Loading...
2009, 08-19 Permit App 09002605 Grading, TransmittalPage 1 of 1 Mike Turbak From: Mike Turbak Sent: Tuesday, August 25, 2009 1:09 PM To: Jenna Davis Cc: Jodi Main; Permit Center Subject: 09002605 - 14716 E 24TH AVE - SITE GRADING FOR BUILDING PAD PREP Hey Jenna, I made the full loop on this one . . The work proposed could be covered under either a Grading or Building Permit. DE would eventually have to review "grading" plans for slopes & site drainage regardless of which path we took to permit the work. Since the applicant submitted a grading permit application, we will review with the intention of approving the issuance of a grading permit. DE will require the following (minimum) submittal requirement(s) to commence their review: • (2 ea) Site Plan (updated to include all of the information required by the residential site plan requirements list — if not already there) • (2 ea ) Grading Plan set to include: o Existing contours (indicating area of proposed cut) o Proposed contours (indicating quantity and location of proposed fill) o Erosion & Sediment Control (ESC) Plan 1 copy each site and grading plan(s) will need to be routed to planning and engineering for their initial review(s). Please contact the applicant to coordinate the submittal / routing of these required plans for review. Thanks for your help, Mike Turbak Senior Permit Specialist City of Spokane Valley Permit Center 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 mturbak@spokanevalley.org 509.688.0035 (Direct) 509.688.0037 (Fax) c5b . 8/25/2009 Project SOO ne Transmittal City of Spokane Valley .00.0%lley Community Development Tuesday, August 25, 2009 Transmittal Date: Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre-app meeting Plan revisions Site Address: 14716 E 24TH AVE Parcel Number: 45264.0120 Zoning: R-4 Fire District: FD 01 Water District: VERA Project Number: 09002605 Applicant: DION, ROBERT D & LAURA L Owner: DION, ROBERT D & LAURA L 14716 E 24TH 14716 E 24TH SPOKANE VALLEY WA 99037 VERADALE, WA 99037- (509) 892-1462 e-mail: e-mail: Contact: DION, ROBERT D & LAURA L Occupant: 14716E 24TH e-mail: SPOKANE VALLEY WA 99037 (509) 892-1462 e-mail: Contractor: SPOKANE STRUCTURES INC Arch / Engineer: 510 N MULLAN RD SPOKANE, WA 99206 (509) 927-0655 e-mail: Project SITE GRADING/ BLDG PERMIT FOR 30 X 40 POLE BLDG ,ription: Landuse Engineer Utilities Health Fire Dist Assessor Building \ APPLICATION SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. 00,9\04. SpoIjne" Valley Site Address: 14716 E 24TH AVE Parcel Number: 45264.0120 Zoning: UR-7 Fire District: FD 01 Project • Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Water District: VERA Applicant: e-mail: Contact: e-mail: DION, ROBERT D & LAURA L 14716 E 24TH SPOKANE VALLEY WA 99037 (509) 892-1462 DION, ROBERT D & LAURA L 14716 E 24TH SPOKANE VALLEY WA 99037 (509) 892-1462 Contractor: OWNER ( ) - 0 New project ❑ Previous pre-app meeting [] Plan revisions is Transmittal Date: Wednesday, August 19, 2009 5\PGz.•). v\c)--v `C1t�.1 E-- e-mail: Occupant: e-mail: Arch / Engineer: e-mail: RECEIVED CSV Development Engineering Project # ��`� Name D 1 0 Y1 Submittal #pNa - 3.4 Project REMOVE SOIL TO CREATE FALT ARE FOR POLE BLDG escription: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION 1 / / L PLANS RECEIVED CSV Dove opment Fngineering project #__- N Please send all plan review and project commentsaroe a e-mail to the highlighted individuals. Spokane �Valley� Community Development Grading Permit Application SITE ADDRESS 1 / -7` ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Permit Center 11703 E SpragieRve, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter@spokanevalley.org T NUMBER: 2. Goy PERMIT FEE: ❑ Rough/Clearing 111 Full Grading ❑ Underground! Site Improvements Sp-0 kv41-1 Property Owner Name: Excavation Contractor JJ Name: Manager: Address: Address: '% 7/ 6 E?, E City: SE0M,0E State:(,} Zip.V03 --Phone: Lic No. City: Phone: SO 7 '9Z ��—/(o — Fax: Contact Person Ts 04j • City Busine Name: b,`oti Phone: 341 9 — 0 3 Identify and describe the work and indicate the use: $1'k 7reldlr75 Estimated Excavation/Cut (Cu Yd): / . Estimated Embankment/Fill (Cu Yd): Destination of Excavated Materials: Engineer Company N Address: City: Phone: Lic No: Soil Testing Company N Address: City: c ‘(\t2c Cev\Q cx co d^ Pik Phone: Fax: I a U ,,1-,o ay) Pro Start Date: c; d ei or 195A-19) Estimated Completion Date: Oe Y-) The permitee verifies, owledges and agr es by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be serve by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can beep pro ed. Signature: Date: Method of Payment: (Faxed permit applications will only be accepted with major bankcard) nCash I I Check ❑ Mastercard I I VISA Bankcard #: Expires: RECEIVED CSV Development Engineering Authorized Signature: Effective 10-28-07 ec,cf._, VIN#: RECEIVED CSV Development Engineering Project # Name Page 1 of 1 P:\Uommumity �ubrni:ty DeveTopmenilluilding DivisionVodi-comm 1\PCF\Grading P$A#MabP• ikee Project # Name Spo°rkane jUalley� For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07