Loading...
09-174.00 Ginno Construction: Discovery PlaygroundSpokan 'al;o0owley DEPARTMENT OF PUBLIC WORKS CHANGE ORDER NO: PROJECT: Discovery Playground CONTRACT DATE: 17 July, 2009 CONTRAC Ginno Construction PROJECT NO: SVPW # 0086 DESCRIPTION OF CHANGES Add: Alternate no. 1: Climbing play eggs located at Eagles Nest $9.417.00 Add: Alternate no. 3: Provide Climbing Fish at entrance $6,277.00 Total Amount of this Change Order: CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL CONTRACT AMOUNT $ 1,476,184. . . . . . . . . . . . . . . ............ . . . . ............... . . . . ............... . . . . . . . . . . . . . . . . . . . .............. . . . . ............ . ............... . ............ . . . . . . TOTAL PRIOR CHANGE ORDER AMOUNT ......................................................................................... ..........................._$., 0. NET THIS CHANGE ORDER $ 15,694. CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,491,878. CONTRACTOR ACCEPTANCE:' DATE: The contractor hereby accepts this adjustment under the terms of the original contract for all work pertomed. RECOMMENDED BY: • AL& DATE: oje M ager PAR1<s d R.SL pt0.ECTOR APPROVED BY: APPROVED BY: Dave Mercier! City Manager DATE: ATTACHMENTS: Distribution: ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office COPIES TO: PW Project File P:PW /Forms/Templates/C0 (Nov 06) Coq -17y GINNO CONSTRUCTION PROD. NO.: 09.15 PROJECT: - Discovery Playground LOCATION: Spokane Valley, Washington CHANGE PROPOSAL REQUEST 01 Add Alt #1 Climbing Eggs CPR DATE: 10/712009 BY: B. LONGWELL RUN DATE: 1017/2009 COST CARP UNIT DATES CODE DESCRIPTION OTY ONir MHRS LABOR MATL •SUBS TOTAL LABOR MAIL SUB 0 0 0 0 so Playtime Eagle eggs at observation ai 1 0 $8.250.00 0 0 8,250 $8,250 0 0 0 0 so 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 50 0 0 0 0 $0 0 0 0 0 so 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 SO SUBTOTAL - -•> MH 1 0.00 $0 $0 $8,250 38,250 FIELD REQUIREMENTS - SURVEYILAYOUT. MH 0 548.00 0 0 0 0 0 SO GENERALLABOR MH 0 $38.00 0 0 0 0 0 $0 FIELD SUPPORT 0.00% (on subtotal) 0 0 0 0 0 $0 SM TOOLSMAREHOUSE 0.00% (on labor) 0 0 0 0 0 $0 OSHAISAFETY 0.00% (on labor) 0 0 0 0 0 $0 PROJECT MANAGER MH 0 $58.00 0 0 0 0 0 $0 SUPERINTENDENT MH 0 $50.00 0 0 0 0 0 $0 PROJECT ENGINEER MH 0 $42.00 0 0 0 0 0 $0 TAXIINSUR IDAHO STATE TAX 0.00% LS 0 0.000 0 0 0 0 50 BUILDERS RISK 0.00% LS 0 0.000 0 0 0 0 $0 INSURANCE 1.20% LS 0 99.000 0 0 99 0 $99 B 8 0 TAXES 0.047% LS 0 3.932 1 0 0 4 0 $4 SUBTOTAL - -> MH 0.00 SO $103 SO $103 C A L_, _ B s - - ..DSO 1 3, ;,; 8;250; `fir:! 38,353 FEE 15% 15%1 1.68% :a 151 138 5154 SUBTOTAL — > j '$0 $1181 58,388 58,507 BUDGET TOTAL $8.507 PAYIPERF BOND 2.00% - $170 TAX ..8.70% 5740 CPR TOTAL $9,417 Page 1 GINNO CONSTRUCTION PROI. NO,: 09.15 PROJECT: DIscwery Playground LOCATION: Spokane Valley, Washington CHANGE PROPOSAL REQUEST 3 Add Alt #3 Fish at Entry CPR DATE: 1042=09 BY: B. LONGWELL RUN DATE: 101212009 COST CARP UNIT RATES CODE DESCRIPTION OTY UNIT MHRS LABOR MATL SUBS TOTAL R 0 0 0 0 $0 PlayOme Fish at Entry 1 0 $5,500.00 0 0 5,500 $5,500 0 0 0 0 $0 0 0 0 0 50 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 so 0 0 0 0 $0 0 0 0 0 so 0 0 0 0 50 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $o 0 0 0 0 so SUBTOT —> MH 1 0.00 $0 $0 $5,500 $5,500 FIELD REQUIREMENTS SURVEY /LAYOUT MH 0 $48.00 0 0 0 0 0 $o GENERAL LABOR MH 0 $36.00 0 0 0 0 0 $0 FIELD SUPPORT 0.00% (on subtotal) 0 0 0 0 0 $0 SM TOOLSM/AREHOUSE 0.00% (on labor) 0 0 0 0 0 $0 OSHA/SAFETY 0.00% (on labor) 0 0 0 0 0 $0 PROJECTMANAGER MH 0 $58.00 0 0 0 0 0 $0 SUPERINTENDENT MH 0 550.00 0 0 0 0 0 $0 PROJECT ENGINEER MH 0 $42.00 0 0 0 0 0 $0 TAXnNSUR IDAHO STATE TAX 0.00% LS 0 0.000 0 0 0 0 $0 BUILDERS RISK 0.00% LS 0 0.000 0 0 0 0 $0 INSURANCE 1.20% LS 0 66.000 0 0 66 0 $66 B 8 O TAXES 0.047% LS 1 01 2.622 1 0 01 3 1 0 83 SUBTOTAL -••> MH 0.00 $0 $69 $0 $69 BUO ET SUBTOTAL - =- -- -_; •, •_IABOR� �_MATL'. e.. SUBS ,;�. "$0 $69' ..;.$5,500 .$5,569 FEE 15% 15%1 1.66% 0 10 91 $102 SUBTOTAL —> $0 $79 1 $5,591 $5,670 BUDGET TOTAL - $5,670 PAYIPERF BOND 2.00% $113 TAX 6.70% $493 CPR TOTAL $6,277 Page 1 To: Carol Henry 211 North Public Rd, suite 200 Lafayette, CO 80026 Ph: (303)664-5301 Fax: (303)664Z313 Description: Add AIM Into contract We are pleased to offer the following specifications and pricing to make the following changes: The total amount to provide this work is .....:.:..::..:......:.. Change Request 71 Number: 1 Date: 1012/09 Job: 09 -15 Discovery Playground Phone: 3893 N Schreiber Way Coeur d'Alene, ID 83815 Ph: 2081667 -5560 The schedule is not affected by this change. If you have any questions, please contact me at 208 - 667 -5560. Submitted by: Brian Longwell Ginno Construction Company Cc: Approved by: Date: J� $9,417.00 Page 1 of 1 1 . 3893 N Schreiber Way Coeur d'Alene, ID 83815 Ph: 208/667.5560 To: Carol Henry 211 North Public Rd, suite 200 Lafayette, CO 80026 Ph: (303)664-5301 Fax: (303)664-5313 Description: Add Alt #3 - Fish Climber at Entry Number: 3 Date: 1012/09 Job: 09 -15 Discovery Playground Phone: We are pleased to offer the following specifications and pricing to make the following changes: The total amount to provide this work is ................................................................... ............................... $6,277.00 The schedule Is not affected by this change. If you have any questions, please contact me at 208. 667 -5560. Submitted by: Brian Longwell Approved by: Ginno Construction Company Date: Cc: Page 1 of 1 Change Request DESIGN UC0NCEPTS Crmmvniq en! Lenduepr ArrMvnr PROPOSAL REQUEST NO. 01 PROJECT: Discovery Playground at Mirabeau Point Park 211 North Public Rd. Suite 200 Lafayette, CO 50026 Phone 303 -664 -5301 Fax 303 - 6645313 DATE: September 28, 2009 TO: Brad / Ginno Construction FROM Trish Kurnik RE: Alternate #1: Climbing play eggs by Playtime Creations, located at Eagle's nest observation area COPIES: Mike Stone, Steve Worley, Joel Molander Please submit a separate itemized quotation for each item of change listed below. Submit a quotation for change in the Contract Sum and /or Time incidental to proposed modifications to the Contract Documents described herein. Include a material and labor breakout for all items listed. This is Not a Change Order Nor a Direction to Proceed with the Work Described Herein. Description: Alternate 41 was accepted into the bid; please provide a proposal to add into the contract. DESIGN CONCEPTS Cnmmnnip in/ L�nAuyr ArrM1ium PROPOSAL REQUEST NO. 03 PROJECT: Discovery Playground at Mirabeau Point Park 211 North Public Rd. Suite 200 Lafayette, CO 80026 Phone 303 - 664.5301 Fax 303 -664 -5313 DATE: September 28, 2009 TO: Brad / Ginno Construction FROM Trish Kurnik RE: Alternate #3 — Delete 2.5'x5'x3' entry plaza boulder. Provide `Fish' by Playtime Creations COPIES: Mike Stone, Steve Worley, Joel Molander Please submit a separate itemized quotation for each item of change listed below. Submit a quotation for change in the Contract Sum and /or Time incidental to proposed modifications to the Contract Documents described herein. Include a material and labor breakout for all items listed. This is Not a Change Order Nor a Direction to Proceed with the Work Described Herein. Description: Alternate #3 was accepted into the bid; please provide a proposal to add into the contract.