133 CUSTOMER PO # MIKE SUPERINTENDENT I MIKE JOBSITE PHONE # JOB NAME:OSBORN, MIKE MODEL:26' COMMONS W/ TAG: INVOICE # TERMS SALES REP SALES AREA LOT # SUBDIV: JOB CATEGORY: HOUSE TC DELIVERY INSTRUCTIONS: SPECIAL INSTRUCTIONS: BY DATE OVERHANG INFO HEEL HEIGHT 00-03-12 REQ. LAYOUTS REQ. ENGINEERING QUOTE TC 09/11/08 END CUT I RETURN NONE LAYOUT TC 09/11/08 PLUMB I YES GABLE STUDS 24 IN. OC NONE DESINGED TC 09/11/08 ROOF TRUSSES LOADING INFORMATION PITCH TYPE PROFILE QTY PLY TOP I BOT ID 12 2 2 6.00 ITEMS 6.00 6.00 6.00 TCLL-TCDL-BCLL-BCDL ISTRESS INCR. 30.0,7.0,0.0,10.0 I 1.15 BASE SPAN 0/A SPAN ROOF TRUSS SPACING:24.0 IN. O.C. (TYP.) LUMBER OVERHANG TOP BOT LEFT 1 RIGHT CANTILEVER LEFT 1 RIGHT 0.00 0.00 0.00 0.001 FAN Al FAN A2 FAN A2G GABLE AG 26-00-00 26-00-00 L2 X 412 X 4 01-00-00 101-00-00 26-00-00 26-00-00 2 X 4 2 X 4 01-00-00 ; 01-00-00 26-00-00 4 26-00-00 2 X 4 2 X 4 01-00-00 01-00-00 i 26-00-00 26-00-00 2 X 4 2 X 4 01-00-00 01-00-00 STUB LEFT RIGHT 1 QTY ITEM TYPE SIZE LENGTH FT-IN-16 PART NUMBER NOTES 30 HANGERS H2.5 ACCEPTED BY SELLER BY: TITLE: DATE OF ACCEPTANCE: ACCEPTED BY BUYER PURCHASER: BY: ADDRESS: PHONE: DATE: Truss Price: Misc. Items: SUB -TOTAL: Delivery: Sales Tax: Selling Price: $1,403.71 - $11.70 $1,415.41 $250.00 $0.00 $1,665.41 Price good until 10/01/08 WARNING: We warn that trusses can cause property damage or personal injury if improperly installed or braced. Customer's or his agent's acceptance hereof shall constitute his affirmative representation that he is fully trained in the proper and safe methods of truss installation and bracing. Refer to the provided pamphlet entitled "Bracing Wood Truss: Commentary and Recommendations", published by Truss Plate Institute, Inc. Do not cut, alter, or use damaged trusses without engineering approval. It is the customer's responsibility to provide access to the job site. Trusses remain our property until full payment is made. ! C• R•O: ' DOR L O.H.: BID I 1' MI • N #: OSBORN O PI E IN 1' P 08 S W/ C PI : 30-7-0 UMB 826 SHED •6/ C 2 : 2.7/12 10 DORMER J 0 0 1 (6) A2 (5) .A1 (t ) 13'0"0 12'0"0 38'0"0 13'0"0 Job C81826 Truss Al Truss Type ROOF TRUSS Qty 12 Ply 1 MIKE OSBORN PRO -BUILD, SPOKANE,WA., TONY CARON I.1-0.01 1-0-0 6-9-4 6-9-4 8-10-3 13-0-0 6-2-12 4x4 = 8-10-3 1- I 4x6 = 4 3x6 = 17-1-13 Job Reference (optional) 7.050 s May 22 2008 MiTek Industries, Inc. Thu Sep 11 09:14:15 2008 Page 1 19-2-12 6-2-12 4x4 = 26-0-0 26-0-0 6-9-4 127.0.01 1-0-0 Scale =1:50.1 8-3-11 8-10-3 Plate Offsets (X,Y):[2:0-9-0,0-0-10], [6:0-9-0,0-0-10] LOADING (psf) TCLL 30.0 (Roof Snow=30.0) TCDL 7.0 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code IRC2006/TPI2002 CSI TC 0.52 BC 0.62 WB 0.36 (Matrix) DEFL in (loc) I/deft L/d Vert(LL) -0.24 8-10 >999 240 Vert(TL) -0.36 8-10 >855 180 Horz(TL) 0.07 6 n/a n/a PLATES GRIP MT20 185/148 Weight: 98 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std LOAD CASE(S) BRACING Standard TOP CHORD Structural wood sheathing directly applied or 4-4-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS (lb/size) 2 = 6 = Max Horz 2 = Max Uplift 2 = 6 = 1357/0-5-8 1357/0-5-8 63(LC 7) -14(LC 7) -14(LC 8) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/58 2-3 = -2250/0 3-11 =-1989/0 4-11 =-1882/1 4-12 =-1882/0 5-12 =-1989/0 5-6 =-2250/0 6-7 = 0/58 BOT CHORD 2-8 = 0/1906 8-13 = 0/1293 9-13 = 0/1293 9-14 = 0/1293 10-14 = 0/1293 6-10 = 0/1906 WEBS 3-8 =-499/107 4-8 = 0/811 4-10 = 0/811 5-10 =-499/107 NOTES 1) Wind: ASCE 7-05; 90mph; TCDL=4.2psf; BCDL=6.0psf; h=25ft; Cat. 11; Exp B; enclosed; MWFRS (low-rise); cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category II; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live Toads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 14 Ib uplift at joint 2 and 14 Ib uplift at joint 6. 8) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. Job 081826 Truss A2 PRO -BUILD, SPOKANE,WA., TONY CARON Truss Type ROOF TRUSS Qty Ply 5 1 MIKE OSBORN Job Reference (optional) 7.050 s May 22 2008 MiTek Industries, Inc. Thu Sep 11 09:14:16 2008 Page 1 1.1-0-01 6-9-4 1-0-0 O 6-9-4 3x9 8-10-3 13-0-0 6-2-12 8 4x4 = 20 4x6 = 4x9 4 17-1-13 9 21 3x6 = 19-2-12 6-2-12 10 4x4 = 2.70112 26.0.0 26-0-0 127.01 6-9-4 1-0-0 3x9 8-10-3 8-3-11 8-10-3 Scale =1:52.3 Plate Offsets (X,Y): [2:0-9-0,0-0-10], [4:0-0-11,0-1-4] LOADING (psf) TCLL 30.0 (Roof Snow=30.0) TCDL 7.0 BCLL 0.0 * BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code IRC2006/TPI2002 [6:0-9-0,0-0-10],[1 2:0-2-0,0-1-6] CSI TC 0.61 BC 0.62 WB 0.36 (Matrix) [13:0-2-0,0-1-6] DEFL in (loc) I/deft Vert(LL) -0.24 8-10 >999 Vert(TL) -0.36 8-10 >855 Horz(TL) 0.07 6 n/a [Id 240 180 n/a PLATES GRIP MT20 185/148 Weight: 121 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied or 4-4-8 oc purlins, Except: 4-5-0 oc bracing: 5-6 4-10-0 oc bracing: 4-5 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. JOINTS 1 Brace at Jt(s): 5 REACTIONS (Ib/size) 2 = 1357/0-5-8 6 = 1357/0-5-8 Max Horz 2 = 63(LC 7) Max Uplift 2 = -14(LC 7) 6 -14(LC 8) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/58 2-3 = -2250/0 4-18 =-1882/1 4-19 =-1882/0 5-6 =-2250/0 6-7 = 0/58 BOT CHORD 2-8 = 0/1906 8-20 = 0/1293 9-21 = 0/1293 10-21 = 0/1293 WEBS 3-8 =-499/107 4-8 = 0/811 5-10 =-499/107 except end verticals. 3-18 =-1989/0 5-19 =-1989/0 9-20 = 0/1293 6-10 = 0/1906 4-10 = 0/811 NOTES 1) Wind: ASCE 7-05; 90mph; TCDL=4.2psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; enclosed; MWFRS (low-rise); cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category II; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non -concurrent with other live Toads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live Toads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 14 Ib uplift at joint 2 and 14 Ib uplift at joint 6. 8) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSUTPI 1. 9) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/ 2-10d nails. LOAD CASE(S) Standard Job 081826 Truss A2G PRO -BUILD, SPOKANE,WA., TONY CARON Truss Type ROOF TRUSS Qty 2 Ply 1 MIKE OSBORN Job Reference (optional) 7.050 s May 22 2008 MiTek Industries, Inc. Thu Sep 11 09:14:16 2008 Page 1 1"1"0"01 1-0-0 6-9-4 6-9-4 6.00 12 8-10-3 8-10-3 1 13-0-0 6-2-12 1 4x6 = 4x9 4 17-1-13 19-2-12 6-2-12 1 2.70112 26-0-0 127"0-01 6-94 1-0-0 4x4 II 9 25 10 3x9 = 3x6 = 4x4 = 26-0-0 8-3-11 8-10-3 1 Scale =1:52.3 Plate Offsets (X Y):[2:0-9-0,0-0-10],[4:0-0-5,0-1-41,[6:0-9-0,0-0-10],[12:0-0-10,0-0-6], [13:0-2-0,0-1-8] LOADING (psf) TCLL 30.0 (Roof Snow=30.0) TCDL 7.0 BCLL 0.0 " BCDL 10.0 SPACING 2-0-0 Plates Increase 1.15 Lumber Increase 1.15 Rep Stress Incr YES Code IRC2006/TPI2002 CSI TC 0.61 BC 0.62 WB 0.36 (Matrix) DEFL in (Ioc) I/defl Vert(LL) -0.24 8-10 >999 Vert(TL) -0.36 8-10 >855 Horz(TL) 0.07 6 n/a LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E WEBS 2 X 4 DF Stud/Std BRACING TOP CHORD Structural wood sheathing directly applied cr 4-4-8 oc purlins, except end verticals. Except: 4-5-0 oc bracing: 5-6 4-10-0 oc bracing: 4-5 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. JOINTS 1 Brace at Jt(s): 5 REACTIONS (Ib/size) 2 = 6 = Max Horz 2 = Max Uplift 2 = 6 = 1357/0-5-8 1357/0-5-8 63(LC 7) -14(LC 7) -14(LC 8) FORCES (Ib) - Maximum Compression/Maximum Tension TOP CHORD 1-2 = 0/58 2-3 = -2250/0 4-22 =-1882/1 4-23 =-1882/0 5-6 =-2250/0 6-7 = 0/58 BOT CHORD 2-8 = 0/1906 8-24 = 0/1293 9-25 = 0/1293 10-25 = 0/1293 WEBS 3-8 =-499/107 4-8 = 0/811 5-10 =-499/107 3-22 =-1989/0 5-23 =-1989/0 9-24 = 0/1293 6-10 = 0/1906 4-10 = 0/811 NOTES 1) Wind: ASCE 7-05; 90mph; TCDL=4.2psf; BCDL=6.opsf; h=25ft; Cat. II; Exp B; enclosed; MWFRS (low-rise); cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category II; Exp B; Partially Exp.; Ct= 1 3) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non -concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) All plates are 2x4 MT20 unless otherwise indicated. L/d 240 180 n/a PLATES GRIP MT20 185/148 Weight: 127 Ib 7)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 14 Ib uplift at joint 2 and 14 Ib uplift at joint 6. 9) This truss is designed in accordance with the 2006 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/ 2-10d nails. LOAD CASE(S) Standard Job . 081826 Truss AG Truss Type GABLE QH 2 Ply 1 MIKE OSBORN Job Reference (optional) PRO -BUILD, SPOKANE,WA., TONY CARON 7.050 s May 22 2008 MiTek Industries, Inc. Thu Sep 11 09:14:17 2008 Page 1 13-0-0 26-0-0 12740-01 I-1-0.01 1 1-0-0 13-0-0 13-0-0 1.0-0 Scale=1:50.1 4x4 = 8 7 9 6.00 Fir 10 28 29 s 9T1 11 ST2 ST7 - sT3 sTe 1z ST4 ST9 13 ST5 Sr rv6 S" 2 14 0 0 4x4 = 16 17 18 19 20 21 22 23 24 25 26 27 4x4 = 3x6 _- 26-0-0 26-0-0 LOADING (psf) 30 0 TCLL (Roof Sncw=30.0) SPACING 2-0-0 Plates Increase 1.15 CSI TC 0.12 DEFL in (loc) I/defl L/d Vert(LL) -0.01 15 n/r 120 PLATES GRIP MT20 185/148 TCDL 7.0 Lumber Increase 1.15 BC 0.05 Vert(TL) -0.01 15 n/r 90 BCLL 0.0 * Rep Stress Incr YES WO 0.13 Hcrz(TL) 0.00 14 n/a n/a BCDL 10.0 Code IRC2006/TPI2002 (Matrix) Weight: 120 Ib LUMBER TOP CHORD 2 X 4 HF 1800F 1.6E BOT CHORD 2 X 4 HF 1800F 1.6E Max Grav OTHERS 2 X 4 DF Stud/Std 26 = 161(LC 1) BRACING 27 = 267(LC 3) TOP CHORD 14 = 213(LC 1) Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD FORCES (Ib) - Maximum Compression/Maximum Tension Rigid ceiling directly applied or 10-0-0 oc bracing. TOP CHORD 1-2 = 0/56 2-3 = -68/34 3-4 = -57/38 REACTIONS (Ib/size) 4-5 = -49/53 5-28 = -52/61 6-28 = -14/68 2 = 213/26-0-0 6-7 = -65/83 7-8 = -69/96 8-9 = -69/93 21 = 172/26-0-0 9-10 = -65/71 10-29 = -14/46 11-29 = -52/39 20 = 188/26-0-0 11-12 = -49/26 12-13 = -57/14 13-14 = -68/34 19 = 187/26-0-0 14-15 = 0/56 18 = 195/26-0-0 BOT CHORD 17 = 161/26-0-0 2-16 = 0/65 16-17 = 0/65 17-18 = 0/65 16 = 266/26-0-0 18-19 = 0/65 19-20 = 0/65 20-21 = 0/65 23 = 188/26-0-0 21-22 = 0/65 22-23 = 0/65 23-24 = 0/65 24 = 187/26-0-0 24-25 = 0/65 25-26 = 0/65 26-27 = 0/65 25 = 195/26-0-0 14-27 = 0/65 26 = 161/26-0-0 WEBS 27 = 266/26-0-0 8-21 = -132/0 7-20 =-230/34 6-19 =-209/38 14 = 213/26-0-0 5-18 =-156/37 4-17 =-130/35 3-16 =-201/45 Max Horz 9-23 =-230/33 10-24 =-209/39 11-25 =-156/37 2 = -63(LC 8) 12-26 = -130/35 13-27 =-201/44 Max Uplift 2 = -8(LC 5) NOTES 20 = -10(LC 7) 1) Truss designed for wind loads in the plane of the truss only. For studs exposed 19 = -14(LC 7) to wind (normal to the face), see MiTek "Standard Gable End Detail" 18 = -12(LC 7) 2) TCLL: ASCE 7-05; Pf=30.0 psf (flat roof snow); Category II; Exp B; Partially Exp.; 17 = -15(LC 7) Ct= 1 16 = -11(LC 7) 3) Unbalanced snow loads have been considered for this design. 23 = -9(LC 8) 4) This truss has been designed for greater of min roof live load of 16.0 psf or 2.00 24 = -15(LC 8) times flat roof load of 30.0 psf on overhangs non -concurrent with other live loads. 25 = -12(LC 8) 5) This truss has been designed for a 10.0 psf bottom chord live Toad nonconcurren i 26 = -15(LC 8) with any other live Toads. 27 = -10(LC 8) 6) All plates are 2x4 MT20 unless otherwise indicated. 14 = -16(LC 8) 7) Gable requires continuous bottom chord bearing. Max Grav 8) Gable studs spaced at 2-0-0 oc. 2 = 213(LC 1) 9) * This truss has been designed for a live load of 20.0psf on the bottom chord in 21 = 172(LC 1) all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord 20 = 270(LC 2) and any other members. 19 = 248(LC 2) 10) Provide mechanical connection (by others) of truss to bearing plate capable of 18 = 199(LC 2) withstanding 8 Ib uplift at joint 2, 10 Ib uplift at joint 20, 14 Ib uplift at joint 19, 12 Ib 17 = 161(LC 1) uplift at joint 18, 15 Ib uplift at joint 17, 11 Ib uplift at joint 16, 9 Ib uplift at joint 23, 15 16 = 267(LC 2) Ib uplift at joint 24, 12 Ib uplift at joint 25, 15 Ib uplift at joint 26, 10 Ib uplift at joint 27 23 = 270(LC 3) and 16 Ib uplift at joint 14. 24 = 248(LC 3) 11) This truss is designed in accordance with the 2006 International Residential 25 = 199(LC 3) Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. Continued on •a•e 2 Job 081826 Truss AG Truss Type GABLE Qty 2 Ply 1 MIKE OSBORN Job Reference (optional) PRO -BUILD, SPOKANE,W,,., i un r ur,r<viv LOAD CASE(S) Standard 7.050 s May 22 2008 MiTek Industries, Inc. Thu Sep 11 09:14:18 2008 Page 138/ 0 Exrs7Heo . =6 PatitrAy 1-•--io'-o1'1 i RIAPt 3 -612 6" ,p /I oust 9 Ave PLANNING DEPT. APPROVED BY' DATE: 4 i6 Lt rs. LTh<15TINL fr g 0 b `-0-441 E)qSTIKLI-, Si-F8P DOSED 3 Uri/ CoPre.N0C- k3s(-0" OR( (4Si 7E OtitkPOSeU' £�2 �1ope _26610= '�E� 2'/ � i;)6. /c'�� 1 iL (iss a(it, vs) / F(u liftt f IN s Tt k,J t t.) e_q.42- a1 i �u,fJ b -litil 1 Sq Ft per =very 300 ttic Vent ation Ft of space ventilated ith at least 56 'o in the upper portion • roof area. Attic Accessibl by 22' ., 30" WSi CEILING: ''A" GWB allowed if perpendicular to rafters or trusses 24" oc and no water based texture used — otherwise 5/8" GWB. t4 ?, EiTi f- 2-XI 1— (2) 2 X (L t.� 193 A ff SUO Alternate Brace Panel • P�a R602.10.4 Brace Wall Panel min. 48 in.— 96 in. R602.10.6.1 Alternate Brace Wall l Panel min.28in.-42in. R602.10.6.2 Alternate Brace Wall Panel min.16in.-24in. Engineered Shear Wall Bracing Minimum depth for frost protection in the City of Spokane Valley is 24 inches measured from the bottom of the footing to finish grade. Grade slope away from building a minimum 6 inches in first 10 feet. CONCRETE TO COMPLY TO IRC TABLE 404.1.1(1) FOUNDATION WALLS - 3000 # PSI SLABS, GARAGES, CARPORTS & PORCHES - 3500 # PSI ALL FOOTINGS MUST BE -CONTINUOUS. q cf « i'`.il (s x-5 - Fed rt ar} • i2g+ OO C - 23H3RO Driveway Approach Deviations, relocations or alter- ations to existing or designated driveway approaches in subdivisions will require a right of way permit address- ing storm water engineered configuration and sizing. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THI.§ BUILDING SUBJECT TO FIEl:D1NSPECTIQN CORRECTIONS REVIEWED FOR CODE I O �' IANCE !VISION M �'