Loading...
Resolution 21-002 TIP CITY OF SPOKANE VALLEY SPOKANE COUNTY,WASHINGTON RESOLUTION 21-002 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, ADOPTING THE 2022-2027 TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS RELATING THERETO. WHEREAS, to provide for the proper and necessary development of the street system within the City of Spokane Valley,the City shall,pursuant to RCW 35.77.010,develop and adopt annually a Six-Year Transportation Improvement Program (Six-Year TIP) with such program acting as a guide for the coordinated development of the City's transportation system; and WHEREAS, the Six-Year TIP of the City shall specifically set forth those projects and programs of both City and regional significance that benefit the transportation system and promote public safety and efficient vehicle movements; and WHEREAS, the Six-Year TIP shall be consistent with the City's Comprehensive Plan and be adopted following one or more public hearings before the City Council; and WHEREAS, a draft copy of the Six-Year TIP was submitted to the Washington State Department of Commerce and has been reviewed and approved prior to the scheduled adoption of the TIP in accordance with RCW 36.70A.106; and WHEREAS, following adoption of the Six-Year TIP, the City will forward a copy to the Washington State Secretary of Transportation; and WHEREAS, the City Council conducted a public hearing on June 8, 2021 for the purpose of inviting and receiving public comment on the proposed Six-Year TIP, NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington, as follows: Section 1. The City Council hereby adopts the attached Six-Year TIP for the City of Spokane Valley for the purpose of guiding the design, development and construction of Iocal and regional transportation improvements for the years 2022 through 2027. The City Clerk is directed to file the 2022- 2027 Six-Year TIP with the Washington State Secretary of Transportation before June 30, 2021. The Six- Year TIP shall be reviewed at least annually for the purpose of determining the work to be accomplished under the program and the City's transportation requirements. Projects and timeframes identified in the Six-Year TIP are to be considered estimates only that may change due to a variety of circumstances, and are not intended by the City to be relied upon by property owners or developers in making development decisions. In the event a railroad ceases to use rail right-of-way within the City, the City will utilize all reasonable options available under state or federal law to preserve the right-of-way for future rail purposes pursuant to RCW 35.77.010(3), Section 2. Effective Date. This Resolution shall be in full force and effect upon adoption. Resolution 21-002,Adopting Six-Year TIP Adopted this 811i day of June, 2021. ATTEST. City of Spokane Valley AAA. l �1' Lu9 1 i tine Bainbridge, City CIer Ben Wick,Mayor Approved as to F 4 Office of e City tt ey Resolution 21-002,Adopting Six-Year TIP 2022 - 2027 Six Year SCITYOF1 ' ane p Transportation Improvement Program (TIP) Y Valle . g .....„ ....., LIF , _ __ J VIP 4 _ • I^ -_ z - te . f yr. . . City of Spokane Valley Community & Public Works Department p of 2022-2027 Transportation Improvement Program (TIP) O1iaIle Walley Glossary & Abbreviations Project Phases: Funding Sources: • PE Preliminary Engineering • City City Funds • RW Right-of-Way • CDBG Community Development Block Grant • CN Construction • CMAQ Congestion Management/Air Quality • COM Washington Department of Commerce Zoning • DEV Private Developer Funds • FHWA Federal Highway Administration RI • FMSIB Freight Mobility Strategic Investment Board R2 • FTA Federal Transit Authority • HSIP Highway Safety Improvement Program R3 • NHFP National Highway Freight Program • Other Misc. Unidentified Funding Sources P©s • RCO Washington State Recreation Conservation Office MF • REET Real Estate Excise Tax • RR Railroad NC • SRTS Safe Routes to School MU • SW City Stormwater Funds • STA Spokane Transit Authority CM U • STBG Surface Transportation Block Grant RC • STBG-SA Surface Transportation Block Grant—Set Aside • TIB Transportation Improvement Board IMU • WAL Washington Legislature • WSDOT Washington Department of Transportation fm or 2022- 2027 SpokajnTe Six-Year Transportation Improvement Program 'Malley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 1 2020 Local Access Streets (Barker Rd. Homes) 35 City 35 35 Description: County sewer partnership. City to reimburse County for paving and stormwater costs. Status: Funding Status: Secured PE 0 2020-2021 CN,2022 Closeout(2%). RW 0 Length (miles):2 Secured CN 35 35 Total 35 35 2 2021 Local Access Streets (4th &Coleman 24 City 24 24 Neighborhood) Description: Pavement Preservation funded with Fund 106. Status: Funding Status: Secured PE 0 2021 CN,2022 Closeout(2%) RW 0 Length (miles):2 Secured CN 24 24 Total 24 24 3 Sullivan Rd. Bridge Deck Resurfacing 5 City Other Fed 5 5 Description: Resurface existing bridge deck for Sullivan Road northbound over UPRR tracks. Status: Funding Status: Secured PE 0 2021 CN,2022 Closeout(2%). Secured RW 0 Length (miles):0 Secured CN 5 5 Total 5 5 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 1 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 4 Citywide Reflective Post Panels (2018) 1 City HSIP 1 1 Description: Installation of reflective post panels to stop signs and speed limit signs on select streets. Status: Funding Status: Secured PE 0 2020-2021 CN,2022 Closeout(2%). RW 0 Length (miles):0 Secured CN 1 1 Total 1 1 5 Citywide Reflective Signal Backplates (2018) 3 City HSIP 3 3 Description: Installation of reflective backplate panels at select traffic signals. Status: Funding Status: Secured PE 0 2020-2021 CN,2022 Closeout(2%). RW 0 Length (miles):0 Secured CN 3 3 Total 3 3 6 Park Rd. Sidewalk 13 City 5 5 TIB 8 8 Description: New sidewalk on west side from Sharp to Mission with potential marked crossing at Sharp or Cataldo. Status: Funding Status: Secured PE 0 2020 PE,2021 CN,2022 Closeout(2%). RW 0 Length (miles):0.2 Secured CN 14 14 Total 13 13 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 2 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 7 Barker Rd. Improvements-Spokane River to Euclid 56 City STBG 35 35 Description: FMSIB 18 18 Reconstruct and widen to 3-lane urban section to east leg of Euclid. HSIP 3 3 DEV Status: Funding Status: Secured PE 0 2020-2021 CN,2022 closeout(2%). Secured RW 0 Length (miles):0.5 Secured CN 57 57 Total 56 56 8 Balfour Park Frontage Improvements 38 City 38 38 Description: Pavement preservation,widen paved shoulder,install curb and sidewalk on Herald, Main and Balfour. Status: Funding Status: Secured PE 0 2021 CN,2022 Closeout(2%). RW 0 Length (miles):0.4 Secured CN 38 38 Total 38 38 9 Mullan Rd. Preservation- Broadway to Mission 22 City 3 3 STBG 19 19 Description: Preservation project with conduit for future ITS infill,signals improvements at Mission. Status: Funding Status: Secured PE 0 2021 CN,2022 Closeout(2%). Secured RW 0 Length (miles):0.5 Secured CN 22 22 Total 22 22 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 3 (l15(af 2022- 2027 Spolane Six-Year Transportation Improvement Program .0000 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 10 Appleway Blvd. Stormwater Improvements 25 Other State 19 19 City 6 6 Description: Improve stormwater facilities between University and Farr. Funded by Dept.of Ecology. Status: Funding Status: Secured PE 0 2020 PE,2021 CN,2022 Closeout(2%). Secured RW 0 Length (miles):0.6 Secured CN 25 25 Total 25 25 11 Evergreen Rd. Preservation -Sprague to Mission 1,045 Other 836 836 City 209 209 Description: Pavement preservation project with ITS and signal upgrades at Broadway. Status: Funding Status: Secured PE 30 30 Sprague to Broadway 2021 CN, Broadway to Mission 2022 CN RW 0 Length (miles):0.9 Partial CN 1,015 1,015 Total 1,045 1,045 12 Sprague Ave. /Barker Rd. Intersection Improvement 1,889 City CMAQ 117 117 Description: DEV 7 7 Provide new roundabout and with sidewalks and bike accommodations. HSIP 1,765 1,765 Status: Funding Status: Secured PE 0 2021 PE+RW,2022 CN Secured RW 54 54 Length (miles): Intersection Secured CN 1,835 1,835 Total 1,889 1,889 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 4 (l15(af 2022- 2027 S'poliane Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 13 Citywide Reflective Post Panels (2020) 157 HSIP 154 3 157 City Description: Installation of reflective post panels to stop signs and speed limit signs on select streets. Status: Funding Status: Secured PE 7 7 2021 PE,2022 CN,2023 Closeout(2%) RW 0 Length (miles):0 Secured CN 147 3 150 Total 154 3 157 14 Barker Rd. at Union Pacific Crossing 1,298 City 751 15 766 FMSIB 261 5 266 Description: STBG 102 2 104 Reconstruct and widen to 3-lane urban section between Euclid intersection HSIP 159 3 162 legs and install shared-use path from river to Trent. Status: Funding Status: Secured PE 0 2021 PE+RW,2022 CN,2023 Closeout(2%). Secured RW 0 Length (miles):0 Secured CN 1,273 26 1,299 Total 1,273 25 1,298 15 Pines Rd. / Mission Ave. Intersection Improvement 1,830 City 142 106 248 CMAQ 908 674 1,582 Description: Signal and channelization upgrades to improve capacity and additional turn lane on southbound Pines. Status: Funding Status: Secured PE 200 200 2020-2022 PE+ROW,2022-2023 CN,2024 Closeout(2%). Secured RW 70 70 Length (miles): Intersection Secured CN 780 780 1,560 Total 1,050 780 1,830 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 5 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 16 Sullivan Rd. /Wellesley Ave. Intersection Improvement 1,999 City 132 3 135 CMAQ 847 17 864 Description: Spo.Co. 980 20 1,000 Traffic signal and intersection improvement project, partnership with Spokane County. Status: Funding Status: Secured PE 0 2019-2021 PE&ROW,2022 CN,2023 Closeout(2%). Secured RW 0 Length (miles): Intersection Secured CN 1,960 40 2,000 Total 1,959 40 1,999 17 Broadway Ave. - Havana to Fancher 2,960 City 60 580 640 Other 2,320 2,320 Description: Pavement preservation&reconstruction,including stormwater improvements. Status: Funding Status: Secured PE 60 60 2020-2022 PE.2023 CN. Planned RW 0 Length (miles):1 Planned CN 2,900 2,900 Total 60 2,900 2,960 18 Broadway Preservation -Fancher to Park 2,000 City 75 925 1,000 STP 75 925 1,000 Description: Pavement preservation project. Status: Funding Status: Planned PE 150 150 Planned project. RW 0 Length (miles):1 Planned CN 1,850 1,850 Total 150 1,850 2,000 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 6 (l15(af 2022- 2027 S'poliane Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 19 Sprague Preservation - Havana to Fancher 150 City 75 75 STP 75 75 Description: Pavement Preservation Project Status: Funding Status: PE 150 150 Planned project. RW 0 Length (miles):1 CN 1,850 1,850 Total 150 150 20 Pedestrian & Bicycle Safety Analysis 50 City 25 25 50 Description: Evaluate crash history of vehicle versus pedestrian/bicyclists on City streets,as identified in the 2020 Local Road Safety Plan. Status: Funding Status: Planned PE 25 25 50 PE only. May be staff-led with support from consultant team.Sprague,SR RW 0 27,and Sullivan have majority of sever pedestrian crashes. Length (miles):0 CN 0 Total 25 25 50 21 Sullivan Rd. Preservation -Sprague to 8th 2,990 City 90 580 670 Other 2,320 2,320 Description: Pavement preservation with signal,sidewalks and stormwater improvements as necessary. Status: Funding Status: Secured PE 90 90 Seeking funds,candidate for TIB or STBG preservation funding.Assumes Planned RW 400 400 20%City match for CN. Length (miles):0.3 Planned CN 2,900 2,900 Total 90 2,900 2,990 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 7 g—lerry o 2022- 2027 plU�ne Six-Year Transportation Improvement Program ValleyDollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 22 Sullivan Rd. Preservation-8th to 16th 1,380 City 80 260 340 Other 1,040 1,040 Description: Pavement preservation with signal,sidewalks and stormwater improvements as necessary. Status: Funding Status: Planned PE 80 80 Seeking funds,candidate for TIB or STBG preservation funding.Assumes RW 0 20%City match for CN. Length (miles):0.3 Planned CN 1,300 1,300 Total 80 1,300 1,380 23 Sprague Ave. Stormwater Improvements 1,902 Other State 1,398 28 1,426 City 466 10 476 Description: Drywell retrofits between University and Park. Funded by Dept.of Ecology. Status: Funding Status: Secured PE 2 2 2021 PE,2022 CN,2023 Closeout.25% Local match. RW 0 Length (miles):2 Secured CN 1,862 38 1,900 Total 1,864 38 1,902 24 Wilbur Rd. Sidewalk-Boone to Mission 581 City 134 3 137 STBG-SA 435 9 444 Description: Install sidewalk from Boone to Mission on one side of road. Status: Funding Status: Secured PE 12 12 2021 PE,2022 CN. Secured RW 4 4 Length (miles):0.3 Secured CN 553 11 564 Total 569 12 581 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 8 (l15(af 2022- 2027 r►'poliane Six-Year Transportation Improvement Program .0000 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 25 Barker Rd. /BNSF Grade Separation Project 13,670 City 1,997 363 2,360 NHFP 3,300 600 3,900 Description: TIGER 3,356 610 3,966 Construct Grade Separation at Barker/BNSF RR/Trent(SR290). FMSIB 2,750 500 3,250 WAL Other 164 30 194 Status: Funding Status: Secured PE 0 WSDOT administers CN 2021-2023. Secured RW 0 Length (miles): Intersection Secured CN 11,567 2,103 13,670 Total 11,567 2,103 13,670 26 Park Rd. / Mission Ave. Intersection Improvement 1,500 City 20 128 1,352 1,500 Description: Improve channelization and signal operations. Status: Funding Status: Planned PE 20 80 100 2021 PE+RW,2022 CN. Planned RW 48 12 60 Length (miles):0 Planned CN 1,340 1,340 Total 20 128 1,352 1,500 27 8th Ave. Preservation -Progress to Sullivan 700 City 25 25 585 635 Other 65 65 Description: Potential partnership with Vera Water&Power for sidewalk extension on south side along frontage of Vera's property. Status: Funding Status: Planned PE 25 25 50 2020 PE with City funds,potential Fund 311 project in future CN years. RW 0 Length (miles):0.2 Planned CN 650 650 Total 25 25 650 700 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 9 (l15(af 2022- 2027 S'poliane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 28 Mission Ave. Bridge Resurfacing 264 City 2 2 Other Fed 20 237 5 262 Description: Surface preservation of concrete bridge deck over Evergreen Road. Status: Funding Status: PE 22 3 25 2022 PE,2023 CN RW 0 Length (miles):0.0 CN 235 5 240 Total 22 237 5 264 29 Spokane Valley River Loop Trail 999 City 333 333 333 999 Other Description: Paved shared-use path on north bank of Spokane River between Plante's Ferry and Flora Parks,including two pedestrian bridges at each end. Status: Funding Status: Planned pE 333 333 333 1,000 PE planned for 2022 local budget,pursue RW/CN funding. RW 0 Length (miles):4 Planned CN 0 Total 333 333 333 999 30 Argonne Rd. Concrete Pavement- Indiana to 2,150 City 4 10 441 455 Montgomery TIB 9 27 798 834 Description: Other 861 861 Reconstruct with concrete and improve signal timing at Montgomery. Status: Funding Status: Secured PE 12 37 50 Phased project:TIB funds Montgomery intersection in 2021. Indiana to Secured RW 0 Montgomery pending funds, CN 2024. Length (miles):0.3 Partial CN 2,100 2,100 Total 13 37 2,100 2,150 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 10 (l15(af 2022- 2027 S'polkane Six-Year Transportation Improvement Program .0000 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 31 Pines Rd. (SR27)/ BNSF Grade Separation Project 25,152 City 830 561 2,180 1,744 5,315 STBG 1,894 1,894 Description: Other Fed 374 125 499 Construct Grade Separation at Pines/BNSF RR/Trent(SR290). Other 1,744 8,722 6,978 17,444 Status: Funding Status: Secured pE 748 249 998 2020 PE Start."Other"assumes 20%City match. Secured RW 2,350 2,350 Length (miles): Intersection Partial CN 2,181 10,903 8,722 21,806 Total 3,098 2,430 10,902 8,722 25,152 32 Sullivan Rd. /SR 290 Interchange Reconstruction 10,958 City 424 848 424 221 55 1,492 3,464 Other 106 212 106 883 221 5,966 7,494 Description: Reconstruct interchange to improve safety and capacity. Status: Funding Status: Partial pE 530 1,060 530 2,120 City secured$500,000 for 2021-2022 initiatial PE, pursuing addietional PE, Planned RW 1,104 276 1,380 RW, CN funding by 2026.CN Start 2027. Length (miles):0 Planned CN 7,458 7,458 Total 530 1,060 530 1,104 276 7,458 10,958 33 Local Access Street Improvements-$1.5M Annually 9,000 City 1,500 1,500 1,500 1,500 1,500 1,500 9,000 Description: Funded by Street Wear Fee. Project type varies(surface treatments, grind/inlays,reconstruction Status: Funding Status: Secured pE 100 100 100 100 100 100 600 Site selection is on-going.Actual locations to be determined. Secured RW 0 Length (miles): Secured CN 1,400 1,400 1,400 1,400 1,400 1,400 8,400 Total 1,500 1,500 1,500 1,500 1,500 1,500 9,000 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 11 g—lcITY a 2U22' 2027 plU�ne Six-Year Transportation Improvement Program 4.0.00 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 34 Street Preservation Projects-$3M Annually 18,000 City 3,600 3,600 3,600 3,600 3,600 18,000 Description: Preservation projects,typically arterials or collectors,or used as matching funds for grants. Status: Funding Status: Planned PE 100 100 100 100 100 500 Specified projects in TIP my duplicate this annual placeholder. Projects RW 0 may include storm and sidewalk upgrades as applicable. Length (miles): Varies Planned CN 3,500 3,500 3,500 3,500 3,500 17,500 Total 3,600 3,600 3,600 3,600 3,600 18,000 35 Citywide Safety Projects-Biennial 1,749 HSIP 86 433 86 433 86 449 1,573 City 10 48 10 48 10 50 176 Description: Projects are consistent with the City's Local Road Safety Plan.Awarded projects specified in TIP. Status: Funding Status: Planned PE 22 11 22 11 22 12 100 Costs assume project implementation in odd-number years and RW 0 design/close-out in even-numbered years. 10%local match. Length (miles):0 Planned CN 85 476 85 476 85 493 1,700 Total 96 481 96 481 96 499 1,749 36 Mission Ave. Preservation-Mullen to University 1,880 City 50 77 1,718 35 1,880 Description: Pavement preservation and possible widening project with stormwater improvements as necessary. Status: Funding Status: Planned PE 50 50 100 Assumes 100%City funded(Fund 311). Planned RW 135 15 150 Length (miles):0 Planned CN 1,715 35 1,750 Total 50 77 1,718 35 1,880 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 12 g—lcITY a 2U22' 2027 plU�ne Six-Year Transportation Improvement Program 4.0.00 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 37 South Bowdish Rd.- Phased Corridor Improvements 4,863 City 12 8 460 12 8 472 972 Other 49 32 1,840 49 32 1,889 3,891 Description: Reconstruct Sprague to Dishman Mica as 2-lane section w/curb,sidewalk, bike lanes and new stormwater facilities. Also included are intersection improvements at 32nd Ave and a new signal or roundabout at 16th Ave. Status: Funding Status: Planned pE 200 200 200 600 Phased improvements to align with available funding opportunities. Planned RW 100 100 200 Potential sources include TIB,SRTC, Local. Length (miles):3 Planned CN 2,300 2,300 4,600 Total 61 40 2,300 61 40 2,361 4,863 38 Sullivan Rd. Preservation- 16th to S. City Limit 2,200 City 80 1,700 1,780 Other 420 420 Description: Pavement preservation with signal,sidewalks and stormwater improvements as necessary. Status: Funding Status: Planned PE 80 20 100 Seeking funds,candidate for TIB or STBG preservation funding.Assumes Planned RW 0 20%City match for CN. Length (miles):0.8 Planned CN 2,100 2,100 Total 80 2,120 2,200 39 Dishman-Mica Rd. Preservation-Schafer to S. City 1,300 City 50 1,250 1,300 Limit Description: Pavement preservation project. Status: Funding Status: Planned PE 50 50 Assumes 100%City funded(Fund 311). Planned RW 0 Length (miles):1 Planned CN 1,250 1,250 Total 50 1,250 1,300 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 13 (l15(af 2022- 2027 S'poliane Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 40 Vera Crest+ Rocky Ridge Street Reconstruction 150 City 75 75 150 Projects Description: Stormwater and road reconstruction projects including multiple neighborhoods: Kahuna Hills(Carnahan/Kahuna/15th), Heather Park(16th at Rocky Ridge, Koren), Ridgemont Estates(Vera Crest,Conklin). Status: Funding Status: Planned PE 75 75 150 Multi-year,phased project.PE required to define scope and CN cost. RW 0 Possible CN funding by Ecology. Length (miles):0 CN 0 Total 75 75 150 41 8th Ave. /Carnahan Rd. Intersection Improvement 2,000 City 35 50 315 400 Other 140 200 1,260 1,600 Description: Add intersection control(turn lanes,potential signal). Status: Funding Status: Planned PE 175 175 Assumes 20%City match. OTHER may be TIB, DEV or City. Planned RW 250 250 Length (miles): Intersection Planned CN 1,575 1,575 Total 175 250 1,575 2,000 42 Barker Rd. Intersection Improvements at 4th &8th 3,500 City 45 45 72 2,988 3,150 DEV 5 5 8 332 350 Description: Provide new traffic signal or roundabout,per S. Barker Corridor Study. Status: Funding Status: Planned PE 50 50 100 Assume City funded, but may be eligible for grant funds. Planned RW 80 20 100 Length (miles):0 Intersection Planned CN 3,300 3,300 Total 50 50 80 3,320 3,500 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 14 (l15(af 2022- 2027 S'poliane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 43 Mirabeau Parkway/Mansfield Ave. Intersection 1,252 City 135 172 307 Improvement CMAQ 50 895 945 Description: Intersection capacity improvements. Status: Funding Status: Partial PE 135 135 Potential for Developer funds via Mirabeau Subarea Traffic Study. Planned RW 50 50 Length (miles): Intersection Planned CN 1,067 1,067 Total 135 50 1,067 1,252 44 Barker Rd. Improvement Project- 1-90 to Appleway 6,501 City 135 270 473 878 Other 865 1,730 3,028 5,623 Description: Reconstruct 5-lane urban section with alignment/channelization improvements at Appleway&Broadway. Status: Funding Status: Planned PE 1,000 1,000 Anticipated to follow 1-90 interchange improvements. Planned RW 2,000 2,000 Length (miles):0.3 Planned CN 3,500 3,500 Total 1,000 2,000 3,501 6,501 45 Flora Rd. Reconstruction- Euclid to Garland 2,200 City 20 20 400 440 Other 80 80 1,600 1,760 Description: Reconstruct to an urban arterial section in partnership with Spokane County Sewer Extension Status: Funding Status: Planned PE 100 100 Seeking funding,assume 20%City match. Planned RW 100 100 Length (miles):0.6 Planned CN 2,000 2,000 Total 100 100 2,000 2,200 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 15 (l15(af 2022- 2027 S'polkane Six-Year Transportation Improvement Program .0000 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 46 Park Rd. Preservation-Sprague to Trent 1,360 City 100 60 1,200 1,360 Description: Pavement preservation project. Status: Funding Status: Planned PE 70 70 Assumes 100%City funded(Fund 311). Planned RW 30 30 Length (miles):0.8 Planned CN 1,200 1,200 Total 100 60 1,200 1,360 47 Flora Rd. /SR 290 Intersection Improvement 200 City 20 20 20 20 80 DEV 5 5 5 5 20 Description: Other 25 25 25 25 100 Provide new signal or roundabout,per adopted Planned Action Ordinance. Assume ROW&CN after 2026. Status: Funding Status: Planned PE 50 50 100 Planned project.Assume PAO contributions from Developers in the Planned RW 50 50 100 amount of 10%,City 40%,grants 50%. Length (miles):0 Planned CN 0 Total 50 50 50 50 200 48 Cataldo Ave. Realignment at Barker Rd. 600 City 36 104 100 240 DEV 9 26 25 60 Description: Other 45 130 125 300 Realign Cataldo east of Barker to intersect Boone Ave.,per adopted Planned Action Ordinance. Status: Funding Status: Planned PE 90 10 100 Planned project.Assume PAO contributions from Developers in the Planned RW 250 250 500 amount of 10%,City 40%,grants 50%.CN after 2025. Length (miles):0.2 Planned CN 0 Total 90 260 250 600 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 16 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 49 32nd Ave. Preservation -Pines to SR 27 1,000 City 54 946 1,000 Description: Pavement preservation project. Status: Funding Status: Planned PE 54 6 60 2024 PE,2025 CN RW 0 Length (miles):0.8 Planned CN 940 940 Total 54 946 1,000 50 Wellesley Ave. Preservation -Sullivan to Flora 1,000 City 54 946 1,000 Description: Pavement preservation project. Status: Funding Status: Planned PE 54 6 60 2024 PE 2025 CN RW 0 Length (miles):1 Planned CN 940 940 Total 54 946 1,000 51 Barker Rd. Improvement-Appleway to S. City Limits 300 City 36 14 10 60 TIB 144 56 40 240 Description: Reconstruct to 3-lane urban section from Appleway to Sprague including signal/channelization improvements at Appleway,and a 2-lane urban section south of Sprague. Status: Funding Status: Planned PE 180 20 200 Identified in S. Barker Corridor Study. Planned RW 50 50 100 Length (miles):0.8 Planned CN 0 Total 180 70 50 300 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 17 (l15(af 2022- 2027 S'polkane Six-Year Transportation Improvement Program .0000 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 52 Pines Rd. (SR-27)/16th Ave. Intersection Improvement 300 City 50 75 25 150 DEV 50 75 25 150 Description: Other Add traffic control at five-leg intersecton. Status: Funding Status: Planned PE 100 100 200 $5M est.total. Pending funding to improve five-leg intersection. Planned RW 50 50 100 Length (miles): Intersection Planned CN 0 Total 100 150 50 300 53 Barker Rd. -Mission to Interstate 90 3,000 City 80 200 920 1,200 DEV 20 50 230 300 Description: Other 100 250 1,150 1,500 Reconstruct to 5-lane urban section. Improvements at Boone intersection are identified separately. Status: Funding Status: Planned PE 200 200 Planned project for 2025 PE.Assume PAO contributions from Developers Planned RW 500 500 in the amount of 10%,City 40%,grants 50%. Length (miles):0.3 Planned CN 2,300 2,300 Total 200 500 2,300 3,000 54 8th Ave. Preservation- Havana to Park 160 City 54 106 160 Description: Pavement preservation project with select locations of sidewalk and road widening. Status: Funding Status: Planned PE 54 6 60 2024 PE,2025 ROW,2026 CN Planned RW 100 100 Length (miles):1 Planned CN 0 Total 54 106 160 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 18 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 55 Appleway Trail -Farr to Dishman Mica 100 City 10 10 20 Other 40 40 80 Description: Extend Shared Use pathway to Dishman Mica(incl. Dishman Hills area) Status: Funding Status: Planned PE 50 50 100 Potential funding sources:TIB,SRTC, RCO, LDA,City Planned RW 0 Length (miles):1 Planned CN 0 Total 50 50 100 56 Argonne Rd. & 1-90 Interchange Bridge Widening 500 City 50 50 100 FMSIB 75 75 150 Description: STBG 100 100 200 Widen Argonne Road bridge to 3 lanes southbound and improve sidewalks. WSDOT 25 25 50 Status: Funding Status: Planned PE 250 250 500 $15 M total assumes bridge reconstruction,rechannelization,adjacent RW 0 signal rework.20%City match,and CN after 2025. Length (miles):0.1 Planned CN 0 Total 250 250 500 57 8th Ave. /Park Rd. Intersection Improvement 340 City 16 52 68 DEV Description: Other 64 208 272 Provide new traffic signal or roundabout. Status: Funding Status: Planned PE 80 20 100 Assume 2025 PE,2026 ROW,2027 CN. Planned RW 240 240 Length (miles):0 Planned CN 0 Total 80 260 340 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 19 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 58 Barker Rd. /Boone Ave. Intersection Improvement 50 City 20 20 DEV 5 5 Description: Other 25 25 Provide new signal or roundabout,per adopted Planned Action Ordinance. Assume ROW&CN after 2025. Status: Funding Status: Planned PE 50 50 $2.8 est.total.Assume PAO contributions from Developers in the amount Planned RW 0 of 10%, City 40%,grants 50%. Length (miles):0 Planned CN 0 Total 50 50 59 Broadway Ave. Improvements-Flora to Barker 80 City 16 16 Other 64 64 Description: Extend 3-lane urban section to Barker Rd and realign connection east of Barker. Status: Funding Status: Planned PE 80 80 Possible partnership with WSDOT. Planned RW 0 Length (miles):5E Planned CN 0 Total 80 80 60 4th Ave. /Pines Rd. (SR 27) Intersection Improvements 10o City 100 100 Description: Install new intersection control. Status: Funding Status: Planned PE 100 100 Est.$1M total cost.2025 PE,2026 ROW,2027 CN. Planned RW 0 Length (miles):0 Planned CN 0 Total 100 100 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 20 (l15(af 2022- 2027 Spokane Six-Year Transportation Improvement Program .0000 valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 61 Sullivan Rd. / Kiernan Ave. Intersection Improvement 80 City 16 16 Other 64 64 Description: Improve channelization and signal operations at intersection and reconstruct intersection with concrete. Status: Funding Status: Planned PE 80 80 $2M est.total. Planned PE in 2026.Assume 20%City match. Planned RW 0 Length (miles):0 Planned CN 0 Total 80 80 62 Sullivan Rd. /Marietta Ave. Intersection Improvement 80 City 16 16 Other 64 64 Description: Improve channelization and signal operations at intersection and reconstruct intersection with concrete. Status: Funding Status: Planned PE 80 80 $2M est.total. Planned PE in 2026.Assume 20%City match. Planned RW 0 Length (miles):0 Planned CN 0 Total 80 80 63 Boone Ave. Reconstruction-Flora to Barker 75 City 75 75 Other Description: Reconstruct corridor to city standards. Status: Funding Status: PE 75 75 Est.$4M total cost.2025 City-funded PE,2026 ROW,2027 CN. RW 0 Length (miles):1 CN 0 Total 75 75 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 21 (l15(af 2022- 2027 S'poliane Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total 64 Flora Rd. Reconstruction -Sprague to Montgomery 75 City 15 15 Other 60 60 Description: Reconstruct to city standards,including a shared-use pathway connecting Appleway&Centennial Trails. Status: Funding Status: PE 75 75 Assume 20%City match. Possible funding from SRTC, RCO,TIB,WA Leg. RW 0 Length (miles):2 CN 0 Total 75 75 65 Euclid Ave. Preservation -Barker to E. City Limit 50 City 50 50 Description: Pavement preservation project.City may consider increasing scope of project to improve road section to meet City standards. Status: Funding Status: Planned PE 50 50 2026 PE RW 0 Length (miles):0.5 Planned CN 0 Total 50 50 66 Sullivan Rd. Improvements-Trent to Wellesley 10o City 20 20 Other 80 80 Description: Widen to add center turn lane,improved corridor access management, improved lighting,and addition of shared-use path. Status: Funding Status: PE 100 100 Est.$3M total cost.Scope based on updated to Sullivan Corridor Study. RW 0 Assume 20%City match. Length (miles):0.3 CN 0 Total 100 100 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 22 e—lerrY a 2U22' 2027 plU�ne Six-Year Transportation Improvement Program 4.0.00 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2022 2023 2024 2025 2026 2027 Total Totals: 11,323 8,838 122,733 142,894 27,895 21,054 31,516 20,096 19,956 19,474 139,991 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 5/27/2021 Page 23 1 . 2020 Local Access Streets (Barker Spokane „ ,0 Valley Rd . Homes) • ri-a 77 r r- 5.. , ... -I 1!A . r'!",:r11:,,-,-,),-, ' • m' ..., r ,a'' " I ,, , t_ 1 G1C fry'. 1/4 Sf; F '. #,I. �'• ,.„ k '.n romp s. - {. Project Type: Street Preservation Project Description: County sewer partnership. City to reimburse County for paving and stormwater costs. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2019 Right of Way (RW): 0 - Construction (CN): 1,750 2020-2021 Total Cost: 1,800 2. 2021 Local Access Streets (4th & Spokane .000 Valley Coleman Area) tr W iii& 11` + i Oil i ,, .y-'^'.,1E=`. Project Type: Street Preservation Project Description: Local access streets pavement preservation project funded by Fund 106. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2020-2021 Right of Way (RW): 0 - Construction (CN): 1,200 2021-2022 Total Cost: 1,250 3. Sullivan Rd . Bridge Deck Spokane „ ,0 Valley Resurfacing , AN, li, . . ! e ! i+{* A i ate„.ate S- - }eI f„ i'l' . i -ice I c . w k $ { 1 iy . N Project Type: Bridge Project Description: Resurface existing bridge deck on northbound bridge over UPRR tracks. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 68 2019-2020 Right of Way (RW): 0 - Construction (CN): 270 2021 Total Cost: 338 4. Citywide Reflective Post Panels Spokane .000 Valley (2018) Project Type: Safety Project Description: Installation of reflective post panels to stop signs and speed limit signs on select streets. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 6 2019 Right of Way (RW): 0 - Construction (CN): 72 2020-2021 Total Cost: 78 5. Citywide Reflective Signal Spokane „ ,0 Valley Backplates (2018) Project Type: Safety Project Description: Installation of reflective backplate panels at select traffic signals. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 15 2019 Right of Way (RW): 0 - Construction (CN): 165 2020-2021 Total Cost: 180 6. Park Rd . Sidewalk Spokane „ ,0 Valley Project Type: Pedestrian/Bicycle Improvement Project Description: New sidewalk on west side from Sharp to Mission with potential marked crossing at Sharp or Cataldo. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2020 Right of Way (RW): 0 - Construction (CN): 683 2021 Total Cost: 733 7. Barker Rd . Improvements - Spokane .000 Valley Spokane River to Euclid h ru. r A a gyp' M �, ' '_r- r I I yr$ < ybh�ro - r. y 0 vT s_Irr _ 5.7 r ,_l.r 2N y d i' r e-• a i." rf "r v -- r£'] i"-,1' r- NIIM ,, ,,y y} '%^+ Ir P r. n fa a# ,"„ ,Abatis'^ .6.4 at-ala. .. Project Type: Arterial Improvement Project Description: Reconstruct and widen to 3-lane urban section to east leg of Euclid. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 165 2019 Right of Way (RW): 195 2020 Construction (CN): 2,831 2020-2021 Total Cost: 3,191 8. Balfour Park Frontage Spokane „ ,0 Valley Improvements Project Type: Street Preservation Project Description: Pavement preservation, widen paved shoulder, install curb and sidewalk on Herald, Main and Balfour. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2020 Right of Way (RW): 0 - Construction (CN): 1,900 2021 Total Cost: 2,000 9. Mullan Rd . Preservation - Spokane .000 Valley Broadway to Mission C W `( r Project Type: Street Preservation Project Description: Preservation project with conduit for future ITS infill, signals improvements at Mission. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 149 2020 Right of Way (RW): 160 2020 Construction (CN): 1,091 2021 Total Cost: 1,400 10. Appleway Blvd . Stormwater Spokane „,,,,o Valley Improvements .., r r ?=r r % ti-0 i 1 .0 '. i i'�'" `4,1 , r , r .0 r,.r'i i 1 ' _� �,L.,. r �� E ,o, , r.. A ,I� l Ry �L r v 3 f `18yr`,` r h �d_®. 4s _ t1 I` aa.. 3 i v^ a i, I� �. r � IA' Pi ,* +yr 5 I 1 ' ,ter.. r'"" 4 r�`' `ram r' a f �TM^,, . a '`. ur rr r- r-r-, r m r Project Type: Stormwater Project Description: Improve stormwater facilities between University and Farr. Funded by Dept. of Ecology. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2020-2021 Right of Way (RW): 100 2020-2021 Construction (CN): 1,250 2021 Total Cost: 1,450 11 . Evergreen Rd Preservation - Spokane .000 Valley Sprague to Mission s , , f !° J 4 I i r a E _r . Project Type: Street Preservation Project Description: Signal and channelization upgrades to improve capacity and additional turn lane on southbound Pines. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2020-2021 Right of Way (RW): 0 - Construction (CN): 2,900 2021-2022 Total Cost: 3,000 12. Sprague Ave. / Barker Rd . Spokane „ ,0 Valley Intersection Improvement t IMF Project Type: Intersection Improvement Project Description: Provide new roundabout and with sidewalks and bike accomodations. Funding Status: Partial Project Phase(s): Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 165 2019-2021 Right of Way (RW): 270 2021-2022 Construction (CN): 1,835 2022 Total Cost: 2,270 13. Citywide Reflective Post Panels Spokane „ ,0 Valley (2020) 1111, A I. I __ : ,,, ,i, I % • : ____ _ .f i =Ili . .,‘'i, : 1 0011 i i W g - ,.. A * _ , ,1 i• mi•*ii I( M --- . 0 a T.- 1 1 I .„=....., L. , .i- 1 h, i lit .ter It -''' .A: 4' '' . itl• r ,,111. a _ i u j,._., _ . Project Type: Safety Project Description: Installation of reflective post panels to stop signs and speed limit signs on select streets. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 14 2021 Right of Way (RW): 0 - Construction (CN): 150 2022-2023 Total Cost: 164 14. Barker Rd . at Union Pacific Spokane „ ,0 Valley Crossing Project Type: Arterial Improvement Project Description: Recnstruct and widen to 3-lane urban section at UPRR and E. Euclid Ave. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 85 2020-2021 Right of Way (RW): 50 2021 Construction (CN): 1,299 2022 Total Cost: 1,434 15. Pines Rd . / Mission Ave. Spokane „ ,0 Valley Intersection Improvement gt ; ill -"Mae l' -'- 0,,,•1; 4 I 1! $F. p 4 I i1 k taKc$ sr r €, 1 I< F e . �, s . ; R ' i ' F r rf F ' : tH...F. .„; .L.„- :i ;„ . _ _ ( . , , 4 ...:, . rr N. TOW pr, t P - SFr, r. I '. -�C V , s...,`,Ir litk, '- r,.., ' ' ,Abilli, , ,, ' ''''' - op, IL,.. ' Project Type: Intersection Improvement Project Description: Signal and channelization upgrades to improve capacity and additional turn lane on southbound Pines. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 400 2020-2022 Right of Way (RW): 140 2021-2022 Construction (CN): 1,560 2022-2023 Total Cost: 2,100 16. Sullivan Rd . / Wellesley Ave. Spokane „ ,0 Valley Intersection Improv. \ \ ! - - . . : ?IN% ll ,ALL ' I11A , Project Type: Intersection Improvement Project Description: Traffic signal and intersection improvement project, partnership with Spokane County. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 225 2019-2021 Right of Way (RW): 185 2020-2021 Construction (CN): 2,000 2022 Total Cost: 2,410 17. Broadway Ave. Preservation - Spokane .000 Valley Havana to Fancher fi , _ N Project Type: Street Preservation Project Description: Pavement preservation, including stormwater improvements as necessary. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2019-2022 Right of Way (RW): 0 - Construction (CN): 2,900 2023 Total Cost: 3,000 18. Broadway Ave. Preservation - Spokane .000 Valley Fancher to Park i !,., b , , , _ _ 1 ,. .___ ,. i .. ■ I_� ' a ;. ` rllil, N ,Illlud1N i ;-`"" , 3 . I 1 I� Project Type: Street Preservation Project Description: Pavement Preservation Project Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2022 Right of Way (RW): 0 - Construction (CN): 1,850 2023 Total Cost: 2,000 19. Sprague Ave. Preservation - Spokane .000 Valley Havana to Fancher ,; — r II 1 i !� a q 1I 4 1' _ ' 1' il il - '' - -R , .A yj is '' Tim• ,-� �- lal 1� `I r' a� E �i liElIi' 1�;. _ a ',' i4 IL e � J 3 •• ' A 1111 II d+ I }s'it. r tArrF klith Project Type: Street Preservation Project Description: Pavement preservation project. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2022 Right of Way (RW): 0 - Construction (CN): 1,850 2023 Total Cost: 2,000 20. Pedestrian & Bicycle Safety Spokane .000 Valley Analysis Project Type: Safety Project Description: Evaluate vehicle vs. pedestrian/bicycist crashes, as identified in the Local Road Safety Plan. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2022-2023 Right of Way (RW): 0 - Construction (CN): 0 - Total Cost: 50 21 . Sullivan Rd . Preservation - Spokane .000 Valley Sprague to 8th s t I fi L e _ , r ,_. IF [1 [1 , , , �- w .n . ._ I pF Y� �t "i'�y��It .It t ��1�', S'u�.pl—�,.s� , I 1^`ti �T .i A i �'1 "r�%j� I _�•��F. _ Pam,, 4 P .` �,, LI _ ,.; a� boll :ri r P !_K 45 » 'r 'i r- . _ L '10',. :�,.� ..,,a ram. 0.1..P i A -- k t 'x a'.;�-- ^:- r I I,.a..,_..{.. is R `.!" ° 4,..i 1m' 1 Trr: r_`d;-d�' d`>,. A� ?�"" i T:-y,- f 1 .i .� 4s .., N 't , 1 i 1I -.,..1�' 1 i r ,* /t �' N x 1 „, S. . x LI '1 •I' '✓F , v `_ 1 _ —� ,t .gyp,-1e,. Project Type: Street Preservation Project Description: Pavement preservation with signal, sidewalks and stormwater improvements as necessary. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2021-2022 Right of Way (RW): 400 2022 Construction (CN): 2,900 2023 Total Cost: 3,400 22. Sullivan Rd . Preservation - 8th to Spokane .000 Valley 16th - -- ....... .., . .. - - i ., ,. ,ii(a..,i-1- :•,14_,-,. , r - ,--,:r! .1 .r. v - T`Pwr-r--4---r-4-.., . -r ', , V- "..- ... t.0.,,- c ',1:-..,. ,-rime* 'o -4,„,—.' , • ta* t... $.,$-*, ..`-- ---1.--r- '1 : 10\..„;---it-Pear'''k'.7.-, '-f17 '• ..-j--- • - -.7----'-'' '''''-' ' I:--.' - — t , ,.. ':6j,_ •,., - ,.. -.,-, 4c*-11; - 0-'-- . fP"--1. '/I, r• . ...' .'''' it.. - ' r - •r'',, t it.\,,,--• -.44, tic IA 4,-,. 'P, ,",-.....!.ti' ,2.•' '''' . r-i:, " .' k ,,14;,1, —- .1trk? F. , ,,- , 1)1' ta..'- . ,,,- v,....--_ i--. ,r-:, -, ftx ',.1 f` r-----2.-- -:. -z ,. : --,-' -i. _ 4‘11k3 --- ,1 '. ... -1„ .7-__.-.....;-_ -- ,"---, _,Lv 4 , .-77 4:.# r--+t--,'-',..,--- .- "°-.1 4,..' '4,t?-± tr.7" ',4 --lik"' • ,'"-- ?"- ''' ,.'" ''''' ,41 ••'''4, --2. Psit---,';'*'; ,-7,— --"-Th•`''•*.—.., 1.- 1'.--1',0,-, *"'-`-r--` '''----- ' ''' i- ' ,,„ c--- ' -r,-, x if,r , _.„.. .., A' i,-** _14.-44-E-77---. •-.- ,•it It,...1(-,17. 0.--- -- f- "war_.i. tv,4 ' 2,.. 1 ki 4,(4-44,41, ,4- • , ,,, e ,..,'" . 1-• - tSc' *,ii!.-'-f e , -..444 r , -- r• '4r-.4"•• ,.., ) , ,04 in.z..5 %,4•4•4 414,,,,, •ti. r 114 r . - 1 • 4,4 ,...4.0_,, 144. .4 , .4._v„,„4_ ' t ai, - "A''''' 4)'- 16 -017 .., i "I r'• j--;.1'. t .1 lai.. ..r.- ..„,3 (-• , ii_r_ to*o * ,%,,er-14-.4---rc,i-''.,-,,,-,1.-a 0. ,-r*% , i-.' lb.r' ''`I--- ‘,A,IP ,.4',4 V 5'..4F,14 4- ,,- 4,4(74,,.410, ',__,1 4:•-,‘,„_______ „ k. t. . 14 SV I A"' Ylv ".• 14 10, 144, A V* At / 10', •e- r'. r-e-r- .-:,`--- , 1 i-T.t, -' ,...' -e.,.., .r ' 4! _1 i' --.' ' ". - . • it_ .0:- ii„/H14k' ' * re It -.•"`"" ''vP—,- li,,, „.... .,4.1i.,, 1------- 0 1. , Frt ;r„r- - -- To* 1,•,...krt r-4.4,0--r-.7.P., f - A ,A... ... , • '' 4 1 r • 4 s 1 h 14 4 ' r or % , —1 r- r„ ti -, , LI. * ..- 0-`=-• ,LL,-,`-.'r— r L -4,?A‘ i 1' _t,• ,-,.1••__ff..,.... te---L r • ' 1 - t .1..0 ..--- _...t .., . • -. 71 - . _ _F--,... • _ ... . , ----'-1 Pc--4, "• ' ' .4 _r".' , 1- 1 ' , , , lii , I -1,-,F-r-r-irr...n*--4.--,r.4r44-4 r Project Type: Street Preservation Project Description: Pavement preservation with signal, sidewalks and stormwater improvements as necessary. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2021-2022 Right of Way (RW): 0 - Construction (CN): 1,300 2024 Total Cost: 1,400 23. Sprague Ave. Stormwater Spokane „ ,0 Valley Improvements Project Type: Stormwater Project Description: Drywell retrofits between University and Park. Funded by Dept. of Ecology. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2021 Right of Way (RW): 0 - Construction (CN): 1,900 2022 Total Cost: 2,000 24. Wilbur Rd . Sidewalk - Boone to Spokane .0,0 Valley Mission 3'r _. 5e,{y ,. �},+. y+ d .„4 .FBI - a paNt4 -,it—',, - p . ..„1 - Fr'. ' y li- -,,,, _ 0417.4 kw, t LI 4,,,, _,- ,_ :,,,,,,,o,,,. ,, ::.7 t �� , _ `jjrr am`; I r, if ,, , 4 i , h. 4Y G. it + "' ate; a yItjtt 1L t' h ., h x r. ��re• � , :tcççr' I �.r Ilk ,I, -tt "4A R ' ._,. :.� -. I, 1.-....--!, ....- l * " k ' I ,,g f ', ....A, .�.__. ... 1 a ' ,„ 1 rt rb:rJia. e • or V I I ram. �, ,. Wlh 4 (, 3q� 4 � t i,? k °ice t IT; , ; ' r• •^ 11 ,�I _�,� t I ri T $ d r{ fir: \ , k 4; 4 iw,. 44-794&L 4r'''- r--1 1,---, r rr,r-- . , r „,,,,, ,,,.....,- ,, ,,,. ,,,- _,- „,''. . ' ,--',-.--: A---1. rN-Ilittr„:4;060%. ' vl 4:A4.1.. -,...;L.: .-„,,tv c '. . . . Project Type: Pedestrian/Bicycle Improvement Project Description: Install sidewalk from Boone to Mission on one side of road. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2021-2022 Right of Way (RW): 20 2021-2022 Construction (CN): 564 2022 Total Cost: 644 25. Barker Rd . / BNSF Grade Spokane „ ,0 Valley Separation Project \\ f Project Type: Bridge Project Description: Construct Grade Separation at Barker/BNSF RR/Trent (SR290). Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 2,595 2019 Right of Way (RW): 2,545 2020 Construction (CN): 21,030 2020-2023 Total Cost: 26,170 26. Park Rd . / Mission Ave. Spokane .000 Valley Intersection Improvement Project Type: Intersection Improvement Project Description: Improve channelization and signal operations. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2022-2023 Right of Way (RW): 60 2023-2024 Construction (CN): 1,340 2024 Total Cost: 1,500 27. 8th Ave. Preservation - Progress Spokane „ .0Valley to Sullivan r ill, id , -. Jim y p - 7 s '' ' '' , 1 , ::lii , pa t %kr s, x -.i vi ill** � .it I kr Jeri. °► , ` . 4ft . 'ii.L , 4 i , , ' - - 1, - , , ii,,ril. t ; ate. G ”, . I x Y h; l ,� Project Type: Street Preservation Project Description: Street preservation with potential sidewalk extension and partnership with Vera Water & Power. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2022-2023 Right of Way (RW): 0 - Construction (CN): 650 2024 Total Cost: 700 28. Mission Ave. Bridge Resurfacing Spokane .000 Valley / 'law* -- ----7.7 Atimilie Project Type: Bridge Project Description: Surface preservation of concrete bridge deck over Evergreen Rd. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 25 2022 Right of Way (RW): 0 - Construction (CN): 240 2023 Total Cost: 265 29. Spokane Valley - River Loop Trail Spokane .000 Valley ♦ r i••■•••%\ Project Type: Pedestrian/Bicycle Improvement Project Description: 5-mile shared-use path on north bank of Spokane River, including two pedestrian bridges. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 1,000 2022-2024 Right of Way (RW): 0 - Construction (CN): 15,000 - Total Cost: 16,000 30. Argonne Rd . Concrete Pave. - Spokane „ ,0 Valley Indiana to Montgomery ilk mar - 4.AR -$ alp I If Project Type: Arterial Improvement Project Description: Reconstruct with concrete and improve signal timing at Montgomery. Funding Status: Secured Project Phase(s): Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 125 2020-2023 Right of Way (RW): 40 2020-2021 Construction (CN): 5,000 2021, 2024 Total Cost: 5,165 31 . Pines Rd . (SR27) / BNSF Grade Spokane .000 Valley Separation Project Project Type: Bridge Project Description: Construct Grade Separation at Pines/BNSF RR/Trent (SR290). Funding Status: Partial Project Phase(s): Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 2,494 2020-2023 Right of Way (RW): 4,700 2021-2022 Construction (CN): 21,806 2023-2025 Total Cost: 29,000 32. Sullivan Rd . / SR 290 Interchange Spokane .000 Reconstruction Valley •- .r.3..,--. -3. ' I. Pa , "Xj ' o., -W1'. It:" IP (: \' i. '1 c,,,,,,, t t-4 'c'.7..% , ' 7" ' ? 7.‘P. 7 ,- -- .---,t." -.-,.:--,: e ".!..- ".: ' i., a , ' 0'2 ' ; ,t. 4 !!:: '''' .t, • ' ` -r';'4', '''P ,i---24--1 . z-4,--,._..... . fto. VI - 110• "' ,'; t ' - smuminamom romilawmf'1"-* jim•I•moom''''' -.olosmiamisa..womm i Project Type: Bridge Project Description: Reconstruct interchange to improve safety and capacity. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 2,650 2021-2024 Right of Way (RW): 1,380 2025-2026 Construction (CN): 22,600 2027-2028 Total Cost: 26,630 33. Local Access Street Spokane .000 Valley Improvements - $1 .5M Annually Project Type: Street Preservation Project Description: Funded by Street Wear Fee. Project type varies (surface treatments, grind/inlays, reconstruction). Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 600 Annually Right of Way (RW): 0 Annually Construction (CN): 8,400 Annually Total Cost: 9,000 34. Street Preservation Projects - Spokane .000 Valley $3M Annually Project Type: Street Preservation Project Description: Preservation projects, typically arterials or collectors, or used as matching funds for grants. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 500 Annually Right of Way (RW): 0 Annually Construction (CN): 17,500 Annually Total Cost: 18,000 35. Citywide Safety Projects - Spokane .000 Valley Biennial Project Type: Safety Project Description: Projects are consistent with the City's Local Road Safety Plan. Awarded projects specified in TIP. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 Annually Right of Way (RW): 0 Annually Construction (CN): 1,700 Annually Total Cost: 1,800 36. Mission Ave. Preservation - Spokane .000 Valley Mullan to University w --.' �r`mr" -r 1r-"..�` :,lam: i ,,(1 ., I }ta . r' _%, rf 5 Ire! riv ,,P, 1. 11 - :, F, r LimeN Project Type: Street Preservation Project Description: Pavement preservation and possible widening project with stormwater improvements as necessary. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2022-2023 Right of Way (RW): 150 2023-2024 Construction (CN): 1,750 2024 Total Cost: 2,000 37. South Bowdish Rd . - Phased Spokane „ ,0 Valley Corridor Improvements c !—• 1—♦ • • 11f `1 1--♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ 1 ---• ♦ ! 1- ♦ ♦ !rr ra rrr... ♦ `• 1 1-' Project Type: Arterial Improvement Project Description: Reconstruct Sprague to Dishman Mica as a modified urban street with improvements at 16th/32nd. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 1,000 2022- Right of Way (RW): 500 2023- Construction (CN): 11,500 2024- Total Cost: 13,000 38. Sullivan Rd Preservation - 16th Spokane .000 Valley Ave. to City Limit .45e,_.:fr1711 *k. * t. rKi � sa B..* ;gyp 97/ ♦ E .ae_ R.B.4 4--_ of � a i is Eq,4' , CBt r Project Type: Street Preservation Project Description: Pavement preservation with signal, sidewalks and stormwater improvements as necessary. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2023-2024 Right of Way (RW): 0 - Construction (CN): 2,100 2024 Total Cost: 2,200 39. Dishman-Mica Rd . Pres. - Schafer Spokane ,0,s Valley to S. City Limit I , � i N Project Type: Street Preservation Project Description: Pavement preservation project. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2023 Right of Way (RW): 0 - Construction (CN): 1,250 2024 Total Cost: 1,300 40. Vera Crest + Rocky Ridge Street Spokane „ ,0 Valley Reconstruction -♦ 9 1 . ! 11 1 1 _♦ ♦ ► ® ; ;- ,♦ 1 ♦ 1 1 110111 14. Imo 4r Project Type: Street Reconstruction Project Project Description: Stormwater/road reconstruction in mulltiple areas: Kahuna Hills, Heather Park, Ridgemont Estates. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2023-2024 Right of Way (RW): 0 - Construction (CN): 0 - Total Cost: 150 41 . 8th Ave. / Carnahan Rd . Spokane .000 Valley Intersection Improvement f •ram= �_ 3 -' � .. �� _ 6` r .��' _- . 14. git ` -1 Project Type: Intersection Improvement Project Description: Add intersection control (turn lanes, potential signal). Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 175 2023 Right of Way (RW): 250 2024 Construction (CN): 1,575 2025 Total Cost: 2,000 42. Barker Rd . Intersection Sioliane .000 Valley Improvements at 4th & 8th 1 i irk 5..1 :. rh :,-* -, 0 r!, r:4417,.., 1 ,. , _, I , ...,. 74.'"nr7f '17-1 vi 44.,I.:' ir-almer-1,2 iirvar;* ' *-i,:kii , .1 SI4 , • ____ ,, r--:r""-----),-,,, - -1*, -. r`rkt ''''" ,?0, .1 ...._ , • ,r....dfpr. 76__ __ „ , 1-7:'1rl-r- ' --L-." -.7: - 1, fa: Ik"r . . A - iii.. '..•,4. k,.. , .„,,, _ L' • c- - 4 14.'..,,-..-: *...44',., ' -1::._--,--.,,,,... . -.— .'. 1—'7- ', 1 "jr ' 7 r-'''.7i..2 , t ,1*-•, g.,..4' r!4'....i vAisi ' ' rift IT r— . ..? , ;---,7 ' or,K ,:sA.--',_•1 r-- ,ir '- P. , '' -r 7 r-- t---i . 7, ro.,,No444.7,‘ , , t . ,..lti: 0 ,,4 7 1 ,,, , 1`,.:. _ .,... - Pxn'• " ' pill ' ...-:"1"''. " 47-77 7 ,...-k-17. - , ,,,,.. -- .,.„,, , 10 ei- .1 r - 1 1 '-- tit -•''t'L-- ''''rt--ri,Cr- t'''' .'7'1.71—,..,----7-- . --' ''''. -7 ' " 7J}k--5.ii.-- .'— 7.' /-r C jEwr 11.'.. 5,, ' - -tLtfiz, , ,,,- 14_, r_-, 7 .• .-11, , dr q , ' — .,,,I •.-.. ' ...:, .;",„A 1 . ,,,ill*I ' ' !I..., i . * i ,.'' .1-',14-4__i.,...,: ..e. _ ---..-, . ;.' . ::':f , ,,,.. ,, .._ _ , . al r. Project Type: Intersection Improvement Project Description: Provide new traffic signal or roundabout, per S. Barker Corridor Study. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2023-2024 Right of Way (RW): 100 2025-2026 Construction (CN): 3,300 2026 Total Cost: 3,500 43. Mirabeau / Mansfield Intersection Spokane .000 Valley Improvements Project Type: Intersection Improvement Project Description: Intersection capacity improvements. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 135 2024 Right of Way (RW): 50 2025 Construction (CN): 1,067 2026 Total Cost: 1,252 44. Barker Rd . Improvements - Spokane .000 Valley Appleway to 1-90 Oa i ^.tip n,' E 11,... «Y.' r• r F !c'�► :.-✓ • I f illoselo .- 5caxs<F.1 a-q-fi rp a- .A4•r yin.!' y ' _ Tr +7F�+rP * tix„..c+eat}� � -m l� e per".. ,ra -, �J j� N. i 7 —''''' '..- ::: I'''" ; iiii f1• __11 �8 �� til ,,..011: 4 ! i ., 'fir If R� p r{ w a' „ �� �' p Gy Mk'F{ "--•^ �'.. 1 e �,F d Sys; 36.4- ' ' ,• =% ,r. ,-- -!,,,,t',, .,3, i ,.. , 1 „„ ,,,,F,v,..1,,ett , ,',. ,„, '11:7-4:4?' '14-7,';'`il IF,17" 117 r .fir « `" ` it\oo '' d , r 1 j r JP ti,r w $ r' ... _ ' , { . es V ad F I# rr aa . 7 r - -" y.. da-- P`` §: " E� t �,. g I� "� r '�c fin.{ RP i �� r $ a l 1 . = r. • - N 4 tip.. Project Type: Arterial Improvement Project Description: Reconstruct 5-lane urban section with alignment/channelization improvements at Appleway & Broadway. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 1,000 2024 Right of Way (RW): 2,000 2025 Construction (CN): 3,500 2026 Total Cost: 6,500 45. Flora Rd . Reconstruction - Euclid Spokane .000 Valley to Garland . - -- ^.=..:mow... --_ rrJ' J``. - ., , - - - -.-3__ -__ .:/' oft "- -an �•. _ tea, 6 � W .:._h.-.....?'ram ,.. ,, � - yam- 1 , - i- '... _ - i 1 4I 1 . .- � f a m 2 s `'k� t ii , \ o ' Project Type: Arterial Improvement Project Description: Reconstruct to an urban arterial section in partnership with Spokane County Sewer Extension Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2024 Right of Way (RW): 100 2025 Construction (CN): 2,000 2026 Total Cost: 2,200 46. Park Rd . Preservation - Sprague Spokane „,0o Valley to Trent 1 Alio, _,, , _ ;._0,-.T., -0,_.:0000.00ium--41736".. it_.... iik,, tr_w_ _ - 10.,.__ _ ._ _, el ._ 1mi iI.- . n ' . * •_ II. 1 f,' --,-1.- - a - . _ ..... "... , .-- ..- •:,,,- ! . , , - f- - '..._.., ,__ ., „... .-- . , ,_ . -„, #4. , , . -.. , r • ...... T. .31 V y u,hrr t Hill* lwitillilli a urre La . -.,. MI ltingilt Project Type: Street Preservation Project Description: Pavement preservation project with potential sidewalks at select locations. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 70 2024 Right of Way (RW): 30 2025 Construction (CN): 1,200 2026 Total Cost: 1,300 47. Flora Rd . / SR 290 Intersection Spokane .000 Valley Improvement =..99 * Ss*** .- Project Type: Intersection Improvement Project Description: Provide new signal or roundabout, per adopted Planned Action Ordinance. Assume ROW& CN after 2026. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2024-2025 Right of Way (RW): 100 2026-2027 Construction (CN): 3,800 2028 Total Cost: 4,000 48. Cataldo Ave. Realignment at Spokane .000 Valley Barker Rd . 0 0(i „...*,.„, \ \ N--- , .117-± t t_ Ilit Project Type: Intersection Improvement Project Description: Realign Cataldo Ave east of Barker to Intersect Boone Ave., per adopted Planned Action Ordinance. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2025-2026 Right of Way (RW): 500 2026-2027 Construction (CN): 1,400 2028 Total Cost: 2,000 49. 32nd Ave. Preservation - Pines to Spokane .000 Valley SR 27 °n F', �. a,i $„4 I*,'i�—.�.�..� '* tl 'mo t r �`", ~,--- � 's`' ^•op.� ~ J's+ V.V.. fig... -r-, .,,• i It- „ m ,.r'" ..�.4 t `+: "'*Sy 9 �. �..i'4440,, •4 _, i ice'' r .t... ax . A".. °L.. p,. . � .. y r - �. A Mlbi 7k L fir:. + I,r' - - - ,S„..,* d .-,. a r c __., r -f%'�,,•tea°":;`R ,�,. r 4 r� ` 1 P.'k 4. 6' .w +,e i :P'..r."li, F'r$ I�"r --Alt ph.. jM, —— b �* Project Type: Street Preservation Project Description: Pavement preservation project. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2025 Right of Way (RW): 0 - Construction (CN): 940 2026 Total Cost: 1,000 50. Wellesley Ave. Preservation - Spokane .000 Valley Sullivan to Flora * ;'1"41, 01144 • f I` way _! Y.`"� it " `. it --�,d r t 't • - :. L +4F'.- • - " Project Type: Street Preservation Project Description: Pavement preservation project. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2025 Right of Way (RW): 0 - Construction (CN): 940 2026 Total Cost: 1,000 51 . Barker Rd . Improvement - Spokane .000 Valley Appleway to S . City Limit 1 , 1 � 1 � 1 �♦ 1 1 �♦ 1 1 ♦♦I Project Type: Arterial Improvement Project Description: Reconstruct 3-lane urban section from Appleway to Sprague and 2-lane urban section south of Sprague. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2025 Right of Way (RW): 100 2026-2027 Construction (CN): 3,200 2028-2029 Total Cost: 3,500 52. Pines Rd (SR-27) / 16th Spokane .000 Valley Intersection Improvement itilk. is 1 _7. _v - - Project Type: Intersection Improvement Project Description: Add traffic control at five-leg intersecton. Funding Status: Partial Project Phase(s): Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2025-2026 Right of Way (RW): 100 2026-2027 Construction (CN): 4,700 2028 Total Cost: 5,000 53. Barker Rd . - Mission to Interstate Spokane .000 Valley 90 1 �t (.a ,, m4. I.--, t - p 4g` rw f, .. .. kl �` . it . i?�•� '. ' r '�, . -_ r ice, �` t a � �i ip mow@ �i A� � ea v "+rt.):;'''' '' _d.e: N: 1 i d.w , .CAM . " t t_'rn� ,�� _.- � a �`,�+.�, r°Via. �..R , 0. f, sue,° ris Sr'- 'r.-1'V1--- 1.7-I..' .rla. P r• o , � • • R, 7[ r P wErf t 'a,' R > S rrr '4 5 Project Type: Arterial Improvement Project Description: Reconstruct to 5-lane urban section. Improvements at Boone intersection are identified separately. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2025 Right of Way (RW): 500 2026 Construction (CN): 2,300 2027 Total Cost: 3,000 54. 8th Ave. Preservation - Havana to Spokane .000 Valley Park i i ,L..�.. sa....t3ar d 6` .-A--o,u 1. '1 Hai 11! I. ,, iit F ! 1 �' — 6 : r' h i 1��k i f I" ilifr. ,A,---11!- 'I ' Lf IMP1 olloirik iplikwwwwwww - - - . wit,---, r tI _ f L 1 I ... s Project Type: Arterial Improvement Project Description: Pavement preservation project with select locations of sidewalk and road widening. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2026 Right of Way (RW): 100 2027 Construction (CN): 1,840 2028 Total Cost: 2,000 55. Appleway Trail - Farr to Dishman Spokane ,.,,s Valley Mica 1,,,_,,,:,,,:,.,.., r.„,..... :rr------- -,5------ - 1i ' b ‘I u t �,-4, 1gJ.,, Project Type: Pedestrian/Bicycle Improvement Project Description: Extend Shared Use pathway to Dishman Mica with north connections to City Hall and Balfour Park. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2026-2027 Right of Way (RW): 100 2028-2029 Construction (CN): 1,000 2029-2030 Total Cost: 1,200 56. Argonne Rd . & 1-90 Interchange Spokane .000 Valley Bridge Widening r : Project Type: Bridge Project Description: Widen Argonne Road bridge to 3 lanes southbound and improve sidewalks. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 500 2026-2027 Right of Way (RW): 0 - Construction (CN): 14,500 2028-2029 Total Cost: 15,000 57. 8th Ave. / Park Rd . Intersection Spokane „ ,0 Valley Improvement rev 1,-, ,..10, - -l , a t;ox, s ir i , Project Type: Intersection Improvement Project Description: Provide new traffic signal or roundabout. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2026-2027 Right of Way (RW): 300 2027-2028 Construction (CN): 2,600 2028 Total Cost: 3,000 58. Barker Rd . / Boone Ave. Spokane „ ,0 Valley Intersection Improvement t, ; Project Type: Intersection Improvement Project Description: Provide new signal or roundabout, per adopted Planned Action Ordinance. Assume ROW& CN after 2025. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 200 2028-2029 Construction (CN): 2,500 2030 Total Cost: 2,800 59. Broadway Ave. Improvements - Spokane .000 Valley Flora to Barker 6 Ztx.� ,�z l i�r4tr . S T I '' r AI'Llt!,-,‘ ,-!),,,-',,fi'.4,77 . „ :__L_ T__.„.,_, i•\N.4 . ... ., tE,-Al: 1-:4.:r , a - a fr tom_ i i - 1,,. ,- i- r+ 1 1'L - P f f r'-''..' �'F_ C r, l r 3`1r ir. r V3 .. ..e Project Type: Arterial Improvement Project Description: Extend 3-lane urban section to Barker Rd and realign connection east of Barker. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 500 2028 Construction (CN): 4,400 2029 Total Cost: 5,000 60. 4th Ave. / Pines Rd . (SR 27) Spokane .0,0 Valley Intersection Improv. int 'V - - - *:., I , ul P r,. it . -,,,,,,i ,4,--,11' " 4. ilk ihor ,,,- , I- t•st.: ., Project Type: Intersection Improvement Project Description: Install new intersection control. Price assumes new signal and channelization. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027 Right of Way (RW): 200 2028 Construction (CN): 700 2029 Total Cost: 1,000 61 . Sullivan Rd . / Kiernan Ave. Spokane „ ,0 Valley Intersection Improv. . 4.. pyr ths.wit t_, migwor Project Type: Intersection Improvement Project Description: Improve channelization and signal operations and reconstruct intersection with concrete. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 100 2028-2029 Construction (CN): 1,800 2029 Total Cost: 2,000 62. Sullivan Rd . / Marietta Ave. Spokane „ ,0 Valley Intersection Improv. Will Project Type: Intersection Improvement Project Description: Improve channelization and signal operations and reconstruct intersection with concrete. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 100 2028-2029 Construction (CN): 1,800 2029 Total Cost: 2,000 63. Boone Ave. Reconstruction - Spokane .000 Valley Flora to Barker R T 47%. r'a Li` L. '."', 1 .Yi,} ^i r c4 {,-i ')-- d i a 'r ,A• _ p y es ���`i- r 'tir _ F` �i; r"� ....,. ri r- A -'�4" w`1.%I-4 11..I rh i' rt '' j'- -r^ +. - l .. -- I 11 -- , 1-1j---'r~4,,I r= ,,— p.4 #rx't .:111 i, — _. r 4ti'` t � t fx v, •^ 3=r�� F fir , �` w ,in- ` `I 7r�� 'J -.kc, rr t-'1,k+s.r'r rs-` .' x i 4.e 'r,r .iil '7''r+eI_r. r �C I'" y --,d ' :N of "'° •;r p� ., ",•.'e. ., ; Project Type: Street Reconstruction Project Project Description: Reconstruct corridor to city standards. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2027-2028 Right of Way (RW): 350 2029-2030 Construction (CN): 3,500 2031 Total Cost: 4,000 64. Flora Rd . Reconstruction - Spokane .000 Valley Sprague to Montgomery oisa BIS& I. R _ Project Type: Arterial Improvement Project Description: Reconstruct to city standards, including a shared-use path connecting Appleway & Centennial Trails. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2027-2028 Right of Way (RW): 250 2029-2030 Construction (CN): 3,600 2031 Total Cost: 4,000 65. Euclid Ave. Preservation - Barker Spokane „ ,0 Valley to E. City Limit .. k f c .. "." r t IP k; 6 ice# ,`cat , 1 i a f—r- rI , '1 rI as �-- ' fi7144 t a J ,r I 1 I Per ` `° ° ra r N b.-._ 1-!.- 3 4: C - Project Type: Street Preservation Project Description: Pavement preservation project. City may elect to improve road section to meet City standards. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2027 Right of Way (RW): 0 - Construction (CN): 450 2028 Total Cost: 500 66. Sullivan Rd . Improvements - Spokane .000 Valley Trent to Wellesley - e -` e E 6-. j�i _ - - r.: F — -�`„-N •'t'tam° .. ,:+ - 41. .r' ..,-:. .+use —' ......� •{ � - a4. ,. e_ A Y i A 4' a. y ' " k - . >! �. am ` ',r4. x y • Hs .,Y+iy es A ,r,� ' 5 ! 'a, ' - Project Type: Arterial Improvement Project Description: Widen for center turn lane, improved access management, lighting, and addition of shared-use path. Funding Status: Planned Project Phase(s): Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2027-2028 Right of Way (RW): 300 2028-2029 Construction (CN): 2,500 2030 Total Cost: 3,000