Loading...
20-005.01 Avista: Barker/BNSF GSP Design Agreement DocuSign Envelope ID:79AEE753-2D87-4948-B6FO-CA1 DC4694F03 LD.0(25 D1 First Amendment to Utility Preliminary Engineering Agreement This First Amendment("Amendment")to the Utility Preliminary Engineering Agreement,Agreement No. UTB ("Engineering Agreement") is entered into between the City of Spokane Valley ("Local Agency") and Avista Corporation, a Washington corporation ("Utility"), as of April 6, 2021. In the event of any conflict between the Engineering Agreement and this Amendment,this Amendment shall control. Exhibit A to the Engineering Agreement is hereby deleted in full and is replaced with the attached Amended Exhibit A. Based upon this substitution, the Parties mutually recognize and agree that the Agreement Amount is revised to: $61,366.00 Except as modified by this Amendment,all of the terms and conditions of the Engineering Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties have executed this Amendment to the Engineering Agreement on the date set forth above. City of S okane Valley: Avista Corporation: DocuSigned by: BY: MI, (jiteBY: - (Signature) (Si Ee47AA65D6E64F6... Ma 1a r lK Ca..(k11 Heather Rosentrater (Printed Name) (Printed Name) C4y r Sr.VP Energy Delivery (Title) (Title) 4(2. 21 (l)2 I Apr-16-2021 1 1:31 PM PDT (Date Sign d) I �Y , (Date Signed) First Amendment to Utility Preliminary Engineering Agreement - 1 DocuSign E+ivetope ID:79AEE753-2D87-4948-B6FO-CA1DC4694F03 AMENDED EXHIBIT A Estimate Actual Variance Engineering: Design 25,000 35,963.52 10,963.52 Project Management 10,000 20,215.44 10,215.44 Support Services 5,000 4,095.38 (904.62) subtotal 40,000 60,274 20,274.34 Permitting: Environmental 2,500 (2,500.00) Road Crossing 2,500 (2,500.00) Other/Misc. 1,000 1,091.32 91.32 subtotal 6,000 1,091 (4,908.68) Totals Total Eng. & Permitting 46,000 61,366 15,365.66 Taxes and A&G 9,200 (9,200.00) Total 55,200 61,366 6,165.66 First Amendment to Utility Preliminary Engineering Agreement-2