Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Painted_Hills_CLOMR_DRAFT_8-16-2018_&_Appendix_A,_B,_C,_D,_E,_F,_G,_H,_I,_J,_L
WEST Consultants, Inc. i CLOMR for Proposed Painted Hills Development (DRAFT) CLOMR APPLICATION FOR THE PROPOSED PAINTED HILLS DEVELOPMENT CITY OF SPOKANE VALLEY & SPOKANE COUNTY, WASHINGTON Prepared for: Whipple Consulting Engineers, Inc. 21 S. Pines Road Spokane Valley, WA 99206 Prepared by: WEST Consultants, Inc. 2601 25th St. SE, Suite 450 Salem, OR 97302 (503) 485-5490 August 16, 2018 WEST Consultants, Inc. ii CLOMR for Proposed Painted Hills Development TABLE OF CONTENTS INTRODUCTION ................................................................................................................ 1 BACKGROUND & RESEARCH ........................................................................................ 2 General ............................................................................................................................ 2 Levees ............................................................................................................................. 7 Infiltration Facilities ....................................................................................................... 9 Interior Drainage ........................................................................................................... 14 SITE INVESTIGATION .................................................................................................... 17 HYDROLOGY ................................................................................................................... 17 HYDRAULICS ................................................................................................................... 20 Duplicate Effective Model (DEM) ............................................................................... 22 Corrected Effective Model (CEM) ............................................................................... 25 Existing (Pre-Project) Conditions Model ..................................................................... 28 Proposed or Post-Project Conditions Models ............................................................... 30 FLOODPLAIN MAPPING ................................................................................................ 38 CERTIFICATION FORMS ................................................................................................ 38 SUMMARY ........................................................................................................................ 39 REFERENCES ................................................................................................................... 39 LIST OF TABLES Table 1. Thorpe Levee Breach Discharges ........................................................................... 9 Table 2. Assumed runoff for Adjacent Subbasins Draining to Project Site. ..................... 14 Table 3. Discharges Used in HEC-RAS Models ............................................................... 17 Table 4. Summary of HEC-RAS Model Plans .................................................................. 20 Table 5. Summary of Model Reaches ................................................................................. 22 Table 6. Summary of 1% Annual Chance Flood Flows for CLOMR Reaches ................. 22 Table 7. Comparison of FIS and DEM model results for Golf Course Overflow Reach ... 24 Table 8. Comparison of FIS and DEM model results for Unnamed Tributary .................. 25 Table 9. DEM and CEM model results for the Golf Course Overflow .............................. 27 Table 10. DEM and CEM model results for the Unnamed Tributary ................................ 28 Table 11. CEM and ECM model results for the Golf Course Overflow ............................ 29 Table 12. CEM and ECM model results for the Unnamed Tributary ................................. 30 Table 13. ECM and PCM model results for the Golf Course Overflow............................. 34 Table 14. ECM and PCM model results for the Unnamed Tributary ................................. 35 Table 15. Change in Top Width for Golf Course Overflow ............................................... 36 Table 16. Change in top width for Unnamed Tributary ..................................................... 37 WEST Consultants, Inc. iii CLOMR for Proposed Painted Hills Development Table 17. PCM model with- and without-levee results comparison for Golf Course Reach ..................................................................................................................................... 38 LIST OF FIGURES Figure 1. Chester Creek Location Map ................................................................................. 3 Figure 2. Effective FIS stream reaches and storage areas .................................................... 4 Figure 3. Detail of project area and levees ........................................................................... 6 Figure 4. Effective FEMA Floodplain and levee south of Thorpe Road .............................. 8 Figure 5. Golf Course Overflow facilities overview. (Full plan set located in Appendix J) ..................................................................................................................................... 12 Figure 6. Unnamed Tributary facility overview. (Full plan set located in Appendix J) ..... 13 Figure 7. Interior drainage basins ....................................................................................... 16 Figure 8. Layout of HEC-RAS Cross Sections for Chester Creek Golf Course Overflow 18 Figure 9. Layout of HEC-RAS Cross Sections for the Unnamed Tributary ...................... 19 WEST Consultants, Inc. iv CLOMR for Proposed Painted Hills Development LIST OF EXHIBITS Appendix A. FEMA Forms Appendix B. Duplicate Effective Models Appendix C. Corrective Effective HEC-RAS Models Appendix D. Existing Conditions HEC-RAS Models Appendix E. Post-Project Conditions HEC-RAS Models Appendix F. Effective Flood Insurance Rate Map (FIRM), Flood Profile, and Floodway Data Table Appendix G. Revised Floodplain Boundaries, Flood Profile, and Floodway Data Table Appendix H. Floodplain Work map for CLOMR Appendix I. Geotechnical Evaluation/Groundwater Analysis Appendix J. Infiltration Facilities Design Report, Plans, O&M Plans Appendix K. Supporting Information WEST Consultants, Inc. 1 CLOMR for Proposed Painted Hills Development INTRODUCTION A 91 acre mixed use development is proposed for the former Painted Hills Golf Course property located in Spokane Valley, Washington. The development includes both residential and commercial property, and open space. Construction of flood control facilities as well as grading and fill are proposed to address floodplain requirements. The property is located within the area known as Storage Area 1 (SA1) in the effective FEMA Flood Insurance Study (FIS). SA1 is designated as a compensatory storage area. Within a compensatory storage area loss of flood storage capacity due to placement of fill must be mitigated with an equivalent compensatory volume of storage or through a reduction in flows such that the net condition causes no adverse impact to the base flood or floodway elevations within the storage area. In addition, loss of infiltration capacity due to placement of fill or impervious surfaces must be mitigated such that the decrease in infiltration capacity will causes no adverse impact to the base flood or floodway elevations within the storage area. The overall purpose of the “compensatory” requirement is to ensure that development activities do not cause an adverse impact on flood elevations within the storage area, or downstream of the development (e.g. increasing downstream flows due to reduced infiltration capacity within the storage area.) Whipple Consulting Engineers, Inc., (WCE) proposes to address the compensatory storage and infiltration requirements by intercepting floodwaters entering the storage area and then storing and infiltrating flood flows and local storm water through the use of a series of infiltration and storage facilities. The infiltration facilities will make use of dry wells and gravel infiltration galleries. Due to the presence of glacially deposited sands and gravels with high infiltration capacities, drywells are currently in wide use throughout the Chester Creek floodplain and are included in the effective FIS hydrologic model and have the effect of reducing flood elevations and volumes. The inclusion of infiltration facilities within the proposed development plan will create a net benefit by significantly reducing flood elevations within and nearby the subject property. The infiltration facilities and proposed changes will result in approximately 126 acres being removed from the 1% annual chance floodplain, and the removal of 0.7 river miles of floodway. Geotechnical analysis was conducted by Inland Pacific Engineering Company (IPEC). Design of infiltration and storage facilities was conducted by Whipple Consulting Engineers. WEST Consultants, Inc, conducted the hydraulic analyses to evaluate the effects the proposed development would have on base flood elevations (BFEs – water surface elevations associated with the 1% annual chance event), floodway elevations, floodplain boundaries, and floodway limits of Chester Creek. This report, along with supporting documentation, will be submitted to the Federal Emergency Management Agency (FEMA) through the local communities (City of Spokane Valley, WA, and Spokane County, WA) as a Conditional Letter of Map Revision (CLOMR). Pertinent information about the request is provided as follows: Identifier: Painted Hills Development Flooding Source: Chester Creek and Unnamed Tributary Community: Spokane Valley, WA, Spokane County, WA WEST Consultants, Inc. 2 CLOMR for Proposed Painted Hills Development Community Number: 530342, 430174 FIRM Panels Affected: 0751D Unless otherwise stated, all elevations within this report are referenced to the North American Vertical Datum of 1988 (NAVD88). BACKGROUND & RESEARCH General The Chester Creek watershed is located in Spokane County and the City of Spokane Valley. A location map of the watershed is shown in Figure 1. A map of the effective stream reaches, storage areas, and CLOMR boundary is shown in Figure 2. The watershed varies in elevation from 1,984 feet at 2nd Avenue (the downstream extent of the effective study) to a high point of approximately 3,680 feet along the western watershed boundary. The lower portions of the watershed are underlain by deep glacial outwash deposits of high infiltration capacity. The upper basin is much steeper and relatively undeveloped. Due to the high infiltration rates in the lower watershed, the Chester Creek channel is distinct only in the upper reaches of the basin. Chester Creek and its unnamed tributary have no outlet. Historically, both channels transitioned from channel to pastures where no distinct channel is evident. An FIS restudy for Chester Creek and its unnamed tributary was conducted in 2005. Due to the unique infiltration characteristics of the Chester Creek watershed, it was recognized that the prior effective FIS did not consider the effects of infiltration or available storage in the watershed. The restudy included an extensive HSPF hydrologic modeling effort that considered the effects of infiltration and several storage areas that would serve to attenuate flood flows. The study resulted in significantly reduced flood discharges. Nine storage areas were identified, several of which were designated by FEMA as ‘compensatory storage areas’ within which development must compensate equally for reductions in storage and infiltration capacity. The hydrology went through multiple rounds of peer review and revision which included FEMA, FEMA’s review consultant Baker, and the USGS. Details of the original hydrologic analysis can be found in the original FIS hydrology report. The main channel of Chester Creek currently terminates at a large borrow pit (Storage Area 4) which was developed as part of improvements to Dishman-Mica Road (D-M Road) in 1998 and is intended to act as a storm water retention and infiltration facility. The FEMA regulatory floodplain continues north for approximately 1.5 miles beyond the physical end of the channel. WEST Consultants, Inc. 3 CLOMR for Proposed Painted Hills Development # .-,90 (/195 "!27 SPOKANE Chester C re e k H a n g m a n Chester Creek L it tle S p o k a n e R iv e r W A S H I N G T O N # PROJECT LOCATION NChester Creek Drainage Basin 2024Miles Figure 1. Chester Creek Location Map WEST Consultants, Inc. 4 CLOMR for Proposed Painted Hills Development Figure 2. Effective FIS stream reaches and storage areas WEST Consultants, Inc. 5 CLOMR for Proposed Painted Hills Development The Unnamed Tributary channel does not physically connect to the main channel of Chester Creek. The lower portion of the Unnamed Tributary was historically rerouted to higher ground and currently terminates in a large pit (Storage Area 6 per the effective FIS) that is east of the proposed project site. Based on the effective FIS, the floodplain of the Unnamed Tributary continues west from the Storage Area 6 (SA6) until it reaches SA1, the site of the former Painted Hills Golf Course. A small levee is located along the left bank between Highway 27 and SA6. For the with-levee condition, the 1% annual chance flow downstream of SA6 that continues to SA1 (project site) is 4 cfs. For the without downstream levee condition in which the levee between Highway 27 and SA6 is removed, the floodplain bypasses SA6 and the 1% annual chance flow that could continue to SA1 is 16 cfs. The proposed development project area is located within SA1 in the right overbank of Chester Creek. SA1 is physically separated from the main channel of Chester Creek by a levee along the right bank of the main channel between Thorpe Rd and Dishman-Mica Road. Figure 3 shows the location of reaches and levees within and near the CLOMR project area.. Flood flows can enter the project site from two sources: The Golf Course Overflow Reach, and the Unnamed Tributary. Due to the natural topography, the Golf Course Levee, and D-M Road, there is no downstream exit for flows that enter SA1 and flood flows that enter the storage area pond until they infiltrate. Descriptions of the two primary flow paths affected by this CLOMR are below. Golf Course Overflow Reach - Flow escapes the Chester Creek channel approximately 3,000 ft upstream of the golf course due to limited channel capacity, and follows the right overbank until it crosses Thorpe Road and enters the golf course (SA1). The flow entering the golf course does not rejoin the main channel due to the topography of the area, a small levee system along the right bank of the main channel, and the raised embankment of Dishman-Mica Road. As the golf course has no outlet, floodwaters up to the 0.2% annual chance flood (500-yr flood) are stored until they infiltrate. This flow path generally does not contain a physical channel. Unnamed Tributary – Based on the effective FIS, flows from the Unnamed Tributary can reach the project site via two paths. First, though SA6 has a noticeable impact on peak discharge and serves to attenuate flood flows, flow from the 1%-annual-chance-flood event will fill SA6 and then overflow (4 cfs) and continue to flow west via low ground, overtopping driveways, and eventually Madison Road, at which point it would enter the project site. Second, a levee is present along the left bank of the Unnamed Tributary between SA6 and Highway 27. As this levee is not certified, a without levee analysis was conducted in the effective FIS. Since the channel is perched at this location, failure of the levee assumed all floodwaters (1% annual chance flow of 16 cfs) potentially leave the channel. Flood waters would then flow along the low ground of the left overbank, bypassing SA6 and continue until reaching SA1. WEST Consultants, Inc. 6 CLOMR for Proposed Painted Hills Development Figure 3. Detail of project area and levees WEST Consultants, Inc. 7 CLOMR for Proposed Painted Hills Development Levees Three non-certified levees are present near the project area based on the effective FIS, that are of concern to the project site. They are described below from south to north. A map denoting the levees is provided as Figure 3. A non-certified levee, referred to in this report as the “levee south of Thorpe”, is located along the right bank and overbank of Chester Creek between Thorpe Road and a private road approximately 1550 feet south of Thorpe Road. The levee is located along the right bank of the original channel; however, based on the 2005 FIS, the channel was diverted to the left overbank and into a pond. Water exits the pond via a rock spillway and returns to the original channel immediately south of Thorpe Road. Due to the diversion, a large portion of the floodplain no longer abuts the levee (Figure 4). A non-certified levee, referred to in this report as the “golf course levee”, is located along the east bank of Chester Creek between Thorpe Road and D-M Road. This levee is approximately 1,000 feet in length and protects the project site. A without levee analysis for this levee was not conducted as part of the original FIS since floodwaters of similar elevation are mapped on both sides of the levee (the floodwaters on the landward side of the levee originating from the Golf Course Overflow Reach). A third non-certified levee, referred to as the “Gustin Ditch levee”, is located along the left bank of the Unnamed Tributary between SA6 and Highway 27. In this area, the man-made channel is perched and the levee protects the low ground to the south, in the left overbank. A without levee analysis was conducted in the 2005 FIS. WEST Consultants, Inc. 8 CLOMR for Proposed Painted Hills Development Figure 4. Effective FEMA Floodplain and levee south of Thorpe Road WEST Consultants, Inc. 9 CLOMR for Proposed Painted Hills Development A review of the effective FIS HEC-RAS model and additional RAS modeling were conducted by WEST, for the levee South of Thorpe Road. The conclusions of that analysis are as follows: Based on the effective FIS. much of the 1% annual chance floodplain no longer abuts the levee due to historic rerouting of the channel to the nearby pond, in the west overbank of Chester Creek Based on the effective FIS, the base flood floodplain does not touch the levee along the southern 1,100 feet of its 1,500 foot overall length (Figure 4). In the areas where floodwaters do abut the levee, flood velocities are low; approximately 0.5ft/s – 2.2 ft/s for the 1% annual chance flood. Velocities are likely higher immediately downstream of the rock spillway from the pond and it is recommended the levee bank across from the spillway be protected by rock, if possible. Additionally, where floodwaters do abut the levee the 1% annual chance flood generally averages 1 foot or less in depth between the base flood elevation and the toe of the levee. Although the flood depths and velocities adjacent to the levee are relatively small, it is recognized that a failure of this levee could cause some additional floodwaters to leave the main channel of Chester Creek and join the Golf Couse Overflow channel and hence the proposed infiltration facility. Accordingly, a without-levee scenario was modeled in HEC-RAS to determine the amount of additional flow that could join the Golf Course Overflow Reach in the event of a levee failure so that the infiltration facility could be designed to accommodate this scenario. In this scenario, the approximately 400-feet long section of the levee that abuts the effective floodplain is removed (to the levee toe) in the hydraulic model and flow is allowed to move between the main channel and the Golf Course Overflow Reach. Under this scenario, an additional 27 cfs and 35 cfs can join the Golf Course Oveflow Reach for the 100-yr and 500-yr events, respectively (increases of 42% and 40%) (Table 1). Accordingly, the infiltration facility being used to intercept the Golf Course Overflow Reach has been designed by WCE with an ultimate infiltration outflow of 162 cfs, which exceeds the 500-year without-levee scenario. Per FEMA guidelines, the revised CLOMR mapping shown in the work maps and annotated FIRM reflect the without-levee scenario. The FDT includes both with- and without-levee data and the flood profiles include a fifth profile indicating the 1% annual chance without-levee water surface elevations for the Golf Course Overflow Reach. Table 1. Thorpe Levee Breach Discharges Event With Levee Without Levee Difference (cfs) Difference (%) 100‐yr 64 91 27 0.42 500‐yr 88 123 35 0.40 Infiltration Facilities The effective FIS included an extensive hydrologic modeling effort that considered the effects of infiltration and several storage areas that would serve to attenuate flood flows. Nine storage areas were identified and considered in the hydrologic analysis, six of which have been WEST Consultants, Inc. 10 CLOMR for Proposed Painted Hills Development designated by FEMA as compensatory storage areas within which development must compensate equally for reductions in storage and infiltration such that there is no adverse impact on water surface elevations within and downstream of the storage areas. The proposed development is to occupy a large portion of Storage Area 1. To mitigate for fill and reduced infiltration WCE proposes to construct two infiltration facilities designed to intercept and infiltrate flows from the Golf Course Overflow and the Unnamed Tributary before they enter the project site. This will result in the entire storage area (and areas outside SA1) being removed from the 1% and 0.2% annual chance floodplains. The infiltration facilities, designed and analyzed by WCE, have several components described below. Further details regarding the facility design beyond the general description below can be found in the technical memo, Painted Hills Flood Control Development Narrative (Storage Area 1, SA1), by WCE (WCE, 2018). The design narrative and full design plans are provided in Appendix J. A geotechnical investigation was conducted by IPEC in order to help WCE determine the design infiltration capacity of the proposed drywells and gravel gallery. More information can be found in the two reports, Preliminary Geotechnical Evaluation Phase I and Full-Scale Drywell Testing, located in Appendix I. The largest of the two flood sources contributing to SA1 is the Golf Course Overflow Reach. The peak 1%-annual-chance-flood discharge entering SA1 via this reach is 64 cfs based on the effective FIS. Flood flows for the 10-year and greater events overtop the right bank of Chester Creek approximately 3,000 feet upstream of Thorpe Road, and flow along low ground in the right overbank before entering the property through three 15” culverts under Thorpe Road, and via overtopping of the roadway when flows exceed the capacity of the culverts. The proposed facility that will intercept this flow path includes a replacement box culvert under Thorpe Road, a short section of open concrete channel, a series of culverts, a bioswale, a settling pond, weir, and a series of gravel infiltration trenches containing 48 drywells (Figure 5). The roadside ditch along the south side of Thorpe will be regraded to drain flows to a 3-foot-tall by 30-foot-wide box culvert under Thorpe Road which will replace the three existing 15” culverts. On the north side of Thorpe Road, a short section of 24-foot-wide rectangular concrete channel will transition flows to a set of two 48” RCP culverts that will convey flow north along the west side of S Madison Road to the northeast corner of the project site where flow exits the pipe into a prismatic open bioswale which will be planted to help filter sediment. At the downstream end of the bioswale, flows will enter a bio-infiltration settling pond. Once flows exceed 1’ in depth they will overtop a rock lined weir and flow into a second bio-infiltration pond which contains the gravel gallery infiltration system. Once flood waters reach a depth of 1’ water will crest over the rims of the drywell and enter into the gravel gallery infiltration system. Based on the design report from WCE the infiltration system has a design infiltration rate capacity of approximately 162 cfs, which is 56 cfs greater than the 0.2% annual chance flow of 88 cfs (or 106 cfs when including local drainage from the hills to the east of Madison St), and 98 cfs greater than the 1% annual chance flow of 64 cfs (or 79 cfs including local drainage) for the Golf Course Overflow Reach. It is recognized however, that the twin 48” RCPs, while having the capacity to convey the 0.2% without-levee flows of 123 cfs, would surcharge and overtop before reaching the 162 cfs capacity of the downstream infiltration gallery. Although that scenario is outside the scope of this analysis, topography indicates that overtopping flows would likely first enter a detention facility located immediately north of Thorpe Road, which contains an outflow pipe into the western RCP. If overflows were to fill the detention facility, water WEST Consultants, Inc. 11 CLOMR for Proposed Painted Hills Development would likely discharge northeast along local low ground, flow across a walking path, and then north along proposed roadside swales, eventually discharging into catch basins which lead to the Madison culverts and the bio infiltration facility. A more complete description of the facilities is available in the WCE design report and plan sheets provided in Appendix J. The Unnamed Tributary (locally known as Gustin Ditch) currently terminates in SA6, a large pit. Although no channel exists downstream of SA6, the FEMA floodplain extends downstream of the pit and connects to SA1. Based on the effective FIS, the 1% annual chance flow entering and leaving the pit is 16 cfs and 4 cfs, respectively. The privately owned pit has a County easement and is currently used for flood control and storage. Proposed changes to the existing pit include regrading to increase overall storage capacity, moving the channel entrance from the south side to the southeast corner of the pit, and construction of 18 double depth drywells (Figure 6). The ditch between Highway 27 and SA6 will be replaced with a 3’ diameter pipe which has the capacity to convey the 0.2% annual chance flood per the effective FIS. Based on the effective FIS, SA6 attenuates the 1% peak flow exiting the pit by 75%, (16 cfs to 4 cfs) and the 0.2% peak flow by 65% (20 cfs to 7 cfs). The 18 proposed drywells have a capacity of 18 cfs, which exceeds the 1% peak discharge of 16 cfs entering the pit. Further, the storage volume of the pit provides an additional factor of safety. As proposed, the modification to the channel and pit will provide capacity to store and infiltrate events up to the 0.2% annual chance event, and the proposed FEMA floodplain for this reach will terminate at SA6. WEST Consultants, Inc. 12 CLOMR for Proposed Painted Hills Development Figure 5. Golf Course Overflow facilities overview. (Full plan set located in Appendix J) WEST Consultants, Inc. 13 CLOMR for Proposed Painted Hills Development Figure 6. Unnamed Tributary facility overview. (Full plan set located in Appendix J) WEST Consultants, Inc. 14 CLOMR for Proposed Painted Hills Development Interior Drainage It is recognized that there are additional local drainage areas that can also contribute flows to the project (Figure 7). This basin area of 0.6 square miles is well under the 1 square mile threshold that FEMA requires for flood inundation analysis; however, the area was considered in order to make sure the proposed infiltration and storm drain facilities can accommodate nearby storm runoff that naturally drains to the project site. The pink and yellow areas in Figure 9 currently drain to the lower portion of the Unnamed Tributary Without Downstream Levee flow path. These areas could potentially contribute flow to the project site that would not be intercepted by the SA6 infiltration facility. Runoff from the largely undeveloped 0.34 square mile area east of Madison Road (shown in pink) will be conveyed to the SA1 infiltration facility via the four existing culverts under S Madison Rd. The four culverts are to be connected to the eastern of the two proposed north/south trending RCP culverts immediately west of S Madison Rd which conveys flood flows to the infiltration facility. Discharges were calculated based the unit discharge and drainage area ratios from similar watersheds reported by the HSPF hydrologic model in the existing FIS (Table 2). The small portion of the school property (in yellow) identified as ‘school west’ has a calculated runoff of 3 cfs; however, five drywells are located at the lower end of the basin which would reduce flow downstream. Single depth drywells in the area typically have a design flow of 0.3 cfs; therefore, it is expected that less than 2 cfs would flow downstream of this portion of the basin. Table 2. Assumed runoff for Adjacent Subbasins Draining to Project Site. Subbasin Assumed 1% annual chance event discharge (cfs/sq mi) Calculated runoff from unit discharge Painted Hills 150 21 School West 100 3 Madison East 44 15 The remaining 0.22 square mile area west of Madison Road (purple) will be addressed by the approximately 103 additional drywells being proposed as part of the project storm water design. These drywells are not part of the proposed infiltration facilities meant to address the Golf Course Overflow and the Unnamed Tributary. As part of the effective FIS, a drywell analysis was conducted on several highly developed subbasins within the Chester Creek watershed in order to determine if the existing drywell system in highly developed portions of the basin have capacity to infiltrate the 1%, and 0.2% annual chance flood events (i.e. do these subbasins contribute to flood flows in Chester Creek?) (WEST 2008). Based on HSPF hydrologic model analysis, the highly developed subbasins had a unit discharge of approximately 150, and 180 cfs/sq mi for the 1% and 0.2% annual chance events, respectively. The existing drywell network density was found to have capacity to address large storm events, and the basins were assumed to contribute no flow to Chester Creek. Using the 1% annual chance flood unit discharge of 150 cfs/sq mi (reasonable since much of this basin will be developed for this project) and a basin area west of Madison Road of 0.22 sq mi, a peak discharge of 33 cfs was estimated. At 0.3 cfs per drywell (conservatively assuming all single depth), the total of 103 proposed drywells would WEST Consultants, Inc. 15 CLOMR for Proposed Painted Hills Development have approximately the same capacity needed to address the peak runoff, assuming no detention facilities were present. The WCE development plan does however contain several large detention facilities as well as pervious open space. WEST Consultants, Inc. 16 CLOMR for Proposed Painted Hills Development Figure 7. Interior drainage basins WEST Consultants, Inc. 17 CLOMR for Proposed Painted Hills Development SITE INVESTIGATION A site visit was conducted on 12/18/2014 by Ken Puhn of WEST Consultants, Inc. (WEST) in order to determine site conditions and observe any changes that may have occurred since the effective FIS was conducted. Survey data for the site was provided in a xyz format by WCE. Survey data were supplemented by 2003 LiDAR data collected for the effective FIS. The 2003 LiDAR data is considered sufficient since areas where it is used have not been modified or changed since the effective FIS. Plan views showing the location of the cross sections in the hydraulic models are shown in Figure 8 and Figure 9. HYDROLOGY Hydrology for the effective FIS is based on a detailed hydrologic analysis using the Hydrologic Simulation Program Fortran (HSPF). Design flows for the proposed infiltration facility are based on the effective FEMA discharges. The 100-year discharge was obtained directly from the effective FIS hydraulic model. Table 3. Discharges Used in HEC-RAS Models Location 1% Annual Chance Peak Flow (cfs) Golf Course Overflow Channel 64 Unnamed Tributary 16/4 (upstream/downstream of SA6) WEST Consultants, Inc. 18 CLOMR for Proposed Painted Hills Development Figure 8. Layout of HEC-RAS Cross Sections for Chester Creek Golf Course Overflow WEST Consultants, Inc. 19 CLOMR for Proposed Painted Hills Development Figure 9. Layout of HEC-RAS Cross Sections for the Unnamed Tributary WEST Consultants, Inc. 20 CLOMR for Proposed Painted Hills Development HYDRAULICS Information related to the development of the various hydraulic models required for the CLOMR application is provided in the following paragraphs. In the effective FIS, Chester Creek (which includes the Golf Course Overflow Reach) and the Unnamed Tributary, were modeled separately. The CLOMR follows this preexisting methodology. The RAS models for the Golf Course Overflow and the Unnamed Tributary are provided in separate folders within the digital submittal materials (Exhibit M) and are named CCMain.prj and CCTrib.prj, respectively. A summary list of model plans is provided in Table 4. A summary of model reaches is provided in Table 5. A summary of modeled existing and proposed conditions 1% annual-chance flood flows within the CLOMR reaches is provided in Table 6. Table 4. Summary of HEC-RAS Model Plans Model Plan Flow File Geometry File Description CCMain.prj DEM Upper Reach US reach w/levee (DEM) Duplicate Effective Model ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj DEM FW Upper Reach, floodway US reach w/levee (DEM) Duplicate Effective Model for Enchroachment Analysis ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj CEM Upper Reach US reach w/levee (CEM) Corrected Effective Model ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj CEM FW Upper Reach, floodway US reach w/levee (CEM) Corrected Effective Model for Enchroachment Analysis ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj ECM Upper Reach US reach w/levee (ECM) Existing Conditions Model ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj ECM FW Upper Reach, floodway US reach w/levee (ECM) Existing Conditions Model for Enchroachment Analysis ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj PCM Upper Reach Proposed US reach w/levee (PCM) Proposed Conditions Model ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj PCM FW Upper Reach Proposed, Floodway US reach w/levee (PCM) Proposed Conditions Model for Enchroachment Analysis ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow CCMain.prj PCM w/breach Upper Reach Proposed, without Thorpe Levee US reach wo/Thorpe levee (PCM) Proposed Conditions Model ‐ Upper Reach of Chester Creek (above SA 5 Borrow Pit), and Golf Course Overflow, without Thorpe levee WEST Consultants, Inc. 21 CLOMR for Proposed Painted Hills Development CCTrib.prj DEM With levee (DEM) With levee flows and boundary Duplicate Effective Model ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj DEM FW With levee (DEM) With levee flows, floodway Duplicate Effective Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj DEM w/o DS lev Without DS levee (DEM) Without ds levee flows and boundary Duplicate Effective Model ‐ Unnamed Tributary without downstream levee conditions (with levee US of Hwy 27 and without levee DS of Hwy 27) CCTrib.prj DEM w/o DS lev FW Without DS levee (DEM) Without ds levee flows and boundary, fw Duplicate Effective Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions(with levee US of Hwy 27 and without levee DS of Hwy 27) CCTrib.prj CEM With levee (CEM) With levee flows and boundary Corrected Effective Model ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj CEM FW With levee (CEM) With levee flows, floodway Corrected Effective Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj CEM w/o DS lev Without DS levee (CEM) Without ds levee flows and boundary Corrected Effective Model ‐ Unnamed Tributary without downstream levee conditions (with levee US of Hwy 27 and without levee DS of Hwy 27) CCTrib.prj CEM w/o DS lev FW Without DS levee (CEM) Without ds levee flows and boundary, fw Corrected Effective Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions(with levee US of Hwy 27 and without levee DS of Hwy 27) CCTrib.prj ECM With levee (ECM) With levee flows and boundary Existing Conditions Model ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj ECM FW With levee (ECM) With levee flows, floodway Existing Conditions Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj ECM w/o DS lev Without DS levee (ECM) Without ds levee flows and boundary Existing Conditions Model ‐ Unnamed Tributary without downstream levee conditions (with levee US of Hwy 27 and without levee DS of Hwy 27) CCTrib.prj ECM w/o DS lev FW Without DS levee (ECM) Without ds levee flows and boundary, fw Existing Conditions Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions(with levee US of Hwy 27 and without levee DS of Hwy 27) CCTrib.prj PCM With levee (PCM) With levee flows and boundary (proposed) Proposed Conditions Model ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) CCTrib.prj PCM FW With levee (PCM) With levee flows, floodway (proposed) Proposed Conditions Model for Encroachment Analysis ‐ Unnamed Tributary with levee conditions (with both levees US and DS of Hwy 27) WEST Consultants, Inc. 22 CLOMR for Proposed Painted Hills Development Table 5. Summary of Model Reaches Model Reach Description Part of CLOMR CCMain.prj Upper Chester Creek from upstream end of FIS to FEMA XS AO (culvert under RR tracks between Bowdish Road and Schafer Rd) No CCMain.prj Dredge Channel Parallel channel of Chester Creek on east side of RR tracks between Bowdish Road and Schafer No CCMain.prj DS Dredge Channel Chester Creek from FEMA XS AO to FEMA XS AD (upstream end of SA 5, Dishman‐Mica Rd Borrow Pit) No CCMain.prj Golf Course Golf Course Overflow reach of Chester Creek Yes CCTrib.prj Trib Main channel of unnamed tributary Yes CCTrib.prj LOB Overflow Left overbank flowpath; flowpath is modeled only for without DS levee conditions Yes Table 6. Summary of 1% Annual Chance Flood Flows for CLOMR Reaches Watercourse Location RAS Station (Existing FIS) RAS Station (Revised CLOMR) 1% Annual Chance Flood (cfs) Effective Model (DEM, CEM, ECM) Revised Model (PCM) Unnamed Tributary Highway 27 to SA6 2080 ‐ 149 2080 ‐ 548 16 16 Unnamed Tributary Outflow from SA6 1 ‐ (‐1303) n/a 4 0 Unnamed Tributary Left Overbank Flowpath (without levee scenario 1989 ‐ (‐1303) n/a 16 0 Chester Creek Golf Course Overflow Reach 23887 ‐ 20779 2863 ‐ (‐2737) 64 64 Duplicate Effective Model (DEM) The Duplicate Effective Model (DEM) is a copy of the hydraulic model used to create the effective FIS. Creation of the DEM is required to ensure proper transfer of data from the effective FIS. As the effective FIS model was developed by WEST, the model was obtained from WEST archives. The hydraulic analysis for the effective FIS had been completed using the WEST Consultants, Inc. 23 CLOMR for Proposed Painted Hills Development Corps of Engineers River Analysis System (HEC-RAS) standard-step backwater computer program version 3.1.3. The DEM model was run using HEC-RAS Version 4.1.0. and model output compared to the effective Floodway Data Tables (FDT). A comparison of water surface elevations (WSEs) for the 1% annual chance flood (100-year flood) event and the floodway for the FIS and DEM model output is provided in Table 7 and Table 8. As shown in Table 7 and Table 8, the water surface elevations computed using the DEM model are nearly identical to elevations published in the effective FISs. For the golf course overflow reach the model reports water surface elevations at RAS cross section 21,013 and 21,128 that differ from the published FIS elevations. This is due to computational changes between RAS version 3.1.3 and 4.1. The water surface elevation at cross section 21,013 is fixed in the RAS model based on the static water elevation reported by the HSPF hydrologic model for SA1. RAS 4.1 has difficulty converging on a subcritical solution at this cross section and defaults to a critical depth solution, ignoring the fixed elevation. In this case, since the floodplain at this location would reflect the ponded conditions expected within the storage area, the reported critical depth solution is erroneous and the fixed elevation of 2008.05 (rounded to 2008.1) is the correct elevation. The erroneous solution at cross section 21,013 results in a slight calculated increase of 0.1 feet at cross section 21,128. For the Unnamed Tributary, RAS cross sections 1,472 and 1,963 are 0.1 foot lower than the FIS. This again is likely due to small computational differences between RAS 3.1.3 and 4.1. No modifications were made to the DEM because the noted differences were within the ±0.50 ft tolerance required by FEMA Guidelines and Specification for Flood Mapping Partners (G&S) (FEMA). HEC-RAS DEM model output data are provided in Exhibit C. WEST Consultants, Inc. 24 CLOMR for Proposed Painted Hills Development Table 7. Comparison of FIS and DEM model results for Golf Course Overflow Reach RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway Effective FIS (FT NAVD) DEM (FT NAVD) Difference (FT) Effective FIS (FT NAVD) DEM (FT NAVD) Difference (FT) 20779 0 A 2008.1 2008.1 0.0 ‐‐ 2009.1 ‐‐ 21013 773 B 2008.1 2007.8 ‐0.3 ‐‐ 2009.1 ‐‐ 21128 961 C 2008.5 2008.6 0.1 ‐‐ 2009.1 ‐‐ 21229 1145 D 2008.9 2008.9 0.0 2009.6 2009.6 0.0 21385 1425 E 2009.1 2009.1 0.0 2010.0 2010.0 0.0 21445 1600 F 2009.3 2009.3 0.0 2010.3 2010.3 0.0 21548 1800 G 2013.3 2013.3 0.0 2014.1 2014.1 0.0 21924 2123 H 2013.3 2013.3 0.0 2014.2 2014.2 0.0 22423 2704 I 2013.5 2013.5 0.0 2014.5 2014.5 0.0 22972 3144 J 2014.8 2014.8 0.0 2015.3 2015.3 0.0 23050 3287 K 2015.4 2015.4 0.0 2016.2 2016.2 0.0 23090 3387 L 2015.7 2015.7 0.0 2016.6 2016.6 0.0 23446 3721 M 2018.1 2018.1 0.0 2019.0 2019.0 0.0 23887 4318 N 2023.0 2023.0 0.0 2023.8 2023.8 0.0 WEST Consultants, Inc. 25 CLOMR for Proposed Painted Hills Development Table 8. Comparison of FIS and DEM model results for Unnamed Tributary RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway Effective FIS (FT NAVD) DEM (FT NAVD) Difference (FT) Effective FIS (FT NAVD) DEM (FT NAVD) Difference (FT) ‐1303 0 A 2008.1 2008.1 0.0 2009.1 2009.1 0.0 ‐1019 283 B 2008.4 2008.4 0.0 2009.1 2009.1 0.0 ‐880 422 C 2008.4 2008.4 0.0 2009.1 2009.1 0.0 ‐466 836 D 2008.4 2008.4 0.0 2009.1 2009.1 0.0 ‐89 910 E 2008.4 2008.4 0.0 2009.1 2009.1 0.0 1 1,378 F 2009.7 2009.7 0.0 2010.7 2010.7 0.0 149 1,525 G 2009.7 2009.7 0.0 2010.7 2010.7 0.0 343 1,720 H 2009.7 2009.7 0.0 2010.7 2010.7 0.0 383 1,760 I 2009.7 2009.7 0.0 2010.7 2010.7 0.0 472 1,849 J 2009.7 2009.7 0.0 2010.7 2010.7 0.0 576 1,952 K 2010.0 2010.0 0.0 2010.7 2010.7 0.0 651 2,028 L 2011.0 2011.0 0.0 2011.1 2011.1 0.0 918 2,295 M 2011.5 2011.5 0.0 2011.6 2011.6 0.0 1472 2,849 N 2012.8 2012.8 0.0 2012.8 2012.7 ‐0.1 1528 2,905 O 2014.3 2014.3 0.0 2014.3 2014.3 0.0 1557 2,933 P 2014.3 2014.3 0.0 2014.3 2014.3 0.0 1963 3,339 Q 2019.7 2019.7 0.0 2019.7 2019.6 ‐0.1 2100 3,485 R 2020.8 2020.8 0.0 2020.8 2020.8 0.0 Corrected Effective Model (CEM) The Corrected Effective Model (CEM) is the model that corrects any errors that occur in the DEM, adds any additional cross sections needed, and/or incorporates more detailed topographic information than that used in the DEM. The DEM model review for both the Unnamed Tributary and the Golf Course Overflow Reach found that the models have reasonable cross section spacing and contain detailed topographic data based on channel survey and LiDAR capable of supporting 2-foot contours. Further, the floodplain areas within the CLOMR boundary have remained essentially unchanged since the effective FIS and the effective model topography is representative of current conditions. For the Unnamed Tributary, the topography and ‘n’ values within the effective models are considered to be reasonable and representative of site conditions based on engineering judgement and guidance provided in the HEC-RAS Hydraulic Reference Manual; therefore, no changes were made. The CEM model is identical to the DEM except for the following two changes. First, ineffective flow stations which were added to RAS cross sections 651 and 1,742 to better reflect local topography. Second, new survey collected by WCE shows that the WEST Consultants, Inc. 26 CLOMR for Proposed Painted Hills Development downstream invert of the Highway 27 culvert is at elevation 2017.4, rather than elevation 2017.83 as shown in the effective model. The change in the culvert invert results in very minor changes to water surface elevations, (ranging from -0.02 to 0.04 feet) at the next five cross sections upstream of the culvert. For the Golf Course Overflow, in order to more accurately assess the impacts of the proposed project, cross sections 22,423, 21,924, and 21,548 were removed and replaced with five new cross-sections (21,525, 21,609, 21,726, 21,857, and 21,983), the spacing and alignment of which better represent the area immediately upstream of Thorpe Road. Cross section 21,498 was also added to better define the influence of Thorpe Road. Mannings ‘n’ values for the new cross sections are identical to the ‘n’ values for the cross sections they were replacing, and were considered reasonable based on engineering judgement and the RAS Hydraulic Reference Manual. Mannings ‘n’ values and topographic data in other portions of the model were considered reasonable; therefore, no other changes were made. A comparison of DEM and CEM results are provided in Table 9 and Table 10. WEST Consultants, Inc. 27 CLOMR for Proposed Painted Hills Development Table 9. DEM and CEM model results for the Golf Course Overflow RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway DEM (FT NAVD) CEM (FT NAVD) Difference (FT) DEM (FT NAVD) CEM (FT NAVD) Difference (FT) 20779 0 A 2008.05 2008.05 0.00 2009.05 2009.05 0.00 21013 773 B 2007.79 2007.79 0.00 2009.05 2009.05 0.00 21128 961 C 2008.60 2008.60 0.00 2009.05 2009.05 0.00 21229 1145 D 2008.87 2008.87 0.00 2009.59 2009.59 0.00 21385 1425 E 2009.12 2009.12 0.00 2010.03 2010.03 0.00 21409 ‐‐ ‐‐ 2009.17 2009.17 0.00 2010.12 2010.12 0.00 21431 ‐‐ ‐‐ 2009.23 2009.23 0.00 2010.23 2010.23 0.00 21445 1600 F 2009.31 2009.31 0.00 2010.29 2010.29 0.00 21456 ‐‐ ‐‐ 2013.13 2013.13 0.00 2013.79 2013.79 0.00 21481 ‐‐ ‐‐ 2013.25 2013.25 0.00 2014.10 2014.10 0.00 21485 1 ‐‐ ‐‐ ‐‐ 2013.25 ‐‐ ‐‐ 2014.10 ‐‐ 21515 ‐‐ ‐‐ 2013.25 2013.26 0.01 2014.11 2014.11 0.00 21525 1 ‐‐ ‐‐ ‐‐ 2013.26 ‐‐ ‐‐ 2014.12 ‐‐ 21548 2 1800 G 2013.26 ‐‐ ‐‐ 2014.13 ‐‐ 21609 1 ‐‐ ‐‐ ‐‐ 2013.26 ‐‐ ‐‐ 2014.14 ‐‐ 21726 1 ‐‐ ‐‐ ‐‐ 2013.26 ‐‐ ‐‐ 2014.16 ‐‐ 21924 3 2123 H 2013.27 2013.27 0.00 2014.23 2014.24 0.01 21983 1 ‐‐ n/a ‐‐ 2013.31 ‐‐ ‐‐ 2014.28 ‐‐ 22423 2704 I 2013.51 2013.64 0.13 2014.48 2014.45 ‐0.03 22972 3144 J 2014.82 2014.60 ‐0.22 2015.26 2015.26 0.00 23005 ‐‐ ‐‐ 2015.25 2015.28 0.03 2016.10 2016.10 0.00 23050 3287 K 2015.38 2015.39 0.01 2016.21 2016.21 0.00 23090 3387 L 2015.65 2015.65 0.00 2016.61 2016.61 0.00 23446 3721 M 2018.10 2018.10 0.00 2019.02 2019.02 0.00 23887 4318 N 2022.99 2022.99 0.00 2023.79 2023.79 0.00 24430 ‐‐ ‐‐ 2029.56 2029.56 0.00 2029.72 2029.72 0.00 WEST Consultants, Inc. 28 CLOMR for Proposed Painted Hills Development Table 10. DEM and CEM model results for the Unnamed Tributary RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway DEM (FT NAVD) CEM (FT NAVD) Difference (FT) DEM (FT NAVD) CEM (FT NAVD) Difference (FT) ‐1303 0 A 2008.05 2008.05 0.00 2009.05 2009.05 0.00 ‐1019 283 B 2008.36 2008.36 0.00 2009.05 2009.05 0.00 ‐880 422 C 2008.42 2008.42 0.00 2009.05 2009.05 0.00 ‐466 836 D 2008.42 2008.42 0.00 2009.05 2009.05 0.00 ‐89 910 E 2008.42 2008.42 0.00 2009.05 2009.05 0.00 1 1,378 F 2009.70 2009.70 0.00 2010.70 2010.70 0.00 149 1,525 G 2009.70 2009.70 0.00 2010.70 2010.70 0.00 343 1,720 H 2009.70 2009.70 0.00 2010.70 2010.70 0.00 383 1,760 I 2009.70 2009.70 0.00 2010.70 2010.70 0.00 472 1,849 J 2009.70 2009.70 0.00 2010.70 2010.70 0.00 576 1,952 K 2009.95 2009.95 0.00 2010.67 2010.67 0.00 651 2,028 L 2010.95 2011.13 0.18 2011.07 2011.07 0.00 918 2,295 M 2011.45 2011.63 0.18 2011.63 2011.63 0.00 1472 2,849 N 2012.83 2012.72 ‐0.11 2012.71 2012.71 0.00 1510 ‐‐ ‐‐ 2013.26 2013.26 0.00 2013.26 2013.26 0.00 1528 2,905 O 2014.30 2014.30 0.00 2014.31 2014.31 0.00 1557 2,933 P 2014.32 2014.32 0.00 2014.32 2014.32 0.00 1963 3,339 Q 2019.66 2019.66 0.00 2019.63 2019.63 0.00 1989 ‐‐ ‐‐ 2020.06 2020.06 0.00 2020.08 2020.08 0.00 2080 ‐‐ ‐‐ 2020.61 2020.65 0.04 2020.61 2020.65 0.04 2100 3,485 R 2020.83 2020.86 0.03 2020.83 2020.86 0.03 2110 ‐‐ ‐‐ 2020.88 2020.90 0.02 2020.88 2020.90 0.02 2120 3,509 S 2020.91 2020.93 0.02 2020.92 2020.93 0.01 2651 4,040 T 2023.40 2023.37 ‐0.03 2023.40 2023.38 ‐0.02 3126 4,515 U 2026.19 2026.19 0.00 2026.18 2026.19 0.01 Existing (Pre-Project) Conditions Model The Existing or Pre-Project Conditions Model is a modification of the CEM to reflect any modifications that have occurred within the floodplain since the date of the effective model but prior to the construction of the project for which the revision is being requested. For the Unnamed Tributary, no significant changes have occurred to the channel or existing floodplain since the time of the effective study; therefore, the Existing Conditions model (ECM) is a duplicate of the CEM. For the Golf Course Overflow Reach, the only significant modifications known to have occurred WEST Consultants, Inc. 29 CLOMR for Proposed Painted Hills Development are the addition of three, 15” corrugated metal culverts under Thorpe Road. The Existing Conditions model was modified to include the culverts. Comparisons of CEM and ECM model results are summarized in Table 11 and Table 12. Table 11. CEM and ECM model results for the Golf Course Overflow RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway CEM (FT NAVD) ECM (FT NAVD) Difference (FT) CEM (FT NAVD) ECM (FT NAVD) Difference (FT) 20779 0 A 2008.05 2008.05 0.00 2009.05 2009.05 0.00 21013 773 B 2007.79 2007.79 0.00 2009.05 2009.05 0.00 21128 961 C 2008.60 2008.60 0.00 2009.05 2009.05 0.00 21229 1145 D 2008.87 2008.87 0.00 2009.59 2009.59 0.00 21385 1425 E 2009.12 2009.12 0.00 2010.03 2010.03 0.00 21409 ‐‐ ‐‐ 2009.17 2009.17 0.00 2010.12 2010.12 0.00 21431 ‐‐ ‐‐ 2009.23 2009.23 0.00 2010.23 2010.23 0.00 21445 1600 F 2009.31 2009.31 0.00 2010.29 2010.29 0.00 21456 ‐‐ ‐‐ 2013.13 2013.14 0.01 2013.79 2013.79 0.00 21481 ‐‐ ‐‐ 2013.25 2013.27 0.02 2014.10 2014.14 0.04 21485 1 ‐‐ ‐‐ 2013.25 ‐‐ ‐‐ 2014.10 ‐‐ ‐‐ 21515 ‐‐ 2013.26 2013.27 0.02 2014.11 2014.15 0.04 21525 ‐‐ ‐‐ 2013.26 2013.28 0.02 2014.12 2014.15 0.03 21609 1800 G 2013.26 2013.28 0.02 2014.14 2014.19 0.05 21726 ‐‐ ‐‐ 2013.26 2013.28 0.03 2014.16 2014.21 0.05 21857 2123 H 2013.27 2013.30 0.03 2014.24 2014.24 0.00 21983 n/a n/a 2013.31 2013.33 n/a 2014.28 2014.27 n/a 22423 2704 I 2013.64 2013.64 0.00 2014.45 2014.45 0.00 22972 3144 J 2014.60 2014.60 0.00 2015.26 2015.27 0.01 23005 ‐‐ ‐‐ 2015.28 2015.28 0.00 2016.10 2016.10 0.00 23050 3287 K 2015.39 2015.39 0.00 2016.21 2016.21 0.00 23090 3387 L 2015.65 2015.65 0.00 2016.61 2016.61 0.00 23446 3721 M 2018.10 2018.10 0.00 2019.02 2019.02 0.00 23887 4318 N 2022.99 2022.99 0.00 2023.79 2023.79 0.00 24430 ‐‐ ‐‐ 2029.56 2029.56 0.00 2029.72 2029.72 0.00 1 XS converted to bridge with culverts in model WEST Consultants, Inc. 30 CLOMR for Proposed Painted Hills Development Table 12. CEM and ECM model results for the Unnamed Tributary RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway CEM (FT NAVD) ECM (FT NAVD) Difference (FT) CEM (FT NAVD) ECM (FT NAVD) Difference (FT) ‐1303 0 A 2008.05 2008.05 0.00 2009.05 2009.05 0.00 ‐1019 283 B 2008.36 2008.36 0.00 2009.05 2009.05 0.00 ‐880 422 C 2008.42 2008.42 0.00 2009.05 2009.05 0.00 ‐466 836 D 2008.42 2008.42 0.00 2009.05 2009.05 0.00 ‐89 910 E 2008.42 2008.42 0.00 2009.05 2009.05 0.00 1 1,378 F 2009.70 2009.70 0.00 2010.70 2010.70 0.00 149 1,525 G 2009.70 2009.70 0.00 2010.70 2010.70 0.00 343 1,720 H 2009.70 2009.70 0.00 2010.70 2010.70 0.00 383 1,760 I 2009.70 2009.70 0.00 2010.70 2010.70 0.00 472 1,849 J 2009.70 2009.70 0.00 2010.70 2010.70 0.00 576 1,952 K 2009.95 2009.95 0.00 2010.67 2010.67 0.00 651 2,028 L 2011.13 2011.13 0.00 2011.07 2011.07 0.00 918 2,295 M 2011.63 2011.63 0.00 2011.63 2011.63 0.00 1472 2,849 N 2012.72 2012.72 0.00 2012.71 2012.71 0.00 1510 2013.26 2013.26 0.00 2013.26 2013.26 0.00 1528 2,905 O 2014.30 2014.30 0.00 2014.31 2014.31 0.00 1557 2,933 P 2014.32 2014.32 0.00 2014.32 2014.32 0.00 1963 3,339 Q 2019.66 2019.66 0.00 2019.63 2019.63 0.00 1989 2020.06 2020.06 0.00 2020.08 2020.08 0.00 2080 2020.65 2020.65 0.00 2020.65 2020.65 0.00 2100 3,485 R 2020.86 2020.86 0.00 2020.86 2020.86 0.00 2110 2020.90 2020.90 0.00 2020.90 2020.90 0.00 2120 3,509 S 2020.93 2020.93 0.00 2020.93 2020.93 0.00 2651 4,040 T 2023.37 2023.37 0.00 2023.38 2023.38 0.00 3126 4,515 U 2026.19 2026.19 0.00 2026.19 2026.19 0.00 Proposed or Post-Project Conditions Models The Proposed Conditions models (PCM) reflect the construction of the infiltration facilities along the Golf Course Overflow Reach and the Unnamed Tributary. The post-project conditions model was developed by making the following modifications to the Existing Conditions models: Golf Course Overflow: As the proposed infiltration facility will intercept all flow up through and including the 0.2% annual-chance-flood, the model was shortened and assigned new stationing based WEST Consultants, Inc. 31 CLOMR for Proposed Painted Hills Development on Thorpe Road as the new downstream limit reference point (Station 0). Thorpe Road is the location at which the flow path is considered to enter the flood control facility. Table 13 provides a comparison of existing and revised model and FEMA stationing. Existing cross sections north (downstream) of Thorpe Road were removed. This includes FEMA XS A (RS 0) through F (RS 1600). This corresponds with effective RAS cross sections 20,779 through 21,481. Two cross sections were added downstream of Thorpe Road in order to represent the proposed concrete open channel between Thorpe Road and the entrance to the culverts that carry north along the west side of S Madison Rd to the proposed bioswale and infiltration facility. It should be noted that the RAS model changes were not used to design the open channel, culverts, or any other components of the flood control facility (anything north of Thorpe Road). These components were added to the RAS model based on design plans provided by WCE. The model geometry was modified to include the replacement of existing culverts under Thorpe Road with a concrete box culvert with a 3 foot rise and 25 foot effective span, perpendicular to flow. Downstream boundary conditions at the entrance to the Madison Road culverts were assigned as known water surface elevations based on an XP SWMM model used to model the Madison Road culverts. Floodway stations upstream of Thorpe Rd were maintained at a generally similar width to the effective FIS; however, since the current/proposed culvert location differs in location from the existing overtopping point of Thorpe Road in the effective FIS, the floodway location was shifted for cross sections 964 through -41 to align with the current centerline of the overflow path. Unnamed Tributary: The Proposed Conditions models (PCM) reflect the construction of the infiltration facility within SA6 and the conversion of Gustin Ditch to a culvert. The post-project conditions model was developed by making the following modifications to the ECM: With downstream levee condition The model was truncated at SA6. Since the infiltration facility will contain all flows up to and including the 0.2% annual-chance flood, the main channel of the tributary no longer continues to Painted Hills. Cross sections between SA6 and Highway 27 were removed and replaced with the cross sections needed to model the proposed culvert. The new downstream most river station in the RAS model is is 548. It should be noted that it appears FEMA shifted the stationing of the FIS maps products on this reach, so they do not correspond directly to the original RAS model stationing. Table 14 provides a comparison of existing and revised model and FEMA stationing. Gustin Ditch between the current Highway 27 outlet and the entrance to SA1 was converted to a culvert and the cross sections along this reach were removed. WEST Consultants, Inc. 32 CLOMR for Proposed Painted Hills Development No PCM was developed for the Without Downstream Levee condition since that scenario no longer exists as the leveed reach will be within a culvert and a without-levee scenario is no longer required. Existing vs Proposed Conditions model results for the 1% annual chance flood event and the floodway are summarized in Table 13 and Table 14. A comparison of the floodplain widths is provided in Table 15 and Table 16. As seen in Table 13 and Table 14 the proposed project will not cause any increase in water surface elevations for the 1% annual chance base flood or floodway elevations. Although a levee failure scenario was not conducted for the levee south of Thorpe for the effective FIS, current FEMA standards require that the failure scenario be considered for analysis and remapping of this area. Accordingly, the final revised BFEs and mapped floodplain downstream of XS 528 on the Golf Course Overflow depict this scenario. A comparison of with- and without-levee scenario base flood elevations is provided in Table 17. Although the levee breach scenario contributes significantly more flow to this reach, the proposed water surface elevations are still lower than the effective FIS due to the flood control improvements, with the exception of revised cross section 964, F (effective XS I). At this cross section the CLOMR will result in the published based flood elevation increasing by 0.1 feet. This is not due to the proposed project (which only serves to lower flood elevations), but is strictly artifact of the revised hydraulic model having additional cross sections and thus more detail than the FIS model. Additionally, the published base flood elevation for XS 2100 on the Unnamed Tributary will increase by 0.1 feet. Again, this is not due to the proposed project but is a function of the correction made to the Highway 27 culvert outlet elevation, in the revised hydraulic model. Post-Project Conditions model output is provided in Appendix E. The proposed flood control facilities would have the following impacts: Golf Course Overflow There will be no increase in base flood or floodway elevations due to the proposed project. Proposed conditions flood elevations will either remain unchanged or be reduced when compared to existing conditions. Reductions will be between 0.0 and 1.1 feet. SA1 would be completely removed from the 1% annual chance floodplain. This includes an area of approximately 94 acres. The portion of the floodway north of Thorpe Rd along the Golf Course Overflow reach would be removed from the floodplain mapping. The floodway would be 3 feet wider at cross section 964 on the revised FIRM panel. This change is not due to the proposed project but is an artifact of the revised hydraulic model having additional cross sections and thus more detail than the FIS model. The BFE at XS 964 will be increased by 0.1 feet on the revised FIRM panel. This change is not due to the proposed project. The proposed project will cause no adverse impact to water surface elevations. WEST Consultants, Inc. 33 CLOMR for Proposed Painted Hills Development Unnamed Tributary The 1% annual chance floodplain will effectively be removed for the areas downstream of Highway 27. This includes Gustin Ditch, all of the left overbank flow path (without DS levee condition) and the floodplain downstream of SA6 between the pre-project SA6 outlet and the Left Overbank Flow path. The floodway downstream of SA6 and along the left overbank would be removed from the mapping. WEST Consultants, Inc. 34 CLOMR for Proposed Painted Hills Development Table 13. ECM and PCM model results for the Golf Course Overflow Effective Revised 1% Annual Chance Flood Event Floodway RAS Station FEMA Station XS Letter RAS Station FEMA Station XS Letter ECM (FT NAVD) PCM (FT NAVD) Differen ce (FT) ECM (FT NAVD) PCM (FT NAVD) Differen ce (FT) 20779 0 A 2 ‐‐ ‐‐ ‐‐ 2008.05 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ 21013 773 B 2 ‐‐ ‐‐ ‐‐ 2007.79 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ 21128 961 C 2 ‐‐ ‐‐ ‐‐ 2008.60 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ 21229 1145 D 2 ‐‐ ‐‐ ‐‐ 2008.87 ‐‐ ‐‐ 2009.59 ‐‐ ‐‐ 21385 1425 E 2 ‐‐ ‐‐ ‐‐ 2009.12 ‐‐ ‐‐ 2010.03 ‐‐ ‐‐ 21409 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 2009.17 ‐‐ ‐‐ 2010.12 ‐‐ ‐‐ 21431 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 2009.23 ‐‐ ‐‐ 2010.23 ‐‐ ‐‐ 21445 1600 F 2 ‐‐ ‐‐ ‐‐ 2009.31 ‐‐ ‐‐ 2010.29 ‐‐ ‐‐ 21456 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 2013.14 ‐‐ ‐‐ 2013.79 ‐‐ ‐‐ 21481 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 2013.27 ‐‐ ‐‐ 2014.14 ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐41 ‐41 ‐‐ 1 ‐‐ 2009.49 ‐‐ ‐‐ 2011.05 ‐‐ ‐‐ ‐‐ ‐‐ ‐32 ‐32 ‐‐ 1 ‐‐ 2009.49 ‐‐ ‐‐ 2011.05 ‐‐ 21515 ‐‐ ‐‐ 23 23 ‐‐ 1 2013.27 2009.51 ‐3.76 2014.15 2011.06 ‐3.09 21525 ‐‐ ‐‐ 36 36 A 2013.28 2012.20 ‐1.08 2014.15 2012.24 ‐1.91 21609 1800 G 178 178 B 2013.28 2012.63 ‐0.65 2014.19 2013.09 ‐1.10 21726 ‐‐ ‐‐ 276 276 C 2013.28 2012.67 ‐0.62 2014.21 2013.20 ‐1.01 21857 2123 H 402 402 D 2013.30 2012.82 ‐0.48 2014.24 2013.39 ‐0.84 21983 ‐‐ ‐‐ 528 528 E 2013.33 2013.09 ‐0.24 2014.27 2013.59 ‐0.68 22423 2704 I 964 964 F 2013.64 2013.62 ‐0.02 2014.45 2014.11 ‐0.34 22972 3144 J 1404 1404 G 2014.60 2014.60 0.00 2015.27 2015.27 0.00 23005 ‐‐ ‐‐ 1489 1489 H 2015.28 2015.28 0.00 2016.10 2016.10 0.00 23050 3287 K 1547 1547 I 2015.39 2015.39 0.00 2016.21 2016.21 0.00 23090 3387 L 1647 1647 J 2015.65 2015.65 0.00 2016.61 2016.61 0.00 23446 3721 M 1981 1981 K 2018.10 2018.10 0.00 2019.02 2019.02 0.00 23887 4318 N 2578 2578 L 2022.99 2022.99 0.00 2023.79 2023.79 0.00 24430 ‐‐ ‐‐ 2863 2863 ‐‐ 2029.56 2029.56 0.00 2029.72 2029.72 0.00 1 New XS added to PCM 2 Removed XS from PCM WEST Consultants, Inc. 35 CLOMR for Proposed Painted Hills Development Table 14. ECM and PCM model results for the Unnamed Tributary RAS Station FEMA Station XS Letter 1% Annual Chance Flood Event Floodway ECM (FT NAVD) PCM (FT NAVD) Difference (FT) ECM (FT NAVD) PCM (FT NAVD) Difference (FT) ‐1303 0 A 2 2008.05 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ ‐1019 283 B 2 2008.36 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ ‐880 422 C 2 2008.42 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ ‐466 836 D 2 2008.42 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ ‐89 910 E 2 2008.42 ‐‐ ‐‐ 2009.05 ‐‐ ‐‐ 1 1,378 F 2 2009.70 ‐‐ ‐‐ 2010.70 ‐‐ ‐‐ 149 1,525 G 2 2009.70 ‐‐ ‐‐ 2010.70 ‐‐ ‐‐ 343 1,720 H 2 2009.70 ‐‐ ‐‐ 2010.70 ‐‐ ‐‐ 383 1,760 I 2 2009.70 ‐‐ ‐‐ 2010.70 ‐‐ ‐‐ 472 1,849 J 2 2009.70 ‐‐ ‐‐ 2010.70 ‐‐ ‐‐ 548 ‐‐ ‐‐ 1 ‐‐ 1991.95 ‐‐ ‐‐ 1992.10 ‐‐ 576 1,952 K 2009.95 ‐‐ ‐‐ 2010.67 ‐‐ ‐‐ 651 2,028 L 2011.13 ‐‐ ‐‐ 2011.07 ‐‐ ‐‐ 665 ‐‐ ‐‐ 1 ‐‐ 1999.23 ‐‐ ‐‐ 1999.23 ‐‐ 918 2,295 M 2 2011.63 ‐‐ ‐‐ 2011.63 ‐‐ ‐‐ 1472 2,849 N 2 2012.72 ‐‐ ‐‐ 2012.71 ‐‐ ‐‐ 1510 ‐‐ ‐‐ 2 2013.26 ‐‐ ‐‐ 2013.26 ‐‐ ‐‐ 1528 2,905 O 2 2014.30 ‐‐ ‐‐ 2014.31 ‐‐ ‐‐ 1557 2,933 P 2 2014.32 ‐‐ ‐‐ 2014.32 ‐‐ ‐‐ 1963 3,339 Q 2 2019.66 ‐‐ ‐‐ 2019.63 ‐‐ ‐‐ 1989 ‐‐ ‐‐ 2020.06 2019.11 ‐0.95 2020.08 2019.11 ‐0.97 2080 ‐‐ ‐‐ 2020.65 2020.65 0.00 2020.65 2020.65 0.00 2100 3,485 R 2020.86 2020.86 0.00 2020.86 2020.86 0.00 2110 ‐‐ ‐‐ 2020.90 2020.90 0.00 2020.90 2020.90 0.00 2120 3,509 S 2020.93 2020.93 0.00 2020.93 2020.93 0.00 2651 4,040 T 2023.37 2023.37 0.00 2023.38 2023.38 0.00 3126 4,515 U 2026.19 2026.19 0.00 2026.19 2026.19 0.00 1 New XS added to PCM 2 Removed XS from PCM WEST Consultants, Inc. 36 CLOMR for Proposed Painted Hills Development Table 15. Change in Top Width for Golf Course Overflow Effective Revised Top Width Base Flood (ft) Top Width Floodway (ft) RAS Station FEMA Station XS Letter RAS Station FEMA Station XS Letter ECM (FT) PCM (FT) Differen ce (FT) ECM (FT) PCM (FT) Differen ce (FT) 20779 0 A 2 ‐‐ ‐‐ ‐‐ 1985 0 ‐1985 ‐‐ ‐‐ ‐‐ 21013 773 B 2 ‐‐ ‐‐ ‐‐ 395 0 ‐395 ‐‐ ‐‐ ‐‐ 21128 961 C 2 ‐‐ ‐‐ ‐‐ 443 0 ‐443 ‐‐ ‐‐ ‐‐ 21229 1145 D 2 ‐‐ ‐‐ ‐‐ 546 0 ‐546 35 0 ‐35 21385 1425 E 2 ‐‐ ‐‐ ‐‐ 286 0 ‐286 30 0 ‐30 21409 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 284 0 ‐284 25 0 ‐25 21431 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 223 0 ‐223 25 0 ‐25 21445 1600 F 2 ‐‐ ‐‐ ‐‐ 143 0 ‐143 20 0 ‐20 21456 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 115 0 ‐115 30 0 ‐30 21481 ‐‐ ‐‐ 2 ‐‐ ‐‐ ‐‐ 640 0 ‐640 45 0 ‐45 ‐‐ ‐‐ ‐‐ ‐41 ‐41 ‐‐ 1 ‐‐ 24 ‐‐ ‐‐ 24 ‐‐ ‐‐ ‐‐ ‐‐ ‐32 ‐32 ‐‐ 1 ‐‐ 24 ‐‐ ‐‐ 24 ‐‐ 21515 ‐‐ ‐‐ 23 23 ‐‐ 1 521 29 ‐492 29 29 0 21525 1 ‐‐ ‐‐ 36 36 A 521 133 ‐388 29 29 0 21609 1800 G 178 178 B 484 439 ‐45 44 44 0 21726 ‐‐ ‐‐ 276 276 C 364 245 ‐119 44 44 0 21857 2123 H 402 402 D 250 204 ‐46 43 43 0 21983 ‐‐ ‐‐ 528 528 E 180 130 ‐50 43 43 0 22423 2704 I 964 964 F 203 202 ‐1 40 43 3 22972 3144 J 1404 1404 G 54 54 0 14 14 0 23005 ‐‐ ‐‐ 1489 1489 H 136 136 0 27 27 0 23050 3287 K 1547 1547 I 152 152 0 22 22 0 23090 3387 L 1647 1647 J 155 155 0 20 20 0 23446 3721 M 1981 1981 K 208 208 0 20 20 0 23887 4318 N 2578 2578 L 160 160 0 20 20 0 24430 ‐‐ ‐‐ 2863 2863 ‐‐ 37 37 0 20 20 0 1 XS 21609 in DEM model 2 Removed XS from PCM WEST Consultants, Inc. 37 CLOMR for Proposed Painted Hills Development Table 16. Change in top width for Unnamed Tributary RAS Station FEMA Station XS Letter Top Width Base Flood (ft) Top Width Floodway (ft) ECM (FT) PCM (FT) Difference (FT) ECM (FT) PCM (FT) Difference (FT) ‐1303 0 A 2 104 0 ‐104 31 0 ‐31 ‐1019 283 B 2 48 0 ‐48 21 0 ‐21 ‐880 422 C 2 362 0 ‐362 40 0 ‐40 ‐466 836 D 2 389 0 ‐389 46 0 ‐46 ‐89 910 E 2 346 0 ‐346 40 0 ‐40 1 1,378 F 2 102 0 ‐102 117 0 ‐117 149 1,525 G 2 176 0 ‐176 180 0 ‐180 343 1,720 H 2 267 0 ‐267 271 0 ‐271 383 1,760 I 2 280 0 ‐280 283 0 ‐283 472 1,849 J 2 193 0 ‐193 9 0 ‐9 576 1,952 K 6 0 ‐6 5 0 ‐5 651 2,028 L 64 0 ‐64 16 0 ‐16 918 2,295 M 2 43 0 ‐43 8 0 ‐8 1472 2,849 N 2 5 0 ‐5 5 0 ‐5 1528 2,905 O 2 10 0 ‐10 10 0 ‐10 1557 2,933 P 2 8 0 ‐8 8 0 ‐8 1963 3,339 Q 2 15 0 ‐15 9 0 ‐9 1989 ‐‐ ‐‐ 48 0 ‐48 9 0 ‐9 2080 ‐‐ ‐‐ 16 16 0 15 15 0 2100 3,485 R 15 15 0 15 15 0 2110 ‐‐ ‐‐ 16 16 0 15 15 0 2120 3,509 S 16 16 0 15 15 0 2651 4,040 T 7 7 0 7 7 0 3126 4,515 U 10 10 0 10 10 0 WEST Consultants, Inc. 38 CLOMR for Proposed Painted Hills Development Table 17. PCM model with- and without-levee results comparison for Golf Course Reach Effective Revised 1% Annual Chance Flood Event RAS Station FEMA Station XS Letter RAS Station FEMA Station XS Letter PCM With Levee PCM Without Levee Difference (FT) ‐‐ ‐‐ ‐‐ ‐41 ‐41 ‐‐ 1 2009.49 2010.12 0.63 ‐‐ ‐‐ ‐‐ ‐32 ‐32 ‐‐ 1 2009.49 2010.12 0.63 21515 ‐‐ ‐‐ 23 23 ‐‐ 1 2009.51 2010.14 0.63 21525 ‐‐ ‐‐ 36 36 A 2012.20 2012.31 0.11 21609 1800 G 178 178 B 2012.63 2012.80 0.17 21726 ‐‐ ‐‐ 276 276 C 2012.67 2012.86 0.19 21857 2123 H 402 402 D 2012.82 2013.11 0.29 21983 ‐‐ ‐‐ 528 528 E 2013.09 2013.33 0.24 22423 2704 I 964 964 F 2013.62 2013.64 0.02 22972 3144 J 1404 1404 G 2014.60 2014.60 0.00 23005 ‐‐ ‐‐ 1489 1489 H 2015.28 2015.28 0.00 23050 3287 K 1547 1547 I 2015.39 2015.39 0.00 23090 3387 L 1647 1647 J 2015.65 2015.65 0.00 23446 3721 M 1981 1981 K 2018.10 2018.10 0.00 23887 4318 N 2578 2578 L 2022.99 2022.99 0.00 24430 ‐‐ ‐‐ 2863 2863 ‐‐ 2029.56 2029.56 0.00 FLOODPLAIN MAPPING Work maps showing existing and proposed floodplain mapping is provided in Appendix H. An annotated FIRM showing existing and proposed floodplain mapping is provided in Appendix G along with revised flood profiles and floodway data tables. The proposed floodplain mapping reflects the proposed flood control improvements. Since portions of the main channel of Chester Creek abut an uncertified levee within the project area, and since Dishman Mica Road is acting as a non-levee embankment for a short stretch of channel under the without-downstream levee (Trailer Park levee) scenario downstream of Dishman-Mica Road, some portions of the project site between the fill and the main channel of Chester Creek have been mapped as 1% annual chance floodplain per the BFE’s in the effective FIS. CERTIFICATION FORMS Completed FEMA MT-2 forms are included in Appendix A. Supporting documentation that includes a copy of public notices and the Biological Opinion are provided in Appendix K. WEST Consultants, Inc. 39 CLOMR for Proposed Painted Hills Development SUMMARY A hydraulic analysis was conducted for a proposed development within the Chester Creek floodplain. The hydraulic analysis was completed to support a Conditional Letter of Map Revision (CLOMR) application for the proposed development per requirements of the City of Spokane Valley, Spokane County, and FEMA. The revised hydraulic models and mapping products reflect the proposed fill and construction of two infiltration and storage facilities and associated infrastructure. The results of the analysis indicate the proposed development will provide significant flood protection for the surround area, will not cause any increase in base flood or floodway elevations when compared to existing conditions, and will significantly reduce the floodplain extent within the extents of the CLOMR. REFERENCES Federal Emergency Management Agency, Procedure Memorandum No. 51, Guidance for Mapping of Non-Levee Embankments, February 27, 2009 Federal Emergency Management Agency, Flood Insurance Study, Spokane County, Washington and Incorporated Areas, July 6, 2010. Federal Emergency Management Agency, Guidelines and Specifications for Flood Hazard Partners, July 6, 2003. U.S. Army Corps of Engineers, HEC-RAS River Analysis System User’s Manual, Version 4.1, January 2010. Whipple Consulting Engineers, Inc., Painted Hills Flood Control Development Narrative, September 26, 2014. WEST Consultants. Inc., Technical Memorandum Chester Creek Flood Insurance Study Hydrology Re-evaluation, January 14, 2008. WEST Consultants. Inc., Flood Insurance Study Hydrologic Analysis for Chester Creek, December 8, 2004. Inland Pacific Engineering Company, Preliminary Geotechnical Evaluation Phase I Painted Hills Golf Course Property, December 31, 2013. Inland Pacific Engineering Company, Geotechnical Evaluation Levee Evaluation and Certification 4403 South Dishman-Mica Road Spokane County, Washington, February 12, 2015 Biology Soil & Water, Inc, Critical Areas Assessment, Buffer Averaging, and Habitat Management Plan for the Painted Hills PRD, May 14, 2015 APPENDIX A FEMA FORMS FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 1 of 3 U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY OVERVIEW & CONCURRENCE FORM O.M.B No. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93- 234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM). A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Example: 480301 480287 City of Katy Harris County TX TX 48473C 48201C 0005D 0220G 02/08/83 09/28/90 530342 City of Spokane valley WA 53063C 0751D 7/6/2010 530174 Spokane County WA 53063C 0751D 7/6/2010 2. a. Flooding Source: b. Types of Flooding: Riverine Coastal Shallow Flooding (e.g., Zones AO and AH) Alluvial fan Lakes Other (Attach Description) 3. Project Name/Identifier: 4. FEMA zone designations affected: AE, X (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Base Map Changes Coastal Analysis Hydraulic Analysis Hydrologic Analysis Corrections Weir-Dam Changes Levee Certification Alluvial Fan Analysis Natural Changes New Topographic Data Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 3 of 3 Ensure the forms that are appropriate to your revision request are included in your submittal. Form Name and (Number) Required if … Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water-surface elevations Riverine Structures Form (Form 3) Channel is modified, addition/revision of bridge/culverts, addition/revision of levee/floodwall, addition/revision of dam Coastal Analysis Form (Form 4) New or revised coastal elevations Coastal Structures Form (Form 5) Addition/revision of coastal structure Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans Seal (Optional) FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 1 of 3 U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY OVERVIEW & CONCURRENCE FORM O.M.B No. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93- 234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM). A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1.The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Example: 480301 480287 City of Katy Harris County TX TX 48473C 48201C 0005D 0220G 02/08/83 09/28/90 530342 City of Spokane valley WA 53063C 0751D 7/6/2010 530174 Spokane County WA 53063C 0751D 7/6/2010 2.a. Flooding Source: b. Types of Flooding: Riverine Coastal Shallow Flooding (e.g., Zones AO and AH) Alluvial fan Lakes Other (Attach Description) 3.Project Name/Identifier: Painted Hills Development 4.FEMA zone designations affected: AE, X (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5.Basis for Request and Type of Revision: a.The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Base Map Changes Coastal Analysis Hydraulic Analysis Hydrologic Analysis Corrections Weir-Dam Changes Levee Certification Alluvial Fan Analysis Natural Changes New Topographic Data Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 2 of 3 b.The area of revision encompasses the following structures (check all that apply) Structures: Channelization Levee/Floodwall Bridge/Culvert Dam Fill Other (Attach Description) 6.Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the instructions for more information. C. REVIEW FEE Has the review fee for the appropriate request category been included? Yes Fee amount: $$7,000 No, Attach Explanation Please see the DHS-FEMA Web site at http://www.fema.gov/plan/prevent/fhm/frm_fees.shtm for Fee Amounts and Exemptions. D. SIGNATURE All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Kenneth D Puhn Company: WEST Consultants, Inc. Mailing Address: 2601 25th St SE, Suite 450 Salem, OR 97302 Daytime Telephone No.: 503-485-5490 Fax No.: 503-485-5491 E-Mail Address: kpuhn@westconsultants.com Signature of Requester (required): Date: As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. For Conditional LOMR requests, the applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA’s review of the Conditional LOMR application. For LOMR requests, I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA’s process. For actions authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2) of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination. Community Official’s Name and Title: Community Name: Spokane County Mailing Address: Daytime Telephone No.: Fax No.: E-Mail Address: Community Official’s Signature (required): Date: CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) and as described in the MT-2 Forms Instructions. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Certifier’s Name: Kenneth D Puhn License No.: 52823 Expiration Date: 8/29/2016 Company Name: WEST Consultants, Inc. Telephone No.: 503-485-5490 Fax No.: 503-485-5491 Signature: Date: E-Mail Address: kpuhn@westconsultants.com FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 3 of 3 Ensure the forms that are appropriate to your revision request are included in your submittal. Form Name and (Number) Required if … Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water-surface elevations Riverine Structures Form (Form 3) Channel is modified, addition/revision of bridge/culverts, addition/revision of levee/floodwall, addition/revision of dam Coastal Analysis Form (Form 4) New or revised coastal elevations Coastal Structures Form (Form 5) Addition/revision of coastal structure Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans Seal (Optional) FEMA Form 086-0-27A, (2/2011) Previously FEMA Form 81-89 MT-2 Form 2 Page 1 of 3 U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE HYDROLOGY & HYDRAULICS FORM O.M.B No. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 3.5 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a NFIP Flood Insurance Rate Maps (FIRM). Flooding Source: Chester Creek and Unnamed Tributary to Chester Creek Note: Fill out one form for each flooding source studied A. HYDROLOGY 1.Reason for New Hydrologic Analysis (check all that apply) Not revised (skip to section B) No existing analysis Improved data Alternative methodology Proposed Conditions (CLOMR) Changed physical condition of watershed 2.Comparison of Representative 1%-Annual-Chance Discharges Location Drainage Area (Sq. Mi.) Effective/FIS (cfs) Revised (cfs) 3.Methodology for New Hydrologic Analysis (check all that apply) Statistical Analysis of Gage Records Precipitation/Runoff Model Specify Model: Regional Regression Equations Other (please attach description) Please enclose all relevant models in digital format, maps, computations (including computation of parameters), and documentation to support the new analysis. 4.Review/Approval of Analysis If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval/review. 5.Impacts of Sediment Transport on Hydrology Is the hydrology for the revised flooding source(s) affected by sediment transport? Yes No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach your explanation.. FEMA Form 086-0-27A, (2/2011) Previously FEMA Form 81-89 MT-2 Form 2 Page 2 of 3 B. HYDRAULICS 1.Reach to be Revised Description Cross Section Water-Surface Elevations (ft.) Effective Proposed/Revised Downstream Limit* See Attached Supplemental Information Upstream Limit* *Proposed/Revised elevations must tie-into the Effective elevations within 0.5 foot at the downstream and upstream limits of revision. 2.Hydraulic Method/Model Used: HEC-RAS 4.1 3.Pre-Submittal Review of Hydraulic Models* DHS-FEMA has developed two review programs, CHECK-2 and CHECK-RAS, to aid in the review of HEC-2 and HEC-RAS hydraulic models,respectively. We recommend that you review your HEC-2 and HEC-RAS models with CHECK-2 and CHECK-RAS.4. Models Submitted Natural Run Floodway Run Datum Duplicate Effective Model* File Name: ___See Attached Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Corrected Effective Model* File Name: __________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Existing or Pre-Project Conditions Model File Name: _________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Revised or Post-Project Conditions Model File Name: ______________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ Other - (attach description) File Name: ______________ Plan Name: ______________ File Name: ______________ Plan Name: ______________ __________ * For details, refer to the corresponding section of the instructions. Digital Models Submitted? (Required) C. MAPPING REQUIREMENTS A certified topographic work map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and proposed conditions 1%-annual-chance floodplain (for approximate Zone A revisions) or the boundaries of the 1%- and 0.2%-annual-chance floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the referenced vertical datum (NGVD, NAVD, etc.). Digital Mapping (GIS/CADD) Data Submitted (preferred) Topographic Information: 2003 LiDAR, 2ft contours Source: TerraPoint Date: March 2003 Accuracy: 2 foot contours from LiDAR, accuracy +/- 1ft Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM must tie-in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and/or FBFM, at the same scale as the original, annotated to show the boundaries of the revised 1%-and 0.2%-annual-chance floodplains and regulatory floodway that tie-in with the boundaries of the effective 1%-and 0.2%-annual-chance floodplain and regulatory floodway at the upstream and downstream limits of the area on revision. Annotated FIRM and/or FBFM (Required) FEMA Form 086-0-27A, (2/2011) Previously FEMA Form 81-89 MT-2 Form 2 Page 3 of 3 D. COMMON REGULATORY REQUIREMENTS* 1. For LOMR/CLOMR requests, do Base Flood Elevations (BFEs) increase? Yes No a. For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations: The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot compared to pre-project conditions. The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot compared to pre-project conditions. b. Does this LOMR request cause increase in the BFE and/or SFHA compared with the effective BFEs and/or SFHA? Yes No If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notifications can be found in the MT-2 Form 2 Instructions. 2. Does the request involve the placement or proposed placement of fill? Yes No If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the NFIP regulations set forth at 44 CFR 60.3(A)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT-2 instructions for more information. 3. For LOMR requests, is the regulatory floodway being revised? Yes No If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1%-annual-chance floodplains [studied Zone A designation] unless a regulatory floodway is being established. Elements and examples of regulatory floodway revision notification can be found in the MT-2 Form 2 Instructions.) 4. For CLOMR requests, please submit documentation to FEMA and the community to show that you have complied with Sections 9 and 10 of the Endangered Species Act (ESA). For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its compliance with Section 7(a)(2) of the ESA. Please see the MT-2 instructions for more detail. * Not inclusive of all applicable regulatory requirements. For details, see 44 CFR parts 60 and 65. FEMA Form 086-0-27B, (2/2011) Previously FEMA Form 81-89B MT-2 Form 3 Page 1 of 11 DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B. NO. 1660-0016 Expires February 28, 2014 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 7 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20598-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program; Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a NFIP Flood Insurance Rate Maps (FIRM). Flooding Source: Chester Creek and Unnamed Tributary Note: Fill out one form for each flooding source studied. A. GENERAL Complete the appropriate section(s) for each Structure listed below: Channelization...............complete Section B Bridge/Culvert................complete Section C Dam...............................complete Section D Levee/Floodwall.............complete Section E Sediment Transport........complete Section F (if required) Description Of Modeled Structure 1. Name of Structure: Thorpe Road Culvert (Replacement) - SEE SUPPLEMENTAL INFORMATION DOC FOR SECTION C DETAILS Type (check one): Channelization Bridge/Culvert Levee/Floodwall Dam Location of Structure: Thorpe Road Downstream Limit/Cross Section: XS -32 (PCM stationing) on Golf Course Overflow Reach Upstream Limit/Cross Section: XS 23 (PCM stationing) on Golf Course Overflow Reach 2. Name of Structure: Highway 27 culvert (Culvert extension) SEE SUPPLEMENTAL INFORMATION DOC FOR SECTION C Type (check one): Channelization Bridge/Culvert Levee/Floodwall Dam Location of Structure: Highway 27, (HEC-RAS Structure 2040 Downstream Limit/Cross Section: 548 PCM Stationing on Unname Tributary Upstream Limit/Cross Section: 1989 PCM Stationing on Unnamed Tributary 3. Name of Structure: Golf Course Concerete Channe SEE SUPPLEMENTAL INFORMATION DOC FOR SECTION B DETAILS l Type (check one) Channelization Bridge/Culvert Levee/Floodwall Dam Location of Structure: DS of Thorpe Road, Golf Course Overflow Channel Downstream Limit/Cross Section: -32 PCM Stationing on Golf Course Overflow Upstream Limit/Cross Section: -41 PCM Stationing on Golf Course Overflow NOTE: FOR MORE STRUCTURES, ATTACH ADDITIONAL PAGES AS NEEDED. MT‐2 Supplemental Information Form 1 Section B, Item 5a/b Other: Construction of storage and infiltration facilities to intercept floodwaters prior to entering development site. Form 2 Section B Reaches to be revised Chester Creek – Golf Course Overflow Description Cross Section Effective WSE Proposed WSE Downstream Limit Storage Area 1 at end of Golf Course Overflow Reach A ‐ 0 2008.1 n/a (no 1% floodplain at this location) Upstream Limit Beginning of Golf Course Overflow Reach (diversion from Chester Creek) N ‐ 4318 2023.0 2023.0 Unnamed Tributary to Chester Creek Description Cross Section Effective WSE Proposed WSE Downstream Limit Storage Area 6 A ‐ 0 2008.1 n/a (no 1% floodplain at this location) Upstream Limit Highway 20 culvert crossing R ‐3485 2020.8 2020.9 Models Submitted Chester Creek – Golf Course Overflow Natural Run Floodway Run Datum File Plan File Plan DEM CCMain.prj DEM CCMain.prj DEM FW NAVD88 CEM CCMain.prj CEM CCMain.prj CEM FW NAVD88 ECM CCMain.prj ECM CCMain.prj ECM FW NAVD88 PCM CCMain.prj PCM CCMain.prj PCM FW NAVD88 PCM CCMain.prj PCM n/a n/a NAVD88 Unnamed Tributary to Chester Creek Natural Run Floodway Run Datum File Plan File Plan DEM CCTrib.prj DEM CCTrib.prj DEM FW NAVD88 CEM CCTrib.prj CEM CCTrib.prj CEM FW NAVD88 ECM CCTrib.prj ECM CCTrib.prj ECM FW NAVD88 PCM CCTrib.prj PCM CCTrib.prj PCM FW NAVD88 Unnamed Tributary to Chester Creek, without DS Levee Natural Run Floodway Run Datum File Plan File Plan DEM CCTrib.prj DEM w/o DS lev CCTrib.prj DEM w/o DS lev FW NAVD88 CEM CCTrib.prj CEM w/o DS lev CCTrib.prj CEM w/o DS lev FW NAVD88 ECM CCTrib.prj ECM w/o DS lev CCTrib.prj ECM w/o DS lev FW NAVD88 PCM CCTrib.prj PCM w/o DS lev n/a n/a NAVD88 Form 3 Section B – Channelization – Golf Course Concrete Channel Approximately 18’ long rectangular concrete channel which connects Thorpe Road box culvert outfall to the Madison twin RCP culvert inlet headwall. 1. Can carry greater than 0.2% flood 2. Plans are provided in Appendix J Painted Hills Flood Control Plans Sheet C5.10 3. None 4. The structure is not considered to be affected by sediment transport. This overflow path is located in a vegetated field and there is no physical channel along this reach. Accordingly, mobilization and transportation of significant amounts of sediment is unlikely. Further, average ‘channel’ velocities within the reach are very low for the 1% annual chance flood (1.2 ft/s; max of 3.8). Most XSs have channel velocities of under 1 ft/s. Form 3 Section B – Highway 27 Culvert (Culvert Extension) ‐ Unnamed Tributary of Chester Creek 1. Proposed extension of existing culvert that passes water under Highway 27. Existing culvert is modeled in effective FIS. Culvert is at RAS station 2040 in effective FIS, between letter Q and R (labeled Pines Road in effective FEMA profile). Culvert will extend entire distance to Storage Area 6 infiltration facility entrance. 2. Modeled in HEC‐RAS 4.1.0 3. Plans are provided in Appendix J Gustin Plans ‐ Sheet C5.0 4. Unknown if culvert is affected by sediment transport but historically the channel downstream of culvert has been maintained by heavy equipment. Form 3 Section B – Thorpe Road Culvert (Replacement) ‐ Golf Course Overflow Reach of Chester Creek 1. Proposed box culvert structure passes water from the Golf Course Overflow Reach under Thorpe Road and replaces three existing round CMP culverts. Existing FIS does not have any structure at this location as culverts were added after FIS. 2. Modeled in HEC‐RAS 4.1.0 3. Plans are provided in Appendix J Painted Hills Flood Control Plans Sheet C5.10 and C5.11 4. The structure is not considered to be affected by sediment transport. This overflow path is located in a vegetated field and there is no physical channel along this reach. Accordingly, mobilization and transportation of significant amounts of sediment is unlikely. Further, average ‘channel’ velocities within the reach are very low for the 1% annual chance flood (1.2 ft/s; max of 3.8). Most XSs have channel velocities of under 1 ft/s. Form RHH Section D Item 1a. 1a. CLOMR would result in a BFE increase of 0.1’ at two cross sections; however, this is not due to the proposed project. These increases occur under the Existing Conditions Model and are due to additional resolution in the model due to addition of new cross sections as well as a correction to a culvert invert elevation from the original FIS. Proposed Conditions model shows no increases in BFEs or FW elevations when compared to the Existing Conditions model FEMA Form 81-107 Payment Information Form FEDERAL EMERGENCY MANAGEMENT AGENCY PAYMENT INFORMATION FORM Community Name: Project Identifier: THIS FORM MUST BE MAILED, ALONG WITH THE APPROPRIATE FEE, TO THE ADDRESS BELOW OR FAXED TO THE FAX NUMBER BELOW. Please make check or money order payable to the National Flood Insurance Program. Type of Request: MT-1 application MT-2 application EDR application Request No. (if known): _______________ Check No.: _______________ Amount: INITIAL FEE* FINAL FEE FEE BALANCE** MASTER CARD VISA CHECK MONEY ORDER *Note: Check only for EDR and/or Alluvial Fan requests (as appropriate). **Note: Check only if submitting a corrected fee for an ongoing request. COMPLETE THIS SECTION ONLY IF PAYING BY CREDIT CARD CARD NUMBER EXP. DATE — — — — 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Month Year _________________________________________________________________ Date Signature NAME (AS IT APPEARS ON CARD): (please print or type) ADDRESS: (for your credit card receipt-please print or type) DAYTIME PHONE: LOMC Clearinghouse 847 South Pickett Street Alexandria, VA 22304-4605 Attn.: LOMC Manager FEMA Project Library 847 South Pickett Street Alexandria, VA 22304-4605 FAX (703) 212-4090 APPENDIX B DUPLICATE EFFECTIVE MODEL HEC-RAS Plan: DEM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 20779 10-yr 30.00 2004.98 2007.19 2005.40 2007.19 0.000006 0.06 517.26 1198.11 0.01 Golf Course 20779 50-yr 54.00 2004.98 2007.80 2005.49 2007.80 0.000003 0.05 1164.72 1860.64 0.01 Golf Course 20779 100-yr 64.00 2004.98 2008.05 2005.52 2008.05 0.000002 0.04 1491.37 1985.36 0.01 Golf Course 20779 500-yr 88.00 2004.98 2008.64 2005.58 2008.64 0.000000 0.03 3229.73 2191.83 0.00 Golf Course 21013 10-yr 30.00 2007.36 2007.65 2007.65 2007.74 0.048676 2.02 13.20 348.57 0.86 Golf Course 21013 50-yr 54.00 2007.36 2007.77 2007.77 2007.86 0.043680 2.09 23.46 392.88 0.83 Golf Course 21013 100-yr 64.00 2007.36 2007.79 2007.79 2007.90 0.048191 2.30 25.52 395.42 0.89 Golf Course 21013 500-yr 88.00 2007.36 2008.64 2007.85 2008.64 0.000463 0.44 192.58 634.20 0.10 Golf Course 21128 10-yr 30.00 2007.08 2008.27 2007.75 2008.28 0.000865 0.55 54.77 320.34 0.14 Golf Course 21128 50-yr 54.00 2007.08 2008.53 2007.86 2008.54 0.001133 0.60 89.93 413.16 0.16 Golf Course 21128 100-yr 64.00 2007.08 2008.60 2007.90 2008.61 0.001181 0.62 103.84 442.77 0.16 Golf Course 21128 500-yr 88.00 2007.08 2008.77 2007.98 2008.77 0.001015 0.61 145.13 510.87 0.15 Golf Course 21229 10-yr 30.00 2006.97 2008.63 2008.48 2008.64 0.007738 0.82 36.63 445.79 0.34 Golf Course 21229 50-yr 54.00 2006.97 2008.82 2008.55 2008.83 0.002311 0.62 86.72 540.30 0.20 Golf Course 21229 100-yr 64.00 2006.97 2008.87 2008.57 2008.88 0.001925 0.63 102.09 545.70 0.19 Golf Course 21229 500-yr 88.00 2006.97 2008.98 2008.63 2008.99 0.001412 0.65 136.02 549.37 0.17 Golf Course 21385 10-yr 30.00 2008.16 2008.94 2008.47 2008.94 0.000409 0.31 97.80 268.00 0.09 Golf Course 21385 50-yr 54.00 2008.16 2009.08 2008.53 2009.08 0.000477 0.40 135.88 283.37 0.10 Golf Course 21385 100-yr 64.00 2008.16 2009.12 2008.56 2009.12 0.000512 0.43 147.76 285.92 0.11 Golf Course 21385 500-yr 88.00 2008.16 2009.22 2008.61 2009.22 0.000552 0.50 176.40 291.98 0.11 Golf Course 21409 10-yr 30.00 2008.27 2008.98 2008.68 2008.98 0.001022 0.46 64.91 246.09 0.14 Golf Course 21409 50-yr 54.00 2008.27 2009.12 2008.75 2009.13 0.001113 0.58 93.59 269.70 0.15 Golf Course 21409 100-yr 64.00 2008.27 2009.17 2008.77 2009.17 0.001210 0.62 103.41 283.87 0.16 Golf Course 21409 500-yr 88.00 2008.27 2009.27 2008.81 2009.28 0.001345 0.68 128.93 323.53 0.17 Golf Course 21431 10-yr 30.00 2008.12 2009.03 2008.45 2009.03 0.000564 0.40 74.75 174.33 0.11 Golf Course 21431 50-yr 54.00 2008.12 2009.18 2008.54 2009.18 0.000767 0.52 103.72 206.07 0.13 Golf Course 21431 100-yr 64.00 2008.12 2009.23 2008.59 2009.24 0.000845 0.56 114.48 222.73 0.14 Golf Course 21431 500-yr 88.00 2008.12 2009.34 2008.66 2009.35 0.000870 0.64 138.33 232.31 0.14 Golf Course 21445 10-yr 30.00 2008.44 2009.09 2008.89 2009.12 0.014872 1.32 22.80 104.20 0.50 Golf Course 21445 50-yr 54.00 2008.44 2009.26 2009.06 2009.28 0.007937 1.23 44.01 139.40 0.38 Golf Course 21445 100-yr 64.00 2008.44 2009.31 2009.10 2009.33 0.006788 1.24 51.65 143.41 0.36 Golf Course 21445 500-yr 88.00 2008.44 2009.42 2009.16 2009.44 0.005945 1.31 67.25 155.76 0.35 Golf Course 21456 10-yr 30.00 2012.42 2012.99 2012.99 2013.09 0.062673 2.50 12.01 61.57 1.00 Golf Course 21456 50-yr 54.00 2012.42 2013.11 2013.11 2013.21 0.060991 2.52 21.40 105.91 0.99 Golf Course 21456 100-yr 64.00 2012.42 2013.14 2013.14 2013.24 0.060320 2.61 24.55 114.71 0.99 Golf Course 21456 500-yr 88.00 2012.42 2013.18 2013.18 2013.31 0.066521 2.86 30.76 134.60 1.05 Golf Course 21481 10-yr 30.00 2011.45 2013.10 2011.82 2013.10 0.000004 0.05 549.78 595.32 0.01 Golf Course 21481 50-yr 54.00 2011.45 2013.22 2011.87 2013.22 0.000009 0.09 620.16 630.22 0.02 Golf Course 21481 100-yr 64.00 2011.45 2013.25 2011.90 2013.25 0.000011 0.10 643.07 634.13 0.02 Golf Course 21481 500-yr 88.00 2011.45 2013.33 2011.93 2013.33 0.000017 0.13 690.78 652.52 0.02 Golf Course 21515 10-yr 30.00 2012.10 2013.10 2012.40 2013.10 0.000023 0.09 319.84 606.72 0.02 Golf Course 21515 50-yr 54.00 2012.10 2013.22 2012.45 2013.22 0.000041 0.14 390.15 624.52 0.03 Golf Course 21515 100-yr 64.00 2012.10 2013.25 2012.45 2013.25 0.000048 0.15 412.91 628.83 0.03 Golf Course 21515 500-yr 88.00 2012.10 2013.33 2012.51 2013.33 0.000063 0.19 459.74 631.14 0.04 Golf Course 21548 10-yr 30.00 2012.09 2013.10 2012.31 2013.10 0.000009 0.07 431.64 624.31 0.01 Golf Course 21548 50-yr 54.00 2012.09 2013.22 2012.36 2013.22 0.000017 0.11 503.76 626.72 0.02 Golf Course 21548 100-yr 64.00 2012.09 2013.25 2012.37 2013.26 0.000021 0.12 526.71 630.57 0.02 Golf Course 21548 500-yr 88.00 2012.09 2013.33 2012.40 2013.33 0.000030 0.15 574.26 635.70 0.03 Golf Course 21924 10-yr 30.00 2012.11 2013.11 2012.42 2013.11 0.000094 0.20 148.10 251.16 0.05 Golf Course 21924 50-yr 54.00 2012.11 2013.23 2012.49 2013.23 0.000169 0.30 178.90 258.69 0.06 Golf Course 21924 100-yr 64.00 2012.11 2013.27 2012.52 2013.27 0.000198 0.34 188.99 259.57 0.07 Golf Course 21924 500-yr 88.00 2012.11 2013.35 2012.57 2013.35 0.000270 0.42 210.13 264.29 0.08 Golf Course 22423 10-yr 30.00 2012.71 2013.25 2012.98 2013.26 0.001640 0.59 50.60 146.20 0.18 Golf Course 22423 50-yr 54.00 2012.71 2013.44 2013.05 2013.45 0.001371 0.67 80.89 171.04 0.17 Golf Course 22423 100-yr 64.00 2012.71 2013.51 2013.07 2013.52 0.001404 0.69 93.10 191.81 0.17 Golf Course 22423 500-yr 88.00 2012.71 2013.64 2013.12 2013.65 0.001265 0.74 118.92 202.88 0.17 Golf Course 22972 10-yr 30.00 2013.92 2014.64 2014.45 2014.67 0.008668 1.44 20.79 55.11 0.41 Golf Course 22972 50-yr 54.00 2013.92 2014.75 2014.57 2014.81 0.012175 1.98 27.23 57.83 0.51 Golf Course 22972 100-yr 64.00 2013.92 2014.82 2014.60 2014.88 0.011286 2.05 31.19 59.44 0.50 Golf Course 22972 500-yr 88.00 2013.92 2014.90 2014.69 2014.99 0.014083 2.44 36.12 62.83 0.57 Golf Course 23005 10-yr 30.00 2014.38 2015.02 2014.75 2015.03 0.002403 0.74 40.27 110.11 0.22 Golf Course 23005 50-yr 54.00 2014.38 2015.19 2014.83 2015.21 0.002393 0.89 60.89 127.76 0.23 Golf Course 23005 100-yr 64.00 2014.38 2015.25 2014.86 2015.27 0.002377 0.93 68.85 133.94 0.23 Golf Course 23005 500-yr 88.00 2014.38 2015.39 2014.91 2015.41 0.002414 0.99 89.09 160.09 0.23 HEC-RAS Plan: DEM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 23050 10-yr 30.00 2014.61 2015.15 2014.87 2015.16 0.002068 0.66 45.59 134.11 0.20 Golf Course 23050 50-yr 54.00 2014.61 2015.32 2014.95 2015.33 0.001873 0.78 69.54 148.17 0.20 Golf Course 23050 100-yr 64.00 2014.61 2015.38 2014.98 2015.39 0.001824 0.82 78.28 151.35 0.20 Golf Course 23050 500-yr 88.00 2014.61 2015.51 2015.03 2015.53 0.001669 0.89 99.12 158.47 0.20 Golf Course 23090 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.004945 0.92 32.71 112.46 0.30 Golf Course 23090 50-yr 54.00 2014.93 2015.60 2015.34 2015.62 0.004846 1.02 52.71 151.19 0.31 Golf Course 23090 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004571 1.07 59.93 154.61 0.30 Golf Course 23090 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003967 1.13 77.59 164.46 0.29 Golf Course 23446 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012985 1.12 26.76 140.46 0.45 Golf Course 23446 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012855 1.25 43.35 192.81 0.46 Golf Course 23446 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013801 1.32 48.44 208.05 0.48 Golf Course 23446 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.016731 1.56 56.49 218.88 0.54 Golf Course 23887 10-yr 30.00 2022.25 2022.83 2022.66 2022.85 0.005569 0.88 34.05 135.89 0.31 Golf Course 23887 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005634 1.05 51.30 158.11 0.33 Golf Course 23887 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 23887 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004911 1.20 73.64 169.28 0.32 Golf Course 24430 10-yr 30.00 2028.58 2029.25 2029.25 2029.46 0.048764 3.65 8.29 21.75 1.00 Golf Course 24430 50-yr 54.00 2028.58 2029.47 2029.47 2029.73 0.037372 4.21 13.58 28.66 0.94 Golf Course 24430 100-yr 64.00 2028.58 2029.56 2029.56 2029.82 0.031201 4.22 16.81 37.07 0.88 Golf Course 24430 500-yr 88.00 2028.58 2029.72 2029.72 2029.99 0.026137 4.41 23.23 42.98 0.83 HEC-RAS Plan: DEM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course 20779 Q100 - base 2008.05 2008.05 1327.67 64.00 934.91 2798.66 Golf Course 20779 Q100 - floodway 2009.05 1.00 2009.05 1178.72 64.00 934.91 934.91 2798.66 2278.72 Golf Course 21013 Q100 - base 2008.05 2008.07 147.76 52.43 11.57 508.09 1602.56 Golf Course 21013 Q100 - floodway 2009.05 1.00 2009.05 173.18 52.98 11.02 1472.43 508.09 1602.56 1725.00 Golf Course 21128 Q100 - base 2008.53 2008.54 190.90 64.00 409.35 1512.91 Golf Course 21128 Q100 - floodway 2009.05 0.52 2009.11 25.00 64.00 1045.00 409.35 1512.91 1070.00 Golf Course 21229 Q100 - base 2008.86 2008.87 305.94 64.00 417.95 1452.44 Golf Course 21229 Q100 - floodway 2009.59 0.72 2009.62 35.00 64.00 985.00 417.95 1452.44 1020.00 Golf Course 21385 Q100 - base 2009.12 2009.12 285.78 64.00 431.52 1001.23 Golf Course 21385 Q100 - floodway 2010.03 0.91 2010.06 30.00 64.00 785.00 431.52 1001.23 815.00 Golf Course 21409 Q100 - base 2009.17 2009.17 222.73 64.00 426.69 980.16 Golf Course 21409 Q100 - floodway 2010.12 0.95 2010.16 25.00 64.00 728.00 426.69 980.16 753.00 Golf Course 21431 Q100 - base 2009.23 2009.24 219.68 64.00 440.00 961.58 Golf Course 21431 Q100 - floodway 2010.23 1.00 2010.26 25.00 64.00 700.00 440.00 961.58 725.00 Golf Course 21445 Q100 - base 2009.31 2009.33 143.36 64.00 440.70 949.64 Golf Course 21445 Q100 - floodway 2010.29 0.98 2010.37 20.00 64.00 683.00 440.70 949.64 703.00 Golf Course 21456 Q100 - base 2013.14 2013.24 114.71 64.00 0.00 937.26 Golf Course 21456 Q100 - floodway 2013.79 0.65 2014.05 30.00 64.00 595.00 0.00 937.26 625.00 Golf Course 21481 Q100 - base 2013.25 2013.25 634.13 64.00 494.28 1387.02 Golf Course 21481 Q100 - floodway 2014.10 0.85 2014.11 37.00 64.00 1073.00 494.28 1387.02 1110.00 Golf Course 21515 Q100 - base 2013.25 2013.25 628.83 64.00 494.23 1385.39 Golf Course 21515 Q100 - floodway 2014.11 0.86 2014.12 44.00 64.00 1051.00 494.23 1385.39 1095.00 Golf Course 21548 Q100 - base 2013.25 2013.26 630.57 64.00 576.95 1602.20 Golf Course 21548 Q100 - floodway 2014.13 0.88 2014.14 45.00 64.00 1058.00 576.95 1602.20 1103.00 Golf Course 21924 Q100 - base 2013.27 2013.27 259.57 64.00 791.72 1477.35 Golf Course 21924 Q100 - floodway 2014.23 0.96 2014.24 43.00 64.00 975.00 791.72 1477.35 1018.00 Golf Course 22423 Q100 - base 2013.51 2013.52 191.81 64.00 843.00 1600.75 Golf Course 22423 Q100 - floodway 2014.48 0.97 2014.49 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 22972 Q100 - base 2014.82 2014.88 59.44 64.00 759.64 1718.25 Golf Course 22972 Q100 - floodway 2015.26 0.45 2015.70 14.13 64.00 1162.20 759.64 1718.25 1176.33 Golf Course 23005 Q100 - base 2015.25 2015.27 133.94 64.00 729.92 1627.92 Golf Course 23005 Q100 - floodway 2016.10 0.85 2016.14 27.34 64.00 1123.02 729.92 1627.92 1150.36 Golf Course 23050 Q100 - base 2015.38 2015.39 151.35 64.00 763.22 1639.53 Golf Course 23050 Q100 - floodway 2016.21 0.84 2016.27 22.35 64.00 1126.64 763.22 1639.53 1148.99 Golf Course 23090 Q100 - base 2015.65 2015.66 154.61 64.00 768.88 1659.11 Golf Course 23090 Q100 - floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 768.88 1659.11 1115.00 Golf Course 23446 Q100 - base 2018.10 2018.12 208.05 64.00 688.98 1310.47 Golf Course 23446 Q100 - floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 23887 Q100 - base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 23887 Q100 - floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 24430 Q100 - base 2029.56 2029.82 37.07 1.56 60.23 2.21 636.32 656.04 Golf Course 24430 Q100 - floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 636.32 656.04 656.04 HEC-RAS Plan: (DEM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 1.00 2004.70 2007.19 2004.82 2007.19 0.000000 0.01 97.62 92.00 0.00 trib -1303 Q50 2.00 2004.70 2007.80 2004.86 2007.80 0.000000 0.02 89.00 31.32 0.00 trib -1303 Q100 4.00 2004.70 2008.05 2004.90 2008.05 0.000000 0.02 181.64 103.69 0.00 trib -1303 Q500 7.00 2004.70 2008.64 2004.96 2008.64 0.000000 0.03 245.69 113.41 0.00 trib -1019 Q10 1.00 2007.91 2008.27 2008.27 2008.30 0.103616 1.40 0.72 31.55 1.04 trib -1019 Q50 2.00 2008.18 2008.31 2008.31 2008.35 0.095084 1.66 1.20 15.60 1.05 trib -1019 Q100 4.00 2007.91 2008.36 2008.36 2008.41 0.077292 1.83 2.19 47.75 1.00 trib -1019 Q500 7.00 2007.91 2008.64 2008.41 2008.64 0.002258 0.58 12.11 93.29 0.20 trib -880 Q10 1.00 2004.89 2008.31 2008.31 0.000000 0.00 721.14 359.15 0.00 trib -880 Q50 2.00 2006.70 2008.36 2008.36 0.000003 0.05 41.16 40.00 0.01 trib -880 Q100 4.00 2004.89 2008.42 2008.42 0.000000 0.01 761.51 361.60 0.00 trib -880 Q500 7.00 2004.89 2008.64 2008.64 0.000000 0.01 843.68 368.58 0.00 trib -466 Q10 1.00 2006.89 2008.31 2008.31 0.000000 0.00 410.09 380.79 0.00 trib -466 Q50 2.00 2006.96 2008.36 2008.36 0.000005 0.05 36.54 45.57 0.01 trib -466 Q100 4.00 2006.89 2008.42 2008.42 0.000000 0.01 453.25 388.60 0.00 trib -466 Q500 7.00 2006.89 2008.64 2008.64 0.000000 0.01 542.61 403.49 0.00 trib -89 Q10 1.00 2006.07 2008.31 2008.31 0.000000 0.00 449.29 336.12 0.00 trib -89 Q50 2.00 2006.83 2008.36 2008.36 0.000002 0.05 40.97 39.70 0.01 trib -89 Q100 4.00 2006.07 2008.42 2008.42 0.000000 0.01 487.40 345.54 0.00 trib -89 Q500 7.00 2006.07 2008.64 2008.64 0.000000 0.01 571.23 388.66 0.00 trib 1 Q10 1.00 1998.92 2005.00 2005.00 0.000000 0.00 225.97 48.42 0.00 trib 1 Q50 2.00 1998.92 2009.60 2009.60 0.000000 0.00 540.96 101.33 0.00 trib 1 Q100 4.00 1998.92 2009.70 2009.70 0.000000 0.01 551.13 102.16 0.00 trib 1 Q500 7.00 1998.92 2010.00 2010.00 0.000000 0.01 582.15 104.63 0.00 trib 149 Q10 10.00 1995.82 2005.00 1996.32 2005.00 0.000000 0.01 1141.63 165.71 0.00 trib 149 Q50 14.00 1995.82 2009.60 1996.38 2009.60 0.000000 0.01 1924.52 175.82 0.00 trib 149 Q100 16.00 1995.82 2009.70 1996.41 2009.70 0.000000 0.01 1942.12 176.16 0.00 trib 149 Q500 20.00 1995.82 2010.00 1996.46 2010.00 0.000000 0.01 1995.13 177.19 0.00 trib 343 Q10 10.00 1993.64 2005.00 1993.99 2005.00 0.000000 0.01 1993.17 252.43 0.00 trib 343 Q50 14.00 1993.64 2009.60 1994.05 2009.60 0.000000 0.00 3182.15 266.09 0.00 trib 343 Q100 16.00 1993.64 2009.70 1994.07 2009.70 0.000000 0.00 3208.78 266.57 0.00 trib 343 Q500 20.00 1993.64 2010.00 1994.11 2010.00 0.000000 0.01 3288.97 267.99 0.00 trib 383 Q10 10.00 1994.23 2005.00 1994.67 2005.00 0.000000 0.01 1938.50 222.78 0.00 trib 383 Q50 14.00 1994.23 2009.60 1994.71 2009.60 0.000000 0.00 3052.64 279.70 0.00 trib 383 Q100 16.00 1994.23 2009.70 1994.73 2009.70 0.000000 0.01 3080.61 279.97 0.00 trib 383 Q500 20.00 1994.23 2010.00 1994.75 2010.00 0.000000 0.01 3164.74 280.78 0.00 trib 472 Q10 10.00 2005.65 2005.00 1999.14 2005.00 0.000000 477.69 135.83 0.00 trib 472 Q50 14.00 2005.65 2009.60 2006.76 2009.60 0.000167 0.68 20.58 8.81 0.08 trib 472 Q100 16.00 2005.65 2009.70 1999.22 2009.70 0.000000 0.01 1274.72 193.16 0.00 trib 472 Q500 20.00 2005.65 2010.00 1999.26 2010.00 0.000000 0.01 1334.21 203.55 0.00 trib 576 Q10 10.00 2008.78 2009.74 2009.74 2009.99 0.032554 4.02 2.48 4.97 1.00 trib 576 Q50 14.00 2008.78 2009.88 2009.88 2010.18 0.031239 4.40 3.18 5.26 1.00 trib 576 Q100 16.00 2008.78 2009.95 2009.95 2010.25 0.030780 4.43 3.61 5.98 1.01 trib 576 Q500 20.00 2008.78 2010.20 2010.20 2010.37 0.028407 3.36 6.36 21.88 0.93 trib 651 Q10 10.00 2009.50 2010.74 2010.48 2010.78 0.004980 1.88 7.84 29.35 0.41 trib 651 Q50 14.00 2009.50 2011.08 2010.60 2011.13 0.006522 1.81 7.73 15.72 0.46 trib 651 Q100 16.00 2009.50 2010.95 2010.71 2010.96 0.004364 1.23 16.50 54.47 0.36 trib 651 Q500 20.00 2009.50 2011.00 2010.77 2011.02 0.004026 1.28 19.68 56.58 0.35 trib 918 Q10 10.00 2009.10 2011.17 2009.95 2011.19 0.000735 1.08 9.22 6.85 0.16 trib 918 Q50 14.00 2009.10 2011.55 2010.11 2011.57 0.000714 1.17 11.93 7.51 0.16 trib 918 Q100 16.00 2009.10 2011.45 2010.17 2011.48 0.001099 1.42 11.64 11.27 0.20 trib 918 Q500 20.00 2009.10 2011.57 2010.29 2011.61 0.001361 1.62 13.89 36.25 0.23 trib 1472 Q10 10.00 2011.44 2012.38 2012.38 2012.67 0.032363 4.35 2.30 3.82 0.99 trib 1472 Q50 14.00 2011.44 2012.54 2012.54 2012.89 0.031230 4.71 2.97 4.22 0.99 trib 1472 Q100 16.00 2011.44 2012.83 2012.61 2013.05 0.015065 3.73 4.29 4.89 0.70 trib 1472 Q500 20.00 2011.44 2013.11 2012.75 2013.30 0.010804 3.50 5.72 5.54 0.61 trib 1510 Q10 10.00 2011.15 2012.95 2012.17 2013.00 0.002787 1.77 5.66 5.40 0.30 trib 1510 Q50 14.00 2011.15 2013.19 2012.35 2013.25 0.003111 2.00 6.99 5.98 0.33 trib 1510 Q100 16.00 2011.15 2013.26 2012.43 2013.33 0.003444 2.15 7.44 6.16 0.35 trib 1510 Q500 20.00 2011.15 2013.46 2012.58 2013.55 0.003501 2.29 8.75 6.67 0.35 trib 1520 Culvert trib 1528 Q10 10.00 2010.84 2013.36 2011.82 2013.38 0.000963 1.00 9.96 6.88 0.15 HEC-RAS Plan: (DEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2010.84 2013.98 2011.99 2013.99 0.000678 0.95 14.68 8.39 0.13 trib 1528 Q100 16.00 2010.84 2014.30 2012.07 2014.32 0.000575 0.91 17.51 9.51 0.12 trib 1528 Q500 20.00 2010.84 2014.61 2012.23 2014.63 0.000672 0.91 25.24 51.66 0.13 trib 1557 Q10 10.00 2011.79 2013.39 2012.66 2013.44 0.003820 1.69 5.91 5.64 0.29 trib 1557 Q50 14.00 2011.79 2014.00 2012.81 2014.03 0.001952 1.44 9.72 6.93 0.21 trib 1557 Q100 16.00 2011.79 2014.32 2012.88 2014.35 0.001437 1.33 12.04 7.61 0.19 trib 1557 Q500 20.00 2011.79 2014.63 2013.01 2014.66 0.001366 1.38 14.51 8.27 0.18 trib 1963 Q10 10.00 2018.61 2019.48 2019.48 2019.66 0.051975 3.44 2.91 7.79 0.99 trib 1963 Q50 14.00 2018.61 2019.58 2019.58 2019.80 0.049077 3.72 3.76 8.55 0.99 trib 1963 Q100 16.00 2018.61 2019.66 2019.66 2019.85 0.038218 3.52 4.80 15.48 0.89 trib 1963 Q500 20.00 2018.61 2019.75 2019.75 2019.93 0.033517 3.48 6.39 18.55 0.84 trib 1989 Q10 10.00 2017.77 2019.85 2018.80 2019.89 0.002658 1.50 6.69 17.19 0.24 trib 1989 Q50 14.00 2017.77 2020.01 2018.98 2020.07 0.003435 1.85 7.58 8.70 0.28 trib 1989 Q100 16.00 2017.77 2020.06 2019.06 2020.12 0.004030 2.04 7.83 48.44 0.30 trib 1989 Q500 20.00 2017.77 2020.14 2019.22 2020.23 0.005238 2.42 8.27 60.64 0.35 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.19 2019.81 2020.30 0.009432 2.61 3.83 8.68 0.47 trib 2080 Q50 14.00 2018.73 2020.48 2019.95 2020.60 0.007681 2.81 4.98 12.81 0.44 trib 2080 Q100 16.00 2018.73 2020.61 2020.02 2020.74 0.007173 2.90 5.51 14.87 0.44 trib 2080 Q500 20.00 2018.73 2020.86 2020.15 2021.01 0.006452 3.07 6.51 18.47 0.42 trib 2100 Q10 12.00 2018.27 2020.39 2019.40 2020.41 0.002032 1.15 10.46 12.11 0.22 trib 2100 Q50 24.00 2018.27 2020.70 2019.87 2020.74 0.003400 1.65 14.57 14.50 0.29 trib 2100 Q100 30.00 2018.27 2020.83 2020.00 2020.88 0.003580 1.82 16.55 15.31 0.30 trib 2100 Q500 46.00 2018.27 2021.08 2020.26 2021.16 0.004409 2.26 20.54 16.79 0.35 trib 2110 Q10 12.00 2018.27 2020.42 2019.40 2020.43 0.001881 1.11 10.78 12.31 0.21 trib 2110 Q50 24.00 2018.27 2020.74 2019.87 2020.78 0.002992 1.58 15.20 14.62 0.27 trib 2110 Q100 30.00 2018.27 2020.88 2020.00 2020.92 0.003147 1.74 17.27 15.59 0.29 trib 2110 Q500 46.00 2018.27 2021.14 2020.26 2021.21 0.003840 2.17 21.53 17.14 0.32 trib 2120 Q10 12.00 2018.27 2020.44 2019.40 2020.45 0.001769 1.09 11.03 12.47 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.81 0.002715 1.53 15.69 14.67 0.26 trib 2120 Q100 30.00 2018.27 2020.91 2020.00 2020.96 0.002861 1.69 17.82 15.80 0.27 trib 2120 Q500 46.00 2018.27 2021.18 2020.26 2021.25 0.003471 2.10 22.30 17.41 0.31 trib 2651 Q10 12.00 2021.38 2022.48 2022.22 2022.62 0.016295 2.96 4.05 5.21 0.59 trib 2651 Q50 24.00 2021.38 2023.16 2022.58 2023.30 0.009561 2.98 8.05 6.49 0.47 trib 2651 Q100 30.00 2021.38 2023.40 2022.73 2023.55 0.009769 3.10 9.67 7.51 0.48 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008805 3.30 14.05 10.00 0.47 trib 3126 Q10 12.00 2023.82 2025.45 2024.69 2025.49 0.003114 1.53 7.84 7.78 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003754 1.97 12.18 9.47 0.31 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.25 0.003704 2.08 14.43 10.23 0.31 trib 3126 Q500 46.00 2023.82 2026.65 2025.48 2026.74 0.003902 2.35 19.60 12.06 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.50 2030.50 2030.93 0.047487 5.26 4.56 5.39 1.01 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.91 0.003029 1.91 12.59 8.67 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.00 2037.62 0.011204 3.01 7.98 7.52 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.49 2038.49 2039.19 0.037939 6.72 3.57 3.15 0.99 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.36 2039.00 2040.40 0.001542 1.56 15.35 8.39 0.19 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: (DEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.45 2039.50 2040.48 0.001583 1.32 16.67 12.65 0.20 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.28 2043.28 2043.49 0.047742 3.69 5.97 13.81 0.99 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2048.03 2047.39 2048.07 0.003615 1.50 14.67 18.51 0.30 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.73 2051.73 2052.11 0.046145 4.92 4.47 6.03 1.01 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.65 2052.28 2052.71 0.006296 1.87 11.74 16.61 0.39 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.15 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047079 4.04 5.44 10.35 0.98 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.19 2064.53 0.022256 3.32 6.62 9.82 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038367 5.06 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.41 2084.85 0.026361 4.77 2.94 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.32 2090.32 2090.80 0.044776 5.59 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.47 2091.33 0.010658 3.24 4.32 2.79 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031476 4.37 3.21 5.40 1.00 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: DEM FW River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Q100 base 2008.05 2008.05 103.69 0.01 3.90 0.09 70.92 163.31 trib -1303 Q100 floodway 2009.05 1.00 2009.05 31.32 4.00 131.99 70.92 163.31 163.31 trib -1019 Q100 base 2008.36 2008.41 21.08 4.00 152.95 253.19 trib -1019 Q100 floodway 2009.05 0.69 2009.05 21.09 4.00 173.33 152.95 253.19 194.42 trib -880 Q100 base 2008.42 2008.42 361.60 0.08 3.92 0.01 62.73 380.37 trib -880 Q100 floodway 2009.05 0.63 2009.05 40.00 4.00 310.00 62.73 380.37 350.00 trib -466 Q100 base 2008.42 2008.42 388.60 4.00 0.00 129.52 566.57 trib -466 Q100 floodway 2009.05 0.64 2009.05 45.57 4.00 521.00 129.52 566.57 566.57 trib -89 Q100 base 2008.42 2008.42 345.54 4.00 144.89 581.16 trib -89 Q100 floodway 2009.05 0.64 2009.05 39.70 4.00 510.00 144.89 581.16 549.70 trib 1 Q100 base 2009.70 2009.70 102.16 4.00 461.25 568.10 trib 1 Q100 floodway 2010.70 1.00 2010.70 116.77 0.00 4.00 461.25 568.10 trib 149 Q100 base 2009.70 2009.70 176.16 16.00 421.08 606.95 trib 149 Q100 floodway 2010.70 1.00 2010.70 179.75 16.00 421.08 606.95 trib 343 Q100 base 2009.70 2009.70 266.57 16.00 410.55 678.07 trib 343 Q100 floodway 2010.70 1.00 2010.70 271.14 0.00 16.00 0.00 410.55 678.07 trib 383 Q100 base 2009.70 2009.70 279.97 16.00 0.00 397.28 677.14 trib 383 Q100 floodway 2010.70 1.00 2010.70 282.66 16.00 0.00 397.28 677.14 trib 472 Q100 base 2009.70 2009.70 193.16 0.12 15.88 340.55 365.05 trib 472 Q100 floodway 2010.70 1.00 2010.70 8.82 16.00 347.00 340.55 365.05 355.82 trib 576 Q100 base 2009.95 2010.25 5.98 16.00 361.81 384.61 trib 576 Q100 floodway 2010.67 0.73 2010.75 5.41 16.00 368.20 361.81 384.61 373.61 trib 651 Q100 base 2010.95 2010.96 54.47 6.94 9.06 360.31 384.41 trib 651 Q100 floodway 2011.07 0.12 2011.14 15.66 16.00 367.72 360.31 384.41 384.41 trib 918 Q100 base 2011.45 2011.48 11.27 15.90 0.10 466.95 478.43 trib 918 Q100 floodway 2011.63 0.18 2011.66 7.59 16.00 468.53 466.95 478.43 478.43 trib 1472 Q100 base 2012.83 2013.05 4.89 16.00 706.41 714.93 trib 1472 Q100 floodway 2012.71 -0.12 2013.00 4.61 16.00 708.23 706.41 714.93 713.11 trib 1510 Q100 base 2013.26 2013.33 6.16 16.00 711.73 722.04 trib 1510 Q100 floodway 2013.26 0.00 2013.33 6.16 16.00 714.06 711.73 722.04 720.22 trib 1520 Culvert trib 1528 Q100 base 2014.30 2014.32 9.51 16.00 727.15 744.68 trib 1528 Q100 floodway 2014.31 0.00 2014.32 9.50 16.00 727.56 727.15 744.68 737.06 trib 1557 Q100 base 2014.32 2014.35 7.61 16.00 726.74 740.03 trib 1557 Q100 floodway 2014.32 0.00 2014.35 7.61 16.00 730.81 726.74 740.03 738.42 trib 1963 Q100 base 2019.66 2019.85 15.48 15.72 0.28 739.45 750.61 trib 1963 Q100 floodway 2019.63 -0.03 2019.86 8.89 16.00 741.45 739.45 750.61 750.61 trib 1989 Q100 base 2020.06 2020.12 5.50 16.00 762.80 771.50 trib 1989 Q100 floodway 2020.08 0.02 2020.15 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Q100 base 2020.61 2020.74 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.61 0.00 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.83 2020.88 15.31 0.01 29.99 44.23 60.09 trib 2100 Q100 floodway 2020.83 0.00 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.88 2020.92 15.59 0.02 29.98 44.23 60.09 trib 2110 Q100 floodway 2020.88 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.91 2020.96 15.80 0.03 29.97 44.23 60.09 trib 2120 Q100 floodway 2020.92 0.00 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.40 2023.55 7.51 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.25 10.23 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 HEC-RAS Plan: DEM FW River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: wo ds fw (DEM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Base 2008.05 2008.05 103.69 5.34 9.25 1.41 134.37 158.76 trib -1303 Floodway 2009.05 1.00 2009.05 31.32 0.63 13.98 1.39 131.99 134.37 158.76 163.31 trib -1019 Base 2008.52 2008.62 38.92 3.31 11.46 1.24 178.65 192.41 trib -1019 Floodway 2009.04 0.53 2009.06 21.09 3.29 11.59 1.12 173.33 178.65 192.41 194.42 trib -880 Base 2008.63 2008.63 367.97 14.91 0.33 0.76 316.80 341.31 trib -880 Floodway 2009.07 0.45 2009.07 40.00 2.68 9.02 4.30 310.00 316.80 341.31 350.00 trib -466 Base 2008.63 2008.63 403.22 15.45 0.52 0.03 552.13 565.20 trib -466 Floodway 2009.09 0.46 2009.09 45.57 9.60 6.11 0.28 521.00 552.13 565.20 566.57 trib -89 Base 2008.63 2008.63 388.12 15.26 0.71 0.03 523.44 545.76 trib -89 Floodway 2009.10 0.47 2009.10 39.70 6.49 8.94 0.57 510.00 523.44 545.76 549.70 trib 1 Base 2008.61 2008.65 112.72 11.69 4.27 0.05 423.34 431.01 trib 1 Floodway 2009.07 0.46 2009.13 15.00 16.00 307.00 423.34 431.01 322.00 trib 149 Base 2008.66 2008.66 270.35 15.86 0.14 0.00 322.78 330.58 trib 149 Floodway 2009.18 0.53 2009.19 15.00 9.49 6.51 315.58 322.78 330.58 330.58 trib 343 Base 2008.66 2008.66 281.64 15.83 0.12 0.05 326.83 335.39 trib 343 Floodway 2009.26 0.60 2009.28 15.00 5.98 10.02 320.39 326.83 335.39 335.39 trib 383 Base 2008.66 2008.66 215.39 15.97 0.03 0.00 321.06 327.35 trib 383 Floodway 2009.30 0.64 2009.32 15.00 10.48 5.52 312.35 321.06 327.35 327.35 trib 472 Base 2008.66 2008.66 214.71 15.97 0.03 0.00 246.06 255.85 trib 472 Floodway 2009.49 0.84 2009.51 15.00 6.05 9.95 240.85 246.06 255.85 255.85 trib 576 Base 2008.66 2008.66 154.76 15.99 0.01 0.00 247.56 254.23 trib 576 Floodway 2009.63 0.97 2009.65 15.00 9.60 6.40 239.23 247.56 254.23 254.23 trib 651 Base 2011.21 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 651 Floodway 2011.47 0.26 2011.63 15.00 16.00 243.59 331.92 337.62 258.59 trib 918 Base 2011.27 2011.27 230.82 7.90 1.56 6.54 290.48 301.36 trib 918 Floodway 2011.80 0.53 2011.80 15.00 2.00 12.93 1.06 288.00 290.48 301.36 303.00 trib 1472 Base 2013.77 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1472 Floodway 2014.15 0.38 2014.31 15.00 16.00 355.00 374.56 390.80 370.00 trib 1510 Base 2014.12 2014.13 129.51 0.02 0.85 15.14 289.44 302.32 trib 1510 Floodway 2014.63 0.51 2014.66 15.00 16.00 355.00 289.44 302.32 370.00 trib 1520 Culvert trib 1528 Base 2014.12 2014.13 119.01 0.00 2.72 13.28 307.04 321.23 trib 1528 Floodway 2013.79 -0.33 4514.91 2.75 16.00 370.00 307.04 321.23 385.00 trib 1557 Base 2014.27 2014.27 140.34 0.00 0.43 15.57 307.11 317.99 trib 1557 Floodway 2014.32 0.05 2014.48 15.00 16.00 370.00 307.11 317.99 385.00 trib 1963 Base 2016.31 2016.33 57.50 2.13 13.78 0.09 243.25 273.87 trib 1963 Floodway 2016.45 0.14 2016.46 66.39 3.52 12.23 0.24 243.25 273.87 trib 1989 Base 2019.07 2019.48 3.69 16.00 762.80 771.50 trib 1989 Floodway 2019.07 0.00 2019.48 3.69 16.00 762.80 771.50 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Floodway 2020.63 0.00 2020.76 4.00 16.00 39.42 68.83 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Floodway 2020.84 0.00 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Floodway 2020.89 0.00 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Floodway 2020.92 0.00 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Floodway 2023.39 0.00 2023.54 7.45 30.00 46.44 55.58 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Floodway 2026.19 0.00 2026.26 10.24 30.00 72.83 95.75 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Floodway 2030.67 0.00 2031.13 5.92 30.00 139.17 162.30 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 HEC-RAS Plan: wo ds fw (DEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4127 Floodway 2035.09 0.00 2035.15 9.22 30.00 251.87 265.32 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Floodway 2037.69 0.00 2037.84 8.14 30.00 314.09 329.75 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Floodway 2038.70 0.00 2039.53 2.50 30.00 340.25 349.22 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Floodway 2041.00 0.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Floodway 2041.03 0.00 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Floodway 2043.40 0.00 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Floodway 2048.08 0.00 2048.13 19.14 28.00 183.69 226.54 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Floodway 2052.07 0.00 2052.35 6.77 28.00 211.57 230.44 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Floodway 2052.76 0.00 2052.83 16.44 28.00 211.25 246.77 trib 6200 Culvert trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Floodway 2054.11 0.00 2054.13 18.59 28.00 221.30 259.22 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Floodway 2055.65 0.00 2055.95 10.56 28.00 210.49 231.21 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Floodway 2064.48 0.00 2064.68 10.59 28.00 197.65 240.39 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Floodway 2083.50 0.00 2083.96 3.69 18.00 150.93 158.25 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Floodway 2084.63 0.00 2085.08 3.10 18.00 118.04 121.88 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Floodway 2086.04 0.00 2086.16 3.79 18.00 111.14 115.72 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Floodway 2090.51 0.00 2091.06 2.65 18.00 114.91 118.45 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Floodway 2091.45 0.00 2091.64 2.88 18.00 119.10 122.49 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Floodway 2092.39 0.00 2092.72 7.10 0.01 17.99 130.02 136.02 HEC-RAS Plan: DEM wo lev River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 10.00 2004.70 2007.19 2005.00 2007.19 0.000006 0.13 97.62 92.00 0.02 trib -1303 Q50 14.00 2004.70 2007.80 2005.05 2007.80 0.000004 0.12 156.26 99.90 0.01 trib -1303 Q100 16.00 2004.70 2008.05 2005.07 2008.05 0.000003 0.12 181.64 103.69 0.01 trib -1303 Q500 20.00 2004.70 2008.64 2005.11 2008.64 0.000002 0.11 245.69 113.41 0.01 trib -1019 Q10 10.00 2008.18 2008.47 2008.47 2008.54 0.040241 2.34 5.15 65.40 0.83 trib -1019 Q50 14.00 2008.18 2008.51 2008.51 2008.59 0.039441 2.57 6.69 70.95 0.84 trib -1019 Q100 16.00 2008.18 2008.52 2008.52 2008.62 0.045491 2.81 7.00 71.61 0.91 trib -1019 Q500 20.00 2008.18 2008.64 2008.56 2008.65 0.003347 0.96 26.15 93.34 0.26 trib -880 Q10 10.00 2007.31 2008.55 2005.25 2008.55 0.000000 0.01 808.03 365.13 0.00 trib -880 Q50 14.00 2007.31 2008.60 2005.30 2008.60 0.000000 0.01 828.10 367.06 0.00 trib -880 Q100 16.00 2007.31 2008.63 2005.32 2008.63 0.000000 0.01 837.43 367.97 0.00 trib -880 Q500 20.00 2007.31 2008.65 2005.36 2008.65 0.000000 0.01 845.25 368.73 0.00 trib -466 Q10 10.00 2006.96 2008.55 2007.05 2008.55 0.000000 0.02 503.64 396.88 0.00 trib -466 Q50 14.00 2006.96 2008.60 2007.08 2008.60 0.000001 0.03 525.58 402.65 0.00 trib -466 Q100 16.00 2006.96 2008.63 2007.08 2008.63 0.000001 0.03 535.81 403.22 0.00 trib -466 Q500 20.00 2006.96 2008.65 2007.08 2008.65 0.000001 0.04 544.38 403.56 0.01 trib -89 Q10 10.00 2007.09 2008.55 2006.35 2008.55 0.000000 0.02 533.76 381.64 0.00 trib -89 Q50 14.00 2007.09 2008.60 2006.40 2008.60 0.000000 0.02 554.94 387.29 0.00 trib -89 Q100 16.00 2007.09 2008.63 2006.43 2008.63 0.000001 0.03 564.78 388.12 0.00 trib -89 Q500 20.00 2007.09 2008.65 2006.47 2008.65 0.000001 0.03 573.08 388.82 0.00 trib 1 Q10 10.00 2008.30 2008.57 2008.57 2008.61 0.049508 2.23 7.05 92.01 0.89 trib 1 Q50 14.00 2008.30 2008.60 2008.60 2008.64 0.049091 2.40 9.47 106.80 0.90 trib 1 Q100 16.00 2008.30 2008.61 2008.61 2008.65 0.045516 2.40 10.81 112.72 0.88 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q10 10.00 2007.52 2008.62 2006.65 2008.62 0.000000 0.01 417.66 269.94 0.00 trib 149 Q50 14.00 2007.52 2008.65 2006.70 2008.65 0.000001 0.02 425.25 270.23 0.00 trib 149 Q100 16.00 2007.52 2008.66 2006.72 2008.66 0.000001 0.02 428.28 270.35 0.00 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q10 10.00 2008.18 2008.62 2007.06 2008.62 0.000001 0.02 272.09 279.48 0.01 trib 343 Q50 14.00 2008.18 2008.65 2007.13 2008.65 0.000003 0.03 279.96 281.03 0.01 trib 343 Q100 16.00 2008.18 2008.66 2007.16 2008.66 0.000003 0.03 283.12 281.64 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q10 10.00 2008.42 2008.62 2007.33 2008.62 0.000003 0.01 193.97 213.44 0.01 trib 383 Q50 14.00 2008.42 2008.65 2007.36 2008.65 0.000006 0.02 199.96 214.83 0.01 trib 383 Q100 16.00 2008.42 2008.66 2007.37 2008.66 0.000007 0.03 202.37 215.39 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q10 10.00 2008.50 2008.62 2007.46 2008.62 0.000008 0.01 146.81 211.42 0.01 trib 472 Q50 14.00 2008.50 2008.65 2007.50 2008.65 0.000014 0.02 152.88 213.77 0.01 trib 472 Q100 16.00 2008.50 2008.66 2007.52 2008.66 0.000017 0.03 155.34 214.71 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q10 10.00 2008.57 2008.62 2007.79 2008.62 0.000034 0.02 83.84 150.04 0.02 trib 576 Q50 14.00 2008.57 2008.65 2007.83 2008.65 0.000057 0.03 88.33 153.40 0.02 trib 576 Q100 16.00 2008.57 2008.66 2007.84 2008.66 0.000069 0.03 90.17 154.76 0.03 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q10 10.00 2011.11 2011.18 2011.18 2011.22 0.097087 0.90 6.25 88.01 0.91 trib 651 Q50 14.00 2011.11 2011.20 2011.20 2011.24 0.084641 1.01 8.16 94.94 0.89 trib 651 Q100 16.00 2011.11 2011.21 2011.21 2011.26 0.076146 1.09 9.16 96.15 0.87 trib 651 Q500 20.00 2011.11 2011.22 2011.22 2011.28 0.078399 1.27 10.44 97.72 0.92 trib 918 Q10 10.00 2009.84 2011.22 2010.09 2011.22 0.000004 0.07 191.15 223.46 0.01 trib 918 Q50 14.00 2009.84 2011.25 2010.13 2011.25 0.000006 0.09 197.86 227.01 0.01 trib 918 Q100 16.00 2009.84 2011.27 2010.15 2011.27 0.000008 0.10 200.97 230.82 0.02 trib 918 Q500 20.00 2009.84 2011.30 2010.16 2011.30 0.000012 0.13 207.29 233.18 0.02 trib 1472 Q10 10.00 2013.44 2013.73 2013.73 2013.78 0.038164 2.06 6.11 55.33 0.79 trib 1472 Q50 14.00 2013.44 2013.76 2013.76 2013.82 0.041668 2.34 7.74 62.95 0.84 trib 1472 Q100 16.00 2013.44 2013.77 2013.77 2013.84 0.039601 2.38 8.80 67.96 0.83 trib 1472 Q500 20.00 2013.44 2013.80 2013.80 2013.87 0.039038 2.52 10.69 77.87 0.84 trib 1510 Q10 10.00 2013.81 2014.06 2013.90 2014.06 0.002778 0.39 19.89 120.64 0.19 trib 1510 Q50 14.00 2013.81 2014.10 2013.94 2014.11 0.002801 0.43 25.50 126.84 0.20 trib 1510 Q100 16.00 2013.81 2014.12 2013.95 2014.13 0.002776 0.45 27.85 129.47 0.20 trib 1510 Q500 20.00 2013.81 2014.15 2013.97 2014.16 0.002826 0.50 31.99 137.40 0.21 trib 1520 Culvert trib 1528 Q10 10.00 2013.78 2014.06 2013.93 2014.06 0.005201 0.69 15.56 100.95 0.28 HEC-RAS Plan: DEM wo lev River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2013.78 2014.10 2013.95 2014.11 0.004983 0.76 20.57 116.23 0.29 trib 1528 Q100 16.00 2013.78 2014.12 2013.97 2014.13 0.005184 0.82 22.52 118.90 0.30 trib 1528 Q500 20.00 2013.78 2014.16 2013.99 2014.17 0.004648 0.85 26.76 122.07 0.29 trib 1557 Q10 10.00 2014.07 2014.21 2014.05 2014.21 0.004529 0.32 16.54 122.35 0.22 trib 1557 Q50 14.00 2014.07 2014.25 2014.10 2014.26 0.004585 0.37 22.60 137.57 0.23 trib 1557 Q100 16.00 2014.07 2014.27 2014.12 2014.27 0.004521 0.42 24.77 140.38 0.24 trib 1557 Q500 20.00 2014.07 2014.29 2014.14 2014.30 0.004640 0.50 28.53 145.80 0.25 trib 1963 Q10 10.00 2015.81 2016.24 2016.10 2016.26 0.007062 1.07 10.25 52.15 0.36 trib 1963 Q50 14.00 2015.81 2016.29 2016.15 2016.31 0.007097 1.20 13.09 56.60 0.37 trib 1963 Q100 16.00 2015.81 2016.31 2016.17 2016.33 0.007323 1.27 14.25 57.48 0.38 trib 1963 Q500 20.00 2015.81 2016.35 2016.20 2016.38 0.007236 1.36 16.68 58.71 0.38 trib 1989 Q10 10.00 2017.77 2018.80 2018.80 2019.13 0.055202 4.65 2.15 3.23 1.00 trib 1989 Q50 14.00 2017.77 2018.98 2018.98 2019.38 0.054111 5.05 2.77 3.54 1.01 trib 1989 Q100 16.00 2017.77 2019.07 2019.07 2019.48 0.052722 5.18 3.09 3.69 1.00 trib 1989 Q500 20.00 2017.77 2019.22 2019.22 2019.68 0.051664 5.45 3.67 3.94 0.99 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001965 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003293 1.63 14.74 14.59 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003479 1.80 16.71 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004326 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001824 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002895 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003072 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001720 1.08 11.15 12.55 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002629 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002801 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017129 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.15 2022.58 2023.29 0.009975 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009967 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003063 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003719 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: DEM wo lev River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.12 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2047.39 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2047.50 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.43 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031946 4.33 5.08 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2051.88 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.007005 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 APPENDIX C CORRECTIVE EFFECTIVE HEC-RAS MODEL HEC-RAS Plan: CEM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 20779 10-yr 30.00 2004.98 2007.19 2005.40 2007.19 0.000006 0.06 517.26 1198.11 0.01 Golf Course 20779 50-yr 54.00 2004.98 2007.80 2005.49 2007.80 0.000003 0.05 1164.72 1860.64 0.01 Golf Course 20779 100-yr 64.00 2004.98 2008.05 2005.52 2008.05 0.000002 0.04 1491.37 1985.36 0.01 Golf Course 20779 500-yr 88.00 2004.98 2008.64 2005.58 2008.64 0.000000 0.03 3229.73 2191.83 0.00 Golf Course 21013 10-yr 30.00 2007.36 2007.65 2007.65 2007.74 0.048676 2.02 13.20 348.57 0.86 Golf Course 21013 50-yr 54.00 2007.36 2007.77 2007.77 2007.86 0.043680 2.09 23.46 392.88 0.83 Golf Course 21013 100-yr 64.00 2007.36 2007.79 2007.79 2007.90 0.048191 2.30 25.52 395.42 0.89 Golf Course 21013 500-yr 88.00 2007.36 2008.64 2007.85 2008.64 0.000463 0.44 192.58 634.20 0.10 Golf Course 21128 10-yr 30.00 2007.08 2008.28 2007.75 2008.28 0.000847 0.54 55.17 320.85 0.14 Golf Course 21128 50-yr 54.00 2007.08 2008.53 2007.86 2008.54 0.001130 0.60 90.05 413.34 0.15 Golf Course 21128 100-yr 64.00 2007.08 2008.60 2007.90 2008.60 0.001189 0.62 103.55 442.36 0.16 Golf Course 21128 500-yr 88.00 2007.08 2008.77 2007.98 2008.77 0.001006 0.60 145.58 511.28 0.15 Golf Course 21229 10-yr 30.00 2006.97 2008.63 2008.48 2008.64 0.007806 0.82 36.50 445.34 0.35 Golf Course 21229 50-yr 54.00 2006.97 2008.82 2008.55 2008.83 0.002308 0.62 86.76 540.31 0.20 Golf Course 21229 100-yr 64.00 2006.97 2008.87 2008.57 2008.88 0.001927 0.63 102.06 545.69 0.19 Golf Course 21229 500-yr 88.00 2006.97 2008.98 2008.63 2008.99 0.001408 0.65 136.13 549.38 0.17 Golf Course 21385 10-yr 30.00 2008.16 2008.94 2008.47 2008.94 0.000409 0.31 97.80 268.00 0.09 Golf Course 21385 50-yr 54.00 2008.16 2009.08 2008.53 2009.08 0.000477 0.40 135.88 283.37 0.10 Golf Course 21385 100-yr 64.00 2008.16 2009.12 2008.56 2009.12 0.000512 0.43 147.76 285.92 0.11 Golf Course 21385 500-yr 88.00 2008.16 2009.22 2008.61 2009.22 0.000552 0.50 176.40 291.98 0.11 Golf Course 21409 10-yr 30.00 2008.27 2008.98 2008.68 2008.98 0.001022 0.46 64.91 246.09 0.14 Golf Course 21409 50-yr 54.00 2008.27 2009.12 2008.75 2009.13 0.001113 0.58 93.59 269.70 0.15 Golf Course 21409 100-yr 64.00 2008.27 2009.17 2008.77 2009.17 0.001210 0.62 103.41 283.87 0.16 Golf Course 21409 500-yr 88.00 2008.27 2009.27 2008.81 2009.28 0.001345 0.68 128.93 323.53 0.17 Golf Course 21431 10-yr 30.00 2008.12 2009.03 2008.45 2009.03 0.000564 0.40 74.75 174.33 0.11 Golf Course 21431 50-yr 54.00 2008.12 2009.18 2008.54 2009.18 0.000767 0.52 103.72 206.07 0.13 Golf Course 21431 100-yr 64.00 2008.12 2009.23 2008.59 2009.24 0.000845 0.56 114.48 222.73 0.14 Golf Course 21431 500-yr 88.00 2008.12 2009.34 2008.66 2009.35 0.000870 0.64 138.33 232.31 0.14 Golf Course 21445 10-yr 30.00 2008.44 2009.09 2008.89 2009.12 0.014872 1.32 22.80 104.20 0.50 Golf Course 21445 50-yr 54.00 2008.44 2009.26 2009.06 2009.28 0.007937 1.23 44.01 139.40 0.38 Golf Course 21445 100-yr 64.00 2008.44 2009.31 2009.10 2009.33 0.006788 1.24 51.65 143.41 0.36 Golf Course 21445 500-yr 88.00 2008.44 2009.42 2009.16 2009.44 0.005945 1.31 67.25 155.76 0.35 Golf Course 21456 10-yr 30.00 2012.42 2013.00 2013.00 2013.09 0.062594 2.50 12.02 61.61 1.00 Golf Course 21456 50-yr 54.00 2012.42 2013.11 2013.11 2013.21 0.055179 2.43 22.25 108.28 0.94 Golf Course 21456 100-yr 64.00 2012.42 2013.13 2013.13 2013.24 0.063554 2.66 24.03 113.14 1.02 Golf Course 21456 500-yr 88.00 2012.42 2013.19 2013.19 2013.31 0.062355 2.79 31.57 136.85 1.02 Golf Course 21481 10-yr 30.00 2011.45 2013.10 2011.82 2013.10 0.000004 0.05 549.78 595.32 0.01 Golf Course 21481 50-yr 54.00 2011.45 2013.22 2011.87 2013.22 0.000009 0.09 620.01 630.19 0.02 Golf Course 21481 100-yr 64.00 2011.45 2013.25 2011.90 2013.25 0.000011 0.10 643.38 634.26 0.02 Golf Course 21481 500-yr 88.00 2011.45 2013.33 2011.93 2013.33 0.000017 0.13 690.07 652.36 0.02 Golf Course 21485 10-yr 30.00 2012.65 2013.10 2012.84 2013.10 0.000056 0.27 109.69 444.23 0.10 Golf Course 21485 50-yr 54.00 2012.65 2013.22 2012.88 2013.22 0.000054 0.33 162.03 474.28 0.10 Golf Course 21485 100-yr 64.00 2012.65 2013.25 2012.90 2013.25 0.000055 0.36 179.70 484.33 0.10 Golf Course 21485 500-yr 88.00 2012.65 2013.32 2012.93 2013.33 0.000060 0.41 215.41 504.02 0.11 Golf Course 21515 10-yr 30.00 2011.57 2013.10 2011.89 2013.10 0.000029 0.11 275.33 488.03 0.03 Golf Course 21515 50-yr 54.00 2011.57 2013.22 2011.98 2013.22 0.000053 0.16 332.54 510.04 0.04 Golf Course 21515 100-yr 64.00 2011.57 2013.26 2012.01 2013.26 0.000063 0.18 351.59 517.17 0.04 Golf Course 21515 500-yr 88.00 2011.57 2013.33 2012.06 2013.33 0.000087 0.23 389.86 531.18 0.05 Golf Course 21525 10-yr 30.00 2011.57 2013.10 2011.89 2013.10 0.000029 0.11 275.45 488.08 0.03 Golf Course 21525 50-yr 54.00 2011.57 2013.22 2011.98 2013.22 0.000053 0.16 332.78 510.14 0.04 Golf Course 21525 100-yr 64.00 2011.57 2013.26 2012.01 2013.26 0.000063 0.18 351.91 517.28 0.04 Golf Course 21525 500-yr 88.00 2011.57 2013.33 2012.06 2013.33 0.000087 0.23 390.31 531.35 0.05 Golf Course 21609 10-yr 30.00 2011.75 2013.11 2011.93 2013.11 0.000004 0.06 493.87 476.54 0.01 Golf Course 21609 50-yr 54.00 2011.75 2013.22 2011.97 2013.22 0.000009 0.10 549.59 482.19 0.02 Golf Course 21609 100-yr 64.00 2011.75 2013.26 2011.98 2013.26 0.000012 0.11 567.93 483.72 0.02 Golf Course 21609 500-yr 88.00 2011.75 2013.33 2012.02 2013.33 0.000018 0.15 604.24 485.21 0.02 Golf Course 21726 10-yr 30.00 2011.65 2013.11 2012.01 2013.11 0.000024 0.12 247.68 329.28 0.02 Golf Course 21726 50-yr 54.00 2011.65 2013.22 2012.11 2013.22 0.000052 0.19 287.55 351.93 0.04 Golf Course 21726 100-yr 64.00 2011.65 2013.26 2012.14 2013.26 0.000065 0.21 301.18 359.35 0.04 Golf Course 21726 500-yr 88.00 2011.65 2013.34 2012.20 2013.34 0.000095 0.27 329.01 371.15 0.05 Golf Course 21857 10-yr 30.00 2012.03 2013.11 2012.42 2013.11 0.000085 0.20 148.70 235.07 0.04 Golf Course 21857 50-yr 54.00 2012.03 2013.23 2012.48 2013.23 0.000157 0.30 177.59 240.59 0.06 Golf Course 21857 100-yr 64.00 2012.03 2013.27 2012.51 2013.28 0.000193 0.34 187.58 249.08 0.07 Golf Course 21857 500-yr 88.00 2012.03 2013.35 2012.57 2013.36 0.000261 0.42 207.87 251.14 0.08 HEC-RAS Plan: CEM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 21983 10-yr 30.00 2012.09 2013.13 2012.50 2013.13 0.000421 0.40 74.96 140.87 0.10 Golf Course 21983 50-yr 54.00 2012.09 2013.27 2012.61 2013.27 0.000776 0.56 96.14 171.89 0.13 Golf Course 21983 100-yr 64.00 2012.09 2013.31 2012.64 2013.32 0.000867 0.61 104.46 178.27 0.14 Golf Course 21983 500-yr 88.00 2012.09 2013.41 2012.71 2013.42 0.001023 0.73 121.27 181.69 0.16 Golf Course 22423 10-yr 30.00 2012.71 2013.36 2012.98 2013.36 0.000730 0.45 67.26 162.34 0.12 Golf Course 22423 50-yr 54.00 2012.71 2013.58 2013.05 2013.58 0.000673 0.51 106.93 201.47 0.12 Golf Course 22423 100-yr 64.00 2012.71 2013.64 2013.07 2013.65 0.000662 0.54 119.30 202.93 0.12 Golf Course 22423 500-yr 88.00 2012.71 2013.77 2013.12 2013.78 0.000691 0.60 146.81 218.24 0.13 Golf Course 22972 10-yr 30.00 2013.92 2014.45 2014.45 2014.57 0.060255 2.72 11.01 48.22 1.00 Golf Course 22972 50-yr 54.00 2013.92 2014.57 2014.57 2014.72 0.053115 3.18 16.96 53.43 1.00 Golf Course 22972 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.054246 3.41 18.77 54.23 1.02 Golf Course 22972 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050317 3.73 23.60 56.31 1.02 Golf Course 23005 10-yr 30.00 2014.38 2015.05 2014.75 2015.05 0.001933 0.69 43.31 112.20 0.20 Golf Course 23005 50-yr 54.00 2014.38 2015.22 2014.83 2015.23 0.002060 0.84 64.21 130.40 0.21 Golf Course 23005 100-yr 64.00 2014.38 2015.28 2014.85 2015.29 0.002060 0.89 72.20 135.50 0.21 Golf Course 23005 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002173 0.95 92.98 164.62 0.22 Golf Course 23050 10-yr 30.00 2014.61 2015.16 2014.87 2015.16 0.001938 0.64 46.54 134.52 0.19 Golf Course 23050 50-yr 54.00 2014.61 2015.33 2014.95 2015.34 0.001742 0.76 71.20 148.90 0.19 Golf Course 23050 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 23050 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001568 0.87 101.32 159.72 0.19 Golf Course 23090 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.005092 0.93 32.35 111.85 0.30 Golf Course 23090 50-yr 54.00 2014.93 2015.60 2015.34 2015.61 0.004889 1.03 52.56 151.12 0.31 Golf Course 23090 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 23090 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 23446 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012459 1.10 27.17 141.49 0.44 Golf Course 23446 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012670 1.24 43.59 193.33 0.46 Golf Course 23446 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 23446 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 23887 10-yr 30.00 2022.25 2022.83 2022.66 2022.84 0.005714 0.89 33.70 135.04 0.31 Golf Course 23887 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005672 1.06 51.18 158.01 0.33 Golf Course 23887 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 23887 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 24430 10-yr 30.00 2028.58 2029.25 2029.25 2029.46 0.048764 3.65 8.29 21.75 1.00 Golf Course 24430 50-yr 54.00 2028.58 2029.47 2029.47 2029.73 0.037372 4.21 13.58 28.66 0.94 Golf Course 24430 100-yr 64.00 2028.58 2029.56 2029.56 2029.82 0.031201 4.22 16.81 37.07 0.88 Golf Course 24430 500-yr 88.00 2028.58 2029.72 2029.72 2029.99 0.026137 4.41 23.23 42.98 0.83 HEC-RAS Plan: CEM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course 20779 Q100 - base 2008.05 2008.05 1327.67 64.00 934.91 2798.66 Golf Course 20779 Q100 - floodway 2009.05 1.00 2009.05 1178.72 64.00 934.91 934.91 2798.66 2278.72 Golf Course 21013 Q100 - base 2008.05 2008.07 147.76 52.43 11.57 508.09 1602.56 Golf Course 21013 Q100 - floodway 2009.05 1.00 2009.05 173.18 52.98 11.02 1472.43 508.09 1602.56 1725.00 Golf Course 21128 Q100 - base 2008.53 2008.53 189.79 64.00 409.35 1512.91 Golf Course 21128 Q100 - floodway 2009.05 0.52 2009.11 25.00 64.00 1045.00 409.35 1512.91 1070.00 Golf Course 21229 Q100 - base 2008.86 2008.87 305.93 64.00 417.95 1452.44 Golf Course 21229 Q100 - floodway 2009.59 0.72 2009.62 35.00 64.00 985.00 417.95 1452.44 1020.00 Golf Course 21385 Q100 - base 2009.12 2009.12 285.94 64.00 431.52 1001.23 Golf Course 21385 Q100 - floodway 2010.03 0.91 2010.06 30.00 64.00 785.00 431.52 1001.23 815.00 Golf Course 21409 Q100 - base 2009.17 2009.17 223.27 64.00 426.69 980.16 Golf Course 21409 Q100 - floodway 2010.12 0.95 2010.16 25.00 64.00 728.00 426.69 980.16 753.00 Golf Course 21431 Q100 - base 2009.23 2009.24 219.82 64.00 440.00 961.58 Golf Course 21431 Q100 - floodway 2010.23 1.00 2010.26 25.00 64.00 700.00 440.00 961.58 725.00 Golf Course 21445 Q100 - base 2009.31 2009.33 143.43 64.00 440.70 949.64 Golf Course 21445 Q100 - floodway 2010.29 0.98 2010.37 20.00 64.00 683.00 440.70 949.64 703.00 Golf Course 21456 Q100 - base 2013.13 2013.24 113.14 64.00 0.00 937.26 Golf Course 21456 Q100 - floodway 2013.79 0.66 2014.05 30.00 64.00 595.00 0.00 937.26 625.00 Golf Course 21481 Q100 - base 2013.25 2013.25 634.26 64.00 494.28 1387.02 Golf Course 21481 Q100 - floodway 2014.10 0.85 2014.11 37.00 64.00 1073.00 494.28 1387.02 1110.00 Golf Course 21485 Q100 - base 2013.25 2013.25 484.33 64.00 0.00 911.00 Golf Course 21485 Q100 - floodway 2014.10 0.85 2014.12 45.00 64.00 514.50 0.00 911.00 559.50 Golf Course 21515 Q100 - base 2013.26 2013.26 517.17 64.00 0.00 751.00 Golf Course 21515 Q100 - floodway 2014.11 0.86 2014.12 45.00 64.00 495.50 0.00 751.00 540.50 Golf Course 21525 Q100 - base 2013.26 2013.26 517.28 64.00 0.00 751.00 Golf Course 21525 Q100 - floodway 2014.12 0.86 2014.12 45.00 64.00 482.50 0.00 751.00 527.50 Golf Course 21609 Q100 - base 2013.26 2013.26 483.72 64.00 0.00 522.16 Golf Course 21609 Q100 - floodway 2014.14 0.88 2014.15 44.00 64.00 278.00 0.00 522.16 322.00 Golf Course 21726 Q100 - base 2013.26 2013.26 359.35 64.00 0.00 402.00 Golf Course 21726 Q100 - floodway 2014.16 0.90 2014.18 44.00 64.00 273.00 0.00 402.00 317.00 Golf Course 21857 Q100 - base 2013.27 2013.28 249.08 64.00 0.00 319.28 Golf Course 21857 Q100 - floodway 2014.24 0.97 2014.25 43.00 64.00 188.50 0.00 319.28 231.50 Golf Course 21983 Q100 - base 2013.31 2013.32 178.27 64.00 0.00 248.45 Golf Course 21983 Q100 - floodway 2014.28 0.96 2014.29 43.00 64.00 103.50 0.00 248.45 146.50 Golf Course 22423 Q100 - base 2013.64 2013.65 202.93 64.00 843.00 1600.75 Golf Course 22423 Q100 - floodway 2014.45 0.81 2014.47 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 22972 Q100 - base 2014.60 2014.78 54.23 64.00 888.76 1267.01 Golf Course 22972 Q100 - floodway 2015.26 0.66 2015.70 14.13 64.00 1162.20 888.76 1267.01 1176.33 Golf Course 23005 Q100 - base 2015.28 2015.29 135.50 64.00 896.09 1271.17 Golf Course 23005 Q100 - floodway 2016.10 0.83 2016.14 27.34 64.00 1123.02 896.09 1271.17 1150.36 Golf Course 23050 Q100 - base 2015.39 2015.40 151.92 64.00 944.30 1324.65 Golf Course 23050 Q100 - floodway 2016.21 0.82 2016.27 22.35 64.00 1126.64 944.30 1324.65 1148.99 Golf Course 23090 Q100 - base 2015.65 2015.66 154.59 64.00 951.93 1347.53 Golf Course 23090 Q100 - floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 951.93 1347.53 1115.00 Golf Course 23446 Q100 - base 2018.10 2018.12 208.12 64.00 688.98 1310.47 Golf Course 23446 Q100 - floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 23887 Q100 - base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 23887 Q100 - floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 24430 Q100 - base 2029.56 2029.82 37.07 1.56 60.23 2.21 636.32 656.04 Golf Course 24430 Q100 - floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 636.32 656.04 656.04 HEC-RAS Plan: CEM River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 1.00 2004.70 2007.19 2004.82 2007.19 0.000000 0.01 97.62 92.00 0.00 trib -1303 Q50 2.00 2004.70 2007.80 2004.87 2007.80 0.000000 0.01 156.26 99.90 0.00 trib -1303 Q100 4.00 2004.70 2008.05 2004.90 2008.05 0.000000 0.02 181.64 103.69 0.00 trib -1303 Q500 7.00 2004.70 2008.64 2004.96 2008.64 0.000000 0.03 245.69 113.41 0.00 trib -1019 Q10 1.00 2007.91 2008.27 2008.27 2008.30 0.103616 1.40 0.72 31.55 1.04 trib -1019 Q50 2.00 2007.91 2008.31 2008.31 2008.35 0.096308 1.67 1.20 38.26 1.06 trib -1019 Q100 4.00 2007.91 2008.36 2008.36 2008.41 0.077292 1.83 2.19 47.75 1.00 trib -1019 Q500 7.00 2007.91 2008.64 2008.41 2008.64 0.002258 0.58 12.11 93.29 0.20 trib -880 Q10 1.00 2004.89 2008.31 2008.31 0.000000 0.00 721.14 359.15 0.00 trib -880 Q50 2.00 2004.89 2008.35 2008.35 0.000000 0.00 738.57 359.95 0.00 trib -880 Q100 4.00 2004.89 2008.42 2008.42 0.000000 0.01 761.51 361.60 0.00 trib -880 Q500 7.00 2004.89 2008.64 2008.64 0.000000 0.01 843.68 368.58 0.00 trib -466 Q10 1.00 2006.89 2008.31 2008.31 0.000000 0.00 410.09 380.79 0.00 trib -466 Q50 2.00 2006.89 2008.35 2008.35 0.000000 0.00 428.60 384.48 0.00 trib -466 Q100 4.00 2006.89 2008.42 2008.42 0.000000 0.01 453.25 388.60 0.00 trib -466 Q500 7.00 2006.89 2008.64 2008.64 0.000000 0.01 542.61 403.49 0.00 trib -89 Q10 1.00 2006.07 2008.31 2008.31 0.000000 0.00 449.29 336.12 0.00 trib -89 Q50 2.00 2006.07 2008.35 2008.35 0.000000 0.00 465.65 339.05 0.00 trib -89 Q100 4.00 2006.07 2008.42 2008.42 0.000000 0.01 487.40 345.54 0.00 trib -89 Q500 7.00 2006.07 2008.64 2008.64 0.000000 0.01 571.23 388.66 0.00 trib 1 Q10 1.00 1998.92 2005.00 2005.00 0.000000 0.00 225.97 48.42 0.00 trib 1 Q50 2.00 1998.92 2009.60 2009.60 0.000000 0.00 540.96 101.33 0.00 trib 1 Q100 4.00 1998.92 2009.70 2009.70 0.000000 0.01 551.13 102.16 0.00 trib 1 Q500 7.00 1998.92 2010.00 2010.00 0.000000 0.01 582.15 104.63 0.00 trib 149 Q10 10.00 1995.82 2005.00 1996.32 2005.00 0.000000 0.01 1141.63 165.71 0.00 trib 149 Q50 14.00 1995.82 2009.60 1996.38 2009.60 0.000000 0.01 1924.52 175.82 0.00 trib 149 Q100 16.00 1995.82 2009.70 1996.41 2009.70 0.000000 0.01 1942.12 176.16 0.00 trib 149 Q500 20.00 1995.82 2010.00 1996.46 2010.00 0.000000 0.01 1995.13 177.19 0.00 trib 343 Q10 10.00 1993.64 2005.00 1993.99 2005.00 0.000000 0.01 1993.17 252.43 0.00 trib 343 Q50 14.00 1993.64 2009.60 1994.05 2009.60 0.000000 0.00 3182.15 266.09 0.00 trib 343 Q100 16.00 1993.64 2009.70 1994.07 2009.70 0.000000 0.00 3208.78 266.57 0.00 trib 343 Q500 20.00 1993.64 2010.00 1994.11 2010.00 0.000000 0.01 3288.97 267.99 0.00 trib 383 Q10 10.00 1994.23 2005.00 1994.67 2005.00 0.000000 0.01 1938.50 222.78 0.00 trib 383 Q50 14.00 1994.23 2009.60 1994.71 2009.60 0.000000 0.00 3052.64 279.70 0.00 trib 383 Q100 16.00 1994.23 2009.70 1994.73 2009.70 0.000000 0.01 3080.61 279.97 0.00 trib 383 Q500 20.00 1994.23 2010.00 1994.75 2010.00 0.000000 0.01 3164.74 280.78 0.00 trib 472 Q10 10.00 2005.65 2005.00 1999.14 2005.00 0.000000 477.69 135.83 0.00 trib 472 Q50 14.00 2005.65 2009.60 1999.19 2009.60 0.000000 0.01 1255.59 189.45 0.00 trib 472 Q100 16.00 2005.65 2009.70 1999.22 2009.70 0.000000 0.01 1274.72 193.16 0.00 trib 472 Q500 20.00 2005.65 2010.00 1999.26 2010.00 0.000000 0.01 1334.21 203.55 0.00 trib 576 Q10 10.00 2008.78 2009.74 2009.74 2009.99 0.032554 4.02 2.48 4.97 1.00 trib 576 Q50 14.00 2008.78 2009.89 2009.89 2010.17 0.030449 4.27 3.28 5.70 0.99 trib 576 Q100 16.00 2008.78 2009.95 2009.95 2010.25 0.030780 4.43 3.61 5.98 1.01 trib 576 Q500 20.00 2008.78 2010.20 2010.20 2010.37 0.028407 3.36 6.36 21.88 0.93 trib 651 Q10 10.00 2009.50 2010.97 2010.45 2011.02 0.007232 1.65 6.05 55.46 0.46 trib 651 Q50 14.00 2009.50 2011.08 2010.60 2011.13 0.006740 1.82 7.70 59.63 0.46 trib 651 Q100 16.00 2009.50 2011.13 2010.67 2011.18 0.006429 1.87 8.54 63.89 0.46 trib 651 Q500 20.00 2009.50 2011.21 2010.78 2011.28 0.006391 2.02 9.91 75.90 0.47 trib 918 Q10 10.00 2009.10 2011.35 2009.95 2011.36 0.000523 0.96 10.46 9.36 0.14 trib 918 Q50 14.00 2009.10 2011.55 2010.09 2011.57 0.000716 1.17 11.95 29.34 0.16 trib 918 Q100 16.00 2009.10 2011.63 2010.17 2011.66 0.000811 1.27 12.60 43.37 0.18 trib 918 Q500 20.00 2009.10 2011.79 2010.29 2011.82 0.000984 1.45 13.82 61.75 0.19 trib 1472 Q10 10.00 2011.44 2012.38 2012.38 2012.67 0.032363 4.35 2.30 3.82 0.99 trib 1472 Q50 14.00 2011.44 2012.53 2012.53 2012.89 0.032599 4.78 2.93 4.19 1.01 trib 1472 Q100 16.00 2011.44 2012.72 2012.61 2013.00 0.021875 4.28 3.74 4.62 0.84 trib 1472 Q500 20.00 2011.44 2013.01 2012.75 2013.24 0.013910 3.84 5.21 5.32 0.68 trib 1510 Q10 10.00 2011.15 2012.95 2012.17 2013.00 0.002806 1.77 5.64 5.39 0.31 trib 1510 Q50 14.00 2011.15 2013.19 2012.35 2013.25 0.003077 1.99 7.02 5.99 0.32 trib 1510 Q100 16.00 2011.15 2013.26 2012.43 2013.33 0.003434 2.15 7.45 6.17 0.34 trib 1510 Q500 20.00 2011.15 2013.44 2012.58 2013.53 0.003647 2.32 8.61 6.62 0.36 trib 1520 Culvert trib 1528 Q10 10.00 2010.84 2013.36 2011.82 2013.38 0.000963 1.00 9.97 6.88 0.15 HEC-RAS Plan: CEM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2010.84 2013.99 2012.00 2014.00 0.000673 0.95 14.72 8.40 0.13 trib 1528 Q100 16.00 2010.84 2014.30 2012.07 2014.32 0.000575 0.91 17.53 9.52 0.12 trib 1528 Q500 20.00 2010.84 2014.58 2012.23 2014.59 0.000719 0.95 23.45 47.67 0.13 trib 1557 Q10 10.00 2011.79 2013.39 2012.66 2013.44 0.003817 1.69 5.92 5.64 0.29 trib 1557 Q50 14.00 2011.79 2014.00 2012.81 2014.04 0.001935 1.43 9.76 6.94 0.21 trib 1557 Q100 16.00 2011.79 2014.32 2012.88 2014.35 0.001434 1.33 12.05 7.61 0.19 trib 1557 Q500 20.00 2011.79 2014.59 2013.01 2014.62 0.001439 1.41 14.22 8.20 0.19 trib 1963 Q10 10.00 2018.61 2019.48 2019.48 2019.66 0.051975 3.44 2.91 7.79 0.99 trib 1963 Q50 14.00 2018.61 2019.59 2019.59 2019.80 0.045074 3.61 3.92 11.07 0.95 trib 1963 Q100 16.00 2018.61 2019.66 2019.66 2019.85 0.038218 3.52 4.80 15.48 0.89 trib 1963 Q500 20.00 2018.61 2019.75 2019.75 2019.93 0.033517 3.48 6.39 18.55 0.84 trib 1989 Q10 10.00 2017.77 2019.85 2018.80 2019.89 0.002658 1.50 6.69 17.19 0.24 trib 1989 Q50 14.00 2017.77 2020.01 2018.98 2020.06 0.003491 1.86 7.54 40.62 0.28 trib 1989 Q100 16.00 2017.77 2020.06 2019.06 2020.12 0.004030 2.04 7.83 48.44 0.30 trib 1989 Q500 20.00 2017.77 2020.14 2019.22 2020.23 0.005238 2.42 8.27 60.64 0.35 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.19 2019.81 2020.30 0.009432 2.61 3.83 8.68 0.47 trib 2080 Q50 14.00 2018.73 2020.48 2019.96 2020.60 0.007671 2.81 4.99 12.81 0.44 trib 2080 Q100 16.00 2018.73 2020.61 2020.02 2020.74 0.007173 2.90 5.51 14.87 0.44 trib 2080 Q500 20.00 2018.73 2020.86 2020.15 2021.01 0.006452 3.07 6.51 18.47 0.42 trib 2100 Q10 12.00 2018.27 2020.39 2019.40 2020.41 0.002032 1.15 10.46 12.11 0.22 trib 2100 Q50 24.00 2018.27 2020.70 2019.86 2020.74 0.003396 1.65 14.58 14.51 0.29 trib 2100 Q100 30.00 2018.27 2020.83 2020.00 2020.88 0.003580 1.82 16.55 15.31 0.30 trib 2100 Q500 46.00 2018.27 2021.08 2020.26 2021.16 0.004409 2.26 20.54 16.79 0.35 trib 2110 Q10 12.00 2018.27 2020.42 2019.40 2020.43 0.001881 1.11 10.78 12.31 0.21 trib 2110 Q50 24.00 2018.27 2020.74 2019.87 2020.78 0.002981 1.58 15.21 14.78 0.27 trib 2110 Q100 30.00 2018.27 2020.88 2020.00 2020.92 0.003147 1.74 17.27 15.59 0.29 trib 2110 Q500 46.00 2018.27 2021.14 2020.26 2021.21 0.003840 2.17 21.53 17.14 0.32 trib 2120 Q10 12.00 2018.27 2020.44 2019.40 2020.45 0.001769 1.09 11.03 12.47 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.81 0.002698 1.53 15.70 14.97 0.26 trib 2120 Q100 30.00 2018.27 2020.91 2020.00 2020.96 0.002861 1.69 17.82 15.80 0.27 trib 2120 Q500 46.00 2018.27 2021.18 2020.26 2021.25 0.003471 2.10 22.30 17.41 0.31 trib 2651 Q10 12.00 2021.38 2022.48 2022.22 2022.62 0.016295 2.96 4.05 5.21 0.59 trib 2651 Q50 24.00 2021.38 2023.16 2022.58 2023.30 0.009750 3.00 8.00 6.47 0.48 trib 2651 Q100 30.00 2021.38 2023.40 2022.73 2023.55 0.009769 3.10 9.67 7.51 0.48 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008805 3.30 14.05 10.00 0.47 trib 3126 Q10 12.00 2023.82 2025.45 2024.69 2025.49 0.003114 1.53 7.84 7.78 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003750 1.97 12.18 9.47 0.31 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.25 0.003704 2.08 14.43 10.23 0.31 trib 3126 Q500 46.00 2023.82 2026.65 2025.48 2026.74 0.003902 2.35 19.60 12.06 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003060 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: CEM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031974 4.34 5.07 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.006997 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: CEM FW River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Q100 base 2008.05 2008.05 103.69 0.01 3.90 0.09 70.92 163.31 trib -1303 Q100 floodway 2009.05 1.00 2009.05 31.32 4.00 131.99 70.92 163.31 163.31 trib -1019 Q100 base 2008.36 2008.41 21.08 4.00 152.95 253.19 trib -1019 Q100 floodway 2009.05 0.69 2009.05 21.09 4.00 173.33 152.95 253.19 194.42 trib -880 Q100 base 2008.42 2008.42 361.60 0.08 3.92 0.01 62.73 380.37 trib -880 Q100 floodway 2009.05 0.63 2009.05 40.00 4.00 310.00 62.73 380.37 350.00 trib -466 Q100 base 2008.42 2008.42 388.60 4.00 0.00 129.52 566.57 trib -466 Q100 floodway 2009.05 0.64 2009.05 45.57 4.00 521.00 129.52 566.57 566.57 trib -89 Q100 base 2008.42 2008.42 345.54 4.00 144.89 581.16 trib -89 Q100 floodway 2009.05 0.64 2009.05 39.70 4.00 510.00 144.89 581.16 549.70 trib 1 Q100 base 2009.70 2009.70 102.16 4.00 461.25 568.10 trib 1 Q100 floodway 2010.70 1.00 2010.70 116.77 0.00 4.00 461.25 568.10 trib 149 Q100 base 2009.70 2009.70 176.16 16.00 421.08 606.95 trib 149 Q100 floodway 2010.70 1.00 2010.70 179.75 16.00 421.08 606.95 trib 343 Q100 base 2009.70 2009.70 266.57 16.00 410.55 678.07 trib 343 Q100 floodway 2010.70 1.00 2010.70 271.14 0.00 16.00 0.00 410.55 678.07 trib 383 Q100 base 2009.70 2009.70 279.97 16.00 0.00 397.28 677.14 trib 383 Q100 floodway 2010.70 1.00 2010.70 282.66 16.00 0.00 397.28 677.14 trib 472 Q100 base 2009.70 2009.70 193.16 0.12 15.88 340.55 365.05 trib 472 Q100 floodway 2010.70 1.00 2010.70 8.82 16.00 347.00 340.55 365.05 355.82 trib 576 Q100 base 2009.95 2010.25 5.98 16.00 361.81 384.61 trib 576 Q100 floodway 2010.67 0.73 2010.75 5.41 16.00 368.20 361.81 384.61 373.61 trib 651 Q100 base 2011.13 2011.18 16.46 16.00 360.31 384.41 trib 651 Q100 floodway 2011.07 -0.06 2011.14 15.66 16.00 367.72 360.31 384.41 384.41 trib 918 Q100 base 2011.63 2011.66 7.79 16.00 466.95 478.43 trib 918 Q100 floodway 2011.63 0.00 2011.66 7.59 16.00 468.53 466.95 478.43 478.43 trib 1472 Q100 base 2012.72 2013.00 4.62 16.00 706.41 714.93 trib 1472 Q100 floodway 2012.71 -0.01 2013.00 4.61 16.00 708.23 706.41 714.93 713.11 trib 1510 Q100 base 2013.26 2013.33 6.17 16.00 711.73 722.04 trib 1510 Q100 floodway 2013.26 0.00 2013.33 6.16 16.00 714.06 711.73 722.04 720.22 trib 1520 Culvert trib 1528 Q100 base 2014.30 2014.32 9.52 16.00 727.15 744.68 trib 1528 Q100 floodway 2014.31 0.00 2014.32 9.50 16.00 727.56 727.15 744.68 737.06 trib 1557 Q100 base 2014.32 2014.35 7.61 16.00 726.74 740.03 trib 1557 Q100 floodway 2014.32 0.00 2014.35 7.61 16.00 730.81 726.74 740.03 738.42 trib 1963 Q100 base 2019.66 2019.85 15.48 15.72 0.28 739.45 750.61 trib 1963 Q100 floodway 2019.63 -0.03 2019.86 8.89 16.00 741.45 739.45 750.61 750.61 trib 1989 Q100 base 2020.06 2020.12 5.50 16.00 762.80 771.50 trib 1989 Q100 floodway 2020.08 0.02 2020.15 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Q100 base 2020.61 2020.74 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.61 0.00 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.83 2020.88 15.31 0.01 29.99 44.23 60.09 trib 2100 Q100 floodway 2020.83 0.00 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.88 2020.92 15.59 0.02 29.98 44.23 60.09 trib 2110 Q100 floodway 2020.88 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.91 2020.96 15.80 0.03 29.97 44.23 60.09 trib 2120 Q100 floodway 2020.92 0.00 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.40 2023.55 7.51 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.25 10.23 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 HEC-RAS Plan: CEM FW River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: wo DS lev (CEM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 10.00 2004.70 2007.19 2005.00 2007.19 0.000006 0.13 97.62 92.00 0.02 trib -1303 Q50 14.00 2004.70 2007.80 2005.05 2007.80 0.000004 0.12 156.26 99.90 0.01 trib -1303 Q100 16.00 2004.70 2008.05 2005.07 2008.05 0.000003 0.12 181.64 103.69 0.01 trib -1303 Q500 20.00 2004.70 2008.64 2005.11 2008.64 0.000002 0.11 245.69 113.41 0.01 trib -1019 Q10 10.00 2008.18 2008.47 2008.47 2008.54 0.040241 2.34 5.15 65.40 0.83 trib -1019 Q50 14.00 2008.18 2008.51 2008.51 2008.59 0.039441 2.57 6.69 70.95 0.84 trib -1019 Q100 16.00 2008.18 2008.52 2008.52 2008.62 0.045491 2.81 7.00 71.61 0.91 trib -1019 Q500 20.00 2008.18 2008.64 2008.56 2008.65 0.003347 0.96 26.15 93.34 0.26 trib -880 Q10 10.00 2007.31 2008.55 2005.25 2008.55 0.000000 0.01 808.03 365.13 0.00 trib -880 Q50 14.00 2007.31 2008.60 2005.30 2008.60 0.000000 0.01 828.10 367.06 0.00 trib -880 Q100 16.00 2007.31 2008.63 2005.32 2008.63 0.000000 0.01 837.43 367.97 0.00 trib -880 Q500 20.00 2007.31 2008.65 2005.36 2008.65 0.000000 0.01 845.25 368.73 0.00 trib -466 Q10 10.00 2006.96 2008.55 2007.05 2008.55 0.000000 0.02 503.64 396.88 0.00 trib -466 Q50 14.00 2006.96 2008.60 2007.08 2008.60 0.000001 0.03 525.58 402.65 0.00 trib -466 Q100 16.00 2006.96 2008.63 2007.08 2008.63 0.000001 0.03 535.81 403.22 0.00 trib -466 Q500 20.00 2006.96 2008.65 2007.08 2008.65 0.000001 0.04 544.38 403.56 0.01 trib -89 Q10 10.00 2007.09 2008.55 2006.35 2008.55 0.000000 0.02 533.76 381.64 0.00 trib -89 Q50 14.00 2007.09 2008.60 2006.40 2008.60 0.000000 0.02 554.94 387.29 0.00 trib -89 Q100 16.00 2007.09 2008.63 2006.43 2008.63 0.000001 0.03 564.78 388.12 0.00 trib -89 Q500 20.00 2007.09 2008.65 2006.47 2008.65 0.000001 0.03 573.08 388.82 0.00 trib 1 Q10 10.00 2008.30 2008.57 2008.57 2008.61 0.049508 2.23 7.05 92.01 0.89 trib 1 Q50 14.00 2008.30 2008.60 2008.60 2008.64 0.049091 2.40 9.47 106.80 0.90 trib 1 Q100 16.00 2008.30 2008.61 2008.61 2008.65 0.045516 2.40 10.81 112.72 0.88 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q10 10.00 2007.52 2008.62 2006.65 2008.62 0.000000 0.01 417.66 269.94 0.00 trib 149 Q50 14.00 2007.52 2008.65 2006.70 2008.65 0.000001 0.02 425.25 270.23 0.00 trib 149 Q100 16.00 2007.52 2008.66 2006.72 2008.66 0.000001 0.02 428.28 270.35 0.00 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q10 10.00 2008.18 2008.62 2007.06 2008.62 0.000001 0.02 272.09 279.48 0.01 trib 343 Q50 14.00 2008.18 2008.65 2007.13 2008.65 0.000003 0.03 279.96 281.03 0.01 trib 343 Q100 16.00 2008.18 2008.66 2007.16 2008.66 0.000003 0.03 283.12 281.64 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q10 10.00 2008.42 2008.62 2007.33 2008.62 0.000003 0.01 193.97 213.44 0.01 trib 383 Q50 14.00 2008.42 2008.65 2007.36 2008.65 0.000006 0.02 199.96 214.83 0.01 trib 383 Q100 16.00 2008.42 2008.66 2007.37 2008.66 0.000007 0.03 202.37 215.39 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q10 10.00 2008.50 2008.62 2007.46 2008.62 0.000008 0.01 146.81 211.42 0.01 trib 472 Q50 14.00 2008.50 2008.65 2007.50 2008.65 0.000014 0.02 152.88 213.77 0.01 trib 472 Q100 16.00 2008.50 2008.66 2007.52 2008.66 0.000017 0.03 155.34 214.71 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q10 10.00 2008.57 2008.62 2007.79 2008.62 0.000034 0.02 83.84 150.04 0.02 trib 576 Q50 14.00 2008.57 2008.65 2007.83 2008.65 0.000057 0.03 88.33 153.40 0.02 trib 576 Q100 16.00 2008.57 2008.66 2007.84 2008.66 0.000069 0.03 90.17 154.76 0.03 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q10 10.00 2011.11 2011.18 2011.18 2011.22 0.097087 0.90 6.25 88.01 0.91 trib 651 Q50 14.00 2011.11 2011.20 2011.20 2011.24 0.084641 1.01 8.16 94.94 0.89 trib 651 Q100 16.00 2011.11 2011.21 2011.21 2011.26 0.076146 1.09 9.16 96.15 0.87 trib 651 Q500 20.00 2011.11 2011.22 2011.22 2011.28 0.078399 1.27 10.44 97.72 0.92 trib 918 Q10 10.00 2009.84 2011.22 2010.09 2011.22 0.000004 0.07 191.15 223.46 0.01 trib 918 Q50 14.00 2009.84 2011.25 2010.13 2011.25 0.000006 0.09 197.86 227.01 0.01 trib 918 Q100 16.00 2009.84 2011.27 2010.15 2011.27 0.000008 0.10 200.97 230.82 0.02 trib 918 Q500 20.00 2009.84 2011.30 2010.16 2011.30 0.000012 0.13 207.29 233.18 0.02 trib 1472 Q10 10.00 2013.44 2013.73 2013.73 2013.78 0.038164 2.06 6.11 55.33 0.79 trib 1472 Q50 14.00 2013.44 2013.76 2013.76 2013.82 0.041668 2.34 7.74 62.95 0.84 trib 1472 Q100 16.00 2013.44 2013.77 2013.77 2013.84 0.039601 2.38 8.80 67.96 0.83 trib 1472 Q500 20.00 2013.44 2013.80 2013.80 2013.87 0.039038 2.52 10.69 77.87 0.84 trib 1510 Q10 10.00 2013.81 2014.06 2013.90 2014.06 0.002778 0.39 19.89 120.64 0.19 trib 1510 Q50 14.00 2013.81 2014.10 2013.94 2014.11 0.002801 0.43 25.50 126.84 0.20 trib 1510 Q100 16.00 2013.81 2014.12 2013.95 2014.13 0.002776 0.45 27.85 129.47 0.20 trib 1510 Q500 20.00 2013.81 2014.15 2013.97 2014.16 0.002826 0.50 31.99 137.40 0.21 trib 1520 Culvert trib 1528 Q10 10.00 2013.78 2014.06 2013.93 2014.06 0.005201 0.69 15.56 100.95 0.28 HEC-RAS Plan: wo DS lev (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2013.78 2014.10 2013.95 2014.11 0.004983 0.76 20.57 116.23 0.29 trib 1528 Q100 16.00 2013.78 2014.12 2013.97 2014.13 0.005184 0.82 22.52 118.90 0.30 trib 1528 Q500 20.00 2013.78 2014.16 2013.99 2014.17 0.004648 0.85 26.76 122.07 0.29 trib 1557 Q10 10.00 2014.07 2014.21 2014.05 2014.21 0.004529 0.32 16.54 122.35 0.22 trib 1557 Q50 14.00 2014.07 2014.25 2014.10 2014.26 0.004585 0.37 22.60 137.57 0.23 trib 1557 Q100 16.00 2014.07 2014.27 2014.12 2014.27 0.004521 0.42 24.77 140.38 0.24 trib 1557 Q500 20.00 2014.07 2014.29 2014.14 2014.30 0.004640 0.50 28.53 145.80 0.25 trib 1963 Q10 10.00 2015.81 2016.24 2016.10 2016.26 0.007062 1.07 10.25 52.15 0.36 trib 1963 Q50 14.00 2015.81 2016.29 2016.15 2016.31 0.007097 1.20 13.09 56.60 0.37 trib 1963 Q100 16.00 2015.81 2016.31 2016.17 2016.33 0.007323 1.27 14.25 57.48 0.38 trib 1963 Q500 20.00 2015.81 2016.35 2016.20 2016.38 0.007236 1.36 16.68 58.71 0.38 trib 1989 Q10 10.00 2017.77 2018.80 2018.80 2019.13 0.055202 4.65 2.15 3.23 1.00 trib 1989 Q50 14.00 2017.77 2018.98 2018.98 2019.38 0.054111 5.05 2.77 3.54 1.01 trib 1989 Q100 16.00 2017.77 2019.07 2019.07 2019.48 0.052722 5.18 3.09 3.69 1.00 trib 1989 Q500 20.00 2017.77 2019.22 2019.22 2019.68 0.051664 5.45 3.67 3.94 0.99 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001965 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003293 1.63 14.74 14.59 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003479 1.80 16.71 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004326 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001824 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002895 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003072 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001720 1.08 11.15 12.55 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002629 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002801 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017129 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.15 2022.58 2023.29 0.009975 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009967 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003063 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003719 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: wo DS lev (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.12 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2047.39 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2047.50 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.43 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031946 4.33 5.08 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2051.88 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.007005 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wo ds fw (CEM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Base 2008.05 2008.05 103.69 5.34 9.25 1.41 134.37 158.76 trib -1303 Floodway 2009.05 1.00 2009.05 31.32 0.63 13.98 1.39 131.99 134.37 158.76 163.31 trib -1019 Base 2008.52 2008.62 38.92 3.31 11.46 1.24 178.65 192.41 trib -1019 Floodway 2009.04 0.53 2009.06 21.09 3.29 11.59 1.12 173.33 178.65 192.41 194.42 trib -880 Base 2008.63 2008.63 367.97 14.91 0.33 0.76 316.80 341.31 trib -880 Floodway 2009.07 0.45 2009.07 40.00 2.68 9.02 4.30 310.00 316.80 341.31 350.00 trib -466 Base 2008.63 2008.63 403.22 15.45 0.52 0.03 552.13 565.20 trib -466 Floodway 2009.09 0.46 2009.09 45.57 9.60 6.11 0.28 521.00 552.13 565.20 566.57 trib -89 Base 2008.63 2008.63 388.12 15.26 0.71 0.03 523.44 545.76 trib -89 Floodway 2009.10 0.47 2009.10 39.70 6.49 8.94 0.57 510.00 523.44 545.76 549.70 trib 1 Base 2008.61 2008.65 112.72 11.69 4.27 0.05 423.34 431.01 trib 1 Floodway 2009.07 0.46 2009.13 15.00 16.00 307.00 423.34 431.01 322.00 trib 149 Base 2008.66 2008.66 270.35 15.86 0.14 0.00 322.78 330.58 trib 149 Floodway 2009.18 0.53 2009.19 15.00 9.49 6.51 315.58 322.78 330.58 330.58 trib 343 Base 2008.66 2008.66 281.64 15.83 0.12 0.05 326.83 335.39 trib 343 Floodway 2009.26 0.60 2009.28 15.00 5.98 10.02 320.39 326.83 335.39 335.39 trib 383 Base 2008.66 2008.66 215.39 15.97 0.03 0.00 321.06 327.35 trib 383 Floodway 2009.30 0.64 2009.32 15.00 10.48 5.52 312.35 321.06 327.35 327.35 trib 472 Base 2008.66 2008.66 214.71 15.97 0.03 0.00 246.06 255.85 trib 472 Floodway 2009.49 0.84 2009.51 15.00 6.05 9.95 240.85 246.06 255.85 255.85 trib 576 Base 2008.66 2008.66 154.76 15.99 0.01 0.00 247.56 254.23 trib 576 Floodway 2009.63 0.97 2009.65 15.00 9.60 6.40 239.23 247.56 254.23 254.23 trib 651 Base 2011.21 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 651 Floodway 2011.47 0.26 2011.63 15.00 16.00 243.59 331.92 337.62 258.59 trib 918 Base 2011.27 2011.27 230.82 7.90 1.56 6.54 290.48 301.36 trib 918 Floodway 2011.80 0.53 2011.80 15.00 2.00 12.93 1.06 288.00 290.48 301.36 303.00 trib 1472 Base 2013.77 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1472 Floodway 2014.15 0.38 2014.31 15.00 16.00 355.00 374.56 390.80 370.00 trib 1510 Base 2014.12 2014.13 129.51 0.02 0.85 15.14 289.44 302.32 trib 1510 Floodway 2014.63 0.51 2014.66 15.00 16.00 355.00 289.44 302.32 370.00 trib 1520 Culvert trib 1528 Base 2014.12 2014.13 119.01 0.00 2.72 13.28 307.04 321.23 trib 1528 Floodway 2013.79 -0.33 4514.91 2.75 16.00 370.00 307.04 321.23 385.00 trib 1557 Base 2014.27 2014.27 140.34 0.00 0.43 15.57 307.11 317.99 trib 1557 Floodway 2014.32 0.05 2014.48 15.00 16.00 370.00 307.11 317.99 385.00 trib 1963 Base 2016.31 2016.33 57.50 2.13 13.78 0.09 243.25 273.87 trib 1963 Floodway 2016.45 0.14 2016.46 66.39 3.52 12.23 0.24 243.25 273.87 trib 1989 Base 2019.07 2019.48 3.69 16.00 762.80 771.50 trib 1989 Floodway 2019.07 0.00 2019.48 3.69 16.00 762.80 771.50 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Floodway 2020.63 0.00 2020.76 4.00 16.00 39.42 68.83 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Floodway 2020.84 0.00 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Floodway 2020.89 0.00 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Floodway 2020.92 0.00 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Floodway 2023.39 0.00 2023.54 7.45 30.00 46.44 55.58 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Floodway 2026.19 0.00 2026.26 10.24 30.00 72.83 95.75 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Floodway 2030.67 0.00 2031.13 5.92 30.00 139.17 162.30 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 HEC-RAS Plan: wo ds fw (CEM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4127 Floodway 2035.09 0.00 2035.15 9.22 30.00 251.87 265.32 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Floodway 2037.69 0.00 2037.84 8.14 30.00 314.09 329.75 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Floodway 2038.70 0.00 2039.53 2.50 30.00 340.25 349.22 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Floodway 2041.00 0.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Floodway 2041.03 0.00 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Floodway 2043.40 0.00 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Floodway 2048.08 0.00 2048.13 19.14 28.00 183.69 226.54 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Floodway 2052.07 0.00 2052.35 6.77 28.00 211.57 230.44 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Floodway 2052.76 0.00 2052.83 16.44 28.00 211.25 246.77 trib 6200 Culvert trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Floodway 2054.11 0.00 2054.13 18.59 28.00 221.30 259.22 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Floodway 2055.65 0.00 2055.95 10.56 28.00 210.49 231.21 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Floodway 2064.48 0.00 2064.68 10.59 28.00 197.65 240.39 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Floodway 2083.50 0.00 2083.96 3.69 18.00 150.93 158.25 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Floodway 2084.63 0.00 2085.08 3.10 18.00 118.04 121.88 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Floodway 2086.04 0.00 2086.16 3.79 18.00 111.14 115.72 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Floodway 2090.51 0.00 2091.06 2.65 18.00 114.91 118.45 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Floodway 2091.45 0.00 2091.64 2.88 18.00 119.10 122.49 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Floodway 2092.39 0.00 2092.72 7.10 0.01 17.99 130.02 136.02 APPENDIX D EXISTING CONDITIONS HEC-RAS MODEL HEC-RAS Plan: ECM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 20779 10-yr 30.00 2004.98 2007.19 2005.40 2007.19 0.000006 0.06 517.26 1198.11 0.01 Golf Course 20779 50-yr 54.00 2004.98 2007.80 2005.49 2007.80 0.000003 0.05 1164.72 1860.64 0.01 Golf Course 20779 100-yr 64.00 2004.98 2008.05 2005.52 2008.05 0.000002 0.04 1491.37 1985.36 0.01 Golf Course 20779 500-yr 88.00 2004.98 2008.64 2005.58 2008.64 0.000000 0.03 3229.73 2191.83 0.00 Golf Course 21013 10-yr 30.00 2007.36 2007.65 2007.65 2007.74 0.048676 2.02 13.20 348.57 0.86 Golf Course 21013 50-yr 54.00 2007.36 2007.77 2007.77 2007.86 0.043680 2.09 23.46 392.88 0.83 Golf Course 21013 100-yr 64.00 2007.36 2007.79 2007.79 2007.90 0.048191 2.30 25.52 395.42 0.89 Golf Course 21013 500-yr 88.00 2007.36 2008.64 2007.85 2008.64 0.000463 0.44 192.58 634.20 0.10 Golf Course 21128 10-yr 30.00 2007.08 2008.27 2007.75 2008.28 0.000865 0.55 54.77 320.34 0.14 Golf Course 21128 50-yr 54.00 2007.08 2008.53 2007.86 2008.54 0.001133 0.60 89.93 413.16 0.16 Golf Course 21128 100-yr 64.00 2007.08 2008.60 2007.90 2008.61 0.001181 0.62 103.84 442.77 0.16 Golf Course 21128 500-yr 88.00 2007.08 2008.77 2007.98 2008.77 0.001015 0.61 145.13 510.87 0.15 Golf Course 21229 10-yr 30.00 2006.97 2008.63 2008.48 2008.64 0.007738 0.82 36.63 445.79 0.34 Golf Course 21229 50-yr 54.00 2006.97 2008.82 2008.55 2008.83 0.002311 0.62 86.72 540.30 0.20 Golf Course 21229 100-yr 64.00 2006.97 2008.87 2008.57 2008.88 0.001925 0.63 102.09 545.70 0.19 Golf Course 21229 500-yr 88.00 2006.97 2008.98 2008.63 2008.99 0.001412 0.65 136.02 549.37 0.17 Golf Course 21385 10-yr 30.00 2008.16 2008.94 2008.47 2008.94 0.000409 0.31 97.80 268.00 0.09 Golf Course 21385 50-yr 54.00 2008.16 2009.08 2008.53 2009.08 0.000477 0.40 135.88 283.37 0.10 Golf Course 21385 100-yr 64.00 2008.16 2009.12 2008.56 2009.12 0.000512 0.43 147.76 285.92 0.11 Golf Course 21385 500-yr 88.00 2008.16 2009.22 2008.61 2009.22 0.000552 0.50 176.40 291.98 0.11 Golf Course 21409 10-yr 30.00 2008.27 2008.98 2008.68 2008.98 0.001022 0.46 64.91 246.09 0.14 Golf Course 21409 50-yr 54.00 2008.27 2009.12 2008.75 2009.13 0.001113 0.58 93.59 269.70 0.15 Golf Course 21409 100-yr 64.00 2008.27 2009.17 2008.77 2009.17 0.001210 0.62 103.41 283.87 0.16 Golf Course 21409 500-yr 88.00 2008.27 2009.27 2008.81 2009.28 0.001345 0.68 128.93 323.53 0.17 Golf Course 21431 10-yr 30.00 2008.12 2009.03 2008.45 2009.03 0.000564 0.40 74.75 174.33 0.11 Golf Course 21431 50-yr 54.00 2008.12 2009.18 2008.54 2009.18 0.000767 0.52 103.72 206.07 0.13 Golf Course 21431 100-yr 64.00 2008.12 2009.23 2008.59 2009.24 0.000845 0.56 114.48 222.73 0.14 Golf Course 21431 500-yr 88.00 2008.12 2009.34 2008.66 2009.35 0.000870 0.64 138.33 232.31 0.14 Golf Course 21445 10-yr 30.00 2008.44 2009.09 2008.89 2009.12 0.014872 1.32 22.80 104.20 0.50 Golf Course 21445 50-yr 54.00 2008.44 2009.26 2009.06 2009.28 0.007937 1.23 44.01 139.40 0.38 Golf Course 21445 100-yr 64.00 2008.44 2009.31 2009.10 2009.33 0.006788 1.24 51.65 143.41 0.36 Golf Course 21445 500-yr 88.00 2008.44 2009.42 2009.16 2009.44 0.005945 1.31 67.25 155.76 0.35 Golf Course 21456 10-yr 30.00 2012.42 2012.99 2012.99 2013.09 0.062673 2.50 12.01 61.57 1.00 Golf Course 21456 50-yr 54.00 2012.42 2013.11 2013.11 2013.21 0.060991 2.52 21.40 105.91 0.99 Golf Course 21456 100-yr 64.00 2012.42 2013.14 2013.14 2013.24 0.060320 2.61 24.55 114.71 0.99 Golf Course 21456 500-yr 88.00 2012.42 2013.18 2013.18 2013.31 0.066521 2.86 30.76 134.60 1.05 Golf Course 21481 10-yr 30.00 2009.90 2013.12 2010.50 2013.12 0.000003 0.05 583.37 602.00 0.01 Golf Course 21481 50-yr 54.00 2009.90 2013.24 2010.78 2013.24 0.000007 0.08 654.53 632.14 0.01 Golf Course 21481 100-yr 64.00 2009.90 2013.27 2010.89 2013.27 0.000009 0.09 678.41 640.47 0.02 Golf Course 21481 500-yr 88.00 2009.90 2013.35 2011.13 2013.35 0.000014 0.12 729.20 656.33 0.02 Golf Course 21485 Culvert Golf Course 21515 10-yr 30.00 2010.70 2013.12 2011.31 2013.12 0.000022 0.10 297.89 491.64 0.02 Golf Course 21515 50-yr 54.00 2010.70 2013.24 2011.60 2013.24 0.000043 0.15 355.63 513.70 0.03 Golf Course 21515 100-yr 64.00 2010.70 2013.27 2011.69 2013.28 0.000051 0.17 375.08 520.92 0.04 Golf Course 21515 500-yr 88.00 2010.70 2013.35 2011.93 2013.35 0.000071 0.21 416.43 535.73 0.04 Golf Course 21525 10-yr 30.00 2011.57 2013.12 2011.89 2013.12 0.000026 0.11 284.66 491.69 0.02 Golf Course 21525 50-yr 54.00 2011.57 2013.24 2012.02 2013.24 0.000048 0.16 342.53 513.79 0.03 Golf Course 21525 100-yr 64.00 2011.57 2013.28 2012.07 2013.28 0.000057 0.18 362.05 521.03 0.04 Golf Course 21525 500-yr 88.00 2011.57 2013.35 2012.17 2013.35 0.000079 0.22 403.47 535.81 0.04 Golf Course 21609 10-yr 30.00 2011.75 2013.12 2011.92 2013.12 0.000009 0.09 324.38 476.94 0.02 Golf Course 21609 50-yr 54.00 2011.75 2013.24 2011.98 2013.24 0.000021 0.15 361.23 483.02 0.02 Golf Course 21609 100-yr 64.00 2011.75 2013.28 2012.00 2013.28 0.000027 0.17 373.46 484.17 0.03 Golf Course 21609 500-yr 88.00 2011.75 2013.36 2012.04 2013.36 0.000041 0.22 399.08 485.74 0.03 Golf Course 21726 10-yr 30.00 2011.65 2013.13 2012.00 2013.13 0.000022 0.12 247.05 333.15 0.02 Golf Course 21726 50-yr 54.00 2011.65 2013.24 2012.11 2013.25 0.000048 0.19 284.55 356.18 0.04 Golf Course 21726 100-yr 64.00 2011.65 2013.28 2012.14 2013.28 0.000060 0.22 297.43 363.81 0.04 Golf Course 21726 500-yr 88.00 2011.65 2013.37 2012.21 2013.37 0.000087 0.27 324.98 373.78 0.05 Golf Course 21857 10-yr 30.00 2012.03 2013.13 2012.43 2013.13 0.000077 0.20 153.29 235.59 0.04 Golf Course 21857 50-yr 54.00 2012.03 2013.25 2012.49 2013.26 0.000146 0.30 182.77 244.41 0.06 Golf Course 21857 100-yr 64.00 2012.03 2013.30 2012.51 2013.30 0.000175 0.33 193.09 249.72 0.07 Golf Course 21857 500-yr 88.00 2012.03 2013.38 2012.56 2013.39 0.000239 0.41 215.04 255.72 0.08 Golf Course 21983 10-yr 30.00 2012.09 2013.15 2012.50 2013.15 0.000389 0.39 77.50 144.29 0.09 Golf Course 21983 50-yr 54.00 2012.09 2013.29 2012.61 2013.29 0.000711 0.54 99.36 174.89 0.13 Golf Course 21983 100-yr 64.00 2012.09 2013.33 2012.64 2013.34 0.000790 0.59 107.74 179.62 0.14 HEC-RAS Plan: ECM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 21983 500-yr 88.00 2012.09 2013.43 2012.71 2013.44 0.000922 0.70 125.58 183.42 0.15 Golf Course 22423 10-yr 30.00 2012.71 2013.36 2012.98 2013.37 0.000706 0.44 68.00 162.73 0.12 Golf Course 22423 50-yr 54.00 2012.71 2013.58 2013.05 2013.59 0.000663 0.50 107.44 201.64 0.12 Golf Course 22423 100-yr 64.00 2012.71 2013.64 2013.07 2013.65 0.000655 0.53 119.69 202.97 0.12 Golf Course 22423 500-yr 88.00 2012.71 2013.78 2013.12 2013.78 0.000681 0.60 147.59 218.74 0.13 Golf Course 22972 10-yr 30.00 2013.92 2014.45 2014.45 2014.57 0.060255 2.72 11.01 48.22 1.00 Golf Course 22972 50-yr 54.00 2013.92 2014.57 2014.57 2014.72 0.053115 3.18 16.96 53.43 1.00 Golf Course 22972 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.054246 3.41 18.77 54.23 1.02 Golf Course 22972 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050317 3.73 23.60 56.31 1.02 Golf Course 23005 10-yr 30.00 2014.38 2015.05 2014.75 2015.05 0.001933 0.69 43.31 112.20 0.20 Golf Course 23005 50-yr 54.00 2014.38 2015.22 2014.83 2015.23 0.002060 0.84 64.21 130.40 0.21 Golf Course 23005 100-yr 64.00 2014.38 2015.28 2014.85 2015.29 0.002060 0.89 72.20 135.50 0.21 Golf Course 23005 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002173 0.95 92.98 164.62 0.22 Golf Course 23050 10-yr 30.00 2014.61 2015.16 2014.87 2015.16 0.001938 0.64 46.54 134.52 0.19 Golf Course 23050 50-yr 54.00 2014.61 2015.33 2014.95 2015.34 0.001742 0.76 71.20 148.90 0.19 Golf Course 23050 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 23050 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001568 0.87 101.32 159.72 0.19 Golf Course 23090 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.005092 0.93 32.35 111.85 0.30 Golf Course 23090 50-yr 54.00 2014.93 2015.60 2015.34 2015.61 0.004889 1.03 52.56 151.12 0.31 Golf Course 23090 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 23090 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 23446 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012459 1.10 27.17 141.49 0.44 Golf Course 23446 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012670 1.24 43.59 193.33 0.46 Golf Course 23446 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 23446 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 23887 10-yr 30.00 2022.25 2022.83 2022.66 2022.84 0.005714 0.89 33.70 135.04 0.31 Golf Course 23887 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005672 1.06 51.18 158.01 0.33 Golf Course 23887 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 23887 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 24430 10-yr 30.00 2028.58 2029.25 2029.25 2029.46 0.048764 3.65 8.29 21.75 1.00 Golf Course 24430 50-yr 54.00 2028.58 2029.47 2029.47 2029.73 0.037372 4.21 13.58 28.66 0.94 Golf Course 24430 100-yr 64.00 2028.58 2029.56 2029.56 2029.82 0.031201 4.22 16.81 37.07 0.88 Golf Course 24430 500-yr 88.00 2028.58 2029.72 2029.72 2029.99 0.026137 4.41 23.23 42.98 0.83 HEC-RAS Plan: ECM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course 20779 Q100 - base 2008.05 2008.05 1327.67 64.00 934.91 2798.66 Golf Course 20779 Q100 - floodway 2009.05 1.00 2009.05 1178.72 64.00 934.91 934.91 2798.66 2278.72 Golf Course 21013 Q100 - base 2008.05 2008.07 147.76 52.43 11.57 508.09 1602.56 Golf Course 21013 Q100 - floodway 2009.05 1.00 2009.05 173.18 52.98 11.02 1472.43 508.09 1602.56 1725.00 Golf Course 21128 Q100 - base 2008.53 2008.53 189.79 64.00 409.35 1512.91 Golf Course 21128 Q100 - floodway 2009.05 0.52 2009.11 25.00 64.00 1045.00 409.35 1512.91 1070.00 Golf Course 21229 Q100 - base 2008.86 2008.87 305.93 64.00 417.95 1452.44 Golf Course 21229 Q100 - floodway 2009.59 0.72 2009.62 35.00 64.00 985.00 417.95 1452.44 1020.00 Golf Course 21385 Q100 - base 2009.12 2009.12 285.94 64.00 431.52 1001.23 Golf Course 21385 Q100 - floodway 2010.03 0.91 2010.06 30.00 64.00 785.00 431.52 1001.23 815.00 Golf Course 21409 Q100 - base 2009.17 2009.17 223.27 64.00 426.69 980.16 Golf Course 21409 Q100 - floodway 2010.12 0.95 2010.16 25.00 64.00 728.00 426.69 980.16 753.00 Golf Course 21431 Q100 - base 2009.23 2009.24 219.82 64.00 440.00 961.58 Golf Course 21431 Q100 - floodway 2010.23 1.00 2010.26 25.00 64.00 700.00 440.00 961.58 725.00 Golf Course 21445 Q100 - base 2009.31 2009.33 143.43 64.00 440.70 949.64 Golf Course 21445 Q100 - floodway 2010.29 0.98 2010.37 20.00 64.00 683.00 440.70 949.64 703.00 Golf Course 21456 Q100 - base 2013.13 2013.24 113.14 64.00 0.00 937.26 Golf Course 21456 Q100 - floodway 2013.79 0.66 2014.05 30.00 64.00 595.00 0.00 937.26 625.00 Golf Course 21481 Q100 - base 2013.27 2013.28 641.26 64.00 494.28 1387.02 Golf Course 21481 Q100 - floodway 2014.14 0.86 2014.14 45.00 64.00 922.50 494.28 1387.02 967.50 Golf Course 21485 Culvert Golf Course 21515 Q100 - base 2013.28 2013.28 521.17 64.00 0.00 751.00 Golf Course 21515 Q100 - floodway 2014.15 0.87 2014.16 29.00 64.00 415.00 0.00 751.00 444.00 Golf Course 21525 Q100 - base 2013.28 2013.28 521.29 64.00 0.00 751.00 Golf Course 21525 Q100 - floodway 2014.15 0.88 2014.17 29.00 64.00 421.50 0.00 751.00 450.50 Golf Course 21609 Q100 - base 2013.28 2013.28 316.56 64.00 0.00 522.16 Golf Course 21609 Q100 - floodway 2014.19 0.91 2014.20 44.00 64.00 278.00 0.00 522.16 322.00 Golf Course 21726 Q100 - base 2013.29 2013.29 329.55 64.00 0.00 402.00 Golf Course 21726 Q100 - floodway 2014.21 0.92 2014.21 44.00 64.00 194.00 0.00 402.00 238.00 Golf Course 21857 Q100 - base 2013.30 2013.30 249.75 64.00 0.00 319.28 Golf Course 21857 Q100 - floodway 2014.24 0.94 2014.24 43.00 64.00 132.50 0.00 319.28 175.50 Golf Course 21983 Q100 - base 2013.33 2013.34 179.68 64.00 0.00 248.45 Golf Course 21983 Q100 - floodway 2014.27 0.94 2014.28 43.00 64.00 105.50 0.00 248.45 148.50 Golf Course 22423 Q100 - base 2013.64 2013.65 202.98 64.00 843.00 1600.75 Golf Course 22423 Q100 - floodway 2014.45 0.81 2014.47 40.00 64.00 1140.00 843.00 1600.75 1180.00 Golf Course 22972 Q100 - base 2014.61 2014.78 54.37 64.00 888.76 1267.01 Golf Course 22972 Q100 - floodway 2015.27 0.66 2015.70 14.13 64.00 1162.20 888.76 1267.01 1176.33 Golf Course 23005 Q100 - base 2015.28 2015.29 135.40 64.00 896.09 1271.17 Golf Course 23005 Q100 - floodway 2016.10 0.83 2016.14 27.34 64.00 1123.02 896.09 1271.17 1150.36 Golf Course 23050 Q100 - base 2015.39 2015.40 151.89 64.00 944.30 1324.65 Golf Course 23050 Q100 - floodway 2016.21 0.82 2016.27 22.35 64.00 1126.64 944.30 1324.65 1148.99 Golf Course 23090 Q100 - base 2015.65 2015.66 154.60 64.00 951.93 1347.53 Golf Course 23090 Q100 - floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 951.93 1347.53 1115.00 Golf Course 23446 Q100 - base 2018.10 2018.12 208.09 64.00 688.98 1310.47 Golf Course 23446 Q100 - floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 23887 Q100 - base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 23887 Q100 - floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 24430 Q100 - base 2029.56 2029.82 37.07 1.56 60.23 2.21 636.32 656.04 Golf Course 24430 Q100 - floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 636.32 656.04 656.04 HEC-RAS Plan: ECM River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 1.00 2004.70 2004.82 2004.82 2004.86 0.130185 1.43 0.70 14.35 1.14 trib -1303 Q50 2.00 2004.70 2004.87 2004.87 2004.90 0.068800 1.40 1.43 18.92 0.89 trib -1303 Q100 4.00 2004.70 2004.90 2004.90 2004.96 0.082803 1.91 2.09 19.79 1.04 trib -1303 Q500 7.00 2004.70 2005.00 2004.96 2005.04 0.029151 1.68 4.17 21.92 0.68 trib -1019 Q10 1.00 2007.91 2008.37 2008.27 2008.37 0.004322 0.44 2.28 48.46 0.24 trib -1019 Q50 2.00 2007.91 2008.42 2008.31 2008.42 0.005030 0.54 3.69 57.51 0.26 trib -1019 Q100 4.00 2007.91 2008.50 2008.36 2008.51 0.004824 0.63 6.37 70.20 0.27 trib -1019 Q500 7.00 2007.91 2008.55 2008.41 2008.56 0.006839 0.85 8.25 74.90 0.33 trib -880 Q10 1.00 2004.89 2008.37 2008.37 0.000000 0.00 743.71 360.32 0.00 trib -880 Q50 2.00 2004.89 2008.43 2008.43 0.000000 0.00 764.25 361.79 0.00 trib -880 Q100 4.00 2004.89 2008.51 2008.51 0.000000 0.01 793.97 364.02 0.00 trib -880 Q500 7.00 2004.89 2008.56 2008.56 0.000000 0.01 813.43 365.63 0.00 trib -466 Q10 1.00 2006.89 2008.37 2008.37 0.000000 0.00 434.11 387.02 0.00 trib -466 Q50 2.00 2006.89 2008.43 2008.43 0.000000 0.00 456.19 389.07 0.00 trib -466 Q100 4.00 2006.89 2008.51 2008.51 0.000000 0.01 488.37 395.18 0.00 trib -466 Q500 7.00 2006.89 2008.56 2008.56 0.000000 0.01 509.51 398.13 0.00 trib -89 Q10 1.00 2006.07 2008.37 2008.37 0.000000 0.00 470.50 340.26 0.00 trib -89 Q50 2.00 2006.07 2008.43 2008.43 0.000000 0.00 490.02 346.49 0.00 trib -89 Q100 4.00 2006.07 2008.51 2008.51 0.000000 0.01 519.18 369.61 0.00 trib -89 Q500 7.00 2006.07 2008.56 2008.56 0.000000 0.01 539.36 383.12 0.00 trib 1 Q10 1.00 1998.92 2008.37 1999.04 2008.37 0.000000 0.00 429.57 80.84 0.00 trib 1 Q50 2.00 1998.92 2008.43 1999.09 2008.43 0.000000 0.00 434.18 81.36 0.00 trib 1 Q100 4.00 1998.92 2008.51 1999.16 2008.51 0.000000 0.01 440.88 82.39 0.00 trib 1 Q500 7.00 1998.92 2008.56 1999.23 2008.56 0.000000 0.02 445.29 82.85 0.00 trib 149 Q10 10.00 1995.82 2008.37 1996.32 2008.37 0.000000 0.01 1710.40 172.13 0.00 trib 149 Q50 14.00 1995.82 2008.43 1996.38 2008.43 0.000000 0.01 1720.20 172.24 0.00 trib 149 Q100 16.00 1995.82 2008.51 1996.41 2008.51 0.000000 0.01 1734.31 172.40 0.00 trib 149 Q500 20.00 1995.82 2008.56 1996.46 2008.56 0.000000 0.01 1743.51 172.50 0.00 trib 343 Q10 10.00 1993.64 2008.37 1993.99 2008.37 0.000000 0.00 2857.81 260.89 0.00 trib 343 Q50 14.00 1993.64 2008.43 1994.05 2008.43 0.000000 0.00 2872.66 261.02 0.00 trib 343 Q100 16.00 1993.64 2008.51 1994.07 2008.51 0.000000 0.01 2894.05 261.22 0.00 trib 343 Q500 20.00 1993.64 2008.56 1994.11 2008.56 0.000000 0.01 2907.99 261.35 0.00 trib 383 Q10 10.00 1994.23 2008.37 1994.67 2008.37 0.000000 0.00 2729.84 244.97 0.00 trib 383 Q50 14.00 1994.23 2008.43 1994.71 2008.43 0.000000 0.01 2743.79 245.28 0.00 trib 383 Q100 16.00 1994.23 2008.51 1994.73 2008.51 0.000000 0.01 2763.90 245.71 0.00 trib 383 Q500 20.00 1994.23 2008.56 1994.75 2008.56 0.000000 0.01 2777.01 245.99 0.00 trib 472 Q10 10.00 2005.65 2008.37 1999.14 2008.37 0.000000 0.00 1026.03 183.04 0.00 trib 472 Q50 14.00 2005.65 2008.43 1999.19 2008.43 0.000000 0.01 1036.45 183.31 0.00 trib 472 Q100 16.00 2005.65 2008.51 1999.22 2008.51 0.000000 0.01 1051.48 183.70 0.00 trib 472 Q500 20.00 2005.65 2008.56 1999.26 2008.56 0.000000 0.01 1061.29 183.95 0.00 trib 576 Q10 10.00 2008.78 2009.74 2009.74 2009.99 0.032554 4.02 2.48 4.97 1.00 trib 576 Q50 14.00 2008.78 2009.89 2009.89 2010.17 0.030449 4.27 3.28 5.70 0.99 trib 576 Q100 16.00 2008.78 2009.95 2009.95 2010.25 0.030780 4.43 3.61 5.98 1.01 trib 576 Q500 20.00 2008.78 2010.20 2010.20 2010.37 0.028407 3.36 6.36 21.88 0.93 trib 651 Q10 10.00 2009.50 2010.97 2010.45 2011.02 0.007232 1.65 6.05 55.46 0.46 trib 651 Q50 14.00 2009.50 2011.08 2010.60 2011.13 0.006740 1.82 7.70 59.63 0.46 trib 651 Q100 16.00 2009.50 2011.13 2010.67 2011.18 0.006429 1.87 8.54 63.89 0.46 trib 651 Q500 20.00 2009.50 2011.21 2010.78 2011.28 0.006391 2.02 9.91 75.90 0.47 trib 918 Q10 10.00 2009.10 2011.35 2009.95 2011.36 0.000523 0.96 10.46 9.36 0.14 trib 918 Q50 14.00 2009.10 2011.55 2010.09 2011.57 0.000716 1.17 11.95 29.34 0.16 trib 918 Q100 16.00 2009.10 2011.63 2010.17 2011.66 0.000811 1.27 12.60 43.37 0.18 trib 918 Q500 20.00 2009.10 2011.79 2010.29 2011.82 0.000984 1.45 13.82 61.75 0.19 trib 1472 Q10 10.00 2011.44 2012.38 2012.38 2012.67 0.032363 4.35 2.30 3.82 0.99 trib 1472 Q50 14.00 2011.44 2012.53 2012.53 2012.89 0.032599 4.78 2.93 4.19 1.01 trib 1472 Q100 16.00 2011.44 2012.72 2012.61 2013.00 0.021875 4.28 3.74 4.62 0.84 trib 1472 Q500 20.00 2011.44 2013.01 2012.75 2013.24 0.013910 3.84 5.21 5.32 0.68 trib 1510 Q10 10.00 2011.15 2012.95 2012.17 2013.00 0.002806 1.77 5.64 5.39 0.31 trib 1510 Q50 14.00 2011.15 2013.19 2012.35 2013.25 0.003077 1.99 7.02 5.99 0.32 trib 1510 Q100 16.00 2011.15 2013.26 2012.43 2013.33 0.003434 2.15 7.45 6.17 0.34 trib 1510 Q500 20.00 2011.15 2013.44 2012.58 2013.53 0.003647 2.32 8.61 6.62 0.36 trib 1520 Culvert trib 1528 Q10 10.00 2010.84 2013.36 2011.82 2013.38 0.000963 1.00 9.97 6.88 0.15 HEC-RAS Plan: ECM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2010.84 2013.99 2012.00 2014.00 0.000673 0.95 14.72 8.40 0.13 trib 1528 Q100 16.00 2010.84 2014.30 2012.07 2014.32 0.000575 0.91 17.53 9.52 0.12 trib 1528 Q500 20.00 2010.84 2014.58 2012.23 2014.59 0.000719 0.95 23.45 47.67 0.13 trib 1557 Q10 10.00 2011.79 2013.39 2012.66 2013.44 0.003817 1.69 5.92 5.64 0.29 trib 1557 Q50 14.00 2011.79 2014.00 2012.81 2014.04 0.001935 1.43 9.76 6.94 0.21 trib 1557 Q100 16.00 2011.79 2014.32 2012.88 2014.35 0.001434 1.33 12.05 7.61 0.19 trib 1557 Q500 20.00 2011.79 2014.59 2013.01 2014.62 0.001439 1.41 14.22 8.20 0.19 trib 1963 Q10 10.00 2018.61 2019.48 2019.48 2019.66 0.051975 3.44 2.91 7.79 0.99 trib 1963 Q50 14.00 2018.61 2019.59 2019.59 2019.80 0.045074 3.61 3.92 11.07 0.95 trib 1963 Q100 16.00 2018.61 2019.66 2019.66 2019.85 0.038218 3.52 4.80 15.48 0.89 trib 1963 Q500 20.00 2018.61 2019.75 2019.75 2019.93 0.033517 3.48 6.39 18.55 0.84 trib 1989 Q10 10.00 2017.77 2019.85 2018.80 2019.89 0.002658 1.50 6.69 17.19 0.24 trib 1989 Q50 14.00 2017.77 2020.01 2018.98 2020.06 0.003491 1.86 7.54 40.62 0.28 trib 1989 Q100 16.00 2017.77 2020.06 2019.06 2020.12 0.004030 2.04 7.83 48.44 0.30 trib 1989 Q500 20.00 2017.77 2020.14 2019.22 2020.23 0.005238 2.42 8.27 60.64 0.35 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.19 2019.81 2020.30 0.009432 2.61 3.83 8.68 0.47 trib 2080 Q50 14.00 2018.73 2020.48 2019.96 2020.60 0.007671 2.81 4.99 12.81 0.44 trib 2080 Q100 16.00 2018.73 2020.61 2020.02 2020.74 0.007173 2.90 5.51 14.87 0.44 trib 2080 Q500 20.00 2018.73 2020.86 2020.15 2021.01 0.006452 3.07 6.51 18.47 0.42 trib 2100 Q10 12.00 2018.27 2020.39 2019.40 2020.41 0.002032 1.15 10.46 12.11 0.22 trib 2100 Q50 24.00 2018.27 2020.70 2019.86 2020.74 0.003396 1.65 14.58 14.51 0.29 trib 2100 Q100 30.00 2018.27 2020.83 2020.00 2020.88 0.003580 1.82 16.55 15.31 0.30 trib 2100 Q500 46.00 2018.27 2021.08 2020.26 2021.16 0.004409 2.26 20.54 16.79 0.35 trib 2110 Q10 12.00 2018.27 2020.42 2019.40 2020.43 0.001881 1.11 10.78 12.31 0.21 trib 2110 Q50 24.00 2018.27 2020.74 2019.87 2020.78 0.002981 1.58 15.21 14.78 0.27 trib 2110 Q100 30.00 2018.27 2020.88 2020.00 2020.92 0.003147 1.74 17.27 15.59 0.29 trib 2110 Q500 46.00 2018.27 2021.14 2020.26 2021.21 0.003840 2.17 21.53 17.14 0.32 trib 2120 Q10 12.00 2018.27 2020.44 2019.40 2020.45 0.001769 1.09 11.03 12.47 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.81 0.002698 1.53 15.70 14.97 0.26 trib 2120 Q100 30.00 2018.27 2020.91 2020.00 2020.96 0.002861 1.69 17.82 15.80 0.27 trib 2120 Q500 46.00 2018.27 2021.18 2020.26 2021.25 0.003471 2.10 22.30 17.41 0.31 trib 2651 Q10 12.00 2021.38 2022.48 2022.22 2022.62 0.016295 2.96 4.05 5.21 0.59 trib 2651 Q50 24.00 2021.38 2023.16 2022.58 2023.30 0.009750 3.00 8.00 6.47 0.48 trib 2651 Q100 30.00 2021.38 2023.40 2022.73 2023.55 0.009769 3.10 9.67 7.51 0.48 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008805 3.30 14.05 10.00 0.47 trib 3126 Q10 12.00 2023.82 2025.45 2024.69 2025.49 0.003114 1.53 7.84 7.78 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003750 1.97 12.18 9.47 0.31 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.25 0.003704 2.08 14.43 10.23 0.31 trib 3126 Q500 46.00 2023.82 2026.65 2025.48 2026.74 0.003902 2.35 19.60 12.06 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003060 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: ECM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031974 4.34 5.07 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.006997 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: ECM FW River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Q100 base 2008.05 2008.05 103.69 0.01 3.90 0.09 70.92 163.31 trib -1303 Q100 floodway 2009.05 1.00 2009.05 31.32 4.00 131.99 70.92 163.31 163.31 trib -1019 Q100 base 2008.36 2008.41 21.08 4.00 152.95 253.19 trib -1019 Q100 floodway 2009.05 0.69 2009.05 21.09 4.00 173.33 152.95 253.19 194.42 trib -880 Q100 base 2008.42 2008.42 361.60 0.08 3.92 0.01 62.73 380.37 trib -880 Q100 floodway 2009.05 0.63 2009.05 40.00 4.00 310.00 62.73 380.37 350.00 trib -466 Q100 base 2008.42 2008.42 388.60 4.00 0.00 129.52 566.57 trib -466 Q100 floodway 2009.05 0.64 2009.05 45.57 4.00 521.00 129.52 566.57 566.57 trib -89 Q100 base 2008.42 2008.42 345.54 4.00 144.89 581.16 trib -89 Q100 floodway 2009.05 0.64 2009.05 39.70 4.00 510.00 144.89 581.16 549.70 trib 1 Q100 base 2009.70 2009.70 102.16 4.00 461.25 568.10 trib 1 Q100 floodway 2010.70 1.00 2010.70 116.77 0.00 4.00 461.25 568.10 trib 149 Q100 base 2009.70 2009.70 176.16 16.00 421.08 606.95 trib 149 Q100 floodway 2010.70 1.00 2010.70 179.75 16.00 421.08 606.95 trib 343 Q100 base 2009.70 2009.70 266.57 16.00 410.55 678.07 trib 343 Q100 floodway 2010.70 1.00 2010.70 271.14 0.00 16.00 0.00 410.55 678.07 trib 383 Q100 base 2009.70 2009.70 279.97 16.00 0.00 397.28 677.14 trib 383 Q100 floodway 2010.70 1.00 2010.70 282.66 16.00 0.00 397.28 677.14 trib 472 Q100 base 2009.70 2009.70 193.16 0.12 15.88 340.55 365.05 trib 472 Q100 floodway 2010.70 1.00 2010.70 8.82 16.00 347.00 340.55 365.05 355.82 trib 576 Q100 base 2009.95 2010.25 5.98 16.00 361.81 384.61 trib 576 Q100 floodway 2010.67 0.73 2010.75 5.41 16.00 368.20 361.81 384.61 373.61 trib 651 Q100 base 2011.13 2011.18 16.46 16.00 360.31 384.41 trib 651 Q100 floodway 2011.07 -0.06 2011.14 15.66 16.00 367.72 360.31 384.41 384.41 trib 918 Q100 base 2011.63 2011.66 7.79 16.00 466.95 478.43 trib 918 Q100 floodway 2011.63 0.00 2011.66 7.59 16.00 468.53 466.95 478.43 478.43 trib 1472 Q100 base 2012.72 2013.00 4.62 16.00 706.41 714.93 trib 1472 Q100 floodway 2012.71 -0.01 2013.00 4.61 16.00 708.23 706.41 714.93 713.11 trib 1510 Q100 base 2013.26 2013.33 6.17 16.00 711.73 722.04 trib 1510 Q100 floodway 2013.26 0.00 2013.33 6.16 16.00 714.06 711.73 722.04 720.22 trib 1520 Culvert trib 1528 Q100 base 2014.30 2014.32 9.52 16.00 727.15 744.68 trib 1528 Q100 floodway 2014.31 0.00 2014.32 9.50 16.00 727.56 727.15 744.68 737.06 trib 1557 Q100 base 2014.32 2014.35 7.61 16.00 726.74 740.03 trib 1557 Q100 floodway 2014.32 0.00 2014.35 7.61 16.00 730.81 726.74 740.03 738.42 trib 1963 Q100 base 2019.66 2019.85 15.48 15.72 0.28 739.45 750.61 trib 1963 Q100 floodway 2019.63 -0.03 2019.86 8.89 16.00 741.45 739.45 750.61 750.61 trib 1989 Q100 base 2020.06 2020.12 5.50 16.00 762.80 771.50 trib 1989 Q100 floodway 2020.08 0.02 2020.15 5.50 16.00 762.80 762.80 771.50 771.50 trib 2040 Culvert trib 2080 Q100 base 2020.61 2020.74 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.61 0.00 2020.74 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.83 2020.88 15.31 0.01 29.99 44.23 60.09 trib 2100 Q100 floodway 2020.83 0.00 2020.88 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.88 2020.92 15.59 0.02 29.98 44.23 60.09 trib 2110 Q100 floodway 2020.88 0.00 2020.93 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.91 2020.96 15.80 0.03 29.97 44.23 60.09 trib 2120 Q100 floodway 2020.92 0.00 2020.96 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.40 2023.55 7.51 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.40 0.01 2023.55 7.50 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.25 10.23 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.18 0.00 2026.25 10.22 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.16 9.22 30.00 253.91 251.87 265.32 263.13 HEC-RAS Plan: ECM FW River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 HEC-RAS Plan: wo DS lev (ECM) River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib -1303 Q10 10.00 2004.70 2007.19 2005.00 2007.19 0.000006 0.13 97.62 92.00 0.02 trib -1303 Q50 14.00 2004.70 2007.80 2005.05 2007.80 0.000004 0.12 156.26 99.90 0.01 trib -1303 Q100 16.00 2004.70 2008.05 2005.07 2008.05 0.000003 0.12 181.64 103.69 0.01 trib -1303 Q500 20.00 2004.70 2008.64 2005.11 2008.64 0.000002 0.11 245.69 113.41 0.01 trib -1019 Q10 10.00 2008.18 2008.47 2008.47 2008.54 0.040241 2.34 5.15 65.40 0.83 trib -1019 Q50 14.00 2008.18 2008.51 2008.51 2008.59 0.039441 2.57 6.69 70.95 0.84 trib -1019 Q100 16.00 2008.18 2008.52 2008.52 2008.62 0.045491 2.81 7.00 71.61 0.91 trib -1019 Q500 20.00 2008.18 2008.64 2008.56 2008.65 0.003347 0.96 26.15 93.34 0.26 trib -880 Q10 10.00 2007.31 2008.55 2005.25 2008.55 0.000000 0.01 808.03 365.13 0.00 trib -880 Q50 14.00 2007.31 2008.60 2005.30 2008.60 0.000000 0.01 828.10 367.06 0.00 trib -880 Q100 16.00 2007.31 2008.63 2005.32 2008.63 0.000000 0.01 837.43 367.97 0.00 trib -880 Q500 20.00 2007.31 2008.65 2005.36 2008.65 0.000000 0.01 845.25 368.73 0.00 trib -466 Q10 10.00 2006.96 2008.55 2007.05 2008.55 0.000000 0.02 503.64 396.88 0.00 trib -466 Q50 14.00 2006.96 2008.60 2007.08 2008.60 0.000001 0.03 525.58 402.65 0.00 trib -466 Q100 16.00 2006.96 2008.63 2007.08 2008.63 0.000001 0.03 535.81 403.22 0.00 trib -466 Q500 20.00 2006.96 2008.65 2007.08 2008.65 0.000001 0.04 544.38 403.56 0.01 trib -89 Q10 10.00 2007.09 2008.55 2006.35 2008.55 0.000000 0.02 533.76 381.64 0.00 trib -89 Q50 14.00 2007.09 2008.60 2006.40 2008.60 0.000000 0.02 554.94 387.29 0.00 trib -89 Q100 16.00 2007.09 2008.63 2006.43 2008.63 0.000001 0.03 564.78 388.12 0.00 trib -89 Q500 20.00 2007.09 2008.65 2006.47 2008.65 0.000001 0.03 573.08 388.82 0.00 trib 1 Q10 10.00 2008.30 2008.57 2008.57 2008.61 0.049508 2.23 7.05 92.01 0.89 trib 1 Q50 14.00 2008.30 2008.60 2008.60 2008.64 0.049091 2.40 9.47 106.80 0.90 trib 1 Q100 16.00 2008.30 2008.61 2008.61 2008.65 0.045516 2.40 10.81 112.72 0.88 trib 1 Q500 20.00 2008.30 2008.63 2008.63 2008.67 0.043045 2.45 13.02 120.22 0.86 trib 149 Q10 10.00 2007.52 2008.62 2006.65 2008.62 0.000000 0.01 417.66 269.94 0.00 trib 149 Q50 14.00 2007.52 2008.65 2006.70 2008.65 0.000001 0.02 425.25 270.23 0.00 trib 149 Q100 16.00 2007.52 2008.66 2006.72 2008.66 0.000001 0.02 428.28 270.35 0.00 trib 149 Q500 20.00 2007.52 2008.68 2006.80 2008.68 0.000001 0.03 433.86 270.56 0.01 trib 343 Q10 10.00 2008.18 2008.62 2007.06 2008.62 0.000001 0.02 272.09 279.48 0.01 trib 343 Q50 14.00 2008.18 2008.65 2007.13 2008.65 0.000003 0.03 279.96 281.03 0.01 trib 343 Q100 16.00 2008.18 2008.66 2007.16 2008.66 0.000003 0.03 283.12 281.64 0.01 trib 343 Q500 20.00 2008.18 2008.68 2007.19 2008.68 0.000005 0.04 288.94 282.74 0.01 trib 383 Q10 10.00 2008.42 2008.62 2007.33 2008.62 0.000003 0.01 193.97 213.44 0.01 trib 383 Q50 14.00 2008.42 2008.65 2007.36 2008.65 0.000006 0.02 199.96 214.83 0.01 trib 383 Q100 16.00 2008.42 2008.66 2007.37 2008.66 0.000007 0.03 202.37 215.39 0.01 trib 383 Q500 20.00 2008.42 2008.68 2007.40 2008.68 0.000011 0.03 206.88 216.43 0.01 trib 472 Q10 10.00 2008.50 2008.62 2007.46 2008.62 0.000008 0.01 146.81 211.42 0.01 trib 472 Q50 14.00 2008.50 2008.65 2007.50 2008.65 0.000014 0.02 152.88 213.77 0.01 trib 472 Q100 16.00 2008.50 2008.66 2007.52 2008.66 0.000017 0.03 155.34 214.71 0.01 trib 472 Q500 20.00 2008.50 2008.68 2007.55 2008.68 0.000025 0.04 159.92 216.36 0.02 trib 576 Q10 10.00 2008.57 2008.62 2007.79 2008.62 0.000034 0.02 83.84 150.04 0.02 trib 576 Q50 14.00 2008.57 2008.65 2007.83 2008.65 0.000057 0.03 88.33 153.40 0.02 trib 576 Q100 16.00 2008.57 2008.66 2007.84 2008.66 0.000069 0.03 90.17 154.76 0.03 trib 576 Q500 20.00 2008.57 2008.68 2007.88 2008.68 0.000096 0.05 93.67 157.85 0.03 trib 651 Q10 10.00 2011.11 2011.18 2011.18 2011.22 0.097087 0.90 6.25 88.01 0.91 trib 651 Q50 14.00 2011.11 2011.20 2011.20 2011.24 0.084641 1.01 8.16 94.94 0.89 trib 651 Q100 16.00 2011.11 2011.21 2011.21 2011.26 0.076146 1.09 9.16 96.15 0.87 trib 651 Q500 20.00 2011.11 2011.22 2011.22 2011.28 0.078399 1.27 10.44 97.72 0.92 trib 918 Q10 10.00 2009.84 2011.22 2010.09 2011.22 0.000004 0.07 191.15 223.46 0.01 trib 918 Q50 14.00 2009.84 2011.25 2010.13 2011.25 0.000006 0.09 197.86 227.01 0.01 trib 918 Q100 16.00 2009.84 2011.27 2010.15 2011.27 0.000008 0.10 200.97 230.82 0.02 trib 918 Q500 20.00 2009.84 2011.30 2010.16 2011.30 0.000012 0.13 207.29 233.18 0.02 trib 1472 Q10 10.00 2013.44 2013.73 2013.73 2013.78 0.038164 2.06 6.11 55.33 0.79 trib 1472 Q50 14.00 2013.44 2013.76 2013.76 2013.82 0.041668 2.34 7.74 62.95 0.84 trib 1472 Q100 16.00 2013.44 2013.77 2013.77 2013.84 0.039601 2.38 8.80 67.96 0.83 trib 1472 Q500 20.00 2013.44 2013.80 2013.80 2013.87 0.039038 2.52 10.69 77.87 0.84 trib 1510 Q10 10.00 2013.81 2014.06 2013.90 2014.06 0.002778 0.39 19.89 120.64 0.19 trib 1510 Q50 14.00 2013.81 2014.10 2013.94 2014.11 0.002801 0.43 25.50 126.84 0.20 trib 1510 Q100 16.00 2013.81 2014.12 2013.95 2014.13 0.002776 0.45 27.85 129.47 0.20 trib 1510 Q500 20.00 2013.81 2014.15 2013.97 2014.16 0.002826 0.50 31.99 137.40 0.21 trib 1520 Culvert trib 1528 Q10 10.00 2013.78 2014.06 2013.93 2014.06 0.005201 0.69 15.56 100.95 0.28 HEC-RAS Plan: wo DS lev (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 1528 Q50 14.00 2013.78 2014.10 2013.95 2014.11 0.004983 0.76 20.57 116.23 0.29 trib 1528 Q100 16.00 2013.78 2014.12 2013.97 2014.13 0.005184 0.82 22.52 118.90 0.30 trib 1528 Q500 20.00 2013.78 2014.16 2013.99 2014.17 0.004648 0.85 26.76 122.07 0.29 trib 1557 Q10 10.00 2014.07 2014.21 2014.05 2014.21 0.004529 0.32 16.54 122.35 0.22 trib 1557 Q50 14.00 2014.07 2014.25 2014.10 2014.26 0.004585 0.37 22.60 137.57 0.23 trib 1557 Q100 16.00 2014.07 2014.27 2014.12 2014.27 0.004521 0.42 24.77 140.38 0.24 trib 1557 Q500 20.00 2014.07 2014.29 2014.14 2014.30 0.004640 0.50 28.53 145.80 0.25 trib 1963 Q10 10.00 2015.81 2016.24 2016.10 2016.26 0.007062 1.07 10.25 52.15 0.36 trib 1963 Q50 14.00 2015.81 2016.29 2016.15 2016.31 0.007097 1.20 13.09 56.60 0.37 trib 1963 Q100 16.00 2015.81 2016.31 2016.17 2016.33 0.007323 1.27 14.25 57.48 0.38 trib 1963 Q500 20.00 2015.81 2016.35 2016.20 2016.38 0.007236 1.36 16.68 58.71 0.38 trib 1989 Q10 10.00 2017.77 2018.80 2018.80 2019.13 0.055202 4.65 2.15 3.23 1.00 trib 1989 Q50 14.00 2017.77 2018.98 2018.98 2019.38 0.054111 5.05 2.77 3.54 1.01 trib 1989 Q100 16.00 2017.77 2019.07 2019.07 2019.48 0.052722 5.18 3.09 3.69 1.00 trib 1989 Q500 20.00 2017.77 2019.22 2019.22 2019.68 0.051664 5.45 3.67 3.94 0.99 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.21 2019.81 2020.31 0.008855 2.56 3.90 8.86 0.46 trib 2080 Q50 14.00 2018.73 2020.50 2019.96 2020.62 0.007337 2.77 5.05 13.08 0.43 trib 2080 Q100 16.00 2018.73 2020.63 2020.02 2020.76 0.006894 2.87 5.58 15.13 0.43 trib 2080 Q500 20.00 2018.73 2020.87 2020.15 2021.02 0.006295 3.05 6.55 18.57 0.42 trib 2100 Q10 12.00 2018.27 2020.40 2019.40 2020.42 0.001965 1.13 10.60 12.20 0.21 trib 2100 Q50 24.00 2018.27 2020.71 2019.86 2020.75 0.003293 1.63 14.74 14.59 0.29 trib 2100 Q100 30.00 2018.27 2020.84 2020.00 2020.89 0.003479 1.80 16.71 15.37 0.30 trib 2100 Q500 46.00 2018.27 2021.09 2020.26 2021.17 0.004326 2.25 20.67 16.84 0.34 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.44 0.001824 1.10 10.90 12.39 0.21 trib 2110 Q50 24.00 2018.27 2020.75 2019.87 2020.79 0.002895 1.56 15.35 14.83 0.27 trib 2110 Q100 30.00 2018.27 2020.89 2020.00 2020.93 0.003072 1.73 17.40 15.64 0.28 trib 2110 Q500 46.00 2018.27 2021.15 2020.26 2021.22 0.003780 2.15 21.65 17.18 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.46 0.001720 1.08 11.15 12.55 0.20 trib 2120 Q50 24.00 2018.27 2020.78 2019.87 2020.82 0.002629 1.52 15.83 15.03 0.26 trib 2120 Q100 30.00 2018.27 2020.92 2020.00 2020.96 0.002801 1.68 17.94 15.84 0.27 trib 2120 Q500 46.00 2018.27 2021.19 2020.26 2021.26 0.003424 2.09 22.40 17.44 0.31 trib 2651 Q10 12.00 2021.38 2022.47 2022.22 2022.61 0.017129 3.01 3.98 5.18 0.61 trib 2651 Q50 24.00 2021.38 2023.15 2022.58 2023.29 0.009975 3.03 7.93 6.46 0.48 trib 2651 Q100 30.00 2021.38 2023.39 2022.73 2023.54 0.009967 3.13 9.59 7.45 0.49 trib 2651 Q500 46.00 2021.38 2023.89 2023.07 2024.06 0.008905 3.31 13.99 9.98 0.47 trib 3126 Q10 12.00 2023.82 2025.46 2024.69 2025.50 0.003063 1.52 7.89 7.80 0.27 trib 3126 Q50 24.00 2023.82 2025.96 2025.03 2026.02 0.003719 1.96 12.22 9.48 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003685 2.07 14.46 10.24 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.74 0.003886 2.34 19.63 12.07 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.90 0.003059 1.91 12.55 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003256 2.32 19.79 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011028 2.99 8.02 7.54 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009167 3.33 13.83 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 HEC-RAS Plan: wo DS lev (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.12 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2047.39 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2047.50 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2047.73 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.43 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031946 4.33 5.08 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2051.88 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.21 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.007005 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: wo DS fw (ECM) River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib -1303 Base 2008.05 2008.05 103.69 5.34 9.25 1.41 134.37 158.76 trib -1303 Floodway 2009.05 1.00 2009.05 31.32 0.63 13.98 1.39 131.99 134.37 158.76 163.31 trib -1019 Base 2008.52 2008.62 38.92 3.31 11.46 1.24 178.65 192.41 trib -1019 Floodway 2009.04 0.53 2009.06 21.09 3.29 11.59 1.12 173.33 178.65 192.41 194.42 trib -880 Base 2008.63 2008.63 367.97 14.91 0.33 0.76 316.80 341.31 trib -880 Floodway 2009.07 0.45 2009.07 40.00 2.68 9.02 4.30 310.00 316.80 341.31 350.00 trib -466 Base 2008.63 2008.63 403.22 15.45 0.52 0.03 552.13 565.20 trib -466 Floodway 2009.09 0.46 2009.09 45.57 9.60 6.11 0.28 521.00 552.13 565.20 566.57 trib -89 Base 2008.63 2008.63 388.12 15.26 0.71 0.03 523.44 545.76 trib -89 Floodway 2009.10 0.47 2009.10 39.70 6.49 8.94 0.57 510.00 523.44 545.76 549.70 trib 1 Base 2008.61 2008.65 112.72 11.69 4.27 0.05 423.34 431.01 trib 1 Floodway 2009.07 0.46 2009.13 15.00 16.00 307.00 423.34 431.01 322.00 trib 149 Base 2008.66 2008.66 270.35 15.86 0.14 0.00 322.78 330.58 trib 149 Floodway 2009.18 0.53 2009.19 15.00 9.49 6.51 315.58 322.78 330.58 330.58 trib 343 Base 2008.66 2008.66 281.64 15.83 0.12 0.05 326.83 335.39 trib 343 Floodway 2009.26 0.60 2009.28 15.00 5.98 10.02 320.39 326.83 335.39 335.39 trib 383 Base 2008.66 2008.66 215.39 15.97 0.03 0.00 321.06 327.35 trib 383 Floodway 2009.30 0.64 2009.32 15.00 10.48 5.52 312.35 321.06 327.35 327.35 trib 472 Base 2008.66 2008.66 214.71 15.97 0.03 0.00 246.06 255.85 trib 472 Floodway 2009.49 0.84 2009.51 15.00 6.05 9.95 240.85 246.06 255.85 255.85 trib 576 Base 2008.66 2008.66 154.76 15.99 0.01 0.00 247.56 254.23 trib 576 Floodway 2009.63 0.97 2009.65 15.00 9.60 6.40 239.23 247.56 254.23 254.23 trib 651 Base 2011.21 2011.26 96.15 15.71 0.27 0.02 331.92 337.62 trib 651 Floodway 2011.47 0.26 2011.63 15.00 16.00 243.59 331.92 337.62 258.59 trib 918 Base 2011.27 2011.27 230.82 7.90 1.56 6.54 290.48 301.36 trib 918 Floodway 2011.80 0.53 2011.80 15.00 2.00 12.93 1.06 288.00 290.48 301.36 303.00 trib 1472 Base 2013.77 2013.84 67.96 1.43 9.86 4.70 374.56 390.80 trib 1472 Floodway 2014.15 0.38 2014.31 15.00 16.00 355.00 374.56 390.80 370.00 trib 1510 Base 2014.12 2014.13 129.47 0.02 0.84 15.14 289.44 302.32 trib 1510 Floodway 2014.63 0.51 2014.66 15.00 16.00 355.00 289.44 302.32 370.00 trib 1520 Culvert trib 1528 Base 2014.12 2014.13 118.90 0.00 2.72 13.28 307.04 321.23 trib 1528 Floodway 2013.79 -0.33 4514.91 2.75 16.00 370.00 307.04 321.23 385.00 trib 1557 Base 2014.27 2014.27 140.38 0.00 0.43 15.57 307.11 317.99 trib 1557 Floodway 2014.32 0.05 2014.48 15.00 16.00 370.00 307.11 317.99 385.00 trib 1963 Base 2016.31 2016.33 57.48 2.12 13.79 0.09 243.25 273.87 trib 1963 Floodway 2016.45 0.14 2016.46 66.39 3.52 12.23 0.24 243.25 273.87 trib 1989 Base 2019.07 2019.48 3.69 16.00 762.80 771.50 trib 1989 Floodway 2019.07 0.00 2019.48 3.69 16.00 762.80 771.50 trib 2040 Culvert trib 2080 Base 2020.63 2020.76 4.00 16.00 39.42 68.83 trib 2080 Floodway 2020.63 0.00 2020.76 4.00 16.00 39.42 68.83 trib 2100 Base 2020.84 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2100 Floodway 2020.84 0.00 2020.89 15.37 0.01 29.99 44.23 60.09 trib 2110 Base 2020.89 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2110 Floodway 2020.89 0.00 2020.93 15.64 0.02 29.98 44.23 60.09 trib 2120 Base 2020.92 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2120 Floodway 2020.92 0.00 2020.96 15.84 0.04 29.96 44.23 60.09 trib 2651 Base 2023.39 2023.54 7.45 30.00 46.44 55.58 trib 2651 Floodway 2023.39 0.00 2023.54 7.45 30.00 46.44 55.58 trib 3126 Base 2026.19 2026.26 10.24 30.00 72.83 95.75 trib 3126 Floodway 2026.19 0.00 2026.26 10.24 30.00 72.83 95.75 trib 3617 Base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Floodway 2030.67 0.00 2031.13 5.92 30.00 139.17 162.30 trib 4127 Base 2035.09 2035.15 9.22 30.00 251.87 265.32 HEC-RAS Plan: wo DS fw (ECM) River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 4127 Floodway 2035.09 0.00 2035.15 9.22 30.00 251.87 265.32 trib 4623 Base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Floodway 2037.69 0.00 2037.84 8.14 30.00 314.09 329.75 trib 4665 Base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Floodway 2038.70 0.00 2039.53 2.50 30.00 340.25 349.22 trib 4685 Culvert trib 4704 Base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Floodway 2041.00 0.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4750 Base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Floodway 2041.03 0.00 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 5165 Base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Floodway 2043.40 0.00 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5676 Base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Floodway 2048.08 0.00 2048.13 19.14 28.00 183.69 226.54 trib 6117 Base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Floodway 2052.07 0.00 2052.35 6.77 28.00 211.57 230.44 trib 6154 Base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Floodway 2052.76 0.00 2052.83 16.44 28.00 211.25 246.77 trib 6200 Culvert trib 6239 Base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Floodway 2054.11 0.00 2054.13 18.59 28.00 221.30 259.22 trib 6274 Base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Floodway 2055.65 0.00 2055.95 10.56 28.00 210.49 231.21 trib 6553 Base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Floodway 2064.48 0.00 2064.68 10.59 28.00 197.65 240.39 trib 7086 Base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Floodway 2083.50 0.00 2083.96 3.69 18.00 150.93 158.25 trib 7121 Base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Floodway 2084.63 0.00 2085.08 3.10 18.00 118.04 121.88 trib 7130 Culvert trib 7143 Base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Floodway 2086.04 0.00 2086.16 3.79 18.00 111.14 115.72 trib 7169 Base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Floodway 2090.51 0.00 2091.06 2.65 18.00 114.91 118.45 trib 7175 Culvert trib 7186 Base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Floodway 2091.45 0.00 2091.64 2.88 18.00 119.10 122.49 trib 7220 Base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Floodway 2092.39 0.00 2092.72 7.10 0.01 17.99 130.02 136.02 APPENDIX E POST-PROJECT CONDITIONS HEC-RAS MODEL HEC-RAS Plan: PCM River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course -41 10-yr 30.00 2007.18 2008.00 2007.55 2008.04 0.000433 1.52 19.68 24.00 0.30 Golf Course -41 50-yr 54.00 2007.18 2009.00 2007.72 2009.02 0.000109 1.24 43.68 24.00 0.16 Golf Course -41 100-yr 64.00 2007.18 2009.49 2007.78 2009.51 0.000072 1.15 55.44 24.00 0.13 Golf Course -41 500-yr 88.00 2007.18 2010.05 2007.93 2010.08 0.000070 1.28 68.88 24.00 0.13 Golf Course -32 10-yr 30.00 2007.36 2008.01 2007.73 2008.07 0.000938 1.93 15.52 24.00 0.42 Golf Course -32 50-yr 54.00 2007.36 2009.00 2007.90 2009.03 0.000151 1.37 39.39 24.00 0.19 Golf Course -32 100-yr 64.00 2007.36 2009.49 2007.96 2009.52 0.000093 1.25 51.14 24.00 0.15 Golf Course -32 500-yr 88.00 2007.36 2010.05 2008.11 2010.08 0.000085 1.36 64.58 24.00 0.15 Golf Course 0 Culvert Golf Course 23 10-yr 30.00 2007.58 2008.16 2007.93 2008.22 0.009013 1.95 15.37 29.00 0.45 Golf Course 23 50-yr 54.00 2007.58 2009.02 2008.08 2009.05 0.001364 1.40 38.52 29.00 0.21 Golf Course 23 100-yr 64.00 2007.58 2009.51 2008.15 2009.53 0.000729 1.24 51.49 29.00 0.16 Golf Course 23 500-yr 88.00 2007.58 2010.07 2008.27 2010.10 0.000587 1.32 66.52 29.00 0.15 Golf Course 36 10-yr 30.00 2011.57 2011.99 2011.99 2012.13 0.056936 3.07 9.78 112.30 1.01 Golf Course 36 50-yr 54.00 2011.57 2012.14 2012.14 2012.33 0.049365 3.42 15.77 127.85 0.99 Golf Course 36 100-yr 64.00 2011.57 2012.20 2012.20 2012.39 0.046927 3.52 18.18 133.37 0.98 Golf Course 36 500-yr 88.00 2011.57 2012.30 2012.30 2012.53 0.046890 3.83 22.97 143.40 1.00 Golf Course 178 10-yr 30.00 2011.75 2012.35 2011.92 2012.36 0.000320 0.29 102.00 388.33 0.08 Golf Course 178 50-yr 54.00 2011.75 2012.56 2011.98 2012.56 0.000297 0.35 155.16 428.86 0.08 Golf Course 178 100-yr 64.00 2011.75 2012.63 2012.00 2012.63 0.000290 0.37 174.62 439.26 0.08 Golf Course 178 500-yr 88.00 2011.75 2012.78 2012.04 2012.78 0.000280 0.40 217.88 460.83 0.08 Golf Course 276 10-yr 30.00 2011.65 2012.41 2012.00 2012.41 0.001184 0.47 63.91 205.42 0.15 Golf Course 276 50-yr 54.00 2011.65 2012.60 2012.11 2012.61 0.000817 0.51 106.51 231.94 0.13 Golf Course 276 100-yr 64.00 2011.65 2012.67 2012.14 2012.67 0.000762 0.52 122.45 245.02 0.13 Golf Course 276 500-yr 88.00 2011.65 2012.82 2012.21 2012.82 0.000670 0.55 159.33 273.42 0.12 Golf Course 402 10-yr 30.00 2012.03 2012.63 2012.42 2012.63 0.002968 0.66 45.74 177.34 0.23 Golf Course 402 50-yr 54.00 2012.03 2012.77 2012.48 2012.77 0.002488 0.75 72.27 201.79 0.22 Golf Course 402 100-yr 64.00 2012.03 2012.82 2012.51 2012.83 0.002193 0.77 83.43 203.77 0.21 Golf Course 402 500-yr 88.00 2012.03 2012.95 2012.57 2012.96 0.001866 0.79 110.76 227.36 0.20 Golf Course 528 10-yr 30.00 2012.09 2012.89 2012.50 2012.90 0.001590 0.66 45.73 110.98 0.18 Golf Course 528 50-yr 54.00 2012.09 2013.04 2012.61 2013.06 0.002029 0.85 63.76 126.63 0.21 Golf Course 528 100-yr 64.00 2012.09 2013.09 2012.64 2013.10 0.002178 0.92 69.80 129.79 0.22 Golf Course 528 500-yr 88.00 2012.09 2013.21 2012.71 2013.23 0.002446 1.01 87.23 153.35 0.24 Golf Course 964 10-yr 30.00 2012.71 2013.36 2012.98 2013.36 0.000741 0.45 66.95 162.28 0.12 Golf Course 964 50-yr 54.00 2012.71 2013.56 2013.05 2013.56 0.000747 0.52 102.86 197.74 0.13 Golf Course 964 100-yr 64.00 2012.71 2013.62 2013.07 2013.63 0.000744 0.56 115.11 202.46 0.13 Golf Course 964 500-yr 88.00 2012.71 2013.76 2013.12 2013.76 0.000739 0.61 143.26 215.93 0.13 Golf Course 1404 10-yr 30.00 2013.92 2014.45 2014.45 2014.57 0.060255 2.72 11.01 48.22 1.00 Golf Course 1404 50-yr 54.00 2013.92 2014.57 2014.57 2014.72 0.053115 3.18 16.96 53.43 1.00 Golf Course 1404 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.054246 3.41 18.77 54.23 1.02 Golf Course 1404 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050317 3.73 23.60 56.31 1.02 Golf Course 1489 10-yr 30.00 2014.38 2015.05 2014.75 2015.05 0.001933 0.69 43.31 112.20 0.20 Golf Course 1489 50-yr 54.00 2014.38 2015.22 2014.83 2015.23 0.002060 0.84 64.21 130.40 0.21 Golf Course 1489 100-yr 64.00 2014.38 2015.28 2014.85 2015.29 0.002060 0.89 72.20 135.50 0.21 Golf Course 1489 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002173 0.95 92.98 164.62 0.22 Golf Course 1547 10-yr 30.00 2014.61 2015.16 2014.87 2015.16 0.001938 0.64 46.54 134.52 0.19 Golf Course 1547 50-yr 54.00 2014.61 2015.33 2014.95 2015.34 0.001742 0.76 71.20 148.90 0.19 Golf Course 1547 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 1547 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001568 0.87 101.32 159.72 0.19 Golf Course 1647 10-yr 30.00 2014.93 2015.45 2015.26 2015.46 0.005092 0.93 32.35 111.85 0.30 Golf Course 1647 50-yr 54.00 2014.93 2015.60 2015.34 2015.61 0.004889 1.03 52.56 151.12 0.31 Golf Course 1647 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 1647 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 1981 10-yr 30.00 2017.57 2017.97 2017.87 2017.99 0.012459 1.10 27.17 141.49 0.44 Golf Course 1981 50-yr 54.00 2017.57 2018.07 2017.95 2018.10 0.012670 1.24 43.59 193.33 0.46 Golf Course 1981 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 1981 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 2578 10-yr 30.00 2022.25 2022.83 2022.66 2022.84 0.005714 0.89 33.70 135.04 0.31 Golf Course 2578 50-yr 54.00 2022.25 2022.95 2022.74 2022.97 0.005672 1.06 51.18 158.01 0.33 Golf Course 2578 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 2578 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 2863 10-yr 30.00 2028.58 2029.26 2029.26 2029.46 0.050578 3.53 8.49 22.03 1.00 Golf Course 2863 50-yr 54.00 2028.58 2029.49 2029.49 2029.71 0.047430 3.77 14.32 32.12 1.00 Golf Course 2863 100-yr 64.00 2028.58 2029.56 2029.56 2029.79 0.047397 3.81 16.79 37.05 1.00 HEC-RAS Plan: PCM River: Chester Creek Reach: Golf Course (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course 2863 500-yr 88.00 2028.58 2029.68 2029.68 2029.94 0.046961 4.11 21.40 41.87 1.01 HEC-RAS Plan: PCM FW River: Chester Creek Reach: Golf Course Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) Golf Course -41 Base 2010.05 2010.06 24.00 64.00 0.00 24.00 Golf Course -41 Floodway 2011.05 1.00 2011.06 24.00 64.00 0.00 0.00 24.00 24.00 Golf Course -32 Base 2010.05 2010.07 24.00 64.00 0.00 24.00 Golf Course -32 Floodway 2011.05 1.00 2011.06 24.00 64.00 0.00 0.00 24.00 24.00 Golf Course 0 Culvert Golf Course 23 Base 2010.06 2010.08 26.70 64.00 0.00 751.00 Golf Course 23 Floodway 2011.06 1.00 2011.07 26.70 64.00 415.00 0.00 751.00 444.00 Golf Course 36 Base 2012.20 2012.39 44.98 64.00 0.00 751.00 Golf Course 36 Floodway 2012.24 0.04 2012.51 29.00 64.00 421.50 0.00 751.00 450.50 Golf Course 178 Base 2012.63 2012.63 283.32 64.00 0.00 522.16 Golf Course 178 Floodway 2013.09 0.46 2013.11 44.00 64.00 278.00 0.00 522.16 322.00 Golf Course 276 Base 2012.67 2012.67 240.64 64.00 0.00 402.00 Golf Course 276 Floodway 2013.20 0.53 2013.22 44.00 64.00 194.00 0.00 402.00 238.00 Golf Course 402 Base 2012.82 2012.83 203.77 64.00 0.00 319.28 Golf Course 402 Floodway 2013.39 0.57 2013.42 43.00 64.00 132.50 0.00 319.28 175.50 Golf Course 528 Base 2013.09 2013.10 129.79 64.00 0.00 248.45 Golf Course 528 Floodway 2013.59 0.50 2013.61 43.00 64.00 105.50 0.00 248.45 148.50 Golf Course 964 Base 2013.62 2013.63 202.46 64.00 843.00 1600.75 Golf Course 964 Floodway 2014.11 0.49 2014.13 43.00 64.00 1137.00 843.00 1600.75 1180.00 Golf Course 1404 Base 2014.60 2014.78 54.23 64.00 888.76 1267.01 Golf Course 1404 Floodway 2015.27 0.67 2015.70 14.13 64.00 1162.20 888.76 1267.01 1176.33 Golf Course 1489 Base 2015.28 2015.29 135.50 64.00 896.09 1271.17 Golf Course 1489 Floodway 2016.10 0.82 2016.14 27.34 64.00 1123.02 896.09 1271.17 1150.36 Golf Course 1547 Base 2015.39 2015.40 151.92 64.00 944.30 1324.65 Golf Course 1547 Floodway 2016.21 0.82 2016.27 22.35 64.00 1126.64 944.30 1324.65 1148.99 Golf Course 1647 Base 2015.65 2015.66 154.59 64.00 951.93 1347.53 Golf Course 1647 Floodway 2016.61 0.96 2016.71 20.00 64.00 1095.00 951.93 1347.53 1115.00 Golf Course 1981 Base 2018.10 2018.12 208.12 64.00 688.98 1310.47 Golf Course 1981 Floodway 2019.02 0.92 2019.14 20.00 64.00 1060.00 688.98 1310.47 1080.00 Golf Course 2578 Base 2022.99 2023.01 160.17 64.00 604.96 928.61 Golf Course 2578 Floodway 2023.79 0.80 2023.91 20.00 64.00 829.00 604.96 928.61 849.00 Golf Course 2863 Base 2029.56 2029.79 37.05 64.00 625.38 682.89 Golf Course 2863 Floodway 2029.72 0.16 2029.93 19.72 64.00 636.32 625.38 682.89 656.04 HEC-RAS Plan: Breach River: Chester Creek Reach: Golf Course Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Golf Course -41 100-yr 91.26 2007.18 2010.12 2007.94 2010.15 0.000070 1.29 70.56 24.00 0.13 Golf Course -41 500-yr 123.33 2007.18 2011.60 2008.12 2011.62 0.000037 1.16 106.08 24.00 0.10 Golf Course -32 100-yr 91.26 2007.36 2010.12 2008.12 2010.15 0.000084 1.38 66.26 24.00 0.15 Golf Course -32 500-yr 123.33 2007.36 2011.60 2008.29 2011.62 0.000042 1.21 101.77 24.00 0.10 Golf Course 0 Culvert Golf Course 23 100-yr 91.26 2007.58 2010.14 2008.30 2010.17 0.000575 1.33 68.40 29.00 0.15 Golf Course 23 500-yr 123.33 2007.58 2011.65 2008.46 2011.67 0.000224 1.13 108.77 50.67 0.10 Golf Course 36 100-yr 91.26 2011.57 2012.31 2012.31 2012.55 0.047674 3.89 23.45 144.35 1.01 Golf Course 36 500-yr 123.33 2011.57 2012.42 2012.42 2012.70 0.044057 4.27 28.89 154.96 1.00 Golf Course 178 100-yr 91.26 2011.75 2012.80 2012.04 2012.80 0.000279 0.41 224.07 464.19 0.08 Golf Course 178 500-yr 123.33 2011.75 2012.97 2012.10 2012.97 0.000265 0.45 275.57 473.83 0.08 Golf Course 276 100-yr 157.20 2011.65 2012.86 2012.36 2012.87 0.001743 0.92 171.04 281.97 0.20 Golf Course 276 500-yr 201.10 2011.65 2013.02 2012.41 2013.03 0.001468 0.93 215.75 312.89 0.19 Golf Course 402 100-yr 157.20 2012.03 2013.11 2012.66 2013.13 0.002311 1.05 149.13 235.12 0.23 Golf Course 402 500-yr 201.10 2012.03 2013.24 2012.71 2013.26 0.002140 1.12 178.94 241.96 0.23 Golf Course 528 100-yr 64.00 2012.09 2013.33 2012.64 2013.33 0.000818 0.60 106.56 179.29 0.14 Golf Course 528 500-yr 88.00 2012.09 2013.45 2012.71 2013.45 0.000872 0.69 128.19 185.20 0.15 Golf Course 964 100-yr 64.00 2012.71 2013.64 2013.07 2013.65 0.000650 0.53 119.99 203.01 0.12 Golf Course 964 500-yr 88.00 2012.71 2013.78 2013.12 2013.78 0.000676 0.59 148.01 219.02 0.13 Golf Course 1404 100-yr 64.00 2013.92 2014.60 2014.60 2014.78 0.054246 3.41 18.77 54.23 1.02 Golf Course 1404 500-yr 88.00 2013.92 2014.69 2014.69 2014.90 0.050317 3.73 23.60 56.31 1.02 Golf Course 1489 100-yr 64.00 2014.38 2015.28 2014.85 2015.29 0.002060 0.89 72.20 135.50 0.21 Golf Course 1489 500-yr 88.00 2014.38 2015.42 2014.91 2015.43 0.002173 0.95 92.98 164.62 0.22 Golf Course 1547 100-yr 64.00 2014.61 2015.39 2014.98 2015.40 0.001701 0.80 80.06 151.92 0.19 Golf Course 1547 500-yr 88.00 2014.61 2015.53 2015.03 2015.54 0.001568 0.87 101.32 159.72 0.19 Golf Course 1647 100-yr 64.00 2014.93 2015.65 2015.37 2015.66 0.004580 1.07 59.89 154.59 0.30 Golf Course 1647 500-yr 88.00 2014.93 2015.76 2015.42 2015.78 0.003922 1.13 77.87 164.55 0.29 Golf Course 1981 100-yr 64.00 2017.57 2018.10 2017.97 2018.12 0.013760 1.32 48.49 208.12 0.48 Golf Course 1981 500-yr 88.00 2017.57 2018.13 2018.02 2018.17 0.017030 1.57 56.03 217.38 0.55 Golf Course 2578 100-yr 64.00 2022.25 2022.99 2022.76 2023.01 0.005408 1.11 57.80 160.17 0.32 Golf Course 2578 500-yr 88.00 2022.25 2023.09 2022.81 2023.11 0.004871 1.19 73.82 169.31 0.32 Golf Course 2863 100-yr 64.00 2028.58 2029.56 2029.56 2029.79 0.047397 3.81 16.79 37.05 1.00 Golf Course 2863 500-yr 88.00 2028.58 2029.68 2029.68 2029.94 0.046961 4.11 21.40 41.87 1.01 HEC-RAS Plan: PCM River: Tributary Reach: trib Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 548 Q10 10.00 1991.00 1991.70 1991.70 1992.05 0.006071 4.73 2.11 3.05 1.00 trib 548 Q50 14.00 1991.00 1991.88 1991.88 1992.31 0.006200 5.28 2.65 3.06 1.00 trib 548 Q100 16.00 1991.00 1991.95 1991.95 1992.43 0.006349 5.54 2.89 3.06 1.01 trib 548 Q500 20.00 1991.00 1996.10 1992.11 1996.12 0.000123 1.25 16.02 3.20 0.10 trib 600 Culvert trib 664 Q10 10.00 1997.52 1998.86 1998.22 1998.95 0.000951 2.45 4.08 3.09 0.38 trib 664 Q50 14.00 1997.52 1999.11 1998.40 1999.24 0.001170 2.88 4.85 3.11 0.41 trib 664 Q100 16.00 1997.52 1999.22 1998.48 1999.37 0.001269 3.07 5.21 3.11 0.42 trib 664 Q500 20.00 1997.52 1999.45 1998.62 1999.62 0.001431 3.39 5.90 3.13 0.44 trib 665 Q10 10.00 1997.52 1998.86 1998.22 1998.96 0.000949 2.45 4.09 3.09 0.38 trib 665 Q50 14.00 1997.52 1999.11 1998.40 1999.24 0.001167 2.88 4.86 3.11 0.41 trib 665 Q100 16.00 1997.52 1999.23 1998.48 1999.37 0.001265 3.07 5.21 3.11 0.42 trib 665 Q500 20.00 1997.52 1999.45 1998.62 1999.63 0.001427 3.39 5.90 3.13 0.43 trib 1000 Culvert trib 1988 Q10 10.00 2017.40 2018.74 2018.11 2018.83 0.000951 2.45 4.08 3.09 0.38 trib 1988 Q50 14.00 2017.40 2018.99 2018.27 2019.12 0.001171 2.88 4.85 3.11 0.41 trib 1988 Q100 16.00 2017.40 2019.10 2018.36 2019.25 0.001268 3.07 5.21 3.11 0.42 trib 1988 Q500 20.00 2017.40 2019.33 2018.50 2019.50 0.001431 3.39 5.90 3.13 0.44 trib 1989 Q10 10.00 2017.40 2018.74 2018.11 2018.84 0.000949 2.45 4.09 3.09 0.38 trib 1989 Q50 14.00 2017.40 2018.99 2018.27 2019.12 0.001168 2.88 4.86 3.11 0.41 trib 1989 Q100 16.00 2017.40 2019.11 2018.36 2019.25 0.001265 3.07 5.21 3.11 0.42 trib 1989 Q500 20.00 2017.40 2019.33 2018.50 2019.51 0.001427 3.39 5.90 3.13 0.43 trib 2040 Culvert trib 2080 Q10 10.00 2018.73 2020.22 2019.81 2020.32 0.008444 2.53 3.96 8.99 0.45 trib 2080 Q50 14.00 2018.73 2020.52 2019.96 2020.63 0.006932 2.72 5.14 13.42 0.42 trib 2080 Q100 16.00 2018.73 2020.65 2020.02 2020.78 0.006501 2.82 5.68 15.52 0.42 trib 2080 Q500 20.00 2018.73 2020.91 2020.15 2021.04 0.005883 2.99 6.69 18.84 0.41 trib 2100 Q10 12.00 2018.27 2020.41 2019.40 2020.43 0.001919 1.12 10.70 12.26 0.21 trib 2100 Q50 24.00 2018.27 2020.72 2019.86 2020.76 0.003167 1.61 14.92 14.66 0.28 trib 2100 Q100 30.00 2018.27 2020.86 2020.00 2020.91 0.003333 1.78 16.94 15.46 0.29 trib 2100 Q500 46.00 2018.27 2021.11 2020.26 2021.19 0.004104 2.21 21.05 16.97 0.33 trib 2110 Q10 12.00 2018.27 2020.43 2019.40 2020.45 0.001785 1.09 10.99 12.45 0.20 trib 2110 Q50 24.00 2018.27 2020.76 2019.87 2020.80 0.002801 1.55 15.51 14.90 0.27 trib 2110 Q100 30.00 2018.27 2020.90 2020.00 2020.95 0.002961 1.71 17.62 15.72 0.28 trib 2110 Q500 46.00 2018.27 2021.16 2020.26 2021.23 0.003618 2.12 21.98 17.30 0.32 trib 2120 Q10 12.00 2018.27 2020.45 2019.40 2020.47 0.001685 1.07 11.24 12.60 0.20 trib 2120 Q50 24.00 2018.27 2020.79 2019.87 2020.83 0.002554 1.50 15.98 15.09 0.25 trib 2120 Q100 30.00 2018.27 2020.93 2020.00 2020.98 0.002712 1.66 18.14 15.92 0.27 trib 2120 Q500 46.00 2018.27 2021.21 2020.26 2021.27 0.003295 2.06 22.70 17.54 0.30 trib 2651 Q10 12.00 2021.38 2022.46 2022.22 2022.60 0.017765 3.05 3.93 5.17 0.62 trib 2651 Q50 24.00 2021.38 2023.13 2022.58 2023.28 0.010317 3.06 7.83 6.43 0.49 trib 2651 Q100 30.00 2021.38 2023.37 2022.73 2023.53 0.010222 3.17 9.48 7.37 0.49 trib 2651 Q500 46.00 2021.38 2023.87 2023.07 2024.04 0.009206 3.34 13.83 9.93 0.48 trib 3126 Q10 12.00 2023.82 2025.47 2024.69 2025.50 0.003029 1.51 7.92 7.81 0.27 trib 3126 Q50 24.00 2023.82 2025.97 2025.03 2026.03 0.003679 1.96 12.27 9.50 0.30 trib 3126 Q100 30.00 2023.82 2026.19 2025.18 2026.26 0.003671 2.07 14.48 10.25 0.31 trib 3126 Q500 46.00 2023.82 2026.66 2025.48 2026.75 0.003843 2.33 19.72 12.11 0.32 trib 3617 Q10 12.00 2029.08 2030.11 2030.11 2030.42 0.049822 4.51 2.66 4.15 0.99 trib 3617 Q50 24.00 2029.08 2030.51 2030.51 2030.93 0.045914 5.20 4.62 5.43 0.99 trib 3617 Q100 30.00 2029.08 2030.67 2030.67 2031.13 0.044711 5.44 5.52 5.92 0.99 trib 3617 Q500 46.00 2029.08 2031.02 2031.02 2031.57 0.042644 5.94 7.75 7.00 0.99 trib 4127 Q10 12.00 2032.61 2034.24 2033.46 2034.28 0.002893 1.55 7.75 7.24 0.26 trib 4127 Q50 24.00 2032.61 2034.85 2033.81 2034.91 0.003051 1.91 12.56 8.66 0.28 trib 4127 Q100 30.00 2032.61 2035.09 2033.95 2035.15 0.003115 2.04 14.68 9.22 0.29 trib 4127 Q500 46.00 2032.61 2035.61 2034.26 2035.69 0.003262 2.33 19.78 10.44 0.30 trib 4623 Q10 12.00 2035.96 2036.97 2036.69 2037.08 0.013584 2.65 4.52 6.04 0.54 trib 4623 Q50 24.00 2035.96 2037.48 2037.01 2037.62 0.011101 3.00 8.00 7.53 0.51 trib 4623 Q100 30.00 2035.96 2037.69 2037.15 2037.84 0.010391 3.11 9.65 8.14 0.50 trib 4623 Q500 46.00 2035.96 2038.17 2037.47 2038.34 0.009155 3.32 13.84 9.51 0.49 trib 4665 Q10 12.00 2036.85 2037.96 2037.96 2038.40 0.044689 5.35 2.24 2.87 1.00 trib 4665 Q50 24.00 2036.85 2038.47 2038.47 2039.19 0.039641 6.81 3.52 3.14 1.01 HEC-RAS Plan: PCM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 4665 Q100 30.00 2036.85 2038.70 2038.70 2039.53 0.037071 7.30 4.11 3.38 1.00 trib 4665 Q500 46.00 2036.85 2039.25 2039.25 2040.35 0.033376 8.39 5.48 4.22 1.00 trib 4685 Culvert trib 4704 Q10 12.00 2037.52 2039.43 2038.69 2039.46 0.002145 1.38 9.18 34.56 0.23 trib 4704 Q50 24.00 2037.52 2040.38 2039.01 2040.40 0.000850 1.31 19.32 102.88 0.16 trib 4704 Q100 30.00 2037.52 2041.00 2039.13 2041.03 0.000501 1.20 26.03 291.32 0.13 trib 4704 Q500 46.00 2037.52 2041.27 2039.39 2041.27 0.000031 0.32 282.27 344.58 0.03 trib 4750 Q10 11.00 2038.64 2039.58 2039.24 2039.63 0.007883 1.81 6.09 11.34 0.42 trib 4750 Q50 22.00 2038.64 2040.41 2039.51 2040.41 0.000085 0.31 133.48 357.36 0.05 trib 4750 Q100 28.00 2038.64 2041.03 2039.62 2041.03 0.000007 0.12 368.77 520.83 0.01 trib 4750 Q500 45.00 2038.64 2041.27 2039.96 2041.27 0.000008 0.14 466.80 590.32 0.02 trib 5165 Q10 11.00 2042.61 2043.28 2043.12 2043.32 0.010179 1.70 7.59 156.47 0.46 trib 5165 Q50 22.00 2042.61 2043.32 2043.32 2043.45 0.029050 3.03 9.04 171.87 0.78 trib 5165 Q100 28.00 2042.61 2043.40 2043.40 2043.50 0.021265 2.88 14.01 232.95 0.69 trib 5165 Q500 45.00 2042.61 2043.49 2043.49 2043.59 0.019619 3.08 22.51 275.32 0.68 trib 5676 Q10 11.00 2046.43 2047.51 2047.55 0.006827 1.64 6.71 11.93 0.39 trib 5676 Q50 22.00 2046.43 2047.98 2048.02 0.004265 1.60 13.77 17.89 0.32 trib 5676 Q100 28.00 2046.43 2048.08 2048.13 0.004979 1.79 15.61 19.14 0.35 trib 5676 Q500 45.00 2046.43 2048.37 2048.44 0.005525 2.09 21.54 22.70 0.38 trib 6117 Q10 11.00 2050.75 2051.68 2051.79 0.014346 2.65 4.14 5.91 0.56 trib 6117 Q50 22.00 2050.75 2051.83 2051.73 2052.13 0.031974 4.34 5.07 6.25 0.85 trib 6117 Q100 28.00 2050.75 2052.07 2052.35 0.024147 4.22 6.64 6.77 0.75 trib 6117 Q500 45.00 2050.75 2052.49 2052.83 0.021971 4.67 9.63 7.67 0.73 trib 6154 Q10 11.00 2051.54 2052.27 2052.10 2052.32 0.013435 1.90 5.78 13.92 0.52 trib 6154 Q50 22.00 2051.54 2052.63 2052.28 2052.69 0.006997 1.94 11.36 16.54 0.41 trib 6154 Q100 28.00 2051.54 2052.76 2052.36 2052.83 0.006400 2.06 13.56 16.98 0.40 trib 6154 Q500 45.00 2051.54 2053.16 2052.55 2053.23 0.004689 2.24 20.12 18.24 0.36 trib 6200 Culvert trib 6239 Q10 11.00 2052.53 2053.54 2052.99 2053.55 0.001418 0.90 12.24 16.61 0.18 trib 6239 Q50 22.00 2052.53 2053.93 2053.16 2053.95 0.001478 1.16 19.00 17.98 0.20 trib 6239 Q100 28.00 2052.53 2054.11 2053.23 2054.13 0.001494 1.26 22.21 18.59 0.20 trib 6239 Q500 45.00 2052.53 2054.53 2053.41 2054.57 0.001512 1.48 30.45 20.08 0.21 trib 6274 Q10 11.00 2054.55 2055.35 2055.35 2055.52 0.056217 3.31 3.32 9.87 1.01 trib 6274 Q50 22.00 2054.55 2055.56 2055.56 2055.82 0.047771 4.06 5.42 10.35 0.99 trib 6274 Q100 28.00 2054.55 2055.65 2055.65 2055.95 0.047024 4.41 6.35 10.56 1.00 trib 6274 Q500 45.00 2054.55 2055.89 2055.89 2056.28 0.043042 5.06 8.90 11.10 1.00 trib 6553 Q10 11.00 2063.24 2064.09 2063.94 2064.19 0.019730 2.62 4.19 8.16 0.64 trib 6553 Q50 22.00 2063.24 2064.36 2064.18 2064.53 0.022013 3.31 6.64 9.84 0.71 trib 6553 Q100 28.00 2063.24 2064.48 2064.31 2064.68 0.022330 3.55 7.88 10.59 0.73 trib 6553 Q500 45.00 2063.24 2064.75 2064.57 2065.01 0.023749 4.13 10.90 12.22 0.77 trib 7086 Q10 7.00 2082.28 2083.02 2083.02 2083.29 0.040330 4.17 1.68 3.16 1.01 trib 7086 Q50 14.00 2082.28 2083.35 2083.35 2083.74 0.038233 5.05 2.77 3.52 1.00 trib 7086 Q100 18.00 2082.28 2083.50 2083.50 2083.96 0.037725 5.40 3.33 3.69 1.00 trib 7086 Q500 28.00 2082.28 2083.90 2083.90 2084.38 0.035210 5.60 5.00 5.17 1.00 trib 7121 Q10 7.00 2083.49 2084.19 2084.10 2084.38 0.024420 3.57 1.96 3.10 0.79 trib 7121 Q50 14.00 2083.49 2084.50 2084.42 2084.85 0.026475 4.77 2.93 3.15 0.86 trib 7121 Q100 18.00 2083.49 2084.63 2084.58 2085.08 0.028160 5.38 3.35 3.17 0.91 trib 7121 Q500 28.00 2083.49 2084.93 2084.92 2085.60 0.030058 6.54 4.28 3.21 0.98 trib 7130 Culvert trib 7143 Q10 7.00 2084.11 2085.20 2084.68 2085.26 0.004776 1.99 3.51 3.52 0.35 trib 7143 Q50 14.00 2084.11 2085.74 2084.98 2085.84 0.005635 2.56 5.48 3.69 0.37 trib 7143 Q100 18.00 2084.11 2086.04 2085.13 2086.16 0.005671 2.73 6.60 3.79 0.36 trib 7143 Q500 28.00 2084.11 2087.67 2085.47 2087.74 0.002300 2.12 13.20 4.31 0.21 trib 7169 Q10 7.00 2089.14 2089.93 2089.93 2090.25 0.043149 4.56 1.54 2.43 1.01 trib 7169 Q50 14.00 2089.14 2090.31 2090.31 2090.80 0.044959 5.60 2.50 2.57 1.00 trib 7169 Q100 18.00 2089.14 2090.51 2090.51 2091.06 0.045443 5.99 3.00 2.65 0.99 trib 7169 Q500 28.00 2089.14 2090.90 2090.90 2091.63 0.049847 6.90 4.06 2.80 1.01 trib 7175 Culvert trib 7186 Q10 7.00 2089.36 2090.59 2090.11 2090.69 0.008472 2.52 2.78 2.60 0.43 trib 7186 Q50 14.00 2089.36 2091.16 2090.49 2091.33 0.010658 3.24 4.32 10.51 0.46 HEC-RAS Plan: PCM River: Tributary Reach: trib (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) trib 7186 Q100 18.00 2089.36 2091.45 2090.65 2091.64 0.011308 3.51 5.13 23.40 0.46 trib 7186 Q500 28.00 2089.36 2092.18 2091.08 2092.41 0.011178 3.83 7.32 80.36 0.44 trib 7220 Q10 7.00 2091.27 2092.00 2092.00 2092.21 0.033770 3.68 1.90 4.41 0.99 trib 7220 Q50 14.00 2091.27 2092.26 2092.26 2092.56 0.031983 4.39 3.19 5.38 1.01 trib 7220 Q100 18.00 2091.27 2092.39 2092.39 2092.72 0.029090 4.57 3.96 7.10 0.98 trib 7220 Q500 28.00 2091.27 2092.67 2092.67 2092.98 0.019326 4.62 6.75 109.88 0.84 HEC-RAS Plan: PCM FW River: Tributary Reach: trib Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 548 Q100 base 1991.95 1992.43 3.06 16.00 0.00 3.20 trib 548 Q100 floodway 1991.95 0.00 1992.43 3.06 16.00 0.00 3.20 trib 600 Culvert trib 664 Q100 base 1999.22 1999.37 3.11 16.00 0.00 3.20 trib 664 Q100 floodway 1999.22 0.00 1999.37 3.11 16.00 0.00 3.20 trib 665 Q100 base 1999.23 1999.37 3.11 16.00 0.00 3.20 trib 665 Q100 floodway 1999.23 0.00 1999.37 3.11 16.00 0.00 3.20 trib 1000 Culvert trib 1988 Q100 base 2019.10 2019.25 3.11 16.00 0.00 3.20 trib 1988 Q100 floodway 2019.10 0.00 2019.25 3.11 16.00 0.00 3.20 trib 1989 Q100 base 2019.11 2019.25 3.11 16.00 0.00 3.20 trib 1989 Q100 floodway 2019.11 0.00 2019.25 3.11 16.00 0.00 3.20 trib 2040 Culvert trib 2080 Q100 base 2020.65 2020.78 4.00 16.00 39.42 68.83 trib 2080 Q100 floodway 2020.65 0.00 2020.78 4.00 16.00 46.05 39.42 68.83 60.92 trib 2100 Q100 base 2020.86 2020.91 15.46 0.02 29.98 44.23 60.09 trib 2100 Q100 floodway 2020.86 0.00 2020.91 14.75 30.00 44.23 44.23 60.09 58.98 trib 2110 Q100 base 2020.90 2020.95 15.72 0.03 29.97 44.23 60.09 trib 2110 Q100 floodway 2020.90 0.00 2020.95 14.82 30.00 44.23 44.23 60.09 59.05 trib 2120 Q100 base 2020.93 2020.98 15.92 0.04 29.96 44.23 60.09 trib 2120 Q100 floodway 2020.93 0.00 2020.98 14.87 30.00 44.23 44.23 60.09 59.10 trib 2651 Q100 base 2023.37 2023.53 7.37 30.00 46.44 55.58 trib 2651 Q100 floodway 2023.38 0.01 2023.53 7.41 30.00 46.68 46.44 55.58 54.18 trib 3126 Q100 base 2026.19 2026.26 10.25 30.00 72.83 95.75 trib 3126 Q100 floodway 2026.19 0.00 2026.26 10.24 30.00 75.79 72.83 95.75 86.03 trib 3617 Q100 base 2030.67 2031.13 5.92 30.00 139.17 162.30 trib 3617 Q100 floodway 2030.66 -0.01 2031.13 5.89 30.00 144.39 139.17 162.30 150.31 trib 4127 Q100 base 2035.09 2035.15 9.22 30.00 251.87 265.32 trib 4127 Q100 floodway 2035.09 0.00 2035.15 9.22 30.00 253.91 251.87 265.32 263.13 trib 4623 Q100 base 2037.69 2037.84 8.14 30.00 314.09 329.75 trib 4623 Q100 floodway 2037.69 0.00 2037.84 8.13 30.00 316.70 314.09 329.75 324.83 trib 4665 Q100 base 2038.70 2039.53 2.50 30.00 340.25 349.22 trib 4665 Q100 floodway 2038.70 0.00 2039.53 2.50 30.00 344.05 340.25 349.22 347.43 trib 4685 Culvert trib 4704 Q100 base 2041.00 2041.03 10.70 5.75 24.25 352.15 360.54 trib 4704 Q100 floodway 2040.99 -0.01 2041.03 7.52 30.00 352.15 352.15 360.54 360.54 trib 4750 Q100 base 2041.03 2041.03 400.62 13.78 2.79 11.43 329.79 342.44 trib 4750 Q100 floodway 2041.05 0.02 2041.07 12.65 28.00 329.79 329.79 342.44 342.44 trib 5165 Q100 base 2043.40 2043.50 77.29 5.63 21.68 0.69 212.11 225.92 trib 5165 Q100 floodway 2043.35 -0.05 2043.61 13.81 0.00 28.00 0.00 212.11 212.11 225.92 225.92 trib 5676 Q100 base 2048.08 2048.13 19.14 28.00 183.69 226.54 trib 5676 Q100 floodway 2048.17 0.09 2048.21 19.14 28.00 187.85 183.69 226.54 206.99 trib 6117 Q100 base 2052.07 2052.35 6.77 28.00 211.57 230.44 trib 6117 Q100 floodway 2051.88 -0.20 2052.30 6.34 28.00 217.18 211.57 230.44 223.95 trib 6154 Q100 base 2052.76 2052.83 16.44 28.00 211.25 246.77 trib 6154 Q100 floodway 2052.80 0.04 2052.86 16.44 28.00 219.96 211.25 246.77 236.94 trib 6200 Culvert trib 6239 Q100 base 2054.11 2054.13 18.59 28.00 221.30 259.22 trib 6239 Q100 floodway 2054.11 0.00 2054.13 18.59 28.00 228.52 221.30 259.22 247.11 trib 6274 Q100 base 2055.65 2055.95 10.56 28.00 210.49 231.21 trib 6274 Q100 floodway 2055.66 0.01 2055.95 10.56 28.00 216.47 210.49 231.21 227.03 trib 6553 Q100 base 2064.48 2064.68 10.59 28.00 197.65 240.39 trib 6553 Q100 floodway 2064.48 -0.01 2064.67 10.55 28.00 208.19 197.65 240.39 218.78 trib 7086 Q100 base 2083.50 2083.96 3.69 18.00 150.93 158.25 trib 7086 Q100 floodway 2083.50 0.00 2083.96 3.68 18.00 153.30 150.93 158.25 156.99 HEC-RAS Plan: PCM FW River: Tributary Reach: trib (Continued) Reach River Sta Profile W.S. Elev Prof Delta WS E.G. Elev Top Wdth Act Q Left Q Channel Q Right Enc Sta L Ch Sta L Ch Sta R Enc Sta R (ft) (ft) (ft) (ft) (cfs) (cfs) (cfs) (ft) (ft) (ft) (ft) trib 7121 Q100 base 2084.63 2085.08 3.10 18.00 118.04 121.88 trib 7121 Q100 floodway 2084.64 0.00 2085.08 3.10 18.00 118.45 118.04 121.88 121.62 trib 7130 Culvert trib 7143 Q100 base 2086.04 2086.16 3.79 18.00 111.14 115.72 trib 7143 Q100 floodway 2086.04 0.00 2086.16 3.79 18.00 111.74 111.14 115.72 115.53 trib 7169 Q100 base 2090.51 2091.06 2.65 18.00 114.91 118.45 trib 7169 Q100 floodway 2090.50 -0.01 2091.06 2.64 18.00 115.24 114.91 118.45 117.88 trib 7175 Culvert trib 7186 Q100 base 2091.45 2091.64 2.88 18.00 119.10 122.49 trib 7186 Q100 floodway 2091.45 0.00 2091.64 2.88 18.00 119.03 119.10 122.49 122.26 trib 7220 Q100 base 2092.39 2092.72 7.10 0.01 17.99 130.02 136.02 trib 7220 Q100 floodway 2092.37 -0.02 2092.72 5.77 18.00 130.02 130.02 136.02 135.83 APPENDIX F EFFECTIVE FLOOD INSURANCE RATE MAP (FIRM), FLOOD PROFILE, AND FLOODWAY DATA TABLE A2 0 _ _ _ 2,008.10 _ _ _ B2 773 _ _ _ 2,008.10 _ _ _ C2 961 _ _ _ 2,008.50 _ _ _ D 1,145 35 41 1.6 2,008.90 2,008.90 2,009.60 0.7E 1,425 30 50 1.3 2,009.10 2,009.10 2,010.00 0.9F 1,600 20 28 2.3 2,009.30 2,009.30 2,010.30 1.0G 1,800 45 86 0.7 2,013.30 2,013.30 2,014.10 0.8H 2,123 43 81 0.8 2,013.30 2,013.30 2,014.20 0.9I 2,704 40 67 1.0 2,013.50 2,013.50 2,014.50 1.0J 3,144 14 12 5.3 2,014.80 2,014.80 2,015.30 0.5K 3,287 22 33 1.9 2,015.40 2,015.40 2,016.20 0.8L 3,387 20 25 2.6 2,015.70 2,015.70 2,016.60 0.9M 3,721 20 23 2.8 2,018.10 2,018.10 2,019.00 0.9N 4,318 20 24 2.7 2,023.00 2,023.00 2,023.80 0.81Feet above Golf Course Storage AreaFEDERAL EMERGENCY MANAGEMENT AGENCY2 - Floodway not computedCHESTER CREEK - GOLF COURSE OVERFLOWTABLE 6AND INCORPORATED AREASSPOKANE COUNTY, WA1-PERCENT-ANNUAL-CHANCE FLOODWATER SURFACE ELEVATIONFLOODWAYFLOODING SOURCECROSS SECTIONDISTANCE1CHESTER CREEK-GOLF COURSE OVERFLOWFLOODWAY DATAWIDTH (FEET)REGULATORY (FEET NAVD)INCREASE (FEET)SECTION AREA (SQ.FEET)MEAN VELOCITY (FEET/SEC.)WITHOUT FLOODWAY (FEET NAVD)WITH FLOODWAY (FEET NAVD) A 0 31 128 0.0 2,008.10 2,008.10 2,009.10 1.0B 283 21 17 0.2 2,008.40 2,008.40 2,009.10 0.7C 422 40 69 0.1 2,008.40 2,008.40 2,009.10 0.7D 836 46 68 0.1 2,008.40 2,008.40 2,009.10 0.7E 910 40 69 0.1 2,008.40 2,008.40 2,009.10 0.7F 1,378 102 658 0.0 2,009.70 2,009.70 2,010.70 1.0G 1,525 176 2,120 0.0 2,009.70 2,009.70 2,010.70 1.0H 1,720 267 3,478 0.0 2,009.70 2,009.70 2,010.70 1.0I 1,760 280 3,362 0.0 2,009.70 2,009.70 2,010.70 1.0J 1,849 232 1,478 0.0 2,009.70 2,009.70 2,010.70 1.0K 1,952 5 7 2.2 2,010.00 2,010.00 2,010.70 0.7L 2,028 17 7 2.2 2,011.00 2,011.00 2,011.10 0.1M 2,295 10 13 1.3 2,011.50 2,011.50 2,011.60 0.1N 2,849 5 4 4.3 2,012.80 2,012.80 2,012.80 0.0O 2,905 10 18 0.9 2,014.30 2,014.30 2,014.30 0.0P 2,933 8 12 1.3 2,014.30 2,014.30 2,014.30 0.0Q 3,339 9 4 3.8 2,019.70 2,019.70 2,019.70 0.0R 3,485 15 17 1.8 2,020.80 2,020.80 2,020.80 0.0S2 3,509 133 59 0.5 2,019.9/2,020.9 2,019.90 2,020.00 0.1T2 4,040 42 31 1.0 2,020.8/2,023.4 2,020.80 2,021.80 1.0U2 4,515 67 27 1.1 2,024.3/2,026.2 2,024.30 2,025.20 0.9V2 5,006 169 23 1.3 2,029.0/2,030.7 2,029.00 2,030.00 1.0W2 5,516 62 17 1.8 2,033.5/2,035.1 2,033.50 2,034.50 1.0X 6,028 8 10 3.1 2,037.70 2,037.70 2,037.70 0.0Y 6,109 8 20 1.5 2,041.00 2,041.00 2,041.00 0.0Z 6,155 13 24 1.2 2,041.00 2,041.00 2,041.10 0.1WIDTH (FEET)REGULATORY (FEET NAVD)INCREASE (FEET)SECTION AREA (SQ.FEET)MEAN VELOCITY (FEET/SEC.)WITHOUT FLOODWAY (FEET NAVD)WITH FLOODWAY (FEET NAVD)1-PERCENT-ANNUAL-CHANCE FLOODWATER SURFACE ELEVATIONFLOODWAYFLOODING SOURCECROSS SECTIONDISTANCE1UNNAMED TRIBUTARY TO CHESTER CREEKFLOODWAY DATAUNNAMED TRIBUTARY TO CHESTER CREEKTABLE 6AND INCORPORATED AREASSPOKANE COUNTY, WA1Feet above confleunce with Chester creekFEDERAL EMERGENCY MANAGEMENT AGENCY2 Floodway is based on combination of with and without levee floodway runs due to perched channel. Width is total width of both runs. A20___2,008.10 _ _ _ B2283 _ _ _ 2,008.50 _ _ _ C2422 _ _ _ 2,008.60 _ _ _ D2836 _ _ _ 2,008.60 _ _ _ E21,244 _ _ _ 2,008.60 _ _ _ F 1,400 15 8 2.0 2,008.60 2,008.60 2,009.10 0.5 G 1,487 15 23 0.7 2,008.70 2,008.70 2,009.20 0.5 H 1,623 15 15 1.1 2,008.70 2,008.70 2,009.30 0.6 I 1,649 15 14 1.2 2,008.70 2,008.70 2,009.30 0.6 J 1,755 15 15 1.1 2,008.70 2,008.70 2,009.50 0.8 K 1,856 15 16 1.0 2,008.70 2,008.70 2,009.60 0.9 L 1,985 15 5 3.3 2,011.20 2,011.20 2,011.50 0.3 M 2,240 15 28 0.6 2,011.30 2,011.30 2,011.80 0.5 N 2,873 15 5 3.3 2,013.80 2,013.80 2,014.20 0.4 O 2,936 15 12 1.3 2,014.10 2,014.10 2,014.60 0.5P2,966 15 11 1.4 2,014.30 2,014.30 2,014.70 0.41Feet above storage area #1FEDERAL EMERGENCY MANAGEMENT AGENCY2 Cross section A through E are common for both Unnamed Tributary to Chester Creek and West Bank Overflow. See Unnamed Tribuatary to Chester Creek for Floodway Data UNNAMED TRIBUTARY TO CHESTR CREEK - LEFT BANK OVERFLOW CHANNELTABLE 6AND INCORPORATED AREASSPOKANE COUNTY, WA1-PERCENT-ANNUAL-CHANCE FLOODWATER SURFACE ELEVATIONFLOODWAYFLOODING SOURCECROSS SECTIONDISTANCE1LEFT BANK OVER FLOW CHANNELFLOODWAY DATAWIDTH (FEET)REGULATORY (FEET NAVD)INCREASE (FEET)SECTION AREA (SQ.FEET)MEAN VELOCITY (FEET/SEC.)WITHOUT FLOODWAY (FEET NAVD)WITH FLOODWAY (FEET NAVD) APPENDIX G REVISED FLOOD PROFILES AND FLOODWAY DATA TABLES FLOODING SOURCE FLOODWAY 1-PERCENT-ANNUAL-CHANCE FLOOD WATER SURFACE ELEVATION CROSS SECTION DISTANCE1 WIDTH (FEET) SECTION AREA (SQ. FEET) MEAN VELOCITY (FEET/SEC) REGULATORY (FEET NAVD) WITHOUT FLOODWAY (FEET NAVD) WITH FLOODWAY (FEET NAVD) INCREASE (FEET) CHESTER CREEK-GOLF COURSE OVERFLOW A 36 29 15 4.2 2012.2 2012.2 2012.2 0.0 B 178 44 57 1.1 2012.6 2012.6 2013.1 0.5 C 276 44 55 1.2 2012.7 2012.7 2013.2 0.5 D 402 43 47 1.4 2012.8 2012.8 2013.4 0.6 E 528 43 54 1.2 2013.1 2013.1 2013.6 0.5 F 964 43 56 1.1 2013.6 2013.6 2014.1 0.5 G 1404 14 12 5.3 2014.6 2014.6 2015.3 0.7 H 1489 27 42 1.5 2015.3 2015.3 2016.1 0.8 I 1547 22 33 1.9 2015.4 2015.4 2016.2 0.8 J 1647 20 25 2.6 2015.7 2015.7 2016.6 0.9 K 1981 20 23 2.8 2018.1 2018.1 2019.0 0.9 L 2578 20 24 2.7 2023.0 2023.0 2023.8 0.8 1Feet above Thorpe Road TABLE 6 FEDERAL EMERGENCY MANAGEMENT AGENCY FLOODWAY DATA SPOKANE COUNTY, WA CHESTER CREEK - GOLF COURSE OVERFLOW AND INCORPORATED AREAS CLOMR - Revised FLOODING SOURCE FLOODWAY 1-PERCENT-ANNUAL-CHANCE FLOOD WATER SURFACE ELEVATION CROSS SECTION DISTANCE1 WIDTH (FEET) SECTION AREA (SQ. FEET) MEAN VELOCITY (FEET/SEC) REGULATORY (FEET NAVD) WITHOUT FLOODWAY (FEET NAVD) WITH FLOODWAY (FEET NAVD) INCREASE (FEET) UNNAMED TRIBUTARY TO CHESTER CREEK A-Q3 R 3,485 15 17 1.8 2,020.80 2,020.80 2,020.80 0.0 S2 3,509 133 59 0.5 2,019.9/2,020.9 2,019.90 2,020.00 0.1 T2 4,040 42 31 1.0 2,020.8/2,023.4 2,020.80 2,021.80 1.0 U2 4,515 67 27 1.1 2,024.3/2,026.2 2,024.30 2,025.20 0.9 V2 5,006 169 23 1.3 2,029.0/2,030.7 2,029.00 2,030.00 1.0 W2 5,516 62 17 1.8 2,033.5/2,035.1 2,033.50 2,034.50 1.0 X 6,028 8 10 3.1 2,037.70 2,037.70 2,037.70 0.0 Y 6,109 8 20 1.5 2,041.00 2,041.00 2,041.00 0.0 Z 6,155 13 24 1.2 2,041.00 2,041.00 2,041.10 0.1 AA 6,570 14 7 4.1 2,043.40 2,043.40 2,043.40 0.0 AB 7,082 19 17 1.6 2,048.10 2,048.10 2,048.20 0.1 AC 7,522 7 5 5.2 2,052.10 2,052.10 2,052.10 0.0 AD 7,645 19 22 1.3 2,054.10 2,054.10 2,054.10 0.0 AE 7,679 11 6 4.4 2,055.70 2,055.70 2,055.70 0.0 AF 7,958 11 8 3.6 2,064.50 2,064.50 2,064.50 0.0 AG 8,491 4 3 5.4 2,083.50 2,083.50 2,083.50 0.0 AH 8,548 4 7 2.7 2,086.00 2,086.00 2,086.00 0.0 AI 8,592 3 5 3.5 2,091.50 2,091.50 2,091.50 0.0 AJ 8,625 6 4 4.7 2,092.40 2,092.40 2,092.40 0.0 1Feet above confluence with Chester creek 2Floodway is based on combination of with and without levee floodway runs due to perched channel. Width is total width of both 3Cross sections A-Q removed because channel enters flood control facility TABLE 6 FEDERAL EMERGENCY MANAGEMENT AGENCY FLOODWAY DATA SPOKANE COUNTY, WA UNNAMED TRIBUTARY TO CHESTER CREEK AND INCORPORATED AREAS CLOMR - Revised Legend CLOMR Boundary Flood Hazard Zones 1 Pct Annual Chance Flood Hazard 0.2 Pct Annual Chance Flood Hazard Floodway Zone A APPENDIX H FLOODPLAIN WORK MAPS 19414 AJ2008.8164 7 J 2 015.7 6 0 2 8 .4 8 X 2 0 3 7 .7 5 0 0 6 .2 6 V2030.7 3508.56 S2020.91300 D2005.47 5 2 2 .0 2 A C 2 0 5 2 .118686 AF2007.822936 AY2020.520524 AP2010.46 5 69 .9 9 A A2043.43485 R2020.92 0 9 83 A R 20 1 1 .220748 A Q 2010.822035 AV2014.819463 AL2008.918774 AG2007.91 9 8 1 K2 0 1 8 . 119365 AI2008.617625 AD2006.71489 H2015.3 7958.03 AF2064.523773 BB2025.2 23332 BA2022.91060 C2005.45 5 1 6 .3 1 W 2 0 3 5 .118150 AE2007.2528 E2013.3 22859 AX2018.517172 AB2006.220233 AN2010.121425 AT2012.1 2578 L2023.017413 AC2006.518819 AH2008.019430 AK2008.82 2 3 4 2 A W 2 0 1 4 .9 4 5 1 5 .2 6 U 2 0 2 6 .2 276 C2012.9 4 03 9.7 1 T2023.4 22977 AZ2020.7 7679.44 AE2055.7964 F2013.6 7 0 8 1 .6 5 A B 2 0 4 8 .1 2 1 2 0 1 A S2011.8 232010.1 178 B2012.8 7 6 4 4 .5 2 A D 2 0 5 4 .1 1404 G2014.6540 B2005.36109.2 Y2041.0 -322010.1 -412010.1 6155.46 Z2041.036 A2012.3 21578 AU2014.7 402 D2013.1 1547 I2015.4201020102010 20102010201020102010 2010 20102010 201020102010 2010 20102010201020102010 2010 20102010 2010 2010 201020102010 20102 0 1 0 201020102010 202020102010 202020102010201020102010 2010201020102010 201020102010 2 01 0 20 1 0 20002010 20102010 2 3 3 0 2320230022902280227022602 25022402230222022102 2 0 0 2 1 9 0 21 8 0 2 1 7 0 2 1 6 0 21502130212021102100209020802050207020602040 225022402 2 3 022 202190218 0217021602150214021102 2 1 022002130 2120 2100 2370236023502340233023202310210020902080207020602040 2020 20 5 0 203021502130212021102100 2080 208020702 0 6 0 205021 2 0210 02 0 7 0 20602050 208020702060205022102200214021302120211019801970 2320 2310206020402030 2020 2020 2010 2010 2000 23102140 2 0 3 0 2010 2000 2300 229021402070 2 0 4 022202240225020502 3 2 0 2260 21502120211020702060206020502050 2050 20202 0 3 0 20202010 2010 2010 2010 20002020 2020 2010 2010 2010 20882 0 8 2 2 0 5 2 207620642058204920702022 2 0 2 5 2046 2 0 3 7 2 0 3 1 2 0 3 420102028 2010 2022 20122 0 1 32008201120082011 2020 2024200620082008200920082006 20152004 2024 20192018 20202008 20192020 2022 2016200620082006 20162008 2018 2 0 3 5200820082005 20142007 2043 2 0 2 620082005 2013 2 0 3 2 2014 2 0 2 9 2 0 2 3 2 0 2 6 2008 2012 2 0 0 8 2012 2012 2019± 1 inch = 325 feet 250 0 250 500125Feet Painted Hills CLOMRFlood Inundation Map 2601 25th Street SESuite 450Salem, OR 97302 Topographic Data Source: Terrapoint, LLC (2003)Project Projection: Washington State Plane North FIPS 4601Horizontal and Vertical Datums: NAD83/NAVD88Units: US FeetContour Interval: 2 FeetDate: 8/15/2018 Legend Base Flood Elevation Stream Centerline Cross Sections Cross Section LeadersStream Station + Letter100-Year WSEL Zone Break Effective Floodplain 0.2 Pct Annual ChanceFlood Hazard 1 Pct Annual ChanceFlood Hazard Floodway CLOMR Boundary 1 Pct Annual ChanceFlood Hazard 0.2 Pct Annual ChanceFlood Hazard Floodway Zone Unnamed Tributary Main Channel Chester Creek Golf Course Overflow Reach Infiltration Facility Infiltration Facility(SA6) 1% and 0.2% annual chance flood enters flood control facility 1% and 0.2% annual chance flood enters flood control facility 2060 2040 2030 2010 2070 2 0 5 0 2020 2080 2020 2010 2 0 7 0 2030 2090 2080 2070 2050 2030 2060 2010 2 0 8 0 2070 2040 2030 2020 206020502 0 5 0 2040 2020 2010 206020602040201020202020 2020 2010 2010 2010 2010 201018150 AE2007.219414 AJ2008.821425 AT2012.120748 A Q 2010.820524 AP2010.418819 AH20082 1 2 0 1 A S 2 0 11 .820462 AO2010.419365 AI2008.619857 AM2009.519463 AL2008.92 0 9 8 3 A R 2 0 1 1.220233 AN2010.118774 AG2007.919430 AK2008.8-322010.1 -412010.1 2010 2010 2010201020102010 2010 2010 201020102010 201020102 0 1 0 201020102 0 1 0 201020102010 20102010 20102010 20102010 20102010 20102010 2010 2010 201020102010 20102010 2 0 1 0 2 0 1 020102010 2020 2 0 1 0 2020201020102010201020102010 2010 201020102010 2010 2010201 02010 2010 2 010 2000201020102010 23302 3 2 0231 02 3 0 0 2 2 9 0 2280 2270 22 6022502240 2 2 3 02220 2210 2200 2190 2180 2170 2160 21502140213021202110210020902080207 02070 2060 2 0 5 0 2040 2010 2080 203 0 2210220020202010 1 9 8 01970 22502240 2 2 3 0 222020502040 2020 2010 2 0 2 0 2 0 1 0 2010 2000 2060 2 0 5 0 20302020 2000 2000 1990 22602 1 2 0 205020502010 201 0 2020 2020 2010 2 0 1 0 2010 2010 201020102012200820112008201120082008200920082008200820082008200820082008 2012 2 0 0 8 2012 1 inch = 160 feet 250 0 250 500125Feet Painted Hills CLOMR -- Upper Golf CourseFlood Inundation Map 2601 25th Street SESuite 450Salem, OR 97302 Legend Base Flood Elevation Stream Centerline Cross Sections Cross Section LeadersStream Station + Letter100-Year WSEL Zone Break Effective Floodplain Limits 0.2 Pct Annual ChanceFlood Hazard 1 Pct Annual ChanceFlood Hazard Floodway 1 Pct Annual ChanceFlood Hazard 0.2 Pct Annual ChanceFlood Hazard Floodway Zone CLOMR Boundary Main Channel Chester Creek Infiltration Facility Infiltration Facility(SA6) 1% and 0.2% annual chance flood enters flood control facility ± Topographic Data Source: Terrapoint, LLC (2003)Project Projection: Washington State Plane North FIPS 4601Horizontal and Vertical Datums: NAD83/NAVD88Units: US FeetContour Interval: 2 FeetDate: 8/15/2018 2150 2140 2130 21002110 2150214021302 1 1 0 2 1 0 0 2090 207020602050208 020402140211021002080207020402 1 5 0 2 1 2 0 20602140 2130 2120 2110 2080 2070 2060 21 00 2090 205 0 213 0 2 11 0 2100 20902080 20702050216021402130212021502140213021202090 2080 20 602050 210020902 0 8 0 2 0 9 0 2 0 8 0 2060 20502090208020702150212021302100 2090 2080 2070 2140 2 1 1 0 21 2 0 2110 213021102 1 4 0 2130 2120 2 1 1 021202 1 1 0 2120 2090 2 1 0 0 2 0 9 0 2090 20 8 0 20702 0 6 0 2090 2070 21202110211021002 1 1 0 2 1 0 0 2060 2050 2060 204 0213021202110 210021102 1 0 02070 206020602050 2 0 6 02050 20502040206021402130 2120 21102100 20502130 211020902100207021502110210020902090 209020802090 2080 2 0 8 0 20502050 2080 2 04 0 2 0 4 0 1 647 J 20 1 5.7 964 F2013.6 178 B2012.8 232010.1 2 1 2 0 1 A S2011.820748 A Q 2010.823773 BB2025.2 22859 AX2018.5 21425 AT2012.1 528 E2013.3 22936 AY2020.5 1 9 8 1 K2 0 1 8.1 1489 H2015.3 22035 AV2014.8 23332 BA2022.9 20462 AO2010.42578 L2023 276 C2012.9 22977 AZ2020.7 1404 G2014.6 2 2 3 4 2 A W 2 0 1 4 .9 2 0 9 8 3 A R 2 0 1 1 .2 -322010.1 -412010.1 36 A2012.3 21578 AU2014.7 402 D2013.1 1547 I2015.4 201020102 0 1 0 2020 20202010201020 1 0 231023002290228022702260225022302220221 02 1 9 0 218 0 2 1 7 0216 02 1 5 0214 021302 1 2 0 2 1 1 0210 0209 02080207020602050204020302080 2070 2060 2040 2020 2010 209020502030 226022502240222022102 2 3 0 22002 1 102120 2110 2100 2090 2080 2150214021302120211020502040210022402230222022302 2202160 2 1 5 0 1 9 9 0 1 9 7 0 20202010224022002000 207021602070 22602150 2 0 6 02050 2050 2030203 0 202020102010 2022 20122 0 1 320112011 2020 2024 2015 2024 2018 2020 2022 2016 2016 2018 2 0 1 4 202 6 2013 2014 2012 2012 2012 1 inch = 160 feet 250 0 250 500125Feet Painted Hills CLOMR -- Lower Golf CourseFlood Inundation Map 2601 25th Street SESuite 450Salem, OR 97302 Legend Base Flood Elevation Stream Centerline Cross Sections Cross Section LeadersStream Station + Letter100-Year WSEL 1 Pct Annual ChanceFlood Hazard 0.2 Pct Annual ChanceFlood Hazard Floodway Zone A CLOMR Boundary Main Channel Chester Creek Golf Course Overflow Reach Zone Break Effective Floodplain Limits 0.2 Pct Annual ChanceFlood Hazard 1 Pct Annual ChanceFlood Hazard Floodway 1% and 0.2% annual chance flood enters flood control facility ± Topographic Data Source: Terrapoint, LLC (2003)Project Projection: Washington State Plane North FIPS 4601Horizontal and Vertical Datums: NAD83/NAVD88Units: US FeetContour Interval: 2 FeetDate: 8/15/2018 2010 2010 201020102010 2010 2010 201020102010 201020102 0 1 0 201020102 0 1 0 20102010 20102010 2010 2 0 1 02010 2010201020102010 201020102010 20102010 20102010 2 0 1 0201020102010 2 0 1 02010201020102 0 1 0 201 0 2000201 0 201020103508.56 S2020.93485 R2020.92230 2220 2210 2 1 9 0 21802 170 2160 2150 2140 2130 2120 2110 2100 2090 2080 2070 2060 2050 2040 2030 206020502 0 4 0 2030 2220 2200 2030 2020 2030 20 2 0 202020102240 2200 2020 221022302120 2 1 2 020502050 20402030 2 0 3 0 2010 20102000 2 0 2 0 2022 2 0 2 5 2 0 2 8 201920192020 2 0 2 3 2 0 2 6 1 inch = 160 feet 250 0 250 500125Feet Painted Hills CLOMR -- Unnamed TributaryFlood Inundation Map 2601 25th Street SESuite 450Salem, OR 97302 Legend Base Flood Elevation Stream Centerline Cross Sections Cross Section LeadersStream Station + Letter100-Year WSEL Zone Break Effective Floodplain Limits 0.2 Pct Annual ChanceFlood Hazard 1 Pct Annual ChanceFlood Hazard Floodway 1 Pct Annual ChanceFlood Hazard 0.2 Pct Annual ChanceFlood Hazard Floodway Zone A CLOMR Boundary Unnamed Tributary with Levee Infiltration Facility Infiltration Facility(SA6) ± Topographic Data Source: Terrapoint, LLC (2003)Project Projection: Washington State Plane North FIPS 4601Horizontal and Vertical Datums: NAD83/NAVD88Units: US FeetContour Interval: 2 FeetDate: 8/15/2018 1% and 0.2% annual chance flood enters flood control facility APPENDIX I GEOTECHNICAL EVALUATION/GROUNDWATER ANALYSIS REPORT 1: PRELIMINARY GEOTECHNICAL EVALUATION, PHASE 1 REPORT 2: GEOTECHNICAL EVALUATION, PROPOSED STORMWATER POND REPORT 3: GEOTECHNICAL EVALUATION, PHASE 2 REPORT 4: SUPPLEMENTAL GEOTECHNICAL EVALUATION REPORT 5: FULL-SCALE DRYWELL TESTING REPORT 1 Preliminary Geotechnical Evaluation, Phase I, dated December 31.2013, revised August 29,2016 PRELIMINARY GEOTECHNICAL EVALUATION PHASE I PAINTED HILLS GOLF COURSE PROPERTY 4403 SOUTH DISHMAN-MICA ROAD SPOKANE COUNTY, WASHINGTON Inland Pacific Engineering Company Project No. 2013-026 December 31, 2013 Revised August 29, 2016 Prepared for: NAI Black Spokane, Washington IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting Preliminary Geotechnical Evaluation Project No. 2013-026 Painted Hills Golf Course Property December 31, 2013 4403 South Dishman-Mica Road Spokane County, WA Inland Pacific Engineering Company Page 3 Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Hardesty ashy silt loam, Narcisse silt loam, Endoaquolls and Fluvaquents, Phoebe ashy sandy loam, and Urban land-Springdale disturbed complex. The native soils encountered in the test pits were consistent with the NRCS data. Field Permeability Testing We performed five test pit permeability tests at the site. The test pit permeability tests were performed in accordance with the Spokane Regional Stormwater Manual (SRSM) Appendix 4C procedures. Test pit permeability tests were performed adjacent to Test Pits TP-3, TP-8, TP-19, TP-22, and TP-28. The following table summarizes the results of the tests performed. Test Location Depth (feet) USCS Classification Percent Fines Infiltration Rate (cfs/ft2) P-1 (TP-3) 1 – 3 SW-SM 10.8 2.84 x 10-4 P-2 (TP-8) 1.5 – 3.5 SM 12.5 8.36 x 10-4 P-3 (TP-19) 1 – 3 GW 3.0 1.21 x 10-3 P-4 (TP-22) 2 – 4 ML 64.0 1.29 x 10-4 P-5 (TP-28) 2 – 4 SM 47.0 6.93 x 10-5 Attached are data sheets summarizing the results of the tests performed. The above results do not include a safety factor. ANALYSIS AND PRELIMINARY RECOMMENDATIONS Discussion Based on the data obtained from the test pits, field permeability tests, and laboratory tests performed, it is our opinion that subsurface infiltration of stormwater is feasible. The most promising layers are the glacial sands and gravels. These soils would be suitable for infiltration using standard drywells. In areas where the alluvial soils are deeper, use of gravel galleries could be considered. These soils are present in the southern portion of the site south and east of Test Pits TP-18, TP-19, and TP-21. Glacial sands were encountered at depth in Test Pits TP-29 and TP-30 at the south end of the site. It is our opinion that drywells could be considered at the south end of the site. Preliminary Geotechnical Evaluation Project No. 2013-026 Painted Hills Golf Course Property December 31, 2013 4403 South Dishman-Mica Road Spokane County, WA Inland Pacific Engineering Company Page 4 Drywell Recommendations We analyzed recommended design rates for drywells using the Spokane 200 Method from the SRSM (Appendix 4A). The following table summarizes the results of the tests performed. Test Pit Depth (feet) USCS Classification Percent Fines Hydraulic Conductivity (cm/s) Recommended Drywell Outflow Rate (cfs) Type A Type B TP-3 10 – 12 SP 3.5 6.1 x 10-2 0.3 1.0 TP-4 10 – 12 GW 4.4 4.1 x 10-2 0.3 0.8 TP-8 10 – 12 GW 3.6 5.9 x 10-2 0.3 1.0 TP-9 8 – 10 GW 2.1 1.7 x 10-1 0.3 1.0 TP-11 10 – 12 SP 2.3 1.5 x 10-1 0.3 1.0 TP-13 10 – 12 SP 2.2 1.6 x 10-1 0.3 1.0 TP-17 10 – 12 SW 2.9 9.0 x 10-2 0.3 1.0 TP-19 10 – 12 SP 1.6 2.5 x 10-1 0.3 1.0 TP-29 10 – 12 SP 2.3 1.5 x 10-1 0.3 1.0 TP-30 14 – 15 SP 4.3 4.3 x 10-2 0.3 0.8 These recommended design infiltration rates include a safety factor of 1.3 as recommended by the SRSM. Higher design outflow rates may be possible if full-scale drywell tests are performed. Gravel Gallery Recommendations We analyzed gravel gallery design infiltration rates using the data from the test pit permeability tests performed. The following table summarizes our recommended design infiltration rates for design of gravel galleries. Test Location Depth (feet) USCS Classification Percent Fines Design Infiltration Rate (cfs/ft2) Safety Factor P-1 (TP-3) 1 – 3 SW-SM 10.8 1.13 x 10-4 2.5 P-2 (TP-8) 1.5 – 3.5 SM 12.5 3.34 x 10-4 2.5 P-3 (TP-19) 1 – 3 GW 3.0 1.10 x 10-3 1.1 P-4 (TP-22) 2 – 4 ML 64.0 5.16 x 10-5 2.5 P-5 (TP-28) 2 – 4 SM 47.0 2.77 x 10-5 2.5 Additional Recommendations We recommend that soil borings be considered to evaluate soil and groundwater conditions at depth. It may be possible that suitable sands and gravels are present below the alluvial soils in the southern portion of the site as evidenced by the sands encountered at depth in Test Pits TP-29 and TP-30. Also, we recommend that additional test pits be excavated for pavement section analysis when a site development plan and traffic data are available. FIGURE 3 Test Pit Location Map Project No. 2013-026 December 30, 2013Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA REPORT 2 Geotechnical Evaluation, Proposed Stormwater Pond, dated October 14, 2014 REPORT 3 Geotechnical Evaluation, Phase 2, dated July 23, 2016 IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting P.O. Box 1566, Veradale, WA 99037 Phone 509-209-6262 July 23, 2015 Project No. 2013-026A NAI Black c/o Mr. Bryan Walker 107 South Howard Suite 500 Spokane, WA 99201 Re: Geotechnical Evaluation Phase 2 Painted Hills Golf Course Property 4403 South Dishman-Mica Road Spokane Valley, WA Dear Mr. Walker: As you authorized, we have completed the Phase 2 geotechnical evaluation for the Painted Hills Golf Course property at the above-referenced site in Spokane Valley, Washington. The purpose of the Phase 2 evaluation is to assess subsurface soil and groundwater conditions to assist your civil engineer, Whipple Consulting Engineers, Inc. (WCE) in evaluating stormwater management alternatives relative to potential future development. This report summarizes the results of our field investigation, laboratory testing, engineering analyses, and our opinions and recommendations for stormwater management. PROJECT DESCRIPTION We understand that the proposed project may consist of a residential development. The site consists of 91 acres currently developed as a golf course. We have assumed that stormwater runoff will be treated using drywells and/or gravel galleries for subsurface infiltration. This Phase 2 evaluation is intended to identify areas where subsurface infiltration of stormwater may be feasible due to the presence of suitable soils at depth. Phase 2 Geotechnical Evaluation Project No. 2013-026A Painted Hills Golf Course Property Parcel No. 45344.9108 Spokane Valley, WA July 23, 2015 Inland Pacific Engineering Company Page 2 AVAILABLE INFORMATION We were provided a topographic survey for the project site by WCE. This topographic survey showed the existing roadways, existing structures, property lines, and existing ground surface elevation contours. This plan was prepared by WCE and was dated November 7, 2013. The site was used as a golf course prior to our evaluation. The site is relatively level with some elevated golf greens and excavated areas for water hazards. The site is primarily grass-covered with scattered trees along the fairways and pine trees in the undeveloped area to the northwest. The clubhouse building is present at the southwest corner. In addition, we performed a preliminary geotechnical evaluation for the property in December 2013. The results of that evaluation, along with our opinions and recommendations, are summarized in our Preliminary Geotechnical Evaluation dated December 31, 2013. We also performed a geotechnical evaluation for certification of the existing levee along Chester Creek in April 2014. The results of that evaluation are summarized in our Geotechnical Evaluation dated February 12, 2015. FIELD EVALUATION Procedures A geotechnical engineer from Inland Pacific Engineering Company (IPEC) observed the drilling of 10 penetration test borings at the site. The borings were drilled between July 1 and 13, 2015 using a truck-mounted drill operated by an independent firm working under subcontract to IPEC. A geotechnical engineer from IPEC observed the borings and logged the surface and subsurface conditions. After we logged the borings, they were abandoned in accordance with state requirements. Ground surface elevations at the borings were provided by WCE. The soils encountered in the borings were visually and manually classified in the field by our field personnel in accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedures)”. The samples were returned to our facility for review of the classification by a geotechnical engineer and laboratory testing. Soils Encountered In general, the borings encountered 1 to 3 feet of topsoil at the surface. However, Borings B-4 and B-5 encountered “possible fill” in the upper 6 feet (it was considered “possible fill” because it did not appear to be native soil, but no indicator, such as buried topsoil, debris, etc., was found to confirm our opinion). Below the topsoil or “possible fill”, the borings generally encountered alluvial lean clay, silty to clayey sand, and poorly graded sands to depths ranging from 6 to 21 feet, but were typically in the upper 10 to 12 feet. Below the fill, topsoil, and alluvial soils, the borings encountered glacially deposited sands to their termination depths. Phase 2 Geotechnical Evaluation Project No. 2013-026A Painted Hills Golf Course Property Parcel No. 45344.9108 Spokane Valley, WA July 23, 2015 Inland Pacific Engineering Company Page 3 Penetration resistances (N-values) in the “possible fill” were 9 and 16 blows per foot (BPF). Penetration resistances in the sands ranged from 3 to 62 BPF and averaged 26 BPF, indicating that these soils were very loose to very dense, but were typically medium dense. A penetration resistance of 14 BPF was recorded in the clay indicating that this soil was stiff in consistency. Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Hardesty ashy silt loam, Narcisse silt loam, Endoaquolls and Fluvaquents, Phoebe ashy sandy loam, and Urban land-Springdale disturbed complex. The native soils encountered in the borings were consistent with the NRCS data. Groundwater was encountered in all the borings at depths ranging from 11 to 47 feet. The following table summarizes the groundwater depths and approximate elevations. Boring Number Depth to Groundwater (feet) Approximate Groundwater Elevation B-1 36 1970 B-2 30 1976 B-3 47 1960 B-4 31 1975 B-5 46 1962 B-6 28 1981 B-7 31 1977 B-8 36 1973 B-9 11 2000 B-10 27 1981 The observed water levels indicate that the groundwater levels drop generally from south to north with higher levels near Chester Creek. These water levels are generally consistent with the observed levels in the borings performed on the Chester Creek levee and is consistent with our opinion that this portion of the creek is the beginning of the recharge section as evidenced by the typical lack of water in the creek further downstream along with dropping groundwater levels away from the creek. Fluctuations in the groundwater level may occur due to rainfall, flooding, irrigation, spring thaw and other seasonal and annual factors not evident at the time the observations were made. FIGURE 1 Site Location Map Project No. 2013-026A July 23, 2015 Painted Hills Phase 2 4403 South Dishman-Mica Road Spokane Valley, WA FIGURE 2 NRCS Map Project No. 2013-026A July 23, 2015 Painted Hills Phase 2 4403 South Dishman-Mica Road Spokane Valley, WA FIGURE 3 Boring Location Map Project No. 2013-026A July 23, 2015 Painted Hills Phase 2 4403 South Dishman-Mica Road Spokane Valley, WA SS SS SS SS SS SS 6-8 (14) 13-12 (25) 17-14(31) 16-15(31) 10-10 (20) 11-12 (23) (ML) SILT, with roots, dark brown, moist. (Topsoil) (CL) LEAN CLAY, brown, wet, stiff.(Alluvium) (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, medium dense to dense. (Glacial Outwash) (SP) POORLY GRADED SAND, fine to medium grained, a traceof Gravel, brown, moist to 36', then water-bearing, medium dense to dense.(Glacial Outwash) NOTES GROUND ELEVATION 2006 ft LOGGED BY PTN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/2/15 COMPLETED 7/2/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING 36.00 ft / Elev 1970.00 ft AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 13-15(28) 11-13(24) 17-21 (38) 8-8 (16) (SP) POORLY GRADED SAND, fine to medium grained, a trace of Gravel, brown, moist to 36', then water-bearing, medium denseto dense.(Glacial Outwash) (continued) (SM) SILTY SAND, very fine to fine grained, brown, wet, mediumdense.(Alluvium) End of boring. Groundwater not encountered with 49' of hollow-stem auger in theground. Groundwater at 36' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 16-14 (30) 6-8 (14) 9-8(17) 7-9(16) 9-9 (18) 10-15 (25) 7 4 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine to coarse grained, a trace of Gravel,brown, moist, medium dense. (Glacial Outwash) (SW) WELL GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist to 30'. then water-bearing, medium dense to very dense.(Glacial Outwash) NOTES GROUND ELEVATION 2005.9 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/10/15 COMPLETED 7/13/15 AT TIME OF DRILLING 30.00 ft / Elev 1975.90 ft AT END OF DRILLING 39.00 ft / Elev 1966.90 ft AFTER DRILLING --- Not encountered (cave-in) HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 31-18(49) 25-19(44) 29-26 (55) 22-16 (38) (SW) WELL GRADED SAND with GRAVEL, medium to coarse grained, brown, moist to 30'. then water-bearing, medium dense tovery dense.(Glacial Outwash) (continued) End of boring. Groundwater at 30' with 34' of hollow-stem auger in the ground. Groundwater at 39' with 49' of hollow-stem auger in the ground 3days later. Groundwater not encountered to cave-in depth of 27' immediatelyafter withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 3-3 (6) 7-8 (15) 9-12(21) 24-27(51) 14-8 (22) 8-13 (21) (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SC) CLAYEY SAND, fine to medium grained, dark brown to brown, moist to wet, loose to medium dense.(Alluvium) (SP) POORLY GRADED SAND, medium to coarse grained, atrace of Gravel, brown, moist, medium dense. (Glacial Outwash) (SP) POORLY GRADED SAND, fine to medium grained, a traceof Gravel, brown, water-bearing, medium dense. (Glacial Outwash) NOTES GROUND ELEVATION 2007 ft LOGGED BY PTN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/2/15 COMPLETED 7/2/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING 47.00 ft / Elev 1960.00 ft AFTER DRILLING --- Not encountered (cave-in) HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 16-16(32) 15-14(29) 29-23 (52) 21-20 (41) (SP) POORLY GRADED SAND,fine grained, brown, moist, dense to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium to coarse grained, with seams of Silty Sand, brown, moist to water-bearing,very dense to dense.(Glacial Outwash) End of boring. Groundwater at 47' with 49' of hollow-stem auger in the ground. Groundwater not encountered to cave-in depth of 19' immediatelyafter withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 7-9 (16) 5-5 (10) 11-13(24) 3-2(5) 7-7 (14) 6-9 (15) 10 9 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SC-SM) SILTY CLAYEY SAND, fine grained, brown, moist.(Possible Fille) (SC) CLAYEY SAND, fine to medium grained, with seams of LeanClay, brown, moist to wet, loose. (Alluvium) (SW-SM) WELL GRADED SAND with SILT, medium to coarsegrained, brown, moist, medium dense. (Alluvium) (SM) SILTY SAND, very fine to fine grained, with seams of Clayey Sand, brown, wet, loose.(Alluvium) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist to 31', then water-bearing, medium dense to verydense. (Glacial Outwash) NOTES GROUND ELEVATION 2006.1 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/6/15 COMPLETED 7/6/15 AT TIME OF DRILLING 31.00 ft / Elev 1975.10 ft AT END OF DRILLING --- Not encountered (cave-in) AFTER DRILLING 45.00 ft / Elev 1961.10 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-4 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 12-16(28) 50 4-11 (15) 23-35 (58) (SP) POORLY GRADED SAND, medium to coarse grained, brown, moist to 31', then water-bearing, medium dense to verydense.(Glacial Outwash) (continued) End of boring. Groundwater at 31' with 34' of hollow-stem auger in the ground. Groundwater at 45' with 49' of hollow-stem auger in the ground 3days later. Groundwater not encountered to cave-in depth of 30' immediatelyafter withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-4 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 4-5 (9) 1-2 (3) 1-8(9) 8-11(19) 9-10 (19) 16-21 (37) 17 7 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SM) SILTY SAND, fine grained, brown, moist.(Possible Fill) (SC) CLAYEY SAND, fine grained, brown, moist, very loose.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, loose to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist to 46', then water-bearing, loose to very deense. (Glacial Outwash) NOTES GROUND ELEVATION 2008.1 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/1/15 COMPLETED 7/1/15 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING 46.00 ft / Elev 1962.10 ft AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-5 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 14-15(29) 19-22(41) 15-17 (32) 27-35 (62) (SP) POORLY GRADED SAND, medium to coarse grained, brown, moist to 46', then water-bearing, loose to very deense.(Glacial Outwash) (continued) End of boring. Groundwater at 46' with 49' of hollow-stem auger in the ground. Groundwater not encountered immediately after withdrawal of theauger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-5 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 6-7 (13) 7-7 (14) 5-10(15) 6-7(13) 8-11 (19) 10-11 (21) 15 6 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine grained, with seams of Clayey Sand, brown, moist, medium dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, loose to medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist to 25', then water-bearing, medium dense to dense. (Glacial Outwash) NOTES GROUND ELEVATION 2009.1 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/7/15 COMPLETED 7/7/15 AT TIME OF DRILLING 44.50 ft / Elev 1964.60 ft AT END OF DRILLING 44.50 ft / Elev 1964.60 ft AFTER DRILLING 28.00 ft / Elev 1981.10 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-6 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 13-15(28) 12-13(25) 19-22 (41) 22-19 (41) (SP) POORLY GRADED SAND, medium to coarse grained, brown, moist to 25', then water-bearing, medium dense to dense.(Glacial Outwash) (continued) End of boring. Groundwater at 44.5' with 49' of hollow-stem auger in the ground. Groundwater at 28' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-6 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 2-5 (7) 4-6 (10) 8-11(19) 9-8(17) 7-10 (17) 10-11 (21) 18 6 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine grained, with seams of Lean Clay, brown,moist to wet, loose. (Alluvium) (SM) SILTY SAND, very fine to fine grained, brown, moist,medium dense.(Alluvium) (SP-SM) POORLY GRADED SAND with SILT, medium to coarsegrained, a trace of Gravel, brown, moist, medium dense. (Glacial Outwash) NOTES GROUND ELEVATION 2007.6 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/10/15 COMPLETED 7/10/15 AT TIME OF DRILLING 34.00 ft / Elev 1973.60 ft AT END OF DRILLING 31.00 ft / Elev 1976.60 ft AFTER DRILLING 37.00 ft / Elev 1970.60 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-7 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 11-15(26) 12-15(27) 12-25 (37) 12-32 (44) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, medium dense.(Glacial Outwash) (continued) End of boring. Groundwater at 34' with 34' of hollow-stem auger in the ground. Groundwater at 37' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 31' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-7 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 11-11 (22) 6-5 (11) 8-10(18) 8-10(18) 9-9 (18) 10-11 (21)18 10 (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine to medium grained, brown, moist, medium dense.(Alluvium) (SP) POORLY GRADED SAND, fine to medium grained, brown,moist, medium dense. (Alluvium) (SM) SILTY SAND, fine to medium grained, with seams of Clayey Sand, brown, moist to wet, medium dense.(Alluvium) (SW-SM) WELL GRADED SAND with SILT, fine to mediumgrained, brown, moist, medium dense.(Glacial Outwash) NOTES GROUND ELEVATION 2009.3 ft LOGGED BY DD DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/7/15 COMPLETED 7/7/15 AT TIME OF DRILLING 43.00 ft / Elev 1966.30 ft AT END OF DRILLING 36.00 ft / Elev 1973.30 ft AFTER DRILLING 47.00 ft / Elev 1962.30 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-8 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 10-9(19) 13-17(30) 18-32 (50) 19-25 (44) (SW-SM) WELL GRADED SAND with SILT, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) (continued) (SP) POORLY GRADED SAND, medium to coarse grained,brown, water-bearing, medium dense to dense. (Glacial Outwash) End of boring. Groundwater at 43' with 44' of hollow-stem auger in the ground. Groundwater at 47' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 36' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-8 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 4-6 (10) 4-5 (9) 6-9(15) 9-9(18) 12-11 (23) 12-15 (27) (SM) SILTY SAND, fine to medium grained, with roots, dark brown, moist.(Topsoil) (SM) SILTY SAND, fine grained, brown, moist, loose.(Alluvium) (SC-SM) SILTY CLAYEY SAND, very fine to fine grained, brown,wet, loose. (Alluvium) (SP) POORLY GRADED SAND, fine to medium grained, brown,moist to 15', then water-bearing, medium dense to dense. (Glacial Outwash) NOTES GROUND ELEVATION 2010.6 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/8/15 COMPLETED 7/8/15 AT TIME OF DRILLING 15.00 ft / Elev 1995.60 ft AT END OF DRILLING 11.00 ft / Elev 1999.60 ft AFTER DRILLING 41.00 ft / Elev 1969.60 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-9 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 18-30(48) 20-25(45) 26-24 (50) 21-26 (47) (SP) POORLY GRADED SAND, fine to medium grained, brown, moist to 15', then water-bearing, medium dense to dense.(Glacial Outwash) (continued) (SP) POORLY GRADED SAND, medium to coarse grained, a trace of Gravel, brown, moist, dense.(Glacial Outwash) End of boring. Groundwater at 15' with 19' of hollow-stem auger in the ground. Groundwater at 41' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 11' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-9 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS SS SS 5-6 (11) 4-5 (9) 9-9(18) 8-8(16) 11-15 (26) 11-15 (26) 19 9 (SM) SILTY SAND, fine grained, with roots, dark brown, moist. (Topsoil) (SP) POORLY GRADED SAND, medium to coarse grained,brown, moist, medium dense. (Alluvium) (SM) SILTY SAND, fine grained, brown, moist, loose.(Alluvium) (SW-SM) WELL GRADED SAND with SILT, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) NOTES GROUND ELEVATION 2008.4 ft LOGGED BY SLN DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 7/8/15 COMPLETED 7/8/15 AT TIME OF DRILLING 28.00 ft / Elev 1980.40 ft AT END OF DRILLING 27.00 ft / Elev 1981.40 ft AFTER DRILLING 48.00 ft / Elev 1960.40 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS (Continued Next Page)PLASTICITYINDEXGRAPHICLOGDEPTH(ft)0 5 10 15 20 25 30 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 1 OF 2 BORING NUMBER B-10 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 SS SS SS SS 13-14(27) 21-25(46) 21-23 (44) 19-20 (39) (SW-SM) WELL GRADED SAND with SILT, fine to medium grained, brown, moist, medium dense.(Glacial Outwash) (continued) End of boring. Groundwater at 28' with 29' of hollow-stem auger in the ground. Groundwater at 48' with 49' of hollow-stem auger in the ground 3days later. Groundwater at 27' immediately after withdrawal of the auger. Bore hole then grouted to the surface.SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)DRY UNIT WT.(pcf)MOISTURECONTENT (%)LIQUIDLIMITPLASTICLIMITPLASTICITYINDEXFINES CONTENT(%)ATTERBERGLIMITS PLASTICITYINDEXGRAPHICLOGDEPTH(ft)35 40 45 50 POCKET PEN.(tsf)MATERIAL DESCRIPTION PAGE 2 OF 2 BORING NUMBER B-10 CLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA IPEC BORING LOG - GINT STD US LAB.GDT - 7/23/15 13:25 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 DENSITY Very Loose 0 - 4 Loose 4 - 10 Coarse-Gravel and Gravel GW Grained Gravelly Soils (with little or no fines)GP Soils <50% coarse fraction Gravel GM passes #4 sieve (with >12% fines)GC <50% Sandy and Sand SW passes #200 Sandy Soils (with little or no fines)SP sieve >50% coarse fraction Sand SM passes #4 sieve (with >12% fines)SC Fine-ML Grained CL Soils OL >50% MH passes #200 CH sieve OH PT Peat DESCRIPTION RANGE Occasional <5% Trace 5% - 12% With >12% Coarse Fine Coarse Medium Fine MODIFIERS Hard > 30 USCS SOIL CLASSIFICATION Liquid Limit > 50 Highly Organic Soils Silt and Clay MAJOR DIVISIONS Liquid Limit < 50 Salt and Clay Organic Clay and Silt (med to high plasticity) Muck Well Graded Sand Inorganic Silt Fat Clay MOISTURE CONTENT Gravel SandBoulders Cobbles GRAIN SIZE (INCHES) Silt and Clay 12 3 0.75 0.19 0.079 0.0171 0.0029 17 - 30 Soft Rather Soft Medium Rather Stiff Stiff Very Stiff 2 - 3 4 - 5 6 - 8 9 - 12 RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALVE FINE-GRAINED SOILS N(BLOWS/FT) CONSISTENCY N(BLOWS/FT) Very Soft 0 - 1 MAJOR DIVISIONS WITH GRAIN SIZE SIEVE SIZE 12" 3" 3/4" 4 10 40 200 COARSE-GRAINED SOILS Poorly Graded Sand Silty Sand Clayey Sand Silt Lean Clay Organic Silt and Clay (low plasticity) GROUP DESCRIPTIONS Well Graded Gravel Poorly Graded Gravel Silty Gravel Clayey Gravel 13 - 16 FIELD OBSERVATION Absence of moisture, dusty, dry to the touch Dry of optimum moisture content Wet of optimum moisture content DESCRIPTION Dry Moist Wet Very Dense > 50 Dense 31 - 50 Medium-Dense 11 - 30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 8.02 21.25 6.64 4.30 5.00 1.57 2.32 1.39 1.21 1.35 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 4.5 8.9 7.1 5.6 5.6 19 15.9 19 12.2 9.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SW Well Graded Sand with Gravel SW-SM Well Graded Sand with Silt SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt Classification D100 D60 D30 D10 %Gravel 4.187 2.258 1.187 0.923 0.899 B-2 B-4 B-5 B-6 B-7 coarse SILT OR CLAYfinemedium 25.0 15.0 25.0 20.0 20.0 %Sand %Silt %Clay 1.851 0.747 0.543 0.491 0.467 0.522 0.106 0.179 0.215 0.18 35.1 13.3 5.9 1.6 0.7 60.4 77.8 87.0 92.8 93.6 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-2 B-4 B-5 B-6 B-7 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 25.0 15.0 25.0 20.0 20.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 13:26 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 7.39 6.26 1.78 1.72 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 9.7 8.8 9.5 9.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SW-SM Well Graded Sand with Silt SW-SM Well Graded Sand with Silt Classification D100 D60 D30 D10 %Gravel 0.582 0.581 B-8 B-10 coarse SILT OR CLAYfinemedium 30.0 15.0 %Sand %Silt %Clay 0.286 0.305 0.079 0.093 0.5 0.5 89.8 90.7 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-8 B-10 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 30.0 15.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 2013-026A PROJECT NAME Pinted Hills Phase 2 PROJECT LOCATION Spokane Valley, WA GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 13:26 - J:\_IPEC PROJECTS\_2013 PROJECTS\2013-026A PAINTED HILLS PHASE 2\GINT\2013-026A PAINTED HILLS PHASE 2.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 REPORT 4 Supplemental Geotechnical Evaluation, dated April 19, 2016 IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting P.O. Box 1566, Veradale, WA 99037 Phone 509-209-6262 April 19, 2016 Project No. 16-249 NAI Black c/o Mr. Bryan Walker 107 South Howard Suite 500 Spokane, WA 99201 Re: Supplemental Geotechnical Evaluation Painted Hills Golf Course Property 4403 South Dishman-Mica Road Spokane Valley, WA Dear Mr. Walker: As you authorized, we have completed the supplemental geotechnical evaluation for the Painted Hills Golf Course property at the above-referenced site in Spokane Valley, Washington. The purpose of the supplemental evaluation is to provide additional soil and groundwater data to address concerns of the City of Spokane Valley. This report summarizes the results of our field investigation, laboratory testing, engineering analyses, and our opinions and recommendations for stormwater management. PROJECT DESCRIPTION We understand that the proposed project may consist of a residential development. The site consists of 91 acres currently developed as a golf course. Stormwater runoff will be treated using drywells and/or gravel galleries for subsurface infiltration. These type of facilities will also be used to manage potential floodwaters, if needed. This supplemental evaluation is intended to provide additional subsurface data at the north end of the site to assist in identifying areas where subsurface infiltration of stormwater may be feasible due to the presence of suitable soils at depth. Supplemental Geotechnical Evaluation Project No. 16-249 Painted Hills Golf Course Property Parcel No. 45344.9108 Spokane Valley, WA April 19, 2016 Inland Pacific Engineering Company Page 2 AVAILABLE INFORMATION We were provided a topographic survey for the project site by Whipple Consulting Engineers, Inc. (WCE). This topographic survey showed the existing roadways, existing structures, property lines, and existing ground surface elevation contours. This plan was prepared by WCE and was dated November 7, 2013. The site was used as a golf course prior to our evaluation. The site is relatively level with some elevated golf greens and excavated areas for water hazards. The site is primarily grass-covered with scattered trees along the fairways and pine trees in the undeveloped area to the northwest. The clubhouse building is present at the southwest corner. In addition, we performed a preliminary geotechnical evaluation for the property in December 2013. The results of that evaluation, along with our opinions and recommendations, are summarized in our Preliminary Geotechnical Evaluation dated December 31, 2013. We also performed a geotechnical evaluation for certification of the existing levee along Chester Creek in April 2014. The results of that evaluation are summarized in our Geotechnical Evaluation report dated February 12, 2015. Lastly, we performed a geotechnical evaluation in July 2015 consisting of ten 50-foot borings in the south half of the property. The results of that evaluation are summarized in our Geotechnical Evaluation Phase 2 report dated July 23, 2015. FIELD EVALUATION Procedures A geotechnical engineer from Inland Pacific Engineering Company (IPEC) observed the drilling of three penetration test borings at the site. The borings were drilled between March 17 and 19, 2016 using a truck-mounted drill operated by an independent firm working under subcontract to IPEC. A geotechnical engineer or engineering assistant from IPEC observed the borings and logged the surface and subsurface conditions. After we logged the borings, they were abandoned in accordance with state requirements. Ground surface elevations at the borings were provided by WCE. The soils encountered in the borings were visually and manually classified in the field by our field personnel in accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedures)”. The samples were returned to our facility for review of the classification by a geotechnical engineer and laboratory testing. Supplemental Geotechnical Evaluation Project No. 16-249 Painted Hills Golf Course Property Parcel No. 45344.9108 Spokane Valley, WA April 19, 2016 Inland Pacific Engineering Company Page 3 Soils Encountered In general, the borings encountered 2 feet of topsoil at the surface. Below the topsoil, the borings generally encountered glacially-deposited silty to clayey sands and/or gravels overlying poorly graded sands to termination depths of the borings. The clayey sands and gravels were generally encountered in the upper 12 to 18 feet. Penetration resistances in the sands and gravels ranged from 15 to 90 blows per foot (BPF) and averaged 37 BPF, indicating that these soils were medium dense to very dense, but were typically dense. Geologic maps indicate the soils in this area consist primarily of alluvial and/or glacially deposited silts, clays, sands, and gravels. According to the Soil Survey of Spokane County, the site soils are classified by the Natural Resource Conservation Service (NRCS) as Hardesty ashy silt loam, Narcisse silt loam, Endoaquolls and Fluvaquents, Phoebe ashy sandy loam, and Urban land-Springdale disturbed complex. The native soils encountered in the borings were consistent with the NRCS data. Groundwater was encountered in Boring B-2 at a depth of 71 feet. This depth corresponds to an elevation of 1934.6. Groundwater was not encountered in the remaining borings. The observed water levels further indicates that groundwater levels drop generally from south to north with higher levels near Chester Creek. Fluctuations in the groundwater level may occur due to rainfall, flooding, irrigation, spring thaw and other seasonal and annual factors not evident at the time the observations were made. ANALYSIS, OPINIONS, AND RECOMMENDATIONS Based on the data obtained from the recent and previous borings, previous test pits, field permeability tests, and laboratory tests performed, it is our opinion that subsurface infiltration of stormwater is feasible. The most promising layers are the glacial sands and gravels. These soils would be suitable for infiltration using standard drywells. We will perform a mounding analysis for the drywells after the proposed full-scale drywell test is completed to assess down-gradient impacts REMARKS This report is for the exclusive use of the addressee and the copied parties to use in design of the proposed project and to prepare construction documents. In the absence of our written approval, we make no representations and assume no responsibility to other parties regarding this report. The data, analyses, and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. FIGURE 1 Site Location Map Project No. 16-249 April 19, 2016 Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA FIGURE 2 NRCS Map Project No. 16-249 April 19, 2016 Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA FIGURE 3 Boring Location Map Project No. 16-249 April 19, 2016 Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA SS SS SS SS SS SS 2003.9 1988.9 SM SP-SM SP 2.0 17.0 (SM) SILTY SAND, fine to medium grained, with roots, dark brown,moist.(Topsoil) (SP-SM) POORLY GRADED SAND with SILT, medium to coarse grained, a trace of Gravel, brown, moist, medium dense. (Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium to coarse grained, brown, moist, very dense to medium dense. (Glacial Outwash) Fines = 7% NOTES GROUND ELEVATION 2005.9 ft LOGGED BY PRF DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 3/17/16 COMPLETED 3/17/16 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERDEPTH(ft)0 5 10 15 20 25 30 (Continued Next Page) PAGE 1 OF 2 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS SS SS SS SS 1955.4 SP 50.5 (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, brown, moist, very dense to medium dense.(Glacial Outwash) (continued) End of boring. Groundwater not encountered with 49' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of the auger. Bore hole then abandoned.SAMPLE TYPENUMBERDEPTH(ft)35 40 45 50 PAGE 2 OF 2 BORING NUMBER B-1 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS SS SS SS SS SS SS 2003.6 1999.1 1993.6 12-33 (45) 24-20 (44) 24-29(53) 25-28(53) 10-18 (28) 11-13 (24) SM SC GC SP 2.0 6.5 12.0 (SM) SILTY SAND, fine to medium grained, with roots, darkbrown, moist.(Topsoil) (SC) CLAYEY SAND with GRAVEL, medium to coarse grained, brown, moist to wet, dense. (Glacial Outwash) (GC) CLAYEY GRAVEL with SAND, fine to coarse grained, brown, moist, dense. (Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium tocoarse grained, a trace of Cobbles, brown, moist, very denseto medium dense. (Glacial Outwash) Fines = 8% NOTES GROUND ELEVATION 2005.6 ft LOGGED BY PRF DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 3/17/16 COMPLETED 3/18/16 AT TIME OF DRILLING --- Not encontered AT END OF DRILLING 71.00 ft / Elev 1934.60 ft AFTER DRILLING 73.50 ft / Elev 1932.10 ft HOLE SIZE 8 inches SAMPLE TYPENUMBERDEPTH(ft)0 5 10 15 20 25 30 (Continued Next Page) PAGE 1 OF 3 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 BLOWCOUNTS(N VALUE)U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS SS SS SS SS SS 28-37(65) 50/5" 50/5" 50/5" 8-17(25) SP (SP) POORLY GRADED SAND with GRAVEL, medium tocoarse grained, a trace of Cobbles, brown, moist, very denseto medium dense. (Glacial Outwash) (continued)SAMPLE TYPENUMBERDEPTH(ft)35 40 45 50 55 60 65 (Continued Next Page) PAGE 2 OF 3 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 BLOWCOUNTS(N VALUE)U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS SS 1930.6 21-11 (32) SP 75.0 (SP) POORLY GRADED SAND with GRAVEL, medium tocoarse grained, a trace of Cobbles, brown, moist, very denseto medium dense. (Glacial Outwash) (continued) End of boring. Groundwater encountered at 71' with 75' of hollow-stem auger in the ground. Goundwater encountered at 73.5' 10 minutes later. Groundwater not encountered to cave-in depth of 15' immediately after withdrawal of the auger. Bore hole then abandoned.SAMPLE TYPENUMBERDEPTH(ft)70 75 PAGE 3 OF 3 BORING NUMBER B-2 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 BLOWCOUNTS(N VALUE)U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS SS SS SS SS SS SS 2002.5 1996.5 1992.5 1986.5 ML GC SC GC SP 2.0 8.0 12.0 18.0 (ML) SANDY SILT, with roots, dark brown, moist.(Topsoil) (GC) CLAYEY GRAVEL with SAND, fine to coarse grained, brown, moist, dense. (Glacial Outwash) (SC) CLAYEY SAND with GRAVEL, medium to coarse grained, brown,moist to wet, dense.(Glacial Outwash) (GC) SILTY CLAYEY GRAVEL with SAND, fine to coarse grained,brown, moist, medium dense.(Glacial Outwash) (SP) POORLY GRADED SAND with GRAVEL, medium to coarse grained, a trace of Cobbles, brown, moist, very dense to medium dense. (Glacial Outwash) Fines = 6% NOTES GROUND ELEVATION 2004.5 ft LOGGED BY PRF DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR Johnson Exploration Drilling GROUND WATER LEVELS: CHECKED BY PTN DATE STARTED 3/18/16 COMPLETED 3/19/16 AT TIME OF DRILLING --- Not encountered AT END OF DRILLING --- Not encountered AFTER DRILLING --- Not encountered HOLE SIZE 8 inches SAMPLE TYPENUMBERDEPTH(ft)0 5 10 15 20 25 30 (Continued Next Page) PAGE 1 OF 2 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS SS SS SS SS 1954.0 SP 50.5 (SP) POORLY GRADED SAND with GRAVEL, medium to coarsegrained, a trace of Cobbles, brown, moist, very dense to medium dense.(Glacial Outwash) (continued) End of boring. Groundwater not encountered with 49' of hollow-stem auger in theground. Groundwater not encountered immediately after withdrawal of the auger. Bore hole then abandoned.SAMPLE TYPENUMBERDEPTH(ft)35 40 45 50 PAGE 2 OF 2 BORING NUMBER B-3 CLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 4/5/16 11:26 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTIONTESTS DENSITY Very Loose 0 - 4 Loose 4 - 10 Coarse-Gravel and Gravel GW Grained Gravelly Soils (with little or no fines)GP Soils <50% coarse fraction Gravel GM passes #4 sieve (with >12% fines)GC <50% Sandy and Sand SW passes #200 Sandy Soils (with little or no fines)SP sieve >50% coarse fraction Sand SM passes #4 sieve (with >12% fines)SC Fine-ML Grained CL Soils OL >50% MH passes #200 CH sieve OH PT Peat DESCRIPTION RANGE Occasional <5% Trace 5% - 12% With >12% Coarse Fine Coarse Medium Fine MODIFIERS Hard > 30 USCS SOIL CLASSIFICATION Liquid Limit > 50 Highly Organic Soils Silt and Clay MAJOR DIVISIONS Liquid Limit < 50 Salt and Clay Organic Clay and Silt (med to high plasticity) Muck Well Graded Sand Inorganic Silt Fat Clay MOISTURE CONTENT Gravel SandBoulders Cobbles GRAIN SIZE (INCHES) Silt and Clay 12 3 0.75 0.19 0.079 0.0171 0.0029 17 - 30 Soft Rather Soft Medium Rather Stiff Stiff Very Stiff 2 - 3 4 - 5 6 - 8 9 - 12 RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N-VALVE FINE-GRAINED SOILS N(BLOWS/FT) CONSISTENCY N(BLOWS/FT) Very Soft 0 - 1 MAJOR DIVISIONS WITH GRAIN SIZE SIEVE SIZE 12" 3" 3/4" 4 10 40 200 COARSE-GRAINED SOILS Poorly Graded Sand Silty Sand Clayey Sand Silt Lean Clay Organic Silt and Clay (low plasticity) GROUP DESCRIPTIONS Well Graded Gravel Poorly Graded Gravel Silty Gravel Clayey Gravel 13 - 16 FIELD OBSERVATION Absence of moisture, dusty, dry to the touch Dry of optimum moisture content Wet of optimum moisture content DESCRIPTION Dry Moist Wet Very Dense > 50 Dense 31 - 50 Medium-Dense 11 - 30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 8.65 8.72 9.95 1.37 2.10 1.85 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 6.8 8.2 6.2 19 19 19 SAND GRAIN SIZE IN MILLIMETERS coarse fine SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt SP-SM Poorly Graded Sand with Silt Classification D100 D60 D30 D10 %Gravel 2.679 1.992 4.708 B-1 B-2 B-3 coarse SILT OR CLAYfinemedium 30.0 25.0 30.0 %Sand %Silt %Clay 1.065 0.977 2.032 0.31 0.228 0.473 21.9 13.9 39.7 71.2 77.9 54.1 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 B-1 B-2 B-3 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 30.0 25.0 30.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 16-249 PROJECT NAME Painted Hills Supplemental PROJECT LOCATION 4403 South Dishman-Mica Road GRAIN SIZE - GINT STD US LAB.GDT - 4/19/16 15:07 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249 PAINTED HILLS SUPPLEMENTAL\GINT\16-249 PAINTED HILLS SUPPLEMENTAL.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 21.8 48.5 25.4 25 19 37.5 SAND GRAIN SIZE IN MILLIMETERS coarse fine SM Silty Sand with Gravel SM SIlty Sand SM Silty Sand with Gravel Classification D100 D60 D30 D10 %Gravel 2.902 0.179 3.959 TP-3 TP-5 TP-6 coarse SILT OR CLAYfinemedium 3.5 4.0 4.0 %Sand %Silt %Clay 0.336 0.195 30.4 12.6 36.9 47.8 38.9 37.6 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 TP-3 TP-5 TP-6 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 3.5 4.0 4.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 14-037B PROJECT NAME Gustin Levee PROJECT LOCATION Spokane County GRAIN SIZE - GINT STD US LAB.GDT - 7/23/15 15:31 - J:\_IPEC PROJECTS\_2014 PROJECTS\14-037B GUSTIN LEVEE FOR PAINTED HILLS\GINT\14-037B GUSTIN LEVEE.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 REPORT 5 Full-Scale Drywell Testing, dated August 22, 2017 IPEC Inland Pacific Engineering Company Geotechnical Engineering and Consulting P.O. Box 1566, Veradale, WA 99037 Phone 509-209-6262 August 22, 2017 Project No. 16-249A NAI Black c/o Mr. Bryan Walker 107 South Howard Suite 500 Spokane, WA 99201 Re: Addendum to Full-Scale Drywell Testing Proposed Stormwater Management Facility 4403 South Dishman-Mica Road Spokane Valley, WA Dear Mr. Walker: As you authorized, we have completed a full-scale drywell test on the drywell installed at the above-referenced site in Spokane Valley, Washington. The purpose of the testing was to establish a design flow rate. This addendum provides our recommendations for a design infiltration rate for proposed gravel galleries between the drywells. AVAILABLE INFORMATION We were provided a topographic survey for the project site by Whipple Consulting Engineers, Inc. (WCE). This topographic survey showed the existing roadways, existing structures, property lines, and existing ground surface elevation contours. This plan was prepared by WCE and was dated November 7, 2013. The site was used as a golf course prior to our evaluation. The site is relatively level with some elevated golf greens and excavated areas for water hazards. The site is primarily grass-covered with scattered trees along the fairways and pine trees in the undeveloped area to the northwest. The clubhouse building is present at the southwest corner. In addition, we performed a preliminary geotechnical evaluation for the property in December 2013. The results of that evaluation, along with our opinions and recommendations, are summarized in our Preliminary Geotechnical Evaluation dated December 31, 2013. Addendum to Full-Scale Drywell Testing Project No. 16-249A Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane Valley, WA August 22, 2017 Inland Pacific Engineering Company Page 2 We also performed a geotechnical evaluation for certification of the existing levee along Chester Creek in April 2014. The results of that evaluation are summarized in our Geotechnical Evaluation report dated February 12, 2015. Lastly, we performed a geotechnical evaluation in July 2015 consisting of ten 50-foot borings in the south half of the property. The results of that evaluation are summarized in our Geotechnical Evaluation Phase 2 report dated July 23, 2015. FIELD EVALUATION A geotechnical engineer from Inland Pacific Engineering Company (IPEC) performed a full-scale drywell test on the Type 2 drywell (double depth) on May 6, 2016. The drywell test was performed in accordance with the Spokane Regional Stormwater Manual, Appendix 4B procedures. The drywell was installed at the location shown on Figure 3 (attached). ANALYSIS AND RECOMMENDATIONS We calculated a design outflow rate for the existing drywell to be 1.05 cfs for design. This recommended design outflow rate included a safety factor of 1.1 as required by the SRSM. Using this design outflow rate and assuming a typical infiltration area of 600 square feet for a Type 2 drywell, we recommend using a design infiltration rate of 1.8 x 10-3 cubic feet per second per square foot (cfs/ft2). This recommended infiltration rate also includes a safety factor of 1.1. REMARKS This report is for the exclusive use of the addressee and the copied parties to use in design of the proposed project and to prepare construction documents. In the absence of our written approval, we make no representations and assume no responsibility to other parties regarding this report. The data, analyses, and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. Services performed by the geotechnical engineers for this project have been conducted in a manner consistent with that level of care ordinarily exercised by members of the profession currently practicing in this area under similar budget and time restraints. No warranty, expressed or implied, is intended or made. FIGURE 1 Site Location Map Project No. 16-249A June 28, 2016 Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA FIGURE 2 NRCS Map Project No. 16-249A June 28, 2016 Painted Hills Golf Course 4403 South Dishman-Mica Road Spokane County, WA 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 PI Cc CuLLPL 5.761.00 GRAIN SIZE DISTRIBUTION COBBLES GRAVEL 3.550 SAND GRAIN SIZE IN MILLIMETERS coarse fine SP Poorly Graded Sand with Gravel Classification D100 D60 D30 D10 %Gravel 5.212 L16-057 coarse SILT OR CLAYfinemedium 20.0 %Sand %Silt %Clay 2.167 0.904 42.9 53.6 BOREHOLE DEPTH BOREHOLE DEPTH 3 100 L16-057 24 16 301 200610501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 1403420406601.5 8 143/4 3/8 20.0PERCENT FINER BY WEIGHTCLIENT NAI Black PROJECT NUMBER 16-249A PROJECT NAME Painted Hills Drywell Test PROJECT LOCATION 4403 South Dishman-Mica Road GRAIN SIZE - GINT STD US LAB.GDT - 6/28/16 15:32 - J:\_IPEC PROJECTS\_2016 PROJECTS\16-249A PAINTED HILLS DRYWELL TESTING\GINT\16-249A PAINTED HILLS DRYWELL TEST.GPJInland Pacific Engineering Company 3012 North Sullivan Road, Suite C Spokane Valley, WA 99216 Telephone: 509-209-6262 Fax: 509-290-5734 Full-Scale Drywell Test Results Time Elapsed Time (seconds) Depth to Water (feet) Flow Meter Reading (ft3) Volume of Water (ft3) Flow Rate (cfs) 10:00 0 19.5 596.6 11:00 3600 18.2 1171.5 574.90 1.60E-01 11:10 600 18.2 1261.0 89.50 1.49E-01 11:20 600 18.2 1350.7 89.70 1.50E-01 11:30 600 18.2 1441.1 90.40 1.51E-01 11:35 18.3 11:40 18.6 11:45 19.1 11:50 19.5 1.50E-01 5/6/2016 Test Location: Existing Drywell Average Flow Rate: Project Name: Painted Hills Drywell Test Project Number: 16-249A Test Date: Client: NAI Black Depth: 20' 17.5 18.0 18.5 19.0 19.5 20.0 Depth to Water (feet) Depth to Water 1.42E‐01 1.44E‐01 1.46E‐01 1.48E‐01 1.50E‐01 1.52E‐01 1.54E‐01 1.56E‐01 1.58E‐01 1.60E‐01 1.62E‐01 11:00 11:10 11:20 11:30 Flow Rate (cfs) Flow Rate (cfs) P.O. Box 1566, Veradale, WA 99037 Phone 509-209-6262 APPENDIX J INFILTRATION FACILITIES DESIGN REPORT, SITE PLANS, O&M PLANS NOTE: O&M PLANS AWAITING COMPLETION PER JURISDICTION COMMENTS WESNCABBREVIATIONSC0.0 COVER SHEETC0.1 GENERAL NOTESC1.0 TOPOGRAPHIC SURVEYC5.0 HIGHWAY 27 TO TRIANGLE POND PIPE P&PC5.1 TRIANGLE POND PLANC9.0 EROSION CONTROL/SWPPP PLANC9.1 SWPPP NOTESC9.2 SWPPP BMPsC9.3 SWPPP BMPsLEGENDEXISTING DESCRIPTION PROPOSEDSEWERWATERDRAINAGEGASTELE-POWERCOVER SHEETC0.0RMA 1" = 100'N/AXIMPROVEMENT PLANSGUSTIN PIPE PLANSLOCATED IN A PORTION OFSE1/4, SEC. 33, T.25N., R. 44E., W.M.SPOKANE COUNTY, WAPROJECTLOCATIONLOCATION MAPSHEET INDEXSITE PLAN40TH AVENUEHIGHWAY 2740TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.:INSP. COUNTYGAS - POWERFIRETELEPHONEWATERSEWERCABLEENGINEERINGSURVEYORHEALTHDEVELOPERROADWAYSPERMIT SPECIALISTSTORM WATERPROPERTY OWNERPROPERTY OWNER GENERAL NOTESC0.1RMA N/AN/AX40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.:SPOKANE COUNTY STREET NOTESSTORM DRAINAGE NOTESWCE GENERAL NOTESWCE GRADING NOTES TOPOGRAPHIC SURVEY (REF. ONLY)C1.0RMA 1" = 60'N/AX40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.:W ESNCABBREVIATIONSFOR REFERENCE ONLYTOPOGRAPHIC SURVEYLEGEND40TH AVENUEHIGHWAY 27 HWY 27 TO TRIANGLE POND PIPE P&PC5.0STT 1" = 30'N/AX40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONAW ESNCSEE SHEET C0.0FOR FULL LEGENDCONSTRUCTION NOTES TRIANGLE POND DETAILC5.1RMA 1" = 20'N/AX40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.:W ESNCCONSTRUCTION NOTESSEEDING NOTE:BSEEDING NOTE:A40TH AVENUE 36" CULVERT ACCESS DETAILD SWPPP/EROSION CONTROL PLANGUSTIN PIPE40TH AVENUESPOKANE COUNTY, WASHINGTONSE 1/4 OF SEC. 33, T. 25 N., R. 44 E., W.M.WESNCINDEX TO PLAN SHEETSC9.0 SWPPP/EROSION CONTROLCOVER SHEETC9.1 SWPPP NOTESC9.2 SWPPP BMP'SC9.3 SWPPP BMP'SLEGENDSWPPP COVERC9.0RMA 1" = 100'N/AXPROJECTLOCATIONLOCATION MAP40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.:GENERAL NOTESSITE PLAN40TH AVENUEHIGHWAY 27INSP. COUNTYGAS - POWERFIRETELEPHONEWATERSEWERCABLEENGINEERINGSURVEYORHEALTHDEVELOPERROADWAYSPERMIT SPECIALISTSTORM WATEROWNEROWNER SWPPP NOTESC9.1RMA N/AN/AXEROSION & SEDIMENT CONTROLGENERAL NOTES AND INFORMATIONMAINTENANCE40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.:E.S.C. STANDARD PLAN NOTES FROM APPENDIX 9A OF THE SPOKANE REGIONAL STORMWATER MANUALSRCAA GENERAL NOTES SWPPP BMPsC9.2RMA N/AN/AX1-SILT FENCE DETAIL2-ROCK CONSTRUCTION ENTRYCONSTRUCTION ENTRANCEPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:MAINTENANCE STANDARDS:BMP C233: SILT FENCEPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:DESIGN AND INSTALLATION:(CONTINUED)MAINTENANCESTANDARDS:BMP C105: STABILIZED 40TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.: SWPPP BMPsC9.3RMA N/AN/AXINLET SEDIMENT FILTER-3GRAVEL AND WIRE MESHBMP C220: STORM DRAIN INLET PROTECTIONPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:BMP C140: DUST CONTROLPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:MAINTENANCE STANDARDS:DESIGN AND INSTALLATIONCONTINUED: MAINTENANCE STANDARDS:BMP C151: CONCRETE HANDLINGPURPOSE:CONDITIONS OF USE:·······DESIGN AND INSTALLATION:MAINTENANCE STANDARDS:CONCRETE TRUCK WASHOUT STANDARDS-440TH AVENUESPOKANE COUNTY, WADRAWN:PROJ #:REVIEWED:DATE:NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/16/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS21 S. PINES RD,SPOKANE VALLEY, WA 99206PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERGUSTIN PIPE 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08/03/16RMA ORIGINAL PREPARATIONASpokane County PermitNo.: WESNCABBREVIATIONSC0.0 COVER SHEETC0.1 GENERAL NOTESC0.1A WCE GENERAL NOTESC0.2 DISHMAN-MICA RD X-SECTIONSC0.3 THORPE RD & MADISON RD CROSS SECTIONSC1.0 OVERALL TOPOGRAPHYC1.1 NORTH TOPOGRAPHY MAPC1.2 SOUTH TOPOGRAPHY MAPC1.3 SITE ELEMENT PLANC3.00 DISHMAN-MICA RD PLAN & PROFILEC3.01 DISHMAN-MICA RD PLAN &PROFILEC3.02 DISHMAN-MICA RD PLAN & PROFILEC3.03 SUNDOWN DR & SIDEWALK PLAN & PROFILEC3.10 THORPE RD PLAN & PROFILEC3.11 THORPE RD PLAN & PROFILEC3.12 CHESTER CREEK CULVERT WIDENINGC3.20 MADISON RD PLAN & PROFILEC3.21 MADISON RD PLAN & PROFILEC3.22 MADISON RD PLAN & PROFILEC3.23 MADISON RD PLAN & PROFILEC3.30 INTERSECTION DETAILSC4.0 GRADING PLANC5.0 STORM SYSTEM OVERVIEWC5.10 BOX CULVERT-CHANNEL-PIPE PLANC5.11 BOX CULVERT DETAILSC5.20 MADISON ROAD PIPE P&PC5.21 MADISON ROAD PIPE P&P CONT.C5.22 MADISON RD CULVERT PLANC5.30 BIOSWALE/SETTLING POND P&PC5.31 INFILTRATION POND PLANC5.32 INFILTRATION PONDS DETAILSC5.6 INFILTRATION HEADWALL DETAILSC6.0 RETAINING WALL SECTIONSC6.1 RETAINING WALL DETAILSC9.0 SWPPP COVERC9.1 SWPPP STANDARD NOTESC9.2 SWPPP BMPsC9.3 SWPPP BMPsC10.0 DISHMAN-MICA RD SIGNING & STRIPING PLANC10.1 THORPE RD SIGNING & STRIPING PLANC10.2 MADISON RD SIGNING & STRIPING PLANLEGENDEXISTING DESCRIPTION PROPOSEDSEWERWATERDRAINAGEGASTELE-POWERCOVER SHEETC0.0JPP/STT 1" = 300'N/AXIMPROVEMENT PLANSPAINTED HILLS FLOOD CONTROL PLANSLOCATED IN A PORTION OFSE1/4, SEC. 33, T.25N., R. 44E., W.M.CITY OF SPOKANE VALLEY, WADISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRDVERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2PROJECTLOCATIONLOCATION MAPSHEET INDEXSITE PLAN VIEWINSPECTIONGAS FIRETELEPHONEWATERSOLID WASTESEWERPERMIT SPECIALISTDEV. CONST. INSP.CABLEENGINEERINGSURVEYORHEALTHOWNERROADWAYSPOWERFUTUREDEVELOPMENTDISHMAN-MICA ROADTHORPE ROADMADISON ROAD 40TH AVENUEHIGHWAY 2744TH AVE43RD AVEPAINTED HILLS AVESUNDOWN DRALVERAZ DRDARCY DR42ND AVECIMMARON DR41ST AVEPINES DR ROBBIE ST WHIPPLE ST PINES DR WHIPPLE ST GENERAL NOTESC0.1ARMA N/AN/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRDVERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)WCE GENERAL NOTESWCE STORM DRAINAGE NOTESWCE GRADING NOTES SPOKANE VALLEYGENERAL CONSTRUCTION NOTES(APPENDIX 4A OF CITY OF SPOKANE VALLEY STREET STANDARDS)GENERAL NOTESC0.1RMA N/AN/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRDVERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)STORM DRAINAGE NOTES FIELD INFORMATIONOFFICE CALCULATIONSDistanceExisting LeftDist C/L toEx Elev @Dist SawcutTop of CurbMin Curb.Proposed ProposedProposedStation C/L Elev LT EP Elev C/L Grade C/L to EP LTCross SlopeSawcut Sawcutto Lip of Gutter @ 4.5% @ 2.0%Curb Elev. FL Grade Sta.Cross-slope2000.00 2022.60 2021.1318.000.0817 0.00 2022.60 22.00 2021.99 2022.542024.782000.00 -0.08170.0034-0.00592050.00 2022.77 2021.6818.000.0606 0.00 2022.77 22.00 2022.16 2022.712024.482050.00 -0.06060.00790.00432059.27 2022.84 2021.7818.000.0591 0.00 2022.84 22.00 2022.23 2022.782024.522059.27 -0.05910.00680.00672100.00 2023.12 2022.0618.000.0588 0.00 2023.12 22.00 2022.51 2023.062024.792100.00 -0.0588.0.00520.00462150.00 2023.38 2022.3418.000.0576 0.00 2023.38 22.00 2022.77 2023.322025.022150.00 -0.05760.00250.00322200.00 2023.50 2022.4418.000.0591 0.00 2023.50 22.00 2022.89 2023.442025.182200.00 -0.05910.00040.00002250.00 2023.52 2022.4818.000.0580 0.00 2023.52 22.00 2022.91 2023.462025.182250.00 -0.0580-0.0038-0.00392300.00 2023.33 2022.2918.000.0579 0.00 2023.33 22.00 2022.72 2023.272024.992300.00 -0.0579-0.0071-0.00762350.00 2022.98 2021.9518.000.0569 0.00 2022.98 22.00 2022.37 2022.922024.612350.00 -0.0569-0.0093-0.00992400.00 2022.51 2021.5118.000.0556 0.00 2022.51 22.00 2021.90 2022.452024.112400.00 -0.0556-0.0114-0.01172450.00 2021.94 2020.9518.000.0549 0.00 2021.94 22.00 2021.33 2021.882023.532450.00 -0.0549-0.0162-0.01722500.00 2021.13 2020.1818.000.0527 0.00 2021.13 22.00 2020.52 2021.072022.672500.00 -0.0527-0.0209-0.02252550.00 2020.08 2019.2018.000.0490 0.00 2020.08 22.00 2019.47 2020.022021.542550.00 -0.0490-0.0217-0.02272600.00 2019.00 2018.1618.000.0466 0.00 2019.00 22.00 2018.39 2018.942020.402600.00 -0.0466-0.0267-0.03362650.00 2017.67 2017.1118.000.0308 0.00 2017.67 22.00 2017.06 2017.612018.722650.00 -0.0308-0.0317-0.03942700.00 2016.08 2015.8418.000.0133 0.00 2016.08 22.00 2015.47 2016.022016.752700.00 -0.0133-0.0254-0.02572725.50 2015.43 2015.2018.000.0129 0.00 2015.43 22.00 2014.82 2015.372016.102725.50 -0.0129-0.0291-0.02772750.00 2014.72 2014.4618.000.0145 0.00 2014.72 22.00 2014.11 2014.662015.422750.00 -0.0145-0.0243-0.02472797.49 2013.57 2013.3218.000.0137 0.00 2013.57 22.00 2012.96 2013.512014.252797.49 -0.0137-0.0231-0.02702800.00 2013.51 2013.2718.000.0133 0.00 2013.51 22.00 2012.90 2013.452014.182800.00 -0.0133-0.0157-0.01842850.00 2012.73 2012.6018.000.0070 0.00 2012.73 22.00 2012.12 2012.672013.262850.00 -0.0070-0.0157-0.01542900.00 2011.94 2011.8018.000.0078 0.00 2011.94 22.00 2011.33 2011.882012.492900.00 -0.0078-0.0178-0.01972950.00 2011.05 2010.9918.000.0034 0.00 2011.05 22.00 2010.44 2010.992011.512950.00 -0.0034-0.0056-0.00363000.00 2010.77 2010.6318.000.0079 0.00 2010.77 22.00 2010.16 2010.712011.333000.00 -0.0079-0.0084-0.00813050.00 2010.35 2010.2018.000.0086 0.00 2010.35 22.00 2009.74 2010.292010.923050.00 -0.0086-0.0030-0.00583100.00 2010.20 2010.1618.000.0023 0.00 2010.20 22.00 2009.59 2010.142010.633100.00 -0.0023-0.00263150.00 2010.07 2009.9818.000.0050 0.00 2010.07 22.00 2009.46 2010.012010.563150.00 -0.0050-0.0050-0.01113200.00 2009.82 2009.9818.00-0.0089 0.00 2009.82 22.00 2009.21 2009.762010.003200.00 0.0089-0.00223250.00 2009.71 2009.3218.000.0217 0.00 2009.71 22.00 2009.10 2009.652010.573250.00 -0.0217-0.0078-0.01543285.69 2009.43 2009.2618.000.0094 0.00 2009.43 22.00 2008.82 2009.372010.023285.69 -0.0094-0.00353300.00 2009.38 2009.0318.000.0194 0.00 2009.38 22.00 2008.77 2009.322010.193300.00 -0.0194-0.0036-0.00073350.00 2009.20 2008.7318.000.0261 0.00 2009.20 22.00 2008.59 2009.142010.153350.00 -0.0261-0.00353378.69 2009.10 2008.5618.000.0300 0.00 2009.10 22.00 2008.49 2009.042010.143378.69 -0.0300-0.0038-0.00153400.00 2009.02 2008.4418.000.0322 0.00 2009.02 22.00 2008.41 2008.962010.113400.00 -0.0322-0.00343450.00 2008.85 2008.1418.000.0394 0.00 2008.85 22.00 2008.24 2008.792010.103450.00 -0.0394-0.0036-0.00203476.74 2008.76 2008.0118.000.0414 0.00 2008.76 22.00 2008.15 2008.702010.053476.74 -0.0414-0.00213500.00 2008.71 2007.8518.000.0476 0.00 2008.71 22.00 2008.10 2008.652010.133500.00 -0.0476-0.00330.00003550.00 2008.54 2007.5518.000.0551 0.00 2008.54 22.00 2007.93 2008.482010.133550.00 -0.0551-0.00063566.01 2008.53 2007.4818.000.0584 0.00 2008.53 22.00 2007.92 2008.472010.203566.01 -0.0584-0.00110.00493582.95 2008.51 2007.3818.000.0630 0.00 2008.51 22.00 2007.90 2008.452010.283582.95 -0.0630-0.00153600.00 2008.49 2007.3118.000.0655 0.00 2008.49 22.00 2007.88 2008.432010.313600.00 -0.0655-0.0021-0.00323650.00 2008.39 2007.2518.000.0631 0.00 2008.39 22.00 2007.78 2008.332010.153650.00 -0.0631DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)DISHMAN-MICA RD CROSS SECTIONSC0.2JPPN/AN/AXTYPICAL DISHMAN-MICA RD CROSS SECTION 3TYPICAL DISHMAN-MICA RD CROSS SECTION 1TYPICAL DISHMAN-MICA RD CROSS SECTION 2 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)THORPE RD & MADISSON RD X-SECTIONSC0.3JPPN/AN/AXTYPICAL MADISON RD CROSS SECTION5TYPICAL THORPE RD CROSS SECTION4TYPICAL CHECK DAMBStreet:MadisonRoadProject:Painted HillsNumber:13-11661/2 Pavingwidth =ftFIELD INFORMATIONOFFICE CALCULATIONSDist C/L toEx Elev @Dist SawcutTop of CurbMin Curb.Proposed ProposedProposedStation C/L Elev C/L Grade Sawcut Sawcutto Lip of Gutter @ -4.5% @ -2.0%Curb Elev. FL Grade Sta.Cross-slope1051.45 2014.240.00 2014.24 20.00 2013.72 2014.222014.021051.45 0.0300-0.0072-0.00721100.00 2013.890.00 2013.89 20.00 2013.37 2013.872013.671100.00 0.0300-0.0078-0.00781150.00 2013.500.00 2013.50 20.00 2012.98 2013.482013.281150.00 0.0300-0.0076-0.00761200.002013.120.002013.1220.00 2012.602013.102012.901200.000.0300.-0.0072-0.00721250.00 2012.760.00 2012.76 20.00 2012.24 2012.742012.541250.00 0.0300-0.0100-0.01001300.00 2012.260.00 2012.26 20.00 2011.74 2012.242012.041300.00 0.0300-0.0128-0.01281350.00 2011.620.00 2011.62 20.00 2011.10 2011.602011.401350.00 0.0300-0.0104-0.01041400.00 2011.100.00 2011.10 20.00 2010.58 2011.082010.881400.00 0.0300-0.0145-0.01451466.04 2010.140.00 2010.14 20.00 2009.62 2010.122009.921466.04 0.0300-0.00251565.04 2009.890.00 2009.89 20.00 2009.37 2009.872009.671565.04 0.0300-0.0003-0.00031600.00 2009.880.00 2009.88 20.00 2009.36 2009.862009.661600.00 0.0300-0.0010-0.00101650.00 2009.830.00 2009.83 20.00 2009.31 2009.812009.611650.00 0.03000.00080.00081700.00 2009.870.00 2009.87 20.00 2009.35 2009.852009.651700.00 0.03000.00340.00341750.00 2010.040.00 2010.04 20.00 2009.52 2010.022009.821750.00 0.03000.00280.00281800.00 2010.180.00 2010.18 20.00 2009.66 2010.162009.961800.00 0.03000.00020.00021850.00 2010.190.00 2010.19 20.00 2009.67 2010.172009.971850.00 0.03000.00000.00001900.00 2010.190.00 2010.19 20.00 2009.67 2010.172009.971900.00 0.0300-0.0100-0.01001950.00 2009.690.00 2009.69 20.00 2009.17 2009.672009.471950.00 0.03000.00280.00282000.00 2009.830.00 2009.83 20.00 2009.31 2009.812009.612000.00 0.0300-0.0056-0.00562062.04 2009.480.00 2009.48 20.00 2008.96 2009.462009.262062.04 0.0300-0.00352155.04 2009.150.00 2009.15 20.00 2008.63 2009.132008.932155.04 0.0300-0.0053-0.00532200.00 2008.910.00 2008.91 20.00 2008.39 2008.892008.692200.00 0.0300-0.00042250.00 2008.890.00 2008.89 20.00 2008.37 2008.872008.672250.00 0.03000.00330.00332300.00 2009.050.00 2009.05 20.00 2008.53 2009.032008.832300.00 0.03000.00450.00452350.00 2009.280.00 2009.28 20.00 2008.76 2009.262009.062350.00 0.03000.00520.00522400.00 2009.540.00 2009.54 20.00 2009.02 2009.522009.322400.00 0.03000.00540.00542450.00 2009.810.00 2009.81 20.00 2009.29 2009.792009.592450.00 0.03000.00160.00162500.00 2009.890.00 2009.89 20.00 2009.37 2009.872009.672500.00 0.03000.00460.00462550.00 2010.120.00 2010.12 20.00 2009.60 2010.102009.902550.00 0.0300-0.0064-0.00642600.00 2009.800.00 2009.80 20.00 2009.28 2009.782009.582600.00 0.0300-0.0038-0.00382650.00 2009.610.00 2009.61 20.00 2009.09 2009.592009.392650.00 0.0300.-0.0062-0.00622700.002009.300.002009.3020.00 2008.78 2009.282009.082700.000.0300-0.0104-0.01042750.00 2008.780.00 2008.78 20.00 2008.26 2008.762008.562750.00 0.0300-0.0020-0.00202800.00 2008.680.00 2008.68 20.00 2008.16 2008.662008.462800.00 0.0300-0.0002-0.00022850.00 2008.670.00 2008.67 20.00 2008.15 2008.652008.452850.00 0.0300-0.0042-0.00422900.00 2008.460.00 2008.46 20.00 2007.94 2008.442008.242900.00 0.0300-0.0016-0.00162950.00 2008.380.00 2008.38 20.00 2007.86 2008.362008.162950.00 0.0300-0.0020-0.00203000.00 2008.280.00 2008.28 20.00 2007.76 2008.262008.063000.00 0.0300-0.0004-0.00043050.00 2008.260.00 2008.26 20.00 2007.74 2008.242008.043050.00 0.0300-0.0002-0.00023102.04 2008.250.00 2008.25 20.00 2007.73 2008.232008.033102.04 0.0300-0.00083195.04 2008.180.00 2008.18 20.00 2007.66 2008.162007.963195.04 0.03000.00380.00383250.00 2008.390.00 2008.39 20.00 2007.87 2008.372008.173250.00 0.0300-0.0016-0.00163300.00 2008.310.00 2008.31 20.00 2007.79 2008.292008.093300.00 0.0300-0.0042-0.00423350.00 2008.100.00 2008.10 20.00 2007.58 2008.082007.883350.00 0.0300-0.0023-0.00233402.02 2007.980.00 2007.98 20.00 2007.46 2007.962007.763402.02 0.0300-0.00453500.98 2007.530.00 2007.53 20.00 2007.01 2007.512007.313500.98 0.0300-0.0053-0.00533550.00 2007.270.00 2007.27 20.00 2006.75 2007.252007.053550.00 0.0300-0.0016-0.00163600.00 2007.190.00 2007.19 20.00 2006.67 2007.172006.973600.00 0.0300-0.0063-0.00633658.49 2006.820.00 2006.82 20.00 2006.30 2006.802006.603658.49 0.03000.5485TYPICAL SWALE SECTIONA 59972005.937B-159982005.584B-259992004.450B-3DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)OVERALL TOPOGRAPHYC1.0JPP1"=200'N/AXW ESNCABBREVIATIONS 59972005.937B-159982005.584B-259992004.450B-3DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)NORTH TOPOGRAPHY MAPC1.1JPP1"=100'N/AXW ESNC DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)SOUTH TOPOGRAPHY MAPC1.2JPP1"=100'N/AXW ESNC WESNCSITE ELEMENT PLANC1.3JPP 1" = 200'N/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116607/19/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRDVERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)DISHMAN-MICA ROADTHORPE ROADMADISON ROAD 40TH AVENUEHIGHWAY 27 WILBER ROAD MADISON RD EASEMENT PLAN- DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2DISHMAN-MICA PLAN & PROFILEC3.00JPP1"=30'1"=10'XWESNCCONSTRUCTION NOTESTAPER CALCULATIONS DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2DISHMAN-MICA PLAN & PROFILEC3.01JPP1"=30'1"=10'XWESNCCONSTRUCTION NOTES J RONALD DUNSMORE PLS 16198DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2DISHMAN-MICA PLAN & PROFILEC3.02JPP1"=30'1"=10'XWESNCCONSTRUCTION NOTESTAPER CALCULATIONS DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2SUNDOWN DR & SIDEWALK P&PC3.03JPP1"=30'1"=10'XWESNCCONSTRUCTION NOTESWESNC SIDEWALK PROFILESUNDOWN DR PROFILE DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2THORPE ROAD PLAN AND PROFILEC3.10JPP1"=30'1"=10'XCONSTRUCTION NOTESW ESNC DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2THORPE ROAD PLAN AND PROFILEC3.11JPP1"=30'1"=10'XCONSTRUCTION NOTESW ESNCDRYWELL DECOMMISSIONING NOTES CHESTER CREEK CULVERT WIDENINGC3.12JPPN/AN/AXWESNCCHESTER CREEK CULVERT WIDENING1CULVERT CROSS SECTIONaDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS21CULVERT CROSS SECTION22TYPICAL GRAVEL GALLERY DETAIL (PLAN VIEW)3TYPICAL GRAVEL GALLERY DETAIL (PROFILE VIEW)4 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON ROAD PLAN AND PROFILEC3.20TEW1"=30'1"=10'XCONSTRUCTION NOTESW ESNC DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON ROAD PLAN AND PROFILEC3.21TEW1"=30'1"=10'XW ESNCCONSTRUCTION NOTES 59992004.450B-3 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON ROAD PLAN AND PROFILEC3.23TEW1"=30'1"=10'XW ESNCCONSTRUCTION NOTESTAPER CALCULATIONS DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2INTERSECTION DETAILSC3.30JPP1"=20'N/AX1INTERSECTION DETAIL2INTERSECTION DETAIL3INTERSECTION DETAIL4INTERSECTION DETAIL5INTERSECTION DETAIL6INTERSECTION DETAIL7INTERSECTION DETAILWESNCWESNCWESNCWESNCWESNCWESNCWESNC DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116611/01/17WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERPAINTED HILLS 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY GRADING PLANC4.0JPP1"=120'N/AXW ESNCQUANTITIES DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2STORM SYSTEM OVERVIEWC5.0JPP1"=100'1"=20'XW ESNCW ESNCSEE SHEETS C5.2 FORMORE INFORMATIONSEE SHEET C5.3FOR MOREINFORMATIONSEE SHEET C5.3FOR MOREINFORMATIONSEE SHEET C5.1FOR MOREINFORMATION ONBOX CULVERTSEE SHEETS C5.5 FORMORE INFORMATION BOX CULVERT-CHANNEL-PIPE PLANC5.10JPPN/AN/AXWESNCBOX CULVERT DETAIL1BOX CULVERT CROSS SECTIONBDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS21 BOX CULVERT CROSS SECTION2243W ESNCCHANNEL & PIPE CONNECTIONC4CHANNEL & PIPE CROSS SECTION3CHANNEL & PIPE CROSS SECTIONPLAN VIEWSIGN DETAILA.3 BOX CULVERT DETAILSC5.11JPPN/AN/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON ROAD P&PC5.20JPP1"=50'1"=10'XCONSTRUCTION NOTESW ESNC1-PIPE CROSS SECTION1 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON ROAD P&P CONT.C5.21JPP1"=50'1"=10'XCONSTRUCTION NOTESW ESNC1C5.20 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON RD CULVERT PLANC5.22JPP1"=30'1"=10'XW ESNCMADISON RD PIPE CROSSING - MH #5BaMADISON RD PIPE CROSSING - MH #4BBMADISON RD PIPE CROSSING - MH #3BCMADISON RD PIPE CROSSING - MH #1BD18" TRASH RACK DETAILE 59992004.450B-3DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116611/01/17WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERPAINTED HILLS 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY CONSTRUCTION NOTESW ESNCTYPICAL BIOSWALE SECTIONABIOSWALE INLET CROSS SECTION3BIOSWALE PROFILEA-BIOSWALE/SETTLING POND P&PC5.30JPP1"=30'1"=10'XBIOSWALE & SETTLING POND PLAN5VERTICAL OUTLET TRASH RACK4SLANTED INLET TRASH RACK 59982005.584B-2DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116611/01/17WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERPAINTED HILLS 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY INFILTRATION POND PLANC5.31JPP1"=30'1"=10'XD-D-CONSTRUCTION NOTESW ESNCC-ROCK WEIR DETAILCTYPICAL POND SECTIONDSEEDING NOTE:EC5.32FC5.32 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116611/01/17WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHERPAINTED HILLS 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY INFILTRATION POND DETAILSC5.32JPPN/AN/AXTYPICAL DRAIN FIELD CROSS SECTION (EAST-WEST)FTYPICAL DRAIN FIELD CROSS SECTION (NORTH-SOUTH)E DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2RETAINING WALL SECTIONSC6.0JDKN/AN/AX.”“””””””“” DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2RETAINING WALL DETAILSC6.1JDKN/AN/AXTYPICAL CORNER REINF AT CONCRETE WALLS3TYPICAL REBAR BENDING SCHEDULE2DEVELOPMENT LENGTH SCHEDULE1TYPICAL LAP SPLICE ANDREINFORCEMENT AT PIPE PENETRATIONS4 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION108-14-18JPP REVISED PLANS2WATER PLAN COVERC7.0JPP1"=300'N/AXINDEX TO PLAN SHEETSC7.0 WATER PLAN COVERC7.1 WATER PLANC7.2 WATER NOTES AND DETAILSPAINTED HILLS WATER PLANSLOCATED IN A PORTION OFSE1/4, SEC. 33, T.25N., R. 44E., W.M.CITY OF SPOKANE VALLEY, WAPROJECTLOCATIONLOCATION MAPINSPECTIONGAS FIRETELEPHONEWATERSOLID WASTESEWERPERMIT SPECIALISTDEV. CONST. INSP.CABLEENGINEERINGSURVEYORHEALTHOWNERROADWAYSPOWERW ESNCSITE PLAN VIEWFUTUREDEVELOPMENTDISHMAN-MICA ROADTHORPE ROADMADISON ROAD 40TH AVENUE44TH AVE43RD AVEPAINTED HILLS AVESUNDOWN DR41ST AVEPINES DR GENERAL NOTESSPOKANE REGIONAL HEALTH DISTRICT STATEMENTFIRE DISTRICT CERTIFICATION STATEMENTWATER SUPPLIER CERTIFICATION STATEMENTCIMMARON DR42ND AVEALVERAZ DR. DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION108-14-18JPP REVISED PLANS2WATER PLANC7.1JPP1"=30'N/AXWESNCCONSTRUCTION NOTESW ESNCLEGENDWATER NOTESSPOKANE COUNTY WATER DISTRICT #3 NOTES DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION108-14-18JPP REVISED PLANS2WATER NOTES & DETAILSC7.2JPPN/AN/AXDEFLECTION TABLESWD3 - THRUST BLOCKSTHRUST BLOCK NOTESVERTICAL THRUST BLOCKING TABLETYPICAL TRENCH SECTION PAVED ROADTYPICAL WATER MAIN GATE VALVEFLUSHER-BLOWOFF ASSEMBLY6" FIRE HYDRANT SETTINGRESTRAINED JOINT TABLEAIR-VACUUM RELIEF DETAILCONTRACTOR TO TAKE NOTE, WHERE WATER LINESCONFLICT WITH STORM AND SEWER PIPE, THE WATERLINES SHALL BE ROUTED UNDER SUCH PIPE(S) ASSHOWN. CONTRACTOR TO SUBMIT SHOP DRAWING FORAPPROVAL PRIOR TO INSTALLATION.NOTE:SEWER - WATER - DRAINAGE - PIPE CROSSING3 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION108-14-18JPP REVISED PLANS2SEWER PLAN COVERC8.0JPP1"=30'N/AXW ESNCINDEX TO PLAN SHEETSSHEET NO. C8.0 SEWER PLAN COVERSHEET NO. C8.1 SUNDOWN RD SEWER P&PSHEET NO. C8.2 SEWER NOTES & DETAILSSITE PLANGENERAL NOTES DEVELOPER'S APPROVALDATEPAINTED HILLS SEWER PLANSLOCATED IN A PORTION OFSE1/4, SEC. 33, T.25N., R. 44E., W.M.CITY OF SPOKANE VALLEY, WAPROJECTLOCATIONLOCATION MAPINSPECTIONGAS FIRETELEPHONEWATERSOLID WASTESEWERPERMIT SPECIALISTDEV. CONST. INSP.CABLEENGINEERINGSURVEYORHEALTHOWNERROADWAYSPOWERABBREVIATIONSSUNDOWN DRDISHMAN-MICA RD DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION108-14-18JPP REVISED PLANS2SUNDOWN DR SEWER P&PC8.1JPP1"=30'1"=10'XWESNCSUNDOWN DR SEWER PROFILECONSTRUCTION NOTES DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION108-14-18JPP REVISED PLANS2SEWER DETAILSC8.2JPPN/AN/AXTYPICAL UTILITY TRENCH4SPECIAL NOTESTYPICAL SERVICE CONNECTIONSEWER CLEANOUTTYPICAL UTILITY CUT REPAIR NOTES FOR SMALL COMMERCIAL PROJECTSSPOKANE COUNTY UTILITIES STANDARD123SEWER GENERAL NOTES SITE PLANSWPPP/EROSION CONTROL PLANPAINTED HILLS PRDDISHMAN-MICA ROAD & THORPE ROADSPOKANE VALLEY, WASHINGTONSE, 1/4 OF S. 33, T. 25 N., R. 44 E., W.M.W ESNCINDEX TO PLAN SHEETSC9.0 SWPPP/EROSION CONTROLCOVER SHEETC9.1 SWPPP NOTESC9.2 SWPPP BMP'SC9.3 SWPPP BMP'SLEGENDGENERAL NOTESSWPPP COVERC9.0RMA 1" = 300'N/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2PROJECTLOCATIONLOCATION MAPINSPECTIONGASFIRETELEPHONEWATERSOLID WASTESEWERPERMIT SPECIALISTDEV. CONST. INSP.CABLEENGINEERINGSURVEYORHEALTHOWNERPOWERROADWAYS3 SWPPP STANDARD NOTESC9.1RMA N/AN/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2EROSION & SEDIMENT CONTROLGENERAL NOTES AND INFORMATIONMAINTENANCEE.S.C. STANDARD PLAN NOTES FROM APPENDIX 9A OF THE SPOKANE REGIONAL STORMWATER MANUAL SWPPP BMPsC9.2RMA N/AN/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS21-SILT FENCE DETAIL2-ROCK CONSTRUCTION ENTRYCONSTRUCTION ENTRANCEPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:MAINTENANCE STANDARDS:BMP C233: SILT FENCEPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:DESIGN AND INSTALLATION:(CONTINUED)MAINTENANCESTANDARDS:BMP C105: STABILIZED SWPPP BMPsC9.3RMA N/AN/AXDISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2INLET SEDIMENT FILTER-3GRAVEL AND WIRE MESHBMP C220: STORM DRAIN INLET PROTECTIONPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:BMP C140: DUST CONTROLPURPOSE:CONDITIONS OF USE:DESIGN AND INSTALLATION:MAINTENANCE STANDARDS:DESIGN AND INSTALLATIONCONTINUED: MAINTENANCE STANDARDS:BMP C151: CONCRETE HANDLINGPURPOSE:CONDITIONS OF USE:·······DESIGN AND INSTALLATION:MAINTENANCE STANDARDS:CONCRETE TRUCK WASHOUT STANDARDS-4 DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2DISHMAN-MICA RD SIGNING & STRIPING C10.0JPP1"=30'N/AXCONSTRUCTION NOTESWESNCWESNCWESNC DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2THORPE RD SIGNING & STRIPING PLANC10.1JPP1"=30'N/AXW ESNCCONSTRUCTION NOTES DISHMAN-MICA RD.SPOKANE VALLEY,WADRAWN:PROJ #:REVIEWED:DATE:DATUM: NAVD - 8813-1166JOB NUMBERSHEETTRW13-116608/14/18WCETBM S-5 OF THE SOUTH PONDEROSA SEWER PROJECTWITH AN ELEVATION OF 2005.87 (NAVD29)=2009.67(NAVD88) WAS USED FOR THE VERTICAL DATUM FOR THISMAP.WHIPPLE CONSULTING ENGINEERS2528 NORTH SULLIVAN ROADSPOKANE VALLEY, WA 99216PH: 509-893-2617 FAX: 509-926-0227CIVILSTRUCTURALSURVEYINGTRAFFICPLANNINGLANDSCAPEOTHER SPOKANE VALLEY PAINTED HILLS PRD 14, SEC. , T. N., R. E., W.M.SE 33 25 44 SW12, SEC.34, T.25N., R.44E., W.M. 14, SEC. , T. N., R. E., W.M.NE 4 24 44VERTICAL:HORIZONTAL:SCALE:REVISIONSNO. DATE BY 08-12-16JPP ORIGINAL PREPARATION1Reviewed for Conformance toStreet Standards andAccepted per Chapter 1.2Not ReviewedDate AcceptedAcceptance CommentsCity of Spokane ValleyDevelopment EngineeringCity of Spokane ValleyProject/Permit No.:SUB-2015-0001(Subdivision)FPD-2016-0007(Flood Plain Development)EGR-2016-0066(Engineered Grading)08-14-18JPP REVISED PLANS2MADISON RD SIGNING & STRIPING PLANC10.2JPP1"=30'N/AXCONSTRUCTION NOTES APPENDIX L CD OF PROJECT FILES