25496 PE-1414D RIVERWALK
. j~ , - ~ - •
~
l-
~
S I' O IG /-N, N E , , r' q C O U N T Y
OfF1CG OF TI•lE COIfNIY ENGINFER • A DIVISION OF T11F. PUAUC WORKS DEPARTMENT
Ronald C. Iiormann, I'.E., County Engineer Dennis M. Scott, P.E., Director
AGREEMENT TO PAY FEES
E1VGiNEER'S AGREEIITEN'I' NLINIBER
Tllis agreement between Spokane County and CD -DC74Ji ,
tname oi person)
wliose interest in the project is Ow NL'YZ
(i e owner, ngeni, eic.) '
is entered into lhis Z P" day of UqYtkr , 19 This agreement is applicable to the project
known as: R 1 Ve2L.JIhI-K "Di 'n oN CewtZ-~y Ac,xaPK ,Sppx4wc Cp. .
tproject nuuress or iuenTme ac iue numner) 3
That the individuals and parties named herein as having an interest in the above described property or project
agree to the following:
l. Reimburse Spokane County for project review and inspection fees as specified in Chapter 9.14 of the Spokane County Code. Tlie tees will be based on actual salary costs incurred
by Spokane County for project reviews and / or inspections plus a ten percent
administrative charge, and will be billed monthly as accrued. Any billing amounts due,
including any expenses incurred in the collection of an overdue account, must be paid
prior to the County's acceptance of tlie project for filing. If a project is approved and/or
filed with a balance still owing, the unpaid balance shall be paid within 30 days of the
invoice date.
2. The undersigned agrees that these fees ar- clue aiid payable upon receipt of the billing as
speciGed above.
3. Any invoices not paid witliin 30 days of the invoice date will be considered delinquent.
If any outstanding balance on the account for this project is not paid within 30 days of
tlie invoice date, no furtlier reviews of tlie project docutnents will be conducted until the
entire account balance is paid. Any balance on the accouiit for tliis project not paid
witliin GS days of the invoice date may result in legal action or the initiation of otller
collection procedures, including referral to a collection agency. The Sponsor will be
liable for any and all expenses incurred by the County for the collection of overdue
accounts.
4. Tlie monthly billing should be sent to the attention of:
NAME: Mf}Rk 44#uCoCk
'De-4+~ ~+eu SLeY Coomott*+Y
ADDRESS: 167Z0 NEr &61", ST.
CITY, STATE: ReDm0N.p _ I.JA
.
ZIP CODE: 1~052
PHONE 1l: 246/~ 9- 661 e
I understand that failure to pay these fees may result in delay in completion or approval of the project or other
possible sanctions. '
❑ If this fee agreement is completed by someone other than tlie Sponsor (i.e., tlle project
owner or a principal in the firm spocisoring the project), such as the Engineer designing
the project, then written at►thorization from the Sponsor specifically authorizing the
Agent to execute tlus Fee Agreeme~ ched to this Fee Agreement.
SIGNATURE By: C~~"+.--
CD
(PRINT NAME) •
RETURN YELLUW COPY TO SPOKANE COUNTY ENGINEERS
k\p\nagreemen.fee 2/1/95
1026 W. Broadway Ave. • Spokane, Wn 992G0-0170 •(509) 456-3600 fAX (509) 324-3478 'I DD: (509) 324-3166
01/24/96 16:22 FA% 206 869 6620 DEAN/HOUSLEY LLC 9002
Re~IG-A eh"IJML
,
' S I' U 1< .A N E • G U U N"I' Y
Or•fJcG or Tiis CouN-iY ENCiNFrit • A DIVlSION OF 171F. PUflLiC WORKS DE!'ARTMEM
Ranald C. Ilormaitn, 1'.E., Caunty Engineer Dennle M. Smlt, P.E., Direclof
AGREEMENT TO PAY I'EES
ENGINEER'S AGRECII'IENT NUMDCR c PI4141D .
I
This agreement between Spokane Counly and - - ' ,
i erson
wliose inlerest in the project is EYR.
,
. . , . .
is entered into tliis ZLP- clny of 19 Tliis agreemeiri iR applicable to Ilia proJect
1ulown as: g2tJlhwK 57-` 4o,l7 dN Cqft-av AcxeS.,,-Po+cmw oE Co. .
proJc at te s of t itamc dTiYe inim ier
That the indivlduais aud parties named herein as liaving an interesl in the above described Qroperly or proJect
agree ta ttie following:
1. Reimburse Spokaile County for project review and inspection tees as specified in Cliapter . 9.14 of the Spokane County Code. "Che fees will be based on actuai saEury cosls iiicurred
by Spokane County for project reviews and / or iiupeclions plus e ten percenl
administrative cliarge, and will be billed montlily as accrueci. Any billing amounls due,
iilcluding aiiy expenses incurred in tlie collection of an overdue account, inust be paid
prior ta the County's acceptance of llie project fvr filing. lf a project is Approved and/or •
filed witli a balance still owing. Ifie unpaid balance sltall be paid wilhin 30 days of tlte
invoice date.
2. Tlie undersigned agrees tliat tliese fees nw clue and payable upon receipt ot the billing as
specified above.
3. Any invoices nol pnid witliin 30 days of the invoice date will be coiisidered deliitquent.
lf nny outstanding balance on Ihe account for this projecl is not pAid within 30 days of
lhe invoice date, no turtlier reviews of lhe projeet documents will be conducted until the
entire lccount balaiice is paid. Any balance on the accoune for lhis project not paid
within GS days of the invoice dale may resu[t in legal action or tlle initiation o.f other
collection procedures, including referral to a colleclion agency. 7'he Sponsor will be
liable for Aiiy and all expenses incurred by lhe County for Ihe colleclion oF ovetdue
accounts.
4. T6e monthly billing should be spnt to the attention of:
NAME: MAit{C PANe-oCk
Dw4N Ft00S LEY COy"PAWSe
ADDRESS: Lfi-7Z0 N-Lv' &6'"% 27:
Cl"fY, STATE: Ret:hM'►OND_ wA
.
Z1P CODE: 1t~~52- nrrnwlr. a.
7A~,I~/_A_L/_~b ~Gl~^~D~DIS
I understand Ihm failure to p,, '~ese tees may result in Jelay in c:oiitiplet ,r approval of tlte proJect or ollier
pos1161e, Aneciuns. ~ -
O If tliis fee agreement is completed by sameone other than the Sponsor (i.e., the project
owner or a principal iii tlte firm spoiuoring the project), such as the Engineer designing
Ute project, then wrilten authorization from lhe Sponsor spec[flcally authortzing the
Agent to execule tl►is Fee Agreeine~,y~~ clied to ti~is ree Agreement.
SIGNA'f URB By: !l--v - - r.1 'e
. 0n
• (PRlNT NAME) •
RETLJW YCL.I,UW COPY TO SPOKANE COUNTY ENGINEERS
k1p%(%ngrcemen.fee 211193 .
1026 W. Broadway Ave. • SI-teknne, INA 99260-0170 •(509) 456-3600 r-AX: (509) 324-3478 'l'DD: (509) 324-3166
Dc
~ '~b w W r"Xw ?A ~",i l
Spokane County Staff Review Checklist
for
Pre-Submittal Meeting
Project Name: O%tf^ Praject Number. „L101 D
Project Spvnsor: DON 1f(QKW
Spansar's Engineer:
Design
Firrry 14kt.• Engineer. ~ ~"A"
Meeting Date: Z5 W iVleeting Time• _JD
County Staff Present at Meeting'
ti
Qther IVTeeting Attendees'
rnamelrepresenting naimeirepresentung
natnelrepresenYing namelrepresenhng
The Following Items need to be Discussed wf the Design Engineer
General items
1. List any special requirements listed in the Gonditians ofApproval, EIS, or MI7NS.
descnptaon reference
description reference
descngtion referenee
dmnptivn reference
descnptian reference
2, Crive Standard Notes to the De5ign Engineer. Tdentify which Special Notes will apply, if any.
. . ~ l
Road Plans
1. Road Classifications and Design Criteria.
#1 ~ #2 ~ #3 #4
Street Name
n .
Classification
. . •
~ • ~
E
Roadway Width, W _
. '
,
. '
. _ ~ •
Minimum right-of-way width
see note (1) '
. . . . _ _ . . . . i . . . ` . . . . . . .
_ . . . . ~
Min. Horiz. Curve w/ super
. . ; ~
. _ ~ ~ . . .
Min. Horiz Curve w/o super
. ; ,
. - . . . . . . , - ~
General Land Slope/Terrain
Design Speed, mph ~
Curb Type & Clear Zone .
(see Sec. 3.15) ;
_ . . . ~ - ~ ~ - .
Sidewalk required? (yes/no)
Note (1) Additional right-of-way may be given by the Sponsor.
Discussion- jm I.G Qicit&5 7~" -PL1A*
c"tmAr iNE
be
2. According to the Design Engineer what is the maximum number of units which will have
access from a single roadway? ~ . What is the max. allowed per Sec.1.03? 1r' D
SW64 ht"'Cs 14" NdAwfi.14 40*. VAlk i3u,+L-T
3. Minimum intersection spacing is 300' for along a Principal or Minor Arterial (per Sec. 3 04),
and l 50' for a Collector or Local Access street. What spacing is provided for this project?
~ 156,
4. Are any off-site sl~pe easnts needed, or off-site right-of-way acquisition needed? If so,
describe. ~m N AIVE
IWOL-'T&AD ol Q%M619T iF .u,NoPF Tv Ow 1o itJ Gge"e
5. What type of turn-arounds are needed? (i.e. cul-de-sac, hammerhead, etc.)
Street Name ~ Turn-around Type ; Location
.
. ~ ~ . .
6. Road Surfacing Requirements (Sec. 3.16)
a) What method in determining road surfacing requirments does the Design Engineer propose to
use (i.e. AASHTO Design Method, R-value, County thickness table, or other)?
%&.S Awux
NAb) Provide the Design Engr, a copy of the Soil Sample Procedures, Design Report Format &
Alternate Pavement Design Table.
7. Does the Engineer plan on applying for any Design Deviations? If so, briefly describe below.
I*1r
Storm Drainage
1. Basin Map
a) Did the Design Engineer bring to the meeting a basin map? ~ . If so, does the basin
map show topography and sufficient information to be useful? ~4 .
1l
b) Does the basin map depict any contributing off-site runoff flowing onto the property? J40
Does it appear to be correct? . If not, explain.
c) Is a site visit needed to verify the basin limits? -Pi, Schedule for: .
2. Is the site located within the Aquifer Sensitive Area (ASA)? ~ . What type of water
quality treatment is proposed by the Design Engineer?~ A&d
3. What subsurface investigations, if any, are needed with this project to make sure the
proposed disposal process will function as planned.
4. Are there dawns#ream canditimns which will affect the design ❑f drainage facilities If sa
describe pcassible mitigative rneasures,
ft 'P - ~ Okeb~ &-A AteA
5. Is rMaintenamce aceess pravided to each `208' stivale or drainage pond? If there is something
unusual, what requ'rrements were given to the Design Engr.?
~
,
b. W'trat does the DeVelvper/Engr. prapose fvr prvviding for perpetual maintenance of the
drainage facilities? Flease briefly describe prvpased rneGhanism, and what is needed to
accomplish this.
7 Are Erosian Control Measures required with this project. If so, hriefly describe applicable
ts. gy ~d
1Vate: Pravide a copy of this campleted dQeument to the Design Engineer at rhe end of the pre-
design meeting.
~STaeM P65~W4 r~~ = 700S 40146 ~ dv~wA.5
-Dea6,j WRIT
'~~Ww
~'V~ ~iar~ M1SE~~ a
WSIfrrJ
,
,►~~o ~
. • r
~
PLAT NAME NQ-
: Tk L(.#ATISTICS bATE ~
Plat Check Fee rPe
Number of Lots ✓ 01 ~
Road Miles (New)
Total Area ~ t M
MAP ~
North Arrow OIP
Scale
Legend ~ , `~'r,7fr,C ,r- _ Ax~.,n / r
Yrocedures & Equipment ~ v
Basis of Bearings
Plat Location $y Title
Official Signature Blocks
Surveyors Certificate
Road Names
Road Widths ~ !!f~
Adjacent Area
Lot & Block Numbers
R!W Dedication designated
1 Foot Strips
3 RPS on GLO Cornets ~ A/f/-+
Tract X
Lot Areas 8!~d.S e
Bench Mark
Ciosure ~~V I S V b,M~t'~; , DEDICATION bescription (To Map)
Description (To Cert)
Owners
Certificate to Plat -
~ • t
1 Foot Strips
RID - CPh Statement ~ ~14
Access Prohibited ~ A J~ f-t
R/W Dedication Drainage Language
Drainage Covenant /f
Flood Insurance ~ - - J -
208 Bonds -$1,000.00 ea 1 208 PLANS APPROV$D _/_/1-" G4!e,(c,,k
Private Road Doc. !!'s
Private Road Warning
Road Plans ~ A" ` ~ ~I ~ •
Koad Bond Improvement /11,4
Itoad gorid Inspectlon
Signed By $ngineer
~ fi •
U &jLo,C> Zi,e-AZ w 14n. K a , t.~~
c 91/
An& ,~c ~/2 ~v►2 . .
~4 4
~
k\d\f\p1atiist.ck9/95 '