Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Appendices_Combined
EXHIBIT A FEMA FORMS U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY OVERVIEW & CONCURRENCE FORM O.M.B No. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM). A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Example: 480301 480287 City of Katy Harris County TX TX 48473C 48201C 0005D 0220G 02/08/83 09/28/90 530342 City of Spokane valley WA 53063C 0751D 7/6/2010 530174 Spokane County WA 53063C 0751D 7/6/2010 2. a. Flooding Source: b. Types of Flooding: Riverine Coastal Shallow Flooding (e.g., Zones AO and AH) Alluvial fan Lakes Other (Attach Description) 3. Project Name/Identifier: Painted Hills Development 4. FEMA zone designations affected: AE, X (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Base Map Changes Coastal Analysis Hydraulic Analysis Hydrologic Analysis Corrections Weir-Dam Changes Levee Certification Alluvial Fan Analysis Natural Changes New Topographic Data Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 1 of 3 b. The area of revision encompasses the following structures (check all that apply) Structures: Channelization Levee/Floodwall Bridge/Culvert Dam Fill Other (Attach Description) 6. Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the instructions for more information. C. REVIEW FEE Has the review fee for the appropriate request category been included? Yes Fee amount: $$7,250 No, Attach Explanation Please see the DHS-FEMA Web site at http://www.fema.gov/plan/prevent/fhm/frm_fees.shtm for Fee Amounts and Exemptions. D. SIGNATURE All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Kenneth D Puhn Company: WEST Consultants, Inc. Mailing Address: 2601 25th St SE, Suite 450 Salem, OR 97302 Daytime Telephone No.: 503-485-5490 Fax No.: 503-485-5491 E-Mail Address: kpuhn@westconsultants.com Signature of Requester (required): Date: As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. For Conditional LOMR requests, the applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA’s review of the Conditional LOMR application. For LOMR requests, I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA’s process. For actions authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2) of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination. Community Official’s Name and Title: Community Name: Spokane County Mailing Address: Daytime Telephone No.: Fax No.: E-Mail Address: Community Official’s Signature (required): Date: CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) and as described in the MT-2 Forms Instructions. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Certifier’s Name: Kenneth D Puhn License No.: 52823 Expiration Date: 8/29/2016 Company Name: WEST Consultants, Inc. Telephone No.: 503-485-5490 Fax No.: 503-485-5491 Signature: Date: E-Mail Address: kpuhn@westconsultants.com FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 2 of 3 Ensure the forms that are appropriate to your revision request are included in your submittal. Form Name and (Number) Required if … Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water-surface elevations Riverine Structures Form (Form 3) Channel is modified, addition/revision of bridge/culverts, addition/revision of levee/floodwall, addition/revision of dam Coastal Analysis Form (Form 4) New or revised coastal elevations Coastal Structures Form (Form 5) Addition/revision of coastal structure Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans Seal (Optional) FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 3 of 3 U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY OVERVIEW & CONCURRENCE FORM O.M.B No. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM). A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Example: 480301 480287 City of Katy Harris County TX TX 48473C 48201C 0005D 0220G 02/08/83 09/28/90 530342 City of Spokane valley WA 53063C 0751D 7/6/2010 530174 Spokane County WA 53063C 0751D 7/6/2010 2. a. Flooding Source: b. Types of Flooding: Riverine Coastal Shallow Flooding (e.g., Zones AO and AH) Alluvial fan Lakes Other (Attach Description) 3. Project Name/Identifier: 4. FEMA zone designations affected: AE, X (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Base Map Changes Coastal Analysis Hydraulic Analysis Hydrologic Analysis Corrections Weir-Dam Changes Levee Certification Alluvial Fan Analysis Natural Changes New Topographic Data Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 1 of 3 b. The area of revision encompasses the following structures (check all that apply) Structures: Channelization Levee/Floodwall Bridge/Culvert Dam Fill Other (Attach Description) 6. Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the instructions for more information. C. REVIEW FEE Has the review fee for the appropriate request category been included? Yes Fee amount: $$7,250 No, Attach Explanation Please see the DHS-FEMA Web site at http://www.fema.gov/plan/prevent/fhm/frm_fees.shtm for Fee Amounts and Exemptions. D. SIGNATURE All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Kenneth D Puhn Company: WEST Consultants, Inc. Mailing Address: 2601 25th St SE, Suite 450 Salem, OR 97302 Daytime Telephone No.: 503-485-5490 Fax No.: 503-485-5491 E-Mail Address: kpuhn@westconsultants.com Signature of Requester (required): Date: As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. For Conditional LOMR requests, the applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA’s review of the Conditional LOMR application. For LOMR requests, I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA’s process. For actions authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2) of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination. Community Official’s Name and Title: Community Name: City of Spokane Valley Mailing Address: Daytime Telephone No.: Fax No.: E-Mail Address: Community Official’s Signature (required): Date: CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) and as described in the MT-2 Forms Instructions. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Certifier’s Name: Kenneth D Puhn License No.: 52823 Expiration Date: 8/29/2016 Company Name: WEST Consultants, Inc. Telephone No.: 503-485-5490 Fax No.: 503-485-5491 Signature: Date: E-Mail Address: kpuhn@westconsultants.com FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 2 of 3 Ensure the forms that are appropriate to your revision request are included in your submittal. Form Name and (Number) Required if … Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water-surface elevations Riverine Structures Form (Form 3) Channel is modified, addition/revision of bridge/culverts, addition/revision of levee/floodwall, addition/revision of dam Coastal Analysis Form (Form 4) New or revised coastal elevations Coastal Structures Form (Form 5) Addition/revision of coastal structure Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans Seal (Optional) FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 3 of 3 U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE HYDROLOGY & HYDRAULICS FORM O.M.B No. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 3.5 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a NFIP Flood Insurance Rate Maps (FIRM). Flooding Source: Chester Creek and Unnamed Tributary to Chester Creek Note: Fill out one form for each flooding source studied A. HYDROLOGY 1. Reason for New Hydrologic Analysis (check all that apply) Not revised (skip to section B) No existing analysis Improved data Alternative methodology Proposed Conditions (CLOMR) Changed physical condition of watershed 2. Comparison of Representative 1%-Annual-Chance Discharges Location Drainage Area (Sq. Mi.) Effective/FIS (cfs) Revised (cfs) 3. Methodology for New Hydrologic Analysis (check all that apply) Statistical Analysis of Gage Records Precipitation/Runoff Model Specify Model: Regional Regression Equations Other (please attach description) Please enclose all relevant models in digital format, maps, computations (including computation of parameters), and documentation to support the new analysis. 4. Review/Approval of Analysis If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval/review. 5. Impacts of Sediment Transport on Hydrology Is the hydrology for the revised flooding source(s) affected by sediment transport? Yes No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach your explanation.. FEMA Form 086-0-27A, (2/2011) Previously FEMA Form 81-89 MT-2 Form 2 Page 1 of 3 B. HYDRAULICS 1. Reach to be Revised Description Cross Section Water-Surface Elevations (ft.) Effective Proposed/Revised Downstream Limit* See Attached Supplemental Information Upstream Limit* *Proposed/Revised elevations must tie-into the Effective elevations within 0.5 foot at the downstream and upstream limits of revision. 2. Hydraulic Method/Model Used: HEC-RAS 4.1 3. Pre-Submittal Review of Hydraulic Models* DHS-FEMA has developed two review programs, CHECK-2 and CHECK-RAS, to aid in the review of HEC-2 and HEC-RAS hydraulic models, respectively. We recommend that you review your HEC-2 and HEC-RAS models with CHECK-2 and CHECK-RAS. 4. Models Submitted Natural Run Floodway Run Datum Duplicate Effective Model* File Name: ________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Corrected Effective Model* File Name: __________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Existing or Pre-Project Conditions Model File Name: _________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Revised or Post-Project Conditions Model File Name: ______________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Other - (attach description) File Name: ______________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ * For details, refer to the corresponding section of the instructions. Digital Models Submitted? (Required) C. MAPPING REQUIREMENTS A certified topographic work map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and proposed conditions 1%-annual-chance floodplain (for approximate Zone A revisions) or the boundaries of the 1%- and 0.2%-annual-chance floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the referenced vertical datum (NGVD, NAVD, etc.). Digital Mapping (GIS/CADD) Data Submitted (preferred) Topographic Information: 2003 LiDAR, 2ft contours Source: TerraPoint Date: March 2003 Accuracy: 2 foot contours from LiDAR, accuracy +/- 1ft Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM must tie-in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and/or FBFM, at the same scale as the original, annotated to show the boundaries of the revised 1%-and 0.2%-annual-chance floodplains and regulatory floodway that tie-in with the boundaries of the effective 1%-and 0.2%-annual-chance floodplain and regulatory floodway at the upstream and downstream limits of the area on revision. Annotated FIRM and/or FBFM (Required) FEMA Form 086-0-27A, (2/2011) Previously FEMA Form 81-89 MT-2 Form 2 Page 2 of 3 D. COMMON REGULATORY REQUIREMENTS* 1. For LOMR/CLOMR requests, do Base Flood Elevations (BFEs) increase? Yes No a. For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations: • The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot compared to pre-project conditions. • The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot compared to pre-project conditions. b. Does this LOMR request cause increase in the BFE and/or SFHA compared with the effective BFEs and/or SFHA? Yes No If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notifications can be found in the MT-2 Form 2 Instructions. 2. Does the request involve the placement or proposed placement of fill? Yes No If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the NFIP regulations set forth at 44 CFR 60.3(A)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT-2 instructions for more information. 3. For LOMR requests, is the regulatory floodway being revised? Yes No If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1%-annual-chance floodplains [studied Zone A designation] unless a regulatory floodway is being established. Elements and examples of regulatory floodway revision notification can be found in the MT-2 Form 2 Instructions.) 4. For CLOMR requests, please submit documentation to FEMA and the community to show that you have complied with Sections 9 and 10 of the Endangered Species Act (ESA). For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its compliance with Section 7(a)(2) of the ESA. Please see the MT-2 instructions for more detail. * Not inclusive of all applicable regulatory requirements. For details, see 44 CFR parts 60 and 65. FEMA Form 086-0-27A, (2/2011) Previously FEMA Form 81-89 MT-2 Form 2 Page 3 of 3 FEMA Form 086-0-27B, (2/2011) Previously FEMA Form 81-89B MT-2 Form 3 Page 1 of 11 DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B. NO. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 7 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20598-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program; Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a NFIP Flood Insurance Rate Maps (FIRM). Flooding Source: Chester Creek and Unnamed Tributary Note: Fill out one form for each flooding source studied. A. GENERAL Complete the appropriate section(s) for each Structure listed below: Channelization...............complete Section B Bridge/Culvert................complete Section C Dam...............................complete Section D Levee/Floodwall.............complete Section E Sediment Transport........complete Section F (if required) Description Of Modeled Structure 1. Name of Structure: Thorpe Road Culverts Type (check one): Channelization Bridge/Culvert Levee/Floodwall Dam Location of Structure: Thorpe Road Downstream Limit/Cross Section: XS 21425 on Golf Course Overflow Reach Upstream Limit/Cross Section: XS 21481 on Golf Course Overflow Reach 2. Name of Structure: Type (check one): Channelization Bridge/Culvert Levee/Floodwall Dam Location of Structure: Downstream Limit/Cross Section: Upstream Limit/Cross Section: 3. Name of Structure: Type (check one) Channelization Bridge/Culvert Levee/Floodwall Dam Location of Structure: Downstream Limit/Cross Section: Upstream Limit/Cross Section: NOTE: FOR MORE STRUCTURES, ATTACH ADDITIONAL PAGES AS NEEDED. FEMA Form 086-0-27B, (2/2011) Previously FEMA Form 81-89B MT-2 Form 3 Page 2 of 11 B. CHANNELIZATION Flooding Source: Name of Structure: 1. Hydraulic Considerations The channel was designed to carry (cfs) and/or the -year flood. The design elevation in the channel is based on (check one): Subcritical flow Critical flow Supercritical flow Energy grade line If there is the potential for a hydraulic jump at the following locations, check all that apply and attach an explanation of how the hydraulic jump is controlled without affecting the stability of the channel. Inlet to channel Outlet of channel At Drop Structures At Transitions Other locations (specify): 2. Channel Design Plans Attach the plans of the channelization certified by a registered professional engineer, as described in the instructions. 3. Accessory Structures The channelization includes (check one): Levees [Attach Section E (Levee/Floodwall)] Drop structures Superelevated sections Transitions in cross sectional geometry Debris basin/detention basin [Attach Section D (Dam/Basin)] Energy dissipator Weir Other (Describe): 4. Sediment Transport Considerations Are the hydraulics of the channel affected by sediment transport? Yes No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach your explanation for why sediment transport was not considered. C. BRIDGE/CULVERT Flooding Source: Golf Course Overflow Reach of Chester Creek Name of Structure: Thorpe Road Culverts 1. This revision reflects (check one): Bridge/culvert not modeled in the FIS Modified bridge/culvert previously modeled in the FIS Revised analysis of bridge/culvert previously modeled in the FIS 2. Hydraulic model used to analyze the structure (e.g., HEC-2 with special bridge routine, WSPRO, HY8): HEC-RAS 4.1.0 If different than hydraulic analysis for the flooding source, justify why the hydraulic analysis used for the flooding source could not analyze the structures. Attach justification. 3. Attach plans of the structures certified by a registered professional engineer. The plan detail and information should include the following (check the information that has been provided): Dimensions (height, width, span, radius, length) Distances Between Cross Sections Shape (culverts only) Erosion Protection Material Low Chord Elevations – Upstream and Downstream Beveling or Rounding Top of Road Elevations – Upstream and Downstream Wing Wall Angle Structure Invert Elevations – Upstream and Downstream Skew Angle Stream Invert Elevations – Upstream and Downstream Cross-Section Locations 4. Sediment Transport Considerations Are the hydraulics of the structure affected by sediment transport? Yes No If Yes, then fill out Section F (Sediment Transport) of Form 3. If no, then attach an explanation. MT-2 Supplemental Information Form 1 Section B, Item 5a/b Other: Construction of storage and infiltration facilities to intercept floodwaters prior to entering development site. Form 2 Section B Chester Creek – Golf Course Overflow Description Cross Section Effective WSE Proposed WSE Downstream Limit Storage Area 1 at end of Golf Course Overflow Reach A - 0 2008.1 n/a (no 1% floodplain at this location) Upstream Limit Beginning of Golf Course Overflow Reach (diversion from Chester Creek) N - 4318 2023.0 2023.0 Unnamed Tributary to Chester Creek Description Cross Section Effective WSE Proposed WSE Downstream Limit Storage Area 6 A - 0 2008.1 n/a (no 1% floodplain at this location) Upstream Limit Highway 20 culvert crossing R -3485 2020.8 2020.8 Chester Creek – Golf Course Overflow Natural Run Floodway Run Datum File Plan File Plan DEM CCMain.prj DEM CCMain.prj DEM FW NAVD88 CEM CCMain.prj CEM CCMain.prj CEM FW NAVD88 ECM CCMain.prj ECM CCMain.prj ECM FW NAVD88 PCM CCMain.prj PCM CCMain.prj PCM FW NAVD88 Unnamed Tributary to Chester Creek Natural Run Floodway Run Datum File Plan File Plan DEM CCTrib.prj DEM CCTrib.prj DEM FW NAVD88 CEM CCTrib.prj CEM CCTrib.prj CEM FW NAVD88 ECM CCTrib.prj ECM CCTrib.prj ECM FW NAVD88 PCM CCTrib.prj PCM CCTrib.prj PCM FW NAVD88 Unnamed Tributary to Chester Creek, without DS Levee Natural Run Floodway Run Datum File Plan File Plan DEM CCTrib.prj DEM w/o DS lev CCTrib.prj DEM w/o DS lev FW NAVD88 CEM CCTrib.prj CEM w/o DS lev CCTrib.prj CEM w/o DS lev FW NAVD88 ECM CCTrib.prj ECM w/o DS lev CCTrib.prj ECM w/o DS lev FW NAVD88 PCM CCTrib.prj PCM w/o DS lev n/a n/a NAVD88 Form 3 Section B4 The structure is not considered to be affected by sediment transport. This overflow path is located in a vegetated field and there is no physical channel along this reach. Accordingly, mobilization and transportation of significant amounts of sediment is unlikely. Further, average ‘channel’ velocities within the reach are very low for the 1% annual chance flood (1.2 ft/s; max of 3.8). Most XSs have channel velocities of under 1 ft/s. Finally, a collection pond is being constructed at the entrance to the culverts. The culvert inverts will be elevated above the pond bottom further discouraging transportation of sediment. FEMA Form 81-107 Payment Information Form FEDERAL EMERGENCY MANAGEMENT AGENCY PAYMENT INFORMATION FORM Community Name: Project Identifier: THIS FORM MUST BE MAILED, ALONG WITH THE APPROPRIATE FEE, TO THE ADDRESS BELOW OR FAXED TO THE FAX NUMBER BELOW. Please make check or money order payable to the National Flood Insurance Program. Type of Request: MT-1 application MT-2 application EDR application Request No. (if known): _______________ Check No.: _______________ Amount: INITIAL FEE* FINAL FEE FEE BALANCE** MASTER CARD VISA CHECK MONEY ORDER *Note: Check only for EDR and/or Alluvial Fan requests (as appropriate). **Note: Check only if submitting a corrected fee for an ongoing request. COMPLETE THIS SECTION ONLY IF PAYING BY CREDIT CARD CARD NUMBER EXP. DATE — — — — 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Month Year _________________________________________________________________ Date Signature NAME (AS IT APPEARS ON CARD): (please print or type) ADDRESS: (for your credit card receipt-please print or type) DAYTIME PHONE: LOMC Clearinghouse 847 South Pickett Street Alexandria, VA 22304-4605 Attn.: LOMC Manager FEMA Project Library 847 South Pickett Street Alexandria, VA 22304-4605 FAX (703) 212-4090 EXHIBIT B SURVEY MAPS AND PLANS OF PROPOSED PROJECT DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116603/18/15WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER P R D PAINTED HILLS 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY SLS ORIGINAL PREPARATION-SOUTH SITE EXHIBIT2 OF 2RMAN/AN/AXW ESNCNOT TO SCALETHORPE RDMADISON RD DISHMAN-MICA RD EXHIBIT C DUPLICATE EFFECTIVE MODEL HEC-RAS Plan: DEM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 20779 10-yr 30.00 2004.98 2007.19 2005.40 2007.19 0.000006 0.06 517.26 1198.11 0.01 Golf Course 20779 50-yr 54.00 2004.98 2007.80 2005.49 2007.80 0.000003 0.05 1164.72 1860.64 0.01 Golf Course 20779 100-yr 64.00 2004.98 2008.05 2005.52 2008.05 0.000002 0.04 1491.37 1985.36 0.01 Golf Course 20779 500-yr 88.00 2004.98 2008.64 2005.58 2008.64 0.000000 0.03 3229.73 2191.83 0.00 Golf Course 21013 10-yr 30.00 2007.36 2007.65 2007.65 2007.74 0.048676 2.02 13.20 348.57 0.86 Golf Course 21013 50-yr 54.00 2007.36 2007.77 2007.77 2007.86 0.043680 2.09 23.46 392.88 0.83 Golf Course 21013 100-yr 64.00 2007.36 2007.79 2007.79 2007.90 0.048191 2.30 25.52 395.42 0.89 Golf Course 21013 500-yr 88.00 2007.36 2008.64 2007.85 2008.64 0.000463 0.44 192.58 634.20 0.10 Golf Course 21128 10-yr 30.00 2007.08 2008.27 2007.75 2008.28 0.000865 0.55 54.77 320.34 0.14 Golf Course 21128 50-yr 54.00 2007.08 2008.53 2007.86 2008.54 0.001133 0.60 89.93 413.16 0.16 Golf Course 21128 100-yr 64.00 2007.08 2008.60 2007.90 2008.61 0.001181 0.62 103.84 442.77 0.16 Golf Course 21128 500-yr 88.00 2007.08 2008.77 2007.98 2008.77 0.001015 0.61 145.13 510.87 0.15 Golf Course 21229 10-yr 30.00 2006.97 2008.63 2008.48 2008.64 0.007738 0.82 36.63 445.79 0.34 Golf Course 21229 50-yr 54.00 2006.97 2008.82 2008.55 2008.83 0.002311 0.62 86.72 540.30 0.20 Golf Course 21229 100-yr 64.00 2006.97 2008.87 2008.57 2008.88 0.001925 0.63 102.09 545.70 0.19 Golf Course 21229 500-yr 88.00 2006.97 2008.98 2008.63 2008.99 0.001412 0.65 136.02 549.37 0.17 Golf Course 21385 10-yr 30.00 2008.16 2008.94 2008.47 2008.94 0.000409 0.31 97.80 268.00 0.09 Golf Course 21385 50-yr 54.00 2008.16 2009.08 2008.53 2009.08 0.000477 0.40 135.88 283.37 0.10 Golf Course 21385 100-yr 64.00 2008.16 2009.12 2008.56 2009.12 0.000512 0.43 147.76 285.92 0.11 Golf Course 21385 500-yr 88.00 2008.16 2009.22 2008.61 2009.22 0.000552 0.50 176.40 291.98 0.11 Golf Course 21409 10-yr 30.00 2008.27 2008.98 2008.68 2008.98 0.001022 0.46 64.91 246.09 0.14 Golf Course 21409 50-yr 54.00 2008.27 2009.12 2008.75 2009.13 0.001113 0.58 93.59 269.70 0.15 Golf Course 21409 100-yr 64.00 2008.27 2009.17 2008.77 2009.17 0.001210 0.62 103.41 283.87 0.16 Golf Course 21409 500-yr 88.00 2008.27 2009.27 2008.81 2009.28 0.001345 0.68 128.93 323.53 0.17 Golf Course 21431 10-yr 30.00 2008.12 2009.03 2008.45 2009.03 0.000564 0.40 74.75 174.33 0.11 Golf Course 21431 50-yr 54.00 2008.12 2009.18 2008.54 2009.18 0.000767 0.52 103.72 206.07 0.13 Golf Course 21431 100-yr 64.00 2008.12 2009.23 2008.59 2009.24 0.000845 0.56 114.48 222.73 0.14 Golf Course 21431 500-yr 88.00 2008.12 2009.34 2008.66 2009.35 0.000870 0.64 138.33 232.31 0.14 Golf Course 21445 10-yr 30.00 2008.44 2009.09 2008.89 2009.12 0.014872 1.32 22.80 104.20 0.50 Golf Course 21445 50-yr 54.00 2008.44 2009.26 2009.06 2009.28 0.007937 1.23 44.01 139.40 0.38 Golf Course 21445 100-yr 64.00 2008.44 2009.31 2009.10 2009.33 0.006788 1.24 51.65 143.41 0.36 Golf Course 21445 500-yr 88.00 2008.44 2009.42 2009.16 2009.44 0.005945 1.31 67.25 155.76 0.35 Golf Course 21456 10-yr 30.00 2012.42 2012.99 2012.99 2013.09 0.062673 2.50 12.01 61.57 1.00 Golf Course 21456 50-yr 54.00 2012.42 2013.11 2013.11 2013.21 0.060991 2.52 21.40 105.91 0.99 Golf Course 21456 100-yr 64.00 2012.42 2013.14 2013.14 2013.24 0.060320 2.61 24.55 114.71 0.99 Golf Course 21456 500-yr 88.00 2012.42 2013.18 2013.18 2013.31 0.066521 2.86 30.76 134.60 1.05 Golf Course 21481 10-yr 30.00 2011.45 2013.10 2011.82 2013.10 0.000004 0.05 549.78 595.32 0.01 Golf Course 21481 50-yr 54.00 2011.45 2013.22 2011.87 2013.22 0.000009 0.09 620.16 630.22 0.02 Golf Course 21481 100-yr 64.00 2011.45 2013.25 2011.90 2013.25 0.000011 0.10 643.07 634.13 0.02 Golf Course 21481 500-yr 88.00 2011.45 2013.33 2011.93 2013.33 0.000017 0.13 690.78 652.52 0.02 Golf Course 21515 10-yr 30.00 2012.10 2013.10 2012.40 2013.10 0.000023 0.09 319.84 606.72 0.02 Golf Course 21515 50-yr 54.00 2012.10 2013.22 2012.45 2013.22 0.000041 0.14 390.15 624.52 0.03 Golf Course 21515 100-yr 64.00 2012.10 2013.25 2012.45 2013.25 0.000048 0.15 412.91 628.83 0.03 Golf Course 21515 500-yr 88.00 2012.10 2013.33 2012.51 2013.33 0.000063 0.19 459.74 631.14 0.04 Golf Course 21548 10-yr 30.00 2012.09 2013.10 2012.31 2013.10 0.000009 0.07 431.64 624.31 0.01 Golf Course 21548 50-yr 54.00 2012.09 2013.22 2012.36 2013.22 0.000017 0.11 503.76 626.72 0.02 Golf Course 21548 100-yr 64.00 2012.09 2013.25 2012.37 2013.26 0.000021 0.12 526.71 630.57 0.02 Golf Course 21548 500-yr 88.00 2012.09 2013.33 2012.40 2013.33 0.000030 0.15 574.26 635.70 0.03 Golf Course 21924 10-yr 30.00 2012.11 2013.11 2012.42 2013.11 0.000094 0.20 148.10 251.16 0.05 Golf Course 21924 50-yr 54.00 2012.11 2013.23 2012.49 2013.23 0.000169 0.30 178.90 258.69 0.06 Golf Course 21924 100-yr 64.00 2012.11 2013.27 2012.52 2013.27 0.000198 0.34 188.99 259.57 0.07 Golf Course 21924 500-yr 88.00 2012.11 2013.35 2012.57 2013.35 0.000270 0.42 210.13 264.29 0.08 Golf Course 22423 10-yr 30.00 2012.71 2013.25 2012.98 2013.26 0.001640 0.59 50.60 146.20 0.18 Golf Course 22423 50-yr 54.00 2012.71 2013.44 2013.05 2013.45 0.001371 0.67 80.89 171.04 0.17 Golf Course 22423 100-yr 64.00 2012.71 2013.51 2013.07 2013.52 0.001404 0.69 93.10 191.81 0.17 Golf Course 22423 500-yr 88.00 2012.71 2013.64 2013.12 2013.65 0.001265 0.74 118.92 202.88 0.17 Golf Course 22972 10-yr 30.00 2013.92 2014.64 2014.45 2014.67 0.008668 1.44 20.79 55.11 0.41 Golf Course 22972 50-yr 54.00 2013.92 2014.75 2014.57 2014.81 0.012175 1.98 27.23 57.83 0.51 Golf Course 22972 100-yr 64.00 2013.92 2014.82 2014.60 2014.88 0.011286 2.05 31.19 59.44 0.50 Golf Course 22972 500-yr 88.00 2013.92 2014.90 2014.69 2014.99 0.014083 2.44 36.12 62.83 0.57 Golf Course 23005 10-yr 30.00 2014.38 2015.02 2014.75 2015.03 0.002403 0.74 40.27 110.11 0.22 Golf Course 23005 50-yr 54.00 2014.38 2015.19 2014.83 2015.21 0.002393 0.89 60.89 127.76 0.23 Golf Course 23005 100-yr 64.00 2014.38 2015.25 2014.86 2015.27 0.002377 0.93 68.85 133.94 0.23 Golf Course 23005 500-yr 88.00 2014.38 2015.39 2014.91 2015.41 0.002414 0.99 89.09 160.09 0.23 HEC-RAS Plan: DEM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 23050 10-yr 30.00 2014.61 2015.15 2014.87 2015.16 0.002068 0.66 45.59 134.11 0.20 Golf Course 23050 50-yr 54.00 2014.61 2015.32 2014.95 2015.33 0.001873 0.78 69.54 148.17 0.20 Golf Course 23050 100-yr 64.00 2014.61 2015.38 2014.98 2015.39 0.001824 0.82 78.28 151.35 0.20 Golf Course 23050 500-yr 88.00 2014.61 2015.51 2015.03 2015.53 0.001669 0.89 99.12 158.47 0.20 Golf Course 23090 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.004945 0.92 32.71 112.46 0.30 Golf Course 23090 50-yr 54.00 2014.93 2015.60 2015.34 2015.62 0.004846 1.02 52.71 151.19 0.31 Golf Course 23090 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004571 1.07 59.93 154.61 0.30 Golf Course 23090 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003967 1.13 77.59 164.46 0.29 Golf Course 23446 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012985 1.12 26.76 140.46 0.45 Golf Course 23446 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012855 1.25 43.35 192.81 0.46 Golf Course 23446 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013801 1.32 48.44 208.05 0.48 Golf Course 23446 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.016731 1.56 56.49 218.88 0.54 Golf Course 23887 10-yr 30.00 2022.25 2022.83 2022.66 2022.85 0.005569 0.88 34.05 135.89 0.31 Golf Course 23887 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005634 1.05 51.30 158.11 0.33 Golf Course 23887 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 23887 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004911 1.20 73.64 169.28 0.32 Golf Course 24430 10-yr 30.00 2028.58 2029.25 2029.25 2029.46 0.048764 3.65 8.29 21.75 1.00 Golf Course 24430 50-yr 54.00 2028.58 2029.47 2029.47 2029.73 0.037372 4.21 13.58 28.66 0.94 Golf Course 24430 100-yr 64.00 2028.58 2029.56 2029.56 2029.82 0.031201 4.22 16.81 37.07 0.88 Golf Course 24430 500-yr 88.00 2028.58 2029.72 2029.72 2029.99 0.026137 4.41 23.23 42.98 0.83 HEC-RAS Plan: DEM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course 20779 Q100 - base 2008.05 2008.05 1327.67 64.00 934.91 2798.66 Golf Course 20779 Q100 - floodway 2009.05 1.00 2009.05 1178.72 64.00 934.91 934.91 2798.66 2278.72 Golf Course 21013 Q100 - base 2008.05 2008.07 147.76 52.43 11.57 508.09 1602.56 Golf Course 21013 Q100 - floodway 2009.05 1.00 2009.05 173.18 52.98 11.02 1472.43 508.09 1602.56 1725.00 Golf Course 21128 Q100 - base 2008.53 2008.54 190.90 64.00 409.35 1512.91 Golf Course 21128 Q100 - floodway 2009.05 0.52 2009.11 25.00 64.00 1045.00 409.35 1512.91 1070.00 Golf Course 21229 Q100 - base 2008.86 2008.87 305.94 64.00 417.95 1452.44 Golf Course 21229 Q100 - floodway 2009.59 0.72 2009.62 35.00 64.00 985.00 417.95 1452.44 1020.00 Golf Course 21385 Q100 - base 2009.12 2009.12 285.78 64.00 431.52 1001.23 Golf Course 21385 Q100 - floodway 2010.03 0.91 2010.06 30.00 64.00 785.00 431.52 1001.23 815.00 Golf Course 21409 Q100 - base 2009.17 2009.17 222.73 64.00 426.69 980.16 Golf Course 21409 Q100 - floodway 2010.12 0.95 2010.16 25.00 64.00 728.00 426.69 980.16 753.00 Golf Course 21431 Q100 - base 2009.23 2009.24 219.68 64.00 440.00 961.58 Golf Course 21431 Q100 - floodway 2010.23 1.00 2010.26 25.00 64.00 700.00 440.00 961.58 725.00 Golf Course 21445 Q100 - base 2009.31 2009.33 143.36 64.00 440.70 949.64 Golf Course 21445 Q100 - floodway 2010.29 0.98 2010.37 20.00 64.00 683.00 440.70 949.64 703.00 Golf Course 21456 Q100 - base 2013.14 2013.24 114.71 64.00 0.00 937.26 Golf Course 21456 Q100 - floodway 2013.79 0.65 2014.05 30.00 64.00 595.00 0.00 937.26 625.00 Golf Course 21481 Q100 - base 2013.25 2013.25 634.13 64.00 494.28 1387.02 Golf Course 21481 Q100 - floodway 2014.10 0.85 2014.11 37.00 64.00 1073.00 494.28 1387.02 1110.00 Golf Course 21515 Q100 - base 2013.25 2013.25 628.83 64.00 494.23 1385.39 Golf Course 21515 Q100 - floodway 2014.11 0.86 2014.12 44.00 64.00 1051.00 494.23 1385.39 1095.00 Golf Course 21548 Q100 - base 2013.25 2013.26 630.57 64.00 576.95 1602.20 Golf Course 21548 Q100 - floodway 2014.13 0.88 2014.14 45.00 64.00 1058.00 576.95 1602.20 1103.00 Golf Course 21924 Q100 - base 2013.27 2013.27 259.57 64.00 791.72 1477.35 Golf Course 21924 Q100 - floodway 2014.23 0.96 2014.24 43.00 64.00 975.00 791.72 1477.35 1018.00 Golf Course 22423 Q100 - base 2013.51 2013.52 191.81 64.00 843.00 1600.75 Golf Course 22423 Q100 - floodway 2014.48 0.97 2014.49 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 22972 Q100 - base 2014.82 2014.88 59.44 64.00 759.64 1718.25 Golf Course 22972 Q100 - floodway 2015.26 0.45 2015.70 14.13 64.00 1162.20 759.64 1718.25 1176.33 Golf Course 23005 Q100 - base 2015.25 2015.27 133.94 64.00 729.92 1627.92 Golf Course 23005 Q100 - floodway 2016.10 0.85 2016.14 27.34 64.00 1123.02 729.92 1627.92 1150.36 Golf Course 23050 Q100 - base 2015.38 2015.39 151.35 64.00 763.22 1639.53 Golf Course 23050 Q100 - floodway 2016.21 0.84 2016.27 22.35 64.00 1126.64 763.22 1639.53 1148.99 Golf Course 23090 Q100 - base 2015.65 2015.66 154.61 64.00 768.88 1659.11 Golf Course 23090 Q100 - floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 768.88 1659.11 1115.00 Golf Course 23446 Q100 - base 2018.10 2018.12 208.05 64.00 688.98 1310.47 Golf Course 23446 Q100 - floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 23887 Q100 - base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 23887 Q100 - floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 24430 Q100 - base 2029.56 2029.82 37.07 1.56 60.23 2.21 636.32 656.04 Golf Course 24430 Q100 - floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 636.32 656.04 656.04 HEC-RAS Plan: (DEM) wl River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 1.00 2004.70 2007.19 2004.82 2007.19 0.000000 0.01 97.62 92.00 0.00 trib -1303 Q50 2.00 2004.70 2007.80 2004.86 2007.80 0.000000 0.02 89.00 31.32 0.00 trib -1303 Q100 4.00 2004.70 2008.05 2004.90 2008.05 0.000000 0.02 181.64 103.69 0.00 trib -1303 Q500 7.00 2004.70 2008.64 2004.96 2008.64 0.000000 0.03 245.69 113.41 0.00 trib -1019 Q10 1.00 2007.91 2008.27 2008.27 2008.30 0.103616 1.40 0.72 31.55 1.04 trib -1019 Q50 2.00 2008.18 2008.31 2008.31 2008.35 0.095084 1.66 1.20 15.60 1.05 trib -1019 Q100 4.00 2007.91 2008.36 2008.36 2008.41 0.077292 1.83 2.19 47.75 1.00 trib -1019 Q500 7.00 2007.91 2008.64 2008.41 2008.64 0.002258 0.58 12.11 93.29 0.20 trib -880 Q10 1.00 2004.89 2008.31 2008.31 0.000000 0.00 721.14 359.15 0.00 trib -880 Q50 2.00 2006.70 2008.36 2008.36 0.000003 0.05 41.16 40.00 0.01 trib -880 Q100 4.00 2004.89 2008.42 2008.42 0.000000 0.01 761.51 361.60 0.00 trib -880 Q500 7.00 2004.89 2008.64 2008.64 0.000000 0.01 843.68 368.58 0.00 trib -466 Q10 1.00 2006.89 2008.31 2008.31 0.000000 0.00 410.09 380.79 0.00 trib -466 Q50 2.00 2006.96 2008.36 2008.36 0.000005 0.05 36.54 45.57 0.01 trib -466 Q100 4.00 2006.89 2008.42 2008.42 0.000000 0.01 453.25 388.60 0.00 trib -466 Q500 7.00 2006.89 2008.64 2008.64 0.000000 0.01 542.61 403.49 0.00 trib -89 Q10 1.00 2006.07 2008.31 2008.31 0.000000 0.00 449.29 336.12 0.00 trib -89 Q50 2.00 2006.83 2008.36 2008.36 0.000002 0.05 40.97 39.70 0.01 trib -89 Q100 4.00 2006.07 2008.42 2008.42 0.000000 0.01 487.40 345.54 0.00 trib -89 Q500 7.00 2006.07 2008.64 2008.64 0.000000 0.01 571.23 388.66 0.00 trib 1 Q10 1.00 1998.92 2005.00 2005.00 0.000000 0.00 225.97 48.42 0.00 trib 1 Q50 2.00 1998.92 2009.60 2009.60 0.000000 0.00 540.96 101.33 0.00 trib 1 Q100 4.00 1998.92 2009.70 2009.70 0.000000 0.01 551.13 102.16 0.00 trib 1 Q500 7.00 1998.92 2010.00 2010.00 0.000000 0.01 582.15 104.63 0.00 trib 149 Q10 10.00 1995.82 2005.00 1996.32 2005.00 0.000000 0.01 1141.63 165.71 0.00 trib 149 Q50 14.00 1995.82 2009.60 1996.38 2009.60 0.000000 0.01 1924.52 175.82 0.00 trib 149 Q100 16.00 1995.82 2009.70 1996.41 2009.70 0.000000 0.01 1942.12 176.16 0.00 trib 149 Q500 20.00 1995.82 2010.00 1996.46 2010.00 0.000000 0.01 1995.13 177.19 0.00 trib 343 Q10 10.00 1993.64 2005.00 1993.99 2005.00 0.000000 0.01 1993.17 252.43 0.00 trib 343 Q50 14.00 1993.64 2009.60 1994.05 2009.60 0.000000 0.00 3182.15 266.09 0.00 trib 343 Q100 16.00 1993.64 2009.70 1994.07 2009.70 0.000000 0.00 3208.78 266.57 0.00 trib 343 Q500 20.00 1993.64 2010.00 1994.11 2010.00 0.000000 0.01 3288.97 267.99 0.00 trib 383 Q10 10.00 1994.23 2005.00 1994.67 2005.00 0.000000 0.01 1938.50 222.78 0.00 trib 383 Q50 14.00 1994.23 2009.60 1994.71 2009.60 0.000000 0.00 3052.64 279.70 0.00 trib 383 Q100 16.00 1994.23 2009.70 1994.73 2009.70 0.000000 0.01 3080.61 279.97 0.00 trib 383 Q500 20.00 1994.23 2010.00 1994.75 2010.00 0.000000 0.01 3164.74 280.78 0.00 trib 472 Q10 10.00 2005.65 2005.00 1999.14 2005.00 0.000000 477.69 135.83 0.00 trib 472 Q50 14.00 2005.65 2009.60 2006.76 2009.60 0.000167 0.68 20.58 8.81 0.08 trib 472 Q100 16.00 2005.65 2009.70 1999.22 2009.70 0.000000 0.01 1274.72 193.16 0.00 trib 472 Q500 20.00 2005.65 2010.00 1999.26 2010.00 0.000000 0.01 1334.21 203.55 0.00 trib 576 Q10 10.00 2008.78 2009.74 2009.74 2009.99 0.032554 4.02 2.48 4.97 1.00 trib 576 Q50 14.00 2008.78 2009.88 2009.88 2010.18 0.031239 4.40 3.18 5.26 1.00 trib 576 Q100 16.00 2008.78 2009.95 2009.95 2010.25 0.030780 4.43 3.61 5.98 1.01 trib 576 Q500 20.00 2008.78 2010.20 2010.20 2010.37 0.028407 3.36 6.36 21.88 0.93 trib 651 Q10 10.00 2009.50 2010.74 2010.48 2010.78 0.004980 1.88 7.84 29.35 0.41 trib 651 Q50 14.00 2009.50 2011.08 2010.60 2011.13 0.006522 1.81 7.73 15.72 0.46 trib 651 Q100 16.00 2009.50 2010.95 2010.71 2010.96 0.004364 1.23 16.50 54.47 0.36 trib 651 Q500 20.00 2009.50 2011.00 2010.77 2011.02 0.004026 1.28 19.68 56.58 0.35 trib 918 Q10 10.00 2009.10 2011.17 2009.95 2011.19 0.000735 1.08 9.22 6.85 0.16 trib 918 Q50 14.00 2009.10 2011.55 2010.11 2011.57 0.000714 1.17 11.93 7.51 0.16 trib 918 Q100 16.00 2009.10 2011.45 2010.17 2011.48 0.001099 1.42 11.64 11.27 0.20 trib 918 Q500 20.00 2009.10 2011.57 2010.29 2011.61 0.001361 1.62 13.89 36.25 0.23 trib 1472 Q10 10.00 2011.44 2012.38 2012.38 2012.67 0.032363 4.35 2.30 3.82 0.99 trib 1472 Q50 14.00 2011.44 2012.54 2012.54 2012.89 0.031230 4.71 2.97 4.22 0.99 trib 1472 Q100 16.00 2011.44 2012.83 2012.61 2013.05 0.015065 3.73 4.29 4.89 0.70 trib 1472 Q500 20.00 2011.44 2013.11 2012.75 2013.30 0.010804 3.50 5.72 5.54 0.61 trib 1510 Q10 10.00 2011.15 2012.95 2012.17 2013.00 0.002787 1.77 5.66 5.40 0.30 trib 1510 Q50 14.00 2011.15 2013.19 2012.35 2013.25 0.003111 2.00 6.99 5.98 0.33 trib 1510 Q100 16.00 2011.15 2013.26 2012.43 2013.33 0.003444 2.15 7.44 6.16 0.35 trib 1510 Q500 20.00 2011.15 2013.46 2012.58 2013.55 0.003501 2.29 8.75 6.67 0.35 trib 1520 Culvert trib 1528 Q10 10.00 2010.84 2013.36 2011.82 2013.38 0.000963 1.00 9.96 6.88 0.15 HEC-RAS Plan: (DEM) wl River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2010.84 2013.98 2011.99 2013.99 0.000678 0.95 14.68 8.39 0.13 trib 1528 Q100 16.00 2010.84 2014.30 2012.07 2014.32 0.000575 0.91 17.51 9.51 0.12 trib 1528 Q500 20.00 2010.84 2014.61 2012.23 2014.63 0.000672 0.91 25.24 51.66 0.13 trib 1557 Q10 10.00 2011.79 2013.39 2012.66 2013.44 0.003820 1.69 5.91 5.64 0.29 trib 1557 Q50 14.00 2011.79 2014.00 2012.81 2014.03 0.001952 1.44 9.72 6.93 0.21 trib 1557 Q100 16.00 2011.79 2014.32 2012.88 2014.35 0.001437 1.33 12.04 7.61 0.19 trib 1557 Q500 20.00 2011.79 2014.63 2013.01 2014.66 0.001366 1.38 14.51 8.27 0.18 trib 1963 Q10 10.00 2018.61 2019.48 2019.48 2019.66 0.051975 3.44 2.91 7.79 0.99 trib 1963 Q50 14.00 2018.61 2019.58 2019.58 2019.80 0.049077 3.72 3.76 8.55 0.99 trib 1963 Q100 16.00 2018.61 2019.66 2019.66 2019.85 0.038218 3.52 4.80 15.48 0.89 trib 1963 Q500 20.00 2018.61 2019.75 2019.75 2019.93 0.033517 3.48 6.39 18.55 0.84 trib 1989 Q10 10.00 2017.77 2019.85 2018.80 2019.89 0.002658 1.50 6.69 17.19 0.24 trib 1989 Q50 14.00 2017.77 2020.01 2018.98 2020.07 0.003435 1.85 7.58 8.70 0.28 trib 1989 Q100 16.00 2017.77 2020.06 2019.06 2020.12 0.004030 2.04 7.83 48.44 0.30 trib 1989 Q500 20.00 2017.77 2020.14 2019.22 2020.23 0.005238 2.42 8.27 60.64 0.35 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.19 2019.81 2020.30 0.009432 2.61 3.83 8.68 0.47 trib 2080 Q50 14.00 2018.73 2020.48 2019.95 2020.60 0.007681 2.81 4.98 12.81 0.44 trib 2080 Q100 16.00 2018.73 2020.61 2020.02 2020.74 0.007173 2.90 5.51 14.87 0.44 trib 2080 Q500 20.00 2018.73 2020.86 2020.15 2021.01 0.006452 3.07 6.51 18.47 0.42 trib 2100 Q10 12.00 2018.27 2020.39 2019.40 2020.41 0.002032 1.15 10.46 12.11 0.22 trib 2100 Q50 24.00 2018.27 2020.70 2019.87 2020.74 0.003400 1.65 14.57 14.50 0.29 trib 2100 Q100 30.00 2018.27 2020.83 2020.00 2020.88 0.003580 1.82 16.55 15.31 0.30 trib 2100 Q500 46.00 2018.27 2021.08 2020.26 2021.16 0.004409 2.26 20.54 16.79 0.35 trib 2110 Q10 12.00 2018.27 2020.42 2019.40 2020.43 0.001881 1.11 10.78 12.31 0.21 trib 2110 Q50 24.00 2018.27 2020.74 2019.87 2020.78 0.002992 1.58 15.20 14.62 0.27 trib 2110 Q100 30.00 2018.27 2020.88 2020.00 2020.92 0.003147 1.74 17.27 15.59 0.29 trib 2110 Q500 46.00 2018.27 2021.14 2020.26 2021.21 0.003840 2.17 21.53 17.14 0.32 trib 2120 Q10 12.00 2018.27 2020.44 2019.40 2020.45 0.001769 1.09 11.03 12.47 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.81 0.002715 1.53 15.69 14.67 0.26 trib 2120 Q100 30.00 2018.27 2020.91 2020.00 2020.96 0.002861 1.69 17.82 15.80 0.27 trib 2120 Q500 46.00 2018.27 2021.18 2020.26 2021.25 0.003471 2.10 22.30 17.41 0.31 trib 2651 Q10 12.00 2021.38 2022.48 2022.22 2022.62 0.016295 2.96 4.05 5.21 0.59 trib 2651 Q50 24.00 2021.38 2023.16 2022.58 2023.30 0.009561 2.98 8.05 6.49 0.47 trib 2651 Q100 30.00 2021.38 2023.40 2022.73 2023.55 0.009769 3.10 9.67 7.51 0.48 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008805 3.30 14.05 10.00 0.47 trib 3126 Q10 12.00 2023.82 2025.45 2024.69 2025.49 0.003114 1.53 7.84 7.78 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003754 1.97 12.18 9.47 0.31 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.25 0.003704 2.08 14.43 10.23 0.31 trib 3126 Q500 46.00 2023.82 2026.65 2025.48 2026.74 0.003902 2.35 19.60 12.06 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.50 2030.50 2030.93 0.047487 5.26 4.56 5.39 1.01 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.91 0.003029 1.91 12.59 8.67 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.00 2037.62 0.011204 3.01 7.98 7.52 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.49 2038.49 2039.19 0.037939 6.72 3.57 3.15 0.99 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.36 2039.00 2040.40 0.001542 1.56 15.35 8.39 0.19 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: (DEM) wl River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.45 2039.50 2040.48 0.001583 1.32 16.67 12.65 0.20 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.28 2043.28 2043.49 0.047742 3.69 5.97 13.81 0.99 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2048.03 2047.39 2048.07 0.003615 1.50 14.67 18.51 0.30 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.73 2051.73 2052.11 0.046145 4.92 4.47 6.03 1.01 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.65 2052.28 2052.71 0.006296 1.87 11.74 16.61 0.39 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.15 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047079 4.04 5.44 10.35 0.98 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.19 2064.53 0.022256 3.32 6.62 9.82 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038367 5.06 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.41 2084.85 0.026361 4.77 2.94 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.32 2090.32 2090.80 0.044776 5.59 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.47 2091.33 0.010658 3.24 4.32 2.79 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031476 4.37 3.21 5.40 1.00 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wl FW (DEM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Q100 base 2008.05 2008.05 103.69 0.01 3.90 0.09 70.92 163.31 trib -1303 Q100 floodway 2009.05 1.00 2009.05 31.32 4.00 131.99 70.92 163.31 163.31 trib -1019 Q100 base 2008.36 2008.41 21.08 4.00 152.95 253.19 trib -1019 Q100 floodway 2009.05 0.69 2009.05 21.09 4.00 173.33 152.95 253.19 194.42 trib -880 Q100 base 2008.42 2008.42 361.60 0.08 3.92 0.01 62.73 380.37 trib -880 Q100 floodway 2009.05 0.63 2009.05 40.00 4.00 310.00 62.73 380.37 350.00 trib -466 Q100 base 2008.42 2008.42 388.60 4.00 0.00 129.52 566.57 trib -466 Q100 floodway 2009.05 0.64 2009.05 45.57 4.00 521.00 129.52 566.57 566.57 trib -89 Q100 base 2008.42 2008.42 345.54 4.00 144.89 581.16 trib -89 Q100 floodway 2009.05 0.64 2009.05 39.70 4.00 510.00 144.89 581.16 549.70 trib 1 Q100 base 2009.70 2009.70 102.16 4.00 461.25 568.10 trib 1 Q100 floodway 2010.70 1.00 2010.70 116.77 0.00 4.00 461.25 568.10 trib 149 Q100 base 2009.70 2009.70 176.16 16.00 421.08 606.95 trib 149 Q100 floodway 2010.70 1.00 2010.70 179.75 16.00 421.08 606.95 trib 343 Q100 base 2009.70 2009.70 266.57 16.00 410.55 678.07 trib 343 Q100 floodway 2010.70 1.00 2010.70 271.14 0.00 16.00 0.00 410.55 678.07 trib 383 Q100 base 2009.70 2009.70 279.97 16.00 0.00 397.28 677.14 trib 383 Q100 floodway 2010.70 1.00 2010.70 282.66 16.00 0.00 397.28 677.14 trib 472 Q100 base 2009.70 2009.70 193.16 0.12 15.88 340.55 365.05 trib 472 Q100 floodway 2010.70 1.00 2010.70 8.82 16.00 347.00 340.55 365.05 355.82 trib 576 Q100 base 2009.95 2010.25 5.98 16.00 361.81 384.61 trib 576 Q100 floodway 2010.67 0.73 2010.75 5.41 16.00 368.20 361.81 384.61 373.61 trib 651 Q100 base 2010.95 2010.96 54.47 6.94 9.06 360.31 384.41 trib 651 Q100 floodway 2011.07 0.12 2011.14 15.66 16.00 367.72 360.31 384.41 384.41 trib 918 Q100 base 2011.45 2011.48 11.27 15.90 0.10 466.95 478.43 trib 918 Q100 floodway 2011.63 0.18 2011.66 7.59 16.00 468.53 466.95 478.43 478.43 trib 1472 Q100 base 2012.83 2013.05 4.89 16.00 706.41 714.93 trib 1472 Q100 floodway 2012.71 -0.12 2013.00 4.61 16.00 708.23 706.41 714.93 713.11 trib 1510 Q100 base 2013.26 2013.33 6.16 16.00 711.73 722.04 trib 1510 Q100 floodway 2013.26 0.00 2013.33 6.16 16.00 714.06 711.73 722.04 720.22 trib 1520 Culvert trib 1528 Q100 base 2014.30 2014.32 9.51 16.00 727.15 744.68 trib 1528 Q100 floodway 2014.31 0.00 2014.32 9.50 16.00 727.56 727.15 744.68 737.06 trib 1557 Q100 base 2014.32 2014.35 7.61 16.00 726.74 740.03 trib 1557 Q100 floodway 2014.32 0.00 2014.35 7.61 16.00 730.81 726.74 740.03 738.42 trib 1963 Q100 base 2019.66 2019.85 15.48 15.72 0.28 739.45 750.61 trib 1963 Q100 floodway 2019.63 -0.03 2019.86 8.89 16.00 741.45 739.45 750.61 750.61 trib 1989 Q100 base 2020.06 2020.12 5.50 16.00 762.80 771.50 trib 1989 Q100 floodway 2020.08 0.02 2020.15 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Q100 base 2020.61 2020.74 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.61 0.00 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.83 2020.88 15.31 0.01 29.99 44.23 60.09 trib 2100 Q100 floodway 2020.83 0.00 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.88 2020.92 15.59 0.02 29.98 44.23 60.09 trib 2110 Q100 floodway 2020.88 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.91 2020.96 15.80 0.03 29.97 44.23 60.09 trib 2120 Q100 floodway 2020.92 0.00 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.40 2023.55 7.51 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.25 10.23 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 HEC-RAS Plan: wl FW (DEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: DEM wo ds lev River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 10.00 2004.70 2007.19 2005.00 2007.19 0.000006 0.13 97.62 92.00 0.02 trib -1303 Q50 14.00 2004.70 2007.80 2005.05 2007.80 0.000004 0.12 156.26 99.90 0.01 trib -1303 Q100 16.00 2004.70 2008.05 2005.07 2008.05 0.000003 0.12 181.64 103.69 0.01 trib -1303 Q500 20.00 2004.70 2008.64 2005.11 2008.64 0.000002 0.11 245.69 113.41 0.01 trib -1019 Q10 10.00 2008.18 2008.47 2008.47 2008.54 0.040241 2.34 5.15 65.40 0.83 trib -1019 Q50 14.00 2008.18 2008.51 2008.51 2008.59 0.039441 2.57 6.69 70.95 0.84 trib -1019 Q100 16.00 2008.18 2008.52 2008.52 2008.62 0.045491 2.81 7.00 71.61 0.91 trib -1019 Q500 20.00 2008.18 2008.64 2008.56 2008.65 0.003347 0.96 26.15 93.34 0.26 trib -880 Q10 10.00 2007.31 2008.55 2005.25 2008.55 0.000000 0.01 808.03 365.13 0.00 trib -880 Q50 14.00 2007.31 2008.60 2005.30 2008.60 0.000000 0.01 828.10 367.06 0.00 trib -880 Q100 16.00 2007.31 2008.63 2005.32 2008.63 0.000000 0.01 837.43 367.97 0.00 trib -880 Q500 20.00 2007.31 2008.65 2005.36 2008.65 0.000000 0.01 845.25 368.73 0.00 trib -466 Q10 10.00 2006.96 2008.55 2007.05 2008.55 0.000000 0.02 503.64 396.88 0.00 trib -466 Q50 14.00 2006.96 2008.60 2007.08 2008.60 0.000001 0.03 525.58 402.65 0.00 trib -466 Q100 16.00 2006.96 2008.63 2007.08 2008.63 0.000001 0.03 535.81 403.22 0.00 trib -466 Q500 20.00 2006.96 2008.65 2007.08 2008.65 0.000001 0.04 544.38 403.56 0.01 trib -89 Q10 10.00 2007.09 2008.55 2006.35 2008.55 0.000000 0.02 533.76 381.64 0.00 trib -89 Q50 14.00 2007.09 2008.60 2006.40 2008.60 0.000000 0.02 554.94 387.29 0.00 trib -89 Q100 16.00 2007.09 2008.63 2006.43 2008.63 0.000001 0.03 564.78 388.12 0.00 trib -89 Q500 20.00 2007.09 2008.65 2006.47 2008.65 0.000001 0.03 573.08 388.82 0.00 trib 1 Q10 10.00 2008.30 2008.57 2008.57 2008.61 0.049508 2.23 7.05 92.01 0.89 trib 1 Q50 14.00 2008.30 2008.60 2008.60 2008.64 0.049091 2.40 9.47 106.80 0.90 trib 1 Q100 16.00 2008.30 2008.61 2008.61 2008.65 0.045516 2.40 10.81 112.72 0.88 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q10 10.00 2007.52 2008.62 2006.65 2008.62 0.000000 0.01 417.66 269.94 0.00 trib 149 Q50 14.00 2007.52 2008.65 2006.70 2008.65 0.000001 0.02 425.25 270.23 0.00 trib 149 Q100 16.00 2007.52 2008.66 2006.72 2008.66 0.000001 0.02 428.28 270.35 0.00 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q10 10.00 2008.18 2008.62 2007.06 2008.62 0.000001 0.02 272.09 279.48 0.01 trib 343 Q50 14.00 2008.18 2008.65 2007.13 2008.65 0.000003 0.03 279.96 281.03 0.01 trib 343 Q100 16.00 2008.18 2008.66 2007.16 2008.66 0.000003 0.03 283.12 281.64 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q10 10.00 2008.42 2008.62 2007.33 2008.62 0.000003 0.01 193.97 213.44 0.01 trib 383 Q50 14.00 2008.42 2008.65 2007.36 2008.65 0.000006 0.02 199.96 214.83 0.01 trib 383 Q100 16.00 2008.42 2008.66 2007.37 2008.66 0.000007 0.03 202.37 215.39 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q10 10.00 2008.50 2008.62 2007.46 2008.62 0.000008 0.01 146.81 211.42 0.01 trib 472 Q50 14.00 2008.50 2008.65 2007.50 2008.65 0.000014 0.02 152.88 213.77 0.01 trib 472 Q100 16.00 2008.50 2008.66 2007.52 2008.66 0.000017 0.03 155.34 214.71 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q10 10.00 2008.57 2008.62 2007.79 2008.62 0.000034 0.02 83.84 150.04 0.02 trib 576 Q50 14.00 2008.57 2008.65 2007.83 2008.65 0.000057 0.03 88.33 153.40 0.02 trib 576 Q100 16.00 2008.57 2008.66 2007.84 2008.66 0.000069 0.03 90.17 154.76 0.03 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q10 10.00 2011.11 2011.18 2011.18 2011.22 0.097087 0.90 6.25 88.01 0.91 trib 651 Q50 14.00 2011.11 2011.20 2011.20 2011.24 0.084641 1.01 8.16 94.94 0.89 trib 651 Q100 16.00 2011.11 2011.21 2011.21 2011.26 0.076146 1.09 9.16 96.15 0.87 trib 651 Q500 20.00 2011.11 2011.22 2011.22 2011.28 0.078399 1.27 10.44 97.72 0.92 trib 918 Q10 10.00 2009.84 2011.22 2010.09 2011.22 0.000004 0.07 191.15 223.46 0.01 trib 918 Q50 14.00 2009.84 2011.25 2010.13 2011.25 0.000006 0.09 197.86 227.01 0.01 trib 918 Q100 16.00 2009.84 2011.27 2010.15 2011.27 0.000008 0.10 200.97 230.82 0.02 trib 918 Q500 20.00 2009.84 2011.30 2010.16 2011.30 0.000012 0.13 207.29 233.18 0.02 trib 1472 Q10 10.00 2013.44 2013.73 2013.73 2013.78 0.038164 2.06 6.11 55.33 0.79 trib 1472 Q50 14.00 2013.44 2013.76 2013.76 2013.82 0.041668 2.34 7.74 62.95 0.84 trib 1472 Q100 16.00 2013.44 2013.77 2013.77 2013.84 0.039601 2.38 8.80 67.96 0.83 trib 1472 Q500 20.00 2013.44 2013.80 2013.80 2013.87 0.039038 2.52 10.69 77.87 0.84 trib 1510 Q10 10.00 2013.81 2014.06 2013.90 2014.06 0.002778 0.39 19.89 120.64 0.19 trib 1510 Q50 14.00 2013.81 2014.10 2013.94 2014.11 0.002801 0.43 25.50 126.84 0.20 trib 1510 Q100 16.00 2013.81 2014.12 2013.95 2014.13 0.002776 0.45 27.85 129.47 0.20 trib 1510 Q500 20.00 2013.81 2014.15 2013.97 2014.16 0.002826 0.50 31.99 137.40 0.21 trib 1520 Culvert trib 1528 Q10 10.00 2013.78 2014.06 2013.93 2014.06 0.005201 0.69 15.56 100.95 0.28 HEC-RAS Plan: DEM wo ds lev River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2013.78 2014.10 2013.95 2014.11 0.004983 0.76 20.57 116.23 0.29 trib 1528 Q100 16.00 2013.78 2014.12 2013.97 2014.13 0.005184 0.82 22.52 118.90 0.30 trib 1528 Q500 20.00 2013.78 2014.16 2013.99 2014.17 0.004648 0.85 26.76 122.07 0.29 trib 1557 Q10 10.00 2014.07 2014.21 2014.05 2014.21 0.004529 0.32 16.54 122.35 0.22 trib 1557 Q50 14.00 2014.07 2014.25 2014.10 2014.26 0.004585 0.37 22.60 137.57 0.23 trib 1557 Q100 16.00 2014.07 2014.27 2014.12 2014.27 0.004521 0.42 24.77 140.38 0.24 trib 1557 Q500 20.00 2014.07 2014.29 2014.14 2014.30 0.004640 0.50 28.53 145.80 0.25 trib 1963 Q10 10.00 2015.81 2016.24 2016.10 2016.26 0.007062 1.07 10.25 52.15 0.36 trib 1963 Q50 14.00 2015.81 2016.29 2016.15 2016.31 0.007097 1.20 13.09 56.60 0.37 trib 1963 Q100 16.00 2015.81 2016.31 2016.17 2016.33 0.007323 1.27 14.25 57.48 0.38 trib 1963 Q500 20.00 2015.81 2016.35 2016.20 2016.38 0.007236 1.36 16.68 58.71 0.38 trib 1989 Q10 10.00 2017.77 2018.80 2018.80 2019.13 0.055202 4.65 2.15 3.23 1.00 trib 1989 Q50 14.00 2017.77 2018.98 2018.98 2019.38 0.054111 5.05 2.77 3.54 1.01 trib 1989 Q100 16.00 2017.77 2019.07 2019.07 2019.48 0.052722 5.18 3.09 3.69 1.00 trib 1989 Q500 20.00 2017.77 2019.22 2019.22 2019.68 0.051664 5.45 3.67 3.94 0.99 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001965 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003293 1.63 14.74 14.59 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003479 1.80 16.71 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004326 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001824 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002895 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003072 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001720 1.08 11.15 12.55 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002629 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002801 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017129 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.15 2022.58 2023.29 0.009975 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009967 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003063 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003719 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: DEM wo ds lev River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.12 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2047.39 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2047.50 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.43 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031946 4.33 5.08 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2051.88 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.007005 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: floodway (DEM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Base 2008.05 2008.05 103.69 5.34 9.25 1.41 134.37 158.76 trib -1303 Floodway 2009.05 1.00 2009.05 31.32 0.63 13.98 1.39 131.99 134.37 158.76 163.31 trib -1019 Base 2008.52 2008.62 38.92 3.31 11.46 1.24 178.65 192.41 trib -1019 Floodway 2009.04 0.53 2009.06 21.09 3.29 11.59 1.12 173.33 178.65 192.41 194.42 trib -880 Base 2008.63 2008.63 367.97 14.91 0.33 0.76 316.80 341.31 trib -880 Floodway 2009.07 0.45 2009.07 40.00 2.68 9.02 4.30 310.00 316.80 341.31 350.00 trib -466 Base 2008.63 2008.63 403.22 15.45 0.52 0.03 552.13 565.20 trib -466 Floodway 2009.09 0.46 2009.09 45.57 9.60 6.11 0.28 521.00 552.13 565.20 566.57 trib -89 Base 2008.63 2008.63 388.12 15.26 0.71 0.03 523.44 545.76 trib -89 Floodway 2009.10 0.47 2009.10 39.70 6.49 8.94 0.57 510.00 523.44 545.76 549.70 trib 1 Base 2008.61 2008.65 112.72 11.69 4.27 0.05 423.34 431.01 trib 1 Floodway 2009.10 0.50 2009.10 271.58 14.66 1.22 0.12 423.34 431.01 trib 149 Base 2008.66 2008.66 270.35 15.86 0.14 0.00 322.78 330.58 trib 149 Floodway 2009.10 0.45 2009.10 275.21 15.78 0.20 0.02 322.78 330.58 trib 343 Base 2008.66 2008.66 281.64 15.83 0.12 0.05 326.83 335.39 trib 343 Floodway 2009.10 0.45 2009.10 306.23 15.62 0.22 0.16 326.83 335.39 trib 383 Base 2008.66 2008.66 215.39 15.97 0.03 0.00 321.06 327.35 trib 383 Floodway 2009.10 0.45 2009.10 324.09 15.73 0.14 0.13 321.06 327.35 trib 472 Base 2008.66 2008.66 214.71 15.97 0.03 0.00 246.06 255.85 trib 472 Floodway 2011.03 2.37 2011.03 8.82 16.00 347.00 246.06 255.85 355.82 trib 576 Base 2008.66 2008.66 154.76 15.99 0.01 0.00 247.56 254.23 trib 576 Floodway 2011.22 2.56 2011.25 5.41 16.00 368.20 247.56 254.23 373.61 trib 651 Base 2011.21 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 651 Floodway 2011.46 0.26 2011.49 16.69 16.00 367.72 331.92 337.62 384.41 trib 918 Base 2011.27 2011.27 230.82 7.90 1.56 6.54 290.48 301.36 trib 918 Floodway 2011.81 0.54 2011.83 7.75 16.00 468.53 290.48 301.36 478.43 trib 1472 Base 2013.77 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1472 Floodway 2014.69 0.92 2014.71 4.88 16.00 708.23 374.56 390.80 713.11 trib 1510 Base 2014.12 2014.13 129.51 0.02 0.85 15.14 289.44 302.32 trib 1510 Floodway 2014.73 0.60 2014.74 6.16 16.00 714.06 289.44 302.32 720.22 trib 1520 Culvert trib 1528 Base 2014.12 2014.13 119.01 0.00 2.72 13.28 307.04 321.23 trib 1528 Floodway 2014.97 0.85 2014.98 9.50 16.00 727.56 307.04 321.23 737.06 trib 1557 Base 2014.27 2014.27 140.34 0.00 0.43 15.57 307.11 317.99 trib 1557 Floodway 2015.24 0.97 2015.25 7.61 16.00 730.81 307.11 317.99 738.42 trib 1963 Base 2016.31 2016.33 57.50 2.13 13.78 0.09 243.25 273.87 trib 1963 Floodway 2019.62 3.31 2019.86 8.82 16.00 741.45 243.25 273.87 750.61 trib 1989 Base 2019.07 2019.48 3.69 16.00 762.80 771.50 trib 1989 Floodway 2020.07 1.01 2020.14 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Floodway 2020.61 -0.02 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Floodway 2020.83 -0.01 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Floodway 2020.88 -0.01 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Floodway 2020.91 -0.01 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Floodway 2023.41 0.02 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 HEC-RAS Plan: floodway (DEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4127 Floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 EXHIBIT D CORRECTIVE EFFECTIVE HEC-RAS MODEL HEC-RAS Plan: CEM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 20779 10-yr 30.00 2004.98 2007.19 2005.40 2007.19 0.000006 0.06 517.26 1198.11 0.01 Golf Course 20779 50-yr 54.00 2004.98 2007.80 2005.49 2007.80 0.000003 0.05 1164.72 1860.64 0.01 Golf Course 20779 100-yr 64.00 2004.98 2008.05 2005.52 2008.05 0.000002 0.04 1491.37 1985.36 0.01 Golf Course 20779 500-yr 88.00 2004.98 2008.64 2005.58 2008.64 0.000000 0.03 3229.73 2191.83 0.00 Golf Course 21013 10-yr 30.00 2007.36 2007.65 2007.65 2007.74 0.048676 2.02 13.20 348.57 0.86 Golf Course 21013 50-yr 54.00 2007.36 2007.77 2007.77 2007.86 0.043680 2.09 23.46 392.88 0.83 Golf Course 21013 100-yr 64.00 2007.36 2007.79 2007.79 2007.90 0.048191 2.30 25.52 395.42 0.89 Golf Course 21013 500-yr 88.00 2007.36 2008.64 2007.85 2008.64 0.000463 0.44 192.58 634.20 0.10 Golf Course 21128 10-yr 30.00 2007.08 2008.27 2007.75 2008.28 0.000865 0.55 54.77 320.34 0.14 Golf Course 21128 50-yr 54.00 2007.08 2008.53 2007.86 2008.54 0.001133 0.60 89.93 413.16 0.16 Golf Course 21128 100-yr 64.00 2007.08 2008.60 2007.90 2008.61 0.001181 0.62 103.84 442.77 0.16 Golf Course 21128 500-yr 88.00 2007.08 2008.77 2007.98 2008.77 0.001015 0.61 145.13 510.87 0.15 Golf Course 21229 10-yr 30.00 2006.97 2008.63 2008.48 2008.64 0.007738 0.82 36.63 445.79 0.34 Golf Course 21229 50-yr 54.00 2006.97 2008.82 2008.55 2008.83 0.002311 0.62 86.72 540.30 0.20 Golf Course 21229 100-yr 64.00 2006.97 2008.87 2008.57 2008.88 0.001925 0.63 102.09 545.70 0.19 Golf Course 21229 500-yr 88.00 2006.97 2008.98 2008.63 2008.99 0.001412 0.65 136.02 549.37 0.17 Golf Course 21385 10-yr 30.00 2008.16 2008.94 2008.47 2008.94 0.000409 0.31 97.80 268.00 0.09 Golf Course 21385 50-yr 54.00 2008.16 2009.08 2008.53 2009.08 0.000477 0.40 135.88 283.37 0.10 Golf Course 21385 100-yr 64.00 2008.16 2009.12 2008.56 2009.12 0.000512 0.43 147.76 285.92 0.11 Golf Course 21385 500-yr 88.00 2008.16 2009.22 2008.61 2009.22 0.000552 0.50 176.40 291.98 0.11 Golf Course 21409 10-yr 30.00 2008.27 2008.98 2008.68 2008.98 0.001022 0.46 64.91 246.09 0.14 Golf Course 21409 50-yr 54.00 2008.27 2009.12 2008.75 2009.13 0.001113 0.58 93.59 269.70 0.15 Golf Course 21409 100-yr 64.00 2008.27 2009.17 2008.77 2009.17 0.001210 0.62 103.41 283.87 0.16 Golf Course 21409 500-yr 88.00 2008.27 2009.27 2008.81 2009.28 0.001345 0.68 128.93 323.53 0.17 Golf Course 21431 10-yr 30.00 2008.12 2009.03 2008.45 2009.03 0.000564 0.40 74.75 174.33 0.11 Golf Course 21431 50-yr 54.00 2008.12 2009.18 2008.54 2009.18 0.000767 0.52 103.72 206.07 0.13 Golf Course 21431 100-yr 64.00 2008.12 2009.23 2008.59 2009.24 0.000845 0.56 114.48 222.73 0.14 Golf Course 21431 500-yr 88.00 2008.12 2009.34 2008.66 2009.35 0.000870 0.64 138.33 232.31 0.14 Golf Course 21445 10-yr 30.00 2008.44 2009.09 2008.89 2009.12 0.014872 1.32 22.80 104.20 0.50 Golf Course 21445 50-yr 54.00 2008.44 2009.26 2009.06 2009.28 0.007937 1.23 44.01 139.40 0.38 Golf Course 21445 100-yr 64.00 2008.44 2009.31 2009.10 2009.33 0.006788 1.24 51.65 143.41 0.36 Golf Course 21445 500-yr 88.00 2008.44 2009.42 2009.16 2009.44 0.005945 1.31 67.25 155.76 0.35 Golf Course 21456 10-yr 30.00 2012.42 2012.99 2012.99 2013.09 0.062673 2.50 12.01 61.57 1.00 Golf Course 21456 50-yr 54.00 2012.42 2013.11 2013.11 2013.21 0.060991 2.52 21.40 105.91 0.99 Golf Course 21456 100-yr 64.00 2012.42 2013.14 2013.14 2013.24 0.060320 2.61 24.55 114.71 0.99 Golf Course 21456 500-yr 88.00 2012.42 2013.18 2013.18 2013.31 0.066521 2.86 30.76 134.60 1.05 Golf Course 21481 10-yr 30.00 2011.45 2013.10 2011.82 2013.10 0.000004 0.05 549.78 595.32 0.01 Golf Course 21481 50-yr 54.00 2011.45 2013.22 2011.87 2013.22 0.000009 0.09 620.16 630.22 0.02 Golf Course 21481 100-yr 64.00 2011.45 2013.25 2011.90 2013.25 0.000011 0.10 643.07 634.13 0.02 Golf Course 21481 500-yr 88.00 2011.45 2013.33 2011.93 2013.33 0.000017 0.13 690.78 652.52 0.02 Golf Course 21498 10-yr 30.00 2012.65 2013.10 2012.84 2013.10 0.000056 0.27 109.69 444.23 0.10 Golf Course 21498 50-yr 54.00 2012.65 2013.22 2012.88 2013.22 0.000054 0.33 162.14 474.35 0.10 Golf Course 21498 100-yr 64.00 2012.65 2013.25 2012.90 2013.25 0.000055 0.36 179.46 484.20 0.10 Golf Course 21498 500-yr 88.00 2012.65 2013.33 2012.93 2013.33 0.000060 0.41 215.90 504.29 0.11 Golf Course 21515 10-yr 30.00 2011.56 2013.10 2011.87 2013.10 0.000008 0.07 433.79 593.18 0.01 Golf Course 21515 50-yr 54.00 2011.56 2013.22 2011.95 2013.22 0.000017 0.11 503.54 618.93 0.02 Golf Course 21515 100-yr 64.00 2011.56 2013.25 2011.97 2013.25 0.000021 0.12 526.14 622.80 0.02 Golf Course 21515 500-yr 88.00 2011.56 2013.33 2012.03 2013.33 0.000030 0.15 572.72 629.20 0.03 Golf Course 21548 10-yr 30.00 2011.58 2013.10 2011.87 2013.10 0.000010 0.08 396.81 568.59 0.02 Golf Course 21548 50-yr 54.00 2011.58 2013.22 2011.95 2013.22 0.000021 0.12 463.57 589.56 0.02 Golf Course 21548 100-yr 64.00 2011.58 2013.26 2011.98 2013.26 0.000026 0.13 485.42 599.31 0.03 Golf Course 21548 500-yr 88.00 2011.58 2013.33 2012.04 2013.33 0.000038 0.17 530.92 614.56 0.03 Golf Course 21924 10-yr 30.00 2012.11 2013.11 2012.42 2013.11 0.000093 0.20 148.44 251.22 0.05 Golf Course 21924 50-yr 54.00 2012.11 2013.23 2012.49 2013.23 0.000167 0.30 179.56 258.76 0.06 Golf Course 21924 100-yr 64.00 2012.11 2013.27 2012.52 2013.27 0.000195 0.34 189.88 259.65 0.07 Golf Course 21924 500-yr 88.00 2012.11 2013.35 2012.57 2013.36 0.000266 0.42 211.26 265.30 0.08 Golf Course 21983 10-yr 30.00 2012.09 2013.13 2012.50 2013.13 0.000418 0.40 75.17 141.06 0.10 Golf Course 21983 50-yr 54.00 2012.09 2013.27 2012.61 2013.27 0.000767 0.56 96.56 172.34 0.13 Golf Course 21983 100-yr 64.00 2012.09 2013.32 2012.64 2013.32 0.000865 0.61 104.55 178.33 0.14 Golf Course 21983 500-yr 88.00 2012.09 2013.41 2012.71 2013.42 0.001017 0.72 121.49 181.73 0.16 Golf Course 22423 10-yr 30.00 2012.71 2013.36 2012.98 2013.37 0.000703 0.44 68.12 162.80 0.12 Golf Course 22423 50-yr 54.00 2012.71 2013.58 2013.05 2013.59 0.000666 0.50 107.27 201.62 0.12 Golf Course 22423 100-yr 64.00 2012.71 2013.64 2013.07 2013.65 0.000657 0.54 119.62 202.97 0.12 Golf Course 22423 500-yr 88.00 2012.71 2013.78 2013.12 2013.78 0.000685 0.60 147.29 218.55 0.13 HEC-RAS Plan: CEM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 22972 10-yr 30.00 2013.92 2014.45 2014.45 2014.57 0.060483 2.73 11.00 48.16 1.01 Golf Course 22972 50-yr 54.00 2013.92 2014.57 2014.57 2014.72 0.053502 3.19 16.92 53.41 1.00 Golf Course 22972 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.053592 3.40 18.85 54.26 1.02 Golf Course 22972 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050499 3.73 23.57 56.30 1.02 Golf Course 23005 10-yr 30.00 2014.38 2015.05 2014.75 2015.05 0.001933 0.69 43.31 112.20 0.20 Golf Course 23005 50-yr 54.00 2014.38 2015.22 2014.83 2015.23 0.002055 0.84 64.26 130.44 0.21 Golf Course 23005 100-yr 64.00 2014.38 2015.28 2014.86 2015.29 0.002061 0.89 72.19 135.49 0.21 Golf Course 23005 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002172 0.95 93.00 164.64 0.22 Golf Course 23050 10-yr 30.00 2014.61 2015.16 2014.87 2015.16 0.001938 0.64 46.54 134.52 0.19 Golf Course 23050 50-yr 54.00 2014.61 2015.33 2014.95 2015.34 0.001739 0.76 71.24 148.91 0.19 Golf Course 23050 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 23050 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001567 0.87 101.34 159.73 0.19 Golf Course 23090 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.005092 0.93 32.35 111.85 0.30 Golf Course 23090 50-yr 54.00 2014.93 2015.60 2015.34 2015.61 0.004889 1.03 52.56 151.12 0.31 Golf Course 23090 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 23090 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 23446 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012459 1.10 27.17 141.49 0.44 Golf Course 23446 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012670 1.24 43.59 193.33 0.46 Golf Course 23446 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 23446 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 23887 10-yr 30.00 2022.25 2022.83 2022.66 2022.84 0.005714 0.89 33.70 135.04 0.31 Golf Course 23887 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005672 1.06 51.18 158.01 0.33 Golf Course 23887 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 23887 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 24430 10-yr 30.00 2028.58 2029.25 2029.25 2029.46 0.048764 3.65 8.29 21.75 1.00 Golf Course 24430 50-yr 54.00 2028.58 2029.47 2029.47 2029.73 0.037372 4.21 13.58 28.66 0.94 Golf Course 24430 100-yr 64.00 2028.58 2029.56 2029.56 2029.82 0.031201 4.22 16.81 37.07 0.88 Golf Course 24430 500-yr 88.00 2028.58 2029.72 2029.72 2029.99 0.026137 4.41 23.23 42.98 0.83 HEC-RAS Plan: CEM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course 20779 Q100 - base 2008.05 2008.05 1327.67 64.00 934.91 2798.66 Golf Course 20779 Q100 - floodway 2009.05 1.00 2009.05 1178.72 64.00 934.91 934.91 2798.66 2278.72 Golf Course 21013 Q100 - base 2008.05 2008.07 147.76 52.43 11.57 508.09 1602.56 Golf Course 21013 Q100 - floodway 2009.05 1.00 2009.05 173.18 52.98 11.02 1472.43 508.09 1602.56 1725.00 Golf Course 21128 Q100 - base 2008.53 2008.54 190.90 64.00 409.35 1512.91 Golf Course 21128 Q100 - floodway 2009.05 0.52 2009.11 25.00 64.00 1045.00 409.35 1512.91 1070.00 Golf Course 21229 Q100 - base 2008.86 2008.87 305.94 64.00 417.95 1452.44 Golf Course 21229 Q100 - floodway 2009.59 0.72 2009.62 35.00 64.00 985.00 417.95 1452.44 1020.00 Golf Course 21385 Q100 - base 2009.12 2009.12 285.78 64.00 431.52 1001.23 Golf Course 21385 Q100 - floodway 2010.03 0.91 2010.06 30.00 64.00 785.00 431.52 1001.23 815.00 Golf Course 21409 Q100 - base 2009.17 2009.17 222.73 64.00 426.69 980.16 Golf Course 21409 Q100 - floodway 2010.12 0.95 2010.16 25.00 64.00 728.00 426.69 980.16 753.00 Golf Course 21431 Q100 - base 2009.23 2009.24 219.68 64.00 440.00 961.58 Golf Course 21431 Q100 - floodway 2010.23 1.00 2010.26 25.00 64.00 700.00 440.00 961.58 725.00 Golf Course 21445 Q100 - base 2009.31 2009.33 143.36 64.00 440.70 949.64 Golf Course 21445 Q100 - floodway 2010.29 0.98 2010.37 20.00 64.00 683.00 440.70 949.64 703.00 Golf Course 21456 Q100 - base 2013.14 2013.24 114.71 64.00 0.00 937.26 Golf Course 21456 Q100 - floodway 2013.79 0.65 2014.05 30.00 64.00 595.00 0.00 937.26 625.00 Golf Course 21481 Q100 - base 2013.25 2013.25 634.13 64.00 494.28 1387.02 Golf Course 21481 Q100 - floodway 2014.10 0.85 2014.11 37.00 64.00 1073.00 494.28 1387.02 1110.00 Golf Course 21498 Q100 - base 2013.25 2013.25 484.20 64.00 0.00 911.00 Golf Course 21498 Q100 - floodway 2014.10 0.84 2014.12 40.00 64.00 560.00 0.00 911.00 600.00 Golf Course 21515 Q100 - base 2013.25 2013.25 622.80 64.00 0.00 888.69 Golf Course 21515 Q100 - floodway 2014.11 0.86 2014.12 44.00 64.00 507.00 0.00 888.69 551.00 Golf Course 21548 Q100 - base 2013.26 2013.26 599.31 64.00 0.00 1025.25 Golf Course 21548 Q100 - floodway 2014.13 0.88 2014.14 45.00 64.00 482.00 0.00 1025.25 527.00 Golf Course 21924 Q100 - base 2013.27 2013.27 259.65 64.00 791.72 1477.35 Golf Course 21924 Q100 - floodway 2014.21 0.94 2014.22 43.00 64.00 975.00 791.72 1477.35 1018.00 Golf Course 21983 Q100 - base 2013.32 2013.32 178.33 64.00 0.00 248.45 Golf Course 21983 Q100 - floodway 2014.26 0.94 2014.27 36.00 64.00 102.00 0.00 248.45 138.00 Golf Course 22423 Q100 - base 2013.64 2013.65 202.97 64.00 843.00 1600.75 Golf Course 22423 Q100 - floodway 2014.47 0.82 2014.48 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 22972 Q100 - base 2014.60 2014.78 54.26 64.00 759.64 1718.25 Golf Course 22972 Q100 - floodway 2015.26 0.66 2015.70 14.13 64.00 1162.20 759.64 1718.25 1176.33 Golf Course 23005 Q100 - base 2015.28 2015.29 135.49 64.00 729.92 1627.92 Golf Course 23005 Q100 - floodway 2016.10 0.83 2016.14 27.34 64.00 1123.02 729.92 1627.92 1150.36 Golf Course 23050 Q100 - base 2015.39 2015.40 151.92 64.00 763.22 1639.53 Golf Course 23050 Q100 - floodway 2016.21 0.82 2016.27 22.35 64.00 1126.64 763.22 1639.53 1148.99 Golf Course 23090 Q100 - base 2015.65 2015.66 154.59 64.00 768.88 1659.11 Golf Course 23090 Q100 - floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 768.88 1659.11 1115.00 Golf Course 23446 Q100 - base 2018.10 2018.12 208.12 64.00 688.98 1310.47 Golf Course 23446 Q100 - floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 23887 Q100 - base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 23887 Q100 - floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 24430 Q100 - base 2029.56 2029.82 37.07 1.56 60.23 2.21 636.32 656.04 Golf Course 24430 Q100 - floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 636.32 656.04 656.04 HEC-RAS Plan: wl (CEM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 1.00 2004.70 2007.19 2004.82 2007.19 0.000000 0.01 97.62 92.00 0.00 trib -1303 Q50 2.00 2004.70 2007.80 2004.87 2007.80 0.000000 0.01 156.26 99.90 0.00 trib -1303 Q100 4.00 2004.70 2008.05 2004.90 2008.05 0.000000 0.02 181.64 103.69 0.00 trib -1303 Q500 7.00 2004.70 2008.64 2004.96 2008.64 0.000000 0.03 245.69 113.41 0.00 trib -1019 Q10 1.00 2007.91 2008.27 2008.27 2008.30 0.103616 1.40 0.72 31.55 1.04 trib -1019 Q50 2.00 2007.91 2008.31 2008.31 2008.35 0.096308 1.67 1.20 38.26 1.06 trib -1019 Q100 4.00 2007.91 2008.36 2008.36 2008.41 0.077292 1.83 2.19 47.75 1.00 trib -1019 Q500 7.00 2007.91 2008.64 2008.41 2008.64 0.002258 0.58 12.11 93.29 0.20 trib -880 Q10 1.00 2004.89 2008.31 2008.31 0.000000 0.00 721.14 359.15 0.00 trib -880 Q50 2.00 2004.89 2008.35 2008.35 0.000000 0.00 738.57 359.95 0.00 trib -880 Q100 4.00 2004.89 2008.42 2008.42 0.000000 0.01 761.51 361.60 0.00 trib -880 Q500 7.00 2004.89 2008.64 2008.64 0.000000 0.01 843.68 368.58 0.00 trib -466 Q10 1.00 2006.89 2008.31 2008.31 0.000000 0.00 410.09 380.79 0.00 trib -466 Q50 2.00 2006.89 2008.35 2008.35 0.000000 0.00 428.60 384.48 0.00 trib -466 Q100 4.00 2006.89 2008.42 2008.42 0.000000 0.01 453.25 388.60 0.00 trib -466 Q500 7.00 2006.89 2008.64 2008.64 0.000000 0.01 542.61 403.49 0.00 trib -89 Q10 1.00 2006.07 2008.31 2008.31 0.000000 0.00 449.29 336.12 0.00 trib -89 Q50 2.00 2006.07 2008.35 2008.35 0.000000 0.00 465.65 339.05 0.00 trib -89 Q100 4.00 2006.07 2008.42 2008.42 0.000000 0.01 487.40 345.54 0.00 trib -89 Q500 7.00 2006.07 2008.64 2008.64 0.000000 0.01 571.23 388.66 0.00 trib 1 Q10 1.00 1998.92 2005.00 2005.00 0.000000 0.00 225.97 48.42 0.00 trib 1 Q50 2.00 1998.92 2009.60 2009.60 0.000000 0.00 540.96 101.33 0.00 trib 1 Q100 4.00 1998.92 2009.70 2009.70 0.000000 0.01 551.13 102.16 0.00 trib 1 Q500 7.00 1998.92 2010.00 2010.00 0.000000 0.01 582.15 104.63 0.00 trib 149 Q10 10.00 1995.82 2005.00 1996.32 2005.00 0.000000 0.01 1141.63 165.71 0.00 trib 149 Q50 14.00 1995.82 2009.60 1996.38 2009.60 0.000000 0.01 1924.52 175.82 0.00 trib 149 Q100 16.00 1995.82 2009.70 1996.41 2009.70 0.000000 0.01 1942.12 176.16 0.00 trib 149 Q500 20.00 1995.82 2010.00 1996.46 2010.00 0.000000 0.01 1995.13 177.19 0.00 trib 343 Q10 10.00 1993.64 2005.00 1993.99 2005.00 0.000000 0.01 1993.17 252.43 0.00 trib 343 Q50 14.00 1993.64 2009.60 1994.05 2009.60 0.000000 0.00 3182.15 266.09 0.00 trib 343 Q100 16.00 1993.64 2009.70 1994.07 2009.70 0.000000 0.00 3208.78 266.57 0.00 trib 343 Q500 20.00 1993.64 2010.00 1994.11 2010.00 0.000000 0.01 3288.97 267.99 0.00 trib 383 Q10 10.00 1994.23 2005.00 1994.67 2005.00 0.000000 0.01 1938.50 222.78 0.00 trib 383 Q50 14.00 1994.23 2009.60 1994.71 2009.60 0.000000 0.00 3052.64 279.70 0.00 trib 383 Q100 16.00 1994.23 2009.70 1994.73 2009.70 0.000000 0.01 3080.61 279.97 0.00 trib 383 Q500 20.00 1994.23 2010.00 1994.75 2010.00 0.000000 0.01 3164.74 280.78 0.00 trib 472 Q10 10.00 2005.65 2005.00 1999.14 2005.00 0.000000 477.69 135.83 0.00 trib 472 Q50 14.00 2005.65 2009.60 1999.19 2009.60 0.000000 0.01 1255.59 189.45 0.00 trib 472 Q100 16.00 2005.65 2009.70 1999.22 2009.70 0.000000 0.01 1274.72 193.16 0.00 trib 472 Q500 20.00 2005.65 2010.00 1999.26 2010.00 0.000000 0.01 1334.21 203.55 0.00 trib 576 Q10 10.00 2008.78 2009.74 2009.74 2009.99 0.032554 4.02 2.48 4.97 1.00 trib 576 Q50 14.00 2008.78 2009.89 2009.89 2010.17 0.030449 4.27 3.28 5.70 0.99 trib 576 Q100 16.00 2008.78 2009.95 2009.95 2010.25 0.030780 4.43 3.61 5.98 1.01 trib 576 Q500 20.00 2008.78 2010.20 2010.20 2010.37 0.028407 3.36 6.36 21.88 0.93 trib 651 Q10 10.00 2009.50 2010.74 2010.48 2010.78 0.004980 1.88 7.84 29.35 0.41 trib 651 Q50 14.00 2009.50 2010.85 2010.68 2010.89 0.004366 1.86 12.04 39.94 0.39 trib 651 Q100 16.00 2009.50 2010.95 2010.71 2010.96 0.004364 1.23 16.50 54.47 0.36 trib 651 Q500 20.00 2009.50 2011.00 2010.77 2011.02 0.004026 1.28 19.68 56.58 0.35 trib 918 Q10 10.00 2009.10 2011.17 2009.95 2011.19 0.000735 1.08 9.22 6.85 0.16 trib 918 Q50 14.00 2009.10 2011.35 2010.09 2011.38 0.001018 1.33 10.62 9.40 0.20 trib 918 Q100 16.00 2009.10 2011.45 2010.17 2011.48 0.001099 1.42 11.64 11.27 0.20 trib 918 Q500 20.00 2009.10 2011.57 2010.29 2011.61 0.001361 1.62 13.89 36.25 0.23 trib 1472 Q10 10.00 2011.44 2012.38 2012.38 2012.67 0.032363 4.35 2.30 3.82 0.99 trib 1472 Q50 14.00 2011.44 2012.69 2012.53 2012.92 0.018459 3.88 3.61 4.56 0.77 trib 1472 Q100 16.00 2011.44 2012.83 2012.61 2013.05 0.015065 3.73 4.29 4.89 0.70 trib 1472 Q500 20.00 2011.44 2013.11 2012.75 2013.30 0.010804 3.50 5.72 5.54 0.61 trib 1510 Q10 10.00 2011.15 2012.95 2012.17 2013.00 0.002787 1.77 5.66 5.40 0.30 trib 1510 Q50 14.00 2011.15 2013.16 2012.35 2013.22 0.003332 2.06 6.81 5.90 0.34 trib 1510 Q100 16.00 2011.15 2013.26 2012.43 2013.33 0.003444 2.15 7.44 6.16 0.35 trib 1510 Q500 20.00 2011.15 2013.46 2012.58 2013.55 0.003501 2.29 8.75 6.67 0.35 trib 1520 Culvert trib 1528 Q10 10.00 2010.84 2013.36 2011.82 2013.38 0.000963 1.00 9.96 6.88 0.15 HEC-RAS Plan: wl (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2010.84 2013.97 2012.00 2013.98 0.000694 0.96 14.55 8.35 0.13 trib 1528 Q100 16.00 2010.84 2014.30 2012.07 2014.32 0.000575 0.91 17.51 9.51 0.12 trib 1528 Q500 20.00 2010.84 2014.61 2012.23 2014.63 0.000672 0.91 25.24 51.66 0.13 trib 1557 Q10 10.00 2011.79 2013.39 2012.66 2013.44 0.003820 1.69 5.91 5.64 0.29 trib 1557 Q50 14.00 2011.79 2013.98 2012.81 2014.02 0.002007 1.45 9.63 6.90 0.22 trib 1557 Q100 16.00 2011.79 2014.32 2012.88 2014.35 0.001437 1.33 12.04 7.61 0.19 trib 1557 Q500 20.00 2011.79 2014.63 2013.01 2014.66 0.001366 1.38 14.51 8.27 0.18 trib 1963 Q10 10.00 2018.61 2019.48 2019.48 2019.66 0.051975 3.44 2.91 7.79 0.99 trib 1963 Q50 14.00 2018.61 2019.59 2019.59 2019.80 0.045074 3.61 3.92 11.07 0.95 trib 1963 Q100 16.00 2018.61 2019.66 2019.66 2019.85 0.038218 3.52 4.80 15.48 0.89 trib 1963 Q500 20.00 2018.61 2019.75 2019.75 2019.93 0.033517 3.48 6.39 18.55 0.84 trib 1989 Q10 10.00 2017.77 2019.85 2018.80 2019.89 0.002658 1.50 6.69 17.19 0.24 trib 1989 Q50 14.00 2017.77 2020.01 2018.98 2020.06 0.003491 1.86 7.54 40.62 0.28 trib 1989 Q100 16.00 2017.77 2020.06 2019.06 2020.12 0.004030 2.04 7.83 48.44 0.30 trib 1989 Q500 20.00 2017.77 2020.14 2019.22 2020.23 0.005238 2.42 8.27 60.64 0.35 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.19 2019.81 2020.30 0.009432 2.61 3.83 8.68 0.47 trib 2080 Q50 14.00 2018.73 2020.48 2019.96 2020.60 0.007671 2.81 4.99 12.81 0.44 trib 2080 Q100 16.00 2018.73 2020.61 2020.02 2020.74 0.007173 2.90 5.51 14.87 0.44 trib 2080 Q500 20.00 2018.73 2020.86 2020.15 2021.01 0.006452 3.07 6.51 18.47 0.42 trib 2100 Q10 12.00 2018.27 2020.39 2019.40 2020.41 0.002032 1.15 10.46 12.11 0.22 trib 2100 Q50 24.00 2018.27 2020.70 2019.86 2020.74 0.003396 1.65 14.58 14.51 0.29 trib 2100 Q100 30.00 2018.27 2020.83 2020.00 2020.88 0.003580 1.82 16.55 15.31 0.30 trib 2100 Q500 46.00 2018.27 2021.08 2020.26 2021.16 0.004409 2.26 20.54 16.79 0.35 trib 2110 Q10 12.00 2018.27 2020.42 2019.40 2020.43 0.001881 1.11 10.78 12.31 0.21 trib 2110 Q50 24.00 2018.27 2020.74 2019.87 2020.78 0.002981 1.58 15.21 14.78 0.27 trib 2110 Q100 30.00 2018.27 2020.88 2020.00 2020.92 0.003147 1.74 17.27 15.59 0.29 trib 2110 Q500 46.00 2018.27 2021.14 2020.26 2021.21 0.003840 2.17 21.53 17.14 0.32 trib 2120 Q10 12.00 2018.27 2020.44 2019.40 2020.45 0.001769 1.09 11.03 12.47 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.81 0.002698 1.53 15.70 14.97 0.26 trib 2120 Q100 30.00 2018.27 2020.91 2020.00 2020.96 0.002861 1.69 17.82 15.80 0.27 trib 2120 Q500 46.00 2018.27 2021.18 2020.26 2021.25 0.003471 2.10 22.30 17.41 0.31 trib 2651 Q10 12.00 2021.38 2022.48 2022.22 2022.62 0.016295 2.96 4.05 5.21 0.59 trib 2651 Q50 24.00 2021.38 2023.16 2022.58 2023.30 0.009750 3.00 8.00 6.47 0.48 trib 2651 Q100 30.00 2021.38 2023.40 2022.73 2023.55 0.009769 3.10 9.67 7.51 0.48 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008805 3.30 14.05 10.00 0.47 trib 3126 Q10 12.00 2023.82 2025.45 2024.69 2025.49 0.003114 1.53 7.84 7.78 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003750 1.97 12.18 9.47 0.31 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.25 0.003704 2.08 14.43 10.23 0.31 trib 3126 Q500 46.00 2023.82 2026.65 2025.48 2026.74 0.003902 2.35 19.60 12.06 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003060 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: wl (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031974 4.34 5.07 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.006997 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wl FW (CEM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Q100 base 2008.05 2008.05 103.69 0.01 3.90 0.09 70.92 163.31 trib -1303 Q100 floodway 2009.05 1.00 2009.05 31.32 4.00 131.99 70.92 163.31 163.31 trib -1019 Q100 base 2008.36 2008.41 21.08 4.00 152.95 253.19 trib -1019 Q100 floodway 2009.05 0.69 2009.05 21.09 4.00 173.33 152.95 253.19 194.42 trib -880 Q100 base 2008.42 2008.42 361.60 0.08 3.92 0.01 62.73 380.37 trib -880 Q100 floodway 2009.05 0.63 2009.05 40.00 4.00 310.00 62.73 380.37 350.00 trib -466 Q100 base 2008.42 2008.42 388.60 4.00 0.00 129.52 566.57 trib -466 Q100 floodway 2009.05 0.64 2009.05 45.57 4.00 521.00 129.52 566.57 566.57 trib -89 Q100 base 2008.42 2008.42 345.54 4.00 144.89 581.16 trib -89 Q100 floodway 2009.05 0.64 2009.05 39.70 4.00 510.00 144.89 581.16 549.70 trib 1 Q100 base 2009.70 2009.70 102.16 4.00 461.25 568.10 trib 1 Q100 floodway 2010.70 1.00 2010.70 116.77 0.00 4.00 461.25 568.10 trib 149 Q100 base 2009.70 2009.70 176.16 16.00 421.08 606.95 trib 149 Q100 floodway 2010.70 1.00 2010.70 179.75 16.00 421.08 606.95 trib 343 Q100 base 2009.70 2009.70 266.57 16.00 410.55 678.07 trib 343 Q100 floodway 2010.70 1.00 2010.70 271.14 0.00 16.00 0.00 410.55 678.07 trib 383 Q100 base 2009.70 2009.70 279.97 16.00 0.00 397.28 677.14 trib 383 Q100 floodway 2010.70 1.00 2010.70 282.66 16.00 0.00 397.28 677.14 trib 472 Q100 base 2009.70 2009.70 193.16 0.12 15.88 340.55 365.05 trib 472 Q100 floodway 2010.70 1.00 2010.70 8.82 16.00 347.00 340.55 365.05 355.82 trib 576 Q100 base 2009.95 2010.25 5.98 16.00 361.81 384.61 trib 576 Q100 floodway 2010.67 0.73 2010.75 5.41 16.00 368.20 361.81 384.61 373.61 trib 651 Q100 base 2010.95 2010.96 54.47 6.94 9.06 360.31 384.41 trib 651 Q100 floodway 2011.07 0.12 2011.14 15.66 16.00 367.72 360.31 384.41 384.41 trib 918 Q100 base 2011.45 2011.48 11.27 15.90 0.10 466.95 478.43 trib 918 Q100 floodway 2011.63 0.18 2011.66 7.59 16.00 468.53 466.95 478.43 478.43 trib 1472 Q100 base 2012.83 2013.05 4.89 16.00 706.41 714.93 trib 1472 Q100 floodway 2012.71 -0.12 2013.00 4.61 16.00 708.23 706.41 714.93 713.11 trib 1510 Q100 base 2013.26 2013.33 6.16 16.00 711.73 722.04 trib 1510 Q100 floodway 2013.26 0.00 2013.33 6.16 16.00 714.06 711.73 722.04 720.22 trib 1520 Culvert trib 1528 Q100 base 2014.30 2014.32 9.51 16.00 727.15 744.68 trib 1528 Q100 floodway 2014.31 0.00 2014.32 9.50 16.00 727.56 727.15 744.68 737.06 trib 1557 Q100 base 2014.32 2014.35 7.61 16.00 726.74 740.03 trib 1557 Q100 floodway 2014.32 0.00 2014.35 7.61 16.00 730.81 726.74 740.03 738.42 trib 1963 Q100 base 2019.66 2019.85 15.48 15.72 0.28 739.45 750.61 trib 1963 Q100 floodway 2019.63 -0.03 2019.86 8.89 16.00 741.45 739.45 750.61 750.61 trib 1989 Q100 base 2020.06 2020.12 5.50 16.00 762.80 771.50 trib 1989 Q100 floodway 2020.08 0.02 2020.15 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Q100 base 2020.61 2020.74 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.61 0.00 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.83 2020.88 15.31 0.01 29.99 44.23 60.09 trib 2100 Q100 floodway 2020.83 0.00 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.88 2020.92 15.59 0.02 29.98 44.23 60.09 trib 2110 Q100 floodway 2020.88 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.91 2020.96 15.80 0.03 29.97 44.23 60.09 trib 2120 Q100 floodway 2020.92 0.00 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.40 2023.55 7.51 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.25 10.23 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 HEC-RAS Plan: wl FW (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: wo DS lev (CEM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 10.00 2004.70 2007.19 2005.00 2007.19 0.000006 0.13 97.62 92.00 0.02 trib -1303 Q50 14.00 2004.70 2007.80 2005.05 2007.80 0.000004 0.12 156.26 99.90 0.01 trib -1303 Q100 16.00 2004.70 2008.05 2005.07 2008.05 0.000003 0.12 181.64 103.69 0.01 trib -1303 Q500 20.00 2004.70 2008.64 2005.11 2008.64 0.000002 0.11 245.69 113.41 0.01 trib -1019 Q10 10.00 2008.18 2008.47 2008.47 2008.54 0.040241 2.34 5.15 65.40 0.83 trib -1019 Q50 14.00 2008.18 2008.51 2008.51 2008.59 0.039441 2.57 6.69 70.95 0.84 trib -1019 Q100 16.00 2008.18 2008.52 2008.52 2008.62 0.045491 2.81 7.00 71.61 0.91 trib -1019 Q500 20.00 2008.18 2008.64 2008.56 2008.65 0.003347 0.96 26.15 93.34 0.26 trib -880 Q10 10.00 2007.31 2008.55 2005.25 2008.55 0.000000 0.01 808.03 365.13 0.00 trib -880 Q50 14.00 2007.31 2008.60 2005.30 2008.60 0.000000 0.01 828.10 367.06 0.00 trib -880 Q100 16.00 2007.31 2008.63 2005.32 2008.63 0.000000 0.01 837.43 367.97 0.00 trib -880 Q500 20.00 2007.31 2008.65 2005.36 2008.65 0.000000 0.01 845.25 368.73 0.00 trib -466 Q10 10.00 2006.96 2008.55 2007.05 2008.55 0.000000 0.02 503.64 396.88 0.00 trib -466 Q50 14.00 2006.96 2008.60 2007.08 2008.60 0.000001 0.03 525.58 402.65 0.00 trib -466 Q100 16.00 2006.96 2008.63 2007.08 2008.63 0.000001 0.03 535.81 403.22 0.00 trib -466 Q500 20.00 2006.96 2008.65 2007.08 2008.65 0.000001 0.04 544.38 403.56 0.01 trib -89 Q10 10.00 2007.09 2008.55 2006.35 2008.55 0.000000 0.02 533.76 381.64 0.00 trib -89 Q50 14.00 2007.09 2008.60 2006.40 2008.60 0.000000 0.02 554.94 387.29 0.00 trib -89 Q100 16.00 2007.09 2008.63 2006.43 2008.63 0.000001 0.03 564.78 388.12 0.00 trib -89 Q500 20.00 2007.09 2008.65 2006.47 2008.65 0.000001 0.03 573.08 388.82 0.00 trib 1 Q10 10.00 2008.30 2008.57 2008.57 2008.61 0.049508 2.23 7.05 92.01 0.89 trib 1 Q50 14.00 2008.30 2008.60 2008.60 2008.64 0.049091 2.40 9.47 106.80 0.90 trib 1 Q100 16.00 2008.30 2008.61 2008.61 2008.65 0.045516 2.40 10.81 112.72 0.88 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q10 10.00 2007.52 2008.62 2006.65 2008.62 0.000000 0.01 417.66 269.94 0.00 trib 149 Q50 14.00 2007.52 2008.65 2006.70 2008.65 0.000001 0.02 425.25 270.23 0.00 trib 149 Q100 16.00 2007.52 2008.66 2006.72 2008.66 0.000001 0.02 428.28 270.35 0.00 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q10 10.00 2008.18 2008.62 2007.06 2008.62 0.000001 0.02 272.09 279.48 0.01 trib 343 Q50 14.00 2008.18 2008.65 2007.13 2008.65 0.000003 0.03 279.96 281.03 0.01 trib 343 Q100 16.00 2008.18 2008.66 2007.16 2008.66 0.000003 0.03 283.12 281.64 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q10 10.00 2008.42 2008.62 2007.33 2008.62 0.000003 0.01 193.97 213.44 0.01 trib 383 Q50 14.00 2008.42 2008.65 2007.36 2008.65 0.000006 0.02 199.96 214.83 0.01 trib 383 Q100 16.00 2008.42 2008.66 2007.37 2008.66 0.000007 0.03 202.37 215.39 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q10 10.00 2008.50 2008.62 2007.46 2008.62 0.000008 0.01 146.81 211.42 0.01 trib 472 Q50 14.00 2008.50 2008.65 2007.50 2008.65 0.000014 0.02 152.88 213.77 0.01 trib 472 Q100 16.00 2008.50 2008.66 2007.52 2008.66 0.000017 0.03 155.34 214.71 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q10 10.00 2008.57 2008.62 2007.79 2008.62 0.000034 0.02 83.84 150.04 0.02 trib 576 Q50 14.00 2008.57 2008.65 2007.83 2008.65 0.000057 0.03 88.33 153.40 0.02 trib 576 Q100 16.00 2008.57 2008.66 2007.84 2008.66 0.000069 0.03 90.17 154.76 0.03 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q10 10.00 2011.11 2011.18 2011.18 2011.22 0.097087 0.90 6.25 88.01 0.91 trib 651 Q50 14.00 2011.11 2011.20 2011.20 2011.24 0.084641 1.01 8.16 94.94 0.89 trib 651 Q100 16.00 2011.11 2011.21 2011.21 2011.26 0.076146 1.09 9.16 96.15 0.87 trib 651 Q500 20.00 2011.11 2011.22 2011.22 2011.28 0.078399 1.27 10.44 97.72 0.92 trib 918 Q10 10.00 2009.84 2011.22 2010.09 2011.22 0.000004 0.07 191.15 223.46 0.01 trib 918 Q50 14.00 2009.84 2011.25 2010.13 2011.25 0.000006 0.09 197.86 227.01 0.01 trib 918 Q100 16.00 2009.84 2011.27 2010.15 2011.27 0.000008 0.10 200.97 230.82 0.02 trib 918 Q500 20.00 2009.84 2011.30 2010.16 2011.30 0.000012 0.13 207.29 233.18 0.02 trib 1472 Q10 10.00 2013.44 2013.73 2013.73 2013.78 0.038164 2.06 6.11 55.33 0.79 trib 1472 Q50 14.00 2013.44 2013.76 2013.76 2013.82 0.041668 2.34 7.74 62.95 0.84 trib 1472 Q100 16.00 2013.44 2013.77 2013.77 2013.84 0.039601 2.38 8.80 67.96 0.83 trib 1472 Q500 20.00 2013.44 2013.80 2013.80 2013.87 0.039038 2.52 10.69 77.87 0.84 trib 1510 Q10 10.00 2013.81 2014.06 2013.90 2014.06 0.002778 0.39 19.89 120.64 0.19 trib 1510 Q50 14.00 2013.81 2014.10 2013.94 2014.11 0.002801 0.43 25.50 126.84 0.20 trib 1510 Q100 16.00 2013.81 2014.12 2013.95 2014.13 0.002776 0.45 27.85 129.47 0.20 trib 1510 Q500 20.00 2013.81 2014.15 2013.97 2014.16 0.002826 0.50 31.99 137.40 0.21 trib 1520 Culvert trib 1528 Q10 10.00 2013.78 2014.06 2013.93 2014.06 0.005201 0.69 15.56 100.95 0.28 HEC-RAS Plan: wo DS lev (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2013.78 2014.10 2013.95 2014.11 0.004983 0.76 20.57 116.23 0.29 trib 1528 Q100 16.00 2013.78 2014.12 2013.97 2014.13 0.005184 0.82 22.52 118.90 0.30 trib 1528 Q500 20.00 2013.78 2014.16 2013.99 2014.17 0.004648 0.85 26.76 122.07 0.29 trib 1557 Q10 10.00 2014.07 2014.21 2014.05 2014.21 0.004529 0.32 16.54 122.35 0.22 trib 1557 Q50 14.00 2014.07 2014.25 2014.10 2014.26 0.004585 0.37 22.60 137.57 0.23 trib 1557 Q100 16.00 2014.07 2014.27 2014.12 2014.27 0.004521 0.42 24.77 140.38 0.24 trib 1557 Q500 20.00 2014.07 2014.29 2014.14 2014.30 0.004640 0.50 28.53 145.80 0.25 trib 1963 Q10 10.00 2015.81 2016.24 2016.10 2016.26 0.007062 1.07 10.25 52.15 0.36 trib 1963 Q50 14.00 2015.81 2016.29 2016.15 2016.31 0.007097 1.20 13.09 56.60 0.37 trib 1963 Q100 16.00 2015.81 2016.31 2016.17 2016.33 0.007323 1.27 14.25 57.48 0.38 trib 1963 Q500 20.00 2015.81 2016.35 2016.20 2016.38 0.007236 1.36 16.68 58.71 0.38 trib 1989 Q10 10.00 2017.77 2018.80 2018.80 2019.13 0.055202 4.65 2.15 3.23 1.00 trib 1989 Q50 14.00 2017.77 2018.98 2018.98 2019.38 0.054111 5.05 2.77 3.54 1.01 trib 1989 Q100 16.00 2017.77 2019.07 2019.07 2019.48 0.052722 5.18 3.09 3.69 1.00 trib 1989 Q500 20.00 2017.77 2019.22 2019.22 2019.68 0.051664 5.45 3.67 3.94 0.99 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001965 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003293 1.63 14.74 14.59 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003479 1.80 16.71 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004326 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001824 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002895 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003072 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001720 1.08 11.15 12.55 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002629 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002801 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017129 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.15 2022.58 2023.29 0.009975 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009967 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003063 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003719 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: wo DS lev (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.12 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2047.39 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2047.50 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.43 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031946 4.33 5.08 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2051.88 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.007005 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wo ds fw (CEM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Base 2008.05 2008.05 103.69 5.34 9.25 1.41 134.37 158.76 trib -1303 Floodway 2009.05 1.00 2009.05 31.32 0.63 13.98 1.39 131.99 134.37 158.76 163.31 trib -1019 Base 2008.52 2008.62 38.92 3.31 11.46 1.24 178.65 192.41 trib -1019 Floodway 2009.04 0.53 2009.06 21.09 3.29 11.59 1.12 173.33 178.65 192.41 194.42 trib -880 Base 2008.63 2008.63 367.97 14.91 0.33 0.76 316.80 341.31 trib -880 Floodway 2009.07 0.45 2009.07 40.00 2.68 9.02 4.30 310.00 316.80 341.31 350.00 trib -466 Base 2008.63 2008.63 403.22 15.45 0.52 0.03 552.13 565.20 trib -466 Floodway 2009.09 0.46 2009.09 45.57 9.60 6.11 0.28 521.00 552.13 565.20 566.57 trib -89 Base 2008.63 2008.63 388.12 15.26 0.71 0.03 523.44 545.76 trib -89 Floodway 2009.10 0.47 2009.10 39.70 6.49 8.94 0.57 510.00 523.44 545.76 549.70 trib 1 Base 2008.61 2008.65 112.72 11.69 4.27 0.05 423.34 431.01 trib 1 Floodway 2009.10 0.50 2009.10 271.58 14.66 1.22 0.12 423.34 431.01 trib 149 Base 2008.66 2008.66 270.35 15.86 0.14 0.00 322.78 330.58 trib 149 Floodway 2009.10 0.45 2009.10 275.21 15.78 0.20 0.02 322.78 330.58 trib 343 Base 2008.66 2008.66 281.64 15.83 0.12 0.05 326.83 335.39 trib 343 Floodway 2009.10 0.45 2009.10 306.23 15.62 0.22 0.16 326.83 335.39 trib 383 Base 2008.66 2008.66 215.39 15.97 0.03 0.00 321.06 327.35 trib 383 Floodway 2009.10 0.45 2009.10 324.09 15.73 0.14 0.13 321.06 327.35 trib 472 Base 2008.66 2008.66 214.71 15.97 0.03 0.00 246.06 255.85 trib 472 Floodway 2011.03 2.37 2011.03 8.82 16.00 347.00 246.06 255.85 355.82 trib 576 Base 2008.66 2008.66 154.76 15.99 0.01 0.00 247.56 254.23 trib 576 Floodway 2011.22 2.56 2011.25 5.41 16.00 368.20 247.56 254.23 373.61 trib 651 Base 2011.21 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 651 Floodway 2011.46 0.26 2011.49 16.69 16.00 367.72 331.92 337.62 384.41 trib 918 Base 2011.27 2011.27 230.82 7.90 1.56 6.54 290.48 301.36 trib 918 Floodway 2011.81 0.54 2011.83 7.75 16.00 468.53 290.48 301.36 478.43 trib 1472 Base 2013.77 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1472 Floodway 2014.69 0.92 2014.71 4.88 16.00 708.23 374.56 390.80 713.11 trib 1510 Base 2014.12 2014.13 129.51 0.02 0.85 15.14 289.44 302.32 trib 1510 Floodway 2014.73 0.60 2014.74 6.16 16.00 714.06 289.44 302.32 720.22 trib 1520 Culvert trib 1528 Base 2014.12 2014.13 119.01 0.00 2.72 13.28 307.04 321.23 trib 1528 Floodway 2014.97 0.85 2014.98 9.50 16.00 727.56 307.04 321.23 737.06 trib 1557 Base 2014.27 2014.27 140.34 0.00 0.43 15.57 307.11 317.99 trib 1557 Floodway 2015.24 0.97 2015.25 7.61 16.00 730.81 307.11 317.99 738.42 trib 1963 Base 2016.31 2016.33 57.50 2.13 13.78 0.09 243.25 273.87 trib 1963 Floodway 2019.62 3.31 2019.86 8.82 16.00 741.45 243.25 273.87 750.61 trib 1989 Base 2019.07 2019.48 3.69 16.00 762.80 771.50 trib 1989 Floodway 2020.07 1.01 2020.14 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Floodway 2020.61 -0.02 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Floodway 2020.83 -0.01 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Floodway 2020.88 -0.01 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Floodway 2020.91 -0.01 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Floodway 2023.41 0.02 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 HEC-RAS Plan: wo ds fw (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4127 Floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 EXHIBIT E EXISTING CONDITIONS HEC-RAS MODEL HEC-RAS Plan: ECM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 20779 10-yr 30.00 2004.98 2007.19 2005.40 2007.19 0.000006 0.06 517.26 1198.11 0.01 Golf Course 20779 50-yr 54.00 2004.98 2007.80 2005.49 2007.80 0.000003 0.05 1164.72 1860.64 0.01 Golf Course 20779 100-yr 64.00 2004.98 2008.05 2005.52 2008.05 0.000002 0.04 1491.37 1985.36 0.01 Golf Course 20779 500-yr 88.00 2004.98 2008.64 2005.58 2008.64 0.000000 0.03 3229.73 2191.83 0.00 Golf Course 21013 10-yr 30.00 2007.36 2007.65 2007.65 2007.74 0.048676 2.02 13.20 348.57 0.86 Golf Course 21013 50-yr 54.00 2007.36 2007.77 2007.77 2007.86 0.043680 2.09 23.46 392.88 0.83 Golf Course 21013 100-yr 64.00 2007.36 2007.79 2007.79 2007.90 0.048191 2.30 25.52 395.42 0.89 Golf Course 21013 500-yr 88.00 2007.36 2008.64 2007.85 2008.64 0.000463 0.44 192.58 634.20 0.10 Golf Course 21128 10-yr 30.00 2007.08 2008.27 2007.75 2008.28 0.000865 0.55 54.77 320.34 0.14 Golf Course 21128 50-yr 54.00 2007.08 2008.53 2007.86 2008.54 0.001133 0.60 89.93 413.16 0.16 Golf Course 21128 100-yr 64.00 2007.08 2008.60 2007.90 2008.61 0.001181 0.62 103.84 442.77 0.16 Golf Course 21128 500-yr 88.00 2007.08 2008.77 2007.98 2008.77 0.001015 0.61 145.13 510.87 0.15 Golf Course 21229 10-yr 30.00 2006.97 2008.63 2008.48 2008.64 0.007738 0.82 36.63 445.79 0.34 Golf Course 21229 50-yr 54.00 2006.97 2008.82 2008.55 2008.83 0.002311 0.62 86.72 540.30 0.20 Golf Course 21229 100-yr 64.00 2006.97 2008.87 2008.57 2008.88 0.001925 0.63 102.09 545.70 0.19 Golf Course 21229 500-yr 88.00 2006.97 2008.98 2008.63 2008.99 0.001412 0.65 136.02 549.37 0.17 Golf Course 21385 10-yr 30.00 2008.16 2008.94 2008.47 2008.94 0.000409 0.31 97.80 268.00 0.09 Golf Course 21385 50-yr 54.00 2008.16 2009.08 2008.53 2009.08 0.000477 0.40 135.88 283.37 0.10 Golf Course 21385 100-yr 64.00 2008.16 2009.12 2008.56 2009.12 0.000512 0.43 147.76 285.92 0.11 Golf Course 21385 500-yr 88.00 2008.16 2009.22 2008.61 2009.22 0.000552 0.50 176.40 291.98 0.11 Golf Course 21409 10-yr 30.00 2008.27 2008.98 2008.68 2008.98 0.001022 0.46 64.91 246.09 0.14 Golf Course 21409 50-yr 54.00 2008.27 2009.12 2008.75 2009.13 0.001113 0.58 93.59 269.70 0.15 Golf Course 21409 100-yr 64.00 2008.27 2009.17 2008.77 2009.17 0.001210 0.62 103.41 283.87 0.16 Golf Course 21409 500-yr 88.00 2008.27 2009.27 2008.81 2009.28 0.001345 0.68 128.93 323.53 0.17 Golf Course 21431 10-yr 30.00 2008.12 2009.03 2008.45 2009.03 0.000564 0.40 74.75 174.33 0.11 Golf Course 21431 50-yr 54.00 2008.12 2009.18 2008.54 2009.18 0.000767 0.52 103.72 206.07 0.13 Golf Course 21431 100-yr 64.00 2008.12 2009.23 2008.59 2009.24 0.000845 0.56 114.48 222.73 0.14 Golf Course 21431 500-yr 88.00 2008.12 2009.34 2008.66 2009.35 0.000870 0.64 138.33 232.31 0.14 Golf Course 21445 10-yr 30.00 2008.44 2009.09 2008.89 2009.12 0.014872 1.32 22.80 104.20 0.50 Golf Course 21445 50-yr 54.00 2008.44 2009.26 2009.06 2009.28 0.007937 1.23 44.01 139.40 0.38 Golf Course 21445 100-yr 64.00 2008.44 2009.31 2009.10 2009.33 0.006788 1.24 51.65 143.41 0.36 Golf Course 21445 500-yr 88.00 2008.44 2009.42 2009.16 2009.44 0.005945 1.31 67.25 155.76 0.35 Golf Course 21456 10-yr 30.00 2012.42 2012.99 2012.99 2013.09 0.062673 2.50 12.01 61.57 1.00 Golf Course 21456 50-yr 54.00 2012.42 2013.11 2013.11 2013.21 0.060991 2.52 21.40 105.91 0.99 Golf Course 21456 100-yr 64.00 2012.42 2013.14 2013.14 2013.24 0.060320 2.61 24.55 114.71 0.99 Golf Course 21456 500-yr 88.00 2012.42 2013.18 2013.18 2013.31 0.066521 2.86 30.76 134.60 1.05 Golf Course 21481 10-yr 30.00 2009.82 2013.10 2010.44 2013.10 0.000003 0.05 572.41 595.29 0.01 Golf Course 21481 50-yr 54.00 2009.82 2013.22 2010.72 2013.22 0.000008 0.08 642.79 630.20 0.01 Golf Course 21481 100-yr 64.00 2009.82 2013.25 2010.83 2013.25 0.000010 0.10 665.70 634.10 0.02 Golf Course 21481 500-yr 88.00 2009.82 2013.33 2011.06 2013.33 0.000015 0.12 713.41 652.50 0.02 Golf Course 21498 Culvert Golf Course 21515 10-yr 30.00 2010.05 2013.10 2010.60 2013.10 0.000007 0.07 460.67 593.07 0.01 Golf Course 21515 50-yr 54.00 2010.05 2013.22 2010.85 2013.22 0.000014 0.10 530.40 618.85 0.02 Golf Course 21515 100-yr 64.00 2010.05 2013.25 2010.94 2013.25 0.000018 0.12 552.92 622.75 0.02 Golf Course 21515 500-yr 88.00 2010.05 2013.33 2011.14 2013.33 0.000026 0.15 599.34 629.04 0.03 Golf Course 21548 10-yr 30.00 2011.58 2013.10 2011.87 2013.10 0.000010 0.08 396.54 568.51 0.02 Golf Course 21548 50-yr 54.00 2011.58 2013.22 2011.95 2013.22 0.000021 0.12 463.29 589.43 0.02 Golf Course 21548 100-yr 64.00 2011.58 2013.25 2011.98 2013.26 0.000026 0.13 484.98 599.12 0.03 Golf Course 21548 500-yr 88.00 2011.58 2013.33 2012.04 2013.33 0.000038 0.17 530.24 614.34 0.03 Golf Course 21924 10-yr 30.00 2012.11 2013.11 2012.42 2013.11 0.000094 0.20 148.32 251.20 0.05 Golf Course 21924 50-yr 54.00 2012.11 2013.23 2012.49 2013.23 0.000167 0.30 179.44 258.75 0.06 Golf Course 21924 100-yr 64.00 2012.11 2013.27 2012.52 2013.27 0.000196 0.34 189.66 259.63 0.07 Golf Course 21924 500-yr 88.00 2012.11 2013.35 2012.57 2013.36 0.000267 0.42 211.03 265.10 0.08 Golf Course 21983 10-yr 30.00 2012.09 2013.13 2012.50 2013.13 0.000419 0.40 75.10 140.98 0.10 Golf Course 21983 50-yr 54.00 2012.09 2013.27 2012.61 2013.27 0.000769 0.56 96.49 172.28 0.13 Golf Course 21983 100-yr 64.00 2012.09 2013.31 2012.64 2013.32 0.000868 0.61 104.44 178.25 0.14 Golf Course 21983 500-yr 88.00 2012.09 2013.41 2012.71 2013.42 0.001020 0.73 121.38 181.71 0.16 Golf Course 22423 10-yr 30.00 2012.71 2013.36 2012.98 2013.37 0.000703 0.44 68.10 162.79 0.12 Golf Course 22423 50-yr 54.00 2012.71 2013.58 2013.05 2013.59 0.000666 0.50 107.27 201.62 0.12 Golf Course 22423 100-yr 64.00 2012.71 2013.64 2013.07 2013.65 0.000658 0.54 119.57 202.96 0.12 Golf Course 22423 500-yr 88.00 2012.71 2013.78 2013.12 2013.78 0.000685 0.60 147.27 218.53 0.13 Golf Course 22972 10-yr 30.00 2013.92 2014.45 2014.45 2014.57 0.060483 2.73 11.00 48.16 1.01 Golf Course 22972 50-yr 54.00 2013.92 2014.57 2014.57 2014.72 0.053502 3.19 16.92 53.41 1.00 Golf Course 22972 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.053592 3.40 18.85 54.26 1.02 HEC-RAS Plan: ECM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 22972 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050499 3.73 23.57 56.30 1.02 Golf Course 23005 10-yr 30.00 2014.38 2015.05 2014.75 2015.05 0.001933 0.69 43.31 112.20 0.20 Golf Course 23005 50-yr 54.00 2014.38 2015.22 2014.83 2015.23 0.002055 0.84 64.26 130.44 0.21 Golf Course 23005 100-yr 64.00 2014.38 2015.28 2014.86 2015.29 0.002061 0.89 72.19 135.49 0.21 Golf Course 23005 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002172 0.95 93.00 164.64 0.22 Golf Course 23050 10-yr 30.00 2014.61 2015.16 2014.87 2015.16 0.001938 0.64 46.54 134.52 0.19 Golf Course 23050 50-yr 54.00 2014.61 2015.33 2014.95 2015.34 0.001739 0.76 71.24 148.91 0.19 Golf Course 23050 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 23050 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001567 0.87 101.34 159.73 0.19 Golf Course 23090 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.005092 0.93 32.35 111.85 0.30 Golf Course 23090 50-yr 54.00 2014.93 2015.60 2015.34 2015.61 0.004889 1.03 52.56 151.12 0.31 Golf Course 23090 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 23090 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 23446 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012459 1.10 27.17 141.49 0.44 Golf Course 23446 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012670 1.24 43.59 193.33 0.46 Golf Course 23446 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 23446 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 23887 10-yr 30.00 2022.25 2022.83 2022.66 2022.84 0.005714 0.89 33.70 135.04 0.31 Golf Course 23887 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005672 1.06 51.18 158.01 0.33 Golf Course 23887 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 23887 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 24430 10-yr 30.00 2028.58 2029.25 2029.25 2029.46 0.048764 3.65 8.29 21.75 1.00 Golf Course 24430 50-yr 54.00 2028.58 2029.47 2029.47 2029.73 0.037372 4.21 13.58 28.66 0.94 Golf Course 24430 100-yr 64.00 2028.58 2029.56 2029.56 2029.82 0.031201 4.22 16.81 37.07 0.88 Golf Course 24430 500-yr 88.00 2028.58 2029.72 2029.72 2029.99 0.026137 4.41 23.23 42.98 0.83 HEC-RAS Plan: ECM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course 20779 Q100 - base 2008.05 2008.05 1327.67 64.00 934.91 2798.66 Golf Course 20779 Q100 - floodway 2009.05 1.00 2009.05 1178.72 64.00 934.91 934.91 2798.66 2278.72 Golf Course 21013 Q100 - base 2008.05 2008.07 147.76 52.43 11.57 508.09 1602.56 Golf Course 21013 Q100 - floodway 2009.05 1.00 2009.05 173.18 52.98 11.02 1472.43 508.09 1602.56 1725.00 Golf Course 21128 Q100 - base 2008.53 2008.54 190.90 64.00 409.35 1512.91 Golf Course 21128 Q100 - floodway 2009.05 0.52 2009.11 25.00 64.00 1045.00 409.35 1512.91 1070.00 Golf Course 21229 Q100 - base 2008.86 2008.87 305.94 64.00 417.95 1452.44 Golf Course 21229 Q100 - floodway 2009.59 0.72 2009.62 35.00 64.00 985.00 417.95 1452.44 1020.00 Golf Course 21385 Q100 - base 2009.12 2009.12 285.78 64.00 431.52 1001.23 Golf Course 21385 Q100 - floodway 2010.03 0.91 2010.06 30.00 64.00 785.00 431.52 1001.23 815.00 Golf Course 21409 Q100 - base 2009.17 2009.17 222.73 64.00 426.69 980.16 Golf Course 21409 Q100 - floodway 2010.12 0.95 2010.16 25.00 64.00 728.00 426.69 980.16 753.00 Golf Course 21431 Q100 - base 2009.23 2009.24 219.68 64.00 440.00 961.58 Golf Course 21431 Q100 - floodway 2010.23 1.00 2010.26 25.00 64.00 700.00 440.00 961.58 725.00 Golf Course 21445 Q100 - base 2009.31 2009.33 143.36 64.00 440.70 949.64 Golf Course 21445 Q100 - floodway 2010.29 0.98 2010.37 20.00 64.00 683.00 440.70 949.64 703.00 Golf Course 21456 Q100 - base 2013.14 2013.24 114.71 64.00 0.00 937.26 Golf Course 21456 Q100 - floodway 2013.79 0.65 2014.05 30.00 64.00 595.00 0.00 937.26 625.00 Golf Course 21481 Q100 - base 2013.25 2013.25 634.10 64.00 494.28 1387.02 Golf Course 21481 Q100 - floodway 2014.09 0.83 2014.09 37.00 64.00 939.00 494.28 1387.02 976.00 Golf Course 21498 Culvert Golf Course 21515 Q100 - base 2013.25 2013.25 622.75 64.00 0.00 888.69 Golf Course 21515 Q100 - floodway 2014.09 0.84 2014.10 44.00 64.00 436.00 0.00 888.69 480.00 Golf Course 21548 Q100 - base 2013.25 2013.26 599.12 64.00 0.00 1025.25 Golf Course 21548 Q100 - floodway 2014.10 0.84 2014.10 45.00 64.00 482.00 0.00 1025.25 527.00 Golf Course 21924 Q100 - base 2013.27 2013.27 259.63 64.00 791.72 1477.35 Golf Course 21924 Q100 - floodway 2014.18 0.91 2014.19 43.00 64.00 975.00 791.72 1477.35 1018.00 Golf Course 21983 Q100 - base 2013.31 2013.32 178.25 64.00 0.00 248.45 Golf Course 21983 Q100 - floodway 2014.24 0.92 2014.26 28.00 64.00 113.00 0.00 248.45 141.00 Golf Course 22423 Q100 - base 2013.64 2013.65 202.96 64.00 843.00 1600.75 Golf Course 22423 Q100 - floodway 2014.52 0.88 2014.54 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 22972 Q100 - base 2014.60 2014.78 54.26 64.00 759.64 1718.25 Golf Course 22972 Q100 - floodway 2015.26 0.66 2015.70 14.13 64.00 1162.20 759.64 1718.25 1176.33 Golf Course 23005 Q100 - base 2015.28 2015.29 135.49 64.00 729.92 1627.92 Golf Course 23005 Q100 - floodway 2016.10 0.83 2016.14 27.34 64.00 1123.02 729.92 1627.92 1150.36 Golf Course 23050 Q100 - base 2015.39 2015.40 151.92 64.00 763.22 1639.53 Golf Course 23050 Q100 - floodway 2016.21 0.82 2016.27 22.35 64.00 1126.64 763.22 1639.53 1148.99 Golf Course 23090 Q100 - base 2015.65 2015.66 154.59 64.00 768.88 1659.11 Golf Course 23090 Q100 - floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 768.88 1659.11 1115.00 Golf Course 23446 Q100 - base 2018.10 2018.12 208.12 64.00 688.98 1310.47 Golf Course 23446 Q100 - floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 23887 Q100 - base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 23887 Q100 - floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 24430 Q100 - base 2029.56 2029.82 37.07 1.56 60.23 2.21 636.32 656.04 Golf Course 24430 Q100 - floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 636.32 656.04 656.04 HEC-RAS Plan: wl (ECM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 1.00 2004.70 2007.19 2004.82 2007.19 0.000000 0.01 97.62 92.00 0.00 trib -1303 Q50 2.00 2004.70 2007.80 2004.87 2007.80 0.000000 0.01 156.26 99.90 0.00 trib -1303 Q100 4.00 2004.70 2008.05 2004.90 2008.05 0.000000 0.02 181.64 103.69 0.00 trib -1303 Q500 7.00 2004.70 2008.64 2004.96 2008.64 0.000000 0.03 245.69 113.41 0.00 trib -1019 Q10 1.00 2007.91 2008.27 2008.27 2008.30 0.103616 1.40 0.72 31.55 1.04 trib -1019 Q50 2.00 2007.91 2008.31 2008.31 2008.35 0.096308 1.67 1.20 38.26 1.06 trib -1019 Q100 4.00 2007.91 2008.36 2008.36 2008.41 0.077292 1.83 2.19 47.75 1.00 trib -1019 Q500 7.00 2007.91 2008.64 2008.41 2008.64 0.002258 0.58 12.11 93.29 0.20 trib -880 Q10 1.00 2004.89 2008.31 2008.31 0.000000 0.00 721.14 359.15 0.00 trib -880 Q50 2.00 2004.89 2008.35 2008.35 0.000000 0.00 738.57 359.95 0.00 trib -880 Q100 4.00 2004.89 2008.42 2008.42 0.000000 0.01 761.51 361.60 0.00 trib -880 Q500 7.00 2004.89 2008.64 2008.64 0.000000 0.01 843.68 368.58 0.00 trib -466 Q10 1.00 2006.89 2008.31 2008.31 0.000000 0.00 410.09 380.79 0.00 trib -466 Q50 2.00 2006.89 2008.35 2008.35 0.000000 0.00 428.60 384.48 0.00 trib -466 Q100 4.00 2006.89 2008.42 2008.42 0.000000 0.01 453.25 388.60 0.00 trib -466 Q500 7.00 2006.89 2008.64 2008.64 0.000000 0.01 542.61 403.49 0.00 trib -89 Q10 1.00 2006.07 2008.31 2008.31 0.000000 0.00 449.29 336.12 0.00 trib -89 Q50 2.00 2006.07 2008.35 2008.35 0.000000 0.00 465.65 339.05 0.00 trib -89 Q100 4.00 2006.07 2008.42 2008.42 0.000000 0.01 487.40 345.54 0.00 trib -89 Q500 7.00 2006.07 2008.64 2008.64 0.000000 0.01 571.23 388.66 0.00 trib 1 Q10 1.00 1998.92 2005.00 2005.00 0.000000 0.00 225.97 48.42 0.00 trib 1 Q50 2.00 1998.92 2009.60 2009.60 0.000000 0.00 540.96 101.33 0.00 trib 1 Q100 4.00 1998.92 2009.70 2009.70 0.000000 0.01 551.13 102.16 0.00 trib 1 Q500 7.00 1998.92 2010.00 2010.00 0.000000 0.01 582.15 104.63 0.00 trib 149 Q10 10.00 1995.82 2005.00 1996.32 2005.00 0.000000 0.01 1141.63 165.71 0.00 trib 149 Q50 14.00 1995.82 2009.60 1996.38 2009.60 0.000000 0.01 1924.52 175.82 0.00 trib 149 Q100 16.00 1995.82 2009.70 1996.41 2009.70 0.000000 0.01 1942.12 176.16 0.00 trib 149 Q500 20.00 1995.82 2010.00 1996.46 2010.00 0.000000 0.01 1995.13 177.19 0.00 trib 343 Q10 10.00 1993.64 2005.00 1993.99 2005.00 0.000000 0.01 1993.17 252.43 0.00 trib 343 Q50 14.00 1993.64 2009.60 1994.05 2009.60 0.000000 0.00 3182.15 266.09 0.00 trib 343 Q100 16.00 1993.64 2009.70 1994.07 2009.70 0.000000 0.00 3208.78 266.57 0.00 trib 343 Q500 20.00 1993.64 2010.00 1994.11 2010.00 0.000000 0.01 3288.97 267.99 0.00 trib 383 Q10 10.00 1994.23 2005.00 1994.67 2005.00 0.000000 0.01 1938.50 222.78 0.00 trib 383 Q50 14.00 1994.23 2009.60 1994.71 2009.60 0.000000 0.00 3052.64 279.70 0.00 trib 383 Q100 16.00 1994.23 2009.70 1994.73 2009.70 0.000000 0.01 3080.61 279.97 0.00 trib 383 Q500 20.00 1994.23 2010.00 1994.75 2010.00 0.000000 0.01 3164.74 280.78 0.00 trib 472 Q10 10.00 2005.65 2005.00 1999.14 2005.00 0.000000 477.69 135.83 0.00 trib 472 Q50 14.00 2005.65 2009.60 1999.19 2009.60 0.000000 0.01 1255.59 189.45 0.00 trib 472 Q100 16.00 2005.65 2009.70 1999.22 2009.70 0.000000 0.01 1274.72 193.16 0.00 trib 472 Q500 20.00 2005.65 2010.00 1999.26 2010.00 0.000000 0.01 1334.21 203.55 0.00 trib 576 Q10 10.00 2008.78 2009.74 2009.74 2009.99 0.032554 4.02 2.48 4.97 1.00 trib 576 Q50 14.00 2008.78 2009.89 2009.89 2010.17 0.030449 4.27 3.28 5.70 0.99 trib 576 Q100 16.00 2008.78 2009.95 2009.95 2010.25 0.030780 4.43 3.61 5.98 1.01 trib 576 Q500 20.00 2008.78 2010.20 2010.20 2010.37 0.028407 3.36 6.36 21.88 0.93 trib 651 Q10 10.00 2009.50 2010.74 2010.48 2010.78 0.004980 1.88 7.84 29.35 0.41 trib 651 Q50 14.00 2009.50 2010.85 2010.68 2010.89 0.004366 1.86 12.04 39.94 0.39 trib 651 Q100 16.00 2009.50 2010.95 2010.71 2010.96 0.004364 1.23 16.50 54.47 0.36 trib 651 Q500 20.00 2009.50 2011.00 2010.77 2011.02 0.004026 1.28 19.68 56.58 0.35 trib 918 Q10 10.00 2009.10 2011.17 2009.95 2011.19 0.000735 1.08 9.22 6.85 0.16 trib 918 Q50 14.00 2009.10 2011.35 2010.09 2011.38 0.001018 1.33 10.62 9.40 0.20 trib 918 Q100 16.00 2009.10 2011.45 2010.17 2011.48 0.001099 1.42 11.64 11.27 0.20 trib 918 Q500 20.00 2009.10 2011.57 2010.29 2011.61 0.001361 1.62 13.89 36.25 0.23 trib 1472 Q10 10.00 2011.44 2012.38 2012.38 2012.67 0.032363 4.35 2.30 3.82 0.99 trib 1472 Q50 14.00 2011.44 2012.69 2012.53 2012.92 0.018459 3.88 3.61 4.56 0.77 trib 1472 Q100 16.00 2011.44 2012.83 2012.61 2013.05 0.015065 3.73 4.29 4.89 0.70 trib 1472 Q500 20.00 2011.44 2013.11 2012.75 2013.30 0.010804 3.50 5.72 5.54 0.61 trib 1510 Q10 10.00 2011.15 2012.95 2012.17 2013.00 0.002787 1.77 5.66 5.40 0.30 trib 1510 Q50 14.00 2011.15 2013.16 2012.35 2013.22 0.003332 2.06 6.81 5.90 0.34 trib 1510 Q100 16.00 2011.15 2013.26 2012.43 2013.33 0.003444 2.15 7.44 6.16 0.35 trib 1510 Q500 20.00 2011.15 2013.46 2012.58 2013.55 0.003501 2.29 8.75 6.67 0.35 trib 1520 Culvert trib 1528 Q10 10.00 2010.84 2013.36 2011.82 2013.38 0.000963 1.00 9.96 6.88 0.15 HEC-RAS Plan: wl (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2010.84 2013.97 2012.00 2013.98 0.000694 0.96 14.55 8.35 0.13 trib 1528 Q100 16.00 2010.84 2014.30 2012.07 2014.32 0.000575 0.91 17.51 9.51 0.12 trib 1528 Q500 20.00 2010.84 2014.61 2012.23 2014.63 0.000672 0.91 25.24 51.66 0.13 trib 1557 Q10 10.00 2011.79 2013.39 2012.66 2013.44 0.003820 1.69 5.91 5.64 0.29 trib 1557 Q50 14.00 2011.79 2013.98 2012.81 2014.02 0.002007 1.45 9.63 6.90 0.22 trib 1557 Q100 16.00 2011.79 2014.32 2012.88 2014.35 0.001437 1.33 12.04 7.61 0.19 trib 1557 Q500 20.00 2011.79 2014.63 2013.01 2014.66 0.001366 1.38 14.51 8.27 0.18 trib 1963 Q10 10.00 2018.61 2019.48 2019.48 2019.66 0.051975 3.44 2.91 7.79 0.99 trib 1963 Q50 14.00 2018.61 2019.59 2019.59 2019.80 0.045074 3.61 3.92 11.07 0.95 trib 1963 Q100 16.00 2018.61 2019.66 2019.66 2019.85 0.038218 3.52 4.80 15.48 0.89 trib 1963 Q500 20.00 2018.61 2019.75 2019.75 2019.93 0.033517 3.48 6.39 18.55 0.84 trib 1989 Q10 10.00 2017.77 2019.85 2018.80 2019.89 0.002658 1.50 6.69 17.19 0.24 trib 1989 Q50 14.00 2017.77 2020.01 2018.98 2020.06 0.003491 1.86 7.54 40.62 0.28 trib 1989 Q100 16.00 2017.77 2020.06 2019.06 2020.12 0.004030 2.04 7.83 48.44 0.30 trib 1989 Q500 20.00 2017.77 2020.14 2019.22 2020.23 0.005238 2.42 8.27 60.64 0.35 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.19 2019.81 2020.30 0.009432 2.61 3.83 8.68 0.47 trib 2080 Q50 14.00 2018.73 2020.48 2019.96 2020.60 0.007671 2.81 4.99 12.81 0.44 trib 2080 Q100 16.00 2018.73 2020.61 2020.02 2020.74 0.007173 2.90 5.51 14.87 0.44 trib 2080 Q500 20.00 2018.73 2020.86 2020.15 2021.01 0.006452 3.07 6.51 18.47 0.42 trib 2100 Q10 12.00 2018.27 2020.39 2019.40 2020.41 0.002032 1.15 10.46 12.11 0.22 trib 2100 Q50 24.00 2018.27 2020.70 2019.86 2020.74 0.003396 1.65 14.58 14.51 0.29 trib 2100 Q100 30.00 2018.27 2020.83 2020.00 2020.88 0.003580 1.82 16.55 15.31 0.30 trib 2100 Q500 46.00 2018.27 2021.08 2020.26 2021.16 0.004409 2.26 20.54 16.79 0.35 trib 2110 Q10 12.00 2018.27 2020.42 2019.40 2020.43 0.001881 1.11 10.78 12.31 0.21 trib 2110 Q50 24.00 2018.27 2020.74 2019.87 2020.78 0.002981 1.58 15.21 14.78 0.27 trib 2110 Q100 30.00 2018.27 2020.88 2020.00 2020.92 0.003147 1.74 17.27 15.59 0.29 trib 2110 Q500 46.00 2018.27 2021.14 2020.26 2021.21 0.003840 2.17 21.53 17.14 0.32 trib 2120 Q10 12.00 2018.27 2020.44 2019.40 2020.45 0.001769 1.09 11.03 12.47 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.81 0.002698 1.53 15.70 14.97 0.26 trib 2120 Q100 30.00 2018.27 2020.91 2020.00 2020.96 0.002861 1.69 17.82 15.80 0.27 trib 2120 Q500 46.00 2018.27 2021.18 2020.26 2021.25 0.003471 2.10 22.30 17.41 0.31 trib 2651 Q10 12.00 2021.38 2022.48 2022.22 2022.62 0.016295 2.96 4.05 5.21 0.59 trib 2651 Q50 24.00 2021.38 2023.16 2022.58 2023.30 0.009750 3.00 8.00 6.47 0.48 trib 2651 Q100 30.00 2021.38 2023.40 2022.73 2023.55 0.009769 3.10 9.67 7.51 0.48 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008805 3.30 14.05 10.00 0.47 trib 3126 Q10 12.00 2023.82 2025.45 2024.69 2025.49 0.003114 1.53 7.84 7.78 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003750 1.97 12.18 9.47 0.31 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.25 0.003704 2.08 14.43 10.23 0.31 trib 3126 Q500 46.00 2023.82 2026.65 2025.48 2026.74 0.003902 2.35 19.60 12.06 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003060 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: wl (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031974 4.34 5.07 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.006997 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wl FW (ECM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Q100 base 2008.05 2008.05 103.69 0.01 3.90 0.09 70.92 163.31 trib -1303 Q100 floodway 2009.05 1.00 2009.05 31.32 4.00 131.99 70.92 163.31 163.31 trib -1019 Q100 base 2008.36 2008.41 21.08 4.00 152.95 253.19 trib -1019 Q100 floodway 2009.05 0.69 2009.05 21.09 4.00 173.33 152.95 253.19 194.42 trib -880 Q100 base 2008.42 2008.42 361.60 0.08 3.92 0.01 62.73 380.37 trib -880 Q100 floodway 2009.05 0.63 2009.05 40.00 4.00 310.00 62.73 380.37 350.00 trib -466 Q100 base 2008.42 2008.42 388.60 4.00 0.00 129.52 566.57 trib -466 Q100 floodway 2009.05 0.64 2009.05 45.57 4.00 521.00 129.52 566.57 566.57 trib -89 Q100 base 2008.42 2008.42 345.54 4.00 144.89 581.16 trib -89 Q100 floodway 2009.05 0.64 2009.05 39.70 4.00 510.00 144.89 581.16 549.70 trib 1 Q100 base 2009.70 2009.70 102.16 4.00 461.25 568.10 trib 1 Q100 floodway 2010.70 1.00 2010.70 116.77 0.00 4.00 461.25 568.10 trib 149 Q100 base 2009.70 2009.70 176.16 16.00 421.08 606.95 trib 149 Q100 floodway 2010.70 1.00 2010.70 179.75 16.00 421.08 606.95 trib 343 Q100 base 2009.70 2009.70 266.57 16.00 410.55 678.07 trib 343 Q100 floodway 2010.70 1.00 2010.70 271.14 0.00 16.00 0.00 410.55 678.07 trib 383 Q100 base 2009.70 2009.70 279.97 16.00 0.00 397.28 677.14 trib 383 Q100 floodway 2010.70 1.00 2010.70 282.66 16.00 0.00 397.28 677.14 trib 472 Q100 base 2009.70 2009.70 193.16 0.12 15.88 340.55 365.05 trib 472 Q100 floodway 2010.70 1.00 2010.70 8.82 16.00 347.00 340.55 365.05 355.82 trib 576 Q100 base 2009.95 2010.25 5.98 16.00 361.81 384.61 trib 576 Q100 floodway 2010.67 0.73 2010.75 5.41 16.00 368.20 361.81 384.61 373.61 trib 651 Q100 base 2010.95 2010.96 54.47 6.94 9.06 360.31 384.41 trib 651 Q100 floodway 2011.07 0.12 2011.14 15.66 16.00 367.72 360.31 384.41 384.41 trib 918 Q100 base 2011.45 2011.48 11.27 15.90 0.10 466.95 478.43 trib 918 Q100 floodway 2011.63 0.18 2011.66 7.59 16.00 468.53 466.95 478.43 478.43 trib 1472 Q100 base 2012.83 2013.05 4.89 16.00 706.41 714.93 trib 1472 Q100 floodway 2012.71 -0.12 2013.00 4.61 16.00 708.23 706.41 714.93 713.11 trib 1510 Q100 base 2013.26 2013.33 6.16 16.00 711.73 722.04 trib 1510 Q100 floodway 2013.26 0.00 2013.33 6.16 16.00 714.06 711.73 722.04 720.22 trib 1520 Culvert trib 1528 Q100 base 2014.30 2014.32 9.51 16.00 727.15 744.68 trib 1528 Q100 floodway 2014.31 0.00 2014.32 9.50 16.00 727.56 727.15 744.68 737.06 trib 1557 Q100 base 2014.32 2014.35 7.61 16.00 726.74 740.03 trib 1557 Q100 floodway 2014.32 0.00 2014.35 7.61 16.00 730.81 726.74 740.03 738.42 trib 1963 Q100 base 2019.66 2019.85 15.48 15.72 0.28 739.45 750.61 trib 1963 Q100 floodway 2019.63 -0.03 2019.86 8.89 16.00 741.45 739.45 750.61 750.61 trib 1989 Q100 base 2020.06 2020.12 5.50 16.00 762.80 771.50 trib 1989 Q100 floodway 2020.08 0.02 2020.15 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Q100 base 2020.61 2020.74 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.61 0.00 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.83 2020.88 15.31 0.01 29.99 44.23 60.09 trib 2100 Q100 floodway 2020.83 0.00 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.88 2020.92 15.59 0.02 29.98 44.23 60.09 trib 2110 Q100 floodway 2020.88 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.91 2020.96 15.80 0.03 29.97 44.23 60.09 trib 2120 Q100 floodway 2020.92 0.00 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.40 2023.55 7.51 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.25 10.23 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 HEC-RAS Plan: wl FW (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: wo DS lev (ECM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 10.00 2004.70 2007.19 2005.00 2007.19 0.000006 0.13 97.62 92.00 0.02 trib -1303 Q50 14.00 2004.70 2007.80 2005.05 2007.80 0.000004 0.12 156.26 99.90 0.01 trib -1303 Q100 16.00 2004.70 2008.05 2005.07 2008.05 0.000003 0.12 181.64 103.69 0.01 trib -1303 Q500 20.00 2004.70 2008.64 2005.11 2008.64 0.000002 0.11 245.69 113.41 0.01 trib -1019 Q10 10.00 2008.18 2008.47 2008.47 2008.54 0.040241 2.34 5.15 65.40 0.83 trib -1019 Q50 14.00 2008.18 2008.51 2008.51 2008.59 0.039441 2.57 6.69 70.95 0.84 trib -1019 Q100 16.00 2008.18 2008.52 2008.52 2008.62 0.045491 2.81 7.00 71.61 0.91 trib -1019 Q500 20.00 2008.18 2008.64 2008.56 2008.65 0.003347 0.96 26.15 93.34 0.26 trib -880 Q10 10.00 2007.31 2008.55 2005.25 2008.55 0.000000 0.01 808.03 365.13 0.00 trib -880 Q50 14.00 2007.31 2008.60 2005.30 2008.60 0.000000 0.01 828.10 367.06 0.00 trib -880 Q100 16.00 2007.31 2008.63 2005.32 2008.63 0.000000 0.01 837.43 367.97 0.00 trib -880 Q500 20.00 2007.31 2008.65 2005.36 2008.65 0.000000 0.01 845.25 368.73 0.00 trib -466 Q10 10.00 2006.96 2008.55 2007.05 2008.55 0.000000 0.02 503.64 396.88 0.00 trib -466 Q50 14.00 2006.96 2008.60 2007.08 2008.60 0.000001 0.03 525.58 402.65 0.00 trib -466 Q100 16.00 2006.96 2008.63 2007.08 2008.63 0.000001 0.03 535.81 403.22 0.00 trib -466 Q500 20.00 2006.96 2008.65 2007.08 2008.65 0.000001 0.04 544.38 403.56 0.01 trib -89 Q10 10.00 2007.09 2008.55 2006.35 2008.55 0.000000 0.02 533.76 381.64 0.00 trib -89 Q50 14.00 2007.09 2008.60 2006.40 2008.60 0.000000 0.02 554.94 387.29 0.00 trib -89 Q100 16.00 2007.09 2008.63 2006.43 2008.63 0.000001 0.03 564.78 388.12 0.00 trib -89 Q500 20.00 2007.09 2008.65 2006.47 2008.65 0.000001 0.03 573.08 388.82 0.00 trib 1 Q10 10.00 2008.30 2008.57 2008.57 2008.61 0.049508 2.23 7.05 92.01 0.89 trib 1 Q50 14.00 2008.30 2008.60 2008.60 2008.64 0.049091 2.40 9.47 106.80 0.90 trib 1 Q100 16.00 2008.30 2008.61 2008.61 2008.65 0.045516 2.40 10.81 112.72 0.88 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q10 10.00 2007.52 2008.62 2006.65 2008.62 0.000000 0.01 417.66 269.94 0.00 trib 149 Q50 14.00 2007.52 2008.65 2006.70 2008.65 0.000001 0.02 425.25 270.23 0.00 trib 149 Q100 16.00 2007.52 2008.66 2006.72 2008.66 0.000001 0.02 428.28 270.35 0.00 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q10 10.00 2008.18 2008.62 2007.06 2008.62 0.000001 0.02 272.09 279.48 0.01 trib 343 Q50 14.00 2008.18 2008.65 2007.13 2008.65 0.000003 0.03 279.96 281.03 0.01 trib 343 Q100 16.00 2008.18 2008.66 2007.16 2008.66 0.000003 0.03 283.12 281.64 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q10 10.00 2008.42 2008.62 2007.33 2008.62 0.000003 0.01 193.97 213.44 0.01 trib 383 Q50 14.00 2008.42 2008.65 2007.36 2008.65 0.000006 0.02 199.96 214.83 0.01 trib 383 Q100 16.00 2008.42 2008.66 2007.37 2008.66 0.000007 0.03 202.37 215.39 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q10 10.00 2008.50 2008.62 2007.46 2008.62 0.000008 0.01 146.81 211.42 0.01 trib 472 Q50 14.00 2008.50 2008.65 2007.50 2008.65 0.000014 0.02 152.88 213.77 0.01 trib 472 Q100 16.00 2008.50 2008.66 2007.52 2008.66 0.000017 0.03 155.34 214.71 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q10 10.00 2008.57 2008.62 2007.79 2008.62 0.000034 0.02 83.84 150.04 0.02 trib 576 Q50 14.00 2008.57 2008.65 2007.83 2008.65 0.000057 0.03 88.33 153.40 0.02 trib 576 Q100 16.00 2008.57 2008.66 2007.84 2008.66 0.000069 0.03 90.17 154.76 0.03 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q10 10.00 2011.11 2011.18 2011.18 2011.22 0.097087 0.90 6.25 88.01 0.91 trib 651 Q50 14.00 2011.11 2011.20 2011.20 2011.24 0.084641 1.01 8.16 94.94 0.89 trib 651 Q100 16.00 2011.11 2011.21 2011.21 2011.26 0.076146 1.09 9.16 96.15 0.87 trib 651 Q500 20.00 2011.11 2011.22 2011.22 2011.28 0.078399 1.27 10.44 97.72 0.92 trib 918 Q10 10.00 2009.84 2011.22 2010.09 2011.22 0.000004 0.07 191.15 223.46 0.01 trib 918 Q50 14.00 2009.84 2011.25 2010.13 2011.25 0.000006 0.09 197.86 227.01 0.01 trib 918 Q100 16.00 2009.84 2011.27 2010.15 2011.27 0.000008 0.10 200.97 230.82 0.02 trib 918 Q500 20.00 2009.84 2011.30 2010.16 2011.30 0.000012 0.13 207.29 233.18 0.02 trib 1472 Q10 10.00 2013.44 2013.73 2013.73 2013.78 0.038164 2.06 6.11 55.33 0.79 trib 1472 Q50 14.00 2013.44 2013.76 2013.76 2013.82 0.041668 2.34 7.74 62.95 0.84 trib 1472 Q100 16.00 2013.44 2013.77 2013.77 2013.84 0.039601 2.38 8.80 67.96 0.83 trib 1472 Q500 20.00 2013.44 2013.80 2013.80 2013.87 0.039038 2.52 10.69 77.87 0.84 trib 1510 Q10 10.00 2013.81 2014.06 2013.90 2014.06 0.002778 0.39 19.89 120.64 0.19 trib 1510 Q50 14.00 2013.81 2014.10 2013.94 2014.11 0.002801 0.43 25.50 126.84 0.20 trib 1510 Q100 16.00 2013.81 2014.12 2013.95 2014.13 0.002776 0.45 27.85 129.47 0.20 trib 1510 Q500 20.00 2013.81 2014.15 2013.97 2014.16 0.002826 0.50 31.99 137.40 0.21 trib 1520 Culvert trib 1528 Q10 10.00 2013.78 2014.06 2013.93 2014.06 0.005201 0.69 15.56 100.95 0.28 HEC-RAS Plan: wo DS lev (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2013.78 2014.10 2013.95 2014.11 0.004983 0.76 20.57 116.23 0.29 trib 1528 Q100 16.00 2013.78 2014.12 2013.97 2014.13 0.005184 0.82 22.52 118.90 0.30 trib 1528 Q500 20.00 2013.78 2014.16 2013.99 2014.17 0.004648 0.85 26.76 122.07 0.29 trib 1557 Q10 10.00 2014.07 2014.21 2014.05 2014.21 0.004529 0.32 16.54 122.35 0.22 trib 1557 Q50 14.00 2014.07 2014.25 2014.10 2014.26 0.004585 0.37 22.60 137.57 0.23 trib 1557 Q100 16.00 2014.07 2014.27 2014.12 2014.27 0.004521 0.42 24.77 140.38 0.24 trib 1557 Q500 20.00 2014.07 2014.29 2014.14 2014.30 0.004640 0.50 28.53 145.80 0.25 trib 1963 Q10 10.00 2015.81 2016.24 2016.10 2016.26 0.007062 1.07 10.25 52.15 0.36 trib 1963 Q50 14.00 2015.81 2016.29 2016.15 2016.31 0.007097 1.20 13.09 56.60 0.37 trib 1963 Q100 16.00 2015.81 2016.31 2016.17 2016.33 0.007323 1.27 14.25 57.48 0.38 trib 1963 Q500 20.00 2015.81 2016.35 2016.20 2016.38 0.007236 1.36 16.68 58.71 0.38 trib 1989 Q10 10.00 2017.77 2018.80 2018.80 2019.13 0.055202 4.65 2.15 3.23 1.00 trib 1989 Q50 14.00 2017.77 2018.98 2018.98 2019.38 0.054111 5.05 2.77 3.54 1.01 trib 1989 Q100 16.00 2017.77 2019.07 2019.07 2019.48 0.052722 5.18 3.09 3.69 1.00 trib 1989 Q500 20.00 2017.77 2019.22 2019.22 2019.68 0.051664 5.45 3.67 3.94 0.99 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001965 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003293 1.63 14.74 14.59 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003479 1.80 16.71 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004326 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001824 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002895 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003072 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001720 1.08 11.15 12.55 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002629 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002801 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017129 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.15 2022.58 2023.29 0.009975 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009967 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003063 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003719 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: wo DS lev (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.12 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2047.39 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2047.50 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.43 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031946 4.33 5.08 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2051.88 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.007005 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wo DS fw (ECM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Base 2008.05 2008.05 103.69 5.34 9.25 1.41 134.37 158.76 trib -1303 Floodway 2009.05 1.00 2009.05 120.14 7.11 7.52 1.36 134.37 158.76 trib -1019 Base 2008.52 2008.62 38.92 3.31 11.46 1.24 178.65 192.41 trib -1019 Floodway 2009.05 0.53 2009.05 115.45 2.56 3.11 10.34 178.65 192.41 trib -880 Base 2008.63 2008.63 367.97 14.91 0.33 0.76 316.80 341.31 trib -880 Floodway 2009.05 0.43 2009.05 378.73 14.65 0.43 0.93 316.80 341.31 trib -466 Base 2008.63 2008.63 403.22 15.45 0.52 0.03 552.13 565.20 trib -466 Floodway 2009.05 0.43 2009.05 420.12 15.44 0.53 0.04 552.13 565.20 trib -89 Base 2008.63 2008.63 388.12 15.26 0.71 0.03 523.44 545.76 trib -89 Floodway 2009.05 0.43 2009.05 402.84 15.12 0.76 0.12 523.44 545.76 trib 1 Base 2008.61 2008.65 112.72 11.69 4.27 0.05 423.34 431.01 trib 1 Floodway 2009.05 0.44 2009.05 268.93 14.54 1.34 0.12 423.34 431.01 trib 149 Base 2008.66 2008.66 270.35 15.86 0.14 0.00 322.78 330.58 trib 149 Floodway 2009.05 0.40 2009.05 274.63 15.79 0.19 0.02 322.78 330.58 trib 343 Base 2008.66 2008.66 281.64 15.83 0.12 0.05 326.83 335.39 trib 343 Floodway 2009.05 0.40 2009.05 305.57 15.64 0.21 0.15 326.83 335.39 trib 383 Base 2008.66 2008.66 215.39 15.97 0.03 0.00 321.06 327.35 trib 383 Floodway 2009.05 0.40 2009.05 322.89 15.76 0.13 0.11 321.06 327.35 trib 472 Base 2008.66 2008.66 214.71 15.97 0.03 0.00 246.06 255.85 trib 472 Floodway 2009.05 0.40 2009.05 244.91 15.62 0.19 0.19 246.06 255.85 trib 576 Base 2008.66 2008.66 154.76 15.99 0.01 0.00 247.56 254.23 trib 576 Floodway 2009.05 0.39 2009.05 220.82 15.48 0.17 0.34 247.56 254.23 trib 651 Base 2011.21 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 651 Floodway 2011.21 0.00 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 918 Base 2011.27 2011.27 230.82 7.90 1.56 6.54 290.48 301.36 trib 918 Floodway 2011.27 0.00 2011.27 230.84 7.90 1.56 6.54 290.48 301.36 trib 1472 Base 2013.77 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1472 Floodway 2013.77 0.00 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1510 Base 2014.12 2014.13 129.47 0.02 0.84 15.14 289.44 302.32 trib 1510 Floodway 2014.12 0.00 2014.13 129.47 0.02 0.84 15.14 289.44 302.32 trib 1520 Culvert trib 1528 Base 2014.12 2014.13 118.90 0.00 2.72 13.28 307.04 321.23 trib 1528 Floodway 2014.12 0.00 2014.13 118.90 0.00 2.72 13.28 307.04 321.23 trib 1557 Base 2014.27 2014.27 140.38 0.00 0.43 15.57 307.11 317.99 trib 1557 Floodway 2014.27 0.00 2014.27 140.38 0.00 0.43 15.57 307.11 317.99 trib 1963 Base 2016.31 2016.33 57.48 2.12 13.79 0.09 243.25 273.87 trib 1963 Floodway 2016.31 0.00 2016.33 57.48 2.12 13.79 0.09 243.25 273.87 trib 1989 Base 2019.07 2019.48 3.69 16.00 762.80 771.50 trib 1989 Floodway 2019.07 0.00 2019.48 3.69 16.00 762.80 771.50 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Floodway 2020.63 0.00 2020.76 4.00 16.00 39.42 68.83 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Floodway 2020.84 0.00 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Floodway 2020.89 0.00 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Floodway 2020.92 0.00 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Floodway 2023.39 0.00 2023.54 7.45 30.00 46.44 55.58 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Floodway 2026.19 0.00 2026.26 10.24 30.00 72.83 95.75 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Floodway 2030.67 0.00 2031.13 5.92 30.00 139.17 162.30 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 HEC-RAS Plan: wo DS fw (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4127 Floodway 2035.09 0.00 2035.15 9.22 30.00 251.87 265.32 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Floodway 2037.69 0.00 2037.84 8.14 30.00 314.09 329.75 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Floodway 2038.70 0.00 2039.53 2.50 30.00 340.25 349.22 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Floodway 2041.00 0.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Floodway 2041.03 0.00 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Floodway 2043.40 0.00 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Floodway 2048.08 0.00 2048.13 19.14 28.00 183.69 226.54 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Floodway 2052.07 0.00 2052.35 6.77 28.00 211.57 230.44 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Floodway 2052.76 0.00 2052.83 16.44 28.00 211.25 246.77 trib 6200 Culvert trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Floodway 2054.11 0.00 2054.13 18.59 28.00 221.30 259.22 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Floodway 2055.65 0.00 2055.95 10.56 28.00 210.49 231.21 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Floodway 2064.48 0.00 2064.68 10.59 28.00 197.65 240.39 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Floodway 2083.50 0.00 2083.96 3.69 18.00 150.93 158.25 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Floodway 2084.63 0.00 2085.08 3.10 18.00 118.04 121.88 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Floodway 2086.04 0.00 2086.16 3.79 18.00 111.14 115.72 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Floodway 2090.51 0.00 2091.06 2.65 18.00 114.91 118.45 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Floodway 2091.45 0.00 2091.64 2.88 18.00 119.10 122.49 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Floodway 2092.39 0.00 2092.72 7.10 0.01 17.99 130.02 136.02 EXHIBIT F POST-PROJECT CONDITIONS HEC-RAS MODEL HEC-RAS Plan: PCM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course -160 10-yr 30.00 2007.00 2007.47 2007.08 2007.47 0.000267 0.29 102.68 219.71 0.08 Golf Course -160 50-yr 54.00 2007.00 2007.73 2007.12 2007.73 0.000199 0.34 159.98 221.04 0.07 Golf Course -160 100-yr 64.00 2007.00 2007.81 2007.14 2007.81 0.000197 0.36 177.70 221.45 0.07 Golf Course -160 500-yr 88.00 2007.00 2007.91 2007.17 2007.91 0.000253 0.44 199.86 221.95 0.08 Golf Course -125 Inl Struct Golf Course -105 10-yr 30.00 2006.40 2009.75 2006.56 2009.75 0.000002 0.10 288.31 270.09 0.01 Golf Course -105 50-yr 54.00 2006.40 2009.90 2006.63 2009.90 0.000007 0.18 301.18 270.84 0.02 Golf Course -105 100-yr 64.00 2006.40 2009.96 2006.66 2009.96 0.000009 0.21 305.75 271.09 0.02 Golf Course -105 500-yr 88.00 2006.40 2010.08 2006.72 2010.08 0.000015 0.28 316.71 271.82 0.03 Golf Course -80 10-yr 30.00 2006.40 2009.75 2006.77 2009.75 0.000034 0.39 77.07 270.08 0.04 Golf Course -80 50-yr 54.00 2006.40 2009.90 2006.95 2009.91 0.000096 0.67 80.46 270.82 0.06 Golf Course -80 100-yr 64.00 2006.40 2009.95 2007.02 2009.96 0.000128 0.78 81.65 271.07 0.07 Golf Course -80 500-yr 88.00 2006.40 2010.07 2007.17 2010.09 0.000217 1.04 84.48 271.76 0.10 Golf Course 0 Culvert Golf Course 54 10-yr 30.00 2005.50 2009.82 2005.67 2009.82 0.000001 0.10 315.37 160.90 0.01 Golf Course 54 50-yr 54.00 2005.50 2010.12 2005.76 2010.12 0.000004 0.16 337.50 162.74 0.01 Golf Course 54 100-yr 64.00 2005.50 2010.27 2005.79 2010.27 0.000005 0.18 347.93 163.60 0.01 Golf Course 54 500-yr 88.00 2005.50 2010.67 2005.86 2010.67 0.000007 0.23 377.48 166.04 0.02 Golf Course 143 10-yr 30.00 2005.50 2009.82 2005.67 2009.82 0.000001 0.07 413.64 109.71 0.01 Golf Course 143 50-yr 54.00 2005.50 2010.12 2005.74 2010.12 0.000003 0.12 447.22 111.73 0.01 Golf Course 143 100-yr 64.00 2005.50 2010.27 2005.77 2010.27 0.000003 0.14 463.27 112.57 0.01 Golf Course 143 500-yr 88.00 2005.50 2010.67 2005.84 2010.67 0.000005 0.17 509.34 114.96 0.01 Golf Course 276 10-yr 30.00 2011.62 2011.96 2011.96 2012.04 0.089336 2.17 13.82 114.35 1.10 Golf Course 276 50-yr 54.00 2011.62 2012.04 2012.04 2012.13 0.063272 2.40 22.51 123.84 0.99 Golf Course 276 100-yr 64.00 2011.62 2012.06 2012.06 2012.16 0.065509 2.57 24.86 126.28 1.02 Golf Course 276 500-yr 88.00 2011.62 2012.10 2012.10 2012.23 0.062532 2.83 31.12 132.57 1.03 Golf Course 287 10-yr 30.00 2011.90 2012.16 2012.04 2012.17 0.004622 0.71 42.47 255.76 0.27 Golf Course 287 50-yr 54.00 2011.90 2012.25 2012.08 2012.26 0.004766 0.88 61.06 278.23 0.29 Golf Course 287 100-yr 64.00 2011.90 2012.28 2012.10 2012.30 0.004863 0.95 67.64 284.80 0.30 Golf Course 287 500-yr 88.00 2011.90 2012.35 2012.13 2012.37 0.004726 1.05 83.85 298.11 0.30 Golf Course 298 10-yr 30.00 2011.65 2012.21 2012.01 2012.23 0.005812 0.97 30.79 109.21 0.32 Golf Course 298 50-yr 54.00 2011.65 2012.32 2012.11 2012.34 0.010111 1.16 46.68 193.79 0.42 Golf Course 298 100-yr 64.00 2011.65 2012.35 2012.14 2012.37 0.009796 1.22 52.55 197.22 0.42 Golf Course 298 500-yr 88.00 2011.65 2012.42 2012.20 2012.44 0.009083 1.33 66.23 206.14 0.41 Golf Course 431 10-yr 30.00 2012.03 2012.66 2012.42 2012.67 0.002078 0.57 52.28 189.55 0.19 Golf Course 431 50-yr 54.00 2012.03 2012.80 2012.48 2012.81 0.001819 0.68 79.58 203.09 0.19 Golf Course 431 100-yr 64.00 2012.03 2012.85 2012.51 2012.85 0.001826 0.72 88.70 207.04 0.19 Golf Course 431 500-yr 88.00 2012.03 2012.93 2012.57 2012.94 0.002036 0.82 107.61 225.79 0.21 Golf Course 557 10-yr 30.00 2012.09 2012.89 2012.50 2012.90 0.001608 0.66 45.55 110.83 0.18 Golf Course 557 50-yr 54.00 2012.09 2013.04 2012.61 2013.05 0.002063 0.85 63.40 126.45 0.21 Golf Course 557 100-yr 64.00 2012.09 2013.09 2012.64 2013.11 0.002152 0.91 70.15 130.22 0.22 Golf Course 557 500-yr 88.00 2012.09 2013.21 2012.71 2013.23 0.002457 1.01 87.10 153.27 0.24 Golf Course 997 10-yr 30.00 2012.71 2013.36 2012.98 2013.36 0.000745 0.45 66.83 162.25 0.12 Golf Course 997 50-yr 54.00 2012.71 2013.56 2013.05 2013.56 0.000750 0.53 102.71 197.64 0.13 Golf Course 997 100-yr 64.00 2012.71 2013.62 2013.07 2013.62 0.000747 0.56 114.94 202.44 0.13 Golf Course 997 500-yr 88.00 2012.71 2013.76 2013.12 2013.77 0.000728 0.61 144.03 216.43 0.13 Golf Course 1437 10-yr 30.00 2013.92 2014.45 2014.45 2014.57 0.060483 2.73 11.00 48.16 1.01 Golf Course 1437 50-yr 54.00 2013.92 2014.57 2014.57 2014.72 0.053502 3.19 16.92 53.41 1.00 Golf Course 1437 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.053592 3.40 18.85 54.26 1.02 Golf Course 1437 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050499 3.73 23.57 56.30 1.02 Golf Course 1522 10-yr 30.00 2014.38 2015.05 2014.75 2015.05 0.001933 0.69 43.31 112.20 0.20 Golf Course 1522 50-yr 54.00 2014.38 2015.22 2014.83 2015.23 0.002055 0.84 64.26 130.44 0.21 Golf Course 1522 100-yr 64.00 2014.38 2015.28 2014.86 2015.29 0.002061 0.89 72.19 135.49 0.21 Golf Course 1522 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002172 0.95 93.00 164.64 0.22 Golf Course 1580 10-yr 30.00 2014.61 2015.16 2014.87 2015.16 0.001938 0.64 46.54 134.52 0.19 Golf Course 1580 50-yr 54.00 2014.61 2015.33 2014.95 2015.34 0.001739 0.76 71.24 148.91 0.19 Golf Course 1580 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 1580 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001567 0.87 101.34 159.73 0.19 Golf Course 1680 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.005092 0.93 32.35 111.85 0.30 Golf Course 1680 50-yr 54.00 2014.93 2015.60 2015.34 2015.61 0.004889 1.03 52.56 151.12 0.31 Golf Course 1680 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 1680 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 2014 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012459 1.10 27.17 141.49 0.44 HEC-RAS Plan: PCM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 2014 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012670 1.24 43.59 193.33 0.46 Golf Course 2014 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 2014 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 2611 10-yr 30.00 2022.25 2022.83 2022.66 2022.84 0.005714 0.89 33.70 135.04 0.31 Golf Course 2611 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005672 1.06 51.18 158.01 0.33 Golf Course 2611 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 2611 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 3121 10-yr 30.00 2028.58 2029.26 2029.26 2029.46 0.050578 3.53 8.49 22.03 1.00 Golf Course 3121 50-yr 54.00 2028.58 2029.49 2029.49 2029.71 0.047430 3.77 14.32 32.12 1.00 Golf Course 3121 100-yr 64.00 2028.58 2029.56 2029.56 2029.79 0.047397 3.81 16.79 37.05 1.00 Golf Course 3121 500-yr 88.00 2028.58 2029.68 2029.68 2029.94 0.046961 4.11 21.40 41.87 1.01 HEC-RAS Plan: PCM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course -160 Base 2007.81 2007.81 221.45 64.00 0.00 244.30 Golf Course -160 Floodway 2007.81 0.00 2007.81 221.45 64.00 3.50 0.00 244.30 241.30 Golf Course -125 Inl Struct Golf Course -105 Base 2009.96 2009.96 86.00 64.00 0.00 285.00 Golf Course -105 Floodway 2009.96 0.00 2009.96 86.00 64.00 4.10 0.00 285.00 281.40 Golf Course -80 Base 2009.95 2009.96 23.00 64.00 0.00 285.00 Golf Course -80 Floodway 2009.95 0.00 2009.96 23.00 64.00 4.10 0.00 285.00 281.40 Golf Course 0 Culvert Golf Course 54 Base 2010.27 2010.27 73.00 64.00 0.00 752.70 Golf Course 54 Floodway 2010.27 0.00 2010.27 73.00 64.00 423.00 0.00 752.70 593.00 Golf Course 143 Base 2010.27 2010.27 112.57 64.00 0.00 687.00 Golf Course 143 Floodway 2010.27 0.00 2010.27 112.57 64.00 401.00 0.00 687.00 533.00 Golf Course 276 Base 2012.06 2012.16 126.28 64.00 0.00 731.01 Golf Course 276 Floodway 2012.10 0.04 2012.24 73.65 64.00 417.00 0.00 731.01 539.00 Golf Course 287 Base 2012.28 2012.30 219.27 64.00 0.00 530.94 Golf Course 287 Floodway 2012.45 0.16 2012.49 90.00 64.00 255.00 0.00 530.94 345.00 Golf Course 298 Base 2012.35 2012.37 197.22 64.00 0.00 421.96 Golf Course 298 Floodway 2012.53 0.18 2012.55 80.00 64.00 153.00 0.00 421.96 233.00 Golf Course 431 Base 2012.85 2012.85 207.04 64.00 0.00 319.28 Golf Course 431 Floodway 2013.03 0.18 2013.08 51.00 64.00 120.00 0.00 319.28 171.00 Golf Course 557 Base 2013.09 2013.11 130.22 64.00 0.00 248.45 Golf Course 557 Floodway 2013.52 0.42 2013.57 26.00 64.00 101.00 0.00 248.45 127.00 Golf Course 997 Base 2013.62 2013.62 202.44 64.00 843.00 1600.75 Golf Course 997 Floodway 2014.22 0.60 2014.24 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 1437 Base 2014.60 2014.78 54.26 64.00 759.64 1718.25 Golf Course 1437 Floodway 2015.26 0.66 2015.70 14.13 64.00 1162.20 759.64 1718.25 1176.33 Golf Course 1522 Base 2015.28 2015.29 135.49 64.00 729.92 1627.92 Golf Course 1522 Floodway 2016.10 0.83 2016.14 27.34 64.00 1123.02 729.92 1627.92 1150.36 Golf Course 1580 Base 2015.39 2015.40 151.92 64.00 763.22 1639.53 Golf Course 1580 Floodway 2016.21 0.82 2016.27 22.35 64.00 1126.64 763.22 1639.53 1148.99 Golf Course 1680 Base 2015.65 2015.66 154.59 64.00 768.88 1659.11 Golf Course 1680 Floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 768.88 1659.11 1115.00 Golf Course 2014 Base 2018.10 2018.12 208.12 64.00 688.98 1310.47 Golf Course 2014 Floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 2611 Base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 2611 Floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 3121 Base 2029.56 2029.79 37.05 64.00 625.38 682.89 Golf Course 3121 Floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 625.38 682.89 656.04 HEC-RAS Plan: PCM River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 546 Q10 10.00 1990.00 1990.90 1990.70 1990.97 0.011466 2.06 4.86 10.80 0.54 trib 546 Q50 14.00 1990.00 1991.00 1990.80 1991.09 0.012814 2.33 6.00 12.00 0.58 trib 546 Q100 16.00 1990.00 1991.10 1990.84 1991.18 0.010069 2.20 7.26 13.20 0.52 trib 546 Q500 20.00 1990.00 2005.00 1990.92 2005.00 0.000000 0.05 552.41 68.83 0.00 trib 566 Q10 10.00 1999.50 2000.20 2000.20 2000.38 0.044032 3.41 2.93 8.39 1.02 trib 566 Q50 14.00 1999.50 2000.30 2000.30 2000.51 0.041805 3.64 3.85 9.61 1.01 trib 566 Q100 16.00 1999.50 2000.35 2000.35 2000.56 0.041101 3.73 4.28 10.14 1.01 trib 566 Q500 20.00 1999.50 2005.00 2005.00 0.000004 0.18 139.08 43.59 0.01 trib 586 Q10 10.00 2008.00 2008.70 2008.70 2008.88 0.043786 3.40 2.94 8.40 1.01 trib 586 Q50 14.00 2008.00 2008.80 2008.80 2009.01 0.041975 3.64 3.85 9.61 1.01 trib 586 Q100 16.00 2008.00 2008.85 2008.85 2009.06 0.040257 3.71 4.32 10.18 1.00 trib 586 Q500 20.00 2008.00 2008.93 2008.93 2009.16 0.039484 3.89 5.14 11.11 1.01 trib 651 Q10 10.00 2009.50 2010.26 2010.08 2010.36 0.011012 2.50 4.00 7.55 0.60 trib 651 Q50 14.00 2009.50 2010.39 2010.19 2010.51 0.011410 2.77 5.05 8.34 0.63 trib 651 Q100 16.00 2009.50 2010.44 2010.25 2010.57 0.011949 2.93 5.47 8.64 0.65 trib 651 Q500 20.00 2009.50 2010.54 2010.34 2010.69 0.012330 3.14 6.37 20.63 0.67 trib 918 Q10 10.00 2009.10 2010.71 2009.68 2010.72 0.000488 0.80 12.57 12.64 0.14 trib 918 Q50 14.00 2009.10 2010.91 2009.80 2010.93 0.000565 0.92 15.28 13.87 0.15 trib 918 Q100 16.00 2009.10 2011.00 2009.84 2011.01 0.000599 0.97 16.51 14.39 0.16 trib 918 Q500 20.00 2009.10 2011.16 2009.94 2011.17 0.000658 1.06 18.83 15.33 0.17 trib 1195.* Q10 10.00 2010.27 2011.02 2010.85 2011.12 0.011805 2.56 3.90 7.47 0.62 trib 1195.* Q50 14.00 2010.27 2011.25 2010.96 2011.34 0.007845 2.42 5.79 8.85 0.53 trib 1195.* Q100 16.00 2010.27 2011.34 2011.01 2011.43 0.006948 2.40 6.67 9.43 0.50 trib 1195.* Q500 20.00 2010.27 2011.51 2011.11 2011.60 0.005860 2.39 8.37 10.46 0.47 trib 1472 Q10 10.00 2011.44 2012.50 2012.02 2012.54 0.002827 1.52 6.57 9.37 0.32 trib 1472 Q50 14.00 2011.44 2012.64 2012.13 2012.69 0.003285 1.76 7.96 10.23 0.35 trib 1472 Q100 16.00 2011.44 2012.71 2012.19 2012.76 0.003483 1.86 8.60 10.59 0.36 trib 1472 Q500 20.00 2011.44 2012.82 2012.28 2012.89 0.003725 2.02 9.89 11.30 0.38 trib 1510 Q10 10.00 2011.15 2012.58 2011.72 2012.60 0.000802 0.96 10.45 11.60 0.18 trib 1510 Q50 14.00 2011.15 2012.74 2011.84 2012.76 0.000991 1.13 12.40 12.56 0.20 trib 1510 Q100 16.00 2011.15 2012.81 2011.91 2012.84 0.001074 1.20 13.29 12.98 0.21 trib 1510 Q500 20.00 2011.15 2012.95 2011.99 2012.97 0.001202 1.33 15.05 13.77 0.22 trib 1528 Q10 10.00 2010.84 2012.60 2011.42 2012.61 0.000327 0.69 14.58 13.56 0.12 trib 1528 Q50 14.00 2010.84 2012.77 2011.54 2012.78 0.000430 0.83 16.92 14.56 0.14 trib 1528 Q100 16.00 2010.84 2012.84 2011.59 2012.85 0.000476 0.89 17.99 14.99 0.14 trib 1528 Q500 20.00 2010.84 2012.97 2011.68 2012.99 0.000554 1.00 20.07 15.81 0.16 trib 1557 Q10 10.00 2011.79 2012.57 2012.36 2012.66 0.009890 2.40 4.16 7.68 0.58 trib 1557 Q50 14.00 2011.79 2012.74 2012.47 2012.84 0.008804 2.52 5.55 8.69 0.56 trib 1557 Q100 16.00 2011.79 2012.81 2012.54 2012.92 0.008497 2.58 6.20 9.13 0.55 trib 1557 Q500 20.00 2011.79 2012.95 2012.64 2013.06 0.007899 2.67 7.50 9.95 0.54 trib 1963 Q10 10.00 2018.61 2019.19 2019.19 2019.40 0.031827 3.69 2.71 6.33 0.99 trib 1963 Q50 14.00 2018.61 2019.31 2019.31 2019.56 0.030543 4.00 3.50 7.01 1.00 trib 1963 Q100 16.00 2018.61 2019.35 2019.35 2019.63 0.031823 4.21 3.80 7.25 1.03 trib 1963 Q500 20.00 2018.61 2019.46 2019.46 2019.75 0.028831 4.32 4.63 7.87 0.99 trib 1989 Q10 10.00 2017.77 2019.48 2018.34 2019.50 0.000506 1.13 8.85 13.27 0.16 trib 1989 Q50 14.00 2017.77 2019.65 2018.46 2019.68 0.000716 1.43 9.76 14.26 0.19 trib 1989 Q100 16.00 2017.77 2019.72 2018.51 2019.76 0.000814 1.57 10.18 14.71 0.20 trib 1989 Q500 20.00 2017.77 2019.85 2018.62 2019.90 0.001027 1.84 10.85 18.52 0.23 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001967 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003296 1.63 14.73 14.58 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003481 1.80 16.70 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004327 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001826 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002896 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003073 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003781 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001721 1.08 11.15 12.54 0.20 HEC-RAS Plan: PCM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002630 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002802 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003425 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017098 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.14 2022.58 2023.29 0.009978 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009961 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008902 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003068 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003718 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003885 2.34 19.63 12.08 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031974 4.34 5.07 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.006997 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 HEC-RAS Plan: PCM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: PCM FW River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 546 Base 1991.10 1991.18 13.20 16.00 38.20 59.35 trib 546 Method 1 FW 1991.10 0.00 1991.18 13.20 16.00 38.20 38.20 59.35 59.35 trib 566 Base 2000.35 2000.56 10.14 16.00 31.00 49.00 trib 566 Method 1 FW 2000.35 0.00 2000.56 10.17 16.00 31.00 31.00 49.00 49.00 trib 586 Base 2008.85 2009.06 10.18 16.00 35.00 53.00 trib 586 Method 1 FW 2008.85 0.00 2009.06 10.17 16.00 35.00 35.00 53.00 53.00 trib 651 Base 2010.44 2010.57 8.64 16.00 357.60 384.41 trib 651 Method 1 FW 2010.44 0.00 2010.57 8.64 16.00 357.60 357.60 384.41 384.41 trib 918 Base 2011.00 2011.01 14.39 16.00 454.00 484.60 trib 918 Method 1 FW 2011.00 0.00 2011.01 14.39 16.00 454.00 454.00 484.60 484.60 trib 1195.* Base 2011.34 2011.43 9.43 16.00 575.00 603.46 trib 1195.* Method 1 FW 2011.34 0.00 2011.43 9.43 16.00 575.00 575.00 603.46 603.46 trib 1472 Base 2012.71 2012.76 10.59 16.00 696.00 722.31 trib 1472 Method 1 FW 2012.71 0.00 2012.76 10.59 16.00 696.00 696.00 722.31 722.31 trib 1510 Base 2012.81 2012.84 12.98 16.00 701.10 730.50 trib 1510 Method 1 FW 2012.81 0.00 2012.84 12.98 16.00 701.10 701.10 730.50 730.50 trib 1528 Base 2012.84 2012.85 14.99 16.00 715.20 746.38 trib 1528 Method 1 FW 2012.84 0.00 2012.85 14.99 16.00 715.20 715.20 746.38 746.38 trib 1557 Base 2012.81 2012.92 9.13 16.00 719.70 746.01 trib 1557 Method 1 FW 2012.81 0.00 2012.92 9.13 16.00 719.70 719.70 746.01 746.01 trib 1963 Base 2019.35 2019.63 7.25 16.00 730.70 751.34 trib 1963 Method 1 FW 2019.35 0.00 2019.63 7.25 16.00 730.70 730.70 751.34 751.34 trib 1989 Base 2019.72 2019.76 5.50 16.00 746.10 773.88 trib 1989 Method 1 FW 2019.72 0.00 2019.76 5.50 16.00 746.10 746.10 773.88 773.88 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Method 1 FW 2020.63 0.00 2020.76 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Method 1 FW 2020.84 0.00 2020.89 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Method 1 FW 2020.89 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Method 1 FW 2020.92 0.00 2020.97 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Method 1 FW 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Method 1 FW 2026.19 0.00 2026.25 10.24 30.00 75.79 72.83 95.75 86.03 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Method 1 FW 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Method 1 FW 2035.09 0.00 2035.15 9.22 30.00 253.91 251.87 265.32 263.13 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Method 1 FW 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Method 1 FW 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Method 1 FW 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Method 1 FW 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Method 1 FW 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Method 1 FW 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Method 1 FW 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Method 1 FW 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert HEC-RAS Plan: PCM FW River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Method 1 FW 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Method 1 FW 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Method 1 FW 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Method 1 FW 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Method 1 FW 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Method 1 FW 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Method 1 FW 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Method 1 FW 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Method 1 FW 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: PCM wo ds l River: Tributary Reach: trib Profile: Q500 Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q500 20.00 2004.70 2007.19 2005.11 2007.19 0.000026 0.27 97.62 92.00 0.03 trib -1019 Q500 20.00 2008.18 2008.56 2008.56 2008.57 0.006304 1.14 19.66 76.15 0.35 trib -880 Q500 20.00 2007.31 2008.58 2005.36 2008.58 0.000000 0.01 819.37 366.21 0.00 trib -466 Q500 20.00 2006.96 2008.58 2007.08 2008.58 0.000001 0.04 516.03 399.51 0.01 trib -89 Q500 20.00 2007.09 2008.58 2006.47 2008.58 0.000001 0.03 545.78 385.26 0.01 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q500 20.00 2010.99 2011.22 2011.22 2011.28 0.080642 1.91 10.48 97.54 1.03 trib 918 Q500 20.00 2009.84 2011.30 2010.15 2011.30 0.000012 0.10 207.49 233.21 0.02 trib 1472 Q500 20.00 2013.44 2013.79 2013.79 2013.85 0.069005 2.04 9.81 73.54 0.98 trib 1510 Q500 20.00 2013.58 2014.16 2013.97 2014.16 0.002873 0.61 32.73 137.70 0.22 trib 1528 Q500 20.00 2013.74 2014.22 2013.98 2014.23 0.002254 0.56 36.01 145.72 0.20 trib 1557 Q500 20.00 2013.77 2014.31 2014.14 2014.31 0.004022 0.65 30.57 149.40 0.25 trib 1963 Q500 20.00 2015.81 2016.36 2016.20 2016.38 0.008419 1.19 16.87 58.82 0.39 trib 1989 Q500 20.00 2017.77 2018.62 2018.62 2018.99 0.041127 4.88 4.10 8.08 1.00 trib 2040 Culvert trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004324 2.25 20.68 16.84 0.34 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 EXHIBIT G EFFECTIVE FLOOD INSURANCE RATE MAP (FIRM), FLOOD PROFILE, AND FLOODWAY DATA TABLE A2 0_ _ _ 2,008.10_ _ _ B2 773_ _ _ 2,008.10_ _ _ C2 961_ _ _ 2,008.50_ _ _ D 1,14535411.62,008.90 2,008.90 2,009.600.7E 1,42530501.32,009.10 2,009.10 2,010.000.9F 1,60020282.32,009.30 2,009.30 2,010.301.0G 1,80045860.72,013.30 2,013.30 2,014.100.8H 2,12343810.82,013.30 2,013.30 2,014.200.9I 2,70440671.02,013.50 2,013.50 2,014.501.0J 3,14414125.32,014.80 2,014.80 2,015.300.5K 3,28722331.92,015.40 2,015.40 2,016.200.8L 3,38720252.62,015.70 2,015.70 2,016.600.9M 3,72120232.82,018.10 2,018.10 2,019.000.9N 4,31820242.72,023.00 2,023.00 2,023.800.81Feet above Golf Course Storage AreaFEDERAL EMERGENCY MANAGEMENT AGENCY2 - Floodway not computedCHESTER CREEK - GOLF COURSE OVERFLOWTABLE 6AND INCORPORATED AREASSPOKANE COUNTY, WA1-PERCENT-ANNUAL-CHANCE FLOODWATER SURFACE ELEVATIONFLOODWAYFLOODING SOURCECROSS SECTIONDISTANCE1CHESTER CREEK-GOLF COURSE OVERFLOWFLOODWAY DATAWIDTH (FEET)REGULATORY (FEET NAVD)INCREASE (FEET)SECTION AREA (SQ.FEET)MEAN VELOCITY (FEET/SEC.)WITHOUT FLOODWAY (FEET NAVD)WITH FLOODWAY (FEET NAVD) AA 6,5701474.12,043.40 2,043.40 2,043.400.0AB 7,08219171.62,048.10 2,048.10 2,048.200.1AC 7,522755.22,052.10 2,052.10 2,052.100.0AD 7,64519221.32,054.10 2,054.10 2,054.100.0AE 7,6791164.42,055.70 2,055.70 2,055.700.0AF 7,9581183.62,064.50 2,064.50 2,064.500.0AG 8,491435.42,083.50 2,083.50 2,083.500.0AH 8,548472.72,086.00 2,086.00 2,086.000.0AI 8,592353.52,091.50 2,091.50 2,091.500.0AJ 8,625644.72,092.40 2,092.40 2,092.400.01Feet above confleunce with Chester creekFEDERAL EMERGENCY MANAGEMENT AGENCYUNNAMED TRIBUTARY TO CHESTER CREEKTABLE 6AND INCORPORATED AREASSPOKANE COUNTY, WA1-PERCENT-ANNUAL-CHANCE FLOODWATER SURFACE ELEVATIONFLOODWAYFLOODING SOURCECROSS SECTIONDISTANCE1UNNAMED TRIBUTARY TO CHESTER CREEKFLOODWAY DATAWIDTH (FEET)REGULATORY (FEET NAVD)INCREASE (FEET)SECTION AREA (SQ.FEET)MEAN VELOCITY (FEET/SEC.)WITHOUT FLOODWAY (FEET NAVD)WITH FLOODWAY (FEET NAVD) A20___2,008.10 _ _ _ B2283___2,008.50___ C2422___2,008.60___ D2836___2,008.60___ E21,244___2,008.60___ F 1,4001582.02,008.60 2,008.60 2,009.100.5 G 1,48715230.72,008.70 2,008.70 2,009.200.5 H 1,62315151.12,008.70 2,008.70 2,009.300.6 I 1,64915141.22,008.70 2,008.70 2,009.300.6 J 1,75515151.12,008.70 2,008.70 2,009.500.8 K 1,85615161.02,008.70 2,008.70 2,009.600.9 L 1,9851553.32,011.20 2,011.20 2,011.500.3 M 2,24015280.62,011.30 2,011.30 2,011.800.5 N 2,8731553.32,013.80 2,013.80 2,014.200.4 O 2,93615121.32,014.10 2,014.10 2,014.600.5P2,96615111.42,014.30 2,014.30 2,014.700.41Feet above storage area #1FEDERAL EMERGENCY MANAGEMENT AGENCY2 Cross section A through E are common for both Unnamed Tributary to Chester Creek and West Bank Overflow. See Unnamed Tribuatary to Chester Creek for Floodway Data UNNAMED TRIBUTARY TO CHESTR CREEK - LEFT BANK OVERFLOW CHANNELTABLE 6AND INCORPORATED AREASSPOKANE COUNTY, WA1-PERCENT-ANNUAL-CHANCE FLOODWATER SURFACE ELEVATIONFLOODWAYFLOODING SOURCECROSS SECTIONDISTANCE1LEFT BANK OVER FLOW CHANNELFLOODWAY DATAWIDTH (FEET)REGULATORY (FEET NAVD)INCREASE (FEET)SECTION AREA (SQ.FEET)MEAN VELOCITY (FEET/SEC.)WITHOUT FLOODWAY (FEET NAVD)WITH FLOODWAY (FEET NAVD) EXHIBIT H REVISED FLOOD PROFILES AND FLOODWAY DATA TABLES FLOODING SOURCE FLOODWAY 1-PERCENT-ANNUAL-CHANCE FLOOD WATER SURFACE ELEVATION CROSS SECTION DISTANCE1 WIDTH (FEET) SECTION AREA (SQ. FEET) MEAN VELOCITY (FEET/SEC) REGULATORY (FEET NAVD) WITHOUT FLOODWAY (FEET NAVD) WITH FLOODWAY (FEET NAVD) INCREASE (FEET) CHESTER CREEK-GOLF COURSE OVERFLOW A 54 73 699 0.2 2010.3 2010.3 2010.3 0.0 B 143 113 463 0.1 2010.3 2010.3 2010.3 0.0 C 276 74 21 3.1 2012.1 2012.1 2012.1 0.0 D 287 90 37 1.7 2012.3 2012.3 2012.5 0.2 E 298 80 53 1.2 2012.4 2012.4 2012.5 0.1 F 431 51 37 1.8 2012.9 2012.9 2013.0 0.1 G 557 26 35 1.8 2013.1 2013.1 2013.5 0.4 H 997 40 57 1.1 2013.6 2013.6 2014.2 0.6 I 1437 14 12 5.3 2014.6 2014.6 2015.3 0.7 J 1580 22 33 1.9 2015.4 2015.4 2016.2 0.8 K 1680 20 25 2.6 2015.7 2015.7 2016.6 0.9 L 2014 20 23 2.8 2018.1 2018.1 2019.0 0.9 M 2611 20 24 2.7 2023.0 2023.0 2023.8 0.8 1Feet above Thorpe Road TABLE 6FEDERAL EMERGENCY MANAGEMENT AGENCY FLOODWAY DATA SPOKANE COUNTY, WA CHESTER CREEK - GOLF COURSE OVERFLOW AND INCORPORATED AREAS FLOODING SOURCE FLOODWAY 1-PERCENT-ANNUAL-CHANCE FLOOD WATER SURFACE ELEVATION CROSS SECTION DISTANCE1 WIDTH (FEET) SECTION AREA (SQ. FEET) MEAN VELOCITY (FEET/SEC) REGULATORY (FEET NAVD) WITHOUT FLOODWAY (FEET NAVD) WITH FLOODWAY (FEET NAVD) INCREASE (FEET) UNNAMED TRIBUTARY TO CHESTER CREEK A 0 -- -- -- -- -- -- -- B 283 -- -- -- -- -- -- -- C 422 -- -- -- -- -- -- -- D 836 -- -- -- -- -- -- -- E 910 -- -- -- -- -- -- -- F 1,378 -- -- -- -- -- -- -- G 1,525 -- -- -- -- -- -- -- H 1,720 -- -- -- -- -- -- -- I 1,760 -- -- -- -- -- -- -- J 1,849 -- -- -- -- -- -- -- K 1,952 10 4 3.7 2008.9 2008.9 2008.9 0.0 L 2,028 15 6 2.7 2010.4 2010.4 2010.4 0.0 M 2,295 8 13 1.3 2011.0 2011.0 2011.0 0.0 N 2,849 5 4 4.3 2012.7 2012.7 2012.7 0.0 O 2,905 10 18 0.9 2012.8 2012.8 2012.8 0.0 P 2,933 8 12 1.3 2012.8 2012.8 2012.8 0.0 Q 3,339 9 6 2.6 2019.4 2019.4 2019.4 0.0 R 3,485 15 17 1.8 2020.8 2020.8 2020.8 0.0 S2 3,509 133 59 0.5 2,019.9/2,020.9 2,019.9 2,020.0 0.1 T2 4,040 42 31 1.0 2,020.8/2,023.4 2,020.8 2,021.8 1.0 U2 4,515 67 27 1.1 2,024.3/2,026.2 2,024.3 2,025.2 0.9 V2 5,006 169 23 1.3 2,029.0/2,030.7 2,029.0 2,030.0 1.0 W2 5,516 62 17 1.8 2,033.5/2,035.1 2,033.5 2,034.5 1.0 X 6,028 8 10 3.1 2,037.7 2,037.7 2,037.7 0.0 Y 6,109 8 20 1.5 2,041.0 2,041.0 2,041.0 0.0 Z 6,155 13 24 1.2 2,041.0 2,041.0 2,041.1 0.1 1Feet above confluence with Chester Creek 2Floodway is based on combination of with and without levee floodway runs due to perched channel. Width is total width of both runs. TABLE 6FEDERAL EMERGENCY MANAGEMENT AGENCY FLOODWAY DATA SPOKANE COUNTY, WA UNNAMED TRIBUTARY TO CHESTER CREEK AND INCORPORATED AREAS H G I J K M L G F A BCDE 2013 2012 2011 End of Floodway Legend BFE Cross Sections Flood Hazard Line 1% Flood Line 0.2% Flood Line Floodway Zone Break/Limit Line Infiltration Facility CLOMR Boundary 20132016201220112010 EXHIBIT I FLOODPLAIN WORKMAP FOR CLOMR R - RS 3485.45 WSE - 2020.8M - R S 2 6 1 1 W S E - 2 0 2 3 Infitration Facility Infitration Facility Infitration Facility 20122013201620192009201020112016 201820 2 0 2014 20 2 4 C - RS 422 WSE - n/aB - RS 283 WSE - n/aZ - RS 6155.46 WSE - 2041D - RS 836 WSE - n/aA - RS 0 WSE - n/aI - RS 1 4 3 7 W S E - 2 0 1 4 . 6 A - RS 54 WSE - 2010.3 J - RS 1 5 8 0 W S E - 2 0 1 5 . 4 AA - RS 6569.99 WSE - 2043.4E - RS 910 WSE - n/aX - RS 6028.48 WSE - 2037.7AI - RS 19365 WSE - 2008.6AV - RS 2203 5 W S E - 2 0 1 4. 8 H - RS 997 WSE - 2013.6 BL - RS 26201 WSE - 2045.7 D - RS 287 WSE - 2012.3 V - RS 5006.26 WSE - 2030.7 BE - RS 24460 WSE - 2028.7 AW - RS 22342 WSE - 2014.9 BJ - RS 25875 WS E - 2 0 4 5. 7 BK - RS 26111 WSE - 2045.7 O - RS 2904.75 WSE - 2012.8U - RS 4515.26 WSE - 2 0 2 6 . 2AJ - RS 19414 WSE - 2008.8T - RS 4039.71 WSE - 2023.4F - RS 1378 WSE - n/aL - RS 2104 WSE - 2018. 1 AC - RS 7522.02 W S E - 2 0 5 2 . 1AK - RS 19430 WSE - 2008.8AB - RS 7081.65 WSE - 2 0 4 8 . 1 BC - RS 24315 WSE - 2 0 2 8 . 1 AD - RS 7644.52 WSE - 2054. 1 AY - RS 22936 WSE - 2020.5 BM - RS 2 6 7 6 2 W S E - 2 0 4 5 . 6 AX - RS 2 2 8 5 9 W S E - 2 0 1 8 . 5 BN - RS 27201 WSE - 2049 BF - RS 24852 WSE - 2031.6 I - RS 1759.59 WSE - n/aAF - RS 7958.03 WSE - 2064.5 BI - RS 25669 WSE - 2 0 3 6 . 2 BB - R S 2 3 7 7 3 W S E - 2 0 2 5 . 2AM - RS 19857 WSE - 2009.5BH - RS 25178 WSE - 2033.3 J - RS 1848.94 WSE - n/aL - RS 2027.72 WSE - 2010.4BG - RS 24936 WSE - 2032.1 BR - RS 28154 WSE - 2058 AS - RS 21201 W S E - 2 0 1 1 . 8 - RS -8888 WSE - -8888 - RS -8888 WSE - -8888B - RS 143 WSE - 2010.3 K - R S 1 6 8 0 W S E - 2 0 1 5 . 7 Y - RS 6109.2 WSE - 2041 - RS -8888 WSE - -8888K - RS 1952.4 WSE - 208.9AP - RS 20524 WSE - 2010.4AI - RS 8592.22 WSE - 2091.5AJ - RS 8625.48 WSE - 2092.4AN - RS 20233 WSE - 2010.1AH - RS 854 8. 2 2 W S E - 2 0 8 6 AT - RS 21425 WSE - 2012.1 AG - RS 8491.4 3 W S E - 2 0 8 3. 5 AR - RS 20983 W S E - 2 0 1 1. 2 BS - RS 28249 W S E - 2 0 5 9 . 3 BQ - RS 28025 W S E - 2 0 5 6 . 9 AQ - RS 20748 WSE - 2010.8 G - RS 557 WSE - 2013.1 Q - RS 3338.84 WSE - 2019.4M - RS 2295.08 WSE - 2011F - RS 431 WSE - 2012.9 H - RS 1719.72 WSE - n/aG - RS 1525.3 WSE - n/aBA - RS 2333 2 W S E - 2 0 2 2 . 9 S - RS 3 5 0 8 . 5 6 W S E - 2 0 2 0 . 9 AL - RS 19463 WSE - 2008.9E - RS 298 WSE - 2012.4 AZ - RS 22977 WSE - 2020.7 AE - RS 767 9.4 4 W S E - 2 05 5.7 AU - RS 21578 WSE - 2014.7 P - RS 2933.32 WSE - 2012.8N - RS 2848.82 WSE - 2012.7BD - RS 24387 WSE - 2028.6 W - RS 5516.31 WSE - 2 0 3 5 . 1 C - RS 276 WSE - 2012.1 2019 201420462018 2016 20 1 2 2026 2023 2032 2043 2013 20 1 12008 2035 2030 2034 20242009 2026 2060205820722074205620762062208020822084207020 8 620542088209020922094209 6 2098210021 0 2 21 0 4 21062 1 0 8 206620642110 2112211 4 211 6 211 8 21202 1 2 4 212621 2 8 21302132213421362 1 38 214021 4 2 2144214621482150215221542156 21582160216221642166216821702172217421762178218021 8 2 218421862188219021922194219621982200220220262028203020322034203620382040204220442046204820502052220422062208221022122214 2216221822202260226222642266226822702272227422762278228022822284 2286228820782222222422262228 224822302232224622342236224422502242225222382240225422562 2 5 8 20202018 2016 2292 201 4 23062122201 2 2 0 1 0 23262330233223362338 234023422344 2346 2348 2350 2352235 4 2356 2358 2360 23622364236623682370 23 7 2 23742376 2378238023 8 22384238623882390 2392 23 9 4 239623982400 240 2 2 4 0 4 2406 240824102412 241424162420 2424242624 2 8 24 3 0 2 4 3 2 2434 24362438 24402442244424462448 20242008 2456 24842486 24882 4 9 0 249 2 24942496249 8 250025022504250625082510251225 1 4 2516 2518 24502520 252225242006252625302532 25342536 2538 2540254225442546254 8 2550 2552255425562558 2560256225642 5 6 6 256825702572257425762578 2580258225842586 2588 25902592259424 5 8 2596 229622942 4 5 2229824602468245424702302 2290 2300 246 2 2482206824 6 6 246 4 24 8 02476 2478241 8 24722598 2304 2600 26022604 2606260826102612261 4 26162618 2474230823202310 2314 2316231826202002 2 3 2 2 2312 2630 2622 252826 2 4 20042000 2638 232426422626 2422 1998 232826282634 1996 19902652 2636 2654 1 9 7 8 2640211422902276 247620582112 20 0 6 208621 0 2 20102008 2460 2 4 1 4 2026 20922272230420942022205822182 0 0 8 2104206420882 4 602018 2290206623062408202 4 21 7 2 2208 2 1 1 4 2108233623 6 4 236223 6 8 25262096 2516227 820102006 200820542082 2444204026 2 6 231624822126 20 0 8 226823282 4 2 4 2 1 1 02108 2 1 2 02086 224020422010 2008243622662314 22422026 20962106 220420142 0 3 2 21882030 21162 1 0 8 2356 2488 20 1 8 216824282036 202220522098 2 3 3 8 2034 23382010 220824302006226220782250 22722006 225020262012 2060233224082002 2 4 0 8 2 0 2 6 2 0 5 6 2316 228020262314202223022492 2106 2354245420022 4 7 8 226420082322 228221402544 2 4 5 8 2028 2502236224562036 2216 2090 2048 252421582056221620622 4 5 8 2308232623562208214620262034 24 0 4 20 9 6 2388 2216 211820 0 6 23042 1 3 0 2 0 2 02074 201 0 205823122318 202420 5 0 2016 20942028224421302422204821 0 4 23662498 2504216021 1 4 231020 6 0 247823302 2 6 42006 243 42064 2420 2074 207620502026 2300203424962036209621022044232821102056 2026 2316229820922210 203621842010 2026217 4206820162000 249020202 0 2 8 20082 0 0 8 25342012 23222010 22262 0 3 4 2010 2 0 9 2 2330 2008 2034206820082420 23 1 2 2006 2206 20242020 2024 208022062042 2 1 1 42388 2232201221502214 242420 0 8 20122010 202224062 0 24 2008 2346 223422982030 2452203022502 0 2 2 22 7 2 2 4 1 6 2296207620382308 25282066 2518252022622286201820 1 2 20342 0 0 8 20082010200220 0 6 2076 202422482 0 0 4 20 3 0 20 1 0 2 1 3 620242018 2020 2020248422762210206020502058227422 6 0 2094 2396 2 028 24422 1 5 82006 227 8 2132241020842420227020062024 22 6 8 2016 2040 227020 1 0 22302322227220542048208220602244 2062 23202208 23 2 2 25 0 62110208020 1 4 2472252620322562 22522 0 0 8 23102 0 7 2 225623542004 20362 3 1 22508240420281998 2496 25282314200 6 2310 22662032208823562088227020702044 2028 202 420222010 222823142240 20162264235222362024 2530250624 7 0 2 0 1 6 21 9 2 2010 2244232024622464206822602014 2018 20042 0 1 6 23022422 2016 2 30 4 225820542 0 6 4 20 7 6 24682056229 0 2272212 0 2036 202820042 3 3 4 2022 23182042 22762052200223902284247420062008 231820 7 2 203 22094 2 0 1 2 2304 216420082278 2018 205422942052232023262082 208621242026200 8 2220 22642042 214 8 2066225024722066 24862002 21 0 0 20102128205220 4 4 2222207820262050224622 6 62026 20242034203022322010227620 5 2 224620 0 4 2 0 0 6 2286245620322156233220242074221221 2 8 251821122 2 7 0 206020302006 2020 20842008 200 6 246022242 0 4 4 2454227420082014 2458 2 0 1 0 2016 232420422296 2172213222922098200820322354 2026 20182010 22 6 82008 21562018 201 0 20 0 0 20142244 205420222024 203020 0 8 2 1 7 02010 240820082032 20122024200622322006 2006 24662246245 22202 2026238620442006 247623522480 2054 22742024 207 0 2016 22 4 2 21322200 2008 2418 Legend CLOMR Boundary BFE Cross Sections Flood Hazard Line 1% Flood Line 0.2% Flood Line Floodway Zone Break/Limit Line Infiltration Facility 2 ft contours from 2003 LiDAR Ü 0 1,000 2,000500 Feet EXHIBIT J GEOTECHNICAL EVALUATION AND LEVEE CERTIFICATION REPORTS Preliminary Geotechnical Investigation FIGURE 3 Test Pit Location Map Project No. 2013-026 December 30, 2013Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA Dishman‐Mica Road Levee Certification GEOTECHNICAL EVALUATION PROPOSED LEVEE 4403 SOUTH DISHMAN-MICA ROAD SPOKANE COUNTY, WASHINGTON Inland Pacific Engineering Company Project No. 14-037A July 17, 2015 IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting GEOTECHNICAL EVALUATION PROPOSED LEVEE 4403 SOUTH DISHMAN-MICA ROAD SPOKANE COUNTY, WASHINGTON Inland Pacific Engineering Company Project No. 14-037A July 17, 2015 Prepared for: NAI Black Spokane, Washington IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting TABLE OF CONTENTS Project No. 14-037A Proposed Levee 4403 South Dishman-Mica Road Spokane County, Washington page 1.0 INTRODUCTION ................................................................................................................ 1 1.1 Project Description .................................................................................................... 1 1.2 Purpose ...................................................................................................................... 1 1.3 Scope ......................................................................................................................... 1 1.4 Available Information ............................................................................................... 1 1.5 Locations and Elevations .......................................................................................... 2 2.0 RESULTS .............................................................................................................................. 2 2.1 Logs........................................................................................................................... 2 2.2 Site Conditions .......................................................................................................... 2 2.3 Soils........................................................................................................................... 2 2.4 Penetration Resistances ............................................................................................. 2 2.5 Groundwater ............................................................................................................. 3 2.6 Laboratory Testing .................................................................................................... 3 3.0 ANALYSIS AND RECOMMENDATIONS ......................................................................... 3 3.1 Discussion ................................................................................................................. 3 3.2 Site Preparation ......................................................................................................... 3 3.3 Freeboard .................................................................................................................. 4 3.4 Closures..................................................................................................................... 4 3.5 Embankment Protection ............................................................................................ 4 3.6 Embankment and Foundation Stability ..................................................................... 5 3.7 Settlement ................................................................................................................. 5 3.8 Interior Drainage ....................................................................................................... 6 3.9 Operation Plans ......................................................................................................... 6 3.10 Maintenance Plan .................................................................................................... 6 4.0 PROCEDURES ..................................................................................................................... 6 4.1 Drilling and Sampling ............................................................................................... 6 4.2 Soil Classification ..................................................................................................... 6 5.0 GENERAL RECOMMENDATIONS.................................................................................... 6 5.1 Basis of Recommendations ....................................................................................... 6 5.2 Groundwater Fluctuations ......................................................................................... 6 5.3 Use of Report ............................................................................................................ 7 5.4 Level of Care............................................................................................................. 7 5.5 Professional Certification .......................................................................................... 7 Appendix A – Site Location Map, NRCS Map, Boring Location Map Appendix B – Logs of Borings, Descriptive Terminology Appendix C – Laboratory Test Results 1.0 INTRODUCTION 1.1 Project Description We understand that the proposed project may consist of a residential development. The site consists of 91 acres currently developed as a golf course. Stormwater runoff will be treated using drywells and/or gravel galleries for subsurface infiltration. These type of facilities will also be used to manage potential floodwaters, if needed. Because the existing Dishman-Mica roadway embankment is not considered a FEMA certified levee, a new levee will be constructed along the east side of the roadway. 1.2 Purpose The purpose of our services is to provide design recommendations for the proposed levee for conformance to 44 CFR 65.10 of the Code of Federal Regulations for certification by the Federal Emergency Management Agency (FEMA). 1.3 Scope Our services were requested by Mr. Bryan Walker of NAI Black. Mr. Walker authorized us to proceed on April 28, 2015. The scope of work agreed upon consisted of the following: review of existing geotechnical data and reports for the development, if available drill 6 penetration test borings at the site to a depth of 15 feet, performing laboratory tests on samples obtained from the test pits, classifying the soils and preparing boring logs, and submitting a geotechnical report containing logs of the borings, results of our field investigation and laboratory testing, and our analyses, opinions, and recommendations relative to levee design and construction for conformance to FEMA standards. 1.4 Available Information We were provided a topographic survey for the project site by WCE. This topographic survey showed the existing roadways, existing structures, property lines, and existing ground surface elevation contours. This plan was prepared by WCE and was dated November 7, 2013. We performed a preliminary geotechnical evaluation for the property in December 2013. The results of that evaluation, along with our opinions and recommendations, are summarized in our Preliminary Geotechnical Evaluation dated December 31, 2013. In addition, we performed a geotechnical evaluation for the existing levee on the property to evaluate conformance to the FEMA standard. The results of that evaluation are summarized in our Geotechnical Evaluation report dated February 12, 2015. In conjunction with this evaluation, West Consultants, Inc. (WEST) has been contracted by NAI Black to provide a FEMA Conditional Letter of Map Revision submittal (CLOMR). They have provided Inland Pacific Engineering Company (IPEC) water surface elevations and velocity output from their revised RAS model to assist us in our evaluation. Geotechnical Evaluation Project No. 14-037A Proposed Levee 4403 South Dishman-Mica Road Spokane County, WA July 17, 2015 Inland Pacific Engineering Company Page 2 1.5 Locations and Elevations The borings were drilled at or near locations selected by us. The boring locations are shown on the Boring Location Map in Appendix A. The borings were staked by Whipple Consulting Engineers, Inc. (WCE). Ground surface elevations at the borings were provided by WCE. 2.0 RESULTS 2.1 Logs Log of Boring sheets indicating the vertical sequence of soils and materials encountered and groundwater observations are included in Appendix B. The strata changes were inferred from the changes in the penetration test samples and auger cuttings brought to the surface. Please note that the depths shown as changes between the strata are only approximate. The changes are likely transitions and the depths of changes vary between the borings. Geologic origins for each stratum are based on the soil type, available geologic maps, previous geotechnical reports for this and adjacent sites, and available common knowledge of the depositional history of the site. 2.2 Site Conditions The site was used as a golf course prior to our evaluation. The site is relatively level with some elevated golf greens and excavated areas for water hazards. The site is primarily grass-covered with scattered trees along the fairways and pine trees in the undeveloped area to the northwest. The clubhouse building is present at the southwest corner. The existing levee is on the east side of Chester Creek between Thorpe Road and Dishman-Mica Road. The new levee will extend from the north end of the existing levee north and west along Dishman-Mica Road. 2.3 Soils Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Narcisse silt loam and Endoaquolls and Fluvaquents. The native soils encountered in the borings were consistent with the NRCS data. Boring B-2 encountered existing fill in the upper 6 feet. The fill consisted of silty clay over silty sand. The remaining borings encountered 6 inches to 4 feet of topsoil at the surface. Below the topsoil or existing fill, the borings generally encountered water-deposited silty to clayey sands and/or poorly graded sands to their termination depths. Boring B-5 encountered alluvial lean clay between the 9 and 12-foot depth. Boring B-6 encountered lean below the 7-foot depth. 2.4 Penetration Resistances Penetration resistances (N-values) in the existing fill were 12 and 13 blows per foot (BPF). Penetration resistances in the silts and sands ranged from 7 to 37 BPF and averaged 19 BPF, indicating that these soils were loose to dense, but were typically medium dense. Penetration Geotechnical Evaluation Project No. 14-037A Proposed Levee 4403 South Dishman-Mica Road Spokane County, WA July 17, 2015 Inland Pacific Engineering Company Page 3 resistances in the clays ranged from 10 to 40 BPF indicating that these soils were rather stiff to hard in consistency. 2.5 Groundwater Groundwater was not encountered in any boring during or immediately after drilling. Groundwater is believed to currently exist at some depth below the termination depths of the borings. Based on our experience in the vicinity of the site, along with numerous test pits excavated previously on the site along with borings performed on the existing levee, it is our opinion that the portion of the creek along the existing levee is the beginning of the recharge section as evidenced by the typical lack of water in the creek further downstream. Also, the test pits previously excavated at the site east of the levee did not encounter groundwater. Well log data in the vicinity of the site indicate that groundwater is typically 50 to 80 feet below the surface. 2.6 Laboratory Testing We obtained soil samples from the borings during our site investigation. The tests performed included the following: 1. ASTM D 6913, Sieve Analysis 2. ASTM D 4318, Atterberg Limits’ These tests were used to aid in classifying the soils and in the engineering analyses and formulation of engineering opinions and recommendations. Attached are data sheets summarizing the tests performed. 3.0 ANALYSIS AND RECOMMENDATIONS 3.1 Discussion Based on the data obtained from the recent and previous borings and/or test pits, it is our opinion that a new levee can be constructed adjacent to the Dishman-Mica Road that conforms to the FEMA standard. The following sections provide recommendations for construction of a levee that meets the standard based on EM 1110-2-1913, “Design and Construction of Levees, by the US Corps of Engineers dated April 30, 2000. Certification of the levee can be completed after construction has been completed. 3.2 Site Preparation We recommend that any existing topsoil, root zone, and existing fill be excavated and removed from the levee footprint area. After these soils have been removed, we recommend surface compacting the exposed soils prior to placing structural fill for the embankment. Structural fill should be placed in 6- to 8-inch-thick loose lifts at or near optimum moisture content and compacted to a minimum of 92 percent of the maximum dry density determined in accordance with ASTM D 1557 (modified Proctor). Geotechnical Evaluation Project No. 14-037A Proposed Levee 4403 South Dishman-Mica Road Spokane County, WA July 17, 2015 Inland Pacific Engineering Company Page 4 In areas where structural fill is placed on the existing Dishman-Mica Road embankment, we recommend that the fill be benched into the slope. We recommend a maximum bench height of 4 feet and a minimum bench width equal to twice the bench height. At this time, we recommend a maximum slope angle of 3:1 (H:V) for permanent slopes excavated in the native soils or embankment fills using the native soils as structural fill. The site soils which will be reused as backfill or fill are likely to be dry of optimum moisture content. These soils may require wetting to achieve adequate compaction. Backfills and fills should be placed in thin lifts not exceeding 6 to 8 inches. Most of the on-site native soils and much of the existing fill can be used as structural fill provided particles larger than six inches and all debris are removed. We recommend in-place density tests be performed on all embankment fill placed. We recommend at least one test for every 100 cubic yards of fill placed in the levee embankment with at least one test for every 2 feet of fill placed. If site grading and construction are anticipated during cold weather, we recommend that good winter construction practices be observed. All snow and ice should be removed from excavated and fill areas prior to additional earthwork or construction. No fill should be placed on soils which have frozen or contain frozen material. Frozen soils should not be used as backfill or fill. 3.3 Freeboard We were provided 100-year flood elevations by WEST. They provided us a plan view of the levee with flood elevations at 6 locations starting at the existing levee at the bridge on Dishman- Mica Road and ending at the northwest corner of the property near Wilbur Road. The elevations ranged from 2010.4 at the existing levee to 2008.1 at the north end. Please refer to the WEST report for a complete summary of the floodplain analysis. According to 44 CFR Section 65.10(b)(1), an additional 1 foot of freeboard is required within 100 feet of bridge structures. The freeboard requirement for the Dishman-Mica Road bridge is adequate. 3.4 Closures There are no penetrations of the levee proposed so closure devices are not required. 3.5 Embankment Protection The levee will tie in to the Dishman-Mica Road embankment along its entire length which will provide creekside erosion protection to the top of the roadway embankment. For those portions of the levee above this elevation (if needed), it is our opinion that vegetative cover (grasses) would be suitable based on the flow velocities provided by WEST. Geotechnical Evaluation Project No. 14-037A Proposed Levee 4403 South Dishman-Mica Road Spokane County, WA July 17, 2015 Inland Pacific Engineering Company Page 5 3.6 Embankment and Foundation Stability We recommend that the new levee be constructed with maximum 3:1 (H:V) slopes for stability. We recommend a minimum crown width of 8 feet. We recommend that the levee embankment materials consist of a granular soil having 10 to 30 percent by weight passing a 200 sieve to reduce the permeability and limit seepage. We have assumed that on-site soils will be used as borrow to construct the embankment. We evaluated the embankment and foundation stability for conditions described in EM 1110-2- 1913, “Design and Construction of Levees, by the US Corps of Engineers dated April 30, 2000, Chapter 6. We analyzed the levee embankment for the following cases: 1. CASE I, End of construction. 2. CASE II: Sudden drawdown. 3. CASE III: Steady state seepage from full flood stage. We performed slope stability analyses for each case. We analyzed the levee embankment with 3:1 slopes. For our analyses, we used XSTABL software which is based on a software program developed at Purdue University. For these cases, we calculated the minimum factors of safety as shown in the following table. CASE Minimum Factor of Safety I 2.45 II 1.86 III 2.15 For stability, a minimum factor of safety of 1.5 is generally considered acceptable. Based on this analysis, it is our opinion that the levee will be stable with respect to global slope stability provided the recommendations of this report are followed. 3.7 Settlement The average depth of fill will be approximately 5 to 6 feet. This would result in a loading increase of approximately 750 pounds per square foot (psf) on the bearing soils. Based on the data obtained from the borings, the levee will be constructed above loose to medium dense sands or sandy silts. Settlement in these soils will generally occur shortly after construction. Given the stiff condition of the clays at depth, we do not anticipate any significant settlement in these layers. We did analyze the lean clay layer encountered in Boring B-5 with a 6-foot raise in grade to maintain minimum freeboard. For our analysis, we used a unit weight of 125 pounds per cubic foot (pcf) for the embankment fill soils and a compression index of 0.06 for the lean clay and assumed total saturation of the clay layer. Based on these parameters, we estimated the settlement to be less than 0.5 inches. Geotechnical Evaluation Project No. 14-037A Proposed Levee 4403 South Dishman-Mica Road Spokane County, WA July 17, 2015 Inland Pacific Engineering Company Page 6 3.8 Interior Drainage Interior drainage systems have been designed by WCE. We understand that these systems will include detention ponds with multiple drywells to control flood waters and infiltrate them into the ground. Please refer to the WCE report for a comprehensive description of the interior drainage system. 3.9 Operation Plans The Operation Plan will be prepared as part of the final levee certification. 3.10 Maintenance Plan The Maintenance Plan will be prepared as part of the final levee certification. 4.0 PROCEDURES 4.1 Drilling and Sampling The borings were completed on May 21, 2015 using a truck-mounted drill rig operated by an independent firm working under subcontract to IPEC. A geotechnical engineer from our firm continuously observed the borings and logged the surface and subsurface conditions. After we logged the borings, they were abandoned in accordance with state requirements. 4.2 Soil Classification The soils encountered in the borings were visually and manually classified in the field by our field personnel in accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedures)”. 5.0 GENERAL RECOMMENDATIONS 5.1 Basis of Recommendations The analyses and recommendations submitted in this report are based on the data obtained from the borings performed at the locations indicated on the Boring Location Map in Appendix A. It should be recognized that the explorations performed for this evaluation reveal subsurface conditions only at discreet locations across the project site and that actual conditions in other areas could vary. Furthermore, the nature and extent of any such variations would not become evident until additional explorations are performed or until construction activities have begun. If significant variations are observed at that time, we may need to modify our conclusions and recommendations contained in this report to reflect the actual site conditions. 5.2 Groundwater Fluctuations We made water level observations in the borings at the times and conditions stated on the boring logs. These data were interpreted in the text of this report. The period of observation was relatively short and fluctuation in the groundwater level may occur due to rainfall, flooding, irrigation, spring APPENDIX A SITE LOCATION MAP, NRCS MAP, BORING LOCATION MAP FIGURE 1 Site Location Map Project No. 14-037A July 17, 2015 Proposed Levee 4403 South Dishman-Mica Road Spokane Valley, WA FIGURE 2 NRCS Map Project No. 14-037A July 17, 2015 Proposed Levee 4403 South Dishman-Mica Road Spokane Valley, WA FIGURE 3 Boring Location Map Project No. 14-037A July 17, 2015 Proposed Levee 4403 South Dishman-Mica Road Spokane Valley, WA APPENDIX B LOGS OF BORINGS, DECRIPTIVE TERMINOLOGY SS SS SS SS SS 8-10(18) 3-10(13) 10-15(25) 17-18(35) 14-8(22)11 7 (SC) CLAYEY SAND, fine grained, with roots, dark gray, moist to wet. (Topsoil) (SC) CLAYEY SAND, fine grained, brown, moist to wet, medium dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, with seams of Clayey Sand, brown, moist, medium dense to dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, medium dense. (Glacial Outwash) End of boring. Groundwater not encountered with 14 feet of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal. Bore hole then grouted. NOTES GROUND ELEVATION 2005.9 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 5/21/15 COMPLETED 5/21/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road IPEC BORING LOG - GINT STD US LAB.GDT - 7/17/15 14:36 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 6-6(12) 7-6(13) 8-9(17) 11-14(25) 15-22(37) 9 7 (CL-ML) FILL: Sandy Silty Clay, with roots, dark brown, moist to wet. (SM) FILL: Silty Sand, fine to medium grained, a trace of Gravel, brown mixed with dark brown, moist. (SP-SM) POORLY GRADED SAND with SILT and GRAVEL, fince to coarse grained, brown, moist, medium dense to dense. (Glacial Outwash) End of boring. Groundwater not encountered with 14 feet of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal. Bore hole then grouted. NOTES GROUND ELEVATION 2006 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 5/21/15 COMPLETED 5/21/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road IPEC BORING LOG - GINT STD US LAB.GDT - 7/17/15 14:36 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 5-6(11) 9-17(26) 11-12(23) 7-9(16) 11-8(19) 7 7 7 5 (ML) SANDY SILT, with roots, dark brown, moist. (Topsoil) (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, medium dense.(Glacial Outwash) End of boring. Groundwater not encountered with 14 feet of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal. Bore hole then grouted. NOTES GROUND ELEVATION 2006 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 5/21/15 COMPLETED 5/21/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road IPEC BORING LOG - GINT STD US LAB.GDT - 7/17/15 14:36 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 4-5(9) 3-4(7) 5-3(8) 15-11(26) 7-8(15) 39 6 45 36 9 74 6 9 (SC) CLAYEY SAND, very fine to fine grained, with roots, dark brown, moist to wet.(Topsoil) (ML) SANDY SILT, brown, moist to wet, loose. (Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarsegrained, with seams of Sandy Lean Clay, brown, moist to wet, loose. (Alluvium) (SC) CLAYEY SAND, fine grained, with seams of Poorly Graded Sand, brown, moist to wet, medium dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT and GRAVEL, mediumto coarse grained, moist, medium dense. (Glacial Outwash) End of boring. Groundwater not encountered with 14 feet of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal. Bore hole then grouted. NOTES GROUND ELEVATION 2006.5 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 5/21/15 COMPLETED 5/21/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-4 CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road IPEC BORING LOG - GINT STD US LAB.GDT - 7/17/15 14:36 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 3-3(6) 6-7(13) 4-6(10) 5-6(11) 10-11(21) 22 31 17 1414 (SC) CLAYEY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, very fine to fine grained, brown to dark brown,moist, loose. (Alluvium) (SC-SM) SILTY CLAYEY SAND, fine grained, brown, moist to wet,medium dense.(Alluvium) (SC) CLAYEY SAND, fine grained, brown, wet, loose. (Alluvium) (CL) LEAN CLAY. brown, wet, very stiff. (Alluvium) (SM) SILTY SAND, fine grained, with seams of Poorly Graded Sand,brown, wet, medium dense. (Alluvium) End of boring. Groundwater not encountered with 14 feet of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal. Bore hole then grouted. NOTES GROUND ELEVATION 2006.8 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 5/21/15 COMPLETED 5/21/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-5 CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road IPEC BORING LOG - GINT STD US LAB.GDT - 7/17/15 14:36 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS 7-7(14) 3-6(9) 5-11(16) 5-5(10) 21-19(40) 19 26 18 8 768 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SP) POORLY GRADED SAND, medium grained, brown, moist,loose.(Alluvium) (CL) LEAN CLAY with SAND, brown, wet, rather stiff to hard.(Alluvium) End of boring. Groundwater not encountered with 14 feet of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal. Bore hole then grouted. NOTES GROUND ELEVATION 2007.2 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 5/21/15 COMPLETED 5/21/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER B-6 CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road IPEC BORING LOG - GINT STD US LAB.GDT - 7/17/15 14:36 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 DENSITY Very Loose 0 - 4 Loose 4 - 10 Coarse-Gravel and Gravel GW Grained Gravelly Soils (with little or no fines)GP Soils <50% coarse fraction Gravel GM passes #4 sieve (with >12% fines)GC <50% Sandy and Sand SW passes #200 Sandy Soils (with little or no fines)SP sieve >50% coarse fraction Sand SM passes #4 sieve (with >12% fines)SC Fine-ML Grained CL Soils OL >50% MH passes #200 CH sieve OH PT Peat DESCRIPTION RANGE Occasional <5% Trace 5% - 12% With >12% Coarse Fine Coarse Medium Fine MODIFIERS Hard > 30 USCS SOIL CLASSIFICATION Liquid Limit > 50 Highly Organic Soils Silt and Clay MAJOR DIVISIONS Liquid Limit < 50 Salt and Clay Organic Clay and Silt (med to high plasticity) Muck Well Graded Sand Inorganic Silt Fat Clay MOISTURE CONTENT Gravel SandBoulders Cobbles GRAIN SIZE (INCHES) Silt and Clay 12 3 0.75 0.19 0.079 0.0171 0.0029 17 - 30 Soft Rather Soft Medium Rather Stiff Stiff Very Stiff 2 - 3 4 - 5 6 - 8 9 - 12 RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALVE FINE-GRAINED SOILS N(BLOWS/FT) CONSISTENCY N(BLOWS/FT) Very Soft 0 - 1 MAJOR DIVISIONS WITH GRAIN SIZE SIEVE SIZE 12" 3" 3/4" 4 10 40 200 COARSE-GRAINED SOILS Poorly Graded Sand Silty Sand Clayey Sand Silt Lean Clay Organic Silt and Clay (low plasticity) GROUP DESCRIPTIONS Well Graded Gravel Poorly Graded Gravel Silty Gravel Clayey Gravel 13 - 16 FIELD OBSERVATION Absence of moisture, dusty, dry to the touch Dry of optimum moisture content Wet of optimum moisture content DESCRIPTION Dry Moist Wet Very Dense > 50 Dense 31 - 50 Medium-Dense 11 - 30 APPENDIX C LABORATORY TEST RESULTS 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc 3645 CuLL PL 4.44 9.80 7.63 4.03 1.36 2.05 1.34 1.02 9 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 7.0 7.0 6.5 5.0 73.9 9.5 19 25 19 0.075 SAND GRAIN SIZE IN MILLIMETERS coarse fine SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt and Gravel SP-SM Poorly Graded Sand with Silt and Gravel SP Poorly Graded Sand with Gravel ML Silt Classification D100 D60 D30 D10 %Gravel 1.265 2.414 3.072 2.956 B-1 B-2 B-3 B-3 B-4 coarse SILT OR CLAYfinemedium 15.0 7.5 7.5 10.0 5.0 %Sand %Silt %Clay 0.701 1.103 1.288 1.488 0.285 0.246 0.403 0.734 1.6 15.1 24.3 15.9 91.5 77.9 69.2 79.1 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-1 B-2 B-3 B-3 B-4 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420 406 601.5 8 143/4 3/8 15.0 7.5 7.5 10.0 5.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road GRAIN SIZE - GINT STD US LAB.GDT - 7/17/15 14:22 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc 1826 CuLL PL 6.671.30 8 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 5.9 75.7 25 0.075 SAND GRAIN SIZE IN MILLIMETERS coarse fine SP-SM Poorly Graded Sand with Silt and Gravel CL Lean Clay with Sand Classification D100 D60 D30 D10 %Gravel 3.204 B-4 B-6 coarse SILT OR CLAYfinemedium 15.0 7.5 %Sand %Silt %Clay 1.413 0.48 24.3 69.8 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-4 B-6 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420 406 601.5 8 143/4 3/8 15.0 7.5PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road GRAIN SIZE - GINT STD US LAB.GDT - 7/17/15 14:22 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 10 20 30 40 50 60 0 20 40 60 80 100 B-4 B-5 B-6 ML CL MH CH 74 76 CL-ML PL AST ICI TY IND EX LIQUID LIMIT Fines Classification 45 31 26 36 17 18 ML Silt CL Lean Clay CL Lean Clay with Sand LL PL PI 9 14 8 ATTERBERG LIMITS' RESULTS 5.0 10.0 7.5 BOREHOLE DEPTH CLIENT NAI Black PROJECT NUMBER 14-037A PROJECT NAME Painted Hills New Levee PROJECT LOCATION 4403 South Dishman-Mica Road ATTERBERG LIMITS - GINT STD US LAB.GDT - 7/17/15 14:22 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037A PAINTED HILLS NEW LEVEE\GINT\14-037A PAINTED HILLS NEW LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 Golf Course Levee Certification Gustin Ditch Levee Certification EXHIBIT K INFILTRATION FACILITIES DESIGN REPORT To be completed when final report is received EXHIBIT L REQUIRED SUPPORTING DOCUMENTATION EXHIBIT M CD OF PROJECT FILES