Loading...
10_Painted_Hills_Phase_I_Preliminary_Geotechnical_Evaluation_Revised_8-29-16 PRELIMINARY GEOTECHNICAL EVALUATION PHASE I PAINTED HILLS GOLF COURSE PROPERTY 4403 SOUTH DISHMAN-MICA ROAD SPOKANE COUNTY, WASHINGTON Inland Pacific Engineering Company Project No. 2013-026 December 31, 2013 Revised August 29, 2016 Prepared for: NAI Black Spokane, Washington IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting Preliminary Geotechnical Evaluation Project No. 2013-026 Painted Hills Golf Course Property December 31, 2013 4403 South Dishman-Mica Road Spokane County, WA Inland Pacific Engineering Company Page 3 Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Hardesty ashy silt loam, Narcisse silt loam, Endoaquolls and Fluvaquents, Phoebe ashy sandy loam, and Urban land-Springdale disturbed complex. The native soils encountered in the test pits were consistent with the NRCS data. Field Permeability Testing We performed five test pit permeability tests at the site. The test pit permeability tests were performed in accordance with the Spokane Regional Stormwater Manual (SRSM) Appendix 4C procedures. Test pit permeability tests were performed adjacent to Test Pits TP-3, TP-8, TP-19, TP-22, and TP-28. The following table summarizes the results of the tests performed. Test Location Depth (feet) USCS Classification Percent Fines Infiltration Rate (cfs/ft2) P-1 (TP-3) 1 – 3 SW-SM 10.8 2.84 x 10-4 P-2 (TP-8) 1.5 – 3.5 SM 12.5 8.36 x 10-4 P-3 (TP-19) 1 – 3 GW 3.0 1.21 x 10-3 P-4 (TP-22) 2 – 4 ML 64.0 1.29 x 10-4 P-5 (TP-28) 2 – 4 SM 47.0 6.93 x 10-5 Attached are data sheets summarizing the results of the tests performed. The above results do not include a safety factor. ANALYSIS AND PRELIMINARY RECOMMENDATIONS Discussion Based on the data obtained from the test pits, field permeability tests, and laboratory tests performed, it is our opinion that subsurface infiltration of stormwater is feasible. The most promising layers are the glacial sands and gravels. These soils would be suitable for infiltration using standard drywells. In areas where the alluvial soils are deeper, use of gravel galleries could be considered. These soils are present in the southern portion of the site south and east of Test Pits TP-18, TP-19, and TP-21. Glacial sands were encountered at depth in Test Pits TP-29 and TP-30 at the south end of the site. It is our opinion that drywells could be considered at the south end of the site. Preliminary Geotechnical Evaluation Project No. 2013-026 Painted Hills Golf Course Property December 31, 2013 4403 South Dishman-Mica Road Spokane County, WA Inland Pacific Engineering Company Page 4 Drywell Recommendations We analyzed recommended design rates for drywells using the Spokane 200 Method from the SRSM (Appendix 4A). The following table summarizes the results of the tests performed. Test Pit Depth (feet) USCS Classification Percent Fines Hydraulic Conductivity (cm/s) Recommended Drywell Outflow Rate (cfs) Type A Type B TP-3 10 – 12 SP 3.5 6.1 x 10-2 0.3 1.0 TP-4 10 – 12 GW 4.4 4.1 x 10-2 0.3 0.8 TP-8 10 – 12 GW 3.6 5.9 x 10-2 0.3 1.0 TP-9 8 – 10 GW 2.1 1.7 x 10-1 0.3 1.0 TP-11 10 – 12 SP 2.3 1.5 x 10-1 0.3 1.0 TP-13 10 – 12 SP 2.2 1.6 x 10-1 0.3 1.0 TP-17 10 – 12 SW 2.9 9.0 x 10-2 0.3 1.0 TP-19 10 – 12 SP 1.6 2.5 x 10-1 0.3 1.0 TP-29 10 – 12 SP 2.3 1.5 x 10-1 0.3 1.0 TP-30 14 – 15 SP 4.3 4.3 x 10-2 0.3 0.8 These recommended design infiltration rates include a safety factor of 1.3 as recommended by the SRSM. Higher design outflow rates may be possible if full-scale drywell tests are performed. Gravel Gallery Recommendations We analyzed gravel gallery design infiltration rates using the data from the test pit permeability tests performed. The following table summarizes our recommended design infiltration rates for design of gravel galleries. Test Location Depth (feet) USCS Classification Percent Fines Design Infiltration Rate (cfs/ft2) Safety Factor P-1 (TP-3) 1 – 3 SW-SM 10.8 1.13 x 10-4 2.5 P-2 (TP-8) 1.5 – 3.5 SM 12.5 3.34 x 10-4 2.5 P-3 (TP-19) 1 – 3 GW 3.0 1.10 x 10-3 1.1 P-4 (TP-22) 2 – 4 ML 64.0 5.16 x 10-5 2.5 P-5 (TP-28) 2 – 4 SM 47.0 2.77 x 10-5 2.5 Additional Recommendations We recommend that soil borings be considered to evaluate soil and groundwater conditions at depth. It may be possible that suitable sands and gravels are present below the alluvial soils in the southern portion of the site as evidenced by the sands encountered at depth in Test Pits TP-29 and TP-30. Also, we recommend that additional test pits be excavated for pavement section analysis when a site development plan and traffic data are available. FIGURE 3       Test Pit Location Map Project No. 2013-026 December 30, 2013Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA