Loading...
213-026A_Painted_Hills_Phase_2_Geotechnical_ReportIPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting P.O. Box 1566, Veradale, WA 99037 Phone 509-209-6262 July 23, 2015 Project No. 2013-026A NAI Black c/o Mr. Bryan Walker 107 South Howard Suite 500 Spokane, WA 99201 Re: Geotechnical Evaluation Phase 2 Painted Hills Golf Course Property 4403 South Dishman-Mica Road Spokane Valley, WA Dear Mr. Walker: As you authorized, we have completed the Phase 2 geotechnical evaluation for the Painted Hills Golf Course property at the above-referenced site in Spokane Valley, Washington. The purpose of the Phase 2 evaluation is to assess subsurface soil and groundwater conditions to assist your civil engineer, Whipple Consulting Engineers, Inc. (WCE) in evaluating stormwater management alternatives relative to potential future development. This report summarizes the results of our field investigation, laboratory testing, engineering analyses, and our opinions and recommendations for stormwater management. PROJECT DESCRIPTION We understand that the proposed project may consist of a residential development. The site consists of 91 acres currently developed as a golf course. We have assumed that stormwater runoff will be treated using drywells and/or gravel galleries for subsurface infiltration. This Phase 2 evaluation is intended to identify areas where subsurface infiltration of stormwater may be feasible due to the presence of suitable soils at depth. Phase 2 Geotechnical Evaluation Project No. 2013-026A Painted Hills Golf Course Property Parcel No. 45344.9108 Spokane Valley, WA July 23, 2015 Inland Pacific Engineering Company Page 2 AVAILABLE INFORMATION We were provided a topographic survey for the project site by WCE. This topographic survey showed the existing roadways, existing structures, property lines, and existing ground surface elevation contours. This plan was prepared by WCE and was dated November 7, 2013. The site was used as a golf course prior to our evaluation. The site is relatively level with some elevated golf greens and excavated areas for water hazards. The site is primarily grass-covered with scattered trees along the fairways and pine trees in the undeveloped area to the northwest. The clubhouse building is present at the southwest corner. In addition, we performed a preliminary geotechnical evaluation for the property in December 2013. The results of that evaluation, along with our opinions and recommendations, are summarized in our Preliminary Geotechnical Evaluation dated December 31, 2013. We also performed a geotechnical evaluation for certification of the existing levee along Chester Creek in April 2014. The results of that evaluation are summarized in our Geotechnical Evaluation dated February 12, 2015. FIELD EVALUATION Procedures A geotechnical engineer from Inland Pacific Engineering Company (IPEC) observed the drilling of 10 penetration test borings at the site. The borings were drilled between July 1 and 13, 2015 using a truck-mounted drill operated by an independent firm working under subcontract to IPEC. A geotechnical engineer from IPEC observed the borings and logged the surface and subsurface conditions. After we logged the borings, they were abandoned in accordance with state requirements. Ground surface elevations at the borings were provided by WCE. The soils encountered in the borings were visually and manually classified in the field by our field personnel in accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedures)”. The samples were returned to our facility for review of the classification by a geotechnical engineer and laboratory testing. Soils Encountered In general, the borings encountered 1 to 3 feet of topsoil at the surface. However, Borings B-4 and B-5 encountered “possible fill” in the upper 6 feet (it was considered “possible fill” because it did not appear to be native soil, but no indicator, such as buried topsoil, debris, etc., was found to confirm our opinion). Below the topsoil or “possible fill”, the borings generally encountered alluvial lean clay, silty to clayey sand, and poorly graded sands to depths ranging from 6 to 21 feet, but were typically in the upper 10 to 12 feet. Below the fill, topsoil, and alluvial soils, the borings encountered glacially deposited sands to their termination depths. Phase 2 Geotechnical Evaluation Project No. 2013-026A Painted Hills Golf Course Property Parcel No. 45344.9108 Spokane Valley, WA July 23, 2015 Inland Pacific Engineering Company Page 3 Penetration resistances (N-values) in the “possible fill” were 9 and 16 blows per foot (BPF). Penetration resistances in the sands ranged from 3 to 62 BPF and averaged 26 BPF, indicating that these soils were very loose to very dense, but were typically medium dense. A penetration resistance of 14 BPF was recorded in the clay indicating that this soil was stiff in consistency. Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Hardesty ashy silt loam, Narcisse silt loam, Endoaquolls and Fluvaquents, Phoebe ashy sandy loam, and Urban land-Springdale disturbed complex. The native soils encountered in the borings were consistent with the NRCS data. Groundwater was encountered in all the borings at depths ranging from 11 to 47 feet. The following table summarizes the groundwater depths and approximate elevations. Boring Number Depth to Groundwater (feet) Approximate Groundwater Elevation B-1 36 1970 B-2 30 1976 B-3 47 1960 B-4 31 1975 B-5 46 1962 B-6 28 1981 B-7 31 1977 B-8 36 1973 B-9 11 2000 B-10 27 1981 The observed water levels indicate that the groundwater levels drop generally from south to north with higher levels near Chester Creek. These water levels are generally consistent with the observed levels in the borings performed on the Chester Creek levee and is consistent with our opinion that this portion of the creek is the beginning of the recharge section as evidenced by the typical lack of water in the creek further downstream along with dropping groundwater levels away from the creek. Fluctuations in the groundwater level may occur due to rainfall, flooding, irrigation, spring thaw and other seasonal and annual factors not evident at the time the observations were made. FIGURE 1       Site Location Map Project No. 2013-026A July 23, 2015 Painted Hills Phase 2 4403 South Dishman-Mica Road Spokane Valley, WA FIGURE 2       NRCS Map Project No. 2013-026A July 23, 2015 Painted Hills Phase 2 4403 South Dishman-Mica Road Spokane Valley, WA FIGURE 3       Boring Location Map Project No. 2013-026A July 23, 2015 Painted Hills Phase 2 4403 South Dishman-Mica Road Spokane Valley, WA SS SS SS SS SS SS 6-8 (14) 13-12 (25) 17-14(31) 16-15(31) 10-10 (20) 11-12 (23) (ML) SILT, with roots, dark brown, moist. (Topsoil) (CL) LEAN CLAY, brown, wet, stiff.(Alluvium) (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, medium dense to dense. (Glacial Outwash) (SP) POORLY GRADED SAND, fine to medium grained, a traceof Gravel, brown, moist to 36', then water-bearing, medium dense to dense.(Glacial Outwash) NOTES GROUND ELEVATION 2006 ft LOGGED BY PTN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/2/15 COMPLETED 7/2/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING 36.00 ft / Elev 1970.00 ft AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 13-15(28) 11-13(24) 17-21 (38) 8-8 (16) (SP) POORLY GRADED SAND, fine to medium grained, a trace of Gravel, brown, moist to 36', then water-bearing, medium denseto dense.(Glacial Outwash) (continued) (SM) SILTY SAND, very fine to fine grained, brown, wet, mediumdense.(Alluvium) End of boring. Groundwater not encountered with 49' of hollow-stem auger in theground. Groundwater at 36' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 16-14 (30) 6-8 (14) 9-8(17) 7-9(16) 9-9 (18) 10-15 (25) 7 4 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine to coarse grained, a trace of Gravel,brown, moist, medium dense. (Glacial Outwash) (SW) WELL GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist to 30'. then water-bearing, medium dense to very dense.(Glacial Outwash) NOTES GROUND ELEVATION 2005.9 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/10/15 COMPLETED 7/13/15 AT TIME OF DRILLING 30.00 ft / Elev 1975.90 ft AT END OF DRILLING 39.00 ft / Elev 1966.90 ft AFTER DRILLING --- Not encountered (cave-in) HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 31-18(49) 25-19(44) 29-26 (55) 22-16 (38) (SW) WELL GRADED SAND with GRAVEL, medium to coarse grained, brown, moist to 30'. then water-bearing, medium dense tovery dense.(Glacial Outwash) (continued) End of boring. Groundwater at 30' with 34' of hollow-stem auger in the ground. Groundwater at 39' with 49' of hollow-stem auger in the ground 3days later. Groundwater not encountered to cave-in depth of 27' immediatelyafter withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 3-3 (6) 7-8 (15) 9-12(21) 24-27(51) 14-8 (22) 8-13 (21) (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SC) CLAYEY SAND, fine to medium grained, dark brown to brown, moist to wet, loose to medium dense.(Alluvium) (SP) POORLY GRADED SAND, medium to coarse grained, atrace of Gravel, brown, moist, medium dense. (Glacial Outwash) (SP) POORLY GRADED SAND, fine to medium grained, a traceof Gravel, brown, water-bearing, medium dense. (Glacial Outwash) NOTES GROUND ELEVATION 2007 ft LOGGED BY PTN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/2/15 COMPLETED 7/2/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING 47.00 ft / Elev 1960.00 ft AFTER DRILLING --- Not encountered (cave-in) HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 16-16(32) 15-14(29) 29-23 (52) 21-20 (41) (SP) POORLY GRADED SAND,fine grained, brown, moist, dense to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium to coarse grained, with seams of Silty Sand, brown, moist to water-bearing,very dense to dense.(Glacial Outwash) End of boring. Groundwater at 47' with 49' of hollow-stem auger in the ground. Groundwater not encountered to cave-in depth of 19' immediatelyafter withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 7-9 (16) 5-5 (10) 11-13(24) 3-2(5) 7-7 (14) 6-9 (15) 10 9 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SC-SM) SILTY CLAYEY SAND, fine grained, brown, moist.(Possible Fille) (SC) CLAYEY SAND, fine to medium grained, with seams of LeanClay, brown, moist to wet, loose. (Alluvium) (SW-SM) WELL GRADED SAND with SILT, medium to coarsegrained, brown, moist, medium dense. (Alluvium) (SM) SILTY SAND, very fine to fine grained, with seams of Clayey Sand, brown, wet, loose.(Alluvium) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist to 31', then water-bearing, medium dense to verydense. (Glacial Outwash) NOTES GROUND ELEVATION 2006.1 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/6/15 COMPLETED 7/6/15 AT TIME OF DRILLING 31.00 ft / Elev 1975.10 ft AT END OF DRILLING --- Not encountered (cave-in) AFTER DRILLING 45.00 ft / Elev 1961.10 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-4 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 12-16(28) 50 4-11 (15) 23-35 (58) (SP) POORLY GRADED SAND, medium to coarse grained, brown, moist to 31', then water-bearing, medium dense to verydense.(Glacial Outwash) (continued) End of boring. Groundwater at 31' with 34' of hollow-stem auger in the ground. Groundwater at 45' with 49' of hollow-stem auger in the ground 3days later. Groundwater not encountered to cave-in depth of 30' immediatelyafter withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-4 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 4-5 (9) 1-2 (3) 1-8(9) 8-11(19) 9-10 (19) 16-21 (37) 17 7 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, fine grained, brown, moist.(Possible Fill) (SC) CLAYEY SAND, fine grained, brown, moist, very loose.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, loose to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist to 46', then water-bearing, loose to very deense. (Glacial Outwash) NOTES GROUND ELEVATION 2008.1 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/1/15 COMPLETED 7/1/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING 46.00 ft / Elev 1962.10 ft AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-5 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 14-15(29) 19-22(41) 15-17 (32) 27-35 (62) (SP) POORLY GRADED SAND, medium to coarse grained, brown, moist to 46', then water-bearing, loose to very deense.(Glacial Outwash) (continued) End of boring. Groundwater at 46' with 49' of hollow-stem auger in the ground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-5 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 6-7 (13) 7-7 (14) 5-10(15) 6-7(13) 8-11 (19) 10-11 (21) 15 6 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine grained, with seams of Clayey Sand, brown, moist, medium dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, loose to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist to 25', then water-bearing, medium dense to dense. (Glacial Outwash) NOTES GROUND ELEVATION 2009.1 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/7/15 COMPLETED 7/7/15 AT TIME OF DRILLING 44.50 ft / Elev 1964.60 ft AT END OF DRILLING 44.50 ft / Elev 1964.60 ft AFTER DRILLING 28.00 ft / Elev 1981.10 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-6 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 13-15(28) 12-13(25) 19-22 (41) 22-19 (41) (SP) POORLY GRADED SAND, medium to coarse grained, brown, moist to 25', then water-bearing, medium dense to dense.(Glacial Outwash) (continued) End of boring. Groundwater at 44.5' with 49' of hollow-stem auger in the ground. Groundwater at 28' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-6 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 2-5 (7) 4-6 (10) 8-11(19) 9-8(17) 7-10 (17) 10-11 (21) 18 6 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine grained, with seams of Lean Clay, brown,moist to wet, loose. (Alluvium) (SM) SILTY SAND, very fine to fine grained, brown, moist,medium dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarsegrained, a trace of Gravel, brown, moist, medium dense. (Glacial Outwash) NOTES GROUND ELEVATION 2007.6 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/10/15 COMPLETED 7/10/15 AT TIME OF DRILLING 34.00 ft / Elev 1973.60 ft AT END OF DRILLING 31.00 ft / Elev 1976.60 ft AFTER DRILLING 37.00 ft / Elev 1970.60 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-7 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 11-15(26) 12-15(27) 12-25 (37) 12-32 (44) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, medium dense.(Glacial Outwash) (continued) End of boring. Groundwater at 34' with 34' of hollow-stem auger in the ground. Groundwater at 37' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 31' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-7 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 11-11 (22) 6-5 (11) 8-10(18) 8-10(18) 9-9 (18) 10-11 (21)18 10 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine to medium grained, brown, moist, medium dense.(Alluvium) (SP) POORLY GRADED SAND, fine to medium grained, brown,moist, medium dense. (Alluvium) (SM) SILTY SAND, fine to medium grained, with seams of Clayey Sand, brown, moist to wet, medium dense.(Alluvium) (SW-SM) WELL GRADED SAND with SILT, fine to mediumgrained, brown, moist, medium dense.(Glacial Outwash) NOTES GROUND ELEVATION 2009.3 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/7/15 COMPLETED 7/7/15 AT TIME OF DRILLING 43.00 ft / Elev 1966.30 ft AT END OF DRILLING 36.00 ft / Elev 1973.30 ft AFTER DRILLING 47.00 ft / Elev 1962.30 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-8 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 10-9(19) 13-17(30) 18-32 (50) 19-25 (44) (SW-SM) WELL GRADED SAND with SILT, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) (continued) (SP) POORLY GRADED SAND, medium to coarse grained,brown, water-bearing, medium dense to dense. (Glacial Outwash) End of boring. Groundwater at 43' with 44' of hollow-stem auger in the ground. Groundwater at 47' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 36' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-8 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 4-6 (10) 4-5 (9) 6-9(15) 9-9(18) 12-11 (23) 12-15 (27) (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine grained, brown, moist, loose.(Alluvium) (SC-SM) SILTY CLAYEY SAND, very fine to fine grained, brown,wet, loose. (Alluvium) (SP) POORLY GRADED SAND, fine to medium grained, brown,moist to 15', then water-bearing, medium dense to dense. (Glacial Outwash) NOTES GROUND ELEVATION 2010.6 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/8/15 COMPLETED 7/8/15 AT TIME OF DRILLING 15.00 ft / Elev 1995.60 ft AT END OF DRILLING 11.00 ft / Elev 1999.60 ft AFTER DRILLING 41.00 ft / Elev 1969.60 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-9 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 18-30(48) 20-25(45) 26-24 (50) 21-26 (47) (SP) POORLY GRADED SAND, fine to medium grained, brown, moist to 15', then water-bearing, medium dense to dense.(Glacial Outwash) (continued) (SP) POORLY GRADED SAND, medium to coarse grained, a trace of Gravel, brown, moist, dense.(Glacial Outwash) End of boring. Groundwater at 15' with 19' of hollow-stem auger in the ground. Groundwater at 41' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 11' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-9 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 5-6 (11) 4-5 (9) 9-9(18) 8-8(16) 11-15 (26) 11-15 (26) 19 9 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist, medium dense. (Alluvium) (SM) SILTY SAND, fine grained, brown, moist, loose.(Alluvium) (SW-SM) WELL GRADED SAND with SILT, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) NOTES GROUND ELEVATION 2008.4 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/8/15 COMPLETED 7/8/15 AT TIME OF DRILLING 28.00 ft / Elev 1980.40 ft AT END OF DRILLING 27.00 ft / Elev 1981.40 ft AFTER DRILLING 48.00 ft / Elev 1960.40 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-10 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 13-14(27) 21-25(46) 21-23 (44) 19-20 (39) (SW-SM) WELL GRADED SAND with SILT, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) (continued) End of boring. Groundwater at 28' with 29' of hollow-stem auger in the ground. Groundwater at 48' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 27' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-10 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 DENSITY Very Loose 0 - 4 Loose 4 - 10 Coarse-Gravel and Gravel GW Grained Gravelly Soils (with little or no fines)GP Soils <50% coarse fraction Gravel GM passes #4 sieve (with >12% fines)GC <50% Sandy and Sand SW passes #200 Sandy Soils (with little or no fines)SP sieve >50% coarse fraction Sand SM passes #4 sieve (with >12% fines)SC Fine-ML Grained CL Soils OL >50% MH passes #200 CH sieve OH PT Peat DESCRIPTION RANGE Occasional <5% Trace 5% - 12% With >12% Coarse Fine Coarse Medium Fine MODIFIERS Hard > 30 USCS SOIL CLASSIFICATION Liquid Limit > 50 Highly Organic Soils Silt and Clay MAJOR DIVISIONS Liquid Limit < 50 Salt and Clay Organic Clay and Silt (med to high plasticity) Muck Well Graded Sand Inorganic Silt Fat Clay MOISTURE CONTENT Gravel SandBoulders Cobbles GRAIN SIZE (INCHES) Silt and Clay 12 3 0.75 0.19 0.079 0.0171 0.0029 17 - 30 Soft Rather Soft Medium Rather Stiff Stiff Very Stiff 2 - 3 4 - 5 6 - 8 9 - 12 RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALVE FINE-GRAINED SOILS N(BLOWS/FT) CONSISTENCY N(BLOWS/FT) Very Soft 0 - 1 MAJOR DIVISIONS WITH GRAIN SIZE SIEVE SIZE 12" 3" 3/4" 4 10 40 200 COARSE-GRAINED SOILS Poorly Graded Sand Silty Sand Clayey Sand Silt Lean Clay Organic Silt and Clay (low plasticity) GROUP DESCRIPTIONS Well Graded Gravel Poorly Graded Gravel Silty Gravel Clayey Gravel 13 - 16 FIELD OBSERVATION Absence of moisture, dusty, dry to the touch Dry of optimum moisture content Wet of optimum moisture content DESCRIPTION Dry Moist Wet Very Dense > 50 Dense 31 - 50 Medium-Dense 11 - 30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 8.02 21.25 6.64 4.30 5.00 1.57 2.32 1.39 1.21 1.35 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 4.5 8.9 7.1 5.6 5.6 19 15.9 19 12.2 9.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SW Well Graded Sand with Gravel SW-SM Well Graded Sand with Silt SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt Classification D100 D60 D30 D10 %Gravel 4.187 2.258 1.187 0.923 0.899 B-2 B-4 B-5 B-6 B-7 coarse SILT OR CLAYfinemedium 25.0 15.0 25.0 20.0 20.0 %Sand %Silt %Clay 1.851 0.747 0.543 0.491 0.467 0.522 0.106 0.179 0.215 0.18 35.1 13.3 5.9 1.6 0.7 60.4 77.8 87.0 92.8 93.6 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-2 B-4 B-5 B-6 B-7 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 25.0 15.0 25.0 20.0 20.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 13:26 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 7.39 6.26 1.78 1.72 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 9.7 8.8 9.5 9.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SW-SM Well Graded Sand with Silt SW-SM Well Graded Sand with Silt Classification D100 D60 D30 D10 %Gravel 0.582 0.581 B-8 B-10 coarse SILT OR CLAYfinemedium 30.0 15.0 %Sand %Silt %Clay 0.286 0.305 0.079 0.093 0.5 0.5 89.8 90.7 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-8 B-10 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 30.0 15.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 13:26 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734