Loading...
09-165.00 Inland Asphalt: Sprague Ave Rehab Ph 1Washington State Change Order 3 Department of Transportation Date September 15, 2009 of Contract Number 09 -031 Federal Aid Number ARRA -3840 (008) Contract Title Sprague Avenue Rehabilitation Project #1 Change Order Number 3 Prime Contractor Inland Asphalt Co. by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Proposed by Contractor Endors d By Surety Consent Contractor Attorney of Fact Date Date Original Contract Amount 393.18 Current Contract Amount $ 2,267,840.22 Estimated Net Change This Change $39,421.90 Estimated Contract Total After Change $ 2,307,262.12 Approval Required Region ❑ Olympia Service Center Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X App al Recomm @nded� ❑Approved Approve Project Engineer �� Approving Auth er C.A. Agreement � nr ,L Date Date ❑ Approval Recommended ❑Approved Approved By Approving Authority per C.A. Agreement Date Date Cog - If05 CHANGE ORDER Page 2 of 3 Contract No: 09 -031 This Contract is revised as follows: Description of Work Change Order No. 3 DRYWELL CATCH BASIN MODIFICATION —This change includes removal and waste of 35 cubic yards of material and replacement of 35 cubic yards of drywell rock around the existing drywell and new catch basin. A concrete cap was also placed above both structures. CATCH BASIN UTILITY CONFLICT - During the placement of Structure #61 a gas main was in conflict with the installation of the cone on the new catch basin type 1. A steel plate was placed on the catch basin barrel and backfilled. The structure above the steel plate was then excavated and the steel plate was removed. SEWER REPAIR (SIDE SEWER SERVICE) — Sewer services to businesses were repaired due to excavation of new catch basins at (3) three locations. This work included removal of contaminated soil, emergency repair and lost production. EXISTING DRYWELL REPLACE CONE — (2) Two Existing drywell cones at structure #'s 7 and 11 were found to be damaged. This work included the replacement of the drywell cone, concrete cap and adjustment rings. REMOVE EXISTING SIGNAL BASES —Old signal bases that remained at the Gillis intersection were removed so ADA ramp improvements could be made at the four corners of the Gillis intersection Materials The Materials shall meet the requirements of the 2008 Standard Specifications. Construction Requirements Work shall meet the requirements of the 2008 Standard Specifications and the special provisions. The installation shall include all labor, materials, tools and equipment to complete the work. Measurement " DRYWELL CATCH BASIN MODIFICATION ", PER EACH "CATCH BASIN UTILITY CONFLICT ", PER EACH 'SEWER REPAIR (SIDE SEWER SERVICE) ", PER EACH "EXISTING DRYWELL REPLACE CONE ", PER EACH "REMOVE EXISTING SIGNAL BASES ", PER EACH CHANGE ORDER Page 3 of 3 Contract No: 09 -031 Change Order No. 3 Payment " DRYWELL CATCH BASIN MODIFICATION ", PER EACH "CATCH BASIN UTILITY CONFLICT ", PER EACH "SEWER REPAIR (SIDE SEWER SERVICE) ", PER EACH "EXISTING DRYWELL REPLACE CONE ", PER EACH "REMOVE EXISTING SIGNAL BASES ", PER EACH CHANGE ORDER PRICING Item No. Item Description Unit Measure Unit Price Est. Qty. Change Est. Amt. Change DRYWELL CATCH BASIN MODIFICATION EA $2,800.00 9 $25,200.00 CATCH BASIN UTILITY CONFLICT EA $ 675.44 1 $675.44 SEWER REPAIR (SIDE SEWER SERVICE) EA $1,714.65 3 $5,143.95 EXISTING DRYWELL REPLACE CONE EA $1,409.35 2 $2,818.70 REMOVE EXISTING SIGNAL BASES EA $ 500.00 4 $2,000.00 SUBTOTAL $35,838.09 CONTRACTOR MARKUP 10% ` $3,583.81 TOTAL $ 39,421.90