2010, 02-26 Permit 10000517 Plan Review Summaryto
•
Commercial/Multi-Family Plan Review
Summary
Permit Center Out -Processing Information
PLUS Project #: 10000517
Project Name: White Elephant
S
Site Address:12614 E Sprague Ave.
Project Description: Security enclosure for gun area and 1st and 2nd floor storage rooms.
Manual Valuation: ❑ Yes ■ No
Valuation: $
Occupancy Group: Group M
Type of Construction: VB
Floor Area
1st floor: 228 sq. ft. Gun Area, 264 sq. ft.
other floors (specify each floor sq.ft.):
Storage Room
2nd Floor Storage Room 264 sq. ft.
Conditions on Permit (list):
1. Pre -construction Meeting Required ❑ Yes ® No
2.
3.
Other Technical Information
Phased Submittal: ❑ Yes •
No
Occupant load (OL)
1st Floor:
2.28 for Gun Area, 1 for each storage floor
other floors (specify each floor occ. load):
Assembly Only (OL for room and room location
(each assembly room)):
NREC Provided: ni/A ❑ Envelope ❑ Mechanical ❑ Electrical/Lighting
Building Envelope Design (HB1848): ❑ Provided ■ Not required
Plan Reviewer:
File Location:
Date: 2.60/( O
Page 1 of 1
Spokar►e
4/' Valley®
• For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -- APPLICANT PINK - BUILDING FILE REV 9/07