Loading...
5194674 Agreement, Mitigation Pines/Mansfield ConstructionRETURN ADDRESS City of Spokane Valley 11707 E. Sprague Ave Spokane Valley, WA 99206 Attn: Chris Bainbridge, City Clerk Please Type or Print Neatly & Clearly All Information 111111110110 111 5194674 Page: 1 of 9 03/24/2805 83:09P Spokam Co, WA Document Title(s): Mitigation Agreement SR 27 (Pines Road) Mansfield Road Construction Project Reference Number(s) of Related Documents Grantor(s) (Last Name, First & Middle Initial) Developer: A & A Construction & Development, Inc. Grantee(s) (Last Name, First & Middle Initial) Mitigation Agreement with Developer noted above and City of Spokane Valley Legal Description (Abbreviated form is acceptable) i.e. S,ection/Township/Range/1M Section Certain real property generally located within the SR 27 (Pines Road) and Mansfield Road corridor north of Interstate 90: 45103.0205 Assessor's PL 6 B4-5 45103.0206 Assessor's PL 6 B6 45103.0208 Assessor's PL 6 W1/2 B7 Assessor's Tax Parcel ID Number: see above The County Auditor will rely on the information provided on this form. Tho Staff will not read the document to verify the Accuracy or completeness of the indexing information provided herein. Sign below only if your document is Non -Standard. I am requesting an emergency non-standard recording for an additional fee as provided in RCW 36.18.010. I understand that the recording processing requirements may cover up or otherwise obscure some parts of the text of the original document. Fee for non- standard grgcessing is $50. ature of Requesting Party • 5194674 111 I page: 2 of 9 3?21/2885 03:09P Spokane Co, WA MITIGATION ION AGREEMENT SR 27 (PINES ROAD)1 MANSFIELD ROAD cON T u TIoN PROIECT• This Mitigation Agreement ("Agreement") is entered into by and between A & A Construction & Development, !ne. ("Developer"), a Washington Corporation, having offices for the transaction of business at 202 E. Trent Avenue, Suite 400, Spokane, Washington 99202, and the City of Spokane Valley ("City"), a political subdivision of the State of Washington, hereinafter jointly referred to as "Parties": RECITALS 1_ The City, in cooperation with Spokane County and the Washington State Department of Transportation, is planning to design and construct improvements to the SR 27 (Pines Road) and Mansfield Road corridor with. Transportation Partnership Program CIPP) grant funds from the Transportation Improvement board (TM) and Congestion Management/Air Quality (CMAQ) grant funds from the Spokane Regional Transportation Council RT)_ The name of the project is the Pines/Mansfield Corridor Congestion Relief~ Project ("Project") and the purpose of this project is to alleviate existing and future traffic congestion in this area The Project will reconfigure the WVB rainps of 1-90 at SR-27 (Pines Rd.), using the existing slip ramps to indiana Ave_ and Montgomery Ave. WB off ramp traffic will use the slip ramp to a s 1palized intersection at indiana Ave_ WJ3 on. -rasp traffic will` use the slip ramp at Montgomery Ave, To improve operation of the WB on -ramp and ensure safety, the portion of iontgorrmery Ave. between Pines Rd. and the slip ramp will be one- way, westbound only. Therefore, to provide access to Pines Rd_ for the properties west of Poxes Rd., Mansfield Ave. will. be improved, with a traffic signal at the intersection of Mansfield Ave. & Pines Rd. Curb, gutter, sidewalks and bike lanes will also be constructed. In addition, a signal will be installed at the Mirabeau Pkwy & Pines Rd. intersection to bring this intersection up to an acceptable level ofservice. 2. The Developer is the ownerldeveloper of certain. real property generally located within the SR 27 (Pines Road) and Mansfield Road corridor north of Interstate 90 legally described i.n. Exhibit "A" ("Property"). 3. The Developer is developing the Property for residential and/or commercial uses (the "Development.") which will increase traffic congestion and directly impact existing transportation infrastructure along the Pines/Mansfleld corridor from and including the ori.- and off -ramps at 1-90_ Mitigation of these impacts will be required as part of the development of said property. 4. The Parties are desirous of entering into an Agreement which provides for the payment of a proportionate share of the .Project in consideration for the allocation of a specified number of P.M. Peak Hour trips and mitigation of traffic impacts associated with the Development. A&A Construction & De. went; Inc., Mitigation Agreement Pines/Mansfield Road Construction Project Page 2 of 6 5. The Developer recognizes the need to improve the traffic congestion in the Pines/Mansfield corridor and has agreed to financially participate in the Project by contributing a pro -raga share of the required local matching funds. The Developer's pro- rata share is based on the total number of trips previously estimated for the Development. 6. Pursuant to RCW 43.21 C.060, and RCW 82.02.020, the City has the authority to allow a payment to mitigate a direct impact that has been identified as a consequence of a proposed development. The City (1) has identified future road projects necessitated by planned development in certain areas of the City; and (2) has identified a reasonable relationship between impacts generated by the Development to the transportation system and the financial contribution toward those impacts. 7. To mitigate the direct impacts of the Development upon existing transportation facilities, the Parties are voluntarily entering into this Agreement pursuant to RCW 82.02.020. 8. It is intended that this Agreement provide funds in order to mitigate the direct traffic -related impacts of the Development upon the environment which have been identified through the SEPA review process and documented in the City File No. REZ- 06-04. AGREEMENT NOW, THEREFORE, in consideration of the mutual covenants and conditions hereafter set forth, the. Developer and the City hereto agree as follows: 1. Voluntary Agreement. This Agreement, including all attached documents, is a voluntary agreement as that term is used in RCW 82.02.020. The mitigation fees charged herein are proportional to the traffic -related impacts generated by the Development. The parties acknowledge that the capital project is reasonably necessary to mitigate the direct traffic impact of the Development. In the event this mitigation agreement is determined by a court to be null and void the City shall refund the unexpended portion of mitigation fees. Following a termination of this agreement the Developer shall, as reasonably required, mitigate the direct traffic impacts of the Development through the Stale Environmental Policy Act. 2. Project Funds. The Project is being funded from several sources including, the Washington State Department of Transportation (WSDOT), the TIB, the SRTC, the City, and private developers. Funds from. WSDOT, TIB, SRTC and the City have been obligated. See "Exhibit B". P;Wublic WorludCnpin! ProjectaiasALscsfzet&Viligation Agreercen;sMitigtiun AgreennentstMIT GAT1GV AGREEMENT A & A Cocs7..thx -0. A&A Construction & De J :nt, Inc., Mitigation Agreement " c Pines/Mans .Meld Road Construe ion Project Page 3 of 6 �� 3. Mitigation Fee. The Developer shall pay $60,388 ($303.46 per P.M. Peak Hour trip), °) o a c� a which has been determined to be the Developer's contribution to the Project for �� ¢' mitigation of future traffic impacts related to the Development. This traffic - mitigation fee shall be expended towards the design, right-of-way acquisition, and construction. of the Project. 4. Payment To begin the design of the Project, the Developer agrees to pay all, or at least 20% of its mitigation fee no later than February 25, 2005. A letter of credit, savings assignment, set -aside letter, or other appropriate mechanism that gives the City a unilateral right to access the funds pursuant to this agreement from a financial institution shall also be provided to the City no later than February 25, 2005 for the remaining 80% of the Developer's mitigation fee. The remaining 80% of the Developer's mitigation fee shall be collected by the City no later than 90-days prior to the Project bid date for construction. The City will notify the Developer of the Project bid date when it i.s determined. All fees paid by the Developer shall be used as a portion of the local match required for the TDB and SRTC grants related to the design, right-of-way acquisition, and construction of the Project. 5. Site :Development. Building permits will be issued for the Development when 1) this agreement has been executed by the Developer and the City, and 2) the Developer's mitigation fees have been paid in accordance with Section 4 above, and 3) all other conditions of approval of the Development required by stateiand local laws are satisfied. Execution of this agreement releases the Developer from the requirement of constructing :frontage improvements on the Property, provided said frontage improvements are included in the Project. If frontage improvements are not included in the Project, the Developer is responsible for constructing frontage improvements in addition to paying the mitigation fees. 6. Compliance with RCW 82.02.020. Payment collected by the City will be held in a mitigation fee reserve account and may only be expended to fund the design, right-of- way way acquisition, and construction of the Project. Payments shall be expended within "five years of collection. The City shall be entitled to reimbursement from the mitigation fee reserve account for any funds it may expend for the design, right-of- way acquisition, and construction of the Project prior to the collection of the fee. Any funds in the mitigation fee reserve account not expended within five years shall be refunded by the City with interest as provided in R.CW 82.02.020. 7. Committed P.M. Peak Hour Trips. The City agr.'ees to reserve within the Project up to a total of 199 P.M. Peak Hour trips for the Property until the Development is complete provided such. reservation complies with all federal, state and local laws at the time application for a building permit is made. "Complete" is defined as having received all governmental permits and approvals necessary to construct and permanently occupy the Development. lithe total number of P.M. Peak IIour trips for the Development exceeds the total number of reserved trips noted above, a new traffic study shall be provided to determine if additional traffic mitigation is required. P.Wub3c WorksiGapital Prajecair.es-MarzfiefaMaiyaliOn Agrcuncnt5U11tigrloo Agreement:MI 1GATION AGREEMENT A R A G),MACA AAA Construction &17e .;nt, Inc., Mitigation Agreement Pines/Mansfield Road Construction Project Page 4 of 6 8. Con currency: In accordance with the City's adopted concurrency standards pursuant to RCW 36.70A, the P.M. Peak [Tour trips mitigated herein shall be considered to have satisfied concurrency for the Project from the Development as provided in paragraph 7. Any remaining capacity shall be available to the general public. 9. Notice: All communications, notices or demands of any kind which a party under this Agreement is required or desires to give to any other party shall be in writing and be either (1) delivered personally, (2) sent by facsimile transmission with an additional copy mailed first class, or (3) deposited in the U.S. mail, certified mail postage prepaid, return receipt requested and addressed as follows: if to the City: City of Spokane Valley 11.707 E. Sprague A-ve., Suite 106 Spokane Valley; \VA 99206 Fax: (509) 921.-1008 Attn: City Manager If to the Developer: Christopher Ashenbrener A & A Construction & Development:, Inc. 202 E. Trent Avenue, Shute 400 Spokane, WA 99202 1.0. Successors. This Agreement shall be binding on and inure to the benefit of the successors and the assigns of the Parties. 11. Covernine Law. This Agreement shall- be construed in accordance with the laws of the State of Washington. Any action for enforcement of this Agreement shall be brought in a court of competent jurisdiction in Spokane County, Washington or as otherwise provided by statute. 1.2. Modifications. No modification or amendment of this Agreement shall be valid until the same is reduced to writing and executed with the same formalities as the present A.g eement. 13. Waiver. No officer, employee, agent or otherwise of the City has the power, right or authority to waive any of the conditions or provisions to this Agreement. No waiver or any breach of this Agreement shall be held to be a waiver of any other or subsequent breach. 14. Representation. This Agreement forms a fully integrated agreement between the Parties. No other understandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind any of the Parties hereto. This agreement shall meet the mitigation requirements for direct traffic -related impacts of the Development within the Project limits as described in the Project description in Section 1. of the Recitals and as identi_(ied and documented in the City File(s) P?Public Wohs'pita] ProjeeisU ina \Srnsfidd.Jthisatioa Atpanscarte;Kitigatinn A+geememstiMl7SCATION AGREEMEYT A & A Conu..doc Th A&A Construction &.DL � mt Inc., Mitigation Agreement Pines/Mansfield Road Construction Project Page 5 of 6 referenced in Section 8 of the Recitals. This agreement shall not supersede any other conditions of approval not directly related to traffic -related impacts of the Development within the Project limits. All Parties have read and understand all of the Agreement, and now state that no representation, promise or agreement not expressed in the Agreement has been made to induce any Party to execute the sarne. 15. Authority. Both Parties to this Agreement represent and certify that they have full authority and power to enter into and carry out this Agreement. The persons signing this Agreement represent that they have authority to act for and bind their respective principals. 11111111 i 5194674 Page: 6 of 9 03/24/2005 03:09P Spokane Co, WA 1':VitbI c A'otkeleapisal ProjrxtftPines-Muttfield' it4ttion A,p-eementstMttivion AgeementiMJT GAT1ON AGREEMENT A & A Coast..doc A&A Construction ti. D. ;Ircnt, Inc., Mitigation Agreement Pines/Mansfield Road Construction Project Page6of6 IN WITNESS WHEREOF, the Parties have executed this Agreement this ,,2,5-'' 4tay of , 2005. DEVELOPER: A & A Construction & Development, Inc. Name: STATE OF WASI-IINGITON County of Spokane On this day of. ) ss. Its: i' 2005 before me, the undersigned, a Notary Pub1if'm! and for A/�State of W lshington, duly commissioned and s»orn verso a peared (� �S bnkt.L9tell(. ' to me known to be the 1G1-f�� of 4-- 4/4a the corporation that executed the oregoing instrument, and acknowledged the instrument to be the free and voluntary act and deed of the corporation, for the uses and purposes therein mentioned, and on oath stated that he is authorized to execute the instrument. WITNESS my hand and official certificate aboxitOthilt Ntri//, `�, c,• ..ssto;r • f •; 9i<% .1 `''.t9 'yZ'. _*:• wizf :*� '',�p . �,;'UA�Ya..00 AO CITY OF SPOKANE VALLEY: David Mercier, City Manager Chris Bainbri.* ge, City Cler seal hereto affixed the day NOTAR Washingtosiding at My commission expires: Printed Narne and year in this and for the State of , eafO- ' : AS TO FT GRIM riskell, uty City Attorney —�Y I.......,_ r PANES: 5: Works :sl Pro*LikE`ina-Mansf eltMitigalion AR; ctmains5A 1tjcsni:n AjrrctovusWI'I•IGA'I'IGN AGREE V4;NT A & A Cons.,dec Exhibit "A" Mansfield a 45103.0205 45103.020645103.020E1 Indiana 45103.0205 ASSESSORS PL 6 B4-5 45103.0206 ASSESSORS PL 6 B6 45103.0208 ASSESSORS PL 6 W1/2 B7 IILILI11JTUJJ1 J'JIK1' 1 lIflhI 5194674 Pagel 8 of 9 63/24/2005 83:09P Spokane Co, WA " Extt ibit 'B' Pines/Mansfield Cost Estimate PE ROW Construction Totals City Portion - Mansfield Ave. (3-lane Section) Preliminary Engineering $75,622 Soils Investigation $15,000 Right-of-way $600, 000 Project Signing $2,000 Contingencies - 10% S75,622 Construction Engineering - 10% $75,622 Construction - 10% $756,220 Environmental/Misc. Eng $16,393 Subtotals WSDOT Portion $107,015 $600,000 $909,464 $1,616;479 Design Engineering $200,000 Right-of-way (Euclid) $25,000 ROW - Pines $100,000 Construction $1,570,464 • Contingencies $65,745 Sales Tax - 8.1% $123,158 Construction Engineering 16% $262,979 Subtotals $200,000 $125,000 $ 2,022,346.00 52,347,346 TOTAL $307,015 $725,000 $2,931,810 53,963,825 Added $50,000 per revised estimate from WSDOT for additional flagging required at RR crossing. TI13 $ 2,193,561 55% Developers $ 499,795 13% City $ 55,000 1 % WSDOT $ 55,000 1 % CMAO $ 1,160,500 29% Total $ 3,963,856 100% ij.jiiiIqJ IIJ 11 5194674 Page: 9 of 9 03124/2005 03:09P Spokane Co, WA