21-194.01 WA State TIB: Sullivan Road ImprovementsUrban Arterial Program (UAP)
Bid Authorization Form
TIB Project Number
8-3-208(012)-1
INSTRUCTIONS: Enter or update all information on the form. Mail the signed Bid Authorization Form and ALL required
documentation to the TIB Office at:
505 Union Avenue SE, Suite 350 ❖ Post Office Box 40901 ❖ Olympia, WA 98504-0901
For assistance with your project, contact Andrew Beagle, TIB Project Engineer at (360) 586-1151
GENERAL INFORMATION
Lead
Agency
Project Name
Agency
Contact
Email
SPOKANE VALLEY
Sullivan Road
Sprague Ave to 8th Ave
Kelly Lynch, PE
klynch@spokanevalley.org
Phone
509-720-5001
Length in Miles
0.50 miles
REQUIRED DOCUMENTATION
Include the following items with your signed Bid Authorization Form
Completed Plans and Specifications
► Final Engineer's Estimate
► Include verification of WSDOT review & approval of construction documents for projects on or
adjacent to state highways
PROJECT DESCRIPTION
Describe the project as defined in the bid documents
The project consists of storm structure installation, new ADA ramps, curb and gutter, and
sidewalk installation, ITS infrastructure installation, traffic signal revisions, and replacement of
the full width of the roadway within the project limits.
CHANGES IN PROJECT SINCE APPLICATION
Describe any changes that have been made to the proposed project since application
Evaluations of the existing pavement showed high percentages of base failure and full depth
repair needed. An Analysis was completed showing it to be cost effective and provide a more
consistent pavement structure with full depth replacement throughout the project limits. A
concrete intersection was also added at 4th and Sullivan, the intersection of a principal arterial
and major collector.
TIB Bid Authorization Form
Revised 9 April 2012 - Generated by TIB Project Tracking System - 99933AndrewBeagle01242023110312 Page 1 of 3
Project SPOKANE VALLEY
Name Sullivan Road - Sprague Ave to 8th Ave
TIB Project Number
8-3-208(012)-1
PROJECT SCHEDULE
Indicate only changes in project target dates
(Month/Year) in the spaces below:
Previous Schedule
Current Schedule
Bid Opening
February 2023
March 2023
Contract Completion
November 2023
June 2024
PROJECT COST ESTIMATE
Update the costs to indicate the current estimated totals
DESIGN PHASE
CONSTRUCTION PHASE
Design Engineering
Right of Way
Construction
Engineering
Construction Other
Contract Amount
229,475
500,250
634,200
64,013
4,216,399
Phase Total
729,725
Phase Total
4,914,612
Total Project Cost
5,644,337
Include a cost breakdown of construction other items:
$34,013 - Prepurchased vehicle detection system required to be installed during 1st weekend of
project for traffic control phasing
$30,000 - Prepurchased signal cabinet for 4th ave, due to lead time.
DETERMINATION OF ELIGIBLE COST
Enter the current estimated totals for Landscaping and Other Noneligible Cost
Noneligible
Engineering
0
Other Noneligible Cost
Total Landscaping
Cost
Allowable Landscaping
Noneligible
Landscaping
Total Noneligible Cost
50,000
44,600
208,320
0
50,000
Total Eligible Project Cost 5,594,337
Include a cost breakdown of noneligible items
Minor Change Item: $25,000 - Eligibility to be evaluated based on change.
Work Zone Safety Contingency: $25,000 - Required WSDOT Item, Eligibility to be evaluated
based on change.
PROJECT COST CHANGE SINCE SELECTION $2,180,949
63.0% Increase
Initial project scope included an overlay only for the pavement portion of the project. The project
design identified the need for substantial patching ultimately resulting in a reconstruction of the
roadway. With the roadway reconstruction a concrete intersection was added at 4th, and the
existing concrete extended at Sprague. The city has as well seen much higher costs in the last 2
years than was expected during the initital project selection - The inflation factor added to the
initial estimate did not keep up with our current costs.
Include explanation of Cost Change
TIB Bid Authorization Form
Revised 9 April 2012 - Generated by TIB Project Tracking System - 99933AndrewBeagle01242023110312 Page 2 of 3
Project SPOKANE VALLEY
Name Sullivan Road - Sprague Ave to 8th Ave
TIB Project Number
8-3-208(012)-1
FUNDING PARTNERS
Update funding amounts to indicate current funding based on the engineer's estimate
Funding Partner Previous Funding Anticipated Funding
SPOKANE VALLEY
411,326
2,575,630
TIB Funds
1,641,462
1,641,462
NHS Asset Management Grant (via WSDOT)
1,029,000
1,029,000
WA Dept of Ecology Stormwater Grant
381,600
398,245
0 '
TOTAL
$3,463,388
$5,644,337
Funding Partner Total is Correct
Contact your TIB engineer about TIB increase Policy
AGENCY CERTIFICATION
► Certification is hereby given that all Local Funds and Other Funds associated with the
Construction Phase of the project are secured.
This project has been reviewed by the Legislative Body of the Administering Agency or
agencies or its designee and is consistent with the agency's comprehensive plan for
community development.
► Design work is complete for this project and is ready to be advertised.
►All applicable state laws and requirements have been met and incorporated into the contract
documents.
► If the project is within a non -attainment area, the Lead Agency certifies compliance with all
requirements of the State and Federal Clean Air Act.
►All right of way for this project has been acquired, or if right of way remains to be acquired a
Possession and Use Agreement has been obtained for the parcels in question. All right of
way required for this project has been acquired in accordance with state laws.
► For projects on or adjacent to state highways, WSDOT has reviewed and approved
construction documents.
All required permits for constrution have been acquired
2 -2 r-zv23
Signature of Agency Designee Date Signed
.7 f /-1' va �v C ` =4
Typed or Printed Name & Title
TIB Bid Authorization Form
Revised 9 April 2012 - Generated by TIB Project Tracking System - 99933AndrewBeagle01242023110312
Page 3 of 3
GROUP D
QUANTITY
(Sidewalk, TIB
Eligible)
0 0 0 0 0 0 o p o 0
0 0 0 0 0 0 o p o
S p o o p p o cc
e o'4.o vpi N
,n N N N N N N N N N.. N N N N N N N N N N N N N N N N N N N N N N N , N N v. N N N N N, .n.n N N
p o o p p o o m o 0 0 0 0 o pp o 0 o p p o 0 0 0 0 0 o p 0 BEE E p p c� p p o 0 o p p p p o o„
d p' 0 0 0' d o o' o o .-' e ' o po 0 0 0 0 0 E
o N o 0 o ry v m N o o upi
N N N N N ./. N N ,/. N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
egg N
O O O C O 0 0 0 0 2PES1 88 O O O 0 0 0 0 0 E
ry ry N rv. O
,/) N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
GROUP C
QUANTITY (Storm,
Ecology, TIB
Eligible)
GROUP 8
QUANTITY
(Traffic, TIB
Eligible)
GROUP A
QUANTITY
(Road, Federal, TIB
Eligible)
TOTAL
$ 25,000.00
$ 50,000.00
0 0
p p
,O ,.
00'000'005 $
00'000'09 5
$ 450,000.00
$ 25,000.00
$ 82,800.00
$ 30,000.00
$ 18,450.00
$ 2,137.78
$ 26,599.92
$ 2,800.00
$ 42,000.00
$ 25,200.00
$ 9,500.00
$ 25,000.00
$ 3,920.00
$ 6,650.00
$ 172,057.00
$ 33,000.00
0 0
po ,i
'
0
gg
$ 173,600.00
$ 377,000.00
$ 308,000.00
$ 2,655.00
N
'i .-,
$ 532,000.00
$ 1.00
$ 23,250.00
$ 26,400.00
O G
O G
$ 6,600.00
$ 35,000.00
$ 31,500.00
$ 56,000.00
EEE
O b o
N m b
PRICE / UNIT
$ 25,000.00
$ 50,000.00
0 0
.D o
NNN
0 E
0 0
N
$ 450,000.00
$ 25,000.00
0 0
N,h
0 0
NN
0 0
NN
0 0
m ry
o NN
0 E
ON o
4
N
$ 7.00
$ 35.00
8 8
N N
00'1 $
00'000'9 $
0 0
.ai
N N
0 0
.7i Om
,i
NN
0 0
0
V. N
0 0
N
No.N
0 0
,y
N.,,NN
0 0
N
m
E
N O
,y
p
b o
O p
O O
,. O
,:r
N N
$ 600.00
$ 3,500.00
O O
O S
ll1OMMO
V n
N,hN
O O O
2 O
NN
TOTAL PROJECT
QUANTITY
.,
,�
.,
,� ,'),,,P.
9,200.00
1.00
Ei m
0 0
0
,.
0 0
""
560.00
190.00
5,933.00
220.00
pp Op
,
O O
O
o
ti
Op p
N m
p
o n
N
OoE
..
,1 o2
v oM
155.00
440.00
p
O
p
^' is
O
S
Ni
s
". p
z ,.i
0 0
ro
0 0 0
m „ n
GROUP D
QUANTITY
(Sidewalk, TIB
Eligible)
,n pp
0 0
p0 ,n
o d
o p
o o
O p
2300.00
0.50
634.00
7.56
op
8
560.00
oN
o0
GROUP C
QUANTITY
(Storm,
Ecology, TIB
Eligible)
0 0
O
D.30
0.30
p
p
0
737.80
444.44
5.00
8 m
po
m
OE
O
O O
4.00
155.00
440.00
o
O O
O O
88
.. p
p
On W
3.00
GROUP B
QUANTITY
(Traffic, TIB
Eligible)
0.25
0.00
0
0 0
0
0 o
o
p
R
0.70
GROUP A
QUANTITY
(Road,
Federal, TIB
Eligible)
vO 1
0 0
O N
o
upj
0 0
upio
0 2
2300
N W
t m
0
N
N
m O
16550.00
4279.89
12400
2900
00ZZ
O i
� I�
j
-,,n
u J
��
J
J-��
u°
LnwuuuLLuiLL>r>
J
J
W
W W
-
u
u u
CNN>z0,,,<_
u
o
0 o
u ca,
6 6"
>0
u
LLuuuuuuuu
w
w,
w w
w w
w
a
�
aui
o
•i ei
.nnnm000����444r4NN-8mmmm
H 0
•i
q o
ri ,i
ei ei
ri N
N
0 0
N N
0 0
N N
N 0
N N
0 0
N N
N 0
N N
0 0
N N
N o
N N
6aaaaaaaaL04
4
d'
0
V .I1
0 0
0 0
vl
0 0
vl vl
0 m
vl
4—g-“.
0
1� n
0 0
n r
aNa
4,
n n
0 0
n n
-2
c o-
2
o 0
n
ITEM DESCRIPTION
MINOR CHANGE
CONSTRUCTION SURVEYING
ADA FEATURES SURVEYING
SPCC PLAN
PUBLIC LIAISON REPRESENTATIVE
MOBILIZATION
PROJECT TEMPORARY TRAFFIC CONTROL
WORK ZONE SAFETY CONTINGENCY
PORTABLE CHANGEABLE MESSAGE SIGN
CLEARING AND GRUBBING
REMOVE CEMENT CONC. CURB
REMOVE CEMENT CONCRETE MEDIAN CURB AND ISLAND
REMOVE CEMENT CONC. SIDEWALK / DRIVEWAY APPROACH
POTHOLE UTILITY
ABANDON EXISTING DRYWELL
REMOVE EXISTING CATCH BASIN
REMOVE STORM DRAIN PIPE
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
REMOVE FENCE
SWALE EXCAVATION INCL. HAUL
ROADWAY EXCAVATION INCL. HAUL
REMOVAL AND REPLACEMENT OE LINSUITABLE MATERIAL
TRENCH EXCAVAT ON SAFE: iY SYS I LM
TRENCH SAFETY FENCE COMPLIANCE
GEOGRID
CRUSHED SURFACING TOP COURSE, 4 IN. DFPTI I
HMA CL. 3/81N. PG 64H-28
COMMERCIAL HMA
UTILITY CASTING DEPTH COMPLIANCE
JOB MIX COMPLIANCE PRICE ADJUSTMENT
CEMENT CONC. PAVEMENT
RIDE SMOOTHNESS COMPLIANCE ADJUSTMENT
SOLID WALL PVC STORM SEWER PIPE 6 IN. DIA.
SOLID WALL PVC STORM SEWER PIPE 101N. DIA.
SPILL CONTROL SEPARATOR
COMBINATION INLET
CATCH BASIN TYPE 2, 48 IN. DIA.
PRECAST CONCRETE DRYWELL, TYPE B
ADJUST EXISTING CATCH BASIN OR DRYWELL
POST ADJUST CATCH BASIN OR DRYWELL
POST ADJUST MANHOLE
SC
2
o 0
102
103
v8
00o
N n
'4N n
124
125
Nry
wN
m"
135
.�nNm,-�o
a,-�
143
145
146
147
148
m
0
9
o0 0 0 o O O o 0 8 8 8 8` 0 0
0 0 D
0 0 0 0 0 0 o r d
vl a
N e tt N W t]Y 1� O
0 0 0 0 0 0 0 0
N N N N, N N N, , Vl N N Vl N N N V) N N VI- N ill N N N N ill N N N N. N N N Vl N N N N. N N to N N N N N
8 08 0 0 0 8 0 0 0 0 8 0 8 0 0 0 0
N N N in, an V2 N v1 +n vx N N N N, V1 vi N N N N N N N Vi to in N N N yr N. N. N. N N N N N. N N N. N N N N N N N
'.. GROUP C
',. QUANTIT3 (Starr,,
Ecclogy, TIB
Eligibl-a)
GROUP A
QUANTITY
(Road, Federal, TiB
Eligible)
TOTAL
888
a
$ 154,800.00
$ 2,500.00
$ 37,400.00
$ 1,900.00
$ 3,600.00
$ 18,050.00
$ 10,000.00
$ -' 9,500.00.
$ 9,999.78
$ 7,700.00
$ 2,400.00
$ 15,000.00
$ 103,647.50
$ 9,180.00
$ 34,500.00
$ 26,400.00
$ 7,600.00
$ 17,600.00
$ 600.00
$ 1,600.00
$ 21,250.00
$ 30,100.00
8
o 1
$ 110,288.89
$ 16,000.0D
$ 12,000.00
$ 70,000.00
$ 32,000.0D
$ 27,700.00
$ 7,000.00
$ 21,000.00
0 08
888
0 0
88
$ 10,000.00
$ 56,408.00
$ 7,600.00
$ 7,400.00
8
$ 6,000.00
$ 2,250.00
$ 490.00
$ 1,000.00
PRICE / UNIT
$ 4,000.00
$ 500.00
$ 900.00
5 500.00
$ 220.00
$ 950.00
$ 1,200.00
$ 950.00
$ 10,000.0D
88
8 888
$ 60.00
$ 150.00
8888
$ 800.00
$ 50.00
88
$ 100,00
$ 100.00
$ 4,000.00
$ 4,000.00
$ 70,000.00
$ 4,000.00
$ 10.00
$ 1,000.00
$ 3,009.00
888
88
00'b
00'000`05 $ '...
888888
Dorm
..
$ 70.00
50.00
TOTAL PROJECT
QUANTITY
0
0
. 0
00 8
0
OO
O d
0
g O
230.00
330.00
95.00
117.33
N
425.00
430.00
430.00
150.00
1,102.89
4.00
3.00
1.00
8.00
2,770.00
7.00
7.00
2,770 00
290.00
N
0 0
o
0
O
00'OSL
00'000'9
7.00
20.00
GROUP D
QUANTITY
(Sidewalk, TIB
Eligible)
0
aq 0
8
m
8 8
o o
N .,
0
425.00
430.00
430.00
150.00
..
.
o
0
0
GROUP C
QUANTITY
(Storm,
Ecology, TIB
Eligible)
3.00
9.00
172.OD
0
8.
v o
v8
00'011
R
08..8
8
GROUP B
QUANTITY
(Traffic, TIB
Eligible)
S
88o88881I',
2770.00
GROUP A
QUANTITY
(Road,
Federal, TIB
Eligible)
N
M c
N
o trail
O
N N
50
4
M
O0
c8i
OM 00p
m
1184
28
O
O n
n ON
H
Z
= =
V U
w w
_ =
V V
w w
_
u. U
J w
_ _
w w
Y
m vl
S
V
¢
LL
J J
J J
LL
J
= _
V U
U w
u.
J O
ii
J
=
Y U
m w
_
V J
u
=
V
W
S =
W w
= _
V O
w¢
LL
J J
J J
J
=
�+- V
N W
's
J
_
(it
W
W
H
N c5300
ut to
4 O
M N
h O
N
W e-1
h h
V�
.-I
h. i�
N VLL1
W
M N
N N
W
t/LLi N.
M.
00
VLLi N
V C
co Cd'
t h
vt
00
VLLi N
�ti tD
W W
N N
0 0
W 00
N
W W
h
00 W
h N
W W
N
0
W W
Le')
0 0
W W
0 0
CO W
VLLi
0 O
W 00
N
O O
W W
ti
W N'
N N
W W
In N
W
W W
N
9 W
ITEM DESCRIPTION
CURB INLET TYPE 2
CLEANOUT JUNCTION
MODULAR STORMWATER CELLS
STORMWATER ACCESS PORT
STORM DRAIN ENCASEMENT
POST ADJUST GAS VALVE
POST ADJUST UTILITY VAULT
POST ADJUST WATER VALVE
EROSION CONTROL AND WATER POLLUTION PREVENTION
SOD INSTALLATION
LANDSCAPE ROCK
TOPSOIL, TYPE A, 18 IN DEPTH
TOPSOIL, TYPE C, 3 IN DEPTH
IRRIGATION SYSTEM REVISION
CEMENT CONC. TRAFFIC CURB AND GUTTER
CEMENT CONC. PEDESTRIAN CURB
CEMENT CONC. CURB WALL
CEMENT CONC. TRAFFIC ISLAND 24 IN. WIDE
CEMENT CONC. TRAFFIC ISLAND 12 IN. WIDE
CEMENT CONCRETE DRIVEWAY APPROACH
DELINEATOR AND CORE HOLE
BULLNOSE MARKER
TEMPORARY FENCE
COATED CHAIN LINK FENCE TYPE 3
COATED CHAIN LINK FENCE TYPE 4
WOOD FENCE
CEMENT CONC. SIDEWALK
CEMENT CONC. CURB RAMP TYPE PARALLELA
CEMENT CONC. CURB RAMP TYPE PARALLEL B
TRAFFIC SIGNAL SYSTEM -MODIFICATIONS
PULL BOX
FIBER OPTIC CABLE (72 SMFO)
FIBER OPTIC PATCH PANEL(48 PORT)
FIBER OPTIC SPLICE CLOSURE
CCTV CAMERA
SFP MODULE
CONDUIT PIPE 2 IN. DIA.
CONDUIT PIPE 3 IN. DIA.
PERMANENT SIGNING
PLASTIC LINE
PLASTIC WIDE LANE LINE
PLASTIC STOP LINE
PLASTIC CROSSWALK LINE
PLASTIC TRAFFIC ARROW _.
PAINT LINE
PAINTED WIDE LINE
PAINTED TRAFFIC ARROW
PAINTED TRAFFIC LETTER
00
N
o O
N N
c-i
�N �ti.N-NH
C
v1 t0
H
00H
HOO
N H
N TH
ti w
m Dr-
h�
�h
177
178
179
180
N HW�
184
t0
188
F4 O
�8 N
MHH8
H8ti
2
7
a
N N U
G
Kg6
0
u r F m
00 G E p d a
K = h 0 m
Wcf
O
O
0
0)
ITEM DESCRIPTION
REMOVING PAINT LINE
SEGMENTAL CONCRETE RETAINING WALL
at
N. N. N. N. N. N N
NNNN N N N
N N N N N N N N N
O
O
O
O
O
O
O
O1
O
O
a
m
late based on expected scope and working days.
Remo numentation
nsocctor (3 for 8hr/day *100 days*$90/hr+3*2hr OT*10odays*106)
Other - Consultant Subtotal
a
O
O
O
O
N
Agency Subtotal
O
O
E
L
OD
Construction Other
O
O
m
O
O
a
Wavetronix System
4,914,611.87
b
0
a
h
0
0
0
0
Consultant, Agency, State
O
O
O
Contract Items (highlited blue)
Construction Engineering Subtotal:
0
m
00
9
O
E
00