21-161.00 Trentwood Irrigation District 3: Sullivan Waterline Project Contract 21-161 INTERLOCAL AGREEMENT BETWEEN THE TRENTWOOD IRRIGATION DISTRICT#3 AND THE CITY OF SPOKANE VALLEY, FOR DESIGN AND CONSTRUCTION OF THE SULLIVAN ROAD WATERLINE EXTENSION This Agreement("Agreement")for design and construction of the Sullivan Road Waterline Extension Project("the Project") is entered into by and between the Trentwood Irrigation District#3 ("District"), an irrigation district organized and existing under the laws of the State of Washington, and the City of Spokane Valley ("City"), a municipal corporation of the State of Washington, hereinafter jointly referred to as"Parties": WHEREAS, the City currently owns and maintains the Sullivan Regional Park, located along Sullivan Road immediately north of the Spokane River and west of Sullivan Road, which has its potable water supplied from a City-owned water well located onsite; WHEREAS, the City-owned water well is not of sufficient size, nor is the water quality adequate, to provide a sustainable water source for additional development of the Sullivan Regional Park; WHEREAS, the District owns and operates a municipal water system that has sufficient capacity to supply potable water to the City's park and adjacent properties; WHEREAS, the City desires to construct the Project, located immediately west of, and along Sullivan Road from its water system in Sullivan Park, to just north of the Union Pacific Railroad tracks, which will include a domestic water transmission main and associated appurtenances; WHEREAS,the City has an interest in developing the Project so it can receive potable water from the District for existing and future park development; WHEREAS, the District and the City agree that installation of the Project would benefit the taxpayers and general public; and WHEREAS, the District and the City desire to enter into this Agreement to establish the mutually agreed terms to accomplish the tasks set forth herein. NOW, THEREFORE, the District and the City agree as follows: SECTION 1 — Responsibilities of City. 1.1 Provide a complete design of the proposed water line extension by a Professional Engineer registered to practice Engineering in the State of Washington. The water transmission main shall include pipe and all appurtenances from a connection point with the District's existing system, and extending south along Sullivan Road, to a connection point with the City's current water system. The design of the water system facilities shall be in accordance with the latest District requirements and standards. The engineering design, construction plans and construction documents will be submitted to the District for review and/or approval at the 30%, 60%, and final stages of design. 1.2 From the final design documents, as approved by the District, the City shall construct the water main, including all appurtenances, in accordance with applicable City, state and federal construction standards and requirements. Interlocal Agreement Page 1 of 3 Sullivan Road Waterline Extension Contract 21-161 1.3 Be responsible for all costs associated with the design and construction of the waterline extension, including construction management and construction inspection. 1.4 Shall, at its own costs and efforts, secure all reviews, approvals, and permits from any and all applicable jurisdictions, including associated fees,for the completion of the water line extension project. 1.5 Shall execute all deeds, documents, permits, annexation agreements, and checklists necessary for the permitting, and conveyance of property rights, including conveyance of the final Project, required for the Project and in the performance if this Agreement. 1.6 If the City determines it is in its best interest, enter into a Latecomer's Agreement with the District to provide for future reimbursement of incurred costs from additional owners and/or developers of property who desire to connect to the Project but did not contribute to the costs of Project development. SECTION 2— Responsibilities of District. 2.1 Designate a "responsible person," who shall represent the District's interest during the design and construction of the Project, and shall coordinate any modifications or changes needed by the District in conjunction with the work; 2.2 Provide Project design criteria, including the size of the pipe, spacing of isolation valves and hydrants, and other appurtenances required to maintain the integrity of the District's water system. 2.3 Provide timely reviews, 14 calendar days or less, of the engineering design, construction plans, and construction documents at the 30%, 60%, and final stages of design. Costs associated with the District's review of project documents shall be fully borne by the District. 2.4 Provide construction observation services during the course of construction, as necessary or required, to ensure the required quality of the completed work meets District guidelines. 2.5 Upon satisfactory completion of the project improvements, accept the dedication of the water system improvements, and by District Board resolution, accept ownership, maintenance, and operation of the improvements. 2.6 At the City's request, enter into a Latecomer's Agreement with the City to provide for future reimbursement of incurred costs to the City from additional owners and/or developers of property who desire to connect to the Project but did not contribute to the costs of Project development. SECTION 3. Notice. All communications, notices, or demands of any kind which a party under this Agreement is required or desires to give to any other party shall be in writing and be either (1) delivered personally, or (2) deposited in the U.S. mail, certified mail, postage prepaid, return receipt requested and addressed as follows: If to the City: City of Spokane Valley 10210 East Sprague Avenue Spokane Valley, WA 99206 Attn: Christine Bainbridge Interlocal Agreement Page 2 of 3 Sullivan Road Waterline Extension If to the District: Trentwood Irrigation District i3 Contract 21-161 4402 N Sullivan Road Spokane Valley, WA 99216 Attn: Michael Klein SECTION 4. Successors. This Agreement shall be binding on and inure to the benefit of the successors and the assigns of the Parties. SECTION 5. Governing Law. This Agreement shall be construed in accordance with the laws of the State of Washington. Any action for enforcement of this Agreement shall be brought in a court of competent jurisdiction in Spokane County, Washington or as otherwise provided by statute. SECTION 5. Modifications. No modification or amendment of this Agreement shall be valid until the same is reduced to writing and executed with the same formalities as the present Agreement. The City Manager or designee is specifically authorized to amend this Agreement without further City Council approval: provided, amendments for changes that result in payment amounts or costs of the City over the City Managers contractual authority under SVMC 3.35.010 shall require City Council approval_ SECTION 7. Waiver. No officer, employee, agent, or otherwise of either Party has the power, right, or authority to waive any of the conditions or provisions to this Agreement. No waiver or any breach of this Agreement shall be held to be a waiver of any other or subsequent breach. SECTION 8. Representation. This Agreement forms a fully integrated agreement between the Parties. No other understandings, oral or otherwise. regarding the subject matter of this Agreement shall be deemed to exist or to bind any of the Parties hereto. All Parties have read and understand all of the Agreement. and now state that no representation, promise, or agreement not expressed in the Agreement has been made to induce any Party to execute the same, SECTION 9. Authority. Both Parties to this Agreement represent and certify that they have full authority and power to enter into and carry out this Agreement. The persons signing this Agreement represent that they have authority to act for and bind their respective principals. IN WITNESS WHEREOF. the Parties have executed this Agreement this %-ZK- day of 0 c to . 2021. CITY OF SPOKANE VALLEY: TRENTWOOD IRRIGATION DISTRICT#3: /11()/d/ Mark Calhoun, City Manager Mic el Klein, District Manager APPROVED TO FORM: APPROVED AS TO FORM: Office of e City Attorney Irrigation District Attorney lnterlocal Agreement Page 3 of 3 Sullivan Road Waterline Extension