Loading...
Ex#15 Transportation Concurrency Cert Version 4 (01.23.2020) Public Works Department 10210 E Sprague Avenue ⧫ Spokane Valley WA 99206 Phone: (509) 720-5000 ⧫ Fax: (509) 720-5075 ⧫ www.spokanevalleywa.gov Traffic Engineering Certificate of Transportation Concurrency – Residential The Spokane Valley Community and Public Works Department has reviewed the development described above and has determined that sufficient roadway capacity exists, or is programmed to exist with future road improvements on the City street system to accommodate the uses and densities shown. This Certificate of Transportation Concurrency reserves the number of PM peak hour trips indicated above and is issued only for the development as described above. Additionally, reservation of these trips is contingent upon the mitigation identified above. The trip reservation shall run with the land and is not transferable to other development projects or properties. The Certificate of Transportation Concurrency is valid upon approval through the expiration date indicated. The owner or owner’s authorized agent shall apply to renew/extend the Certificate of Transportation Concurrency prior to the expiration date. The City of Spokane Valley will not notify a property owner/agent of an expired or impending certificate expiration. Approval: Traffic Engineering Manager or Designee Date Copies to: CSV Planning Department, CSV Project Files, Project Applicant, Project Traffic Engineer Project Name: Ponderosa Ridge East File Number: SUB-2022-0002 Application Date: 02/22/2022 SEPA Number: N/A Parcel Number(s): 45052.9011 Project Address: Approximatey 9500 E 44th Avenue Specific Land-Use: 91 Land Use Description: Vacant Land ITE (Land Use Code): 210-Single Family Detached Housing (81 units in the City, 49 in the County) Number of Adjacent Roadway Network PM Peak Trips Reserved: 80 net new trips (City) 128 trips overall (including development in County) Analysis Performed: TIA, Dated 5/19/2023 City Intersections Affected 44th/Schafer, Dishman-Mica/Schafer, Dishman-Mica/Bowdish Expiration Date: 5 years from Preliminary Plat Approval or for a period of 6 years from issuance of concurrency, whichever occurs earlier. Mitigation Measures: There are no level of service deficiencies identified as a result of this project. No mitigation is required for concurrency. 03/14/2024