Loading...
22-098.00 Consolidated Irrigation Dist 19: Sprague/Barker Intersection 22-D9g MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SPOKANE VALLEY AND CONSOLIDATED IRRIGATION DISTRICT NO.19 FOR THE RELOCATION OF AN OF EXISTING HYDRANT AND MODIFICATIONS TO AN EXISTING WATER VAULT IN CONJUNCTION WITH THE SPRAGUE AVENUE/BARKER ROAD INTERSECTION IMPROVEMENT PROJECT, CIP NO. 0205 WHEREAS, the City of Spokane Valley (City) intends to construct the Sprague/Barker Intersection Improvement Project CIP No. 0205 (Road Project) in 2022. The project will reconstruct the existing 4 way stop controlled intersection with a single lane roundabout; and WHEREAS, Consolidated Irrigation District 19 (District 19) is operating waterlines within the existing rights-of-way on Sprague Avenue and Barker Road; and WHEREAS, the proposed footprint of the proposed intersection requires that a hydrant be relocated, a water vault with an above-ground vent be modified, and a traffic rated lid for a water vault be furnished; and WHEREAS,the City and District 19 desire to enter into this Memorandum of Understanding (MOU)to establish the mutually agreed terms to accomplish the tasks set forth herein. WHEREAS, it is mutually understood that this MOU will not supersede any existing agreements the City and District 19 have in existence. NOW,THEREFORE,the City and District 19 do hereby agree as follows: ARTICLE 1—RESPONSIBILITIES OF THE CITY 1.1 The City shall designate a"responsible person"who shall represent the City's interest during the design and construction of the Road Project and shall coordinate any modifications or changes needed by the City in conjunction with the work. 1.2 Plans and specifications for the Road Project are being prepared by the City, and the City intends to construct the Road Project in 2022. The City will enter into a contract with a qualified contractor to perform the work in the plans and specifications. 1.3 The City shall identify which facilities require relocation and modification by District 19. 1.4 The City shall have an authorized representative stake the right-of-way and the back of sidewalk to assist District 19 with the relocations. MOU—Euclid Avenue Reconstruction/Sewer Project Page 1 of 2 i ; ,untiot�,i 9 1 s i 1.5 The City's contractor shall adjust the water vault to the existing grate with a traffic rated lid furnished by District 19. ARTICLE 2—RESPONSIBILITIES OF CONSOLIDATED IRRIGATION DISTRICT 19 2.1 District 19 shall designate a "responsible person" who shall represent the District's interest during the design and construction of the Road Project,and shall coordinate any modifications or changes needed by the District in conjunction with the work. 2.2 District 19 shall be responsible for the following work: A.Relocating the hydrant at the southwest corner of the intersection behind the proposed back of walk. B. Modifying the existing vault at the southwest corner to endure all above-ground appurtenances can be placed within the vault, ensuring the vault can be adjusted to proposed elevations by the City's contractor,and furnishing a traffic rated lid to City's contractor. C. All work must be completed prior to June 21, 2022. ARTICLE 3—ALLOCATION OF COSTS 3.1 The City shall reimburse District 19 time and materials cost to relocate the hydrant,modify the existing vault, and install a traffic rated lid for the existing vault up to $ 5,350. 3.2 District 19 shall invoice the City following the work. The invoice shall include tabulations of all quantities,equipment, and labor hours for work done. 3.3 Upon receipt of an invoice from District 19, the City shall immediately review each invoice and shall bring to District 19's attention any amount on an invoice that is unclear or questionable. The City shall pay District 19 all unquestioned amounts within 30 days of the receipt of the invoice. The Parties have executed this Agreement this irw day of %7t , 2022. CITY OF SPOKANE VALLEY CONSOLIDATED IRRIGATION DISTRICT 19 ,147, r.4, : John Hohman By: Shane Sheppard City Manager Consolidated Irrigation District 19 Mgr. APPROVER S TO FORM: Office the Cit. orney MOU—Euclid Avenue Reconstruction/Sewer Project Page 2 of 2 i