19-198.01 David Evans & Associates: Pines & Mission Intersection 1`1-Igg.0 � le" Washington State l// Department of Transportation Supplemental Agreement Organization and Address Number 1 David Evans and Associates,Inc. Original Agreement Number 1600 Broadway,Suite 800 Denver,CO 80202 19-198 Phone: (720) 225-4650 Project Number Execution Date Completion Date 0300 December 31,2021 Project Title New Maximum Amount Payable Pines/Mission Intersection Improvements $92,835.16 Description of Work Traffic Engineering Design and PS&E per proposal dated 12/5/2019. The Local Agency of City of Spokane Valley desires to supplement the agreement entered in to with David Evans and Associates, Inc. and executed on 12/19/2019 and identified as Agreement No. 19-198 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Traffic Engineering Design and PS&E per proposal dated 12/5/2019 (Exhibit A, original agreement) and revised design with PS&E per additional services proposal dated 11/3/2020 (Exhibit A.1, attached). I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Completion date is now December 31, 2021, Ill Section V, PAYMENT, shall be amended as follows: Maximum amount payable is now$92,835.16 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:Rusty Leahy. Senior Associate By: ark Calhoun,Ci Manager - 1�U lAl Consul Signature pprovmg ut fay Sig ature 1 /23(2120 Date DOT Form 140-063 Revised 09/2005 Exhibit "A" Summary of Payments Basic Supplement#1 Total Agreement Direct Salary Cost $20,676.48 $9,859.10 $30,535.58 Overhead $36,090.79 $17,209.06 $53,299.85 (Including Payroll Additives) Direct Non-Salary Costs $191.65 $44.37 $236.02 Fixed Fee $5,934.15 $2,829.56 $8,763.71 Total $62,893.07 $29,942.09 $92,835.16 DOT Form 140-063 Revised 09/2005 Exhibit A. 1 City of Spokane Valley, WA Pines and Mission Intersection Improvement Project No. 0300 Phase I — Design and PS&E Scope of Services Contract Amendment #1 Prepared by: David Evans and Associates, Inc. 1600 Broadway, Suite 800 Denver, CO 80202 U November 3, 2020 TABLE OF CONTENTS I. INTRODUCTION 1 II. DESIGN CRITERIA 1 III. DESIGN SOFTWARE 1 IV. DETAILED TASK DESCRIPTION 1 TASK 1 PROJECT ADMINISTRATION 1 1.1 Project Management 2 1.2 Project Setup 2 1.3 Quality Management Plan 2 1.4 Project Schedule 2 1.5 Monthly Progress Reports and Invoices 2 TASK 2 COORDINATION AND MEETINGS 3 TASK 3 UTILITIES COORDINATION 3 TASK 4 SURVEYING 3 TASK 5 60% DESIGN,WSDOT DOCUMENTATION, AND 75% DESIGN 3 5.1 Title and Index/Vicinity Map 3 5.2 Roadway Typical Sections 3 5.3 Signing and Pavement Marking Plans 3 5.4 Signal Modification Plans 3 5.5 Traffic Control Plans 4 5.6 Utility Plans 4 5.7 Preliminary Special Provisions 4 5.8 Preliminary Opinion of Probable Cost 4 5.9 Preliminary Design Submittal QC 4 5.10 Submit 60% Design Package 4 5.11 60% Design Review and Comment/Resolution Meeting 4 5.12 WSDOT Diversity Management and Compliance System (DMCS) Reporting 4 5.13 WSDOT Intersection Plan for Approval (IPA) and Summary of Design (SOD) 4 5.14 75% DESIGN 4-5 TASK 6 90% DESIGN 5 6.1 Title, Index and Vicinity Map Sheet 5 6.2 Survey Control and Found Monuments 5 6.3 Roadway Typical Sections 5 6.4 Intersection Plans and Details 5 6.5 Signing and Pavement Marking Plans 5 6.6 Signal Modification Plans and Details 6 6.7 Traffic Control Plans 6 6.8 Utility Plans 6 6.9 Utility Hearing Waivers 6 6.10 Specifications and Proposal 6 6.11 Contract Time Determination 6 6.12 Opinion of Probable Cost 6 City of Spokane Valley Page i Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 6.13 QC Review of 90% Design Submittal 6 6.14 Submit 90% PS&E 6 6.15 90% Design Review Meeting 6 TASK 7 100% (AD-READY) DESIGN 7 7.1 Prepare PS&E Package 7 7.1.1. Plans 7 7.1.2. Specifications and Proposal 7 7.1.3. Construction Time Determination CPD 7 7.1.4. QC of PS&E 7 7.1.5. Submit Ad-ready PS&E Package 7 7.1.6. Compiled Project Information 7 7.2 Bid Assistance 7 V. GENERAL ASSUMPTIONS 8 VI. DOCUMENTS TO BE FURNISHED BY CONSULTANT 8 VII. ITEMS AND SERVICES TO BE FURNISHED BY CITY 9 VIII. EXTRA WORK 9 IX. TIME FOR COMPLETION 9 X. MANAGEMENT RESERVE FUND 9 City of Spokane Valley Page ii Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 I. INTRODUCTION David Evans and Associates, Inc. (DEA) and associated subconsultants will provide Final Plans, Specifications and Estimate (PS&E), for the Pines and Mission Intersection Improvement (PROJECT) under the direction of the City of Spokane Valley (CITY). The primary project objective is to relieve congestion, reduce delays, and improve operability of the intersection by reconfiguring the travel lanes and signal operations. The scope of services under this agreement will develop design plans ultimately into a PS&E Package ready for bid advertisement in March 2021 and provide support during bidding and construction. The project goals include: • Reconfigure the Mission Ave approaches for revised lane configuration including dedicated left turn lanes, and remove existing split-phase traffic signal operations; • Provide improved operations at the Pines and Mission intersection through the design year; • Improve safety and intersection level of service (LOS); • Minimize right-of-way impacts; • Identify and implement strategies that conform to WSDOT Practical Design Solutions, achieving economical and cost-effective solutions; This scope of services uses the following references for project team members: • CITY = City of Spokane Valley - Project Sponsor and owner of facilities within the City of Spokane Valley rights-of-way. • WSDOT = Washington State Department of Transportation - Project coordination with review authority, and owner of facilities within State rights-of-way (Major Project Stakeholder). • CONSULTANT or DEA = David Evans and Associates, Inc. (Consultant on the project) II. DESIGN CRITERIA No changes this section III. DESIGN SOFTWARE No changes this section IV. DETAILED TASK DESCRIPTION TASK 1 PROJECT ADMINISTRATION City of Spokane Valley Page 1 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 1.1 Project Management Project management will be on-going during the course of the project. The project manager will maintain communication with the CITY and WSDOT as well as with the Design Team. The project manager will monitor the project's scope, schedule, and budget, will coordinate and communicate with the project's subconsultants, and other similar project management tasks. Assumptions 1. The tasks in this section assume that the project will be active from December 2019 through August 2021, or a total of 21 months. 2. For purposes of this scope it is assumed that project management will require 2 hours per month during this Design and PS&E stage of the project, for a total of an additional 20 hours from November 2020 through August 2021. No change to the original estimate from December 2019 through October 2020. 1.2 Project Setup No changes this section 1.3 Quality Management Plan No changes this section 1.4 Project Schedule DEA will prepare a schedule in Microsoft Project for the project through PS&E delivery. The project team will use the schedule, which will be updated monthly with actual milestone achievements, to check the budget, staffing levels, and where the deliverable schedule might be affected. These tools will be used to adjust staff assignments so that the schedule and fee commitments are met. Project team meetings will enforce the schedule and hold team members accountable for progress on their components of the project. Schedule updates will be submitted monthly to the CITY as part of the invoice package. Deliverables 1. Project Schedule through PS&E 2. Monthly Project Schedule updates during design (10 additional months from November 2020 through August 2021) 1.5 Monthly Progress Reports and Invoices The CONSULTANT Team will provide monthly progress reports and invoices in accordance with the CITY's standard procedures. Each progress report and invoice package will include the CONSULTANT Team's invoice showing all labor and direct expenses included for the period, the monthly progress report, and full documentation of labor hours and direct expenses charged for the period. A total of 21 progress report and invoice packages (December 2019 to August 2021) will be submitted as part of this contract. Assumptions 1. Progress Report and Invoice packages will be prepared monthly for 21 months. City of Spokane Valley Page 2 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 Deliverables 1. Monthly Progress Report and Invoice Packages 2. Monthly Project Schedule update TASK 2 COORDINATION AND MEETINGS No changes this section TASK 3 UTILITIES COORDINATION No changes this section TASK 4 SURVEYING No changes this section TASK 5 60% DESIGN, WSDOT DOCUMENTATION, AND 75% DESIGN The following tasks will be accomplished in preparing the 60% Design Documents. The sheet count for this task is included in the table at the end of this section (11"x17" sheets will be used and unless noted otherwise the plan scale will be 1" = 40'). Prior to completing this 60% Design Phase and as part of the Phase 1 tasks on this project, it is assumed that WSDOT Design Approval in accordance with WSDOT Design Manual 300.04 will be issued. It is assumed that no right-of-way acquisition will be required for this project. The following tasks will be accomplished in supporting the CITY with WSDOT approval and process requirements. Also included in this task are the design modifications necessary for the revised scope of the project, covered under the 75% Design. 5.1 Title and IndexNicinity Map No changes this section 5.2 Roadway Typical Sections No changes this section 5.3 Signing and Pavement Marking Plans No changes this section 5.4 Signal Modification Plans No changes this section City of Spokane Valley Page 3 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 5.5 Traffic Control Plans No changes this section 5.6 Utility Plans No changes this section 5.7 Preliminary Special Provisions No changes this section 5.8 Preliminary Opinion of Probable Cost No changes this section 5.9 Preliminary Design Submittal QC No changes this section 5.10 Submit 60% Design Package No changes this section 5.11 60% Design Review and Comment/Resolution Meeting No changes this section 5.12 WSDOT Diversity Management and Compliance System (DMCS) Reporting DEA will enter required information into the WSDOT DMCS website on a monthly basis for the duration of the project. This task includes catch up from prior months as needed as well as monthly input for the remainder of the project through August 2021. Deliverable: 1. Monthly input into the WSDOT DMCS website - online 5.13 WSDOT Intersection Plan for Approval (IPA) and Summary of Design (SOD) DEA will review the SOD as populated by the CITY and/or other consultant (F&P) for consistency and information to support development of an IPA for submittal to WSDOT. Non-design information necessary for inclusion in the IPA will be provided to DEA by the CITY and/or F&P as needed. DEA will revise the initial IPA as needed up to three times to address comments provided by WSDOT and/or CITY staff, including modifications for consistency with revisions to the SOD. Deliverables: 1. Turning Templates (up to 10) - PDF 2. IPA— PDF 5.14 75% DESIGN This task includes the design modifications necessary for the revised scope of the project. City of Spokane Valley Page 4 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 DEA will revise the 60% design to incorporate the project changes as required by WSDOT and approved by the Spokane Regional Transportation Council (SRTC). Changes include modification of the proposed eastbound approach from two lefts and a shared through/right to a single left and a shared/through right. The proposed raised median will be preserved but relocated. Other striping and signal modifications to the 60% design will be required as a result. DEA will also incorporate 60% review comments received that are still relevant in the revised project condition. The 75% plans will include a similar level of information and content to the 60% plans, with revised content to address the changes to the project. The 75% plans will be submitted to the CITY for CITY staff review and comment only. No additional WSDOT review or comments will take place for this task. Deliverables: 1. 75% Design plans— 11"x17" PDF TASK 6 90% DESIGN DEA will incorporate 75% review comments and further develop the project design. This task includes preparing 90% plans, specifications and estimate. The plans will be organized in accordance with CITY and WSDOT Design Guidelines. The sheet count for this task is included in the table at the end of this section. 6.1 Title, Index and Vicinity Map Sheet DEA will develop the Title Sheet for the 90% Design Package and include the Index and Vicinity Map Information from the 75% Design Package. 6.2 Survey Control and Found Monuments No changes this section 6.3 Roadway Typical Sections No changes this section 6.4 Intersection Plans and Details No changes this section 6.5 Signing and Pavement Marking Plans DEA will finalize the pavement marking plans indicating locations for channelization and pavement markings. DEA will also finalize signing design and complete the plans for construction. Additional adjustments to the plans will be made based on comments received at the 75% Design Review Meeting. The plan set will be enlarged to include the following: Assumptions • Sign Specification Sheets = 1 City of Spokane Valley Page 5 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 • Signing and Pavement Marking Plans = 2 • Sign Details = 1 6.6 Signal Modification Plans and Details DEA will finalize the 75% Design Signal Modification Plan sheets. Additional adjustments to the plans will be made based on comments received at the 75% Design Review Meeting. 6.7 Traffic Control Plans DEA will finalize the Traffic Control Plans, staging overview plans, and detour plans in accordance with MUTCD and WSDOT standards. Additional adjustments to the plans will be made based on comments received at the 75% Design Review Meeting. 6.8 Utility Plans No changes this section 6.9 Utility Hearing Waivers No changes this section 6.10 Specifications and Proposal DEA will update the special provisions based on 75% design comments and expand on level of detail of specifications. 6.11 Contract Time Determination No changes this section 6.12 Opinion of Probable Cost No changes this section 6.13 QC Review of 90% Design Submittal No changes this section 6.14 Submit 90% PS&E No changes this section 6.15 90% Design Review Meeting DEA will attend the 90% Design Review meeting with the CITY and WSDOT staff. DEA will also prepare meeting minutes and distribute to the appropriate recipients by email. Prior to the meeting, DEA will assemble the comments received from the CITY and WSDOT in a comment response form. The team will address the comments and identify comments that require further discussion at the 90% Design Review meeting. The compiled comment form will be provided to attendees at the 90% Design Review meeting and the 90% design review comment form will be included in the PS&E submittal. City of Spokane Valley Page 6 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 Assumptions 1. The design review will be completed in two (2)weeks. All comments will be placed in a Bluebeam Revu Session three business days prior to the design review meeting. The incorporation of hard copy comments will be completed by the CITY. 1. There will be one Design Review Meeting lasting two (2) hours. 2. Three (3) DEA staff will attend (Project Manager, Traffic Design Staff, Survey/ROW Lead). 3. The CONSULTANT will process the Bluebeam Revu Session comments and identify those necessary for resolution with CITY and WSDOT staff. The CONSULTANT will prepare to review those comments as deemed necessary at the meeting. Deliverables 1. 100% Design Review Package TASK 7 100% (AD-READY) DESIGN 7.1 Prepare PS&E Package No changes this section 7.1.1. Plans No changes this section 7.1.2. Specifications and Proposal No changes this section 7.1.3. Construction Time Determination CPD No changes this section 7.1.4. QC of PS&E No changes this section 7.1.5. Submit Ad-ready PS&E Package No changes this section 7.1.6. Compiled Project Information No changes this section 7.2 Bid Assistance No changes this section City of Spokane Valley Page 7 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 V. GENERAL ASSUMPTIONS This Scope of Services is based upon certain assumptions and exclusions, identified below and under specific tasks. The following assumptions were used in the development of this scope of services: 1. The project management budget for the Scope of Services is based on a project duration from December 2019 to August 2021, for a total of 21 months. The Ad Ready Design submittal is expected to occur by March 2021. 2. This scope of work assumes that right-of-way acquisition and an Access Hearing is not required for this project. 3. This scope of work assumes that survey, geotechnical, and/or environmental services are not required for this project. 4. Consultant will not convert the project files to any AutoCAD format at project completion. 5. All title commitments or title commitment renewals will be obtained by the CITY. 6. The level of effort for a given work task is limited to the amount of labor and expenses indicated in Exhibit D. Out-of-scope services beyond these limits will be provided as Extra Work. The CONSULTANT reserves the opportunity to shift budget between work tasks and between labor and expenses. 7. WSDOT LAG agreement for cost plus fixed fee with a not to exceed maximum will be utilized. If the scope of services increases or decreases as it relates to this original scope of services, then an adjustment to the associated fees and delivery schedule will be executed once the CITY and the CONSULTANT mutually agree on the terms of the change. 8. WSDOT will review and approve project elements that could impact Pines Road (SR 27). 9. WSDOT Design and Local Agency Guideline (LAG) Manuals will be consulted for specifications and general special provisions. CITY Special Provisions will also be utilized where pertinent. 10. Opinion of Probable Costs are estimated values. Therefore, CONSULTANT makes no warranty that actual project costs, financial aspects, economic feasibility, or schedules will not vary from CONSULTANT's opinions, analyses, projections or estimates. 11. WSDOT standard bid items will be used for all items on the project unless unavailable for items specified by special provisions. 12. All design reviews conducted by the CITY or WSDOT will be completed electronically using a Bluebeam Revu Session. DEA will provide training as requested for the reviews. VI. DOCUMENTS TO BE FURNISHED BY CONSULTANT No changes this section City of Spokane Valley Page 8 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 VII. ITEMS AND SERVICES TO BE FURNISHED BY CITY No changes this section VIII. EXTRA WORK No changes this section IX. TIME FOR COMPLETION After the PROJECT kickoff meeting is held, a schedule will be prepared based on CITY and CONSULTANT feedback. Following is an estimated PROJECT schedule: Task Timeframe Project management and Quality Control December 2019 to August 2021 CITY and WSDOT Coordination December 2019 to August 2021 60% Design Package January 2020 to February 2020 75% Design Package &WSDOT Documentation February 2020 to December 2020 90°/o Design Package January 2021 to February 2021 100% (Ad-ready) PS&E Package for Bid February 2021 to March 2021 Bid Advertisement March 2021 Bid Award &Construction Completion April 2021 to August 2021 X. MANAGEMENT RESERVE FUND No changes this section End of Scope of Services City of Spokane Valley Page 9 Scope of Services Pines and Mission Intersection Improvement Phase I Design Contract Amendment 1 November 3, 2020 I ®Ac�o CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 12/1/2020 12/12/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONT PRODUCER Lockton Companies NAMEACT 444 W.47th Street,Suite 900 PHONE FAX (A/C.No.Exth (A/C,No): Kansas City MO 64112-1906 E-MAIL (816)960-9000 ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Zurich American Insurance Company 16535 INSURED DAVID EVANS AND ASSOCIATES,INC. INSURER B:Continental Casualty Company 20443 1456304 2100 SW RIVER PARKWAY INSURER C:American Guarantee and Liab.Ins.Co. 26247 PORTLAND OR 97201 INSURER D:American Zurich Insurance Company 40142 INSURER E: INSURER F: COVERAGES DEAIN01 -MAIN CERTIFICATE NUMBER: 16455937 REVISION NUMBER: XXXXXXX THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRPOLICY EFF POLICY EXP ADDL SUER POLICY NUMBER (MM/DD TYPE OF INSURANCE LTR INSD WVD /YYYY) (MM/DD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY Y N GL09830389 12/1/2019 12/1/2020 EACH OCCURRENCE $ $1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $ $300,000 MED EXP(Any one person) $ $10,000 PERSONAL BADVINJURY $ $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ $2,000,000 X POLICY X JECOT LOC PRODUCTS-COMP/OP AGG $ $2,000,000 OTHER: $ C AUTOMOBILE LIABILITY Y N BAP9830390 12/1/2019 12/1/2020 COMBaaccideINEDnt)SINGLE LIMIT $ (E $1,000,000 x ANY AUTO BODILY INJURY(Per person) $ XXXXXXX OWNED SCHEDULED BODILY INJURY(Per accident) $ XXXXX}G( AUTOS ONLY AUTOS X H X NON-OWNED PROPERTY DAMAGE _ AUTO IREDS ONLY AUTOS ONLY (Per accident) • $ XxxxxXX UMBRELLA LIAB OCCUR NOT APPLICABLE EACH OCCURRENCE $ XXXXXXX EXCESS LIAB CLAIMS-MADE AGGREGATE DED RETENTION$ WORKERS COMPENSATION D AND EMPLOYERS'LIABILITY �,/N WC 9336626 12/1/2019 12/1/2020 X I PER H STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 B PROFESSIONAL N N AEH591924704 12/1/2019 12/1/2020 PER CLAIM$1,000,000 LIABILITY ANNUAL AGGREGATE$1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) RE: 19-198-PINES/MISSION INTERSECTION IMPROVEMENTS(CIP#300).THE STATE AND AGENCY,THEIR OFFICERS,EMPLOYEES,AND AGENTS ARE ADDITIONAL INSUREDS AS RESPECTS GENERAL LIABILITY AND AUTO LIABILITY,AND THESE COVERAGES ARE PRIMARY, IF REQUIRED BY WRITTEN CONTRACT.THE ADDITIONAL INSUREDS'OWN COVERAGE IS EXCESS OF AND NON-CONTRIBUTORY WITH THE GENERAL LIABILITY,AND ON THE AUTO LIABILITY AS RESPECTS THE USE OF VEHICLES OWNED BY DAVID EVANS AND ASSOCIATES, INC.IF REQUIRED BY WRITTEN CONTRACT. CERTIFICATE HOLDER CANCELLATION 16455937 CITY OF SPOKANE VALLEY SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE ATTN: CHRISTINE BAINBRIDGE,CITY CLERK THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 10210 EAST SPRAGUE AVENUE ACCORDANCE WITH THE POLICY PROVISIONS. SPOKANE VALLEY WA 99206 AUTHORIZED REPRESENTATIV ©1988 015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD