Loading...
2009, 08-19 Permit 09002605 Engineer's Review Sheet• • Include? - Project Name: Site Address: Sec - T - R Page 1 ENGINEER'S REVIEW SHEET: BUILDING PERMIT Change of Use (Y/N) Change of Occupancy (Y/N) Dion Pole Building 14716 E 24th Ave 26-25-44 Pre -Application: Date Time Application In August 19, 2009 Meeting Bldg. Sq. Feet: 1200 sf Total Area: 39,037 sf Related Rezone: File #: Decision Date: Full Permit # 09002605 Pre-App Permit # Parcels: 45264.0120 Historical / Info Files: Applicant Name: Robert Dion Business: Address: 14716 E 24th Ave Owner City, State, Zip: Spokane Valley WA 99037 Phone: 509-892-1462 Cell: FAX: email: Name: Business: Address: City, State, Zip: Phone: CeII: FAX: email: Name: Business: Address: City, State, Zip: Phone: CeII: FAX: email: Engineer Planning Dept: Contact Name Special Conditions & Notes: Phone: !Frontage Improvements included in the design (Yes/No) ? Design Deviation 1: Notes: Submit # Date Received Accepted? Comments Initial Y/N Date Out 1 2 3 Design Deviation 2: Notes: ;gin, .,. ,Submit # Date Received Accepted? Date Out Comments Initial Y/N 1 2 3 Page 2 Full Submittal Permit # 09002605 DESIGN (Items to be accepted for sign off on permit) Pre-App Permit # SEPA: 'Required? Notes: Submit # Date Received Date Out Comments Initial 1 2 3 Trip Generation and Distribution Letter 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 Traffic Study 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 Access Point Study 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 Grading -only Plans (e.g. if construction is to be phased) 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 _ 2 3 4 5 Page 3 Full Submittal Permit # 09002605 Pre-App Permit # Civil Plans (Site, Drainage, ESC, Landscaping) 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 6 7 8 9 10 Site Plan 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 6 7 8 9 10 Drainage Report 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 Road Widening Calcs 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 Page 4 Full Submittal Permit # 09002605 Pre-App Permit # Right -of -Way Dedication 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 Easements (Drainage, Access, etc.) 'Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 CONSTRUCTION Letter from Engineer for Certification - or - Required? Certification Package Required? Notes: Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 3 4 5 Surety 'Required? Notes: Date Activity (Amount, Reviewed, Accepted, Reduced, Balance, Notes, etc.) Initial Record Drawings 'Required? Notes:. Submit # Date Received Accept Y/N Date Out Comments Initial 1 2 _ 3 4 5 Page 5 Full Submittal Permit # 09002605 Pre-App Permit # Meetings and Miscellaneous Items Date Initial 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25