20-073.01 Avista: Barker/BNSF GSP Facilities Relocation DocuSign Envelope ID: 79AEE753-2D87-4948-B6FO-CA1DC4694F03 First Amendment to Utility Construction Agreement This First Amendment ("Amendment") to the Utility Construction Agreement, Agreement No. R-43107 ("Construction Agreement") is entered into between the City of Spokane Valley ("Local Agency") and Avista Corporation, a Washington corporation("Utility"), as of April 6,2021. In the event of any conflict between the Construction Agreement and this Amendment,this Amendment shall control. Exhibit A to the Construction Agreement is hereby deleted in full and is replaced with the attached Amended Exhibit A. Based upon this substitution, the Parties mutually recognize and agree that the Agreement Amount is revised to: $910,907.22. Except as modified by this Amendment, all of the terms and conditions of the Construction Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties have executed this Amendment to the Construction Agreement on the date set forth above. City of Spokane Valley: Avista Corporation: l(/F r—DocuSigned by: BY: Y V,�/l� BY: 4jL„<- (Signatur ) (Sipatuse2)iAA65D6E64F6... Mark O I Heather Rosentrater (Printed Name) (Printed Name) /V r Sr.VP Energy Delivery (Title) / (Title) 7124 ` Apr-16-2021 I 1:31 PM PDT (Date Signed) /// (Date Signed) First Amendment to Utility Construction Agreement- 1 DocuSign Envelope ID:79AEE753-2D87-4948-B6FO-CA1DC4694F03 AMENDED EXHIBIT A Transmission Project Cost Estimate Actual Variance Materials: (3) Self Supporting Steel Structures @ $50,000 $150,000 $212,018 $62,018 each (2) Direct Embed Steel Poles @ $8,000 each $16,000 $20,672 $4,672 (9) Post Insulators with Clamps @ $1000 each $9,000 $1,734 ($7,266) (21) Toughened Glass Insulators with Clamps @ $3,150 $2,838 $150 each ($312) 3000ft. "Drake"ACSS Conductor @ $3.00/ft. $9,000 $19,284 $10,284 Miscellaneous Materials (lump sum) $15,000 $18,664 $3,664 TOTAL MATERIALS: $202,150 $275,210 $73,060 Construction: (3) Drilled Pier Foundations @ $50,000 each $150,000 $168,513 $18,513 (2) Direct Embed Foundations @ $10,000 $20,000 $28,780 $8,780 Construction Materials (lump sum) $25,000 $3,033 ($21,967) Traffic Control (lump sum) $5,000 $1,583 ($3,417) TOTAL CONSTRUCTION: $200,000 $201,909 $1,909 Construction Structures: (15) Crew-Days @ $5,000 /day $75,000 $104,521 $29,521 Labor: TOTAL CONSTRUCTION LABOR: $75,000 $104,521 $29,521 Totals: TOTAL (Materials and Construction): $477,150 $581,640 $104,490 TOTAL (Taxes, A&G, and PM @ 20%): $95,800 $90,530 ($5,270) TOTAL COST (Transmission): $572,950 $672,170 $99,220 Estimate Actual Variance Electric Distribution Project: $102,438.82 $165,133.41 $62,700.59 Fiber Relocation Project: $60,000.00 $60,000.001 $0 Natural Gas Relocation Project: $13,603.81 $13,603.812 $0 TOTAL PROJECT COST: $748,992.63 $910,907.22 $161,914.59 1 Avista is not seeking recovery of overage related to Fiber Relocation. 2 Work on the Natural Gas Relocation Project has not yet commenced;Avista reserves the right to request overage from the City for Gas Relocation expenses. First Amendment to Utility Construction Agreement-2