09-202.00 Inland Asphalt: Sprague Ave Rehab Ph 1Washington State Department of Transportation Change Order 7 Date October 23, 2009 Contract Number 09 -031 Federal Aid Number ARRA -3840 (008) Contract Title Sprague Avenue Rehabilitation Project #1 Change Order Number 7 Prime Contractor Inland Asphalt Co. Ordered by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Proposed by Contractor EndorAed By Surety Consent 1 � Contractor Attomey of Fact �T, 2�1, 2 gOcl Date Date Original Contract Amount $ 2,256,393.18 Current Contract Amount $ 2,440,646.44 Estimated Net Change This Change 746.27 Estimated Contract Total After Change -- $ 2,448,392.71 Approval Required Region El // Olympia Service Center P Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X Appfo al Recommended Project ❑Approved jej Project Engineer � n(yA � a o Approved Approving Authori p Agreement Date Date ❑ Approval Recommended ❑Approved Approved B Approving Authority per C.A. Agreement Date Date Coq -2-o2 CHANGE ORDER Page 2 of 3 Contract No: 09 -031 Change Order No. 7 This Contract is revised as follows: Description of Work This change order will remove the existing paint striping on the current concrete intersection projects completed in 2009. The new striping layout for lane widths along the Sprague Avenue Project did not match the lane width striping for the concrete intersections along the project. The existing paint will be removed and new lane lines will be placed with plastic pavement markings. Materials The Materials shall meet the requirements of the 2008 Standard Specifications. Construction Requirements Work shall meet the requirements of the 2008 Standard Specifications and the special provisions. Measurement "MOBILIZATION ", PER LUMP SUM "4 INCH PAINTED SKIP STRIPE REMOVAL ", PER LINEAL FOOT "8 INCH PAINTED WIDE LINE REMOVAL ", PER LINEAL FOOT "24 INCH PAINTED CROSSWALK LINE REMOVAL ", PER SQUARE FOOT "PAINTED TRAFFIC ARROW REMOVAL ", PER EACH "PAINTED TRAFFIC LETTER REMOVAL ", PER EACH "PLASTIC TRAFFIC LETTER ", PER EACH Payment "MOBILIZATION ", PER LUMP SUM "4 INCH PAINTED SKIP STRIPE REMOVAL ", PER LINEAL FOOT "8 INCH PAINTED WIDE LINE REMOVAL ", PER LINEAL FOOT "24 INCH PAINTED CROSSWALK LINE REMOVAL ", PER SQUARE FOOT "PAINTED TRAFFIC ARROW REMOVAL ", PER EACH "PAINTED TRAFFIC LETTER REMOVAL ", PER EACH "PLASTIC TRAFFIC LETTER ", PER EACH CHANGE ORDER Page 3 of 3 Contract No: 09 -031 Item Item Description No. Unit Measure Unit Price Est. Qty. Change MOBILIZATION LS $570.00 LS 4" PAINTED SKIP STRIPE REMOVAL LF $.23 8,176 8" PAINTED WIDE LINE REMOVAL LF $71 1,370 24" PAINTED CROSSWALK LINE REMOVAL SF $2.14 256 PAINTED TRAFFIC ARROW REMOVAL EACH $34.16 16 PAINTED TRAFFIC LETTER REMOVAL EACH $17.08 32 PLASTIC TRAFFIC LETTER EACH $57.88 32 SUBTOTAL PRIME CONTRACTOR MARKUP (12 %) TOTAL Change Order No. 7 Est. Amt. $1,880.48 $972.70 $547.84 $546.56 $546.56 $1,852.16 $6,916.30 829.97 $7,746.27 Spokane jVa11ey® Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 1 cityhall @spokanevalley.org Memorandum PY Date: November 4, 2009 To: Steve Worley, Neil Karsten From: Shane Arlt Cc: Mike Jackson and Finance Department Re: Change Order 7 - Sprague Avenue Rehabilitation Project Budget Account No: 307.307.0110.595.30.10.00 Change Order #7 is for removing the existing striping on the current concrete intersection projects completed this summer. The existing paint will be removed and new plastic intersection markings will be placed. The total cost of this change order is $7,746.27. There are sufficient funds in the project budget to cover these costs. Public Works Director CO Authority Available: $ 75.000.00 Previous Change Order Authority Used: $ 66,331.74 This Estimated Change Order Amount ( #7): $ 7,746.27 Total $ 74,078.01 Remaining Change Order Authority: $ 921.99 Original City Manager Chan a Order Authority Available: $200,000.00 Previous Public Works Director CO Authority used $ 66,331.74 Previous CO Authority used by City Manager $117,921.52 Total $184,253.26 $ 7,746.27 This Change Order Amount: Total Sprague Avenue Change Order Amount $191,999.53 Remaining Change Order Authority: $ 8,000.47 Public Works 4iMZ,1 4# Project Manager