Loading...
20-093.01 HDR Engineering: Pines/BNSF GSPCONTRACT AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF SPOKANE VALLEY AND HDR ENGINEERING, INC. Spokane Valley Contract #20-093.01 For good and valuable consideration, the legal sufficiency of which is hereby acknowledged, City and the HDR Engineering, Inc. mutually agree as follows: 1. Purpose: This Amendment is for the Contract for engineering design services for the Pines Road/BNSF Grade Separation Project by and between the Parties, executed by the Parties on May 11, 2020, and which terminates on December 31, 2025. Said contract is referred to as the "Original Contract" and its terms are hereby incorporated by reference. 2. Original Contract Provisions: The Parties agree to continue to abide by those terms and conditions of the Original Contract and any amendments thereto which are not specifically modified by this Amendment. 3. Amendment Provisions: This Amendment is subject to the following amended provisions, which are either as follows, or attached hereto as Appendix "A". All such amended provisions are hereby incorporated by reference herein and shall control over any conflicting provisions of the Original Contract, including any previous amendments thereto. This Amendment #1 replaces Appendix C in the scope of work from the original agreement with the attached updated Appendix C. The total contract amount does not increase. 4. Compensation Amendment History: This is Amendment # 1 of the Original Contract. The history of amendments to the compensation on the Original Contract and all amendments is as follows: Original Contract Amount Amendment #1 Total Amended Compensation Date Compensation May 11, 2020 $2,062,269.14 Rate increase only $2,062,269.14 The parties have executed this Amendment to the Original Contract this 2.4.7/1 day of August, 2022. CITY OF SPOKANE VALLEY: J6hn Hohman City Manager APPROVED AS TO FORM: Office ofhe City Attorney 1 HDR ENGINEERING,INC.: By: Rob Berman Its: Sr. Vice President Scope of Services — Phase 2 Pines Road/BNSF Grade Separation APPENDIX C - ESTIMATED COST OF SERVICES FEE ESTIMATE City of Spokane Valley: Pines Road/BNSF Underpass Phase 2 (Amendment) 1 e/ N. ` 6,:, Task C Task Description Total Labor Total Expenses Total Subconsultants 1 71 Protect Management 5 161,675.85 5 20.679.00 S 6,660.00 2 72 Public Involvement S 25,020.28 5 2,629.50 S - 3 TJ Survey Services 5 13,083.16 S - S 10,257 00 4 T4 Utilities S 35,610.56 S 5.075.00 S 10.000.00 6 T5 Railroad Coordination S 31.902.92 5 - S - 6 T6 Intersection Plan for Approval S 43,590.52 $ 31.20 S - 7 T7 Environmental Services 5 2,692.34 5 - S - 8 T8 Geotechnlcal 8 Seismic Design Services S 6,147.04 S - S 144,015.00 9 T9 Design 5 474,825.10 5 - 5 - 10 T10 PS&E Conceptual, Draft Preliminary, Preliminary, 100 . 5 343.737.49 5 - S - 11 T11 Design Reviews 5 16,963.90 S 3.382.20 S - 12 T12 Right of Way Plans and Legal Descriptions 5 73,402.58 S - S 40,293.00 13 713 Right of Way Valuation,Acquisition, and Relocation Services S 368.645.50 S 8.750.00 S 113,300.00 14 714 Management Reserve Fund 5 100,000.00 5 - $ - Total From Spreadsheet S 189,014,85 S 27,649.76 S 23,340.16 S 60,685.56 $ 31,902.92 $ 43,621.72 S 2,692.34 150,162.04 S 474,826.10 343,737.49 S 20,346.10 S 113,695.58 S 490,695.50 S 100,000.00 S 2,062,269.14 58 I April 29, 2020 LABOR ESTIMATE, HDR ENGINEERING STAFF City of Spokane valley: Pines Road/8rvsl underpass Pnase2 L1/ ■ED Project Role Billing Rate ' te(Proposed) Young. E Gudmn xm�m:n 16106 Marshall, ScoBR unrecn 26308 roirll, Me60anfl ined ran 19t03 Kirkman. Brent) ,r .50 Redman. Lori Beth Eror•er 11693 Rougli. Mayumi R... 108 Price. Jeffrey William (Jee) r, 36 Pa ass, Ricardo _ /0 Acevedo, Robed rdneer _� 2546 Jake Surg J Don 1nrv0 a"a,.e 14064 Chemberq NH. Ray 'tlEi° 226.81 yril0la Gene. Genella (gndj M.re tr5.30 Ereanne8e, ea. el0aWd (Dann» 6Jr 80.2T der, Bail M Dann °1 Em a Poem o 9296 Jawetl,HeMl An ' ao RePoem 121.66 Gra,, PNarJ R..yn=.r 190.00 PrBMard' PllisonE r.a,kd.,, 111.08 Total Lahor Hours COST TO comPLETe CHDR Labor Dollars comPLro Subconsultants TOTAL COMPLETE CONTRACT w.cr CRUDGET SPENTH ENT THROUGH JULY 2022C BUDGET nest ., .:... ... 651.5 35 -5 9.28 E T1,303.92 5 -2 1 PI T1 Project Management 71 2 54 24 26,023.3T 0 5 3 189,014.85 $ 31,7.72.9T $ (05.31 Public Involvement 6241 21 4 T3 Surveyservices 23 128 2 3 68T.79 6 8,214.07 27 687, $ 7,939S418 6 27,649.78 E 29,340.16 $ . $ $ $ I73.01) T4 as TT 52 a T5 Rallraad Coordination 159 149$ $ 28,758.22 22400.12 10,000.00 $ 9, E 60,585.56 E 31,902.92 8 45.2/ $ 2.511.145 E 281.57 (8.34) TS IMersecion Plan for Approval 0$ $ $ 43,621.72 43 OH 50E593.22 TT Envi1Onmenral Services 4 4 4 T8 Geotechnical B Seismic Design Se rvirea 13 e 12 $ 2,282.04 4,560.04 $ 29,786.3.t E 2,28206 E 31,346.37 $ 2,692.34 $ 150,162.04 0.16 $ 5,85501$ E 200.14 13514) T9 Dealgn 15 151 110 TS 20 601 641 '510P55E 0onwplual, Droll Pn8mlrery,Prgminary, 100% T6 161 201 65.5 14 69 7 217,66216 $ 073.69 1 E 217,66216 $148 07 59E E 474,826.10 343,73249 $ 257,274.57 9 195,690.69 $ (11.63) $ i261.L T11 Design Revises 16 10 10 10 2 Right 41 Way Plena and Legal Descriptions 79 35 105 885 36$ $ 15,563.79 44.M9.37 8220 $ 4529200E $ 19 245.09$ 84,742.37 20,346.10 E 113,696.58 $ 1,067.1T E 25,493.46 $32.94 $ 11.38 3) r13 Right of Way Valuation, Acquisition, and Relocation Services 13J 416 69 403 1074 835 445 T14 Management Reserve Fund 3196 $ 371,694.77 $ 85,000 00 E 113,30000 $ 5 400,695.50 35,000.00 $ E $ $ T15 Value Engineering 0 0 - E - $ 15,00200 $ 14,9T4.48 $ 2552 The new billing rates shown above are requested since the original contract rates were a composite of 2020,2021,and 2022 rates with a majority of the work planned to occur in 2020 and 2021. Due to the pandemic and review times, the project has been delayed with a majority of the work occurring in 2022 and 2023. New billing rates are an average of 2022 actual rates and a 3% escalated 2023 rate. The overall contract amount remains unchanged for this revision. The estimated hours to complete the scoped tasks result in the project being completed within the overall budget. Printed 8/5/2022,39 EXPENSES SIry.1s001. 01,111 :.m.s so.d/0ns1 unl.r.u,1nn0 01.m..em.0 /2 .„,,F.,..„....,„,, Vo...., In,*...v I.L..m., c.„.,.., a.h.l Cope✓3„n> RYW10.,,.i1 00001 11.1., a`.u4M xona/.11. m..Mnu v na LiN .eS.lt olh. . We Na, 370 `• 9 ~ S .. M I.+ 1r.✓ lr.r t.v .n.rw.....E..... Owrw..� r.... r.. u...mn.lo leva j mx.cv,os orco.on w.cow. OTHER DIRECT COSTS Unll cool [..x 110010 e.41. SM. c.ex n:0110 [o.x ,1100 coax ., ..10 SOW SO.10 11 O, e.... -0N e.en s015 e..n S'AOcO e..ry uex SJIS [ry S80 Cash s+ .:. 100 00 ,m m0 0 . 0 O : 1 5 .. N. �m� 0 suswm 310.00 10.1000 mum slay.w sar000 um stow ssw wow >n.. loom uw 1 O n ,OO. ,OCO Mm °m °°° .m S.M. om.M 711011100 1.11.00 1/i5 OD 10 CO 1000 10.10 II,.m 1I-- 1005 .nu 0 0 ..a r.el 11.00 11100 woo I 11.mT-SUIT now w.0I .o°° I ,a.° 600 sow SO DI 30.20 m.. I ,00° I w.m I Mm 3000 1103 ,smem .O c0 1 ,,,.acc, 10.00 ww 1000 SO 00 .03 ,Om 10.00 00..w1 1..w0a✓1 10.00 110.00 3000 moo ,om I ° 315.00 um 1 we0 1 ,ao0 1 ,om taw I 10.00I >� ,°.. ,.o. ,.m ,em I ,.00 1003 MOO 0.0 -i , I w 000 SON SO 00 .10 I .n. I loon so ei 1 anw 1.1250.00 I wm w,mm r0u1 o0cis so.w0.001s 0.240.00 lS 4,.29.00t0 0,ml.mI s ..<m00ps 007.m1s 0.001s +w.wis n.s0L: owl .0I_s 11,000.0011 Mts. IS pawls vs.mlls - is • II 401w.w1s - Is .0.01.10 SUBCONSULTANTS Oty of Spokane Valley: Pines Read/0NSF Underpass Phase 2 (Amendment) Simpson GooEnolnoero Appraiser Appraisal Revlowor Escrow UII%y Pot o0n0 SUBCONSULTANTS Task Total 50,000.00 0.00 50.00 50.00 0.00 $0.00 1= 0.00% 56,660.00 I S0,00 56,660.00 Tee k Tater 50.00 50.00 50.00 S0.00 50.00 50.00 50.00 50,00 S0.00 TL Rsilr5ad Co0ldl nation Task Tolol 50.00 S0.00 50.00 MOO 50.00 50.00 0.00 30,00 I 50.00 Took Tole s0.0C TT EnvllanmsnlelB,Mese D.0e01.ohnleal j %Await Design Dottlua Task Tolel 50.00 Da0lan Task Tola D,00 50.00 50.00 50,00 $0.00 30,00 30.00 10.00 S0,00 Task 7alol S0.00 I 50.00 50.00 1 S0.00 S0.00 50.00 s0.00 I so.0o s0.oa Took Tole; 50.00 1 30.00 50.00 S0.00 50.00 50.00 50.oa I 50.00 50,00 MIN Rlom a&Way Plans ant Leo.I 0u00011003 - -1111111; - S0.00 50,00 S0.00 50.00 540,29] 00 $0.00 940,203.00 T❑RL hl awe Palliation. Acquisition, en0R Tack Toal 50.00 00.OD 384,500.00 I 514,000.00 S14,000.00 50.00 3113.300.00 $0.00 S113,300.00 Total Sulxonsultantao S 57,210.0015 144,015,00 I s 04,500.00 ft s 14,600.00 I S 14,000.00 B$ 10,000.001 Q 5 324,525.0D V 5 - II 5 324,525.00 eaa,eammemaownner,0M,ma rm.1 M0,r,0IW,m„0 Page 1 of 2 AC R et. CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDD/YYYY) 05/18/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Willis Towers Watson Midwest, Inc. c/o 26 Century Blvd P.O. Box 305191 Nashville, TN 372305191 USA INSURED HDR Engineering, Inc. 1917 South 67th Street Omaha, NE 68106 CONTACT NAME: Willis Towers Watson Certificate Center CNNo Ext 1-977-945-7379 iC No: 1-886-467-2379 E-MAIL ce.com ADDRESSrtificates@willis_....._............_._�.____._.____ ,..._. ... __._._ _.._.._.__.., .. INSURER(S)AFFORDING COVERAGE NAIC# INSURERA: Liberty Mutual Fire Insurance Company 23035 INSURERS: Ohio Casualty Insurance Company 24074 INSURERC: Liberty Insurance Corporation '__._._,__._....__ ...a..,. ..._ 42404 um_w INSURER D INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: W24782800 REVISION NUMBER: THIS IS INDICATED. CERTIFICATE EXCLUSIONS S R LTR TO CERTIFY THAT THE POLICIES NOTWITHSTANDING ANY REQUIREMENT, MAY BE ISSUED OR MAY AND CONDITIONS OF SUCH OF INSURANCE PERTAIN, POLICIES. INSD LISTED BELOW HAVE BEEN TERM OR CONDITION OF ANY THE INSURANCE AFFORDED BY LIMITS SHOWN MAY HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, REDUCED BY PAID CLAIMS. POUCYEFF 1 POLICY EXP '._.,.- - (MM!D0/YYYY) 1 (MM/DD/YYYY) , LIMITS _.__,..__,.._... .�._ _............. ...--_.._.ADDL TYPE OF INSURANCE SUBR ._._.._..._._..�...._.. _...,._.,.._e WVD i POLICYNUMBER A X COMMERCIAL GENERAL LIABILITY 1 Y Y T82-641-444950-032 1 1 EACH OCCURRENCE S 2 , 000,000 CLAIMS-MADE'j X .1 OCCUR 1DAMAGETO RENTED 1,000,000 PREMISES (Ea occurrence) 9 X Contractual Liability j MED EXP (Any one person) $ 10,000 106/01/2022106/01/20231 I PERSONAL & AM/ INJURY I $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 4,000,000 POLICY X t PROT- I X LOC PRODUCTS -COMP/OPAGG 5 4,000,000 OTHER: S A---- AUTOMOBILE LIABILITY ANY AUTO Y Y AS2-641-444950-042 1 COMBINED SINGLE LIMIT $ 2 , 000, 000 1 (Ea accident)) _ X f a BODILY INJURY (Per person) S OWNED I SCHEDULED AUTOS ONLY I AUTOS 106/01/2022 j 06/01/2023 1 BODILY INJURY (Per accident) $ HIRED NON•OWNED 1 AUTOS ONLY 1 AUTOS ONLY PROPERTY DAMAGE S 1 (Per accident) 1 f I UMBRELLAL!AB 1 X 1 OCCUR Y Y EUO(23)57919363 i EACH OCCURRENCE I$ 5,000,000 X EXCESSLIAB 1 ICLAIMS-MADE! 06/01/2022!06/01/2023 AGGREGATE $ 5,000,000 DED 1 X j RETENTIONS 0 i $ i WORKERS IANDEMPLOYERS'unsure C ANYPROPRIETOR OFFICER+MEMBER 1(Mandatory If yes. (DESCRIPTION COMPENSATION YIN N NIA 1 Y WA7-64D-444950-012 !MUTE E1 1 OTRH- j E.L. EACH ACCIDENT S 1,000,000 06/01/20221 06/01/2023 ;----T-----�- m-•--_ _.,,,..,_.._._.__.___,.....�_._..__..�..... I 1 El DISEASE EA EMPLOYEE $ 1,000,000 PARTNER'EXECUTIVE EXCLUDED? No in NH) describe under OF OPERATIONS beklw I E.L. DISEASE • POLICY LIMIT 1 $ 1,000,000 I 1 1 I i 1 DESCRIPTION OF OPERATIONS / LOCATIONS 1 VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Certificate Holder is named as Additional Insured on General Liability, Automobile Liability and Umbrella/Excess Liability on a Primary, Non-contributory basis where required by written contract. Waiver of Subrogation applies on General Liability, Automobile Liability, Umbrella/Excess Liability and Workers Compensation where required by written contract and as permitted by law. Umbrella/Excess policy is follow form over General Liability, Auto Liability and Employers Liability. CERTIFICATE HOLDER CANCELLATION City of Spokane Valley Attn: Christine Bainbridge 10210 East Sprague Avenue Spokane Valley, WA 99206 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE !!G'�GIL/w��> ACORD 25 (2016/03) ©1988-2016 AGORD CORPORATION. AU rights reserved. The ACORD name and logo are registered marks of ACORD SR 2D, 22594842 BATCH: 2530924