Loading...
21-091.01 LaRiviere: Appleway Stormwater Improvements c'�oFkane ..�a11eyE CHANGE ORDER NO: 1 ENGINEERING DIVISION CONSTRUCTION CONTRACT NO: 21-091 • of PROJECT: Appleway Stormwater Improvements CONTRACT DATE: 6/17/2021 PRIME CONTRACTOR: LaRiviere, Inc. CIP NO: 317 DESCRIPTION OF CHANGES Avista qas main conflict and delays. Item No. Description Unit Quantity Unit Price Total 1.01 Avista gas main conflict and delays LS 1 $53,777.12 $53,777.12 Total Amount of this Change Order(incl. Tax): $53,777.12 VERBAL APPROVAL AND JUSTIFICATION Independent Justification on File Yes Verbal Approval Yes Verbal Approval by Glenn Ritter PHYSICAL COMPLETION Original Contract Working Days: 60 Revision By This Change Order: 15 Revisions by Prior Minor Change: 2 Total Revised Contract Working Days: 77 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,667,086.00 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(through CO#_) $ 0.00 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 1,667,086.00 NET THIS CHANGE ORDER $ 53,777.12 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,720,863.12 Paul Loska", ; m;;� a,� 10/20/2021 CONTRACTOR ACCEPTANCE: DATE: The contractor hereby accepts this adjustment under th of Section 1-04.4 of the original contract. RECOMMENDED BY: DATE:` /20 7_/ Proje M r / APPROVED BY: DATE: /Q' 202-1 GG Ci ngineer APPROVED BY: Y DATE: Im(Z2./2fZt City Manager ATTACHMENTS: LaRiviere Cost Proposal dated 10/15/21 Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File, Project Inspector, Finance Department COSV Form 9/5/2014 INCORPORATED October 15, 2021 Lariviere Inc. 17564 N. Dylan Ct. Rathdrum, Idaho 83858 Attention: Mr. Glenn Ritter, P.E. Re: City of Spokane Valley Appleway Stormwater Improvements Project (GAS LINE UTILITY CONFLICT) Mr Ritter: Lariviere requests you kindly review the attached change order proposal concerning the gas-line utility conflict on the Appleway Stormwater Improvements Project.Through careful documentation,we have compiled the costs and time delays resulting from the conflict,shown in the following documents. In summary, Lariviere requests$53,777.12 and fifteen days be added to the contract. If you have any questions pertaining to the cost breakdown or contract time request, please do not hesitate to reach out to me. Sincerely, Paul Loska Project Manager Dlgltally signed by Paul Loska Lariviere Inc. DN:C=US, Paul Loska 0=aari@areriv.i,eorU M, (760)975 9550 CN=Paul Loska Date:2021.10.15 14:53:08-07'00' paull@lariviere.co 17564 N DYLAN CT, RATHDRUM ID 83858 p. 208-683-2646 f. 208-518-2003 PWC 17425 UNLIMITED 1,2,3 ID LICENSE #RCE-22213 WA LICENSE#LARIVI*817J3 PRICE AND DELAY SUMMARY PRICE SUMMARY TIME SUMMARY TAB SUM($) TAB SUM(HOURS) CSTC $14,265.16 REPAIR CSTC 19 HOURS $15,875.35 SWALE EXCAVATION INEFFICIENCY 42 EQUIPMENT STANDBY $ 6,035.48 EQUIPMENT STANDBY N/A TRAFFIC CONTROL FOR AVISTA $ 4,000.64 TRAFFIC CONTROL FOR AVISTA N/A STORM SYSTEM DELAYS $ 5,627.01 STORM SYSTEM DELAYS 19 CAD AND SURVEY $ - CAD AND SURVEY N/A _ SUPERVISION $ 7,973.49 INVESTIGATION AND SURVEY 40 TOTAL PRICE $53,777.12 TOTAL TIME REQUEST** 120 **TIME REQUEST:FOR NON COMPENSIBLE DAYS. THE COST IS CAPTURED IN THE PRICE SUMMARY. TIME REQUEST RESULTING FROM AVISTA GAS-LINE CONFLICT IS 15 DAYS. Avista Gas Issue CSTC Repair STA LEN I [WIDTH SF CY IMPACT 11+75-12+25 50' x 7' = 350 / 9 = 39 FULL 39 13+30-16+50 150' x 7' 1050 / 9 = 116.67 HALF / 2 58.33 16+50-18+00 150' x 7' = 1050 / 9 = 116.67 FULL 116.67 18+00-20+00 200' x 7' = 1400 / 9 = 155.55 QUARTER / 4 38.89 20+00-21+50 100' x 7' = 700 / 9 = 77.7 FULL 77.7 25+20-25+35 210 x 7 = 1470 / 9 = 163.33 FULL 163.33 40+50 20 x 7 140 9 15.55 FULL 15.55 UNIT RATE TOTAL PRICE 684.47 SUBTOTAL 509.47 TOTAL 28 $ 14,265.16 Avista Gas Issue Reg.hours(Equipment and personnel) Avista onsite on 8-2-21 thru 8-5-21 Avista onsite on 8-23-21 thru 8-25-21 Direct Labor PRICE Labor 42 hrs $ 4,948.26 Force Account PRICE Task related 64 hrs $ 10,240.00 Total hours 84 hrs Total Labor 106 Equipment PRICE Total hours 21 [hrs $ 687.09 SUM $ 15,875.35 LaRiviere Personnel Force Account DATE NAME HOURS TASK Reg.time 8/2/2021 D.Mossender 8 AVISTA RELATED 8/3/2021 8 AVISTA RELATED 8/4/2021 8 AVISTA RELATED 8/5/2021 8 AVISTA RELATED 8/10/2021 8 AVISTA RELATED 8/11/2021 8 AVISTA RELATED 8/12/2021 8 AVISTA RELATED 8/13/2021 8 AVISTA RELATED 64 HOURS 8/16/2021 10 NOT AVISTA RELATED 8/17/2021 10 NOT AVISTA RELATED Direct Labor DATE NAME HOURS TASK 8/10/2021 Grant&Dakota 12 AVISTA RELATED 8/11/2021 Grant&Dakota 12 AVISTA RELATED 8/12/2021 Grant&Dakota 12 AVISTA RELATED 8/26/2021 Grant&Dakota 4 AVISTA RELATED 8/27/2021 Grant&Dakota 2 AVISTA RELATED 42 HOURS Equipment DATE NAME HOURS TASK Week ending 8/13/2021 CAT 289D(LDR1-18) 18 AVISTA RELATED Week ending 8/27/2021 CAT 289D(LDR1-18) 3 AVISTA RELATED 21 HOURS P.W.RATE HOURS COST MARKUP TOTAL COST DAKOTA WRIGHT 42.54 42 $ 1,786.68 29% $ 2,304.82 GRANT 48.79 42 $ 2,049.18 29% $ 2,643.44 F.A.RATE HOURS TOTAL COST SURVEYOR AND EQUIPMENT 160 64 $ 10,240.00 RATE HOURS COST MARKUP TOTAL COST CAT SKIDSTEER 27.04 21 $ 567.84 21% $ 687.09 EQUIPMENT STAN BY COST AVISTA SHUT DOWN:08/02-08/05 TYPE CODE _WEEKLY RATE COST MARKUP PRICE CAT 308 EXCAVATOR EXC-1-7 $ 1,490.00 $ 1,490.00 21% $ 1,802.90 CAT 420 BACKHOE BSL-1-7 $ 1,145.00 $ 1,145.00 21% $ 1,385.45 CAT 289 SKIDSTEER LDR-1-17 $ 1,160.00 $ 1,160.00 21% $ 1,403.60 CAT 305 EXCAVATOR EXC-1-13 $ 1,193.00 $ 1,193.00 21% $ 1,443.53 TOTAL PRICE $ 6,035.48 TRAFFIC CONTROL COST ADDITIONAL WEEK OF TRAFFIC CONTROL FOR AVISTA CREWS DESCRIPTION QUANTITY UNIT _ RATE COST MARKUP PRICE TRAFFIC CONTROL SUPERVISOR 33 HOUR _ 59 $ 1,947.00 12% $ 2,180.64 EQUIPMENT 5 DAY 325 $ 1,625.00 12% $ 1,820.00 TOTAL PRICE $ 4,000.64 STORM SYSTEM COST AND DELAYS STORM PIPE CREW UNIT RATE ESTIMATED TIME DELAYED (SEE PDF MARKUP) BRETT 96.22'$/HR SHEET TIME (HOURS) PRICE MARCUS 49.11 $/HR 23 1 $ 296.16 DAKOTA 42.54 $/HR 2 $ 592.32 308 EXCAVATOR 31.71 $/HR 4 $ 1,184.63 SLED COMPACTOR 10 $/HR 24 2 $ 592.32 COST 229.58 $/HR 2 $ 592.32 MARKUP 29 % 25 2 $ 592.32 TOTAL UNIT PRICE 296 $/HR 2 $ 592.32 27 2 $ 592.32 28 2 $ 592.32 TOTAL PRICE $ 5,627.01 CAD AND SURVEY INITIAL GAS LINE IDENTIFICATION WHO TASK TIME RATE COST MARKUP PRICE PARAMETRIX SURVEY GAS LINE AND DRAFTING PLAN VIEW MAP 6 N/A $ - 12% $ - LARIVIERE DRAFTING CROSS SECTIONS 4 N/A $ - 29% $ TOTAL PRICE $ - PARAMETRIX WILL NOT INVOICE FOR THIS WORK AND WAS PLEASED TO HELP. SUPERVISION COST AND DELAYS Compensable Days Cost Item No. Type Description Time(HOURS) Hourly Rate($/HOUR) Cost Markup PRICE 1 Labor Supervision(Brett Ferro)-100% 40 96.22 $3,848.80 29% $4,964.95 2 Labor Supervision(Paul Loska)-50% 40 104.31 $2,086.20 29% $2,691.20 3 Labor Project Engineer(Jasmine James)-15% 40 41.00 $ 246.00 29% $ 317.34 TOTAL PRICE $7,973.49 Avisto onsite on 8-2-21 thru 8-5-21 One week of work lost due to Avista gas relocation.Crew lefts site to allow Avista relocation Avisto onsite on 8-23-21 thru 8-25-21 Slowed down work-cost and delays captured in Storm System Delays Summary