23-125.01McKinstryLowVoltageCableInstall efitginetru
CHANGEBNOTICE
City Of Spokane Valley McKinstry
10210 E Sprague Ave 601 E Riverside Ave
Spokane Valley,WA 99206 Suite 510
Spokane,WA 99202
CCN# CO-001
CCN Date 10/2/2023
Date: 10/2/2023
Project Name: Spokane Valley City Hall CCTV Cable Pull
Page Number: 1
Start Date: 10/2/2023
Work Description
Deductive change order for using customer supplied shielded outdoor rated CAT6 cable in lieu of contractor supplied EMT
conduit and shielded CAT6 cable.
Itemized Breakdown
Description Qty Net Price U Total Mat. Labor U Total Hrs.
3/4"CONDUIT-EMT -20 148.83 C -29.77 4.00 C -0.80
3/4"CONN SS STL-EMT -2 222.16 C -4.44 12.50 C -0.25
3/4"COUPLING SS STL-EMT -2 261.08 C -5.22 5.00 C -0.10
3/4" 1-H STRAP-EMT-STEEL -3 48.21 C -1.45 6.75 C -0.20
4x 1 1/2"SQ BOX COMB KO -1 1,239.81 C -12.40 28.75 C -0.29
4"SQ BLANK COVER -1 461.05 C -4.61 3.13 C -0.03
#8 TO#10x 7/8 PLAS ANCHOR(3/16) -5 3.19 C -0.16 7.50 C -0.38
#10x 1 P/H SELF-TAP SCREW -5 10.28 C -0.51 3.75 C -0.19
Totals -39 -58.56 -2.23
Summary
MATERIAL
General Materials -58.56
SHIELDED CAT6 CABLE -300.00
Material Subtotal -358.56
Total Material -358.56
LABOR
FOREMAN (-1.12 Hrs @$75.94) -85.05
JOURNEYMAN (-1.12 Hrs @$71.10) -79.63
Indirect Labor Subtotal -164.68
Total Labor -164.68
Subtotal -523.24
Final Amount $-523.24
CLIENT ACCEPTANCE
ORIGINAL
CHANGE NOTICE
CCN# CO-001
Final Amount: $-523.24
Name: 7014 hbtf."at,
Date: e Z.-G- 2 3
Signature:
Change Order#:
I hereby accept this quotation and authorize the contractor to complete the above described work.
ORIGINAL