2009, 08-19 Permit App 09002605 Grading, TransmittalPage 1 of 1
Mike Turbak
From: Mike Turbak
Sent: Tuesday, August 25, 2009 1:09 PM
To: Jenna Davis
Cc: Jodi Main; Permit Center
Subject: 09002605 - 14716 E 24TH AVE - SITE GRADING FOR BUILDING PAD PREP
Hey Jenna,
I made the full loop on this one . .
The work proposed could be covered under either a Grading or Building Permit. DE would eventually have to
review "grading" plans for slopes & site drainage regardless of which path we took to permit the work. Since the
applicant submitted a grading permit application, we will review with the intention of approving the issuance of a
grading permit.
DE will require the following (minimum) submittal requirement(s) to commence their review:
• (2 ea) Site Plan (updated to include all of the information required by the residential site plan
requirements list — if not already there)
• (2 ea ) Grading Plan set to include:
o Existing contours (indicating area of proposed cut)
o Proposed contours (indicating quantity and location of proposed fill)
o Erosion & Sediment Control (ESC) Plan
1 copy each site and grading plan(s) will need to be routed to planning and engineering for their initial review(s).
Please contact the applicant to coordinate the submittal / routing of these required plans for review.
Thanks for your help,
Mike Turbak
Senior Permit Specialist
City of Spokane Valley Permit Center
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
mturbak@spokanevalley.org
509.688.0035 (Direct)
509.688.0037 (Fax)
c5b .
8/25/2009
Project
SOO ne Transmittal
City of Spokane Valley
.00.0%lley
Community Development Tuesday, August 25, 2009
Transmittal Date:
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre-app meeting
Plan revisions
Site Address: 14716 E 24TH AVE
Parcel Number: 45264.0120
Zoning: R-4
Fire District: FD 01
Water District: VERA
Project Number: 09002605
Applicant: DION, ROBERT D & LAURA L Owner: DION, ROBERT D & LAURA L
14716 E 24TH 14716 E 24TH
SPOKANE VALLEY WA 99037 VERADALE, WA 99037-
(509) 892-1462
e-mail: e-mail:
Contact: DION, ROBERT D & LAURA L Occupant:
14716E 24TH e-mail:
SPOKANE VALLEY WA 99037
(509) 892-1462
e-mail:
Contractor: SPOKANE STRUCTURES INC Arch / Engineer:
510 N MULLAN RD
SPOKANE, WA 99206
(509) 927-0655
e-mail:
Project SITE GRADING/ BLDG PERMIT FOR 30 X 40 POLE BLDG
,ription:
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
Building
\
APPLICATION
SITE PLAN
PLANS
Please send all plan review and project comments via e-mail to the
highlighted individuals.
00,9\04.
SpoIjne"
Valley
Site Address: 14716 E 24TH AVE
Parcel Number: 45264.0120
Zoning: UR-7
Fire District: FD 01
Project •
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Water District: VERA
Applicant:
e-mail:
Contact:
e-mail:
DION, ROBERT D & LAURA L
14716 E 24TH
SPOKANE VALLEY WA 99037
(509) 892-1462
DION, ROBERT D & LAURA L
14716 E 24TH
SPOKANE VALLEY WA 99037
(509) 892-1462
Contractor: OWNER
( ) - 0
New project ❑
Previous pre-app meeting []
Plan revisions is
Transmittal Date:
Wednesday, August 19, 2009
5\PGz.•). v\c)--v
`C1t�.1 E--
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
RECEIVED
CSV Development Engineering
Project # ��`�
Name D 1 0 Y1
Submittal #pNa - 3.4
Project REMOVE SOIL TO CREATE FALT ARE FOR POLE BLDG
escription:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
1
/
/
L
PLANS
RECEIVED
CSV Dove
opment Fngineering
project #__-
N
Please send all plan review and project commentsaroe a e-mail to the
highlighted individuals.
Spokane
�Valley�
Community Development
Grading
Permit Application
SITE ADDRESS 1 / -7`
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Permit Center
11703 E SpragieRve, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@spokanevalley.org
T NUMBER: 2. Goy
PERMIT FEE:
❑ Rough/Clearing 111 Full Grading
❑ Underground! Site Improvements
Sp-0 kv41-1
Property Owner
Name:
Excavation Contractor
JJ
Name:
Manager:
Address:
Address: '% 7/ 6 E?, E
City: SE0M,0E State:(,} Zip.V03 --Phone:
Lic No.
City:
Phone: SO 7 '9Z ��—/(o — Fax:
Contact Person Ts 04j
•
City Busine
Name: b,`oti
Phone: 341 9 — 0 3
Identify and describe the work and indicate the use:
$1'k 7reldlr75
Estimated Excavation/Cut (Cu Yd): / .
Estimated Embankment/Fill (Cu Yd):
Destination of Excavated Materials:
Engineer
Company N
Address:
City:
Phone:
Lic No:
Soil Testing
Company N
Address:
City:
c ‘(\t2c
Cev\Q cx co d^
Pik
Phone: Fax:
I a U ,,1-,o ay) Pro
Start Date: c; d ei or 195A-19) Estimated Completion Date: Oe Y-)
The permitee verifies, owledges and agr es by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be serve by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can beep pro ed.
Signature: Date:
Method of Payment: (Faxed permit applications will only be accepted with major bankcard)
nCash I I Check ❑ Mastercard I I VISA
Bankcard #: Expires:
RECEIVED
CSV Development Engineering
Authorized Signature:
Effective 10-28-07
ec,cf._,
VIN#:
RECEIVED
CSV Development Engineering
Project #
Name
Page 1 of 1
P:\Uommumity
�ubrni:ty DeveTopmenilluilding DivisionVodi-comm 1\PCF\Grading P$A#MabP•
ikee
Project #
Name
Spo°rkane
jUalley�
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07