Loading...
22-114.03AllwestTestingEngineeringOnCallGeotechEngineeringMaterialTesting 40°I..\ft06, Wkane 10210 E Sprague Avenue• Spokane Valley WA 99206 Phone: (509)720-5000•Fax:(509)720-5075 •www.spokanevalleywa.gov 40.0011%ft• Email:cityhall@spokanevalleywa.gov December 12, 2023 Contract No. 22-114-03 Scott Fraiser Allwest Testing&Engineering,Inc. 16617 E. Euclid Ave., Bldg. A Spokane Valley, WA 99216 Re: Implementation of 2024 option year, Agreement for Geotech Engineering and Material Testing Services for Capital Improvement Projects, 22-114, executed June 29, 2022 Dear Mr. Fraiser: The City executed an Agreement for provision of Geotech Engineering and Material Testing Services for Capital Improvement Projects on June 29, 2022,by and between the City of Spokane Valley, hereinafter "City", and Allwest Testing & Engineering, Inc., hereinafter"Contractor" and jointly referred to as"Parties." The original Agreement states that it was for one year, with two optional one-year terms possible if the parties mutually agree to exercise the options each year. This is the second of two possible option years that can be exercised and runs through December 31,2024. The City would like to exercise the 2024 option year of the Agreement. The Compensation as outlined in Exhibit A, 2024 to the Agreement, includes the labor and material cost negotiated and shall not exceed $8,357.25. The history of the annual renewals,including dollar amounts, is set forth as follows: Original contract amount $50,000.00 Funds Expended via Task Order in 2022 <$ 3,000.00 2023 Renewal .. $47,000.00 Amendment No. 1 $15,000.00 Funds Expended via Task Order in 2023 ..<$53,642.75> 2024 Renewal $ 8,357.25(remaining funds) All of the other contract provisions contained in the original Agreement shall remain in place and remain unchanged in exercising this option year. If you are in agreement with exercising the 2024 option year, please sign below to acknowledge the receipt and concurrence to perform the 2024 option year. Please return two copies to the City for execution, along with current insurance information. A fully executed original copy will be mailed to you for your files. CITY OF SPOKANE VALLEY ALLWEST TESTING& ENGINES G,INC. Scot{ tee., 9F-. John Holtman,City Manager Name Area frOafiv. Title APPROVED AS TO FORM: Of of the City Attorney Exhibit"A" ALLWEST-Schedule of Fees 2023-City of Spokane Valley On-Call Geotechnical Services Agreement Personnel Services Technicians,Hourly Unit Fee Engineering,Hourly Unit Fee jAsphalt Technician-In place density $75.00 (Principal Engineer 5185.00 Asphalt Technician-Lab Technician $75.00 Senior Engineer $165.00 ;Concrete Technictan $75.00, (roject Engineer $135.00 Lab Technician-Lab Testing/Hourly $85.00 Staff Engineer $110.00 "Soil Technician $75.00. Geologist,Hourly Special Inspector,Hourly 'Project Geologist 5120.00 Special Inspector $90.00 Staff Geologist 3100.00 i oll-in-9 $90.00. Concrete Floor Flatness S 85.00 Environmental,Hourly lblaphragm/Shear Nailing $100.00 'Senior Environmental Professional $135.00 Epoxy $85.00 Project Environmental Professional $100.00 f Fireproofing $85.00 (Staff Environmental Professional $90.00 Post Tension $95.00 lPrecasUPrestressed 395.00 Office Services Pull Testing $95.00 'Administrative Assistant,Hourly $70.00; IRebar 8 Concrete $100.00 Project Manager,Hourly $95.00 Reber 8 Masonry $90.00 Final Letter,Each $500.00; rRebar InipecUon S 90.00: Visual Welding $100.00 Eouinment Commercial Building Inspector(CBI) $11o.00. 'Coring Machine,Daily Charge $165.00: Dial Gauge,Daily Charge $100.00 Certified Welding Inspector,Hourly "-Disposable Relative Humidity Meter Sensors,Each $45.00i (CerWied Welding Inspector $125.00, Floor Flatness Equipment,Daily Charge $300.00 -- -" f Generator,Daiiy Charge $50.00; Non-Destructive Testing,Hourly Hand Auger,Daily Chime $25.00 NOT Welding Inspector-Level I $105.00: (Hydraulic Ram,Daily Charge $60.00' NDT Welding Inspector-Level 11 $110.00 Magnetic Particle Machine,Daily Charge $50.00 INDT Welding inspector-Level III $125.00. .1Mah rity Probes,Each S 75.00: Moisture Vapor Kits,Each $35.00 Welding Services FNudeer Densometer,Daliy Charge $70.00: TAWS Welder Certification $165.00 Pachometer,Daily Charge $25.00 Procedure Qualification Record Quote rhoto lontzation Detector,Daily Charge $150.0rt WABOWelder Certification $210.00 Relative Humidity Meter,Daily Charge $25.00 Weld Performance Qualification Record Quote !Skidmore Wilhelm,Daily Charge $75.00i :Weld Procedure Spealication Quote Temperature Controlled Cure Box/trailer,Daily Charge 5150.00 Turbidity Meter,Daily Charge $25.00 Miscellaneous Ultrasonic Testing Machine,Deily Charge $50.00 (Consumable Supplies Cost+18% ;Turbidity Meter,Daily Charge $25A0 Laboratory Rush Charge 1.5x Rate 'Windsor Probe Rental+1 Probe Kit,Each $75.00; It obtie Feld Laboratory Quote Additional Windsor Probes,Each $50.00 Overtime.Hourly 1.5x Rate Pull Testing Machine $50.00 "Per Diem-Reimbursable Quote Torque Wrench $25.00 Subcontracted Services Cost+18% Labor Surcharge(Fxempler Sundays and Holidys) ix Rate Vehicle Miteege,per mile $1.20 Final Letter,Each $500.00 Laboratory Testino Services Unit Fees Concrete Aggregate (Atterberg Limits $130.00 iCement Treated Base Design $1,750.00. Check Potni,Modified Proctor $100.00 Concrete Cores Compressive Strength S 40.00 (Check Potnl,Standard Proctor $100.00 f Conc etc Cylinders Compressive Strength $40.00, Chloride Quote Concrete A0x Design with Aggregate Testing Quote lb-wit-Lim-pia Friable Particles $75A0 I Concrete Mix Design without Aggregate'fining duote • Cleanliness Value $85.00 Concrete Moisture Lab Test $35.00 (DMSO $180.00. concrete Verification Trial Batch Quote Dry Rodded Weight $60.00 Dry Selling Time Quote (Durability index(Coarse) $125.00• !Ftreprooring Densities i $85.00' Durability Index(Fine) • 5150.00 Flexural Strength Beams $90.00 iElhyiene Gtycot $80.00. jGroul Cubes Compressive Strength $60.00; Flakiness Index $80.00 Grout Cylinders Compressive Strength $35.00 (Flat ii Elongated Parodies $SO.00. (Grout Prisms Compressive Strength 3 60.00j Fine Angularity $76.00 Masonry Block Absorption(set of 3) 5135.00 )Fracture Face .$95.00 Vasonry Block Compressive Strength(set of 3) $24010. Gradation with 0.02 Hydrometer $210.00 Mortar Making Properties $360.00 ;Idaho Degradation $.28U.0o icMU Pdsms Compressive Strength(set of$) $395.00 Wrby Chip Seal Design $370.00 Mortar Cylinders Compressive Strength $30.00 LA An'rasin $iii0o 1Shoterete Cores Compressive Strength $7oA0 Laboratory Crush/Sample Prep $265.00 Trial Batch(3 WIC Ratios) Quote fUghtwelgh!sar6deti $90.00, �/ciled Absorption S 150.00. McLeod Design $420.00 Resistivity $100.00 Asphalt Soil jAssphalt Bum Begs/Set of 2 $160.00' rAtterberg Limits $180.00. Asphalt Core Density $80.00 California Bearing Ratio $540.00 ik phaR Extraction(Olt Content),NCAT $225.00 (dill c Paint,Modified Proctor $100.0ti Asphalt Extraction Gradation,NCAT $300.00 Check Point,Standard Proctor $.100.00 lAsphali Moist irs 3 45:00. )Chloride Quote Asphalt Reflux Extraction Gradation $290.00 Clay Sample Surcharge $90.00 Dry Strength lmmersIon Compression $370 00; ;Direct Shear Remold $5W.00' Gyratory!Volumetri s $770.00 Direct Shear Remold $805.00 'Igniilon,Oven Correction Factor $290A0; [Hydromeler.Test ` $190.0& Marshall Biscuit Densities(set of 3) $230.00 In-Place Density&Moisture,ASTM D 2937 $85.00 (Marshall Stability and Flow $,210.00, )Modilled Prraactor(Granular) S 230.00 Rice's Theoretical (Sal of 2) $215.00 Modified Proctor(Cohesive) $230.00 f-99 Asphalt Binder.AnOStep $60A0; One Dimensional Consolidation Test,O 2436 $515.00. Wax Coated Unit Weight $65.00 Organic Content $125.00 IPercent,plus 3/4',. • $70.00; :.;.. Asphalt Mix Deakins Cement Treated Base(CTB)Design $1,575.00 pH $60.00 fair! =FreezetThawTestbg $1,050:00; [Resistivity $130.00. CTB Design-Wel/DryTesting $1,050.00 Moisture Content $37.00 r veers RaNewan45tamp $630.00 le Prep Surohar'ge S ore; Federal Highway Superpave-mix Design $5.775.00 Semi Cone $210.00 iiil)CommerdafSuperpeve Mix Design(SP2 through 6) $6,250 00° ,Sorel Equlvaient $135.00; ITD Mix Design Revision $525.00 SieveAnalyals with Hydrometer $265.00 IITD Supeipave,Mm Design(SP2 Paper Verification) $8,090.00 Sj)7ificc Gravity $160.OD' ITO Superpave Mix Design wNeritcaion(SP3 through 8) $11,075.00 Modified Proctor with gradation&Pi(Cohesive) S 326.00 fiiiistisiiTlXilejian •• $6.250.00 Modified Proctor w111i greda6oe(Granular) S 275AD: Mix Design Extra Blends $630.00 Swell Pressure Consolidation Test,D 4546 Meth.A or B $525.00 iMontana Superpave Mix Design Quote ., iSweg Pressure Consolidation Test,D 4846 Method C $525A0 RAP Correlation for NCAT(6 Reflux end 6 Bums) $2,625.00 Unconfined Compression,D 2166 $175.00 !RAP Qualit-icailon Tor NCAT Correction Fedor and Aggregate Quality $5.150.00 IUnti Weight S 70.00 RAP Correlation for NCAT(every one after 6) $370.00 Wash 200. $110.00 !RAP Relies for Asphalt Properties $1,260.00 i Wadi Gradation $155.00 RAP Specific Gravity $150.00 TSR/lmmersion Compression $750.00 WSDOT Superpave hlx Design $4,000.00 WSDOT x Ver18calon $3,600.00 WSDOT 2nd Mbk Verification(Same Gradation) $2,500.00 ALLWTES-01 KPHILLIPSI '4��REY CERTIFICATE OF LIABILITY INSURANCE DA3/22/2023 TE ) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Debbie Johnston,CRM,CPCU,CIWCS,CPIW,ARM,AMIM,AINS NAME: Alliant Insurance Services,Inc. PHONE FAX 818 W Riverside Ave Ste 800 (NC,No,Ext):(208)770-3844 (A/C,No):(509)325-1803 Spokane,WA 99201 E-MAIL ADDRESS: debbie.johnston@alliant.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Ohio Security Insurance Company 24082 INSURED INSURER B:Ohio Casualty Insurance Company 24074 ALLWEST Testing&Engineering Inc. INSURER C: 690 Capstone Ct INSURER D: Hayden,ID 83835 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSD WVD IMM/DD/YYYYI IMM/DD/YYYYI. A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR BKS56505694 4/1/2023 4/1/2024 DAMAGE TO RENTED 1,000,000 X PREMISES(Ea occurrence) $ MED EXP(Any one person) $ 15,000 PERSONAL&ADVINJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X JERD X LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ COMBINED SINGLE LIMIT 1,000,000 A AUTOMOBILE LIABILITY (Ea accident) $ X ANY AUTO BAS56505694 4/1/2023 4/1/2024 BODILY INJURY(Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY(Per accident) $ AUHIRED A -AYPROPERTY DAMAGE TOS ONLY AUTOS ONLYaccident) $ B X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 EXCESSLIAB CLAIMS-MADE US056505694 4/1/2023 4/1/2024 AGGREGATE $ 10,000,000 DED X RETENTION$ I0,000 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project: City of Spokane Valley—On-Call Services City of Spokane Valley is Additional Insured with respect to the General Liability per form attached. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Cityof Spokane ValleyTHE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN P ACCORDANCE WITH THE POLICY PROVISIONS. 10210 E.Sprague Ave. Spokane Valley,WA 99206 AUTHORIZED REPRESENTATIVE I l Q ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Terra Insurance Company TERRA (A Risk Retention Group) Two Fifer Avenue, Suite 100 INSURANCE COMPANY Corte Madera, CA 94925 DATE 01/01/24 CERTIFICATE OF INSURANCE CERTIFICATE HOLDER City of Spokane Valley 10210 East Sprague Avenue Spokane Valley,WA 99206 This certifies that the'claims made"insurance policy(described below by policy number)written on forms in - use by the Company has been issued. This certificate is not a policy or a binder of insurance and is issued as a matter of information only,and confers no rights upon the certificate holder. This certificate does not alter, amend or extend the coverage afforded by this policy. The policy of insurance listed below has been issued to the insured named above for the policy period indicated. Notwithstanding any requirement,term or condition of any contract or other document with respect to which this certificate may be issued or may pertain,the insurance afforded by the policy described herein is subject to all the terms,exclusions and conditions of such policy. Aggregate limits shown may have been reduced by paid claims. TYPE OF INSURANCE Professional Liability POLICY NUMBER EFFECTIVE DATE EXPIRATION DATE 224194 01/01/24 12/31/24 LIMITS OF LIABILITY $2,000,000 EACH CLAIM $2,000,000 ANNUAL AGGREGATE PROJECT DESCRIPTION On-Call Services CANCELLATION: If the described policy is cancelled by the Company before its expiration date, the Company will mail written notice to the certificate holder thirty(30)days in advance,or ten (10)days in advance for non-payment of premium. If the described policy is cancelled by the insured before its expiration date,the Company will mail written notice to the certificate holder within thirty(30) days of the notice to the Company from the insured. NAME AND ADDRESS OF INSURED ISSUING COMPANY: TERRA INSURANCE COMPANY Allwest Testing& Engineering, Inc. (A Risk Retention Group) 690 W. Capstone Court Hayden, ID 83835 joertaer_ President