Loading...
12_Gustin_Levee_Geotechnical_Report_Revised_8-29-16 GEOTECHNICAL EVALUATION GUSTIN LEVEE EVALUATION PARCEL NO. 45344.9108 SPOKANE COUNTY, WASHINGTON Inland Pacific Engineering Company Project No. 14-037B July 23, 2015 Revised August 29, 2016 IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting GEOTECHNICAL EVALUATION GUSTIN LEVEE EVALUATION PARCEL NO. 45344.9108 SPOKANE COUNTY, WASHINGTON Inland Pacific Engineering Company Project No. 14-037B July 23, 2015 Revised August 29, 2016 Prepared for: NAI Black Spokane, Washington IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting TABLE OF CONTENTS Project No. 14-037B Gustin Levee Evaluation Parcel No. 45344.9108 Spokane County, Washington page 1.0 INTRODUCTION ................................................................................................................ 1 1.1 Project Description .................................................................................................... 1 1.2 Purpose ...................................................................................................................... 1 1.3 Scope ......................................................................................................................... 1 1.4 Available Information ............................................................................................... 1 1.5 Locations and Elevations .......................................................................................... 1 2.0 RESULTS .............................................................................................................................. 2 2.1 Logs........................................................................................................................... 2 2.2 Site Conditions .......................................................................................................... 2 2.3 Soils........................................................................................................................... 2 2.4 Penetration Resistances ............................................................................................. 3 2.5 Groundwater ............................................................................................................. 3 2.6 Laboratory Testing .................................................................................................... 3 3.0 ANALYSIS AND RECOMMENDATIONS ......................................................................... 3 3.1 Discussion ................................................................................................................. 3 3.2 History....................................................................................................................... 3 3.3 Freeboard .................................................................................................................. 3 3.4 Closures..................................................................................................................... 4 3.5 Embankment Protection ............................................................................................ 4 3.6 Embankment and Foundation Stability ..................................................................... 4 3.7 Settlement ................................................................................................................. 5 3.8 Interior Drainage ....................................................................................................... 5 3.9 Operation Plans ......................................................................................................... 5 3.10 Maintenance Plan .................................................................................................... 5 4.0 PROCEDURES ..................................................................................................................... 6 4.1 Excavation and Sampling ......................................................................................... 6 4.2 Soil Classification ..................................................................................................... 6 5.0 GENERAL RECOMMENDATIONS.................................................................................... 6 5.1 Basis of Recommendations ....................................................................................... 6 5.2 Groundwater Fluctuations ......................................................................................... 6 5.3 Use of Report ............................................................................................................ 6 5.4 Level of Care............................................................................................................. 7 5.5 Professional Certification .......................................................................................... 7 Appendix A – Site Location Map, NRCS Map, Boring and Test Pit Location Map Appendix B – Logs of Borings, Logs of Test Pits, Descriptive Terminology Appendix C – Laboratory Test Results 1.0 INTRODUCTION 1.1 Project Description We understand that the proposed Painted Hills project may consist of a residential development. The site consists of 91 acres currently developed as a golf course. Stormwater runoff will be treated using drywells and/or gravel galleries for subsurface infiltration. These type of facilities will also be used to manage potential floodwaters, if needed. In addition, runoff from the drainage east of the site will require a FEMA certified levee. The existing levee is located on the Gustin property off State Highway 27. 1.2 Purpose The purpose of our services is to evaluate the existing levee for conformance to 44 CFR 65.10 of the Code of Federal Regulations for certification by the Federal Emergency Management Agency (FEMA). 1.3 Scope Our services were requested by Mr. Bryan Walker of NAI Black. Mr. Walker authorized us to proceed on April 28, 2015. The scope of work agreed upon consisted of the following:  review of existing geotechnical data and reports for the development, if available  drill 8 penetration test borings at the site to a depth of 15 feet,  excavate 6 test pits through the existing levee embankment,  performing laboratory tests on samples obtained from the test pits,  classifying the soils and preparing boring logs, and  submitting a geotechnical report containing logs of the borings, results of our field investigation and laboratory testing, and our analyses, opinions, and recommendations relative to the conformance of the existing levee to FEMA standards. 1.4 Available Information We were provided a topographic survey for the project site by WCE. This topographic survey showed the existing roadways, existing structures, property lines, and existing ground surface elevation contours. This plan was prepared by WCE and was not dated. We also performed a preliminary geotechnical evaluation for the golf course property in December 2013. The results of that evaluation, along with our opinions and recommendations, are summarized in our Preliminary Geotechnical Evaluation dated December 31, 2013. In conjunction with this evaluation, West Consultants, Inc. (WEST) has been contracted by NAI Black to provide a FEMA Conditional Letter of Map Revision submittal (CLOMR). They have provided Inland Pacific Engineering Company (IPEC) water surface elevations and velocity output from their revised RAS model to assist us in our evaluation. 1.5 Locations and Elevations The borings and test pits were drilled and/or excavated at or near locations selected by us. The boring and test pit locations are shown on the Boring Location Map in Appendix A. The borings Geotechnical Evaluation Project No. 14-037 Gustin Property Levee Parcel No. 45344.9108 Spokane County, WA July 23, 2015 Inland Pacific Engineering Company Page 2 were staked by Whipple Consulting Engineers, Inc. (WCE). The test pits were staked by IPEC. Ground surface elevations at the borings were provided by WCE. Ground surface elevations at the test pits were interpolated from the topographic survey provided by WCE. 2.0 RESULTS 2.1 Logs Log of Boring and Log of Test Pit sheets indicating the vertical sequence of soils and materials encountered and groundwater observations are included in Appendix B. The strata changes were inferred from the changes in the penetration test samples and auger cuttings brought to the surface or measured from the surface in the test pits. Please note that the depths shown as changes between the strata are only approximate. The changes are likely transitions and the depths of changes vary between the borings. Geologic origins for each stratum are based on the soil type, available geologic maps, previous geotechnical reports for this and adjacent sites, and available common knowledge of the depositional history of the site. 2.2 Site Conditions The site is an open field with no trees and is primarily grass-covered. The existing levee extends from the culvert under State Highway 27 on the east side of the property and extends west to the west side of the parcel. The creek side of the levee is typically at a 1.5:1 to 1:1 (H:V) slope. The land side of the levee is typically at a 2.5:1 to 1.5:1 slope. There are two existing crossings where the levee embankment is not present. The crossings consist of embankments with culverts. 2.3 Soils Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Hardesty ashy silt loam and Urban land-Springdale, disturbed complex. The native soils encountered in the borings and test pits were consistent with the NRCS data. The borings encountered approximately 1 foot of topsoil at the surface. Below the topsoil, the borings encountered alluvial or glacial silty to clayey sands and/or poorly graded sands to their termination depths. Borings B-1 and B-3 encountered silty clay between the 4 and 9-foot depths. The test pits were excavated through the existing levee embankment. They encountered existing fill in the upper 4 to 5½ feet. The embankment fill consisted primarily of silty sand. Below the fill, the test pits encountered alluvial or glacial silty to clayey sands and/or gravels to their termination depths. Geotechnical Evaluation Project No. 14-037 Gustin Property Levee Parcel No. 45344.9108 Spokane County, WA July 23, 2015 Inland Pacific Engineering Company Page 3 2.4 Penetration Resistances Penetration resistances (N-values) in the sands and gravels ranged from 6 to 59 blows per foot (BPF) and averaged 23 BPF indicating that these soils were loose to very dense, but were typically medium dense. Penetration resistances in the clays ranged from 8 to 18 BPF indicating they were medium to very stiff in consistency. 2.5 Groundwater Groundwater was not encountered in the borings or test pits. Groundwater is believed to currently exist at some depth below the termination depths of the borings and test pits. Well log data in the vicinity of the site indicate that groundwater is typically 50 to 80 feet below the surface. 2.6 Laboratory Testing We obtained soil samples from the borings during our site investigation. The tests performed included the following: 1. ASTM D 6913, Sieve Analysis 2. ASTM D 4318, Atterberg Limits’ These tests were used to aid in classifying the soils and in the engineering analyses and formulation of engineering opinions and recommendations. The tests were performed by IPEC. Attached are data sheets summarizing the tests performed. 3.0 ANALYSIS AND RECOMMENDATIONS 3.1 Discussion Based on the results of the borings and test pits, along with topographic data from WCE, the existing levee will need significant modification in order to meet the FEMA standard. At this time, we understand that the existing crossings will be removed. As such, additional freeboard will not be required at these locations. The sideslopes of the levee will need to be sloped flatter to maintain slope stability during flooding. In addition, the crown will need to be widened. It is our opinion that the levee embankment materials are suitable but will need to be re-worked to provide adequate flood protection. In summary, the levee as it exists cannot be certified at this time. 3.2 History The levee was constructed prior to 1945, when the Gustin family purchased the land. As such, design plans or as-built drawings are not available. However, an as-built survey was completed by WCE in 2015. 3.3 Freeboard We were provided 100-year flood elevations by WEST. They provided us a plan view of the levee with flood elevations at 9 locations starting at the culvert on State Highway 27 and ending Geotechnical Evaluation Project No. 14-037 Gustin Property Levee Parcel No. 45344.9108 Spokane County, WA July 23, 2015 Inland Pacific Engineering Company Page 4 at the proposed triangle stormwater pond north of 40th Avenue west of the Gustin property. The elevations ranged from 2020.02 at State Highway 27 to 2008.85 at the triangle pond. Please refer to the WEST report for a complete summary of the floodplain analysis. According to 44 CFR Section 65.10(b)(1), an additional 1 foot of freeboard is required within 100 feet of bridge structures. This will require the top of the levee to be at elevation 2024.02 at the State Highway 27 crossing and extending 100 feet west. Since the existing levee is at approximately elevation 2020 in this area, it will need additional fill to meet the minimum freeboard requirements. 3.4 Closures There are no penetrations of the levee so closure devices are not required. 3.5 Embankment Protection The levee is currently grass-covered for erosion protection. We evaluated the erosion protection for the creek side of the levee using the results of the HEC-RAS analysis by WEST. They provided flow velocities for the 100-year flood event. The flow velocities are shown in the following table. FEMA FIS Station RAS Station 100-year Channel Velocity (ft/sec) 1962.72 586 3.71 2027.72 651 2.67 2295.08 918 1.26 2848.82 1472 4.34 2886.75 1510 2.15 2904.75 1528 0.91 2933.32 1557 1.33 3338.84 1963 2.30 3364.84 1989 2.11 As shown in the table, the average flow velocity is typically less than 3 feet per second. At these velocities, it is our opinion that the vegetative erosion protection is adequate for levee slope protection. 3.6 Embankment and Foundation Stability We evaluated the embankment and foundation stability for conditions described in EM 1110-2- 1913, “Design and Construction of Levees, by the US Corps of Engineers dated April 30, 2000, Chapter 6. We analyzed the existing levee embankment for the following cases: 1. CASE I, End of construction. 2. CASE II: Sudden drawdown. 3. CASE III: Steady state seepage from full flood stage. Geotechnical Evaluation Project No. 14-037 Gustin Property Levee Parcel No. 45344.9108 Spokane County, WA July 23, 2015 Inland Pacific Engineering Company Page 5 We performed slope stability analyses for each case. We analyzed the levee embankment with 1:1 slopes. This configuration is considered to have the lowest factor of safety. For our analyses, we used XSTABL software which is based on a software program developed at Purdue University. For these cases, we calculated the minimum factors of safety as shown in the following table. CASE Minimum Factor of Safety I 1.03 II 0.92 III 0.50 For stability, a minimum factor of safety of 1.5 is generally considered acceptable. Based on this analysis, it is our opinion that the levee will not be stable with respect to global slope stability with its current geometry. We recommend that the levee be improved to have maximum 3:1 (H:V) slopes for stability. We recommend a minimum crown width of 8 feet. We recommend that the levee embankment materials consist of a granular soil having 10 to 30 percent by weight passing a 200 sieve to reduce the permeability and limit seepage. We have assumed that on-site soils will be used as borrow to construct the embankment. 3.7 Settlement The average depth of fill is approximately 5 feet. This would result in a loading increase of approximately 625 pounds per square foot (psf) on the bearing soils. Based on the data obtained from the borings, the levee was constructed above medium dense sands. Settlement in these soils would have occurred shortly after construction. Also, given the age of the levee, it is our opinion that significant additional long term settlement will not occur even with addition of 1 to 2 feet in areas requiring additional fill to meet the freeboard requirements. 3.8 Interior Drainage Interior drainage systems have been designed by WCE. We understand that these systems will include the proposed triangle stormwater pond with multiple drywells to control flood waters and infiltrate them into the ground. Please refer to the WCE report for a comprehensive description of the interior drainage system. 3.9 Operation Plans The Operation Plan will be prepared as part of the final levee certification. 3.10 Maintenance Plan The Maintenance Plan will be prepared as part of the final levee certification. Geotechnical Evaluation Project No. 14-037 Gustin Property Levee Parcel No. 45344.9108 Spokane County, WA July 23, 2015 Inland Pacific Engineering Company Page 6 4.0 PROCEDURES 4.1 Excavation and Sampling The borings were completed on July 13 and 14, 2015 using a truck-mounted drill rig operated by an independent firm working under subcontract to IPEC. After we logged the borings, they were abandoned in accordance with state requirements. The test pits were excavated on July 21, 2015 using a rubber-tired backhoe operated by an independent firm working under subcontract to IPEC. After we logged the test pits, the test pits were backfilled. A geotechnical engineer from our firm continuously observed the borings and test pits and logged the surface and subsurface conditions. 4.2 Soil Classification The soils encountered in the borings were visually and manually classified in the field by our field personnel in accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedures)”. 5.0 GENERAL RECOMMENDATIONS 5.1 Basis of Recommendations The analyses and recommendations submitted in this report are based on the data obtained from the borings and test pits performed at the locations indicated on the Boring and Test Pit Location Map in Appendix A. It should be recognized that the explorations performed for this evaluation reveal subsurface conditions only at discreet locations across the project site and that actual conditions in other areas could vary. Furthermore, the nature and extent of any such variations would not become evident until additional explorations are performed or until construction activities have begun. If significant variations are observed at that time, we may need to modify our conclusions and recommendations contained in this report to reflect the actual site conditions. 5.2 Groundwater Fluctuations We made water level observations in the borings and test pits at the times and conditions stated on the boring and test pit logs. These data were interpreted in the text of this report. The period of observation was relatively short and fluctuation in the groundwater level may occur due to rainfall, flooding, irrigation, spring thaw and other seasonal and annual factors not evident at the time the observations were made. Design drawings and specifications and construction planning should recognize the possibility of fluctuations. 5.3 Use of Report This report is for the exclusive use of the addressee and the copied parties to use in design of the proposed project and to prepare construction documents. In the absence of our written approval, we make no representations and assume no responsibility to other parties regarding this report. The data, analyses, and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. APPENDIX A SITE LOCATION MAP, NRCS MAP, BORING AND TEST PIT LOCATION MAP FIGURE 1    Site Location Map Project No. 14-037B July 22, 2015 Gustin Levee Parcel No. 45344.9108 Spokane County, WA FIGURE 2    NRCS Map Project No. 14-037B July 22, 2015 Gustin Levee Parcel No. 45344.9108 Spokane County, WA FIGURE 3    Boring Location Map Project No. 14-037B July 22, 2015 Gustin Levee Parcel No. 45344.9108 Spokane County, WA APPENDIX B LOGS OF BORINGS, LOGS OF TEST PITS, DECRIPTIVE TERMINOLOGY SS SS SS SS SS 5-4(9) 4-4(8) 6-8(14) 12-13(25) 14-15(29) 21 24 20 4 774 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, fine to medium grained, brown, moist, loose. (Alluvium) (CL-ML) SANDY SILTY CLAY, brown, moist to wet, medium tostiff.(Alluvium) (SM) SILTY SAND, fine to medium grained, a trace of Gravel,brown, moist, medium dense.(Alluvium) (SM) SILTY SAND with GRAVEL, medium to coarse grained,brown, moist to wet, medium dense. (Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2010.8 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/13/15 COMPLETED 7/13/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:32 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 3-3(6) 7-8(15) 6-8(14) 5-8(13) 15-11(26) 34 6 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, fine to medium grained, brown, moist, loose to medium dense.(Alluvium) (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, medium dense. (Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2010.7 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/13/15 COMPLETED 7/13/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:32 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 3-3(6) 8-10(18) 7-6(13) 7-9(16) 9-9(18) 17 23 19 4 62 8 4 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, very fine to fine grained, brown, moist, loose. (Alluvium) (CL-ML) SANDY SILTY CLAY, brown, moist to wet, very stiff.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarsegrained, a trace of Gravel, brown, moist, medium dense. (Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2012.4 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/13/15 COMPLETED 7/13/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:32 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 4-4(8) 10-9(19) 6-7(13) 20-21(41) 13-13(26) 36 4 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, fine to medium grained, brown, moist, loose. (Alluvium) (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, medium dense to dense.(Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2013 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/13/15 COMPLETED 7/13/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-4 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:32 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 11-10(21) 15-10(25) 5-6(11) 6-9(15) 13-17(30) 8 (SM) SILTY SAND, fine to mediium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND with GRAVEL, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) (SP-SM) POORLY GRADED SAND with SILT and GRAVEL, medium to coarse grained, brown, moist, medium dense.(Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2013.9 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/14/15 COMPLETED 7/14/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-5 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:32 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 16-16(32) 7-15(22) 43-15(58) 17-16(33) 12-12(24) (SM) SILTY SAND, fine to mediium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND with GRAVEL, fine to coarse grained, brown, moist, dense to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium to coarse grained, brown, moist,very dense to medium dense.(Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2015.1 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/14/15 COMPLETED 7/14/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-6 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:33 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 5-13(18) 24-18(42) 25-16(41) 8-15(23) 50 (SM) SILTY SAND, fine to mediium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND with GRAVEL, fine to coarse grained, brown, moist, medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, dense to very dense.(Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2015.9 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/14/15 COMPLETED 7/14/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-7 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:33 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 9-8(17) 5-7(12) 7-7(14) 20-19(39) 27-32(59) 7 (SM) SILTY SAND, fine to mediium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND with GRAVEL, fine to coarse grained, brown, moist, medium dense.(Glacial Outwash) (GP-GM) POORLY GRADED GRAVEL with SILT and SAND, finegrained, brown, moist, dense to very dense.(Glacial Outwash) End of boring. Groundwater not encountered with 14' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface. NOTES GROUND ELEVATION 2020 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/14/15 COMPLETED 7/14/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-8 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 15:33 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 2011.0 2009.0 MC = 16%Fines = 44% SM SC- SM 5.0 7.0 (SM) FILL: Silty Clayey Sand, fine grained, a trace of fibers, brown,moist. (SC-SM) SILTY CLAYEY SAND, fine grained, brown, moist.(Alluvium) End of test pit. Groundwater not encountered Test pit immediately backfilled. NOTES GROUND ELEVATION 2016 ft LOGGED BY PTN EXCAVATION METHOD Backhoe EXCAVATION CONTRACTOR Alpine Excavating GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/21/15 COMPLETED 7/21/15 AT TIME OF EXCAVATION --- Not encountered AT END OF EXCAVATION --- Not encountered AFTER EXCAVATION --- Not encountered TEST PIT SIZE 30 inches SAMPLE TYPENUMBERDEPTH(ft)0.0 2.5 5.0 PAGE 1 OF 1 TEST PIT NUMBER TP-1 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 7/23/15 15:54 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 TESTS U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION 2012.0 2008.0 SM SM 4.0 8.0 (SM) FILL: Silty Sand, fine to medium grained, brown, moist. (SM) SILTY SAND, fine to medium grained, brown, moist. (Alluvium) End of test pit. Groundwater not encountered Test pit immediately backfilled. NOTES GROUND ELEVATION 2016 ft LOGGED BY PTN EXCAVATION METHOD Backhoe EXCAVATION CONTRACTOR Alpine Excavating GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/21/15 COMPLETED 7/21/15 AT TIME OF EXCAVATION --- Not encountered AT END OF EXCAVATION --- Not encountered AFTER EXCAVATION --- Not encountered TEST PIT SIZE 30 inches SAMPLE TYPENUMBERDEPTH(ft)0.0 2.5 5.0 7.5 PAGE 1 OF 1 TEST PIT NUMBER TP-2 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 7/23/15 15:54 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION 2009.5 2008.0 MC = 6% Fines = 22% SM SM 5.5 7.0 (SM) FILL: Silty Sand with Gravel, fine to medium grained, brown,moist. (SM) SILTY SAND, fine to coarse grained, a trace of Gravel, brown, moist.(Glacial Outwash) End of test pit. Groundwater not encountered Test pit immediately backfilled. NOTES GROUND ELEVATION 2015 ft LOGGED BY PTN EXCAVATION METHOD Backhoe EXCAVATION CONTRACTOR Alpine Excavating GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/21/15 COMPLETED 7/21/15 AT TIME OF EXCAVATION --- Not encountered AT END OF EXCAVATION --- Not encountered AFTER EXCAVATION --- Not encountered TEST PIT SIZE 30 inches SAMPLE TYPENUMBERDEPTH(ft)0.0 2.5 5.0 PAGE 1 OF 1 TEST PIT NUMBER TP-3 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 7/23/15 15:54 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 TESTS U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION 2012.0 2010.0 SM SM 5.0 7.0 (SM) FILL: Silty Sand with Gravel, fine to coarse grained, brown, moist. (SM) SILTY SAND with GRAVEL, fine to coarse grained, brown, moist.(Glacial Outwash) End of test pit. Groundwater not encountered Test pit immediately backfilled. NOTES GROUND ELEVATION 2017 ft LOGGED BY PTN EXCAVATION METHOD Backhoe EXCAVATION CONTRACTOR Alpine Excavating GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/21/15 COMPLETED 7/21/15 AT TIME OF EXCAVATION --- Not encountered AT END OF EXCAVATION --- Not encountered AFTER EXCAVATION --- Not encountered TEST PIT SIZE 30 inches SAMPLE TYPENUMBERDEPTH(ft)0.0 2.5 5.0 PAGE 1 OF 1 TEST PIT NUMBER TP-4 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 7/23/15 15:54 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION 2016.0 2014.0 MC = 7%Fines = 48% SM SM 5.0 7.0 (SM) FILL: Silty Sand, fine grained, brown, moist. (SM) SILTY SAND with GRAVEL, fine to coarse grained, brown, moist.(Glacial Outwash) End of test pit. Groundwater not encountered Test pit immediately backfilled. NOTES GROUND ELEVATION 2021 ft LOGGED BY PTN EXCAVATION METHOD Backhoe EXCAVATION CONTRACTOR Alpine Excavating GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/21/15 COMPLETED 7/21/15 AT TIME OF EXCAVATION --- Not encountered AT END OF EXCAVATION --- Not encountered AFTER EXCAVATION --- Not encountered TEST PIT SIZE 30 inches SAMPLE TYPENUMBERDEPTH(ft)0.0 2.5 5.0 PAGE 1 OF 1 TEST PIT NUMBER TP-5 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 7/23/15 15:54 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 TESTS U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION 2016.0 2014.0 Fines = 25% SM GM 5.0 7.0 (SM) FILL: Silty Sand with Gravel, fine to coarse grained, brown, moist. (GM) SILTY GRAVEL with SAND, fine to coarse grained, brown, moist.(Glacial Outwash) End of test pit. Groundwater not encountered Test pit immediately backfilled. NOTES GROUND ELEVATION 2021 ft LOGGED BY PTN EXCAVATION METHOD Backhoe EXCAVATION CONTRACTOR Alpine Excavating GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/21/15 COMPLETED 7/21/15 AT TIME OF EXCAVATION --- Not encountered AT END OF EXCAVATION --- Not encountered AFTER EXCAVATION --- Not encountered TEST PIT SIZE 30 inches SAMPLE TYPENUMBERDEPTH(ft)0.0 2.5 5.0 PAGE 1 OF 1 TEST PIT NUMBER TP-6 CLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 7/23/15 15:54 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 TESTS U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION DENSITY Very Loose 0 - 4 Loose 4 - 10 Coarse-Gravel and Gravel GW Grained Gravelly Soils (with little or no fines)GP Soils <50% coarse fraction Gravel GM passes #4 sieve (with >12% fines)GC <50% Sandy and Sand SW passes #200 Sandy Soils (with little or no fines)SP sieve >50% coarse fraction Sand SM passes #4 sieve (with >12% fines)SC Fine-ML Grained CL Soils OL >50% MH passes #200 CH sieve OH PT Peat DESCRIPTION RANGE Occasional <5% Trace 5% - 12% With >12% Coarse Fine Coarse Medium Fine MODIFIERS Hard > 30 USCS SOIL CLASSIFICATION Liquid Limit > 50 Highly Organic Soils Silt and Clay MAJOR DIVISIONS Liquid Limit < 50 Salt and Clay Organic Clay and Silt (med to high plasticity) Muck Well Graded Sand Inorganic Silt Fat Clay MOISTURE CONTENT Gravel SandBoulders Cobbles GRAIN SIZE (INCHES) Silt and Clay 12 3 0.75 0.19 0.079 0.0171 0.0029 17 - 30 Soft Rather Soft Medium Rather Stiff Stiff Very Stiff 2 - 3 4 - 5 6 - 8 9 - 12 RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALVE FINE-GRAINED SOILS N(BLOWS/FT) CONSISTENCY N(BLOWS/FT) Very Soft 0 - 1 MAJOR DIVISIONS WITH GRAIN SIZE SIEVE SIZE 12" 3" 3/4" 4 10 40 200 COARSE-GRAINED SOILS Poorly Graded Sand Silty Sand Clayey Sand Silt Lean Clay Organic Silt and Clay (low plasticity) GROUP DESCRIPTIONS Well Graded Gravel Poorly Graded Gravel Silty Gravel Clayey Gravel 13 - 16 FIELD OBSERVATION Absence of moisture, dusty, dry to the touch Dry of optimum moisture content Wet of optimum moisture content DESCRIPTION Dry Moist Wet Very Dense > 50 Dense 31 - 50 Medium-Dense 11 - 30 APPENDIX C LABORATORY TEST RESULTS 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc 20 19 24 23 CuLLPL 12.01 7.85 1.39 1.48 4 4 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 77.0 34.2 6.1 61.7 7.8 0.075 9.5 19 0.075 15.9 SAND GRAIN SIZE IN MILLIMETERS coarse fine CL-ML Sandy Silty Clay SM Silty Sand SP-SM Poorly Graded Sand with Silt and Gravel CL-ML Sandy Silty Clay SP-SM Poorly Graded Sand with Silt Classification D100 D60 D30 D10 %Gravel 0.411 4.142 1.234 B-1 B-2 B-2 B-3 B-3 coarse SILT OR CLAYfinemedium 5.0 7.5 15.0 5.0 10.0 %Sand %Silt %Clay 1.408 0.537 0.345 0.157 1.9 35.7 12.8 63.9 58.2 79.4 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-1 B-2 B-2 B-3 B-3 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 5.0 7.5 15.0 5.0 10.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 15:31 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 6.63 13.93 20.18 0.45 2.37 2.50 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 36.1 4.4 7.8 6.8 44.0 9.5 12.5 25 25 9.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SM Silty Sand SP Poorly Graded Sand with Gravel SP-SM Poorly Graded Sand with Silt and Gravel GP-GM Poorly Graded Gravel with Silt and Sand SM Silty Sand Classification D100 D60 D30 D10 %Gravel 0.494 2.893 3.369 7.153 0.233 B-4 B-4 B-5 B-8 TP-1 coarse SILT OR CLAYfinemedium 2.5 15.0 10.0 10.0 4.0 %Sand %Silt %Clay 0.751 1.391 2.518 0.436 0.242 0.354 2.3 24.7 25.5 54.8 1.2 61.7 70.9 66.8 38.4 54.7 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-4 B-4 B-5 B-8 TP-1 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 2.5 15.0 10.0 10.0 4.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 15:31 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 21.8 48.5 25.4 25 19 37.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SM Silty Sand with Gravel SM SIlty Sand SM Silty Sand with Gravel Classification D100 D60 D30 D10 %Gravel 2.902 0.179 3.959 TP-3 TP-5 TP-6 coarse SILT OR CLAYfinemedium 3.5 4.0 4.0 %Sand %Silt %Clay 0.336 0.195 30.4 12.6 36.9 47.8 38.9 37.6 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 TP-3 TP-5 TP-6 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 3.5 4.0 4.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 15:31 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734