Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1971, 07-21 Permit App J0229 A & W
1 1 1► GENERAL REQUIREMENTS County of Spokane, Washington BUILDING CODES DEPARTMENT, COURTHOUSE, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT 4 of PERMIT FEE( PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable through civil action. Corgi+ y O.ficiAl. an not bring action to enforce covenants or dedications. . ...mew.. )1 ai l : sttOW THIS LINE Name of Own i /// � i /l. ddress WA Phone-y- U / Architect/�' d Phone Engineer Phone tiVA-./j�-.�'{ I I Phone p� �..L- Legal Descri tion of Property (Give complete description from deed, tax receipt, etc.030/) TRACTi /(vim CPPPR7viv/TY /CX4C w, g / �XC W3,0 / DEDiCA7ED TO CDOA(TY Vv 30 ye ��sR © i R5A ' YA r Contractor Heat. System Use of Bldg. DESCRIPTION OF WORK: New Size ofLo .s X/ d' Const £ .�.. �: Dimensions (Frame, concrete, brick, etc.) / �+ Rooms_ Baths Basement Foundation Const. (Full, part, none) ,y� * QQ Type of oofing IVY( twit - Ext Finish _- ixita �i.ntif� Address Garage or Carport Attached rr � Draw sketch with dimensions showing: (1) proposed buildings; (4) distance to property ;r tem and water supply lines. l' NORTH SR R,4 c AVE r hereby eertif a$' showa Chimney Remodel Moving Bld Sewage System Total Sq. Ft Fire Zone Q Stories / Valuation /4, DDV Fireplace (Kind) 7% (Nu ber) t5i�-C , �nt Wall Finish No. of Units Bedrooms Private I)etatched ' PLOT PLAN property lines; (2) street or road locations; (3) location of existing and lines and streets; (5) dimensions of buildings; (6) location of sewage sys- ,4't-tu Raar REEK PRiuE g,J SOUTH rmation submitted is correct Owner or Agent A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE THIS IS NOT A PERMIT. and there are DO NOT WRITE BELOW THIS LIH State License No. Ind. Ins. Acct. No. EQUIRED Plumbing Permit Heating Permit Sewage Permit Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed no other structures located on this property except 'rj-21-7/ Date CONSTRUCTION COMMENCES. Your street address will be . Sewage Permit Number Issued Remarks Bu lding Permit • e zone 1s Receipt 73 ' 2-Issued Form 52:1 Rlrlr. Cn-1.. n