Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Resolution 22-010 TIP
CITY OF SPOIKANE VALLEY SPOKANE COUNTY,WASHINGTON RESOLUTION 22-010 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, ADOPTING THE 2023-2028 TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS RELATING THERETO. WHEREAS, to provide for the proper and necessary development of the street system within the City of Spokane Valley,the City shall,pursuant to RCW 35.77.010,develop and adopt annually a Six-Year Transportation Improvement Program (Six-Year TIP) with such program acting as a guide for the coordinated development of the City's transportation system; and WHEREAS, the Six-Year TIP of the City shall specifically set forth those projects and programs of both City and regional significance that benefit the transportation system and promote public safety and efficient vehicle movements; and WHEREAS, the Six-Year TIP shall be consistent with the City's Comprehensive Plan and be adopted following one or more public hearings before the City Council; and WHEREAS, a draft copy of the Six-Year TIP was submitted to the Washington State Department of Commerce and has been reviewed and approved prior to the scheduled adoption of the I'IP in accordance with RCW 36.70A.106; and WHEREAS, following adoption of the Six-Year 1'IP, the City will forward a copy to the Washington State Secretary of Transportation; and WHEREAS, the City Council conducted a public hearing on June 14, 2022, for the purpose of inviting and receiving public comment on the proposed Six-Year TIP. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington, as follows: Section L The City Council hereby adopts the attached Six-Year TIP for the City of Spokane Valley for the purpose of guiding the design, development and construction of local and regional transportation improvements for the years 2023 through 2028. The City Clerk is directed to file the 2023- 2028 Six-Year TIP with the Washington State Secretary of Transportation before June 30,2022. The Six- Year TIP shall be reviewed at least annually for the purpose of determining the work to be accomplished under the program and the City's transportation requirements. Projects and timeframes identified in the Six-Year TIP are to be considered estimates only that may change due to a variety of circumstances, and are not intended by the City to be relied upon by property owners or developers in making development decisions. In the event a railroad ceases to use rail right-of-way within the City, the City will utilize all reasonable options available under state or federal law to preserve the right-of-way for future rail purposes pursuant to RCW 35.77.010(3), Section 2. Effective Date. This Resolution shall be in full force and effect upon adoption. Resolution 22-010,Adopting Six-Year TIP Adopted this 14 day of June, 2022. AT Ty,STi City of Spokane Valley """:4-4,A.,€ ,J5-41;40/: cr\-- '06--D ristine Bainbridge, City Clerk Pam Haley,Mayor Appro ed as t Office of ki e City A ey Resolution 22-010,Adopting Six-Year TIP 2023 - 2028 Six Year SCOF1� .11e Transportation Improvement Program (TIP) 4.0• V .11ey'� ems_ �_ — — - - - *� ,/ i I re i ni t L2.1 ' I .� '�e r�r .II' -. —. _— — a - - -: + _ < �� 1`t f v , City of Spokane Valley Community & Public Works Department 2023-2028 Transportation Improvement Program (TIP) Spo°Fka�le Glossary & Abbreviations Project Phases: Funding Sources: • PE Preliminary Engineering • City City Funds • RW Right-of-Way • CDBG Community Development Block Grant • CN Construction • CMAQ Congestion Management/Air Quality • COM Washington Department of Commerce • DEV Private Developer Funds • FHWA Federal Highway Administration • FMSIB Freight Mobility Strategic Investment Board • FTA Federal Transit Authority • HSIP Highway Safety Improvement Program • NHFP National Highway Freight Program • Other Misc. Unidentified Funding Sources • RCO Washington State Recreation Conservation Office • REET Real Estate Excise Tax • RR Railroad • SRTS Safe Routes to School • SW City Stormwater Funds • STA Spokane Transit Authority • STBG Surface Transportation Block Grant • STBG-SA Surface Transportation Block Grant—Set Aside • TIB Transportation Improvement Board • WAL Washington Legislature • WSDOT Washington Department of Transportation "oile 2023- 2028 h Six-Year Transportation Improvement Program Walley Dollars in Thousands Funding Project I Description/Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total I Sprague Ave.I Barker Rd. Intersection Improvement 40 city CMAQ 2 2 Description: DEV Provide new roundabout and sidewalks and bike accommodations. HSIP 38 38 Status: Funding Status: Secured PE 0 2022 CN,2023 Closeout Secured RW 0 Length (miles) Intersection Secured CN 40 40 Total 40 40 2 Citywide Reflective Post Panels (2020) 3 HSIP 3 3 City Description: installation of reflective post panels to stop signs and speed limit signs on select streets. Status: Funding Status: Secured PE 0 2022 CN,2023 Closeout RW 0 Length (miles) 0 Secured CN 3 3 Total 3 3 3 Sullivan Rd.I Wellesley Ave. Intersection Improvement 40 City 3 3 CMAQ 17 17 Description: Spo.Co. 20 20 Traffic signal and intersection improvement project,partnership with Spokane County. Status: Funding Status: Secured PE 0 2022 CN,2023 Closeout Secured RW 0 Length (miles) Intersection Secured CN 40 40 Total 40 40 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 1 2023- 2028 Spokane Six-Year Transportation Improvement Program 40000Valley Dollars in Thousands Funding Project I Description 1 Current Status/Length Total Sources 2023 2024 2025 2026 2027 2028 Total 4 Sprague Preservation-Havana to Fancher 45 City 25 25 STP 20 20 Description: Pavement Preservation with signal,sidewalk and ITS improvements as needed. Status: Funding Status: Secured PE 0 2022 CN,2023 Closeout RW 0 Length (miles) 1 Secured CN 45 45 Total 45 45 5 Wilbur Rd.Sidewalk-Boone to Mission 14 City 3 3 STBG-SA 11 11 Description: Install sidewalk from Boone to Mission on one side of road,including pavement preservation. Status: Funding Status: Secured PE 0 2021 PE,2022 CN.2D23 Closeout Secured RW 0 Length(miles) 0.3 Secured CN 14 14 Total 14 14 6 Barker Rd.1 BNSF Grade Separation Project 1,900 City 328 328 NHFP 542 542 Description: TIGER 551 551 Construct Grade Separation at Barker/BNSF RRITrent(SR290). FMSIB 462 452 WAL Other 27 27 Status: Funding Status: Secured PE 0 WSDOT administers CN 2021-2022,2023 Closeout. Secured RW 0 Length (miles) Intersection Secured CN 1,900 1,900 Total 1,900 1,900 Projects and timeframes identified in the TIP are to he considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 2 ���� 2023- 2028 S�„ �� Six-Year Transportation Improvement Program yDollars in Thousands Funding Project/Description!Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 7 Buckeye Sewer Extension 15 City 15 15 Description: Street reconstruction and sewer extension project with Spokane County (McMillan to City Limit) Status: Funding Status: Secured PE 0 2022 CN,2023 Closeout RW 0 Length (miles) 0 Secured CN 15 15 Total 15 15 8 Mission Ave. Bridge Resurfacing 242 City Other Fed 237 5 242 Description: Surface preservation of concrete bridge deck over Evergreen Road. Status: Funding Status: Secured PE 2 3 2022 PE,2023 CN,2024 Closeout RW 0 Length(miles) 0.0 Secured CN 235 5 240 Total 237 5 242 9 Barker Rd.at Union Pacific Crossing 1,299 City 752 15 767 FMSIB 261 5 266 Description: STBG 102 2 104 Reconstruct and widen to 3-lane urban section between Euclid intersection HSIP 159 3 162 legs and install shared-use path from river to Trent. Status: Funding Status: Secured PE 0 2022 PE+RW,2023 ON,2024 Closeout Secured RW 0 Length (miles) 0 Secured CN 1,274 26 1,300 Total 1,274 25 1,299 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 3 ur 2023. 2028 Sp0Ille Six-Year Transportation Improvement Program 4••••10Valley Dollars in Thousands Funding Project 1 Description/Current Status/Length Total Sources 2023 2024 2025 2026 2027 2028 Total 10 Pines Rd./Mission Ave. Intersection Improvement 1,612 City 214 4 218 CMAQ 1,366 28 1,394 Description: Signal and channelization upgrades to improve capacity and additional turn lane on southbound Pines. Status: Funding Status: Secured PE 0 2023 ON,2024 Closeout Secured RW 0 Length (miles) Intersection Secured CN 1,580 32 1,612 Total 1,560 32 1,612 11 Broadway Preservation-Fancher to Park 1,660 City 813 17 830 STP 813 17 830 Description: Pavement preservation project. Status: Funding Status: Secured PE 0 2023 CN,2024 Closeout RW a Length (miles) 1 Secured CN 1,627 33 1,660 Total 1,626 34 1,660 12 Sullivan Rd. Improvements-Sprague to 8th 2,734 City 503 10 513 Other Fed 1,009 21 1,030 Description: TiB 1,167 24 1,191 Pavement rehabilitation with signal and concrete improvements at 4th,ITS, sidewalks and stormwater improvements as necessary. Status: Funding Status: Secured PE 0 2023 ON.2024 Closeout. Secured RW 0 Length(miles) 0.3 Secured CN 2,679 55 2,734 Total 2,679 55 2,734 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 4 SQ„����� 2023. 2028 p Six-Year Transportation Improvement Program .000 Valley Dollars in Thousands Funding Project/Description/Current Status/Length Total Sources 2023 2024 2025 2026 2027 2028 Total 13 Sprague Ave. Stormwater Improvements 1,902 Other State 1,398 28 1,426 City 466 10 476 Description: Drywell retrofits between University and Park.Funded by Dept.of Ecology. Status: Funding Status: Secured pE 2 2 In Design RW 0 Length (miles) 2 Secured CN 1,862 38 1,900 Total 1,864 38 1,902 14 2022 Local Access Streets (Summerfield East) 1,300 City 1,274 26 1,300 Description: Street reconstruction with sidewalk and stormwater upgrades as needed. Status: Funding Status: Secured PE 0 2022 CN delayed to 2023 due to bid climate.2023 CN,2024 Closeout RW 0 Length(miles) 0 Secured CN 1,274 26 1,300 Total 1,274 26 1,300 15 Pedestrian & Bicycle Safety Analysis 150 City 75 75 150 Description: Evaluate crash history of vehicle versus pedestrian/bicyclists on City streets,as identified in the 2020 Local Road Safety Plan. Status: Funding Status: Planned PE 75 75 150 PE only.May be staff-led with support from consultant team.Sprague,SR RW 0 27,and Sullivan have majority of severe pedestrian crashes. Length(miles) 0 CN 0 Total 75 75 150 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 5 �n 2023- 2028 Sp0`�kane Six-Year Transportation Improvement Program eyDollars in Thousands Funding Project I Description I Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 16 2023 Local Access Streets (Donwood Neighborhood) 1,500 City 100 1,400 1,500 Description: Local street reconstruction and sewer extension project in Donwood neighborhood. Status: Funding Status: Planned pE 1DD 100 RW 0 Length(miles) 0 Planned CN 1,400 1,400 Total 100 1,400 1,500 17 Northeast Industrial Sewer Extension 4,975 City 4,876 99 4,975 Description: Street reconstruction and sewer extension project(Flora,Tschirley,Dalton) with Spokane County. Status: Funding Status: Planned PE 25 25 2023 CN,2024 Closeout RW 0 Length (miles) 0 Planned CN 4,851 99 4,950 Total 4,876 99 4,975 18 8th Ave. Sidewalk 920 City 361 7 368 TIB 541 11 552 Description: Install sidewalk with curb and gutter on north side from Edgecliff park to Coleman Road to Thierman Road.CN may be phased as funding allows. New bike lanes to be considered as well. Status: Funding Status: Secured PE 20 20 Park to Coleman:2023 CN,2024 Closeout,Coleman to Theirman:TBD RW 0 Length (miles) 0 Partial CN 882 18 900 Total 902 18 920 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 6 _ 2023- 2028 SpOIle Six-Year Transportation Improvement Program .0•000Valley Dollars in Thousands Funding Project 1 Description 1 Current Status/Length Total sources 2023 2024 2025 2026 2027 2028 Total 19 2022 City Safety Program Improvements 1,442 City 17 17 HSIP 156 1,269 1,425 Description: Pedestrian crossing improvments on Sprague(at Chronicle,McKinnon,& City Hall)and Trent access control improvements(at Dale,McDonald,& Evergreen). Status: Funding Status: Planned pE 173 173 City Safety Program application funds pending. Planned RW 0 Length(miles) C Planned CN 1,269 1,269 Total 173 1,269 1,442 20 Barker Road Corridor Design Phase 100 DEV 75 25 100 Description: Design phase for Barker Road from Appleway to South City Limits Status: Funding Status: Secured PE 75 25 100 Project included for finance tracking purposes. RW 0 Length (miles) 0 CN 0 Total 75 25 100 21 Sprague Ave. Safety Improvements 618 City 4 93 97 STA 163 163 Description: Other Fed 24 534 556 Install pedestrian crossing at City Hall&Balfour Park with potential lane reductions,see TIP#23. Status: Funding Status: Secured PE 28 28 55 Funding includes STA,PBP,and City. RW 0 Length (miles) 0 Secured CN 762 762 Total 28 790 818 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 7 pirikane 2023. 2028 1} Six—Year Transportation Improvement Program Valley Dollars in Thousands Funding Project 1 Description 1 Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 22 South Bowdish Sidewalk(12th to 22nd) 1,985 City 6 310 316 SRTS 31 1,638 1,009 Description: Install new sidewalk on the east side,including crosswalk,signage,and ADA ramp improvements. Status: Funding Status: Secured PE 37 37 74 2023 PE,2024 CN,2025 Closeout RW 0 Length (miles) 0 Secured CN 1,911 1,911 Total 37 1,948 1,985 23 Sullivan Rd. Preservation-8th to 16th 1,400 City 20 80 260 360 Other 1,040 1,040 Description: Pavement preservation with signal, ITS,sidewalks and stormwater improvements as necessary. Status: Funding Status: Planned PE 20 80 100 Seeking funds,candidate for TB or STBG preservation funding. RW 0 Length (miles) 0.3 Planned CN 1,300 1,300 Total 20 80 1,300 1,400 24 Broadway Ave.-Havana to Fancher 2,980 City 10 70 580 660 Other 2,32D 2,320 Description: Pavement preservation&reconstruction,including stormwater improvements. Status: Funding Status: Secured PE 10 70 80 2020-2024 PE.2025 CN. Planned RW 0 Planned CN 2,900 2,900 Length(miles) 1 Total 10 70 2,900 2,980 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page B 2023- 2028 SScmix-Year Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project 1 Description 1 Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 25 Pines Rd. (SR27)!BNSF Grade Separation Project 28,745 City 908 2,690 2,152 5,750 STBG 1,138 1,138 Description: Other Fed 100 100 Construct Grade Separation at Pines/BNSF RRITrent(SR290). Other 2,152 10,760 8,608 21,520 DEV 237 237 Status: Funding Status: Secured PE 230 230 2020 PE Start.ROW in progress. Secured RW 1,616 1,616 Length (miles) Intersection Partial CN 2,690 13,450 10,760 26,900 Total 4,535 13,450 10,760 28,745 26 Spokane Valley River Loop Trail 6,899 City 333 933 233 600 2,099 Other 2,400 2,400 4,800 Description: Paved shared-use path on north bank of Spokane River between Plante's Ferry and Flora Parks,including two pedestrian bridges at each end. Status: Funding Status: Secured PE 333 333 233 900 PE planned for 2022 local budget,pursue RW/CN funding. RW Length (miles) 5 Planned CN 3,000 3,000 6,000 Total 333 3,333 233 3,000 6,899 27 Sullivan Rd./SR 290 Interchange Reconstruction 26,630 City 848 848 562 138 2,260 2,260 6,916 Other 212 212 658 552 9,040 9,040 19,714 Description: Reconstruct interchange to improve safety and capacity. Status: Funding Status: Partial PE 1,060 1,060 530 2,650 City secured$500,000 for 2021-2022 initiatial PE,pursuing additional PE, Planned RW 690 690 1,380 RW,CN funding by 2026.CN Start 2027. Length (miles) 0 Planned CN 11,300 11,300 22,600 Total 1,060 1,060 1,220 690 11,300 11,300 26,630 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 9 �,,. 2023- 2028 Spokane Six-Year Transportation Improvement Program 4. v ey Dollars in Thousands Funding Project I Description 1 Current Status/Length Total Sources 2023 2024 2025 2026 2027 2028 Total 28 Barker Rd. Intersection Improvements at 4th &8th 5,501 City 31 805 1,517 381 1,502 4,236 0EV 4 104 197 50 195 550 Description: CMAQ 5 136 256 64 254 715 Provide new traffic signal or roundabout,per S.Barker Corridor Study. Status: Funding Status: Planned PE 40 40 20 100 Assume City funded,but may be eligible for grant funds. Planned RW 1,005 495 1,500 Length(miles) 0 Intersection Planned CN 1,950 1,950 3,900 Total 40 1,045 1,970 495 1,951 5,501 29 Barker Rd. Improvement-Appleway to S. City Limits 7,327 City 148 486 482 350 1,466 Other 592 1,943 1,927 1,399 5,861 Description: Reconstruct to 3-lane urban section including signal/channelization improvements at Appleway. Status: Funding Status; Planned PE 80 20 100 Identified in S.Barker Corridor Study. Planned RW 660 660 660 1,980 Length(miles) 0.8 Planned CN 1,749 1,749 1,749 5,247 Total 740 2,429 2,409 1,749 7,327 30 Citywide Safety Projects-Biennial 6,999 HSIP 1,866 351 1,866 351 1,866 6,300 City 207 39 207 39 207 699 Description: Projects are consistent with the City's Local Road Safety Plan.Unique projects identified separately in TIP. Status: Funding Status: Planned PE 18 48 18 48 18 150 Costs assume project implementation in odd-number years and RW 0 design/close-out in even-numbered years.10%local match. Length(miles) 0 Planned CN 2,055 343 2,055 343 2,055 6,850 Total 2,073 390 2,073 390 2,073 6,999 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 10 a►kane 2023- 2028 S��` Six-Year Transportation Improvement Program ley Dollars in Thousands Funding Project!Description!Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 31 Local Access Street Improvements-$1.5M Annually 7,500 City 1,500 1,500 1,500 1,500 1,500 7,500 Description: Fund#106.Project type varies(surface treatments,grind/inlays, reconstruction).Unique projects identified separately in TIP. Status: Funding Status: Secured PE 100 100 100 100 100 500 Site selection is on-going.Actual locations to be determined. Secured RW 0 Length(miles) Secured CN 1,400 1,400 1,400 1,400 1,400 7,000 Total 1,500 1,500 1,500 1,500 1,500 7,500 32 Street Preservation Projects-$3M Annually 15,000 City 3,000 3,000 3,000 3,000 3,000 15,000 Description: Preservation projects,typically arterials or collectors,or used as matching funds for grants. Status: Funding Status: Planned PE 100 100 100 100 100 500 Unique projects identified separately in TIP.Projects may include signal, RW 0 ITS,storm and sidewalk upgrades as applicable. Length(miles) Varies Planned CN 2,900 2,900 2,900 2,900 2,900 14,500 Total 3,000 3,000 3,000 3,000 3,000 15,000 33 Argonne Rd. Concrete Pavement- Indiana to Knox 3,000 City 20 40 540 B00 TIE BO 160 2,160 2,400 Description: Reconstruct with concrete and improve stormwater and signal operations. Status: Funding Status: Planned PE 100 100 200 Planned RW 100 100 200 Length(miles) 0.3 Planned CN 2,600 2,600 Total 100 200 2,700 3,000 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 11 2023- 2028 Scirpo"lan �' Six-Year Transportation Improvement Program ....00Valley Dollars in Thousands Funding Project I Description I Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 34 8th Ave. Preservation-Progress to Sullivan 700 City 25 25 585 635 Other 65 65 Description: Pavement preservation with potential partnership with Vera Water&Power for sidewalk extension&stormwater upgrades on south side. Status: Funding Status: Planned PE 25 25 50 Potential Fund 311 project in future CN years. RW 0 Length(miles) 0.2 Planned CN 650 650 Total 25 25 650 700 35 South Bowdish Rd.-Phased Corridor Improvements 2,502 City 12 8 460 12 8 500 Other 49 32 1,840 4g 32 2,002 Description: Reconstruct Sprague to Dishman Mica as urban section. May also include intersection improvements at 32nd Ave.,ITS,and a new signal or roundabout at 16th Ave. Status: Funding Status: Planned PE 200 200 400 Phased improvements to align with available funding opportunities. Planned RW 100 100 200 Potential sources include TIB,SRTC,Local. Length (miles) 3 Planned CN 2,300 2,300 Total 61 40 2,300 61 40 2,502 36 Sullivan Rd. Preservation-16th to 24th 2,200 City 80 1,700 1,780 Other 420 420 Description: Pavement preservation with signal,ITS,sidewalks and stormwater improvements as necessary. Status: Funding Status: Planned PE 80 20 100 Assumes 20%City match for CN. Planned RW 0 Length(miles) 0.8 Planned CN 2,100 2,100 Total 80 2,120 2,200 Projects and tirreframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 12 2023- 2028 pI I iii� Six-Year Transportation Improvement Program ..0,00Valley Dollars in Thousands Funding Project f Description 1 Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 37 Dishman-Mica Rd. Preservation-Schafer to S. City 1,30o City 50 1,250 1,300 Limit Description: Pavement preservation project with possible stormwater,path,ITS,and signal improvements as needed. Status: Funding Status: Planned PE 50 50 Planned RW 0 Length (miles) 1 Planned CN 1,250 1,250 Total 50 1,250 1,300 38 Vera Crest+Rocky Ridge Street Reconstruction 150 City 75 75 150 Projects Description: Stormwater and road reconstruction projects including multiple neighborhoods:Kahuna Hills(Camahan/Kahunall5th),Heather Park(16th at Rocky Ridge,Koren),Ridgemont Estates(Vera Crest,Conklin). Status: Funding Status: Planned PE 75 75 150 Multi-year,phased project.PE required to define scope and CN cost. RW 0 Possible CN funding by Ecology. Length(miles) 0 CN_ 0 Total 75 75 150 39 8th Ave./Carnahan Rd. Intersection Improvement 2,000 City 35 50 315 400 Other 140 200 1,260 1,600 Description: Add intersection control(turn lanes,potential signal). Status: Funding Status: Planned PE 175 175 Assumes 20%City match.OTHER may be TIB, DEV or City. Planned RW 250 250 Length (miles) Intersection Planned CN 1,575 1,575 Total 175 250 1,575 2,040 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 13 2023- 2028 SPrkan� Six-Year Transportation Improvement Program 'Dailey Dollars in Thousands Funding Project I Description 1 Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 40 Mirabeau Parkway 1 Mansfield Ave. Intersection 1,835 City 135 27 202 364 Improvement CMAQ 173 1,298 1,471 Description: Intersection capacity improvements:ITS&signal improvements,with added through/tum lanes Status: Funding Status: Partial PE 135 135 Potential for Developer funds via Mirabeau Subarea Traffic Study. Planned RW 200 200 Length(miles) Intersection Planned CN 1,500 1,500 Total 135 200 1,500 1,835 41 Barker Rd. Improvement Project-Appleway to 1-90 6,501 City 68 202 372 236 878 Other 432 1,298 2,379 1,514 5,623 Description: Reconstruct 5-lane urban section with ITS and alignmentichannelization improvements at Appleway(signal)&Broadway(RAB). Status: Funding Status: Planned PE 500 500 1,000 Anticipated to follow 1-90 interchange improvements. Planned RW 1,000 1,000 2,000 Length (miles) 0.3 Planned CN 1,750 1,750 3,500 Total 500 1,500 2,751 1,750 6,501 42 N. Sullivan Preservation (Spokane River to Marietta) 1,499 City 22 428 450 Other 52 997 1,049 Description: Pavement Preservation project with potential for new/expanded sidewalk per Sullivan Corridor Study. Status: Funding Status: PE 75 75 2024 PE,2025 CN RW 0 Length(miles) 0 CN 1,425 1,425 Total 74 1,425 1,499 Projects and tirreframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 14 ScnT l 2023- 2028 p Six-Year Transportation Improvement Program jValley Dollars in Thousands Funding Project 1 Description/Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 43 Flora Rd. Reconstruction-Euclid to Garland 2,200 City 30 410 440 Other 120 1,640 1,760 Description: Street reconstruction in partnership with Spokane County Sewer Extension. Status: Funding Status: Planned PE 100 100 Seeking funding,assume 20%City match. Planned RW 50 50 100 Length (miles) 0.6 Planned CN 2,000 2,000 Total 150 2,050 2,200 44 Park Rd. Preservation-Sprague to Trent 1,360 City 100 60 1,200 1,360 Description: Pavement preservation project,ITS Broadway to Trent Status: Funding Status: Planned PE 70 70 Assumes 100%City funded(Fund 311). Planned RW 30 30 Length(miles) 0.8 Planned CN 1,200 1,200 Total 100 60 1,200 1,360 45 32nd Ave. Preservation-Pines to SR 27 2,000 City 60 1,940 2,000 Description: Pavement preservation project with potential ITS,storm,sidewalk upgrades as needed. Status: Funding Status: Planned PE 60 60 RW 0 Length (miles) 0.8 Planned CN 1,940 1,940 Total 60 1,940 2,000 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 15 2023. 2©2s p0 �� Six-Year Transportation Improvement Program Talley Dollars in Thousands Funding Project I Description I Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 46 Park Rd.I Mission Ave. Intersection Improvement 2,000 City 20 150 1,820 2,000 Description: Improve channelization and signal operations. Status: Funding Status: Planned PE 20 80 100 Planned RW 80 20 100 Length (miles) 0 Planned CN 1,800 1,800 Total 20 160 1,820 2,000 47 Flora Rd.I SR 290 Intersection Improvement 4,000 City 40 40 1,520 1,600 DEV 10 10 380 400 Description: Other 50 50 1,900 2,000 Provide new signal with added turn lanes or roundabout,per adopted Planned Action Ordinance.Assume ROW&CN after 2027. Status: Funding Status: Planned PE 100 100 Planned project.Assume PAO contributions from Developers in the Planned RW 100 100 amount of 10%,City 40%,grants 50%. Length (miles) 0 Planned CN 3,800 3,800 Total 100 100 3,800 4,000 48 Cataldo Ave. Realignment at Barker Rd. 1,300 City 140 100 280 520 DEV 35 25 70 130 Description: Other 175 125 350 650 Realign Cataldo east of Barker to intersect Boone Ave.,per adopted Planned Action Ordinance. Status: Funding Status: Planned PE 100 100 PAO calls for cul-de-sac at ex.Cataldo.Assume PAO contributions from Planned RW 250 250 500 Developers in the amount of 10%,City 40%,grants 50%.CN after 2025. Length(miles) 0.2 Planned CN 700 700 Total 350 250 700 1,300 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 16 2023- 2028 SPO Ile Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project I Description I Current Status I Length Total Sources 2023 2024 2025 2026 2027 2028 Total 49 Wellesley Ave. Preservation-Sullivan to Flora 2,000 City 54 1,946 2,000 Description: Pavement preservation project. Status: Funding Status: Planned PE 54 6 60 2024 PE 2025 CN RW 0 Length (miles) 1 Planned CN 1,940 1,940 Total 54 1,946 2,000 50 Pines Rd. (SR-27)/16th Ave. Intersection Improvement 300 City 50 75 25 150 DEV 50 75 25 150 Description: Other Add traffic control at five-leg intersecton. Status: Funding Status: Planned PE 100 100 200 55M est.total.Pending funding to improve five-leg intersection. Planned RW 50 50 100 Length (miles) Intersection Planned CN 0 Total 100 150 50 300 51 Barker Rd.-Mission to Interstate 90 3,000 City 80 200 920 1,200 DEV 20 50 230 300 Description: Other 100 250 1,150 1,500 Reconstruct to 5-lane urban section.Improvements at Boone intersection are identified separately. Status: Funding Status: Planned PE 200 200 Planned project for 2025 PE.Assume PAO contributions from Developers Planned RW 500 500 in the amount of 10%,City 40%,grants 50%. Length(miles) 0.3 Planned CN 2,300 2,300 Total 200 500 2,300 3,000 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6115/2022 Page 17 ano�l�alle 2023- 2028 h Six-Year Transportation Improvement Program Walley Dollars in Thousands Funding Project!Description/Current Status!Length Total Sources 2023 2024 2025 2026 2027 2028 Total 52 8th Ave. Preservation- Havana to Park 2,000 City 54 1D6 1,840 2,000 Description: Pavement preservation project with select locations of sidewalk and road widening. Status: Funding Status: Planned PE 54 6 60 Planned RW 100 100 Length(miles) 1 Planned CN 1,840 1,840 Total 54 106 1,840 2,000 53 Appleway Trail-Farr to Dishman Mica 1,200 City 20 20 200 240 Other 80 80 800 960 Description: Extend Shared Use pathway to Dishman Mica. Status: Funding Status: Planned PE 100 100 Potential funding sources:TIE,SRTC,RCO,LDA,City Planned RW 100 100 Length (miles) 1 Planned CN 1,000 1,000 Total 100 100 1,000 1,200 54 Argonne Rd. & 1-90 Interchange Bridge Widening 7,750 City 50 50 1,450 1,550 FMSIB 75 75 2,175 2,325 Description: STBG 100 100 2,900 3,100 Widen Argonne Road bridge to 3 lanes southbound and improve WSDOT 25 25 725 775 sidewalks.New channelization to evaluate future STA park&ride facility. Status: Funding Status: Planned PE 250 250 500 $15 M total assumes bridge reconstruction,rechannelization,adjacent RW 0 signal rework.2028-2029 CN Length(miles) 0.1 Planned CN 7,250 7,250 Total 250 250 7,250 7,750 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 18 . • 2023- 2028 Spokane Six-Year Transportation Improvement Program valley Dollars in Thousands Funding Project I Description I Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 55 8th Ave./Park Rd. Intersection Improvement 340 City 16 52 68 DEV Description: Other 64 208 272 Provide new traffic signal or roundabout. Status: Funding Status: Planned PE 80 20 100 2029 CN Planned RW 240 240 Length(miles) 0 Planned CN 0 Total 80 260 340 56 Barker Rd.I Boone Ave. Intersection Improvement 200 City 20 60 80 DEV 5 15 20 Description: Other 25 75 100 Provide new signal or roundabout,per adopted Planned Action Ordinance, Assume ROW&CN after 2027. Status: Funding Status: Planned PE 50 50 100 Assume PAO contributions from Developers in the amount of 10%,City Planned RW 100 100 40%,grants 50%.2030 CN Length (miles) 0 Planned CN 0 Total 50 150 200 57 Broadway Ave. Improvements-Flora to Barker 600 City 16 104 120 Other 64 416 480 Description: Extend 3-lane urban section to Barker Rd and realign connection east of Barker. Status: Funding Status: Planned PE 80 20 100 Possible partnership with WSDOT.2029 CN Planned RW 500 500 Length (miles) 1 Planned CN 0 Total 80 520 600 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 611 512 02 2 Page 19 S Ogle 2023. 2028 p leu Six-Year Transportation Improvement Program J Dollars in Thousands Funding Project!Description!Current Status!Length Total Sources 2023 2024 2025 2026 2027 2028 Total 58 4th Ave./Pines Rd. (SR 27) Intersection Improvements 600 City 100 500 600 Description: Install new intersection control. Status: Funding Status: Planned PE 100 100 2029 ON Planned RW 500 500 Length (miles) 0 Planned CN 0 Total 100 500 600 59 Sullivan Rd.I Kiernan Ave. Intersection Improvement 80 City 16 16 Other 64 64 Description: Improve channelization and signal operations at intersection and reconstruct intersection with concrete. Status: Funding Status: Planned PE 80 80 2030 CN Planned RW 0 Length(miles) 0 Planned CN 0 Total 80 80 60 Sullivan Rd./Marietta Ave. Intersection Improvement 80 City 16 16 Other 64 64 Description: Improve channelization and signal operations at intersection and reconstruct intersection with concrete. Status: Funding Status: Planned PE 80 80 2030 CN Planned RW 0 Length (miles) 0 Planned CN 0 Total 80 80 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 20 Sao° e 2023. 2028 Six-Year Transportation Improvement Program galley Dollars in Thousands Funding Project 1 Description!Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 61 Boone Ave. Reconstruction- Flora to Barker 75 City 75 75 Other Description: Reconstruct corridor to city standards. Status: Funding Status: PE 75 75 2030 ROW.2032 CN RW 0 Length(miles) 1 CN 0 Total 75 75 62 Flora Rd. Reconstruction-Sprague to Montgomery 75 City 15 15 Other 6D 60 Description: Reconstruct to city standards,including a shared-use pathway connecting Appleway&Centennial Trails. Status: Funding Status: PE 75 75 Assume 20%City match.Possible funding from SRTC, RCO,TIB,WA Leg. RW 0 Length (miles) 2 CN 0 Total 75 75 63 Euclid Ave. Preservation-Barker to E. City Limit 50 City 50 50 Description: Pavement preservation project.City may consider increasing scope of project to improve road section to meet City standards. Status: Funding Status: Planned PE 50 50 2029 CN RW 0 Length (miles) 0.5 Planned CN 0 Total 50 50 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 61 5/2022 Page 21 un• 2023. 2028 Sp0�Ine Six-Year Transportation Improvement Program 40000 Valley Dollars in Thousands Funding Project!Description!Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 64 Sullivan Rd. Improvements-Trent to Wellesley in City 20 20 Other 80 SO Description: Widen to add center turn lane,improved corridor access management, ITS,improved lighting,and addition of shared-use path. Status: Funding Status: PE 100 100 Design may be combined with Sullivan/Trent VC pro.ect. RW 0 Length(miles) 0.3 CN 0 Total t00 too 65 Spokane Valley-Millwood Trail 75 City 15 15 Other 60 60 Description: Shared use path following existing railway,connecting to City of Spokane and City of Millwood trail network,and the Centennial Trail. Status: Funding Status: Planned PE 75 75 PE Concept Design in 2028 Planned RW 0 Length (miles) 0 Planned CN 0 Total 75 75 66 Sprague& Pines Intersection Improvement 25 City 25 25 Description: Install SB right turn lane and intersection control.Price assumes new signal and channelization. Status: Funding Status: Planned PE 25 25 Based on N.Pines Subarea Study.May include developer contributions. RW 0 Length(miles) 0 CN 0 Total 25 25 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 22 2023- 2028 Sp1 1 ui� Six-Year Transportation Improvement Program Walley Dollars in Thousands Funding Project 1 Description I Current Status 1 Length Total Sources 2023 2024 2025 2026 2027 2028 Total 67 N.Sullivan Rd. Pedestrian &Bicycle Improvements 20 City 4 4 Other 16 16 Description: Segments of improved shared-use pathways(5,000 LF+1-)and sidewalks (1,000 LF+1-) between the Spokane River and SR 290,including an improved crossing at the UPRR and potential for transit upgrades. Status: Funding Status: Planned PE 20 20 Project identified in 2015 and 2020 Sullivan Corridor Studies. Planned RW 0 Length (miles) 2 Planned CN 0 Total 20 20 68 Local Access Street Reconstruction:Skyview 100 City 100 100 Neighborhood Description: Reconstruct local streets.Actual project limits to be identified during design phase based on pavement condition and available funds. Status: Funding Status: Planned PE 100 100 Planned project. RW 0 Length (miles) 0 Planned CN 0 Total 100 100 Totals: 11,076 12,296 163,862 187,234 25,595 35,154 33,077 29,261 25,024 38,783 186,894 Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances. 6/15/2022 Page 23 1 . Sprague Ave. I Barker Rd. s� e Intersection Improvement Valley- ter, y I ,, • f *ttitf—4-4 I r ili'''' . q, -Y t ' .r l.. t - er :1 z , . - - - i•,‘" __ it i k i ''I • Project Type: Intersection Improvement Project Description: Provide new roundabout and sidewalks and bike accomodations. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 260 2020-2022 Right of Way (RW): 200 2021-2022 Construction (CN): 2,000 2022-2023 Total Cost: 2,460 2. Citywide Reflective Post Panels Spokane (2020) Millet' a ` ;- `' r ' .. gi r t " • 0 f ,e-' 'it ' r� 'r . ----.1f,IJ tifitaib_,' I - 1� - - - — g i� -cat,I 1 ' �" l r _ [� 111111pr t 1 WC IOW Project Type: Safety Project Description: Installation of reflective post panels to stop signs and speed limit signs on select streets. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 8 2021-2022 Right of Way (RW): 0 - Construction (CN): 150 2022-2023 Total Cost: 158 3. Sullivan Rd. I Wellesley Ave. „Hi Ika<%44,..... Intersection lmprov. „,• ' alley Project Type: Intersection Improvement Project Description: Traffic signal and intersection improvement project, partnership with Spokane County. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 230 2019-2021 Right of Way (RW): 165 2019-2021 Construction (CN): 2,000 2022-2023 Total Cost: 2,395 4. Sprague Ave. Preservation - Sokan+e Havana to Fancher _.Valley: � � f Imo + Y s ` I �f r Ak ,�r,, � p p 'I p' i I 1 r � p paI ! l �l III �I_ 1 II A - , 1 r"g �_ I i! 1 - —1 1 I 1 I'. { f y .. i ! ! l'_V vL '4 y1 y - �e-_ .,- z.nl.-_,v i-- - _>= r._ . _ - _ •I'^• a_ _ tl 'r i' y.- - I.I '� - _.. 11r irr 'fa: .. 1— it — I '; I 11 f 1 1flni. I 1 r. 71 toll 1 I I .1-- I_ - r 1 ,- ` I I7 - - I` t„ a • " ` r " - I• , a . � -• ' I . :x r- , .1 I' • 1' I I .. • }I , w r 1 . It?f if l 11 r I i s I j J - - ' '1 . ! - :II 44 IT i 9 , s . - MN— 1 . - S I ,Yai.�.' 'II it E` ; 'a Z.`_i - a-- - i' *if' z., r S•t Project Type: Street Preservation Project Description: Pavement preservation project with signal, sidewalk, and ITS improvements as needed. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 90 2021-2022 Right of Way (RW): 0 - Construction (CN): 2,247 2022-2023 Total Cost: 2,337 5. Wilbur Rd . Sidewalk Boone to noliane Mission _..Valley: lIa � . s 4_ c I I Yi a, . n 4 I 4i 1, Y 4 .5I , a k Ailleido . , r," y' l'I 9� a tlF^ I .. - • - Jk � :N _ w. _ L Tail A `i F l �r r ._., asl i 414 Y 1 r ! is — ._ �• 1 I: I.5 ! a : 1y t I A is . . 1: L. ' ram. . f ., .I'I `� r, I Y I • - ' A* , 1 _ Project Type: Pedestrian/Bicycle Improvement Project Description: Install sidewalk from Boone to Mission on one side of road, including pavement preservation. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2021-2022 Right of Way (RW): 13 2021-2022 Construction (CN): 700 2022 - Total Cost: 813 6. Barker Rd. 1 BNSF Grade stiokne Separation Project• Valley v m' e,a i 7i • .. r. , • vr. Project Type: Bridge Project Description: Construct Grade Separation at Barker/BNSF RR/Trent (SR290). Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 3,006 2019-2020 Right of Way (RW): 3,420 2019-2020 Construction (CN): 19,000 2021-2023 Total Cost: 25,426 7. Buckeye Sewer Extension sIir y Solan _ Valley am f 1 IY j r • � Ls v n -14.it, <a , r„ t7 p , . ipoi El. i:J ` u Iu li �1., ,?I 1, i- ua A -i ►1.. ;M'I 1 I it t_1,,:I I o t li, 1 .t: L . Project Type: Street Reconstruction Project Project Description: Street reconstruction and sewer extension project with Spokane County. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2022-2023 Right of Way (RW): 0 Construction (CN): 750 2023 Total Cost: 800 8. Mission Ave. Bridge ResurfacingSikikane . ,S lley Project Type: Bridge Project Description: Surface preservation of concrete bridge deck over Evergreen Rd. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 25 2022 Right of Way (RW): 0 - Construction (CN): 240 2023 Total Cost: 265 9. Barker Rd. at Union Pacific sookao.--;;;\4ft,r,„ Crossing . Valley3 1 1, ' I k • -4111111111111P maw raw Project Type: Arterial Improvement Project Description: Recnstruct and widen to 3-lane section at UPRR and E. Euclid Ave. with shared-use path on one side. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 85 2020-2022 Right of Way (RW): 50 2021-2023 Construction (CN): 1,300 2023-2024 Total Cost: 1,435 10. Pines Rd . 1 Mission Ave. St �,,� Intersection Improvement Mu11ey il, —, ' ; n r 0., .,. 1 1 . . :1 .-11 to ) ,,,, 1 6 til 6.f, ii t-4. r-6M" 1: '',.'--,. '''': t 11.* CPU ; , , ,,,i,,,,,c i fiikt ' —- . y , F '� .,J ,•. t 'Ili Nov I t ' • � � t Project Type: Intersection Improvement Project Description: Signal and channeiization upgrades to improve capacity and additional turn lane on southbound Pines. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 355 2020-2022 Right of Way (RW): 191 2021-2022 Construction (ON): 1 ,612 2023-2024 Total Cost: 2,158 11 . Broadway Ave. Preservation - SII Fancher to Park ...„00Valley 4J Ti'...., °= I 1 1 'l l II I` r I , i I n , 1 ?I { it I { 1. c�, . �q. F .I r 'q_ I, I ,III _2 a' a �..I,I ryI _ " r + a I 7` i�- r_I f I 1 1 J; I I ,� j i I I P 1 r z pp i i. Inf _ 1 , g_r I • i Ip r • t I. t ;ahr z f I}. E fr— .. ; �a • r r .. IJ 'I,"AaI II y pr .. i _ it ! I \',I _` - ' I '•' t' k. fj -Ir r 'I a I, I I W 1 , I 1 r .. 0 I I ' 2 I IA ` I e , I I , ,�` Ill I`' r i / I j a ' 1 1 r I. I I / t S I 1 I li, Ii 1 L, i I( i. 1 ' r ? I ,, = - 1 r` { e L , Project Type: Street Preservation Project Description: Pavement preservation project with sidewalk ramp upgrades as needed. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 140 2022 Right of Way (RW): 0 - Construction (CN): 1 ,660 2023-2024 Total Cost: 1,800 2. Sullivan Rd . Preservation - Sk rrane Sprague to 8th Valley - ' , I1 r if �! 115 I F rl''r `Ita t t Ip' S t� i ` yr. '1 r 1. 1 1 I.. _ ,', •��. e f I 9 A. , �� '� f ��1. 4I 7 L I 1' II. — ! :j- w _ - - - - fr, ri ,4 t; , 1 r j 4 I 1 �� 5 �� K�.w � 4d �}(� -1 'y I �, } [� l^ ' r �1— IIr �K I J t ir I. 11 ii $�, -I' 11 1�11; �1" 1. 44 ff i . ' i . k_ s Viz 6 i • '.' iIL* i 1' I V��"1. k1 (11 1 i,I t. s '- -. r �a1.., �'-1 ��, , `I� '`r } .. 11. f;+' 1f _ I r�r �Y� .f �� ' ;w A ,•r..-,' # 1 ' J e I 1 a. ', ' ' t' lei,. I , -I I a 1 t 0}'*10c-r,aP* y% r---1�r^r.T7! -'3` l*i.ii, + I.I1 , I , i r �' � _fi r r ! .I r k n5 I ( 1 F_t Project Type: Street Preservation Project Description: Pavement rehab. with 4th Ave. improvements, sidewalks, ITS, stormwater improvements as necessary. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 224 2021-2022 Right of Way (RW): 504 2022 Construction (CN): 2,734 2023-2024 Total Cost: 3,462 13. Sprague Ave. Stormwater Spokane Improvements �,,. Valley r. s , 7 !' s , .y e gam . y 1 r Q� t a i 111 a . Lc�s ,. HISS '� •� f ,� ig . P , - f —...-10 1 IJ ., . 1 �• P<f, � . i; T�I fi � ? v . . II I f r; ■. I 1 4 ti ' ' I I S l ':,, sl L.— } ' ''-' , .. .. fit ik�'? `a � f> ♦k+w f >, 4 y� r . " p 3 1' �f-�r it �:..� ' - ,'ydY. 4 P Project Type: Stormwater Project Description: Drywell retrofits between University and Park. Funded by Dept. of Ecology. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2022-2023 Right of Way (RW): 0 Construction (ON): 1 ,900 2023-2024 Total Cost: 2,000 14. 2022 Local Access (Summerfield S`I"okane East Neighborhood) .. ' aHey Ii I I 1 I 1 - ! � , � , I i `�tfi .. a _ „ 1 >. dr '� "'s` � .illy f(S , t' 17 l 3' Y , 4 j.r '4 r'[�. , y6``t ,�,"i.. J.,�. 3:, �' lnJ jti 'S.. . ?ptt Y Y l' .IY �1J.r I S 1 .t Oat r ,, - 'V r r , I''a I_ ia �J"4 1 y { t. •�qY{� c . Fe b I ., .,I i ,. _ ter. 'i r .y , ,�.� y ,.� � t y> - - _ f I ,r,,,u�' 4� M----•����1111 1 _ `'V ..„ _ 1.k- 5 � I I Ir +, i� ,I �. .. '' 1 - [ r , '.Y it ., q.. ,'I yyy.. • A dry �•t1 y 1 .1 c' 41 l4. . : itt, ±:"- ' r witt+ ,1I , ". --r -+7s 77,2 fin }:.. S •'r!- �:§�' 1' 11'5'S , -_ .t-. IL •' �. ,.^ Ft. f_ - .,,, .II, , vs: r HC ' Y 4 •1 Y [ r I SZ M -: r all - " a� . �+ �' !� 'I ' rro-�:: c= , ±r." 1 ¢ - + r y k v. Y y' , I'i(4' I A, l.kr a' .. I7t •y?1,- 1'c,T1 . • l .rl 1', ...kr.1*.x + -.? ::! l - 44 v i Ij�,4 �,' "- . — _ Project Type: Street Preservation Project Description: Local street reconstruction project in Summerfield neighborhood. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 80 2021-2022 Right of Way (RW): 0 - Construction (CN): 1 ,300 _ 2023-2024 Total Cost: 1,380 15. Pedestrian & Bicycle safety S I kane Analysis Valley G ,� 1 _ I -_ �. ' , i - 1 II l'• Y --T �i,) -r . ,, 1• 11- ^ • *` I r 7 � I 1. ridaillaa. !II _ .., I'k'C�iS �; I I giT' b I I 1 I . , (, rii_i _ I - - - r * I I IC I ,, , „..). ... E 1,. .7 j..,..? _„ ,..._ ,______ , .., 1 . I :-- . i f iiiiil ,w$ A � « �_ LYI,� a —. !�,_ AV Project Type: Safety Project Description: Evaluate vehicle vs. pedestrian/bicyclist crashes, as identified in the Local Road Safety Plan. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2023-2024 Right of Way (RW): 0 - Construction (CN): 0 - Total Cost: 150 16. 2023 Local Access (Donwood so e Neighborhood) . Valley r I ���FFF u i. _ 11Y, 'j � • �tiIlI, iti 0 r . • i' , p try ; ,,i e y IW 1 - -, a tlle�_ t t 4„,,p 4,6,i I .Ilr 1 , ry et _ yg i 4. Project Type: Street Reconstruction Project Project Description: Local street reconstruction and sewer extension project in Donwood neighborhood. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2023 Right of Way (RW): 0 Construction (CN): 1,400 2024 Total Cost: 1,500 17. Northeast Industrial Sewer „poi Extension Valley ii -�r : - - : ref ,110116.10. ' l : k, `'41 , 1 volt0H- i II 4' I ,,i it I. I I, I � It I l-1.1111.1.1.1,,10111), , I , ' i 1_ - ° Y i , I, ' ,a{, I I 1 A .. M r: - - ..rya. , y, {, + ai is A, % ir' P '� n 1 4 I ( , Y' •- 4. Project Type: Street Reconstruction Project Project Description: Street reconstruction and sewer extension project (Flora, Tschirley, Dalton) with Spokane County. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2022-2023 Right of Way (RW): 0 - Construction (CN): 4,950 2023-2024 Total Cost: 5,000 18. 8th Avenue Sidewalk S O' Bane Valley O pI� `I` id. F .; , •iii , .4., :,, _i ... d —,I 1 I y I il. I P (r I 1 I I I ; t , ' ` [ I ' III is ' 1- 'trt ' _,, '..`. e4' ' ib I r i i 5 I. `i`• a ii .I ,� 1 I I I I Y 44 ,_" JW� w".•, ' 1 5 I n I I i o } I .I r I ;.,v1 r � '� , , I 1 r . i ; N, ,. ,: t I I I I I ! I IY r ppl -I I I I I, I j 1r, f '_ r , a I, - _ ' I I I • I I ,; 1 .,i 11 11 I , I 4,-- . ,... ,I '! ' ' r IF, I j I ! I r I # I ' '1 ,' •-1 I I r i L. Project Type: Pedestrian/Bicycle Improvement Project Description: Sidewalk north side (Park to Coleman to Thierman) phased as funding allows. Bike lanes considered. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2022 Right of Way (RW): 0 2022-2023 Construction (CN): 900 2023 Total Cost: 1,000 19. 2022 City Safety Program Spokane I p ,,rove ..Valley' I . r ., r, A" ' N-5 Lii � -`- ay 57 ! i ,�. d eta, --_--we .1-. ,-,._A 1 y a1 ■1 in 1PIP _ 1 • .r ' •_ ). "` Len t 3M` ,-1 . * I y-. 1161 -- - A —1_. '._ 'iag ■ pc il r 9 I! .7v.,iar.re1._--.•, i1-",,. _FIil k - 1 jail in Inli' _::1-.;)_, ..'_r i t"7),, .1 -.•.,', , ._' _- -T._i, I itw wry • •L b� id, _ ,._4___ _ _.=_,. ,..„.. ..„.. , , linivism r.r: .!„ --„d.,..- ___ 1 i_ -- __:.-„i_i__-----,,. 71--. -.r_--t--,, .- ,, , 13, „,, - , , •-, 1 pm= . _, ' _ ;=,=. , ,-7--- _ __. i-L-- _ _ 7:-. ,.,-, *.-,i,,. =., ,.i. : 3 II 1 - - '•:• ---_ -1,--c-c ,_ ., 1 __ _ Imo 4,t M ' V Jar oI N NI I ,_ -3 X t Project Type: Safety Project Description: Pedestrian crossing improvments on Sprague and access control improvements on Trent. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 173 2023 Right of Way (RW): 40 2023 Construction (CN): 1,269 2024 Total Cost: 1,482 20. Barker Road Corridor Design 1.111(11 '' g poKan Phase Valley' lif I �I C i , , , t 41 Y"t A J i‘ i+. '' . 5 e - 0 i t ^ , 11 y. Il [ I } . - . -- 1 Ala �+.i Sl�3S . • ` i l �u� w 1 - WfiCtl r �x , 12 a ! o :!s� ! + '• ._owl 1Ap "'` ■ * -"--� ri ,if- 1, d ' P ! 1w_• •,,r 1. 3 . W,.r nip � - i 6i'- k; _ 1 r- �ri �Illemite. IpI 'F �,r-�' ,' I� �r v a �, I ^ ,1 •� -i a 'w S 7gi�* ...� ` `ice 1 Y 1r �.$ 4 „1..^s. nC; ..-.. Project Type: Street Reconstruction Project Project Description: Design phase for Barker Road from Appleway to South City Limits Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 250 2022-2023 Right of Way (RW): 0 - Construction (CN): 0 - Total Cost: 250 21 . Sprague Ave. Safety Spokane Improvements ..'Valley: 4614 1 i - ' yt r' -Anal�1 11 t r f ., ,. c lip I. - re ; a 1 ..1j o ,. - ..# - --vim--• i I ! � j y j all II I "- �,, , I 'I 1 l !_ J 1 ;1 . Project Type: Safety Project Description: Install pedestrian crossing at City Hall & Balfour Park with potential lane reductions, see TIP #23. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 46 2022 Right of Way (RW): 0 - Construction (CN): 423 2023 Total Cost: 469 22. South Bowdish Rd . Sidewalks lI ;lane (12th to 22nd) Valley i . ' y- 1 4 I, 1 i' d II I. a t 1 "- r- I . l }I 'I _-_ I. . I., Y r 1 I 5 • 1 ,'y'' 1.'- I 11. 1,4 1 - I y „4{ 11 . l . - rr i ' f.' 1 ,1'.,. d�} ,.yA .1•, 1, >1 ,T r-- .z-e.' ' Ir�. r t.I 1 r -' +, } �r; - 11 ii I r 1 i: 1 _• I i Il 4?' I K r s' r + f r,i. . ' 1.1 { 1 ' 1 'v I II - ` °Iy ♦- - 1 .. r ir` I fr., 1- ` °' 1 '`. t I } C + I I Ir , e , ±I . .4�II 1 I `: I i 1 I F '1 ,''. I ` I ' I I t f .F p • I c' , 1' 1 J .r- .r I : 1 1• _ 9 � 1 • l + I I L� I i— a' ,'1' ( , 3 Y' 1 .. "11 I' i I 1 , •I' 1 y , 1 1 . .3wy.l \ 1.', � I } I'. 1t l I I4 1 1' I 1 �� .A • 1� i I I i' t � ��- IF.• 7- 1•v !', ic 1 f 1�II ��, • .....'a 1,' r r ,I 11 17 I • . I t y,� I }, • 1 y r a_I I. c r r i • 1 `i 1 t 111 f " I. II f� 1 1 •ry I' I _I I 11 f 1 I 1 'I 1 ° 1.,I r I�t z I.a 41 , -sue •40— Y :_ 1 I-I° 1 ry,. r I' S 7 'i !r, Ii ; f1 II. t I t• 1 I_I 1 ( .+. \F �, MY ,`..y, . Ir u' ' ,r 4 f I l I. 1 I^I.. , I fr . - 4 • Y +�._ y"' 11 t tt f I ems( 1 y II '� I I I. 4 d i t l I S!1' 1 1'.r l 1 I ,l o eta _ ; ti4N f I • }1 1 ,• _ I 'j. I 1— f I I I Y I Ft 1 • A"r1' Y ti '►, 4. ..•1.. i t. �Ir ''7. 1l 1.J_I.Ir G°I 'C_1. i}, , I . .,1 I.. :, 1 ,p,:-- • 'I 1:i'"I 'k,, +,`�1?g . 1. - 1 1! ' -�E y` , -' �� 1 , F: d i A .iY_ •1 1'I�i YID 4 ! I 1 a -IY` ' }}: I �..l - 4• ,1. I 1 Y I y� S W { timed F , , a I' °- �. , ,�1.� tA - ray' -I o' „k- . i I I•, I .Cri y1 h`I ,. .. r: , Icti` * ;110 .. .41 4 4 1 ' ' . la f. '} .:.3 ' 1 1� +r; ' II 4; ' ,r 1 1 Il 1 _. .! '' I '$ I' 'i}' ' m�i ,., - " - 7 4 r a- -k• I"1 r v:4CA v,�nn:'i i I' y, t , ') . I 1 'f to ". ~r r. i ! ..r—f— y �i. '�—— � ` i - � g ''' ',, iy,�T°i:,y °+I tom ' — _ •li _ _ �i_•.�ix�.i ">! f�' �• +�a , __. • %r ' 1 ems{ k Project Type: Pedestrian/Bicycle Improvement Project Description: Install new sidewalk on the east side, including crosswalk, signage, and ADA ramp improvements. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 74 2023- Right of Way (RW): 0 - Construction (CN): 1 ,911 2024 Total Cost: 1,985 23. Sullivan Rd . Preservation - 8th to S, l 16th ...ON/alley. - It e '." +,s 1• r t 1 4 �, j • I' '' ''',:l it ''f''^�4 ;' C t a ,4,l, '' ,( u. IA j ; I , i ' I )1 I ,_ ,i. I { ,- . , ..,_ , ,,_•,,, , , „. . rt I I •t i .I I I, -, , _ I ,• , - I ., 1 I - 1 • S r.. Ir I' r •_. a ,. t, _ _v' _ .. .1 _ - =a-gyr ywc�-0�,,�Q"�. m., ._ , _, , • .,. I , li ' ' �"�r- , ' f t f - I II y lY • I I I Iplity i '- .. I. _ , f 1 ,, F: • I 4l.ay ''''I rr ,. f • -%-a - - _ JJ l G Ir•r ., I :r/ , ! r I•. 4 ` r ' �'•' , II , '4-- ..r , ,11 ,, I 1 Y I i r „ iIP} Project Type: Street Preservation Project Description: Pavement preservation with signal, ITS, sidewalks and stormwater improvements as necessary. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2023-2024 Right of Way (RW): 0 - Construction (ON): 1,300 2025 Total Cost: 1 ,400 24. Broadway ,Ave. Preservation - �� le Havana to Fancher ...,I.fValley' 1 .. ..- f ;t _.� ` � sari , I ; i i 0 '` ' r, ` ram S: -: I r a r a i � I ,r1 J r yu+ r I I I s y r _- ',_r,_. rrr, ! 1 I yv. y . eta 1 tat . 1 . �i # .111 { • f I s' i' I ` I1 1, .. 1 Ni- I 1 , �I i 'I_ I ti tf1 '" — i I . • el ' _ 1 1-1 11_11',) 1, r i: .,' ' tz - i Project Type: Street Preservation Project Description: Pavement preservation and reconstruction, including stormwater improvements as necessary. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2021-2024 Right of Way (RW): 0 - Construction (CN): 2,900 2025 Total Cost: 3,000 25. Pines Rd . (SR27) I BNSF sorkane ; Separation Project .Valley: 1c7' Tr- Vi7 ,t,y:a 74 51 Project Type: Bridge Project Description: Construct Grade Separation at Pines/BNSF RR/Trent (SR290). Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 2,300 2020-2023 Right of Way (RW): 5,385 2021-2023 Construction (CN): 26,900 2023-2025 Total Cost: 34,585 26. Spokane Valley - River Loop Trail Spol re ...„••vValley3 w d • 1 1 I , L I 11, Kl�-PI j1 jli Ai'.....' .ea�'�® ! t , Iy • ul, II,I R-111111 - - . — —II �, .cam.' MI E �WNIR. @ 4 I } �..y — aRIP 70l " L- v. '� re f. 1 4r '. } J/F 4 9 I' 1 ./ 1 1 � iti — - t � I� it ,a -,,\ pp Y. IY:., t -; �. mow. �� i t ; y ' I �� " it - _ / —`. _ -'.f I w• ` l' rr yl^ il+Wr ' A. .' 1 ( 1 -.. e ii. A �1 , e• a _ --- I `i Project Type: Pedestrian/Bicycle Improvement Project Description: 5-mile shared-use path on north bank of Spokane River, including two pedestrian bridges. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 1,000 2022-2025 Right of Way (RW): 0 - Construction (CN): 15,000 2024, 2028 Total Cost: 16,000 27. Sullivan Rd . 1 SR 290 Interchanges owe Reconstruction .,,•Valley, if_ t., ,,,, T , y , , i;,.1 t! ,. ,,.c.i i P - --. _.'. ' 'E. ')':!•-, 1, -."' - I \ - ' , 1 r ill 8 \ I r�jf 1 I�--- t' ' ‘ �t r• I .. s 1'd l ' __ -" ,. . ,p# [ ;1u, '1 ti �_y 4,". 1 ' owasissigimiling I 1 . ;, , 1 I Hip, Iiii I^I,II,1, Project Type: Bridge Project Description: Reconstruct interchange to improve safety and capacity. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 2,650 2021-2025 Right of Way (RW): 1 ,380 2025-2026 Construction (CN): 22,600 _ . 2027-2028 Total Cost: 26,630 28. Barker Rd. Intersection s,I kan: Improvements at 4th & 8th ''alley r - ' , t i +1 l' ! it e 1 0 4 ,i i 'I _ -..i ',, -'.. ' ' 414 i i 0 . , _ , . , . i___, ,,,,,,,,„., , .. ?„. ., . .,„. . it -, i iT ' I I , 'f f , ,i ,I ,' 0 :.;i it ' I _ Project Type: Intersection Improvement Project Description: Provide new traffic signal or roundabout, per S. Barker Corridor Study. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2023-2024 Right of Way (RW): 1,500 2025-2026 Construction (CN): 3,900 2026 Total Cost: 5,500 29. Barker Rd. Improvement - Siitil,,,,..00"sk,„ane Appleway to S. City Limit ..•''Valley: E l , •„ I1 r Il f 1 r I r 4 r 1 1 r • 1 4 II .rim-----ac k RIFF — --.--- ' ` 1 - N lr�a 8- " ' k � ..: , . ..I 4 ,,, ,, 'M ;al , , _ .- � , ®� �� l.y3/4 r.U. ( „ I ' rs 1 '. ' to . _ 'i I' Zs4.0 __ s w 'r +E8!Ga I .,I, Project Type: Arterial Improvement Project Description: Reconstruct 3-lane urban section from Appleway to Sprague and 2-lane urban section south of Sprague. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2022-2024 Right of Way (RW): 2,000 2023-2025 Construction (CN): 5,300 2024-2026 Total Cost: 7,500 30. Citywide Safety Projects - Sp�"tee Biennial ....Valley I].. , I - -�- 9 i, , ii„,, •I '1 r y r - - , . - ' =' Li- ii- 5,i.-- r 1 I , i_r M, I+ ,� , , , , ,. .....,„ h _ ,, ,u4__ _ __ r. __,.._ ,..,, , , ----,---,-. , ...„ ._ I, , , , , ___.„--. ._. . . . . .. . ' 1V ..... . Project Type: Safety Project Description: Projects are consistent with the City's Local Road Safety Plan. Awarded projects specified in TIP. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 Biennial Right of Way (RW): 0 Biennial Construction (CN): 1 ,700 Biennial Total Cost: 1,800 31 . Local Access Street S`p�akane Improvements - $1 .5M Annually ,, Valley 4111611H. f. � . t. �I • — IAN IT,_ i Graf Imo' I AV Project Type: Street Preservation Project Description: Funded by Street Wear Fee. Project type varies (surface treatments, grind/inlays, reconstruction). Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 500 Annually Right of Way (RW): 0 Annually Construction (CN): 7,000 Annually Total Cost: 7,500 32. Street Preservation Projects - Spode $3M Annually .,..Valleys .a s , , 5, t) 1 z. . zr , M a i ;, l I A,, Ir .. icidaillik" ate., _ : i • t.: , ., 44. 'Cie.*, .'..1 _ 4i4 SFr i -;. , , fw+ co, @ -,I - ( fJ -- -i_ 1- _1 _ r i 1. y _ r . � .� I 1 Project Type: Street Preservation Project Description: Preservation projects, typically arterials or collectors, or used as matching funds for grants. Funding Status: Secured Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 500 Annually Right of Way (RW): 0 Annually Construction (CN): 14,500 Annually Total Cost; 15,000 33. Argonne Rd . Concrete Pave. - Sttpokan Indiana to Knox .....Valley r. s 1r r' ;, it a 1 .t s, 1 Y I -1 !*'�f I . Ti • L. t;;. fi� ' IIIii" — , r ', • C.' t }fit: . :. r .1 'ir \ E.7kJ ' , , - YHA t :. • f , ,- ilr . "' I Project Type: Arterial Improvement Project Description: Reconstruct with concrete and improve stormwater and signal operations. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2024-2025 Right of Way (RW): 200 2025-2026 Construction (CN): 2,600 2026 Total Cost: 3,000 34. 8th Ave. Preservation - Progress s,,�,�ukane � Valle to Sullivan ` y ,. , r .: „....ir , , ' \ k ,,,, , k•-• i, . , . . f , ,.• t t„?!4' i ' w• I Ili. 7 . . t _ 3'p:. I n,:-- I�r it ".t 0 st $.---- 411110 , r t, I _. K t. — wog. ,;;,« li it i-4, f, f A I. I ;,I -- _ . _ c, t Y. /' 1 i jer - --46`1 ,'— - y t 1. 't ?T�4 A.. .4'1 g` { fi,�. Project Type: Street Preservation Project Description: Pavement preservation with potential sidewalk extension and partnership with Vera Water & Power. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2024-2025 Right of Way (RW): 0 - Construction (CN): 650 2026 - Total Cost: 700 35. South Bowdish Rd . - Phased S�"pokar e Corridor Improvements ...Valley g - J.- .. fl atF.. 7 , ' rY n, {F�. � into mti a, -, L I- M... ‘ J T r YY WA .�! _ Y -1/ --\ I t 1 I ., • — ai i;. ice TiS _ -'i V .` :, ( . , 1 , , ;6111 1 I . r� i� ; , i'1 r ,,. , : ., . �- , l' ., ,!- , _. ,r . .. .„ . , •,, Project Type: Arterial Improvement Project Description: Reconstruct Sprague to Dishman Mica as a modified urban street with improvements at 16th & 32nd. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 1,000 2023- Right of Way (RW): 500 2024- Construction (CN): 11,500 - 2025- Total Cost: 13,000 36. Sullivan Rd Preservation - 16th 1( °� „ � Ave. to 24th Ave. Valle Y ;r lr rt *" r f cd • _ •• C` t� ' - 1. ! i 1, `t— _ 1_4 ti it ut`- _ ' 1 Y ti;). 4 3' 1 :' 4 A '..'1' r-. l4r, I I ,J C u ' 1 4 I J .ter + ` l:- � � Y - t 1 a rt° ( 4 1 ` 4 '- ' Isom®v -----ems ems `.��' 1 \ . Project Type: Street Preservation Project Description: Pavement preservation with signal, sidewalks and stormwater improvements as necessary. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2024 Right of Way (RW): 0 - Construction (CN): 2,100 2025 Total Cost: 2,200 37. Dishman-Mica Rd. Pres. - Schafers�[ i to S. City Limit .Valley. . 1c`r14 5 ! . a � �_ q • ! u a —ram Yr��� T I � u� may,' t � i '�1.� * -- ' , iii __.):- '1..° ..•,.., ''.,,—:.,,IE:,' ,_ i: M oilif u Q:r 7 _.� 1 •.$..• ' A r. . jam ..+..r.� !•�. --Rr.., e 1-. x1[ 5. !P w'" ' yam` ` r".. -`� K •,, •h7 ly Project Type: Street Preservation Project Description: Pavement preservation project with stormwater, path, ITS, and signal improvements as needed. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2024 Right of Way (RW): 0 - Construction (CN): 1,250 2025 Total Cost: 1,300 38. Vera Crest + Rocky Ridge Street s o Reconstruction Valley ,f� ma 'w5 i :�-fs, J"L.f.1 Jf '' 11 # 0.. ill• , .. 5 , _ m,,,,.,, I T-•• , --M S. . 4.: �} pirt ro iiii$11101p, liamd ,t2 1 1 aiari . --:-P _T-11- k4.1 -,4,.. , _ 1w E'`," r"',611R,,41411 0_ mi br ___:. ....- ■ ■;•1. �l, , _., .,, ,,,,,,,,,,,, : , 1 '„.„mil...,,,,,, d lid air-:3.� , i � __ �. :In_ —__ _ 1,1 f.� `F _ �+� � iq ; 'sue ,'� ill � � �; ray --`p .�f� i,,,afw �► ��r�m,=iri�.. fir• .5� *, �f"""�= .a �-11. M , PM ,tril T , , ) ,, _ � .�-• a �`'-. '.. '1 • I; ... 0 11.11 111! ""ri .e ", , �_ ' of IlrnNwn � , t_i-' k• i s. , .`#0 to i ...cc '�F.r ; ae 1_ IffeA CE • A I �f + ' 'Illw 1 rye 9 ter a §r'ilf -4 , 1., c� .. `" _' ii 0, ,,,,,,,,. , .. ,, . , , , , , . . ,li , ..,..,. lik, 1 ii Ns WO' • j S'il't 'la ''- '' ' ,= ; N ,- ? . set4 Project Type: Street Reconstruction Project Project Description: Stormwater/road reconstruction in multiple areas: Kahuna Hills, Heather Park, Ridgemont Estates. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2024-2025 Right of Way (RW): 0 Construction (CN): 0 - Total Cost: 150 39. 8th Ave. 1 Carnahan Rd . Spokane Intersection Improvement alley' 14 = 9 Ill I) ' 1/4 _ f f' F�- - il - if--�f'' 'l t : 11 R;{' l 1 - - 3 . I i I L--. ,.,,_. %, L _ _:!. ),i ._ _ • 'L _ , i : A 1 i , f! :J y li,.i j �y^l f ,f 1 ' r .....�n�_•� I `.. N j•1-' _ I : Project Type: Intersection Improvement Project Description: Add intersection control (turn lanes, potential signal). Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 175 2024 Right of Way (RW): 250 2025 Construction (CN): 1,575 2026 Total Cost: 2,000 40. Mirabeau 1 Mansfield Intersection S,i-ems'' Improvements .. 'Valley r',-' );,"- -,"E illir_ ir . . , , .‘. .....„---- , .,,, „ . _ �' r ., .• , . , ., _ ._ _ _ . 4 ' t s`}SLr,, :+r .cam , , i. Aillk . Project Type: Intersection Improvement Project Description: Intersection capacity improvements: ITS & signal improvements and revised channelization. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 135 2024 Right of Way (RW): 200 2025 Construction (CN): 1 ,500 2026 Total Cost: 1,835 41 . Barker Rd. Improvements - rle Appleway to 1-90 `valley: k I ? , i I {lt x lJ` � i f Imo,, I• �q ' ,• or ..H...„,, ,, 1- g�_4 7 ;}[ ilyyI�}y�,� i le SM4 gge' r r 9S{�I�¢• ,I ' 'I;t, vl f�9`�' .. •, _ F7 � JF ', 11E,Y 1 C Jr F ' -4 7 �: 0 i,ryritir • . ` 1 .1;'- * fir 1 t«K •4+ . `� 'R4Ir,iii :.- 0 11 I '1 I'.-I ;1, r7ff.I 1p3r {�*TT''y��.�.,�,, 1. ;rMs '' tr EAVLD •'� �1 F •L,' i .•1� -- -.1 �'; I Y.. 4, I`6��,,, I . F.Pir J ,r _ F Tr li,IIIS�1Liii., ,,• 4f1y 1.Ii I`I _, , ....., L. „,_ J , ar i a_ icti. f ' i`- .# 1 ~I r 4, ` • fit. - �'J f r' TS i , frtep y' ,J ,I , " r r` •` '-- �fl °.� 9d :lidl I L " , J rr ._ F f"`` 11 _ � _ I s r :r r. +ar �i I t, :.II. + , � .0'. 't ' < ,.- • I -e,1 rl4 „, .: . , „ L_ ,7,‘ , . „±ri$ .._ . ,-, Project Type: Arterial Improvement Project Description: Reconstruct 5-lane section with ITS, alignment/channelization improvements at Appleway & Broadway. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 1,000 2024-2025 Right of Way (RW): 2,000 2025-2026 Construction (CN): 3,500 2026-2027 Total Cost: 6,500 42. N . Sullivan Preservation - River toss kafe Marietta .0.• Valley' I I - flu I l ... —7 .15' - 1 i . .� _. _ _ irioi , , .. 1,- . , . l' ,. . _ .%. , „ , i, u I I` asA 11 k � #1 '-' .f(I' �1 C�\ ,., 7r' � a � III 1 i Project Type: Street Preservation Project Description: Pavement Preservation project with potential for new/expanded sidewalk per Sullivan Corridor Study, Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 75 2024 Right of Way (RW): 0 Construction (CN): 1,425 2025 Total Cost: 1,500 43. Flora Rd . Reconstruction - Euclid s o1 to Garland 'Valley= e ,to i ?--j�. I' I l , lCIIIIE � , Illlili . �' I f , t r I ' 'EeI 1 E II 1 , 11 1 I I, III I E 1 —' II . I 1 I 1 I I, I 1 I I I- I i 1 • — I ' ` i, I I I 1 I ti - X,1.- ,i.o{itlk" e11 — a 4 lli. •.15 t. Project Type: Arterial Improvement Project Description: Street Reconstruction in partnership with Spokane County Sewer Extension. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2025 Right of Way (RW): 100 2025-2026 Construction (CN): 2,000 2026 Total Cost: 2,200 44. Park Rd. Preservation - Sprague Spokane to Trent Valleys i I„I ks s M �. ,,, Th. s � pl A 1 - r t' i r { *+.0 �q p ,y .i ram"' •�. I S9 I ,lam n •---=^L �..�_�. #tp 9yl } �.-�■ F' 4 ' wn' �� "LEI. —�- --' € 1,. TI r ® it I .d, t — W iv _ 6 ' ' o RI :I, m 71 ; .e"t i',.."'of '` ' ' ' r ,', ''' : .2 - .. r i. , '`: . ,i W1 n p .��. {�-�■ f iSs.t: `•. • o_ r�, • mr I 'I�• ..- :;L7._N.,.1 Al. {{ .2. -ff t • rr `!:.. v�ws c 1 ^ rewgt�...� r ,Jbz�i - __, .�: F !'.n I.-_ s do �► ,fa R - I rA agiltill � � 1 — s a Project Type: Street Preservation Project Description: Pavement preservation project with potential sidewalks at select locations. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 70 2025 Right of Way (RW): 30 2026 Construction (CN): 1 ,200 2027 Total Cost: 1,300 45. 32nd Ave. Preservation - Pines to Spokane SR 27 Valley , �� } t i. I.•I. ! i t r A - A ,' 'mom A f , 1 ', 3 I , a I 1- ` ' •fir _ _ + I I' 1 i , . 4. e- 'r:�¢r k=i r, r. yi .s t�.f �.--— +I 4 �1 : .I4J: G . •- ._ :�+r� iiiiiiimmummis- 111142114i. II If i, (I1t 1 ell i f Project Type: Street Preservation Project Description: Pavement preservation project with potential ITS, storm, sidewalk upgrades as needed. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2025 Right of Way (RW): 0 - Construction (CN): 1,940 2026 Total Cost: 2,000 46. Park Rd . 1 Mission Ave. �� ,� Intersection Improvement lle li ,. k 1 i_ �# A ., i . -,--- - ., - , I ,„ ,, (iimipp,-• 4,40, ,,, ,, , r 1i - Trb me } Nl 1 CD J l k {i 1 i Project Type: Intersection Improvement Project Description: Improve channelization and signal operations. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2026-2027 Right of Way (RW): 100 2027-2028 Construction (CN): 1,800 2028 Total Cost: 2,000 47. Flora Rd . 1 SR 290 Intersection ����� Spa Improvement Valley as j 1� ' . `i`. 1 .i , . , ,,,, _ -K OA .. 3 A �11 1 1 4^i r' . y I':1 p 9 II ilia ' --ecel*„.c o , E, o K, „ , „ „ „ ,. ., ,, „ .. a _ _ o _ o ,,, Project Type: Intersection Improvement Project Description: Provide new signal or roundabout, per adopted Planned Action Ordinance.Assume ROW & CN after 2027. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2026 Right of Way (RW): 100 2027 Construction (CN): 3,800 2028 - Total Cost: 4,000 48. Cataldo Ave . Realignment at Spoka�xae Barker Rd . Vey iF l 1 'I J pl oe r i *r; i I , ,11 'I i �� , I ,! ery 7 JJJ \ .-, 1 !!� r, E I E Project Type: Intersection Improvement Project Description: Realign Cataldo Ave east of Barker to intersect Boone Ave., per adopted Planned Action Ordinance. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2026 Right of Way (RW): 500 2026-2027 Construction (CN): 1,400 2028-2029 Total Cost: 2,000 49. Wellesley Ave. Preservation - sokane Sullivan to Flora Mi.Hey .. M-- .,i 1 A ' y ,, . 1 '', t 7'. ! r r 1., x' L— ,, J r , I r '..$i r, r. .'�'_ ''.I. ,, ' -4' n r __. ` 'dEwl fe. -.. x 0Sr. C f ,V_iortft11 l I I P r . 1 a.. ` jr,i ....41110....a • Project Type: Street Preservation Project Description: Pavement preservation project. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2026 Right of Way (RW): 0 - Construction (CN): 1,940 2027 Total Cost: 2,000 50. Pines Rd (SR-27) I 16th sijoica. Intersection Improvement Valley .. _ ; t - , , --i. aka- !: { ' ,14 ....,,--.1,t..,,i',,, i,.,,,„ . ,,, , ,„,, \' '''..i,.ir- , .--,.i t f ,( ni cal ..,„4.. . . ,,. .... . ., ,,=r ›..,,,. ., , v. 1 .•2 1 K 1 c° `.-e ri i S f ,46�°• ."Md,° 1. v{'',- 1;',7+•.44$0, , ' I i,a 1 ' 4tAi*t.„:4, , ,,,,.1c,,., -91;_:-.". it ,.41, - 4.,,,t, , . 4 t) t="I.,. 41c1116 viit, (1St ','., . r 1 g4 R :� 7 r; 1 1 SI 'N, r„, ,,, ‘ ._,_,_. t'r,.. s .. vs j.,..., .,. 14 4, ,_ tr , ... ., , L, _ ,., , „ , , __ , ,,,,,,,iit, ,,._ .. , ,_. -.A ,... Project Type: Intersection Improvement Project Description: Add traffic control at five-leg intersecton. Funding Status: Partial Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2026-2027 Right of Way (RW): 100 2027-2028 Construction (CN): 4,700 2029-2030 Total Cost: 5,000 51 . Barker Rd . - Mission to Interstate spokane 90 .0. 'Valley- 4ti. i. [,:1 '" >� it n Yv•v p �*l w/t 1 !Iti(. ' I/ ,ti ,, ,+ p 1 ('' r t 9A PPP _ i li .�15p IM '. Ol It t e N 'L ' O.. -.I '� �I 1 '+' " 9a I I 1 �Yw — ,�:' r C Ip t • r', f' I r I r EE ,,, , , '111r ii kD-. -1 L h. R,I r_Y It fir. .v:, ` . , 60 ,,. *'p] I i { ;� i s d ii , ., or r y- , '- -r ' I i. ' .:- ,r, �, , �r, Project Type: Arterial Improvement Project Description: Reconstruct to 5-lane urban section. Improvements at Boone intersection are identified separately. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2026 Right of Way (RW): 500 2027 Construction (CN): 2,300 2028 Total Cost: 3,000 52. 8th Ave. Preservation - Havana to pdhIjane Park .......Vtlley2 ,.I l = , r ;_ A - - - rS I ¢ —. _.. .—-.. _- ", k 1 My _ L f .I f r� Cam. '., ra f �• 9fit.---- —- :.pA r. .( F ir1�Irl+ . sin a w.: A ;. '' - . - .r._,.•.. 6+ -" __.-^..'�._�_,i',�.�''am —...L.'�+ i�1.:. �'� �a �. r�t �:sr2.j �'A rl =1r 1�,� J 1— ! P r @�,, ;f , , r , X #} l 11 ll-,� l- s' Project Type: Arterial Improvement Project Description: Pavement preservation project with select locations of sidewalk and road widening. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 60 2026-2027 Right of Way (RW): 100 2027 Construction (CN): 1 ,840 2028 Total Cost: 2,000 53. Appleway Trail - Farr to Dishman sp►olkane MicaValley; , ,, •gf'. , I� ,, i •.. E II ` ri uu�� P.r C i f f I i « , 1 t' ...r_ 7 , I, 41 , 1 i� I P w A tN. S }4 . A I ; , ,/■R 1. frrI ,,,, ( % i 7- 4; ' --"7 .-'' l'- i t- •-••••-•'' •\� • rfi t;. 1 1 '_z ri,, ,, ., , .1 ,...g- Ili 0. �" Ac r/ li gin -'ir 1 y 4 11 Project Type: Pedestrian/Bicycle Improvement Project Description: Extend Shared Use pathway to Dishman Mica with north connections to City Hall and Balfour Park. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2026 Right of Way (RW): 100 2027 Construction (CN): 1,000 2028 Total Cost: 1,200 54. Argonne Rd . & 1-90 Interchange Bridge Widening , . Valley =t kr._:,- . \ r=e �0 i__,..„,___ __4 crr _________---------- . , .\\ ....._ „..„, ______— ,..._ ; r I IP .----- ---- _Nr-4 ii, 1 .1, 4s s-a. Project Type: Bridge Project Description: Widen Argonne Road bridge to 3 lanes southbound and improve sidewalks. Coordinate with STA. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 500 2026-2027 Right of Way (RW): 0 2027-2028 Construction (CN): 14,500 2028-2029 Total Cost: 15,000 55. 8th Ave. I Park Rd . Intersection sOOiiam Improvement .• Y 1 ;r„ _,. . , 1 _11. 1. 5444 . , ' ,,r. _, , 11 - 7?"1114-- I p •r i r - j '.- ! " ' i T'i3 ait1 4 I ,,r - I YT r. Project Type: Intersection Improvement Project Description: Provide new traffic signal or roundabout. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 300 2028-2029 Construction (ON): 2,600 2029 - Total Cost: 3,000 56. Barker Rd . 1 Boone Ave. s.iiane ' Intersection Improvement .....*Valley i I •ill . _ C. II' ' ' - '' Iii r ?I } 1 INIMIMMIMMIMIMMIMIMMINIMID 'Ikil': •ts-''s\ f'+'- . -- Project Type: Intersection Improvement Project Description: Provide new signal or roundabout, per adopted Planned Action Ordinance.Assume ROW & CN after 2027. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 200 2028-2029 Construction (CN): 2,500 2030 Total Cost: 2,800 57. Broadway Ave. Improvements - Sokane Flora to Barker Valley re_ , ,i,� 1 1 I. 1 A 4 � 0 ,. • rl.,'- Y' - �1 (`Rrq{ /p. `,�- -4- I 1 1r , , - - I,.j y#' "or ir �. 0,, i•.', '' �I 1 r ,A It a r 1 $ :t 4 t '1 , i _ k l 1 ( 1 , - { .-� ,� r ph,a [ it" s111$n 1 1 • t , a A ,, Ri I I , i,IIIR -,::, +r'�e' ___A; i r ilrtli a''i, ',I � 1 4 `t II rii Y' 4 ,pr ,l_ s1' s _ 1i I: , I 1 ' i a, h 4' R1 I I ' r - ' f'4,f 1 .,�1 'r_\ t tl 1 L.'r I e `ix-"b MI�� ,rt'r •}. ,� 4'i', 1. °�i..1 _ { '.. II 1 --, — it = ,, to I` ,•'�. 1 i`F 4 It 4 . '�4. - �i' w+si§!', ' - • 1 i d` � ? '�'., r' ' t a w}r , ;+ `'" ' . 11 .'�1 ;In C�-, 4 1 - r d( Eq 'h. *', ir l J `-_,i','drltr 1 . ri d4I{ `. - `'rl #J jar • ' r b ! Y gSIII r i, , ,, -0 �.qr.: .,' I? r R r t e.r. , 7} N f .a }w,i 1 '. i -I , . T $ail t.. A. .. , O .. t # '. 1 "Iran " ,4"' - r. 1. M ,x 4., RR ,e. 1 YI,. se.C.fs`" Lk:'Ir * �r 'h Y.ir1 : Lr . 'i' 4d . i . r, _ !�10 _ '.y. MSi.{ '. aft i,.i,t ,.. 1q 1 y, S .a. y °`'11, *t, 44 Y eR µ ` Ii , _. ; 1* . .° ' •'_ '1.� ' Y� I A I,,a 11 4l r Project Type: Arterial Improvement Project Description: Extend 3-lane urban section to Barker Rd and realign connection east of Barker. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2028 Right of Way (RW): 500 2028 Construction (CN): 4,400 _ 2029 Total Cost: 5,000 58. 4th Ave. 1 Pines Rd. (SR 27) Soo' Intersection Improv. Valley : lil I, ;:' _ i Y 1 {' gf Project Type: Intersection Improvement Project Description: Install new intersection control. Price assumes new signal and channelization. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027 Right of Way (RW): 500 2028 Construction (ON): 2,200 2029 Total Cost: 2,800 59. Sullivan Rd . 1 Kiernan Ave. ,,,,{Lka, e � Intersection Improv. .....''`Valle y • .1> r il. _ _ivior , . .., , . i , , -.] , , --,,,,,, _,, i ,:, .- ' . ,. , , ,.. , ,, ode ' --- - - . ', L b • i , ,_ . - - r . , - i' , ,— -- , _ 'I 4: ti , , l I I � 1 _ Project Type: Intersection Improvement Project Description: Improve channelization and signal operations and reconstruct intersection with concrete. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2028-2029 Right of Way (RW): 100 2029-2030 Construction (CN): 2,300 2030 Total Cost: 2,500 60. Sullivan Rd . I Marietta Ave. S`�pokane Intersection Improv. ,� Valley r imam • • �I1 i :-0 Project Type: Intersection Improvement Project Description: Improve channelization and signal operations and reconstruct intersection with concrete. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2028-2029 Right of Way (RW): 100 2029-2030 Construction (CN): 2,300 2030 Total Cost: 2,500 14111*111111, 61 . Boone Ave. Reconstruction - S1I ,e Flora to Barker ..,,..Miley? ' • ' .liha 1 i I F } . ,_a:it / ' ia*, Air !/ -1 4 R ! {Y I it j` i rya.._} 1 I � i Y, e 1 Y I t,`� — ,# J 1 yl il 9- lli. • O1 J� dII Ir 1 —• ! 1' ,'; �'� .11:�1 i II ..1 , �J/ r :4 r " r S 1. I z ++ I• W - 1 r• ' _ r _4;?:._ .1 4 4!_I ar w!'' 1 4 yiy� ' i- ow r u a _ 1' i IW: r�i r Project Type: Street Reconstruction Project Project Description: Reconstruct corridor to city standards. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2028-2029 Right of Way (RW): 350 2030-2031 Construction (CN): 3,500 2032 Total Cost: 4,000 62. Flora Rd . Reconstruction - I kane Sprague to Montgomery Valleys 11 � ....., - . _. 9! t {. , ,,x,.. . , ..„...___ . , ... .. . , 4 l l a I d (I !l. ' t t .. - t .' (I , .r N ar - J 1.` _ —? s, ' ,• s Mr • ° tl r • Liert r p} f 1� ti ri r , Y ,, .g� - 7 *ID I r' � µ�l "1'�"``r°,. 5. 4 1 ;I 9,, ,7 1, f) . , i fOro —1. r 1 - ... 1 \. t '' I 1 1 ",ie �kv1 a: +o:i r ! ( r I 1"-i r M lil•�I I k: ° q •� '�. _ ` �6 "-II 1 1 ' Q y ... 2 i I el ' I yt.' _ SIT i. ....1 � 1. mil'r/ .1 a W , • • "71— r r 1 1 f l... f' �ta.v r _i..,..b...— 4 Project Type: Arterial Improvement Project Description: Reconstruct to city standards, including a shared-use path connecting Appleway & Centennial Trails. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2028-2029 Right of Way (RW): 250 2030-2031 Construction (CN): 3,600 2032 Total Cost: 4,000 63. Euclid Ave. Preservation - Barker S,Ie: to E. City LimitValley 1 .. {1 IN' f I fr f r;^ II r I,, ' - b f' d I a I 1' ,a n, 1 � .";'' _` I a �: r...l� 1 .a •i _ _. ' i a. 1 "`%a�f r i ria64.. illitAillk mire i1iIikl. � —. A .mac' — - Project Type: Street Preservation Project Description: Pavement preservation project. City may elect to improve road section to meet City standards. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 50 2028 Right of Way (RW): 0 - Construction (CN): 450 2029 Total Cost: 500 64. Sullivan Rd. Improvements - Siibliane 00 Trent to Wellesley ,ter Va11ey° , 6V r .0 it I, k HIV , 'i - 5� ,.: ! 6' `,. L..t .'A := i &-ki I $i. ,.- r 1'y 6,t R t i ,i huh' v. x _ ill p s r, .4, - • ei '1 1 Project Type: Arterial Improvement Project Description: Widen for center turn lane, improved access management, lighting, and addition of shared-use path. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 200 2028-2029 Right of Way (RW): 300 2029-2029 Construction (CN): 2,500 2031 Total Cost: 3,000 65. Spokane Valley - Millwood Trail SPIpakane . Valley" -- 1 � f E-T ) Ds „II Ls � C' A. iat1 _ i +®a 1, '1� k 3 r . „ r 'Y "..;-*--, ..'".,H7:_. ,1 al - 1;..3 _ _ ____t . i ‘ ri .... , 11- „ ` M d.• ' .." .. .- „ ■■ A._ \ .. G - --' mw m `Ill, Y f I)J 1 wI ^ -� , l{ I:ago nI L , ^ }r L_ t 4 - 1 IIHIIIIIIm1 R - IS -T� t `:, e�ig !yam -•.a ,, Ili .�+ .1 im 44„iit, .. . - •agisim ,,-.,t ` e r a d 'u,, ! `� I l�,.P i� r ,.,w ... :,.. �+wirI r: rye 9 @'1 m Y f, SS 8 '' 6._ _w 1. >4 . m in , ii r _Fz-.�. n fni Project Type: Pedestrian/Bicycle Improvement Project Description: Path following existing railway, connecting to trails in Spokane and Millwood, and Centennial Trail. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 150 2028-2029 Right of Way (RW): 500 2029-2030 Construction (CN): 6,350 - 2031-2032 Total Cost: 7,000 66. Sprague l Pines (SR 27I,I,a kane Intersection Improv. ..• Valley . , F il c I, i.- ' , . _. 1 ' ) l JII t i a it 'ii 12' . ram, ear. r: ^ *-Atii._ -Aig",k. - l'. ' _, i'I 1; , , ..p ' :111 fa*Vit 1 14:1 i :Ail i, ' , _z__, -, it I _ ,S 1 4 IU IC 1 r ,1 + I y1 k,l 4. It] s [• I w ., a 4 :: •, x=; a .TI] I- 1 fir: ' ' i . e. Project Type: Intersection Improvement Project Description: Install SB right turn lane and intersection control. Price assumes new signal and channelization. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 25 Right of Way (RW): 0 Construction (CN): 0 Total Cost: 25 67. N . Sullivan Rd . Pedestrian & sCIfIokane p Bicycle Improvements Valley- I fy ° , + 5 i 1 1 •• „ - I �I` I,i, 1,.1r1.7�.1 . i�'�'�. ;III` 1K;I I•n' 1 1 l{ ;� '•1!!I � - _ — iI 111 ) I .p� I ,. [ I I ,'1! Il 'J ` I ..._ , 1 - -. 1 ti ,.. 4 ' I c “ I,irl III., . j �� , I I Hll I i, i Il;p 11 ,I III I 7 q. _ p f =i i 1 • a ..!i k.. IA 1.F 1 — t „ L 5 p rlr^I- { i,. 7I1 I I-i 111 I• , 1I.. -.1 1 I 4 1j p, 1 1, I I1 ' i tp y I` ,,i J•t �Y I 1 P f�I I I C � 1 1 ,, P I I ' ' If to I ,f } ' ‘1014106, o — _ . ' r . 1 , I '' — - '-'--- —Il < I • Project Type: Pedestrian/Bicycle Improvement Project Description: Segments of shared-use path and sidewalks, including possible transit upgrades. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2027-2029 Right of Way (RW): 250 2029-2030 Construction (CN); 4,650 2030-2031 Total Cost: 5,000 68. Local Access Streets s oka0" - p Valle ne (Skyview Neighborhood) y `- , r ram, .- _- _ �1 .. p. T�. ill' I '' P n I . i ' f� -_ripe ' NIL \ ,, 1 1 _ I .r .'' i a3��c A i;- J 1vr i I °, al it _ -Y 1 I , f I I I. ; • 1 i , I f i I i ig,iIN1s , _ , i .,_1 " , . 11- 1 li t , s - 0 1$ ,, 1 ` M Project Type: Street Reconstruction Project Project Description: Local street reconstruction in Skyview neighborhood. Streets to be evavluated during design phase. Funding Status: Planned Cost Estimate Estimated Project (in $1,000) Schedule Preliminary Engineering (PE): 100 2028 Right of Way (RW): 0 - Construction (CN): 3,900 2029-2030 Total Cost: 4,000