09-174.00 Ginno Construction: Discovery PlaygroundSpokan
'al;o0owley
DEPARTMENT OF PUBLIC WORKS
CHANGE ORDER NO:
PROJECT:
Discovery Playground
CONTRACT DATE:
17 July, 2009
CONTRAC
Ginno Construction
PROJECT NO:
SVPW # 0086
DESCRIPTION OF CHANGES
Add: Alternate no. 1: Climbing play eggs located at Eagles Nest $9.417.00
Add: Alternate no. 3: Provide Climbing Fish at entrance $6,277.00
Total Amount of this Change Order:
CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE:
ORIGINAL CONTRACT AMOUNT $ 1,476,184.
. . . . . . . . . . . . . . ............ . . . . ............... . . . . ............... . . . . . . . . . . . . . . . . . . . .............. . . . . ............ . ............... . ............ . . . . . .
TOTAL PRIOR CHANGE ORDER AMOUNT ......................................................................................... ..........................._$., 0.
NET THIS CHANGE ORDER $ 15,694.
CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,491,878.
CONTRACTOR ACCEPTANCE:'
DATE:
The contractor hereby accepts this adjustment under the terms of the original contract for all work pertomed.
RECOMMENDED BY: • AL& DATE:
oje M ager
PAR1<s d R.SL pt0.ECTOR
APPROVED BY:
APPROVED BY:
Dave Mercier! City Manager
DATE:
ATTACHMENTS:
Distribution:
ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office
COPIES TO: PW Project File
P:PW /Forms/Templates/C0 (Nov 06)
Coq -17y
GINNO CONSTRUCTION
PROD. NO.: 09.15
PROJECT: - Discovery Playground
LOCATION: Spokane Valley, Washington
CHANGE PROPOSAL REQUEST
01
Add Alt #1 Climbing Eggs
CPR DATE: 10/712009
BY: B. LONGWELL
RUN DATE: 1017/2009
COST
CARP
UNIT DATES
CODE
DESCRIPTION
OTY
ONir
MHRS
LABOR
MATL
•SUBS
TOTAL
LABOR
MAIL
SUB
0
0
0
0
so
Playtime
Eagle eggs at observation ai
1
0
$8.250.00
0
0
8,250
$8,250
0
0
0
0
so
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
50
0
0
0
0
$0
0
0
0
0
so
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
SO
SUBTOTAL - -•>
MH
1 0.00
$0
$0
$8,250
38,250
FIELD REQUIREMENTS
-
SURVEYILAYOUT.
MH
0
548.00
0
0
0
0
0
SO
GENERALLABOR
MH
0
$38.00
0
0
0
0
0
$0
FIELD SUPPORT
0.00%
(on subtotal)
0
0
0
0
0
$0
SM TOOLSMAREHOUSE
0.00%
(on labor)
0
0
0
0
0
$0
OSHAISAFETY
0.00%
(on labor)
0
0
0
0
0
$0
PROJECT MANAGER
MH
0
$58.00
0
0
0
0
0
$0
SUPERINTENDENT
MH
0
$50.00
0
0
0
0
0
$0
PROJECT ENGINEER
MH
0
$42.00
0
0
0
0
0
$0
TAXIINSUR
IDAHO STATE TAX
0.00%
LS
0
0.000
0
0
0
0
50
BUILDERS RISK
0.00%
LS
0
0.000
0
0
0
0
$0
INSURANCE
1.20%
LS
0
99.000
0
0
99
0
$99
B 8 0 TAXES
0.047%
LS
0
3.932 1
0
0
4
0
$4
SUBTOTAL - ->
MH
0.00
SO
$103
SO
$103
C A L_,
_ B s
- - ..DSO
1 3,
;,; 8;250;
`fir:! 38,353
FEE
15%
15%1
1.68%
:a
151
138
5154
SUBTOTAL — > j
'$0
$1181
58,388
58,507
BUDGET TOTAL
$8.507
PAYIPERF BOND 2.00%
-
$170
TAX ..8.70%
5740
CPR TOTAL
$9,417
Page 1
GINNO CONSTRUCTION
PROI. NO,: 09.15
PROJECT: DIscwery Playground
LOCATION: Spokane Valley, Washington
CHANGE PROPOSAL REQUEST
3
Add Alt #3 Fish at Entry
CPR DATE: 1042=09
BY: B. LONGWELL
RUN DATE: 101212009
COST
CARP
UNIT RATES
CODE
DESCRIPTION
OTY
UNIT
MHRS
LABOR
MATL
SUBS
TOTAL
R
0
0
0
0
$0
PlayOme
Fish at Entry
1
0
$5,500.00
0
0
5,500
$5,500
0
0
0
0
$0
0
0
0
0
50
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
so
0
0
0
0
$0
0
0
0
0
so
0
0
0
0
50
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$0
0
0
0
0
$o
0
0
0
0
so
SUBTOT —>
MH
1 0.00
$0
$0
$5,500
$5,500
FIELD REQUIREMENTS
SURVEY /LAYOUT
MH
0
$48.00
0
0
0
0
0
$o
GENERAL LABOR
MH
0
$36.00
0
0
0
0
0
$0
FIELD SUPPORT
0.00%
(on subtotal)
0
0
0
0
0
$0
SM TOOLSM/AREHOUSE
0.00%
(on labor)
0
0
0
0
0
$0
OSHA/SAFETY
0.00%
(on labor)
0
0
0
0
0
$0
PROJECTMANAGER
MH
0
$58.00
0
0
0
0
0
$0
SUPERINTENDENT
MH
0
550.00
0
0
0
0
0
$0
PROJECT ENGINEER
MH
0
$42.00
0
0
0
0
0
$0
TAXnNSUR
IDAHO STATE TAX
0.00%
LS
0
0.000
0
0
0
0
$0
BUILDERS RISK
0.00%
LS
0
0.000
0
0
0
0
$0
INSURANCE
1.20%
LS
0
66.000
0
0
66
0
$66
B 8 O TAXES
0.047%
LS
1
01
2.622 1
0
01
3 1
0
83
SUBTOTAL -••>
MH
0.00
$0
$69
$0
$69
BUO ET SUBTOTAL
- =- -- -_;
•,
•_IABOR�
�_MATL'.
e.. SUBS
,;�. "$0
$69'
..;.$5,500
.$5,569
FEE
15%
15%1
1.66%
0
10
91
$102
SUBTOTAL —>
$0
$79 1
$5,591
$5,670
BUDGET TOTAL -
$5,670
PAYIPERF BOND 2.00%
$113
TAX 6.70%
$493
CPR TOTAL
$6,277
Page 1
To: Carol Henry
211 North Public Rd, suite 200
Lafayette, CO 80026
Ph: (303)664-5301 Fax: (303)664Z313
Description: Add AIM Into contract
We are pleased to offer the following specifications and pricing to make the following changes:
The total amount to provide this work is .....:.:..::..:......:..
Change Request 71
Number: 1
Date: 1012/09
Job: 09 -15 Discovery Playground
Phone:
3893 N Schreiber Way
Coeur d'Alene, ID 83815
Ph: 2081667 -5560
The schedule is not affected by this change.
If you have any questions, please contact me at 208 - 667 -5560.
Submitted by: Brian Longwell
Ginno Construction Company
Cc:
Approved by:
Date:
J�
$9,417.00
Page 1 of 1
1 .
3893 N Schreiber Way
Coeur d'Alene, ID 83815
Ph: 208/667.5560
To: Carol Henry
211 North Public Rd, suite 200
Lafayette, CO 80026
Ph: (303)664-5301 Fax: (303)664-5313
Description: Add Alt #3 - Fish Climber at Entry
Number: 3
Date: 1012/09
Job: 09 -15 Discovery Playground
Phone:
We are pleased to offer the following specifications and pricing to make the following changes:
The total amount to provide this work is ................................................................... ............................... $6,277.00
The schedule Is not affected by this change.
If you have any questions, please contact me at 208. 667 -5560.
Submitted by: Brian Longwell Approved by:
Ginno Construction Company Date:
Cc:
Page 1 of 1
Change Request
DESIGN UC0NCEPTS
Crmmvniq en! Lenduepr ArrMvnr
PROPOSAL REQUEST NO. 01
PROJECT: Discovery Playground at Mirabeau Point Park
211 North Public Rd.
Suite 200
Lafayette, CO 50026
Phone 303 -664 -5301
Fax 303 - 6645313
DATE: September 28, 2009
TO: Brad / Ginno Construction
FROM Trish Kurnik
RE: Alternate #1: Climbing play eggs by Playtime Creations,
located at Eagle's nest observation area
COPIES: Mike Stone, Steve Worley, Joel Molander
Please submit a separate itemized quotation for each item of change listed below. Submit a quotation for
change in the Contract Sum and /or Time incidental to proposed modifications to the Contract Documents
described herein. Include a material and labor breakout for all items listed.
This is Not a Change Order Nor a Direction to Proceed with the Work Described Herein.
Description:
Alternate 41 was accepted into the bid; please provide a proposal to add into the contract.
DESIGN CONCEPTS
Cnmmnnip in/ L�nAuyr ArrM1ium
PROPOSAL REQUEST NO. 03
PROJECT: Discovery Playground at Mirabeau Point Park
211 North Public Rd.
Suite 200
Lafayette, CO 80026
Phone 303 - 664.5301
Fax 303 -664 -5313
DATE: September 28, 2009
TO: Brad / Ginno Construction
FROM Trish Kurnik
RE: Alternate #3 — Delete 2.5'x5'x3' entry plaza boulder. Provide
`Fish' by Playtime Creations
COPIES: Mike Stone, Steve Worley, Joel Molander
Please submit a separate itemized quotation for each item of change listed below. Submit a quotation for
change in the Contract Sum and /or Time incidental to proposed modifications to the Contract Documents
described herein. Include a material and labor breakout for all items listed.
This is Not a Change Order Nor a Direction to Proceed with the Work Described Herein.
Description:
Alternate #3 was accepted into the bid; please provide a proposal to add into the contract.