1166_Painted_Hills_Phasing_Narrative_5-30-17Painted Hills Planned Residential Development Phasing Plan  May 30, 2017          A. INTRODUCTION ‐ PHASING  The Painted Hills Planned Residential Development (the “Project”) submitted by Black Realty,  Inc., (the “Applicant”) will be phased. Construction will begin in each housing area at the same  time after approval of the Project by the City of Spokane Valley with the other components  constructed as set forth herein. The timing and size of phases within each housing area will  depend on market conditions. The duration of the plat build‐out is expected to be 7 years.     Below is the phasing plan for submission under SVMC 20.40.050.  The number and location of  lots within the Project is subject to revision based upon the receipt of approval of the  preliminary plat.  The Applicant will modify this Phasing Plan in the future if circumstances  require revision.     B. INFRASTRUCTURE IMPROVEMENTS  The Applicant is separately seeking a Conditional Letter of Map Revision and Letter of Map  Revision from the Federal Emergency Management Agency (“FEMA”) to amend the Flood  Insurance Rate Map for the property apart from the approval of the Project by the City.  As part  of the CLOMR/LOMR process, the Applicant will need to relocate the compensatory storage  through levee construction and improvements to Dishman‐Mica Road, Thorpe Road and  Madison Road.  Assuming approval is received from FEMA, this would occur immediately after  the approval of the Project. This would include making water and sewer connections within  these roads and stubbing the utilities into the site at the local access road locations.     The disposal of sewerage from the Project depends on use of a sewer lift station to be built  near Dishman‐Mica Road and Sundown Drive. Sewer mains will be extended from the lift  station location to the cottage and the estate type housing areas (as discussed below) within  the future street right of ways and open space areas/access easements. This work will be  completed in year one.     Painted Hills Planned Residential Development Phasing Plan  May 30, 2017  Page 2 of 4      C. HOUSING  The project will consist of five housing types identified as Estate, Single Family, Cottage, Multi‐ Family and Mixed Use as depicted on the phasing map accompanying this narrative.     1. Estate (The Reserve @ Painted Hills). On the south end of the Project will be an area of  42 lots that are larger, estate type lots ranging in the quarter acre size. The access to this  area will be from Madison Road and consists of a loop street and a cul‐de‐sac.    The southern half of this area fronting 44th Avenue will be constructed during  years 1‐3 along with water, sewer and dry utilities. This will consist of 23 lots.  Sewer lines will be extended through the next phase to connect into the line to  the lift station.    Whipple Street, Alvarez Drive and Pines Road will be constructed during years 3‐ 5 along with water, sewer and dry utilities. This will consist of 19 lots.    The secondary emergency vehicle access will connect to the north during years  3‐5 or earlier if needed due to the progress the Project.    2. Single Family (Meadows @ Painted Hills). The majority of the middle of the site will be  standard single family lots ranging in size from 5500 to 7700 square feet, consisting of  206 lots.    Sundown Drive from Dishman‐Mica Road to the residential area along with  water, sewer and dry utilities will be constructed during year one.    Water, sewer and dry utilities will be extended through each phase below as  they are constructed.   The area fronting 41st Avenue and Cimarron Drive east of Whipple Street will be  constructed during years 1‐3.  This will consist of 43 lots.    The area fronting 41st Avenue and Cimarron Drive west of Whipple Street will be  constructed during years 5‐7.  This will consist of 37 lots.    The area fronting 42nd Avenue will be constructed during years 4‐6.  This will  consist of 44 lots.    The area fronting 43rd Avenue and Darcy Drive east of Whipple Street will be  constructed during years 2‐4.  This will consist of 43 lots.    The area fronting 43rd Avenue and Darcy Drive west of Whipple Street will be  constructed during years 3‐5.  This will consist of 39 lots.       Painted Hills Planned Residential Development Phasing Plan  May 30, 2017  Page 3 of 4      3. Cottage (Whispers @ Painted Hills). At the north end is an area of cottage or townhouse  type units on 52 lots ranging in the size of 1800 to 3600 square feet. The access to this  area consists of a single street running west from Madison Road ending in a cul‐de‐sac.    The eastern half of Painted Hills Avenue with water, sewer and dry utilities will  be constructed during years 1‐2. There will be 23 units.    A sewer line will be extended through the next phase to connect into the line to  the lift station.    The completion of Painted Hills Ave along with water and dry utilities will be  completed during years 3‐4.  There will be 29 units.    The secondary emergency vehicle access will connect to the south from the west  end of the street during years 3‐4 or earlier if needed due to the progress the  Project.    4. Multi‐Family (M. Family @ Painted Hills). In the northwest area of the project are the  multi‐family units. The multi‐family area will have direct access off Dishman‐Mica Road  and another access, Yony Lane., connected to Sundown Drive. There are 228 units, an  office and a recreation building planned for this area.  Construction will be completed  during years 1‐3. All utilities will be extended through each portion of the site as it is  constructed.    5. Mixed Use (The Lofts @ Painted Hills). Finally, the proposal is for 52 mixed use units to  be built in combination with commercial/retail facilities. See description below for  phasing of commercial areas and the residential area will be developed concurrently  therewith.      C. COMMERCIAL AND MIXED USE  The existing golf course buildings and parking lot (Shops @ Painted Hills) at the corner of  Dishman‐Mica Road and Thorpe Road will be retained as a commercial use. The former  clubhouse is currently leased as restaurant space. Additional commercial space is anticipated to  be constructed in years 3‐5.     A mixed use area (The Lofts @ Painted Hills) is planned for along Dishman‐Mica Road adjacent  to the main project entrance with business at ground level and housing above. This area will  develop once there are existing residential construction within the Project to support the  commercial development. This construction is anticipated to be further phased during years 1‐3  (one‐third) and years 3‐5 (remaining two‐thirds).         Painted Hills Planned Residential Development Phasing Plan  May 30, 2017  Page 4 of 4      D. ACCESS – Vehicular and Pedestrian  Phasing of vehicular access to the various housing elements is described above under the  housing section.     Vehicular access to the park within the Project will be off Thorpe Road at the  existing parking  area. The southern commercial area will also use the existing driveway off of Thorpe Road into  its parking lot. The northern commercial area will use driveway access off Dishman‐Mica Road.  These accesses will be completed with the other road improvements during year one.    All housing areas will have pedestrian access via sidewalks along exterior and interior streets  and by the trail system throughout the open space areas to occur with the development of the  area including the improvements.     E. OPEN SPACE AND RECREATION  The project will contain over 30% open space. There is a large open space north of the cottage  housing area. This will include a golf practice area which may include up to 3 chip and putt  areas. This area will be developed in year one.      The Cottage, Single Family and Estate housing areas are separated by green belts. Open space  separates the housing areas from the commercial areas and there will be a large passive park  area on the south end of the site next to Thorpe Road. Open space areas will be connected by  the trail system described above. These areas will be developed concurrently with the adjacent  housing areas.    F. TRAIL SYSTEM  Additional pedestrian connectivity will be provided by a trail system throughout the Project  open space. The trails will run across the larger open space areas, will run between the  different housing type areas and will connect into the sidewalk system within the housing  areas. The existing golf cart bridges across Chester Creek will be retained to provide pedestrian  connections to the southwest commercial area. Trails will be developed at the time of the  improvement of the open space.         WCE WHIPPLE CONSULTING ENGINEERS CIVIL , STRUCTURAL AND TRANSPORTATION ENGINEERING 2528 NORTH SULLIVAN ROAD SPOKANE VALLEY, WASHINGTON 99216 PH: 509-893-2617 FAX: 509-926-0227 DRAWN:DATE:PROJ #: APPROVED:PAINTED HILLS PRD MASTER PHASING PLANSPOKANE VALLEY, WASHINGTONSHEET1 OF 213-116605/30/17JPPTRWYEAR 3 -4 Y E A R 1 - 2 YE A R 1 - 3 YE A R 4 - 6 YE A R 5 - 7 YE A R 1 - 3 YE A R 1 - 3 YE A R 1 - 3 YE A R 5 - 7 YE A R 3 - 5 YE A R 3 - 5 YE A R 3 - 5 YEAR 3 -5 P:\WCE_WORK\2013 WCE PROJECTS\2013-1166 Walker - Painted Hills GC\DWG\1166-PHASING.dwg, 7/18/2017 11:24:12 AM, mark WCE WHIPPLE CONSULTING ENGINEERS CIVIL , STRUCTURAL AND TRANSPORTATION ENGINEERING 2528 NORTH SULLIVAN ROAD SPOKANE VALLEY, WASHINGTON 99216 PH: 509-893-2617 FAX: 509-926-0227 DRAWN:DATE:PROJ #: APPROVED:PAINTED HILLS PRD PHASING INFRASTRUCTURE PLANSPOKANE VALLEY, WASHINGTONSHEET2 OF 213-116605/30/17JPPTRWYEAR 3 -4 Y E A R 1 - 2 YE A R 1 - 3 YE A R 4 - 6 YE A R 5 - 7 YE A R 1 - 3 YE A R 1 - 3 YE A R 1 - 3 YE A R 5 - 7 YE A R 3 - 5 YE A R 3 - 5 YE A R 3 - 5 YEAR 3 -5 P:\WCE_WORK\2013 WCE PROJECTS\2013-1166 Walker - Painted Hills GC\DWG\1166-PHASING.dwg, 7/18/2017 11:25:35 AM, mark