AC21 SV Development Engineering comments 2-28-2017
Development Engineering
11707 E Sprague Ave Suite 106 Spokane Valley WA 99206
509.921.1000 Fax: 509.921.1008 cityhall@spokanevalley.org
Memorandum
To: Lori Barlow, Senior Planner
From: Chad Riggs, Development Engineer
Date: February 28, 2017
Re: SUB-2015-0001 / PRD-2015-0001: Painted Hills Preliminary Plat and PRD - SEPA
Comments and Recommended Conditions of Approval
The following are comments from the SEPA checklist:
The SEPA checklist was reviewed for environmental impacts due to the proposed grading only.
Once designs for the development itself are submitted then comments can be prepared
addressing the site details and anticipated traffic impacts.
Per SEPA sections:
1. Section A BACKGROUND, Part 14.a.1: Stormwater will discharge below the ground
surface in the swales/ponds via percolation through grass during small storms and via
infiltration by drywells during large storms.
2. Section A BACKGROUND, Part 14.b.2: Stormwater will be discharged below the ground
surface (see Part 14.a.1). A significant impact could occur during high flows where
pollutants contained in the stormwater would be introduced into the soil via the drywells.
3. Section B ENVIRONMENTAL, Part 3.a.5: The flood zone is a compensatory storage area
which means that any loss of storage volume or infiltration capacity needs to be compensated
for.
4. Section B ENVIRONMENTAL, Part 3.b1: Low stormwater flows discharged to groundwater
via infiltration through vegetated swales, large storm flows discharged to groundwater via
drywells. Flood water being infiltrated is currently from primarily non-PGIS (pollution
generating impervious surface) areas.
5. Section B ENVIRONMENTAL, Part 3.c.1: offsite stormwater will be coming into the site
from Chester Creek to the south and an unnamed tributary at the site’s northeast corner. This
stormwater will be disposed of onsite using gravel galleries and drywells.
6. Section B ENVIRONMENTAL, Part 14 Transportation: This project has not yet received
transportation concurrency.
The following recommended conditions are to be included in the staff report. Prior to final
plat submittal or issuance of any building permit, the following items shall be addressed:
Design
1. A Professional Engineer, licensed in the State of Washington, shall prepare required
engineering documents (including civil/street plans, drainage plans, drainage calculations,
traffic studies, shared access driveway plans, etc.) Plans shall conform to the 2009 City of
Spokane Valley Street Standards (SVSS) or as amended, the 2008 Spokane Regional
Stormwater Manual (SRSM) or as amended, the City of Spokane Valley Municipal Code
(SVMC) and all other federal, state and local regulations, as applicable.
2. Review of civil plans and supporting documents cannot proceed until an application for a Land
Disturbance permit has been received. All documents (plans, reports, etc) must be submitted through
the Building Department Permit Center located at 11707 E Sprague Avenue, Suite 108.
3. All areas of the development within a floodplain will require a Floodplain Development Permit.
4. Dishman-Mica Road is designated as a 2-Lane Minor Arterial and half-street frontage
improvements are required per SVSS Chapters 2 and 7. Required improvements are detailed below:
22’ of asphalt width from street centerline to edge of gutter.
2’ wide Type ‘B’ curb and gutter per SVSS Std. Plan R-102.
10’ wide roadside swale per SVSS Std. Plan S-130. The applicant shall install
seed/grass in the roadside swale and maintain the swale.
6’ wide concrete sidewalk per SVSS Std. Plan R-103.
Additional improvements as documented within the approved Traffic Impact Analysis
and addendums.
5. A soil investigation and pavement design shall be prepared for all streets per SVSS Chapter 8.
6. The following determines the Dishman-Mica Road right-of-way (ROW) and border easement
dedications per SVSS 7.5.2 and 7.5.3. Existing dedication widths were estimated using information
from the Spokane County Assessor’s Office. The project applicant is responsible for verifying all
values listed below.
Existing half ROW width is 30’.
Required half ROW width is 26’.
o ROW dedication not required.
A Border Easement is required and shall extend from the ROW to the back of sidewalk.
o 10’ minimum wide Border Easement dedication required.
o Where the sidewalk/pedestrian path meanders into the project site, a Public Access
Easement shall be provided.
o Note: building setbacks begin at the edge of border easement.
7. Thorpe Road is designated as a Collector Arterial and half-street frontage improvements are required
per SVSS Chapter 2 and SVSS Std. Plan R-122, “Swale Section”. Required improvements are
detailed below:
20’ of asphalt width from street centerline to edge of gutter.
2’ wide Type ‘B’ curb and gutter per SVSS Std. Plan R-102.
10’ wide roadside swale per SVSS Std. Plan S-130. The applicant shall install seed/grass
in the roadside swale and maintain the swale.
5’ wide concrete sidewalk per SVSS Std. Plan R-103.
8. The following determines the Thorpe Road right-of-way (ROW) and border easement dedications
per SVSS Std. Plan R-122. Existing dedication widths were estimated using information from the
Spokane County Assessor’s Office. The project applicant is responsible for verifying all values
listed below.
Existing half ROW width is 25’.
Required half ROW width is 24’.
o ROW dedication not required.
A Border Easement is required and shall extend from the ROW to the back of sidewalk.
o 12’ wide Border Easement dedication required.
o Note: building setbacks begin at the edge of border easement.
9. Madison Road is designated as a Collector Arterial and half-street frontage improvements are
required per SVSS Chapter 2 and SVSS Std. Plan R-122, “Swale Section”. Required improvements
are detailed below:
20’ of asphalt width from street centerline to edge of gutter.
2’ wide Type ‘B’ curb and gutter per SVSS Std. Plan R-102.
10’ wide roadside swale per SVSS Std. Plan S-130. The applicant shall install seed/grass
in the roadside swale and maintain the swale.
5’ wide concrete sidewalk per SVSS Std. Plan R-103.
10. The following determines the Madison Road right-of-way (ROW) and border easement dedications
per Std. Plan R-122. Existing dedication widths were estimated using information from the Spokane
County Assessor’s Office. The project applicant is responsible for verifying all values listed
below.
Existing half ROW width is 30’.
Required half ROW width is 24’.
o ROW dedication not required.
A Border Easement is required and shall extend from the ROW to the back of sidewalk.
o 7’ wide Border Easement dedication required.
o Note: building setbacks begin at the edge of border easement.
11. All internal streets designated as public streets shall be designed per SVSS Table 7.3 and Standard
Plan R-120.
12. Any internal streets located behind gated accesses shall be designated as private streets and designed
per SVSS Section 7.3.2, Table 7.3, and Standard Plan R-133 (Turnarounds).
13. All block lengths shall be limited to 600 feet per SVSS Section 7.5.14.
14. Local access street intersections shall meet the minimum spacing requirements per SVSS Table 7.5.
15. All residential developments with greater than 30 single family dwelling units shall have two (2) street
accesses that meet the Fire Department separation requirement to ensure adequate emergency access
per SVSS Section 7.5.14.
16. In accordance with the SVMC, Zoning Regulations (19.40.020 Residential Standards), all residential
driveways shall be paved. Private driveways shall conform to SVSS Section 7.3.4.
17. Dishman-Mica Road is a Minor Arterial. Access to an arterial is limited to a single access
point. One additional access point may be granted on an arterial by the Development Services
Senior Engineer if the criteria outlined in SVSS Section 7.8.2 demonstrate an adequate need.
18. Madison Road is a collector. Access to a collector is limited to two access points. Additional access
points may be granted by the Development Services Senior Engineer if the criteria outlined in SVSS
Section 7.8.2 demonstrate an adequate need.
19. Driveway approach design shall follow the 2009 SVSS, or as amended.
20. All stormwater facilities are to be designed per the SRSM. Linear roadside facilities such as swales
shall be located within the right of way and/or border easements when adjacent to public streets or
within a tract or easement when adjacent to a private street or driveway serving more than one lot.
Non-roadside facilities such as ponds (especially consolidated ponds, which are those receiving runoff
from more than one lot) shall be within a tract (see SRSM 11.2).
21. A Homeowners Association (HOA) is required for the perpetual operation and maintenance of any
on-site private streets, associated stormwater facilities, common areas and all flood improvements
within the City and County constructed for this project. A draft copy of the CC&Rs for the HOA is
required to be submitted with the drainage submittal.
22. An Operations and Maintenance Manual, per SRSM Chapter 11 shall be submitted with the
initial submittal of final design plans for the street and/or stormwater systems. Prior to plan
approval, a complete Operations and Maintenance Manual under a single cover, which includes
all operations and maintenance information for the street and stormwater systems as well as all
of the operations and maintenance for the flood improvements including levees, shall be
accepted.
23. For the General Construction Notes use those in the SVSS Appendix 4A rather than those in the
SRS Appendix 3B.
24. Show all utilities and utility easements (i.e. Telephone, power, etc.). The permittee is
responsible for arranging all utility adjustments, improvements, or relocations as required for
completion of the project. All rigid objects shall be located out of the clear zone. The clear
zone requirements can be found in the 2009 SVSS, or as amended. The permittee shall
contact every utility purveyor impacted by the project and conduct the following –
a. Discuss with the purveyor the proposed work including private services, utility
improvements, and any relocations and adjustments as well as the costs for these
activities,
b. When utility relocations are required, obtain from the purveyor a written statement
that they acknowledge and concur with or have alternatives for the needed work; and
c. Forward a copy of the statement to Spokane Valley Development Engineering.
Receipt of statements will be required prior to plan approval.
25. If sewer and/or water needs to be brought to the properties and to do this requires an
Engineering design, copies of the approved sewer and water plans shall be submitted to
Development Engineering. The civil plans for the project shall show the extents of
pavement removal and replacement.
26. All new dry wells and other injection wells shall be registered with the Underground
Injection Control program (UIC) at Department of Ecology prior to use and the discharge
from the well(s) must comply with the ground water quality requirement (non-endangerment
standard) at the top of the ground water table. Contact the UIC staff at UIC Program,
Department of Ecology, P.O. Box 47600, Olympia, WA 98504-7600, (360) 407-6143 or go
to: http://www.ecy.wa.gov/programs/wq/grndwtr/uic/UIConlineregis.html for registration
forms and further information. Copies of the registration for drywells, which receive public
road stormwater runoff, are to be sent to Development Engineering. The City of Spokane
Valley NPDES Permit Number is WAR04-6507.
27. A Construction Stormwater Permit shall be obtained from the Department of Ecology if
both of the following two conditions apply:
a. Construction project disturbs one or more acres of land (area is the cumulative
acreage of the entire project whether in a single or in a multiphase project), and,
b. If there is a possibility that stormwater could run off the site during construction and
into surface waters or into conveyance systems leading to surface waters of the state.
c. Construction site operators must apply for a permit 60 days prior to discharging
stormwater. More information can be obtained from
http://www.ecy.wa.gov/programs/wq/stormwater/construction/
Construction
28. A pre-construction conference with Development Engineering is required prior to the start of
construction. During this meeting, standards and submittal requirements for the
Construction Certification will be given to the project engineer/inspector. The grading
permit shall be taken out following the pre-construction meeting.
29. For construction affecting public right-of-way, forty-eight (48) hours prior to construction
securely post a sign at each ingress to the project area. Sign shall be clearly visible from the
right-of-way and provide project construction details. See SVSS Section 9.7.
30. Permits are required for any access to or work within the right-of-way of the Spokane Valley
roadway system. A traffic control plan shall accompany the right-of-way obstruction permit.
31. The TESC structures (such as filter fence, silt ponds, silt traps) shall be installed prior to the
start of site work and maintained throughout the duration of construction and until the site
has stabilized.
32. All survey monuments shall be protected during construction. Any disturbed or damaged
monuments shall be replaced prior to certification / final plat and/or release of surety.
33. Construction within the proposed public streets and easements shall be performed under the
direct supervision of a licensed Washington State Professional Engineer/Land Surveyor. All
work is subject to inspection by the City Senior Development Engineer or by his staff.
34. Upon completion of the improvements, a Construction Certification package and record
drawings are required for the improvements and shall be submitted and approved prior to
Final Plat approval.
35. All public improvements shall provide a Performance/Warranty Surety per SVSS Chapter 9.
The City accepts Letters of Credit or Cash Savings Assignments only for Performance
Sureties and Letters of Credit, Cash Savings Assignments, and Bonds for Warranty Sureties.
Final Plat
36. Right-of-way dedications and border easements shall be designated on the final plat map. Any
right-of-way and easement dedications executed as part of the flood improvements prior to
final plat submittal shall be shown on the final plat map with recording numbers.
37. The Homeowner Association’s UBI number shall be referenced on the face of the Final Plat
38. Plat language will be determined at the time of final plat submittal. Contact Development
Engineering after civil plan approval and/or prior to first submittal of final plat to obtain plat
language.