23-039.07NorthForkEnterprisesSullivanRdImprovements00111111011i o(Wk :a��ne ENGINEERING DIVISION CHANGE ORDER NO: 7 CONSTRUCTION CONTRACT NO: 23-039 2ROJECT: Sullivan Rd Improvements CONTRACT DATE: 4/25/2023 3RIME CONTRACTOR: North Fork Enterprises CIP NO: 320 Item No. Description CO 7.1 CDr= Structure Removal Independent Justification on File Yes Verbal Approval ._. Yes Original Contract Working Days: 100 Revisions by Prior Change Orders: W__2.5_ Unit Quantity Unit Price Total LS 1 $8,748.78 8,748.78 Sales Tax $ NO Total Amount of this Chance Order (incl. Tax): $ 8.748.78 Verbal Approval by Revision By This Change Order: Total Revised Contract Working Days: KL CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 3,820,971.36 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 28,242.26 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 3,849,213.62 NET THIS CHANGE ORDER - --•---________.M•______.. $ 8,748.78 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 3,857,962.40 CONTRACTOR ACCEPTAN The contractor hereby accept RECOMMENDED BY: APPROVED BY: DATE: contract. DATE: 11 iZ� �0 DATE: 1 " Zg " Z� APPROVED BY: N/A DATE: City Manager ATTACHMENTS: Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File, Project Inspector, Finance Department SV: *05'JuM, ,,;00%11ey1X Community & Public Works Department 10210 E Sprague Avenue ♦ Spokane Valley WA 99206 Phone: (509) 720-5000 ♦ Fax: (509) 720-5075 ♦ www.spokanevalley.org Change Order Memo Date: 9/19/2023 By: Kelly Lynch Re: Change Order # 7 for Sullivan Rd Improvements, CIP #320 1. Describe the Change: a. An existing CDF duct bank carrying communication lines was discovered at a shallower depth than anticipated. The duct bank extended into the roadway section. The utility owner was contacted and provided guidance the top of the ductbank in the roadway section could be scraped away. 2. Evolution of the Change a. The utility duct was potholed during the design phase and determined to be of sufficient depth to not be in conflict. Upon exposing the duct bank during construction significant areas of the duct bank are at irregular elevations. It was not cost or schedule efficient to relocate the duct bank so the utility provider permitted the removal of excess CDF protecting their utility. b. Verbal approval was provided in order to not cause delays to the project and agreed to be tracked by force account. c. The elevation of the duct bank was investigated through out the project and top layer removed where encountered. 3. Payment a. Payment for these changes is paid through change order, based on force account rates, invoice costs and associated markup for a total payment of $8,748.78 b. Standard Spec 1-09.6 permits change orders by force account may by agreement of the parties be converted to Lump Sum as applicable for remaining work. c. Force account time was tracked independently by inspectors and associated project costs submitted through invoice. 4. Time a. 2 Working Days added with this change order 5. Change Order Approval a. Change order approval is within the cost limits of the City Engineer 6. DBE Impact a. North Fork Enterprises is one of two DBE's on the contract and the prime contractor b. DBE Work Added i. Change Order, on site overhead, and associated markups: $7,448.78 c. DBE Work Removed i. No DBE Work removed d. Non DBE Work Added i. Traffic Control: $1,300 7. Attachments a. Change order checklist b. Change Order form