Resolution 22-023 Fee Schedule for 2023 CITY OF SPOKANE VALLEY
SPOKANE COUNTY,WASHINGTON
RESOLUTION NO.22-023
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,WASHINGTON,
REPEALING AND REPLACING RESOLUTION 22-009, AND APPROVING THE 2023 MASTER
FEE SCHEDULE,AND OTHER MATTERS RELATING THERETO.
WHEREAS,it is the general policy of the City to establish fees that are reflective of the cost of services
provided by the City; and
WHEREAS,the City uses a resolution to establish the schedule of fees for City programs,permits and
services,and periodically the fee resolution and fee schedule must be amended to incorporate new or modified
services; and
WHEREAS, Council desires to approve the resolution and accompanying fee schedule.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington,as follows:
Section 1. Adoption. The Master Fee Schedule is hereby adopted as provided herein and as shown
and incorporated in the attached schedules.
Section 2. Repeal. Resolution 22-009 is hereby repealed in its entirety.
Section 3. Effective Date. This Resolution shall be in full force and effect January 1, 2023.
Approved this 13th day of December,2022.
ATTES : CITY OF SPOKANE VALLEY
, k4N--0>.
u•istine Bainbridge, City Clerk Pam Haley,Mayor
Approved o form:
I flee the Ci ey
Resolution 22-023 Fee Schedule for 2023 Page I of 18
MASTER FEE SCHEDULE
Fee Schedule Page No.
Schedule A: Planning 3
Schedule B: Building/Engineering 5
Schedule C:Parks and Recreation 11
Schedule D: Administrative 14
Schedule E: Other Fees 15
Schedule F: Police Fees 15
Schedule G: Transportation Impact Fees 16
Resolution 22-023 Fee Schedule for 2023 Page 2 of 18
MASTER FEE SCHEDULE
Schedule A — Planning
Automatic Annual Adjustment
Unless otherwise specifically amended, Schedule A of this Master Fee Schedule shall be reviewed and
automatically adjusted annually to reflect(80%)of any change from September to September of the Consumer
Price Index for All Urban Consumers (CPI-U), West Region, 1982-84=100, published by the United States
Department of Labor,Bureau of Labor Statistics, or other comparable index if not published.In no event shall
the cumulative change in rates or charges be more than four percent(4%)per year.Unit prices shall be rounded
to the nearest dollar. The automatic adjustment shall be effective January 1 of each year. No other fee
schedules shall be affected by such automatic adjustment.
FEE AMOUNT
AMENDMENTS
Comprehensive Plan Amendment $ 2,704.00
Zoning or other code text amendment $ 2,704.00
APPEALS
Appeal of Administrative Decision $ 811.00
Appeal of Hearing Examiner Findings $ 1,082.00
Transcript/record deposit on Appeals of Hearing Examiner Decisions $ 170.00
Appeal of Administrative Decision- Code Enforcement Final Decision
pursuant to chapter 17.100 SVMC $ 541.00 unless otherwise
waived pursuant to SVMC 17.110
ENVIRONMENTAL REVIEW
STATE ENVIRONMENTAL POLICY ACT(SEPA)
Single Dwelling(when required) $303.00
All other developments $ 379.00
Environmental Impact Statement(EIS)Review,minimum deposit $ 2,380.00
Addenda of existing EIS Review $379.00
SHORELINE
Substantial Development Permit-under$50K $ 1,082.00
Substantial Development Permit- over$50K $ 1,731.00
Shoreline Exemption $ 649.00
CRITICAL AREAS
Floodplain Permit not associated with a subdivision $ 541.00
Floodplain Permit associated with a subdivision $ 541.00+$ 56.00 per lot
LAND USE ACTIONS
SUBDIVISIONS
Preliminary plat $ 2704.00 $44.00 per lot
Final Plat $1540.00+ $10.00 per lot
Time extensions—file review and letter $ 541.00
Resolution 22-023 Fee Schedule for 2023 Page 3 of 18
SHORT PLATS
Preliminary 2 to 4 lots $ 2,163,00
Final plat 2 to 4 lots $ 1,298.00
Preliminary plat 5 to 9 lots $2,163.00+$27.00 per lot
Final plat 5 to Slots $ 1,406.00+$27.00 per lot
Time extensions—file review and letter $ 541.00
PLAT ALTERATION
Subdivision plat $ 1,298.00
Short plat $ 811.00
PLAT VACATION $ 1,594.00
BINDING SITE PLAN
Binding site plan alteration $ 2,163.00
Change of Conditions $ 2,163.00
Preliminary binding site plan $ 2,163.00
Creating lots within final binding site plan via Record of Survey $ 1,622.00
Final Binding Site Plan $2,163.00
AGGREGATION/SEGREGATION
Lot line adjustment $ 270.00
Lot line elimination $ 216.00
Zero lot line $216.00+$ 10.00 per lot
OTHER PLANNING
Administrative Exception $ 541.00
Variance $ 1,704.00
Administrative Interpretations $ 379.00
Home Occupation Permit $ 108.00
Accessory Dwelling Units (ADU) $ 324.00
Conditional Use Permit $ 1,731.00
Temporary Use Permit $ 541.00
Small Cell Permit Application $ 541.00 for up to five sites+$ 108.00 per additional site
Hourly Rate for City Employees $ 66.00
Document Recording Service by Staff Hourly
Street Vacation Application $ 1,477.00
Pre-application Meetings $ 270.00*
*Fee shall be deducted from land use application, building or commercial permit fees when application is
filed within one year of pre-application meeting.
ZONING map amendments (rezone)* $ 3,786.00
Planned residential development plan $2,163.00 +$28.00 per lot
Planned residential development modification $ 568.00
Zoning letter $ 227.00
*If rezone is combined with other action(s), cost of other action(s) is additional
Resolution 22-023 Fee Schedule for 2023 Page 4 of 18
Schedule B — Building
Automatic Annual Adjustment
Unless otherwise specifically amended, Schedule B of this Master Fee Schedule shall be reviewed and
automatically adjusted annually to reflect(80%)of any change from September to September of the Consumer
Price Index for All Urban Consumers (CPI-U), West Region, 1982-84=100, published by the United States
Department of Labor,Bureau of Labor Statistics,or other comparable index if not published. In no event shall
the cumulative change in rates or charges be more than four percent(4%)per year.Unit prices shall be rounded
to the nearest dollar. The automatic adjustment shall be effective January 1 of each year.
Stornwater Utility Charges on Developed Parcels shall be reviewed and automatically adjusted annually to
reflect any change from September to September of the Consumer Price Index for All Urban Consumers(CPI-
U), West Region, 1982-84=100, published by the United States Department of Labor, Bureau of Labor
Statistics, or other comparable index if not published. In no event shall the cumulative change in rates or
charges be more than four percent (4%) per year. Unit prices shall be rounded to the nearest dollar. The
automatic adjustment shall be effective January 1 of each year.
Building permit fees shall not be included in the annual automatic adjustment because updates occur semi-
annually through the International Code Council (ICC) published updates. No other fee schedules shall be
affected by such automatic adjustment.
Fee Payment
Plan review fees are collected at the time of application. Such fees may be adjusted during plan review.
Overages or under payments shall be appropriately adjusted at the time of permit issuance.
Plan review fees are separate from and additional to building permit fees. Permit fees and any other unpaid
fees shall be collected prior to issuance of the permit.
Fees for outside professional services required during the permit process shall be paid by the applicant.
Examples of outside professional services include review by contract reviewers, special inspection or
construction services, consultant services for special topics, surveying or other services required to determine
compliance with applicable codes.
Fee Refund Policy. Refunds authorized under this policy apply only to Schedule B.
PLAN REVIEW FEES
• Plan review fees are non-refundable once any plan review work has been started.
• Paid plan review fees may be refunded when an eligible request is received in writing.
• At a minimum,a$ 66.00 administrative fee shall be retained.
• If the paid plan review fee is less than $ 66.00, no refund is authorized.
• If the paid plan review fee is more than $ 66.00, the amount for refund shall be calculated at
the rate of 100% of the paid plan review fee minus $ 66.00.
PERMIT FEES
• Permit fees are non-refundable once work authorized by the permit has begun.
• Paid pennit fees may be refunded when an eligible request is received in writing.
• At a minimum, a $ 66.00 administrative fee will be retained when fees are refunded.
• If the paid permit fee is less than $ 66.00,no refund is authorized.
• If the paid permit fee is more than$ 66.00,the refund shall be calculated at the rate of 95% of
the paid pennit fee minus $ 66.00.
For any application taken or permit issued in error, a full refund of fees paid shall be made. No portion of the
paid fees shall be retained.
Resolution 22-023 Fee Schedule for 2023 Page 5 of 18
FEES
GENERAL.
Hourly Rate for City Employees $ 66.00
Overtime rate for City Employees (1.5 times regular rate) $ 99.00
Investigation fee: Work commenced without required permits Equal to permit fee
Working beyond the scope of work $ 162.00
Replacement of lost permit documents Hourly rate; 1 hour minimum
Revisions to plans requested by the applicant or permit holder shall be charged the hourly rate with a minimum
of one hour. Revised plans submitted in response to reviewer correction letters are not subject to the hourly
assessment.
Washington State Building Code Council Surcharge (WSBCC) — see the Washington State Building Code
Council website for fees.
BUILDING PERMIT:
Building permit fees for each project are set by the following fees. The figures below shall be used to determine
the building permit fees and plans check fees based on the value of the construction work as stated by the
applicant or the value calculated by the Building Official using the latest valuation data published in the
Building Safety Journal by the International Code Council, whichever value is greater.
Valuations not listed in the Building Safety Journal:
Building Type Valuation Per Square Foot
Residential garages/storage buildings(wood frame) $21.00
Residential garages (masonry) $24.00
Miscellaneous residential pole buildings $ 21.00
Residential carports, decks, porches $ 17.00
Building Permit Fee Calculation
Total Valuation Building Permit Fee
$1.00 to $25,000.00 $69.25 for first$2,000.00+
$14.00 for each additional$1,000.00 (or fraction thereof)
Up to and including $25,000.00
$25,001.00 to $50,000.00 $391.25 for first$25,000+
$10.10 for each additional $1,000.00 (or fraction thereof)
Up to and including$50,000.00
$50,001.00 to $100,000.00 $643.75 for first$50,000.00+
$7.00 for each additional $1,000.00 (or fraction thereof)
Up to and including$100,000.00
$100,001.00 to$500,000.00 $993.75 for first$100,000+
$5.60 for each additional $1,000.00 (or fraction thereof)
Up to and including$500,000.00
$500,001.00 to$1,000,000.00 $3,233.75 for first$500,000.00+
$4.75 for each additional $1,000.00 (or fraction thereof)
Up to and including$1,000,000.00
Resolution 22-023 Fee Schedule for 2023 Page 6 of I8
$1,000,001 and up $5,608.75 for first $1,000,000.00+
$3.15 for each additional$1,000.00 (or fraction thereof)
Plan Review Fee Calculation % of Building Permit Fee
Plans review fee(general) 65%
Plans review fee—Group R-3 occupancies (single family less than 7,999 sq. ft.) 40%
Plans review fee—Group R-3 occupancies (single family 8,000 sq. ft. or more) 65%
Plans review fee—Group U occupancies (sheds, barns, et.) 25%
OTHER PERMITS:
SITE PLAN REVIEW
New Residential Home Site Plan Review $ 324.00
Residential Accessory Structure Site Plan Review $ 86.00
Commercial Site Plan Review $ 595.00
DEMOLITION PERMIT
Single Family Residence $ 50.00 flat fee
Commercial Building $ 141.00 flat fee
Garage or accessory building associated with residence or commercial building $23.00 flat fee
Foundation Only Building Permit: 25% of building permit fee
Swimming Pools, over 2 feet in depth $ 66.00+plumbing fees
Re-roof(no plan review charge unless submitted for review) Based on Project Valuation
Change of Use or Occupancy Classification Permit Hourly
TEMPORARY CERTIFICATE OF OCCUPANCY
Commercial or Multifamily Building $ 216.00
Residential Building $ 162.00
Manufactured Home(FAS)Placement Permit $ 54.00 per section
Permit or Application Expiration Extension $66.00
Towers, elevated tanks, antennas Hourly
SIGN PERMIT:.
Sign Permits are subject to the assessment of the WSBCC fee as noted in Schedule B "General" section and
the following review fees.
Sign Plan Review Fee $ 92.00
Wall Sign Permit $ 81.00 per sign(flat fee)
Freestanding or Monument Sign Permit $ 108.00 per sign(flat fee)
Resolution 22-023 Fee Schedule for 2023 Page 7 of 18
RIGHT-OF-WAY(ROW)PERMIT:
A traffic plan and traffic plan review is required if more than 50% of the width of any street is closed or if a
single arterial lane is closed. A minimum plan review fee of$66.00 (hourly rate for City employees) applies
to all right-of-way permits that require a traffic plan. If additional staff time is required, it shall be charged at
the hourly rate.
Fees for outside professional services required during the permit process shall be paid by the applicant.
Examples of outside professional services include review by contract reviewers, special inspection or
construction services, consultant services for special topics, surveying or other services required to determine
compliance with applicable codes.
TYPES OF ROW
Non-cut obstruction without clean up $ 79.00
Non-cut obstruction with clean up $ 119.00
Pavement cut obstruction,non-winter $216.00
Pavement cut obstruction,winter $227.00
Working without a permit 100%Permit Fee
Commercial Approach Permit $ 81.00
Residential Approach Permit $ 76.00
Multiple Use Permit—overhead $ 119.00 per 1/4 mile
Multiple Use Permit—underground $ 703.00 per 1/4 mile
Erosion/Sediment Control—Site Inspection $ 108.00
Oversized Load Permit Fee $ 81.00
Structure Transport Permit $ 162.00 per section
ENGINEERING PERMITS
GRADING PERMIT:
100 cubic yards(cu yd) or less $27.00
101 to 1,000 cubic yards $27.00 for first 100 cu yd.+
$7.00 each additional 100 cu yd
1,001 to 10,000 cubic yards $ 135.00 for first 1,000 cu yd+
$10.00 each additional 1,000 cu yd
10,001 to 100,000 cubic yards $ 243.00 for first 10,000 cu yd+
$37.00 each additional 10,000 cu yd
100,001 to 200,000 cubic yards $ 568.00 for first 100,000 cu yd+
$ 27.00 each additional 10,000 cu yd
200,000 or more cubic yards $ 676.00 for first 200,000 cu yd+
$ 27.00 for each additional 10,000 cu yd
GRADING PLAN REVIEW FEE:
100 cubic yards (cu yd)or less $22.00
101 to 1,000 $27.00
1,001 to 10,000 $ 37.00
Resolution 22-023 Fee Schedule for 2023 Page 8 of 18
10,001 to 100,000 $ 37.00 for first 10,000 cu yd+
$27.00 each additional 10,000 cu yd
100,001 to 200,000 $ 189.00 for first 100,000 cu yd+
$27.00 for each additional 10,000 cu yd
200,001 or more $ 676.00 for first 200, 000 cu yd+
$27.00 for each additional 10,000 cu yd
Grubbing& Clearing Only(without earth being moved) $ 74.00
Paving Permit(greater than 5,000 sq. ft.-new paving only) $285.00
OTHER ENGINEERING
Design Deviation $ 162.00
STORMWATER UTILITY CHARGE ON DEVELOPED PARCELS:
Each single-family unit $58.00 annual
All other properties each $58.00 per 3,160 sq. ft impervious surface
MECHANICAL PERMIT:
Plan review fees for mechanical permits shall be collected at the time of application as noted in the "Fee
Payment"section of this schedule. Permit fees shall be collected when the permit is issued.
Mechanical Permit Fees
A. BASIC FEES
I. Basic fee for issuing each Stand Alone permit $ 40.00
2. Basic fee for each Supplemental permit $ 8.00
B. UNIT FEES (in addition to the basic fee)
1.Installation or relocation of Furnaces and suspended heaters
a. up to and including 100,000 btu $ 15.00
b. over 100,000 btu $ 18.00
2. Duct work system $ 11.00
3. Heat pump and air conditioner
a. 0 to 3 tons $ 15.00
b. over 3 tons to 15 tons $ 23.00
c. over 15 tons to 30 tons $ 28.00
d. over 30 tons to 50 tons $ 40.00
e. over 50 tons $ 69.00
4. Gas water heater $ 11.00
5, Gas piping system $1.00 per outlet
6. Gas log,fireplace, and gas insert installation $ 11.00
7. Appliance vents installation; relocation; replacement $ 10.00 each
8. Boilers, compressors, and absorption systems
a. 0 to 3 hp-100,000 btu or less $ 15.00
b. over 3 to 15 hp- 100,001 to 500,000 btu $23.00
e. over 15 -30 hp-500,001 to 1,000,000 btu $ 28.00
d. over 30 hp- 1,000,001 to 1,750,000 btu $ 40.00
e. over 50 hp-over 1,750,000 btu $ 69.00
9. Air Handlers
a. each unit up to 10,000 cfm, including ducts $ 15.00
b. each unit over 10,000 cfm $ 18.00
Resolution 22-023 Fee Schedule for 2023 Page 9 of 18
10. Evaporative Coolers (other than portable) $ 11.00
11. Ventilation and Exhausts
a. each fan connected to a single duct $ 11.00
b. each ventilation system $ 15.00
c. each hood served by mechanical exhaust $ 15.00
12, Incinerators
a. residential installation or relocation $ 23.00
b. commercial installation or relocation $ 25.00
13. Unlisted appliances
a. under 400,000 btu $ 56.00
b. 400,000 btu or over $ 113.00
14. Hood
a. Type I $ 56.00
b. Type II $ 11.00
15.LP Storage Tank $ 11.00
16. Wood or Pellet Stove insert $ 11.00
17. Wood stove system-free standing $28.00
PLUMBING PERMIT:
Plan review fees for plumbing permits shall be collected at the time of application as noted in the "Fee
Payment"section of this schedule. Permit fees shall be collected when the permit is issued.
A. BASIC FEES
1. Basic fee for issuing each Stand-Alone permit $ 40.00
2. Basic fee for each Supplemental permit $ 8.00
B.UNIT FEES (in addition to the basic fee)
1.Each plumbing fixture on a trap $ 6.00 each
(includes garbage disposals, dishwashers, backflow device, drainage, hot tubs, built-in water softener, water
closets, lavatories, sinks, drains, etc.)
2. Water Heater $ 6.00 each
3.Industrial waste pretreatment interceptor $ 18.00
(includes its trap and vent, except kitchen type grease interceptors functioning as fixture traps.)
4. Repair or alteration of water piping, drainage or vent piping $ 6.00 each fixture
5.Atmospheric type vacuum breaker $ 6.00 each
6. Backflow protective device other than atmospheric type vacuum breakers $ 6.00 each
7. Medical gas $ 6.00 per outlet
8. Interceptors $ 6.00 each
Resolution 22-023 Fee Schedule for 2023 Page 10 of 18
Schedule C — Parks and Recreation
ADMINISTRATIVE FEES
Basic fees to be considered when applying rates
Administrative Fee $32.00
Refuse Fee $52.00
AQUATICS
Pool admission(age 5 and under) free
Pool admission(age older than 5) $1.00
Pool punch pass(25 swims) $20.00
Weekend family discount— 1 child under 13 free with paying adult
At the discretion of the City Manager, the Parks and Recreation Department may on occasion offer free
admission open swim days.
Swimming Lessons $40.00
Swim Team Fee $75.00
Pool Rental (fewer than IOU people) $300.00 for 2-hr rental
Pool Rental (101-200 people) $400.00 for 2-hr rental
Refundable Pool Damage Deposit $150.00
ALCOHOLIC BEVERAGE PERMIT $10.00
CENTERPLACE
Conference Center Wing
Auditorium (presentation system included) $79.00 per hour
Auditorium (presentation system included) $475.00 per day
Auditorium (presentation system included) $236.00 per half day
Auditorium Refundable Damage Deposit $75.00
Executive Conference Room $52.00 per hour
Executive Conference Room %2 day $156 per 4 hours
Executive Conference Room full day rental $416 per day
Executive Conference Room Refundable Damage Deposit $75.00
Meeting Room (day and evening use) $42.00 per hour
Meeting Room $263.00 per day
Large Meeting Room $75.00 per hour
Large Meeting Room $225.00 per half day
Large Meeting Room $450.00 per 9 hr. day
Meeting Room $131.00 per half day
Meeting Room Refundable Damage Deposit $75.00
Portable Sound System $150.00 per event
Bluetooth Speaker(includes hand-held or lapel microphone) $75.00
Platinum Package $500.00 per event
Great Room
Multi-use/Banquet Hall $105.00 per hour
Multi-use/Banquet Hall-Wedding Ceremony-2 hours $500.00
Resolution 22-023 Fee Schedule for 2023 Page 11 of 18
Multi-use/Banquet Hall—Wedding Reception— 10 hours $1,310.00
Multi-use/Banquet Hall $840.00 per 9 hr session
Multi-use/Banquet Hall $1,575.00 all day(6 a.m.-1 a.m.)
Small Dining Area $52.00 per hour
Refundable Deposit $210.00
Refundable Deposit—Weddings $500.00
Table Settings (linens and tableware) $3.00 per place setting
Pipe&Drape rental $100/day
Senior Center Wing
Lounge with Dance Floor $105.00 per hour
Lounge with Dance Floor--Wedding Ceremony—2 hours $500.00
Lounge with Dance Floor—Wedding Reception—6 hours $850.00
Refundable Lounge deposit $210.00
Refundable Lounge deposit---Weddings $500.00
Meeting room (evening use) $42.00 per hour
Meeting room (evening use) $131.00 per 4 hr session
Meeting room (weekend use) $262.00 per day
Meeting room (weekend use) $131.00 per half day
Meeting room deposit $52.00
West Lawn and CenterPlace
Rental fee $3,500.00 per day
West Lawn Wedding Ceremony-2 hours (with CenterPlace Reception) $1,000
West Lawn Plaza Rental $2,000 per day
- North Meadow additional $500 per day
North Meadow Rental $1,000 per day
West Lawn Plaza Rental- 1/2 day $1,000
- North Meadow additional $250
North Meadow Rental—%2 Day $500
Outdoor Venue Refundable Damage Deposit $500
Miscellaneous
Self-Catered Event fee for groups bringing their own food in on Sundays
• Groups in meeting rooms $52
• Groups in Fireside Lounge $210
• Groups in Great Room $500
Host/Hostess (after hours) $25.00 per hour
Presentation System $262.00 per day
(includes projector, podium, DVD/VCR sound system, camera.system)
Room Setup $26.00 per hour
Satellite Video Confereneing $262.00 per hour
Sound System $42.00 per day
Additional Microphones $25.00 each
Technical Support $42.00 per hour
LCD Projector/Television $25.00 per hour
LCD Projector/Television $100.00 per day
Linens Only $10.00 per table
Wine glass only rental $.50 per glass
Conference Phone $100.00 per event
Easel Paper Pad $20.00 per pad
Laptop Usage $50.00 per event
Resolution 22-023 Fee Schedule for 2023 Page 12 of 18
Business Incentive Rental Policy —The Parks & Recreation Director has the authority to reduce the room
rental rate by one hr. when the rental meets the following criteria: minimum of 25 participants; utilize a
classroom at CenterPlace eight or more times per calendar year; and use in-house caterer for a meal each
reservation.
PICNIC SHELTER RESERVATION
(For groups fewer than 200 people)
Browns—large red (up to five hours) $100.00
Browns—small green(up to two hours) $40.00
Edgecliff(up to five hours) $100.00
Discovery Playground (up to two hours) $40.00
Greenacres—large (up to five hours) $100.00
Mirabeau Meadows(up to five hours) $100.00
Mirabeau Meadows—shelter and stage(up to five hours) $150.00
Mirabeau Springs—shelter and dock(up to two hours) $250.00
Sullivan(up to five hours) $100.00
Terrace View(up to five hours) $100.00
Valley Mission(up to five hours) $100.00
EVENT RESERVATION—include shelter
(For groups of 200 or more people)
Events include but are not limited to activities such as car shows, tournaments, or high-risk activities. The
Parks and Recreation Director shall make the final determination.
General fee(up to five hours): $175.00
Non-profit applications with proof of qualifying as a 501(e)(3) entity (up to five hours): $100.00
EVENT PHOTOS
Mirabeau Springs shelter and dock $150.00 per hour
BALL FIELD RENTAL/USE $26.00 151 hour+
$15.00 each additional hour
REFUNDABLE FACILITY DAMAGE DEPOSIT
Fewer than 200 people $75.00
Weddings, Special Events and events with 200 or more people $300.00
SPECIAL EVENTS (See Spokane Valley Municipal Code 5.15)
Application Fee $50.00
RECREATION
Recreation program fees are established at amounts to recover costs, as specified in the Parks and Recreation
revenue policy.
Resolution 22-023 Fee Schedule for 2023 Page 13 of 18
Schedule D —Administration
COPY FEE
Paper copies up to 11"x17" (b/w or color) $0.15 per page*
Paper copies larger than 11"x17"(b/w or color) $0.87 per square foot*
Scanned copies of paper records $0.10 per page *
EIectronics records uploaded to email,cloud-based storage,
CD/DVD, or flash drive $0.05 per every 4 electronic
files or attachments*
Records transmitted in electronic format $0.10 per GB*
Digital Storage Media Device(CD/DVD,flash drive) Actual Cost*
Envelope Actual Cost*
Postage Actual Cost*
Records sent to outside vendor for reproduction Actual Cost*
Customized Service Charge - When the request would require the use of IT expertise to prepare data
compilations or when such customized access services are not used by the agency for other business purposes,
the agency may charge the actual cost.The agency must notify the requestor that it will be doing a customized
service and can require a 10 percent deposit.*
*It is the intent of the City of Spokane Valley to recover the cost of providing public records when the total
cost, including but not limited to the per-page, device, envelope, or postage costs, amounts to $5.00 or more.
Copy charges above may be combined to the extent more than one type of charge applies to copies responsive
to a particular request. When combining fees associated with the request,the City will determine the total cost
and charge accordingly.
Copy charges are assessed for each installment of records provided to the requestor. A deposit of 10%may be
required on public record requests.
NSF CHECK RETURN FEE $26.00
CREDIT CARD TRANSACTION PROCESSING FEE 2.5% of transaction amount
Applies to all City fees paid by credit card/debit card except
for those fees under Schedule F—Police Fees(amount of the
alarm fee is intended to cover the total cost of administering
the false alarm program,including,but not limited to,payment
processing fees). Credit card transaction processing fees are
non-refundable.
Resolution 22-023 Fee Schedule for 2023 Page 14 of 18
Schedule E — Other Fees
BUSINESS REGISTRATION
Business Registration $25.00 annual
Nonprofit Registration $10.00 annual
Out-of-City Business Registration with
annual revenues equal to or less than $2,000 (SVMC 5.05.020(D)) $0.00
Adult Entertainment*
Establishment License,Live Adult Entertainment $1,575.00
Establishment License,Adult Arcade $1,575.00
Adult Arcade Device License $157.00
Manager License $157.00
Entertainer License $157.00
Late Adult Entertainment License Fee* (charged in addition to the license fee)
7 to 30 calendar days past due 25% of license fee
31 to 60 calendar days past due 50% of license fee
61 and more calendar days past due 75% of license fee
Appeal of Administrative Determination—Adult Entertainment License*
Adult Entertainment License denial,suspension or revocation pursuant
to SVMC 5.10$1,050.00*Delegation of Authority from City Manager to the Spokane County Sherriffis Office
to act as the Licensing Administrator for the purposes of administering and enforcing Chapter 5.20 SVMC.
Tow Operator Registration Fee $105.00 annual
Schedule F -- Police Fees
FALSE ALARM RECOVERY FEE $65 per incident
Amount of the fee is intended to cover the total cost
of administering the false alarm program, including,
but not limited to, payment processing fees.
Resolution 22-023 Fee Schedule for 2023 Page 15 of 18
Schedule G — Transportation Impact Fees
SOUTH BARKER CORRIDOR TRANSPORTATION IMPACT FEE SCHEDULE
Pursuant to chapter 22.100 SVMC and the adopted South Barker Corridor Study and South Barker Corridor
Transportation Impact Fee Rate Study,the following fees are the transportation impact fees applicable within
the South Barker Corridor area identified in the South Barker Corridor Transportation Impact Fee Rate Study.
Base Rate $1,153 per PM Peak Trip
Land Use Group ITE Code ITE Land Use Category Impact Fee Per Unit
210 Single Family& Duplex $1,084 per dwelling unit
Residential 220 Multi-Family (Low-Rise) - Not Close to Rail $588 per dwelling unit
Transit
310 Hotel(3 or More Levels) $680 per room
Services 492 Health Club $3.98 per sq ft
912 Bank $15.74 `per sq ft
520 Elementary School $2,052 per employee
Institution 522 Middle School $2,236 per employee
525 High School $1,856 der employee
975 Drinking Establishment $7.46 per sq ft
Restaurant 934 Fast Food Restaurant(with drive-thru) $17.13 per sq ft
938 Coffee Shop with Drive-Thru(no indoor seating) $1,912 per drive-thru lane
820 Shopping Center $2.78 per sq ft
Retail 841 Automobile Sales-Used/New $4.32 per sq ft
945 Convenience Store/Gas Station-GFA(4-5.5k) $8,921 per pump
110 Light Industry/High Technology $0.75 per sq ft
Industrial 140 Manufacturing $0.85 per sq ft
150 Warehousing $0.21 per sq ft
151 Mini-Storage $19.37 per storage unit
710 General Office $1.66 per sq ft
Office 720 Medical Office/Clinic $4.53 per sq ft
750 Office Park $1.50 per sq ft
ITE Trip Generation manual,11th Edition
"sq ft"means square foot.
"pump"means vehicle servicing position/gas pump.
"room"means available hotel room.
Pursuant to chapter 22.100 SVMC,transportation impact fees for uses not listed in the rate table shall
be based on (1) the most similar land use category identified in the table, or (2) the base rate and the
most similar land use category identified in I1'E Trip Generation Manual, as documented by a trip
generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street
Standards.
Resolution 22-023 1'ee Schedule for 2023 Page 16 of 18
MIRABEAU SUBAREA TRANSPORTATION IMPACT FEE SCHEDULE
Pursuant to chapter 22.100 SVMC and the adopted Mirabeau and North Pines Road Subarea Transportation
Impact Fee Rate Study, the following fees are the transportation impact fees applicable within the Mirabeau
subarea identified in the Rate Study.
Base Rate=$698 per PM Peak Trip
Land Use Group ITE Code ITE Land Use Category Impact Fee Per Unit
210 Single Family & Duplex $657 per dwelling unit
Residential 220 Multi-Family (Low-Rise) - Not Close to Rail $356 per dwelling unit
Transit
310 Hotel (3 or More Levels) $412 per room
Services 492 Health Club $2.41 per sq ft
912 Bank $9.54 per sq ft
520 Elementary School $1,243 per employee
Institution 522 Middle School $1,355 per employee
525 High School $1,125 per employee
975 Drinking Establishment $4.52 per sq ft
Restaurant 934 Fast Food Restaurant(with drive-thru) $10.38 per sq ft
938 Coffee Shop with Drive-Thru(no indoor seating) $1,159 per drive-thru lane
820 Shopping Center $1.69 per sq ft
Retail 841 Automobile Sales-Used/New $2.62 per sq ft
945 Convenience Store/Gas Station-GFA(4-5.5k) $5,405 per pump
110 Light Industry/High Technology $0.45 per sq ft
Industrial 140 Manufacturing $0.52 per sq ft
150 Warehousing $0.13 per sq ft
151 Mini-Storage $11.73 per storage unit
710 General Office $1.01 per sq ft
Office 720 Medical Office/Clinic $2.75 per sq ft
750 Office Park _ $0.91 per sq ft
ITE Trip Generation manual,11th Edition
"sq It"means square foot.
"pump"means vehicle servicing position/gas pump.
"room"means available hotel room.
Pursuant to chapter 22.100 SVMC,transportation impact fees for uses not listed in the rate table shall
be based on(1) the most similar land use category identified in the table, or (2) the base rate and the
most similar land use category identified in ITE Trip Generation Manual, as documented by a trip
generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street
Standards.
Resolution 22-023 Fee Schedule for 2023 Page 17 of 18
NORTH PINES ROAD SUBAREA TRANSPORTATION IMPACT FEE SCHEDULE
Pursuant to chapter 22.100 SVMC and the adopted Mirabeau and North Pines Road Subarea Transportation
Impact Fee Rate Study,the following fees are the transportation impact fees applicable within the North Pines
Road subarea identified in the Rate Study.
Base Rate^$2,195 per PM Peak Trip
Land Use Group ITE Code ITE Land Use Category Impact Fee Per Unit
210 Single Family& Duplex $2,063 per dwelling unit
Residential 220 Multi-Family (Low-Rise) - Not Close to Rail $1,119 per dwelling unit
Transit
310 Hotel (3 or More Levels) $1,295 per room
Services 492 Health Club $7.57 per sq ft
912 Bank $29.97 per sq fit
520 Elementary School $3,906 per employee
Institution 522 Middle School $4,258 per employee
525 High School $3,533 per employee
975 Drinking Establishment $14.21 per sq ft
Restaurant 934 Fast Food Restaurant(with drive-thru) $32.62 per sq ft
938 Coffee Shop with Drive-Thru(no indoor seating) $3,640 per drive-thru lane
820 Shopping Center $5.30 per sq ft
Retail 841 Automobile Sales-Used/New $8.23 per sq ft
945 Convenience Store/Gas Station-GFA(4-5.5k) , $16,983 per pump
110 Light Industiy/High Technology $1.43 per sq ft
140 Manufacturing $1.62 per sq ft
Industrial 150 Warehousing $0.40 per sq ft
151 Mini-Storage $36.87 per storage unit
710 General Office $3.16 per sq ft
Office 720 Medical Office/Clinic $8.62 per sq ft
750 Office Park $2.85 per sq ft
ITE Trip Generation manual,I lth Edition
"sq ft"means square foot.
"pump"means vehicle servicing position/gas pump.
"room"means available hotel room.
Pursuant to chapter 22.100 SVMC,transportation impact fees for uses not listed in the rate table shall
be based on (1) the most similar land use category identified in the table, or(2) the base rate and the
most similar land use category identified in ITE Trip Generation Manual, as documented by a trip
generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street
Standards.
Resolution 22-023 Fee Schedule for 2023 Page 18 of 18