09-162.00 Knife River: Broadway Rehab Ph 2r' Federal Aid Project No.: STPUS. 3846(008) S��il�ane - Valley CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 09.036 DEP ARTMENT OF PUBLIC WORKS PROJECT: Broadway Rehabilitation ProJeot - Phase 2 - CONTRACT DATE: 7/3112009 CONTRACTOR: Hap Taylor & Sons Inc dba Knife River CHANGE ORDER NO: 4 CAPITAL IMPROVEMENT PROJECT NO: 0066 BID NO.: 09-036 DESCRIPTION OF CHANGES This Change Order Increases the contract amount to include final micellaneous quantity overuns. Item No Description unit Quantity Unit Price I2W 62 Summary of Quantity Overuns LS 1 $31,629.16 $31,629.16 Total Amount of this Change Order(incl. Tax): $31,629.16 SUBSTANTIAL COMPLETION Original Date: 9/1412009 Prior to this Change Order. 9/14/2009 Including this Change Order: 9/14/2009 idglnal Working Days: 27 Worldng Days Added by this CO: 0 Working Days Including this CO: 27 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $, 508,306.75 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $. 10,128.96 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER ,,,_,,...,,,_ „_,,,,,_$, 618,435.71 NET THIS CHANGE ORDER „^.. 31,628.16 __.._...........__._.._...._...._....._......_.._..._... .....,._......._.._.__._._...., . TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 650,064.87 CONTRACTOR ACCEPTANCE: // 7? DATE: / d ^i2- ^ G 9 The contractor hereby accepts thts adjustment under the terms of the odginal contract for all work perfomed. RECOMMENDED B k % —� /�� DATE: A-7 • ?• 0 9 APPROVED BY: APPROVED BY: ATTACHMENTS: Otstabuuon. ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Offtoe, PIN Project File COPIES TO: PW Project File P:PuMC wo,twaad,svgW (sasrmor) DATE: r, DATE: Cog- 1 (,2 rl Spokane jValleya Memorandum Public Works Department Capital Improvement Program 1170 : Sprag -- ... Ec o PY , vy 509.921.11 1 ♦ Fax: 509.921.1008 ♦ cityhaftspokanevalley.q Date: October 9, 2009 To: Steve Worley, Neil Karsten From: Craig Aldworth i Re: Change Order 4 for Broadway Rehab 2 Project, CIP 0066 Budget Account No. 303.303.0066.595.30.63.00 Knife River Contract 09 -036 Change Order 4 is an administrative project closeout change order that increases the authorized contract amount to include final miscellaneous quantity overruns. The final changes ( + / -) in quantities and cost for each bid item are shown on the attached spreadsheet version of Pay Estimate Application 2. The majority of the cost increase is due to increases in three bid items: Bid Item 14, HMA Utility Patch Quantities were increased 202 SY (22 %) due to cave — ins at edges of utility excavations and to re -grade a section of existing pavement on the eastbound lanes on the east end of the project to improve drainage and ride. Increased cost $9,696.00 Bid Item 15, HMA Pavement Patch Quantities were increased 155 SY (12 %) to repair failing pavement on the north side of intersections up to the curb return. Increased cost $9,687.50 Bid Item 16, HMA Cl. V2" PG 70 -28 Quantities were increased 179 tons (16 %) to remove existing rutting and increase rideability on the east end of the project. The increased HMA thickness will increase the pavement life on truck arterial. Increased cost $15,036.00 Overages and underages in other bid item quantities nearly balanced. The total cost (incl. tax) for this Change Order work is $31,629.16 paid for by an 86.5% Federal grant and the City of Spokane Valley. There are sufficient funds in the project budget to cover these costs. Original Contract amount — $508,306.75 Previous Change Order Cost = $10,128.96 Change Order #4 Cost = $31.629.16 Project Cost including Change Order #4 = $550,064.87 15% of Original Contract amount = $77,794.01 Max Public Works Director Contract authority = $75,000.00 Change Order Cost to date = $41.758.12 Remaining P.W. Director Contr t Authority after CO #4 $33,241.88 Public Works r roject anager t� Cc: Deputy City Manage Finance Department APPLICATION FOR PAYMENT NO.2 Broadway Rehab Phase 2 Project CIP No. 0066 SCHEDULE A • Road Work Payment Period: September 1, 2009 through September 14, 2009 Spokane AL V$ SCHEDULE A ORIGINALCONTRACTVALUES WORN COMPLETED PREVIOUS PERIOD THIS PERIOD PROJECT TO DATE ITEM NO. ITEM DESCMFrnON UNIT QUANTITY UNrT PMCE TOTAL COST OUANiTTY TOTAL COST QUANTITY TOTAL COST DUANTrrY TOTAL COST 1 MOBILIZATION LS 1 $59,500.00 $59,500.00 1.00 $ 59,500.00 0.00 $ 1.00 $ 59 500.00 2 CONSTRUCTION SURVEYING LS 1 $10000.00 $10,000.00 0.75 $ 7,500.00 0.25 $ 2500.00 1.00 $ 10000.00 3 SPCC PLAN LS 1 $250.00 $250.00 0.00 $ 1.00 250.00 1.00 $ 250.00 4 EROSION CONTROL LS 1 $6,500.00 $6,500.00 0.67 $ 4,355.00 0.33 $ 2.145.00 1.00 $ 6,500.00 5 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 $25,000.00 $25,000.00 0.67 $ 18 750.00 0.33 $ 8 1.00 $ 25,000.00 6 PEDESTRIAN CONTROL AND PROTECTION LS 1 $1,300.00 $1300.00 0.67 $ 871.00 0.33 $ 429.00 1.00 $ 1,300.00 7 REMOVE PCC CURB LF 222 $13.00 $2 30.00 $ 390.00 5.00 $ 65.00 35.00 $ 455.00 8 REMOVE PCC CURB AND GUTTER LF 318 $6.00 $1,908.00 378 $ 2,268.00 241 $ 1,446.00. 619.00 $ 3,714.00 9 REMOVE PCC SIDEWALK / DRIVEWAY APPROACH SY 263 $5.25 $1,380.75 123 $ 645.75 0 $ 123.00 $ 645.75 10 ABANDON EXISTING DRYWELL EA 10 $850.00 $8500.00 10 $ 8500.00 0 $ 10.00 $ 8,500.00 11 SAWCUT 2 IN. ACP PAVEMENT LF 388 $0.60 $232.80 287 $ 172.20 0 $ 287.00 $ 172.20 12 MICRO MILL PLANING BITUMINOUS PAVEMENT SY 6625 $2.50 $16,562.50 3.315 $ 8,287.50 3,441 $ 8,602.50 6 $ 18 890.00 13 SHIM PLANING BITUMINOUS PAVEMENT BY 4563 $2.40 $10,951.20 2,280 $ 5,472.00 2,283 $ 5,479.20 4,563.00 $ 10.951.20 14 HMA UTILITY PATCH SY 884 $48.00 $42,432.00 981 $ 47 088.00 105 $ 5,040.00 1 086.00 $ 52 128.00 15 HMA PAVEMENT PATCH BY 1288 $62.50 $80,500.00 355 $ 22,187.50 1 $ 68,000.00 1,443.00 $ 90 187.50 16 HMA CL. 112" PG 70 -28 TN 1124 $84.00 $94.416.00 672 $ 56,448.00 631 $ 53,004.00 1.303.00 $ 109,452.00 17 ANTI-STRIPPING ADDITIVE CALC 1 $1.00 $1.00 $ 1 $ 1196.15 1196.15 $ 1,198.15 18 JOB MIX COMPLIANCE PRICE ADJUSTMENT CALC 1 $1.00 $1.00 $ - 0 $ $ 19 COMPACTION PRICE ADJUSTMENT CALC 1 $1.00 $1.00 $ 0 $ - $ 20 CRUSHED SURFACING TOP COURSE TON 33 $59.00 $1,947.00 $ 45 $ 2,655.00 45.00 $ 2,655.00 21 TRENCH EXCAVATION SAFETY SYSTEM LS 1 $500.00 $500.00 1 $ 500.00 0 $ - 1.00 $ 500.00 22 CATCHBASIN TYPE 2 481N. DIAM. EA 10 $2 $23 5 $ 11,500.00 5 $ 11,600.00 10.00 $ 23,000.00 23 SPILL CONTROL SEPARATOR EA 10 $350.00 $3500.00 10 $ 3,500.00 0 $ 10.00 $ 3 24 CONCRETE INLET EA 10 $850.00 $8,500.00 10 $ 8,500.00 0 $ - 10.00 $ 8,500.00 25 PRECAST CONCRETE DRYWELL, TYPE 2 EA 10 $2 $25,000.00 5 $ 12 500.00 5 $ 12 500.00 10.00 $ 25,000.00 26 SOLID WALL PVC STORM SEWER PIPE 12 IN. DIAM. LF 179 $50.00 $8,950.00 96 $ 4,800.00 90 $ 4,500.00 186.00 $ 9,300.00 27 ADJUST EXISTING MANHOLE, CATCH BASIN OR DRYWELL EA 8 $350.00 $2.100.00 6 $ 2 0 $ 6.00 $ 2,100.00 28 ADJUST EXISTING VALVE BOX EA 4 $275.00 $1,100.00 1 $ 275.00 3 $ 825.00 4.00 $ 1 100.00 29 CEMENT CONC.TRAFFIC CURB LF 37 1 $14.00 $518.00 36 $ 504.00 8 $ 112.00 44.00 $ 816.00 30 CEMENT CONC. TRAFFIC CURB AND GUTTER LF 540 $15.25 $8,235.00 264 $ 4,026.00 115 $ 1,753.75 379.00 $ 5,779.75 31 CEMENT CONC. PEDESTRIAN CURB LF 84 $12.50 $1,050.00 $ 74 $ 925.00 74.00 $ 925.00 32 CEMENT CONC. SIDEWALK BY 191 $34.00 $6,494.00 62 $ 2,108.00 72 $ 2 134.00 $ 455600 33 DRIVEWAY APPROACH SY 26 $55.00 $1,430.00 1 1 $ - 43 $ 2,365.00 1 43.00 $ 2385.00 Qu.Change Coat Change (187.00) $ (2,431.00) 301.00 $ 1,806.00 (140.00) $ (735.00) _ g _ (101.00) $ (60.60) 131.00 $ 327.50 202.00 $ 9,696.00 155.00 $ 9,687.50 179.00 $ 15,036.00 1,195.15 $ 1,195.15 (1.00) $ (1.00) (1.00) $ (1.00) 12.00 $ 708.00 7.00 $ 350.00 7.00 $ 98.00 (161.00) $ (2,455.25) (10.00) $ (125.00) (57.00) $ (1,938.00) 17.00 $ 935.00 38 ISO[ 47 IPAII 'PROACH CURB AND GUTTER 14 HM) TABLE WARNING RETROFIT SF 10 (CRETE SIDEWALK RAMP, TYPE 2 EA 3 CO2 EA Si i ATION 50 TEN 'PROACH CURB AND GUTTER LF 1St TABLE WARNING RETROFIT SF 10 (CRETE SIDEWALK RAMP, TYPE 2 EA 3 (CRETE SIDEWALK RAMP, TYPE 4A EA 2 ATION SY 28 E B SY 30 E 2 IN. DIAM. LF 193 CASING PIPE, 6 IN. DIAM. LF 60 )X, TYPE 1 EA 1 $ 50.16 EA 5 SIGNING LS 1 _ROAD CROSSING SYMBOL EA 4 PAVEMENT MARKING LF 800 LF 577 P LINE LF 52 DOP TYPE 2 EA 2 7.00 7.00 0.00 CHANGE ORDER I SUBTOTAL $ 1 1 $150.00 CHANGE ORDER 2 SUBTOTAL $ Closeout 1. 1 $ 1 $ 6 2 $ 3.300.00 24.00 $ 408.00 (2.00) $ (74.00) (3.00) $ (144.00) (5.00) $ (115.00) 66.00 $ 627.00 I (6,039.00) $ (1,207.80) I I I 228.00 $ 50.16 (2.00) $ (7.50)' $ 31,629.16 (1.00) $ (31,629.16)