09-168.00 Inland Asphalt: Sprague Ave Rehab Ph 1r Washington State Change Order 6 Department of Transportation Date September 30. 2009 e 1 of Contract Number 09 -031 Federal Aid Number ARRA -3840 (008) Contract Title Sprague Avenue Rehabilitation Project #1 Change Order Number 6 Prime Contractor Inland Asphalt Co. Ordered by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Proposed by Contractor Endo ed By c Contra r Surety Consent Attomey of Fact Original Contract Amount $ 2,256,393.18 Current Contract Amount Estimated Net Change This Change rrzlera 17, 921.52 Estimated Contract Total After Change $ 2,345,908.92 Approval Required Region ❑ Olympia Service Center R Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X Appro Recommen ed ❑Approved Approved Project Engineer // ��/� Approving Authority per C.A. Agreement lO -Jd —o7 Date Date ❑ Approval Recommended ❑Approved Approved By Approving Authority per C.A. Agreement Date Date Cog -14 CHANGE ORDER Page 2 of 3 Contract No: 09 -031 Change Order No. 6 This Contract is revised as follows: Description of Work During asphalt grinding operations on the Sprague Avenue Project areas of inadequate asphalt thickness were encountered. The project specified that 2.5 inches of asphalt be removed with a grinder and replaced with 2.5" of Hot Mix Asphalt. Existing areas along Sprague Avenue had only 2 to 2.5 inches of existing asphalt. Grinding operations in these areas completely removed all existing asphalt. Existing material in these areas will need to be removed and reconstructed with crushed surfacing and or asphalt. Two (2) Working Days will be added to the contract. 1) PAVEMENT REPLACEMENT CSTC /3.5" HMA - Pavement replacement in the outside eastbound lane between Bowdish Road and Pines Road will be replaced with crushed surfacing and 3.5 inches of Asphalt. Existing material will be removed and hauled off. 2) PAVEMENT REPLACEMENT 2.5" HMA - Pavement patching in the center turn lane and other areas along Sprague Avenue between University Road and Bowdish Road that were discovered during grinding operations will be paved with 2.5 inches of asphalt. Existing material will be removed and hauled off. 3) PAVEMENT REPLACEMENT MISC AREAS - Pavement patching in miscellaneous areas along Sprague Avenue between Pines Road and Evergreen Road that were discovered during grinding operations will be paved with 2.0 inches of asphalt. Existing material will be removed and hauled off. Materials The Materials shall meet the requirements of the 2008 Standard Specifications. Construction Requirements Work shall meet the requirements of the 2008 Standard Specifications and the special provisions. Measurement "PAVEMENT REPLACEMENT CSTC /3.5" HMA ", PER SQUARE YARD "PAVEMENT REPLACEMENT 2.5" HMA ", PER SQUARE YARD "PAVEMENT REPLACEMENT MISC AREAS ", PER SQUARE YARD Payment "PAVEMENT REPLACEMENT CSTC /3.5" HMA ", PER SQUARE YARD "PAVEMENT REPLACEMENT 2.5" HMA ", PER SQUARE YARD "PAVEMENT REPLACEMENT MISC AREAS ", PER SQUARE YARD i� CHANGE ORDER Page 3 of 3 Contract No: 09 -031 Change Order No. 6 Item Item Description Unit Unit Price Est. Qty. Est. Amt. No. Measure Change Change PAVEMENT REPLACEMENT CSTC /3.5' HMA SY $35.75 1706.30 $61,000.23 PAVEMENT REPLACEMENT 2.5" HMA SY $39.20 939.60 $36,832.32 PAVEMENT REPLACEMENT MISC AREAS SY $30.75 653.30 $20,088.98 (PRICES INCLUDE MARKUP) TOTAL $117,921.53