Loading...
09-203.00 Inland Asphalt: Pines-Mansfield Corridor Congestion ReliefWashington State Alli 7 Department of Transportation Change Order - Minor Change Contract Number Contract Title Federal Aid Number TA - 2942 Pines - Mansfield Corridor Congestion Relief Project CM 9932(032) Change Order Number Change Description Date 35 Rock Excavation for Signal Installation Oct 26, 2009 Region Project Engineer Phone Number Eastem Region Steven M. Worley 509- 688 -0198 Prime Contractor Inland Asphalt Company ® Ordered by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Change proposed by Contractor Change Description The General Special Provisions for this project are supplemented as follows: Description This Change Order compensates the Contractor to excavate rock encountered during trenching for during installation of signal and loop lead -ins at the Pines - Mansfield intersection. Payment The lump sum amount of $1,905.00 shall be full pay for all labor, equipment and materials to perform the work specified. Contract Time Contract time will not be adjusted as a result of this Change Order. All work, materials and measurements to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction Involved unless stated otherwise in this document. Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Revised Contract Amount $ 3,061,916.95 $ 3,321,111.72 $ 1,905.00 $ 3,323,016.72 Prime Contractor Signature or Method of Concurrence: � _�k Project Engineer's Signature for Execution: Distribution: Original w /Attachments - Steven M. Worley Copy of page 1 only w/o Attachments - Inland Asphalt Company Copy w/o Attachments - ER Construction Office DOT Form 421 -005A EF Copy w/o Attachments - State Construction Office Revised 412002 Date t OS 264 Date 01 ( o1 Page 1 Cog - 203