Loading...
Resolution 22-009 Amended Fee Schedule CITY OF SPOKANE VALLEY SPOKANE COUNTY,WASHINGTON RESOLUTION NO.22-009 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, REPEALING AND REPLACING RESOLUTION 22-003, AND APPROVING THE 2022 MASTER FEE SCHEDULE,AND OTHER MATTERS RELATING THERETO. WHEREAS, it is the general policy of the City of Spokane Valley(City)to reflect the cost of services provided by the City; and WHEREAS,the City adopts a resolution to establish the schedule of fees for City programs, permits and services, and periodically the fee resolution and fee schedule must be amended to incorporate new or modified services; and WHEREAS, the Master Fee Schedule adopted by City Council in Resolution No. 22-003 on March 29, 2022 contained a scrivener's error in Schedule G relating to the Expanded North Pines Road Subarea Impact Fee Schedule in the Rate Studies adopted by City Council in Ordinance No. 22-005. The error relates to leaving out the words"per sq fft," suggesting a much lower fee than was approved by Council; and WHEREAS, Council desires to approve the fees set forth in the attached Master Fee Schedule in order to accurately reflect the fees in the Rate Studies adopted by Council in Ordinance No. 22-005. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington,as follows: Section I. Adoption. The Master Fee Schedule is hereby adopted as provided herein and as shown and incorporated in the attached schedules,and which shall have an effective date retroactive to April 1,2022, as originally intended. Section 2. Repeal. Resolution 22-003 is hereby repealed in its entirety. Section 3. Effective Date. This Resolution shall be in full force and effect immediately upon adoption. Approved this 31st day of May, 2022. A T• CITY OF SPOKANE VALLEY C *0— Christine ainbridge, itylerk Pam Haley, Mayor- Approved as • Ptyi Office o 4• Citto y Resolution 22-009 Fee Schedule for 2022 Page 1 of I8 MASTER FEE SCHEDULE Fee Schedule Page No, Schedule A: Planning 3 Schedule B: Building/Engineering 5 Schedule C: Parks and Recreation 11 Schedule D: Administrative i 4 Schedule E: Other Fees 15 Schedule F: Police Fees 15 Schedule G: Transportation Impact Fees 16 Resolution 22-009 Fee Schedule for 2022 Page 2 of 18 MASTER FEE SCHEDULE Schedule A — Planning Automatic Annual Adjustment Unless otherwise specifically amended, Schedule A of this Master Fee Schedule shall be reviewed and automatically adjusted annually to reflect(80%)of any change from September to September of the Consumer Price Index for All Urban Consumers (CPI-U), West Region, 1982-84=100, published by the United States Department of Labor, Bureau of Labor Statistics,or other comparable index if not published. In no event shall the cumulative change in rates or charges be more than four percent(4%)per year.Unit prices shall be rounded to the nearest dollar. The automatic adjustment shall be effective January I of each year. No other fee schedules shall be affected by such automatic adjustment. FEE AMOUNT AMENDMENTS Comprehensive Plan Amendment $2,600.00 Zoning or other code text amendment $2,600.00 APPEALS Appeal of Administrative Decision $780.00 Appeal of Hearing Examiner Findings $1,040.00 Transcript/record deposit on Appeals of Hearing Examiner Decisions $163.00 Appeal of Administrative Decision- Code Enforcement Final Decision pursuant to chapter 17.100 SVMC $520.00 unless otherwise waived pursuant to SVMC 17.110 ENVIRONMENTAL REVIEW STATE ENVIRONMENTAL POLICY ACT(SEPA) Single Dwelling(when required) $291.00 All other developments $364.00 Environmental Impact Statement(EIS) Review,minimum deposit $2,288.00 Addenda of existing EIS Review $364.00 SHORELINE Substantial Development Permit-under$50K $1,040.00 Substantial Development Permit- over$50K $1,664.00 Shoreline Exemption $624.00 CRITICAL AREAS Floodplain Permit not associated with a subdivision $520.00 Floodplain Permit associated with a subdivision $520.00+$54.00 per lot LAND USE ACTIONS SUBDIVISIONS Preliminary plat $2,600.00+ $42.00 per lot Final Plat $1,481.00 + $10.00 per lot Time extensions—file review and letter $520.00 Resolution 22-009 Fee Schedule for 2022 Page 3 of 18 SHORT PLATS Preliminary 2 to 4 lots $2,080.00 Final plat 2 to 4 lots $1,248.00 Preliminary plat 5 to 9 lots $2,080.00+$26,00 per lot Final plat 5 to 9 lots $1,352.00+$26.00 per lot Time extensions—file review and letter $520.00 PLAT ALTERATION Subdivision plat $1,248.00 Short plat $780.00 PLAT VACATION $1,533.00 BINDING SITE PLAN Binding site plan alteration $2,080.00 Change of Conditions $2,080.00 Preliminary binding site plan $2,080.00 Creating lots within final binding site plan via Record of Survey $1,560.00 Final Binding Site Plan $2,080.00 AGGREGATION/SEGREGATION Lot line adjustment $260.00 Lot line elimination $208.00 Zero lot line $208.00 +$10.00 per lot OTHER PLANNING Administrative Exception $520,00 Variance $1,638.00 Administrative Interpretations $364,00 Home Occupation Permit $104.00 Accessory Dwelling Units (ADU) $312.00 Conditional Use Permit $1,664.00 Temporary Use Permit $520.00 Small Cell Permit Application $520.00 for up to five sites+$104.00 per additional site Hourly Rate for City Employees $63.00 Document Recording Service by Staff Hourly Street Vacation Application $1,420.00 Pre-application Meetings $260.00* *Fee shall be deducted from land use application, building or commercial permit fees when application is filed within one year of pre-application meeting. ZONING map amendments (rezone)* $3,640.00 Planned residential development plan $2,080.00+ $27.00 per lot Planned residential development modification $546.00 Zoning letter $218.00 *If rezone is combined with other action(s), cost of other action(s) is additional Resolution 22-009 Fee Schedule for 20.22 Page 4 of 18 Schedule B —Building Automatic Annual Adjustment Unless otherwise specifically amended, Schedule B of this Master Fee Schedule shall be reviewed and automatically adjusted annually to reflect(80%)of any change from September to September of the Consumer Price Index for All Urban Consumers (CPI-U), West Region, 1982-84=100, published by the United States Department of Labor,Bureau of Labor Statistics,or other comparable index if not published. In no event shall the cumulative change in rates or charges be more than four percent(4%)per year.Unit prices shall be rounded to the nearest dollar. The automatic adjustment shall be effective January 1 of each year. Building permit fees shall not be included in the annual automatic adjustment because updates occur semi-annually through the International Code Council (ICC) published updates. Stormwater Utility Charges on Developed Parcels shall not be included in the annual automatic adjustment because updates are done through a separate analysis of the City's Stormwater Utility needs. No other fee schedules shall be affected by such automatic adjustment. Fee Payment Plan review fees are collected at the time of application. Such fees may be adjusted during plan review. Overages or under payments shall be appropriately adjusted at the time of permit issuance. Plan review fees are separate from and additional to building permit fees. Permit fees and any other unpaid fees shall be collected prior to issuance of the permit. Fees for outside professional services required during the permit process shall be paid by the applicant. Examples of outside professional services include review by contract reviewers, special inspection or construction services, consultant services for special topics, surveying or other services required to determine compliance with applicable codes. Fee Refund Policy. Refunds authorized under this policy apply only to Schedule B. PLAN REVIEW FEES • Plan review fees are non-refundable once any plan review work has been started. • Paid plan review fees may be refunded when an eligible request is received in writing. • At a minimum, a$63.00 administrative fee shall be retained. • If the paid plan review fee is less than $63.00, no refund is authorized. • If the paid plan review fee is more than $63.00, the amount for refund shall be calculated at the rate of 100% of the paid plan review fee minus $63.00. PERMIT FEES • Permit fees are non-refundable once work authorized by the permit has begun. • Paid permit fees may be refunded when an eligible request is received in writing. • At a minimum, a$63.00 administrative fee will be retained when fees are refunded. • If the paid permit fee is less than $63.00, no refund is authorized. • If the paid permit fee is more than$63.00,the refund shall be calculated at the rate of 95% of the paid permit fee minus $63.00. For any application taken or permit issued in error, a full refund of fees paid shall be made. No portion of the paid fees shall be retained. Resolution 22-009 Fee Schedule for 2022 Page 5 of 18 FEES GENERAL Hourly Rate for City Employees $63.00 Overtime rate for City Employees (1.5 times regular rate) $95.00 Investigation fee: Work commenced without required permits Equal to permit fee Working beyond the scope of work $156.00 Replacement of lost permit documents Hourly rate; 1 hour minimum Revisions to plans requested by the applicant or permit holder shall be charged the hourly rate with a minimum of one hour. Revised plans submitted in response to reviewer correction letters are not subject to the hourly assessment. Washington State Building Code Council Surcharge (WSBCC) — see the Washington State Building Code Council website for fees. BUILDING PERMIT: Building permit fees for each project are set by the following fees. The figures below shall be used to determine the building permit fees and plans check fees based on the value of the construction work as stated by the applicant or the value calculated by the Building Official using the latest valuation data published in the Building Safety Journal by the International Code Council,whichever value is greater. Valuations not listed in the Building Safety Journal: Building Type Valuation Per Square Foot Residential garages/storage buildings (wood frame) $20.00 Residential garages (masonry) $23.00 Miscellaneous residential pole buildings $20.00 Residential carports, decks,porches $16.00 Building Permit Fee Calculation Total Valuation Building Permit Fee $1.00 to $25,000.00 $69.25 for first$2,000.00+ $14.00 for each additional$1,000.00 (or fraction thereof) Up to and including$25,000.00 $25,001,00 to $50,000.00 $391.25 for first $25,000+ $10.10 for each additional $1,000.00 (or fraction thereof) Up to and including$50,000.00 $50,001.00 to $100,000.00 $643.75 for first $50,000.00+ $7.00 for each additional $1,000.00(or fraction thereof) Up to and including$100,000.00 $100,001.00 to $500,000.00 $993.75 for first$100,000+ $5.60 for each additional $1,000.00 (or fraction thereof) Up to and including$500,000.00 $500,001.00 to$1,000,000.00 $3,233.75 for first$500,000.00+ $4.75 for each additional $1,000.00 (or fraction thereof) Up to and including $1,000,000.00 Resolution 22-009 Fee Schedule for 2022 Page 6 of 18 $1,000,001 and up $5,608.75 for first$1,000,000.00 + $3.15 for each additional $1,000.00 (or fraction thereof) Plan Review Fee Calculation % of Buildin t Permit Fee Plans review fee(general) 65% Plans review fee—Group R-3 occupancies(single family less than 7,999 sq. ft.) 40% Plans review fee—Group R-3 occupancies (single family 8,000 sq. ft. or more) 65% Plans review fee—Group U occupancies(sheds, barns, et.) 25% OTHER PERMITS: SITE PLAN REVIEW New Residential Home Site Plan Review $312.00 Residential Accessory Structure Site Plan Review $83.00 Commercial Site Plan Review $572.00 DEMOLITION PERMIT Single Family Residence $48.00 flat fee Commercial Building $136.00 flat fee Garage or accessory building associated with residence or commercial building $22.00 flat fee Foundation Only Building Permit: 25% of building permit fee Swimming Pools, over 2 feet in depth $63.00 +plumbing fees Re-roof(no plan review charge unless submitted for review) Based on Project Valuation Change of Use or Occupancy Classification Permit Hourly TEMPORARY CERTIFICATE OF OCCUPANCY Commercial or Multifamily Building $208.00 Residential Building $156.00 Factory Assembled Structure (FAS) Placement Permit $52.00 per section Towers, elevated tanks, antennas Hourly SIGN PERMIT: Sign Permits are subject to the assessment of the WSBCC fee as noted in Schedule B "General" section and the following review fees. Sign Plan Review Fee $88.00 Wall Sign Permit $78.00 per sign(flat fee) Freestanding or Monument Sign Permit $104.00 per sign(flat fee) RIGHT-OF-WAY(ROW)PERMIT: A traffic plan and traffic plan review is required if more than 50% of the width of any street is closed or if a single arterial lane is closed. A minimum plan review fee of$63.00 (hourly rate for City employees) applies Resolution 22-009 Fee Schedule for 2022 Page 7 of 18 to all right-of-way permits that require a traffic plan. If additional staff time is required, it shall be charged at the hourly rate. Fees for outside professional services required during the permit process shall be paid by the applicant. Examples of outside professional services include review by contract reviewers, special inspection or construction services, consultant services for special topics, surveying or other services required to determine compliance with applicable codes. TYPES OF ROW Non-cut obstruction without clean up $76.00 Non-cut obstruction with clean up $114.00 Pavement cut obstruction, non-winter $208.00 Pavement cut obstruction,winter $218.00 Working without a permit 100% Permit Fee Commercial Approach Permit $78.00 Residential Approach Permit $73.00 Multiple Use Permit--overhead $114.00 per 1/4 mile Multiple Use Permit—underground $676.00 per 1/4 mile Erosion/Sediment Control—Site Inspection $104.00 Oversized Load Permit Fee $78.00 Structure Transport Permit $156.00 per section ENGINEERING PERMITS GRADING PERMIT: 100 cubic yards(cu yd) or less $26.00 101 to 1,000 cubic yards $26.00 for first 100 cu yd. + $7.00 each additional 100 cu yd 1,001 to 10,000 cubic yards $130.00 for first 1,000 cu yd+ $10.00 each additional 1,000 cu yd 10,001 to 100,000 cubic yards $234.00 for first 10,000 cu yd+ $36.00 each additional 10,000 cu yd 100,001 to 200,000 cubic yards $546.00 for first 100,000 cu yd+ $26.00 each additional 10,000 cu yd 200,000 or more cubic yards $650.00 for first 200,000 cu yd+ $26.00 for each additional 10,000 cu yd GRADING PLAN REVIEW FEE: 100 cubic yards(cu yd) or less $21.00 101 to 1,000 $26.00 1,001 to 10,000 $36.00 10,001 to 100,000 $36.00 for first 10,000 cu yd+ $26.00 each additional 10,000 cu yd Resolution 22-009 Fee Schedule for 2022 Page 8 of 18 100,001 to 200,000 $182.00 for first 100,000 Cu yd + $26.00 for each additional 10,000 cu yd 200,001 or more $650.00 for first 200, 000 cu yd+ $26.00 for each additional 10,000 cu yd Grubbing& Clearing Only (without earth being moved) $71.00 Paving Permit(greater than 5,000 sq.ft.-new paving only) $274.00 OTHER ENGINEERING Design Deviation $156.00 STORMWATER UTILITY CHARGE ON DEVELOPED PARCELS: Each single-family unit $21.00 annual All other properties each $21.00 per 3,160 sq. ft impervious surface MECHANICAL PERMIT: Plan review fees for mechanical permits shall be collected at the time of application as noted in the "Fee Payment" section of this schedule. Permit fees shall be collected when the permit is issued. Mechanical Permit Fees A. BASIC FEES 1. Basic fee for issuing each Stand-Alone permit $38.00 2. Basic fee for each Supplemental permit $8.00 B. UNIT FEES (in addition to the basic fee) 1. Installation or relocation of Furnaces and suspended heaters a. up to and including 100,000 btu $14.00 b. over 100,000 btu $17.00 2. Duct work system $11.00 3. Heat pump and air conditioner a. 0 to 3 tons $14.00 b. over 3 tons to 15 tons $22.00 c. over 15 tons to 30 tons $27.00 d. over 30 tons to 50 tons $38.00 e. over 50 tons $66.00 4. Gas water heater $11.00 5. Gas piping system $1.00 per outlet 6. Gas log, fireplace, and gas insert installation $11.00 7. Appliance vents installation; relocation; replacement $10.00 each 8. Boilers, compressors, and absorption systems a. 0 to 3 hp- 100,000 btu or less $14.00 b. over 3 to 15 hp- 100,001 to 500,000 btu $22.00 c. over 15 -30 hp-500,001 to 1,000,000 btu $27.00 d. over 30 ph- 1,000,001 to 1,750,000 btu $38.00 e. over 50 hp-over 1,750,000 btu $66.00 9.Air Handlers a. each unit up to 10,000 cfm, including ducts $14.00 b. each unit over 10,000 cfin $17.00 10. Evaporative Coolers(other than portable) $11.00 11. Ventilation and Exhausts a. each fan connected to a single duct $11.00 Resolution 22-009 Fee Schedule for 2022 Page 9 of 18 b. each ventilation system $14.00 c. each hood served by mechanical exhaust $14.00 12. Incinerators a. residential installation or relocation $22.00 b. commercial installation or relocation $24.00 13. Unlisted appliances a. under 400,000 btu $54.00 b. 400,000 btu or over $109.00 14. Hood a. Type I $54.00 b. Type II $11.00 15. LP Storage Tank $11.00 16. Wood or Pellet Stove insert $11.00 17. Wood stove system-free standing $27.00 PLUMBING PERMIT: Plan review fees for plumbing permits shall be collected at the time of application as noted in the "Fee Payment"section of this schedule. Permit fees shall be collected when the permit is issued. A. BASIC FEES 1. Basic fee for issuing each Stand-Alone permit $38.00 2. Basic fee for each Supplemental permit $8.00 B.UNIT FEES (in addition to the basic fee) 1.Each plumbing fixture on a trap $6.00 each (includes garbage disposals, dishwashers, backflow device, drainage, hot tubs, built-in water softener, water closets, lavatories, sinks, drains, etc.) 2. Water Heater $6.00 each 3. Industrial waste pretreatment interceptor $17.00 (includes its trap and vent, except kitchen type grease interceptors functioning as fixture traps.) 4. Repair or alteration of water piping, drainage or vent piping $6.00 each fixture 5, Atmospheric type vacuum breaker $6.00 each 6. Backflow protective device other than atmospheric type vacuum breakers $6.00 each 7. Medical gas $6.00 per outlet 8. Interceptors $6.00 each Resolution 22-009 Fee Schedule for 2022 Page 10 of 18 Schedule C — Parks and Recreation ADMINISTRATIVE FEES Basic fees to be considered when applying rates Administrative Fee $32.00 Refuse Fee $52.00 AQUATICS Pool admission(age 5 and under) free Pool admission(age older than 5) $1.00 Pool punch pass(25 swims) $20.00 Weekend family discount— 1 child under 13 free with paying adult At the discretion of the City Manager, the Parks and Recreation Department may on occasion offer free admission open swim days. Swimming Lessons $40.00 Swim Team Fee $60.00 Pool Rental (fewer than 100 people) $300.00 for 2-hr rental Pool Rental (101-200 people) $400.00 for 2-hr rental Refundable Pool Damage Deposit $150.00 ALCOHOLIC BEVERAGE PERMIT $10.00 CENTERPLACE Conference Center Wing Auditorium $79.00 per hour Auditorium $475.00 per day Auditorium $236.00 per half day Auditorium w/Presentation System $52.00 per hour*** Auditorium w/Presentation System $315.00 per day*** Auditorium w/Presentation System $158.00 per half day*** Auditorium Deposit $52.00 Executive Conference Room $52.00 per hour Executive Conference Room %day $156 per 4 hours Executive Conference Room full day rental $416 per day Executive Conference Room Deposit $52.00 Meeting Room(day and evening use) $42.00 per hour Meeting Room $263.00 per day Large Meeting Room $75.00 per hour Large Meeting Room $225.00 per half day Large Meeting Room $450.00 per 9 hr. day Meeting Room $131.00 per half day Meeting Room Deposit $52.00 Portable Sound System $150.00 per event Platinum Package $500.00 per event **Requires rental of presentation system, see below Resolution 22-009 Fee Schedule for 2022 Page 11 of 18 Great Room Multi-use/Banquet Hall $105.00 per hour Multi-use/Banquet Hall - Wedding Ceremony-2 hours $500.00 Multi-use/Banquet Hall-Wedding Reception- 10 hours $1,310.00 Multi-use/Banquet Hall $840.00 per 9 hr session Multi-use/Banquet Hall $1,575.00 all day(6 a.m.-I a.m.) Small Dining Area $52.00 per hour Refundable Deposit $210.00 Refundable Deposit-Weddings $500.00 Table Settings (linens and tableware) $3.00 per place setting Pipe &Drape rental $100/day Senior Center Wing Lounge with Dance Floor $105.00 per hour Lounge with Dance Floor-Wedding Ceremony-2 hours $500.00 Lounge with Dance Floor-Wedding Reception-6 hours $850.00 Refundable Lounge deposit $210.00 Refundable Lounge deposit-Weddings $500.00 Meeting room(evening use) $42.00 per hour Meeting room (evening use) $131.00 per 4 hr session Meeting room (weekend use) $262.00 per day Meeting room (weekend use) $131.00 per half day Meeting room deposit $52.00 West Lawn and CenterPlace Rental fee $3,500.00 per day West Lawn Wedding Ceremony-2 hours(with CenterPlace Reception) $1,000 West Lawn PIaza Rental $2,000 per day - North Meadow additional$500 per day North Meadow Rental $1,000 per day West Lawn Plaza Rental- 1/2 day $1,000 - North Meadow additional $250 North Meadow Rental-1/2 Day $500 Miscellaneous Cleanup fee for groups bringing their own food in on Sundays • Groups under 30 in small meeting room $52 • Groups under 150 in large meeting room or lounge $210 • Groups over 150 in Great Room $500 Host/Hostess(after hours) $25.00 per hour Presentation System *** $262.00 per day (includes projector, podium, DVD/VCR sound system, camera system) Room Setup $26.00 per hour Satellite Video Conferencing $262.00 per hour Sound System $42.00 per day Additional Microphones $25.00 each Technical Support $42.00 per hour LCD Projector/Television $25.00 per hour LCD Projector/Television $100.00 per day Linens Only $10.00 per table Wine glass only rental $.50 per glass Conference Phone $100.00 per event Easel Paper Pad $20.00 per pad Laptop Usage $50.00 per event Resolution 22-009 Fee Schedule for 2022 Page 12 of 18 Business Incentive Rental Policy—The Parks & Recreation Director has the authority to reduce the room rental rate by one hr. when the rental meets the following criteria: minimum of 25 participants; utilize a classroom at CenterPlace eight or more times per calendar year; and use in-house caterer for a meal each reservation. PICNIC SHELTER RESERVATION (For groups fewer than 200 people) Browns—large red (up to five hours) $100.00 Browns—small green(up to two hours) $40.00 Edgecliff(up to five hours) $100.00 Discovery Playground (up to two hours) $40.00 Greenacres—large (up to five hours) $100.00 Mirabeau Meadows(up to five hours) $100.00 Mirabeau Meadows—shelter and stage(up to five hours) $150.00 Mirabeau Springs—shelter and dock(up to two hours) $250.00 Sullivan(up to five hours) $100.00 Terrace View(up to five hours) $100.00 Valley Mission(up to five hours) $100.00 EVENT RESERVATION—include shelter (For groups of 200 or more people) Events include but are not limited to activities such as car shows, tournaments, or high-risk activities. The Parks and Recreation Director shall make the final determination. General fee(up to five hours): $175.00 Non-profit applications with proof of qualifying as a 501(c)(3) entity (up to five hours): $100.00 EVENT PHOTOS Mirabeau Springs shelter and dock $150.00 per hour BALL FIELD RENTAL/USE $26.00 1st hour+ $15.00 each additional hour REFUNDABLE FACILITY DAMAGE DEPOSIT Fewer than 200 people $75.00 Weddings, Special Events and events with 200 or more people $300.00 SPECIAL EVENTS (See Spokane Valley Municipal Code 5.15) Application Fee $50.00 RECREATION Recreation program fees are established at amounts to recover costs, as specified in the Parks and Recreation revenue policy. Resolution 22-009 Fee Schedule for 2022 Page 13 of I8 Schedule D — Administration COPY FEE Paper copies up to 11"x17" (b/w or color) $0.15 per page* Paper copies larger than I 1"x17"(b/w or color) $0.87 per square foot* Scanned copies of paper records $0.10 per page * Electronics records uploaded to email, cloud-based storage, CD/DVD, or flash drive $0.05 per every 4 electronic files or attachments* Records transmitted in electronic format $0.10 per GB* Digital Storage Media Device(CD/DVD, flash drive) Actual Cost* Envelope Actual Cost* Postage Actual Cost* Records sent to outside vendor for reproduction Actual Cost* Customized Service Charge - When the request would require the use of IT expertise to prepare data compilations or when such customized access services are not used by the agency for other business purposes, the agency may charge the actual cost.The agency must notify the requestor that it will be doing a customized service and can require a 10 percent deposit.* *It is the intent of the City of Spokane Valley to recover the cost of providing public records when the total cost, including but not limited to the per-page, device, envelope, or postage costs, amounts to $1.00 or more. Copy charges above may be combined to the extent more than one type of charge applies to copies responsive to a particular request.When combining fees associated with the request,the City will determine the total cost and charge accordingly. Copy charges are assessed for each installment of records provided to the requestor. A deposit of 10%may be required on public record requests. NSF CHECK RETURN FEE $26.00 CREDIT CARD TRANSACTION PROCESSING FEE 2.5% of transaction amount Applies to all City fees paid by credit card/debit card except for those fees under Schedule F—Police Fees (amount of the alarm fee is intended to cover the total cost of administering the false alarm program, including, but not limited to, payment processing fees). Credit card transaction processing fees are non-refundable. Resolution 22-009 Fee Schedule for 2022 Page 14 of 18 Schedule E — Other Fees BUSINESS REGISTRATION Business Registration $25.00 annual Nonprofit Registration $10.00 annual Out-of-City Business Registration with annual revenues equal to or less than$2,000 (SVMC 5.05.020(D)) $0.00 Adult Entertainment Establishment License, Live Adult Entertainment $1,575.00 Establishment License,Adult Arcade $1,575.00 Adult Arcade Device License $157.00 Manager License $157.00 Entertainer License $157.00 Late Adult Entertainment License Fee(charged in addition to the license fee) 7 to 30 calendar days past due 25% of license fee 31 to 60 calendar days past due 50% of license fee 61 and more calendar days past due 75% of license fee Appeal of Administrative Determination—Adult Entertainment License Adult Entertainment License denial, suspension or revocation pursuant to SVMC 5.10 $1,050.00 Tow Operator Registration Fee $105.00 annual Schedule F — Police Fees FALSE ALARM RECOVERY FEE $65 per incident Amount of the fee is intended to cover the total cost of administering the false alarm program, including, but not limited to, payment processing fees. Resolution 22-009 Fee Schedule for 2022 Page 15 of 18 Schedule G — Transportation Impact Fees SOUTH BARKER CORRIDOR TRANSPORTATION IMPACT FEE SCHEDULE Pursuant to chapter 22.100 SVMC and the adopted South Barker Corridor Study and South Barker Corridor Transportation Impact Fee Rate Study, the following fees are the transportation impact fees applicable within the South Barker Corridor area identified in the South Barker Corridor Transportation Impact Fee Rate Study. Base Rate=$1,153 per PM Peak Trip Land Use Group ITE Code ITE Land Use Category Impact Fee Per Unit 210 Single Family& Duplex $1,084 per dwelling unit Residential 220 Multi-Family (Low-Rise) - Not Close to Rail $588 per dwelling unit Transit 310 Hotel (3 or More Levels) $680 per room Services 492 Health Club $3.98 per sq ft 912 Bank $15.74 per sq ft 520 Elementary School $2,052 per employee Institution 522 Middle School $2,236 per employee 525h School $1,856 per employee 975 Drinking Establishment $7.46 per sq ft Restaurant 934 Fast Food Restaurant(with drive-thru) $17.13 per sq ft 938 Coffee Shop with Drive-Thru(no indoor seating) $1,912 per drive-thru lane 820 Shopping Center $2.78 per sq ft Retail 841 Automobile Sales-Used/New $4.32 per sq ft 945 Convenience Store/Gas Station-GFA(4-5.5k) $8,921 per pump 110 Light Industry/High Technology $0.75 per sq ft 140 Manufacturing $0.85 per sq ft Industrial 150 Warehousing $0.21 per sq ft 151 Mini-Storage $19.37 per storage unit 710 General Office $1.66 per sq ft Office 720 Medical Office/Clinic $4.53 per sq ft 750 Office Park $1.50 per sq ft ITE Trip Generation manual,11 th Edition "sq ft"means square foot. "pump"means vehicle servicing position/gas pump. "room"means available hotel room. Pursuant to chapter 22.100 SVMC,transportation impact fees for uses not listed in the rate table shall be based on (1) the most similar land use category identified in the table, or (2) the base rate and the most similar land use category identified in ITE Trip Generation Manual, as documented by a trip generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street Standards. Resolution 22-009 Fee Schedule for 2022 Page 16 of 18 MIRABEAU SUBAREA TRANSPORTATION IMPACT FEE SCHEDULE Pursuant to chapter 22,100 SVMC and the adopted Mirabeau and North Pines Road Subarea Transportation Impact Fee Rate Study, the following fees are the transportation impact fees applicable within the Mirabeau subarea identified in the Rate Study. Base Rate=$698 per PM Peak Trip Land •Use Group ITE Code " ITE Land Use Category Impact Fee Per Unit 210 Single Family & Duplex $657 per dwelling unit Residential 220 Multi-Family (Low-Rise) - Not Close to Rail $356 per dwelling unit _ Transit 310 Hotel(3 or More Levels) $412 per room Services 492 Health Club $2.41 per sq ft 912 Bank $9.54 per sq ft 520 Elementary School $1,243 per employee Institution 522 Middle School $1,355 per employee 525 High School $1,125 per employee 975 Drinking Establishment $4.52 per sq ft Restaurant 934 Fast Food Restaurant(with drive-thru) $10.38 per sq ft 938 Coffee Shop with Drive-Thru (no indoor seating) $1,159 per drive-thru lane 820 Shopping Center $1.69 per sq ft Retail 841 Automobile Sales-Used/New $2.62 per sq ft 945 Convenience Store/Gas Station-GFA(4-5.5k) $5,405 per pump 110 Light Industry/High Technology $0.45 per sq ft Industrial 140 Manufacturing $0.52 per sq ft 150 Warehousing $0.13 per sq ft 151 Mini-Storage $11.73 per storage unit 710 General Office $1.01 per sq ft Office 720 Medical Office/Clinic $2.75 per sq ft 750 Office Park $0.91 per sq ft ITE Trip Generation manual, l lth Edition. "sq ft"means square foot. "pump"means vehicle servicing position/gas pump. "room"means available hotel room. Pursuant to chapter 22.100 SVMC,transportation impact fees for uses not listed in the rate table shall be based on(1)the most similar land use category identified in the table, or (2) the base rate and the most similar land use category identified in ITE Trip Generation Manual, as documented by a trip generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street Standards. Resolution 22-009 Fee Schedule for 2022 Page 17 of 18 NORTH PINES ROAD SUBAREA TRANSPORTATION IMPACT FEE SCHEDULE Pursuant to chapter 22.100 SVMC and the adopted Mirabeau and North Pines Road Subarea Transportation Impact Fee Rate Study,the following fees are the transportation impact fees applicable within the North Pines Road subarea identified in the Rate Study. Base Rate=$2,195 per PM Peak Trip Land Use Group ITE Code ITE Land Use Category Impact Fee Per Unit 210 Single Family &Duplex $2,063 per dwelling unit Residential 220 Multi-Family (Low-Rise) - Not Close to Rail $1,119 per dwelling unit Transit 310 Hotel(3 or More Levels) $1,295 per room Services 492 Health Club $7.57 per sq ft 912 Bank $29.97 per sq ft 520 Elementary School $3,906 per employee Institution 522 Middle School $4,258 per employee 525 High School $3,533 per employee 975 Drinking Establishment $14.21 per sq ft Restaurant 934 Fast Food Restaurant(with drive-thru) $32.62 per sq ft 938 Coffee Shop with Drive-Thru (no indoor seating) $3,640 per drive-thru lane 820 Shopping Center $5.30 per sq ft Retail 841 Automobile Sales-Used/New $8.23 per sq ft 945 Convenience Store/Gas Station-GFA(4-5.5k) $16,983 per pump 110 Light Industry/High Technology $1.43 per sq ft Industrial 140 Manufacturing $1.62 per sq ft 150 Warehousing $0.40 per sq ft 151 Mini-Storage $36.87 per storage unit 710 General Office $3.16 per sq ft Office 720 Medical Office/Clinic $8.62 per sq ft 750 Office Park $2.85 per sq ft ITE Trip Generation manual,11th Edition "sq ft"means square foot. "pump"means vehicle servicing position/gas pump. "room"means available hotel room. Pursuant to chapter 22.100 SVMC,transportation impact fees for uses not listed in the rate table shall be based on (1) the most similar land use category identified in the table, or (2) the base rate and the most similar land use category identified in 1TE Trip Generation Manual, as documented by a trip generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street Standards. Resolution 22-009 Fee Schedule for 2022 Page 18 of 18