Subject: Drainage Report for Northwest Corner of Mission & Pines
Dear Mr. Hemmings:
Enclosed are the calculations and data for the drainage report for the subject project. Procedures
used are as outlined in the "Guidelines for Stormwater Management" as published by the
Spokane County Engineers with revisions as of 4-15-86. The format used is as follows:
Project Description
Methodology
Soils
Topographic Data
Demographic Data
~Rainfall Data
Proposed Runoff Control
Methods of Disposal
Peak Flow, Volume and Disposal Calculations
a. Hydrology Computations
b. Inlet Capacities
c. Detention/Retention Storage Capacities OFFICIAL PUBLIC DOCUmENT
R'S OFFICE
d. Pipe System Capacities gpOKANE COUNTY ENG
ORIG-NAL
Remarks 9
ppp,fECT # . ,
SUBN+ITTAL # ~
Following your review, I would be happy to answer any questio Ry_o
report.
Sincerely,
TAYLOR ENGINEERING, INC.
RECvJVED
-a Mark Aronson, P.E. SEP 0 91994
_ Project Manager CODF ~k~g~ ~ ,
n ;
R!F
1 . t r~ ~1
Enclosures ~ ~t~~
SAJ/try/94-110A/Hemmings/090794 SEP ~
W. 106 Mission Ave. • Spokane, WA 99201 0 (509) 328-3371 i
FAX (509) 328-8224 SppKAfiE GUUWV ENGINEER ~
• •
~ raylor Engineermg, Inc.
Civfl Design and Land Planrting
Principals.
l+"
Perry K 7Nyior, P. E.
Sfanley R. SLirling
Mark A. Aronson, P.E.
David C. I.arsen, P.E.
DRAINAGE REPORT A,ssociates:
FOR Scott M. Busch, P.E.
NORTHWEST CORNER* OF MISSION AND PINES
Prepared : September 7, 1994 By: Sandra Johnson
Taylor Engineering, Inc.
West lOb Mission Avenue
Spokane, Washington 99201
(509) 328-3371
W. 106 Mission Ave. • Spokane, WA 99201 0 (509) 328-3371
FAX (509) 328-8224
. ~ TABLE OF CONTENTS
Project Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Soils . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Topographic Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Demographic Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Rainfall Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Methods of Runoff Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Methods of Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Peak Flow, Volume and Disposal Calculations . . . . . . . . . . . . . . . . . . . . . . Page 2-3
a. Hydrology Computation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
b. Irilet Capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
c. Detention/Retention Storage Capacities . . . . . . . . . . . . . . . . . . . . Page 3
d. Pipe System Capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
ATTACHMENTS
Soils Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment "A'►
Vicinity Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment "B"
Drainage Basin Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment "C"
_ DRAINAGE REPORT
for
NORTHWEST CORNER OF MISSION AND PINES
Proj ect Description:
This project is a commercial development of 3.6 acres. It includes one retail building,
one office building and one future pad site. The project is on the west side of Pines
Road, north of Mission Avenue. The site was previously unoccupied.
Methodology:
The procedures as outlined in "Guidelines for Stormwater Management" as published by
Spokane County Engineers was followed. The rational method is used with a 10 year
return frequency for on site drainage. No off site drainage flows onto the site.
Soils: (See map, Attachment "A")
Soils are classified as GgA - Garrison Gravelly Loam in accordance with the "Soil
Survey, Spokane County Washington, 1968".
GgA - 0 to 5 percent slopes. Gravelly, medium-textured, somewhat excessively drained
soils formed in gravelly glacial outwash material from a variety of acid, igneous
parent rock; on nearly level to moderately sloping terraces; depth to mixture of
sand, gravel, and cobblestones ranges from 2 1/2 to 5 feet. This soil group is
acceptable for drywells per the GSM.
Topographic Data: (See map, Attachment "B")
The site generally slopes to the north with grades varying from 1% to 5%.
Demographic Data:
The site is currently unoccupied. Upon completion this site will contain a retail building,
an office building and a future pad site.
: Drainage Report, Northwest Corner of Mission and Pines Page 1
September 7, 1994
Rainfall Data:
Data used is in accordance with Figure 2, page 6-3 of the "Guidelines for Stormwater
Management", by Spokane County Engineers. A 10 year return frequency event was
used. This chart is included with the calculations of this report.
Methods of Runoff Control:
Control will be by four drainage basins which flow overland to grass percolation areas
(GPA's) and drywells located in the landscaped areas of the site. Roof areas will be
piped directly to drywells. All GPA's will be sodded for treatment.
Methods of Disposal:
Four (4) grass percolation areas, one for each drainage basin, will be utilized. All
swales contain one (1) each Spokane County Standard single depth drywell. Swales and
drywell capacities were sized using the 10 year on-site storm.
Peak Flow, Volume and Disposal Calculations:
a. Hydrology Computations:
The site has been divided into four (4) basins labeled alphabetically.
o Basin A lies on the western side of the site and includes parking and sidewalk
areas around north and east sides of the retail building and landscaped areas along
the west and north.
o Basin B is just east of Basin A and contains parking, sidewalk and landscapes
areas in front of the office building.
o Basin C lies just east of Basin B and contains the same surface types as Basin
B, but sits in front of the future pad site.
o Basin D, lying east of Basin C and the future pad site, contains parking and
landscaped areas. All basins flow overland and deposit directly into the GPA's
for disposal. (See attached calculations).
Hydrology calculations were also performed on the roof areas. The retail
building roof generated 0.95 cfs and is disposed of by one (1) double depth
drywell. The office building roof generated 0.44 cfs and is disposed of by two
(2) single depth drywells. Flows were estimated for the future pad site assuming
a conservative 10730 sf roof would generate 0.70 cfs and would require one (1)
double depth drywell for disposal. The drywell and piping to the future pad site
will be installed with this development for future connection.
Drainage Report, Northwest Corner of Mission and Pines Page 2
- September 7, 1994
b. Inlet Capacities:
Three (3) curb inlets are utilized with this design, two in Basin B and one in
Basin C. Individual calculations for each inlet show that widths of two (2) feet
will sufficiently pass the generated flow. Curb inlets are located at the low spot
of each basin area and any flow surpassing the capacity of the inlet will flow over
the curb and still flow to the GPA's.
c. Detention/Retention Storage Capacities:
Grassed percolation areas were calculated to hold the first 1/2" of runoff over the
entire parking lot area. See Calculations on the following pages. Grass
percolation areas are a minimum of 6 inches deep and will be sodded.
d. Pipe System Capacities:
Pipe diameters were calculated to handle each roof basins peak runoff for a 10
year storm event. Connecting to the building roof drains just outside the
building, runoff is routed to collection pipes for conveyance to the drywells.
Piping was designed for the retail and office buildings only. Each building
required a small closed conduit system which did not appear to warrant back
water calculations. Manning's equation was used to size roof drain piping and
velocities of greater than 4 feet per second were maintained throughout. All
pipes are sized conservatively, with capacities well above the calculated 10 year
storm flow rates.
A roof schematic for each building and sizing information can be found on the
attached pages.
Remarks:
The above described system of stormwater control will provide the quality and quantity
controls as outlined in the "Spokane County Stormwater Management Guide" for the
Northwest corner of Mission and Pines.
Drainage Report, Northwest Corner of Mission and Pines Page 3
- September 7, 1994
~
00/ 06 09 OL 09 Us' 0k uZ 0I 0
, . ...I-~_I.. . .
Y- - - _ - _ ~ _ _ p
- •
, " - ___~..~-J-'_- ~ - - -~~'-y- _ / •
. ----__--I-~---~----I - y _ O
~
-
3
-___~~_i__._..----~---~~----~-- _
- - -
_ - - - . W .
t
---------1------~---~~-__----=--~---~=` - z
= - - ~ -
~
~_y 'r~ _ _ \
- - - - 'd
- - - - - - • N ~
- - - __--i_\.--~ o
-~r~~'~~- _G b
~R ~ - - - ~ d
_ _
--=_=__==----=____=~=__==_=~==_=__~,~,=--=====._,r=_=_._~__==_=--~_=__=_===_=_~==_`~"~~~
--=====_-==__-==-==_-===_=-=---==r=--==-___~~",.~=~.=:='=~=-_=_=-
- - J- " - ° - - - - - _ 0 A
~i~.;_'_ -~:W~:~~~-- __~._-•------_~i--- _ - . rs
-F -FT
- - - - - - - - - - i-~' - - - - ~T ` - i_- ~ - - - -~_.~l - - - - JJ: _ _ _ ~ J~_~-__ ~ P1
~W_---- _ . ~ ~
- - ~___-----V-
-
_ ~r--,. - ~ - _
~ - ~t
- - _=1~r -
- - - -__~~.__~I_►_
- -
- - -1-__---------
-
~ i - - - ' _ - - ~ =r~ - - ~ ~ _ ` • _ ~_i7'.~ ~ ~L"` r~ / ~ - -
- _ - ---r---~_~-------~-
- - - - ~
~ _ ~
u
_ _ _
~
- `~-a--- ~ ' '-1 ~ ~ ,,r~
_
~ , ~ - ~ ~
- ~ -h•- -4 - ~r- - ~
~-;--4-~•-;-~-- - -
• ,
.
~
HYDROLUGY COMPUTATIONS
AND
DETENTION/RETENTION STORAGE CAPACITIES
TAYLOR ENGINEERING, INC_
W. 106 MISSION AVE., StJITS 206
SP4KANE, WA. 99241
RATIONAL METHOD
FI LENAME: NWC-A. WKl 10 YBAR RETiJF:td FFcEQUENCY
PR4JFC,T: NwC Mission & Pines
DATE: 25-Aug-94
TOTAL ARBp. (A(.-,) 0.53
DESIGNSD: S. Johnson
CHECKED:
BASIN: A
~ (2) ~ (3) ~ (4)
TYPF OF SURFACF ;SQUARE F00'I'AGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD ; 127°0 ; 0.9 ; 11511
SIDEWALK - 208 NOT REQD ; 1790 ; 0.9 ; 1511
LANDSCAPE AR.EAS ; 8320 ; 0.25 ; 2080
0
0
q
, 0
o
TOTALS 22900 15202
DEVELOPED "C" = 0.66
TIME OF CONCENTRATION {MIN}: LESS THAN 5 MIN.
RAINFALL INTBNSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 1.11
ROADS ONLY : 0.84
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
533 CUBIC FEET
1066 SQUARE FEET @ .5' DEPTH
PROJECT SWALE:
BJwSTRINr, METHCL►
_DETENTION BASIN UESIGN
Date: 02-Sep-94
PROJEt~T- NW C',orner of Mission & Pines Filendme: MRcPbow-A
BASIN N0.- A Prepared by:
TAYLt7R FNGINEBRING, INC.
Time Increment (min) ; 5.00 ;
Time of Concentratian (min) ; 5.00 ;
Outflow (ofs) ; 0.30 ~
Design yFar flrjw (YY`) ~ 10.00 ;
Area (acres) ; 0.53 ;
DevPlf,ped "C" ff.ictoY` ~ 0.66
~
#1 ; #2 ; #3 ; #4 ; #5 ; #6 ; #7 ;
Time inc. ; Time inr. ; Int,Fnsity ; "Q" dFv. ; "V" in ; "V" out ; Storh-ge ;
(min) ; (min) ~ (min) ~ (c - f - s. ) , (cu. ft. ) ; (cu- ft- ) ; (r;u. ft. ) ~
; (#i * 50) ; ; (A * r * #3) ; (see beiow) ; (autfiow*-#2) ; (#5 - 0(3) ;
I
, 5; 300 ; 3.18 ; 1.11 ; 447 ; 90 ; 357 ;
10 ; 600 ; 2.24 ; 0.78 ; 550 ; 180 ; 370 ;
15 ; 900 ; 1.77 ; 0.52 ; 620 ; 270 ; 350 ;
20 ; 1200 ; 1.45 ; 0.51 ; 560 ; 360 ; 300 ;
25 ; 1500 ; 1.21 ; 0.42 ; 678 ; 450 ; 228 ;
;
30 ; 1800 ; 1.04 ; 0.36 ; 592 ; 540 ; 152
35 ; 2100 ; 0.91 ; 0.32 ; 701 ; 630 ; 71 ;
_ 40 ; 2400 ; 0.82 ; 0.29 ; 718 ; 720 ; -2 ;
45 ; 2700 ; 0.74 ; 0.26 ; 725 ; 824 ; -85 ;
50 ; 3000 ; 0.68 ; 0.24 ; 7 38 ; 900 ; - 152 ;
55 ; 3300 ; 0.54 ; 0.22 ; 762 ; 990 ; -228 ;
60 ; 3500 ; 0.61 ; 0.21 ; 790 ; 1080 ; -290 ;
65 ; 3900 ; 0.50 ; 0.21 ; 840 ; 1170 ; -330 ;
70 ; 4200 ; 0.58 ; 0_20 ; 873 ; 1260 ; -387 ;
75 ; 4500 ; 0.56 ; 0.20 ; 901 ; 1350 ; -449 ;
80 ; 4800 ; 0.53 ; 0.19 ; 909 ; 1440 ti -531 ;
85 ; 5100 ; 0.52 ; 0.18 ; 946 ; 1530 ; -584 ;
90 ; 5404 ; 0.50 ; 0.17 ; 952 ; 1520 ; -658 ;
95 ; 5740 ; 0.49 ; 0.17 ; 994 ; 1710 ; -716 ;
100 ; 6000 ; 0.48 ; 0.17 ; 1025 ; 1804 ; -775 ;
V in =(1.34 *Q dFv. ~ t) for t : Tc
V in = (Q (lev. * t + .34 ~ ~ dev. _ * Tc ) f or t > Tc
, TAYL,OR ENGINBERING, INC.
- W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
FILENP.MB: NWC-B.WK1 10 YEAR RETt1kN FkEQtJBNCY
PRQJBC'T: NWC MissiOn & Pines
DATE ; 2 5-P,u.g-94
TOTP.L ARFsA (AC) 0.87
UESIGNSD: S. ►7ohnson
CHECKBD:
BASIN: B
~ ~ (3) ~ (4)
TYPB OF SURFACE ;SQiJARE FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-248 REQD ; 34600 ; 0.9 ; 27540
SIDEWALK -%08 NOT REQD ; 1174 ; 0.9 ; 1056.6
LANDSCAPE AREAS ; 6283 ; 0.25 ; 1570 . 75
0
0
0
0
0
►
TOTALS 38057 30167.35
DEVELOPED "C" = 0.79
TIME OF CONCENTRATION {MIN}: LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 2.20
ROADS ONLY: 2.01
SWALE VOLUMF REQUIREU: ASHALT AREA x 1/2"
1275 CUBIC FEET
2550 SQUARE FEET @ .5' DEPTH
PROJBCT SWALF:
. BOwSTRING METHOU
UETENT I(3N BAS I N DFS I GN
Date: 02-Sep-94
PROJECT- NW C'orner of Mission & Pines FilenamF : MRcPr}ow-B
BAS I N NO.- B PY'Pp3X'Pd by:
TAYLOR ENrINEERINr, INC.
Time IncremFnt (min) ; 5.00 ;
Time of ~',oncentration (min) ; 5.00 ;
Out f low ( r_ f s) ; 0.30
;
Uesign yFax f low (yr ) ~ 10.00 ;
ArPa (acres) ; 0.87 ;
I?eve loped "(C" f actor ; 0.79
;
#i ; 02 ; #3 ; #4 ; 05 ; #r, ; #7 ;
TimP inc. ; Time inc. ; Int,ensit,y ; "Q" dev. ; "V" in ; "V" oUt ; Stor•age ;
(min) ~ (min) ; (min) ~ (c.f.s. ) ; (cu. ft. ) ~ f cu, ft. ((-.u. ft. ) ~
' (#1 * 60) ~ :(A * t; * #:3) ; (SFF below) ~ (out,flr)w*$t2) ~ (#5 - #6) ~
,
, 5 ; 300 ; 3.18 ; 2.29 ; 879 ; 90 ; 789 ;
10 ; 500 ; 2.24 ; 1.54 ; 1081 ; 180 ; 901 ;
15 ; 900 ; 1.77 ; 1.22 ; 1219 ; 270 ; 949 ;
20 ; 1200 ; 1.45 ; 1.00 ; 1298 ; 350 ; 9 38 ;
25 ; 1500 ; 1.21 ; 0.83 ; 1332 ; 450 ; 882 ;
30 ; 1800 ; 1.04 ; 0.71 ; 1350 ; 540 ; 820 ;
35 ; 2100 ; 0.91 ; 0.63 ; 1377 ; 530 ; 747
;
40 ; 2400 ; 0.82 ; 0.56 ; 1410 ; 720 ; 690 ;
45 ; 2704 ; 0.74 ; 0.51 ; 1425 ; 810 ; 615 ;
50 ; 3000 ; 0.68 ~ 0.47 ; 1450 ; 500 ; 550 ;
55 ; 3300 ; 0.64 ; 0.44 ; 1496 ; 990 ; 506 ;
64 ; 3600 ; 0.61 ; 0.42 ; 1552 ; 1080 ; 472 ;
65 ; 3900 ; 0.60 ; 0.41 ; 1650 ; 1170 ; 480 ;
70 ; 4200 ; 0.58 ; 0.40 ; 1715 ; 1260 ; 455 ;
75 ; 4500 ; 0.55 ; 0.38 ; 2771 ; 1350 ; 421 ;
80 ; 4800 ; 0.53 ; 0.36 ; 1785 ; 1440 ; 346 ;
85 ; 5100 ; 0.52 ; 0.36 ; 1859 ; 1530 ; 329 ;
90 ; 5404 ; 4.50 ; 0.34 ; 1891 ; 1624 ; 271 ;
95 ; 5700 ; 0.49 ; 0.34 ; 1954 ; 1710 ; 244 ;
100 ; 5000 ; 0.48 ; 0.33 ; 2013 ; 1800 ; 213 ;
Vin =(1.34 dFv.* t) f or t: Tf.
V in = (Q dFV. * t, + .34 * Q dev. ~ Tc ) for t > Tc
TAYLOR ENGINEERING, INC.
W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
F I LENAME : NWC-C.WK1 10 YFsAR RFTi1KN FREQt1ENt~Y
PROJECT: NWC Mission & PinFs
DATE: 25-Aug-94
TOTAL AREA (AC) 0.52
DESIGNED: S. tJohnson
CHECKSD:
BASIN: C
~ (2) ~ (3) ~ (4)
TYPE OF SURFAGE ;SQUARE FOOTAGF;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD ; 18587 ; 0.9 ; 16728.3
SIDEWALK - 208 NQT REQD ; 320 ; 0.9 ; 288
LANDSCAPE AREAS ; 3900 ; 0_25 ; 975
0
0
►
0
0
►
, 0
. ►
TOTALS 22807 17991.3
DEVELOPED "C" = 0.79
TIME OF CONCENfiRATION (MIN): LESS THAia 5 MIN.
RAINFALL iiJTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 1.31
ROADS ONLY: 1.22
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
774 CUBIC FEET
1549 SQUARE FEET C.5' DEPTH
PROJFCT SWALE:
' BOWSTRING MMOD
UETENTION BASIN DESIGN
I3ate: 02-Sep-94
PROJECT- NW ('.orner of Mission & Pines Filename: H&Pbow-C
BAS IN NO. - C PrFpr,.red by :
TAYLOR ENGINEERING, INr.
Time Inr•remFnt, (min) ; 5.00 ;
Time of ~'•oncentration (min) ; 5.00 ;
Outf low ( cf s) ; 0.30
;
Uesign yFar flow (Yr) ~ 10.00 ;
Area (ar_rPs ) ; 0.52
;
~
DPvp loped „r.,.. ~actor. ~ 0.79
#1 ; #L ; #3 ; #4 #S ; #7 ;
Time in<<. ; TirriF inc. ; Int,Fnsity ; "Q" de,v, ~ „;I" in ; „V,, rJut. ; Stor•age ;
(min) ~ (min) (c- f ) : Ccu. ft. j ~ (cu, ft. ) ~ toll. ft.
' (#l * 60) ~ ; (A * C * #3) ~ (see belr-)w) ~ (outflfjw*4L) ~ (05 - 06) ~
300 ; 3.18 ; 1.31
; 525 ; 90 ~ 435 ;
10 ; 600 ; 2.24 ; 0.92 ; 646 ; 180 ; 466 ;
15 ; 900 ; 1.77 ; 0.73 729 ; 270 ; 459 ;
20 ; 1200 ; 1.45 ; 0.60 ; 77F ; 36{~ ; 416 ;
25 ; 1500 ; 1.21 ~ 0.50 ; 795 ; 450 ; 345 ;
. 30 ; 1800 ; 1.04 ; 0.43 ; 813 ; 540 ; 273 ;
, 35 ; 2100 ; 0.91 ; 0.37 ; 823 ; 630 ; 193 ;
' 40 ; 2400 ; 0.82 ; 0.34 ; 343 ; 720 ; 123 ;
45 ; 2700 ; 0.74 ; 0.30 ; 852 ; 810 ; 42 ;
50 ; 3000 ; 0.68 ; 0.28 ; 867 ; 900 ; -33 ;
JJ ; 3300 ; 0.64 ; 0.26 ; 894 ; 990 ~ -96 ;
60 ; 3600 ; 0_61 ; 0.25 ; 928 ; 1080 ; -152 ;
65 ; 3900 ; 0.60 ; 0.25 ; 985 ; 1170 ; -184 ;
70 ; 4200 ; 0.58 ; 0.24 ; 1025 ; 1260 ; -235 ;
75 ; 4500 ; 0.55 ; 0.2.3 ; 1059 ; 1350 ; -291 ;
80 ; 4800 ; 0.53 ; 0.22 ; 1057 ; 1440 ; -373 ;
85 ; 5100 ; 0.52 ; 0_21 ; 1111 ; 1530 ` -419 '
90 ; 5400 ; 0.50 ; 0_ 21 ; 1130 ; 162(} S -490 ±
95 ; 5740 ; 0.49 ; 0.20 ; 1168 ; 1710 ; -542 ;
104 ; 6040 ; 0.48 ; 0.20 ; 1203 ; 1800 ; -597 ~
V in =(1. 34 drv t) f ar t ti Tr_.
V in =(Q dFv.~ t. 34 *Q dev.* Tc ) f or t. 5 Tc
TAYIOR ENGINEERING, INC.
W. 106 MISSION AVE., SUITE 206
SFOKANE, WA. 99201
RATIONAL METHOD
FIL,BNAME: idWC-D.WKl 10 YEAR RFTIJP.N FRBQUBNCY
PROJFCT: NWC Mission & Pines
DATE: 2 5-Au.g-94
TOTAL A.R£A ( Ar. ) 0.36
DESIGNED: S. Johnson
CHECKED:
BASIN: D
~ (2) ~ (3) ~ (4)
TYPF OF SURFACE ;SQUAR.B FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD ; 11442 ; 0.9 ; 10297.8
SIDEWAI,K - 208 NOT REQD 0.9 ; 0
LANDSCAPE AREAS ; 4285 ; 0.25 ; 1071.25
0
0
0
0
0
TOTALS 25727 11369.05
DEVELOPFD "C" = 0.72
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3_18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVFRALL: 0.83
ROADS ONLY: 0.75
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
477 CUBIC FEFT
954 SQUARE FEET Q.5' DEPTH
PROJECT SWALE:
BOWSTRING METHOD
DETENTIOid BASIN DESIGN
Date: 02-Sep-94
PROJEt:T- NW Corner nf Mission R,c Pines Fi1Fname: t'1&Pbow-U
BAS I N IdO.- U Prepared by :
TAYIOR ENGINEBP.INC,, INC,
Time Increment (min ) ; 5.00
;
Time of (3,oncentration (min ) ; 5.00
;
Out f law ( c f s) ; 0.30
;
Uesign year flow (Yr) ~ 10.00 ;
Area ( arres ) ~ 0.36
;
Deve loped „t'., f dctor ; 4_ 72 ;
#1 ; #2 #4 ; #5 ; 06 ; #7 ;
Time inr_. ; TimF inr. ; Intensity ; "Q" dev_ ; "V" in ; "V" out ; Stor•age ;
(min) ~ tminj ; (min) ; ({•.f.~. ) ~ (cu, ft. ((-.;u. ft. ) ; (cu. ft.-) ;
~ (#1 * 60) ~ :(A * C * #3) ► (sFp be 1ow) :(outf lrjw*#2 ) ~ (#5 - #6 ) ;
. s ; 300 ; 3.18 ; 0.82 ; 331 ; 90 ; 241 ;
10 ; 500 ; 2.24 ; 0.58 ; 408 ; 180 ; 228 ;
15 ; 900 ; 1.77 ; 0.45 ; 460 ; 270 ; 190 ;
20 ; 1200 ; 1.45 ; 0.38 ; 489 ; 350 ; 129 ;
25 ; 1500 ; 1.21 ; 0.31 ; 502 ; 450 ; 52 ;
30 ; 1800 ; 1.04 ; 0.27 ; 513 ; 540 ; -27 ;
35 ; 2100 ; 0.91 ; 0.24 ; 519 ; 530 ; -111 ;
' - 40 ; 2400 ; 0.82 ; 0.21 ; 532 ; 720 ; -188 ~
45 ; 2700 ; 0.74 ; 0.19 ; 537 ; 810 ; -273 ;
50 i 3000 ~ 0.58 f 0.18 ~ 547 ~ 900 ; -353 ~
55 ; 3300 ; 0.54 ; 4.17 ; 564 ; 990 ; -425 ;
50 ; 3600 ; 0.61 ; 0.15 ; 585 ~ 1080 ; -495 ;
65 ; 3900 ; 0.60 ; 0.15 ; 522 ; 1170 ; -548 ;
70 ; 4200 ; 0.58 ; 0.15 ; 647 ; 1260 ; -613 ;
75 ; 4500 ; 0.56 ; 0.15 ; 658 ; 1350 ; -682 ;
80 ; 4800 ; 0.53 ; 0.14 ; 673 ; 1440 ; -767 ;
85 ; 5104 ; 0.52 ; 0.13 ; 701 ; 2530 ; -829 ;
90 ; 5400 ; 0.50 ; 0.13 ; 713 ; 1620 ; -907 ;
95 ; 5700 ; 0.49 ; 0.13 ; 737 ; 1714 ; -973 ;
100 ; 6000 ; 0.48 ; 0.12 ; 759 ; 1800 ; -1041 ;
Vin =(1. 34 flFv.* t) f or t< Tc
V in = (Q dev. ~ t + .34 * Q rev. . * Tr_ ) f or t > Tc
TAYL3R ENGINEERING, iNG_
W. 106 MISSION AVE., SUITS 206
SPOKANE, WP.. 99201
P,ATIONAL METHOD
FILENAME: NWC-RET.WKI 10 YEpLR P.ETIJkN FREQl1ENCY
PRO.JECT: NWC Mission & Pines
DATS : 2 5-Au.g-94
TOTAL AF.EP. ( P.C) 0.33
DFsSIGNED: S. •Iohnson
CHECKED:
BASIN: Retail Building Roof
~ ~ (3) ~ (4)
TYPB OF SURFACE ;SQUARE FOOTAGE;PUNOFF GOEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD 0.9 ~ 0
ROOF - 208 NOT REQD ; 14470 ; 0.9 ; 13023
LANDSCAPE AREAS 0.25 ; 0
0
, 0
0
0
0
.
TOTALS 14470 13023
DEVBLOPED "C" = 0.90
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.95
ROADS ONLY: 0.00
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
0 CUBIC FEET
0 SQUARE FEET C.5' DEPTH
PROJECT SWALE :
TAYLOR ENGINEERING, INC.
- W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
F I LFNAME: NWC- FiJT . WK 1 10 YEAR RFTtJRN FREQtJENCY
PROJECT: NWC Mission & Pines
DATE: 25-Aug-94
TOTAL AREA (AC) 0.25
DESIGNED: S. Jahnson
CHECKED:
BASIN: Ftiiture Building Roof
~ (2) ~ (3) ~ (4)
TYPE OF SURFACE ;SQUARB FC)OTAGE;RUNOFF GQEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD 0.9 ; 0
ROOF - 208 NOT REQD ; 10730 ; 0.9 ; 9657
LANDSCAPE AREAS 0.25 ; 0
0
0
0
0
0
, ►
TOTALS 10730 9657
DEVEIAPED "C" = 0.90
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (Iid/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.70
ROADS ONLY: 0.00
SWALF VOLUME R.EQUIRED: ASHALT AREA x 1/2"
0 CUBIC FEET
0 SQUARF FEET @ .5' DEPTH
PRO,JECT SWALS:
INLET CAPACITIES
V
e
/0000~ ~76\~S
INLET Ni1MBFR B LFNGTH 2.4 STATION East f,f Ret,ai I
TOTAL PEAK DI SCH~°.RrE = 0.04 ( cf s)
GUTTER SL,OPE = 0.0200 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT
SPREAD AT A SGOPE OF _OZ() (ft./ft_ ) AND 0_02 (cfs) I5 1_47 (ft_ )
XXXuYYYJGQ; C11KB I NLET I N A StIMP Y•YYYYXUXX
PEFFEC. LFNrTH (ft) = 5.6(} H(ft) = 0.500
DEPTH t3F WATBR (ft 0.02 SPkEAU ( ft 1.06
1 TC 32.56
, .
~ ASP 32.56 /
TC 34.30 ASP
~ ASP 33.80 ~ 32,g2
lk\ ASP
'33.44
, ~ ' I I f ~ _ y _ •~r=`
~ -c7" TC 33.42
.
TC 3,3.80- . NASP 32.92
SP 33.80 r7 ( ~ ITC 33.0E
33.80 G p 'ASP 32.'
n~l
TC 34.30 N i
/ TC 3 2.51
ASP 33.80 TC 32.70
ASP 32.20 ASP 32.
~ TC 32.00
~
TC 33.30 ASP 32.00
/ ASP 32.80
I URB fRANSITIO
R I
FF = 2034.50
BSMT = 2022.00
.
Asp 329 ` 4~~
z 8
A
TC 32. QQ ~
ASP 82.04 - ~
~r~
1 PS~•
1 .
CURB TRANSITION ~
~ ~ - TC-33. 50 TC 33.00
~
ASP 33.00 SP 32.50
T1 2~
I ~ .
.
~ Taylor ~n.gineerin$., Ino.
~ Clyil Deaign and Lnnd Plnnning
T .
V' `
/000~ `~A S 1 I / ~ 1 " ~
INLET NUMBER BB LENGTH 2.0 STATION East of Uffice
TOTAL PEAK DISCHARGE = 0.06 (cfs)
GUTTER SLOPE = 0.0200 FT/FT PAVEMENT CROSS SIAPE = 0.0200 FT/F'T ~
SPREAD AT A SLOPE OF _020 (ft./ft.) AND 0.03 (cfs) IS 1.71 (ft.) ~
XX)O~~ CURB I AlLET IN A SUMF Xll~~"IQXX
P EFFEC. LENGTH (ft) = 5_60 H(ft) = 0.500
DEPTH OF wATER ( f t)= 0.03 SPREE9D ( f t) = 1. 39
~.2
~
ASP 32.76 V TC 3~
~ ~ • w
- - - - ~ ~
.
TC 32.901
\~~g
~ , Te 32.4o sP i 2.4 ~ i -11
ASP 31.90 ~ ASP
VA's 1 \ l CURB TRANSITION 32.40
P _ TC 32.40
. 32.54 2032 ~ TC 1.50 ~ ZT-.90 ~
I ASI 31.50 20
~ I CURB TRANS4
ASP A~ 1
G • TC 31.50
~ 31.5Q. ---l-*ASP 31._50,-Z
OF SWALE r-i wo. s o~ BoITroM oF
~ .
_ Lv
ASP . TC~ 31.50 1/ I _ O A N. ' TC 31 ! 50
31.50 ,P 31.50 ASP ,31.50
CURB TRANSITION CURB TRAN IT1C
_ I I I I I 1\ r
2032 2032 '
~ 240
APSA ~Wj~0 TC 3 ASP 31.90\
T~ I t4lPT TC 32.90 T~ ..40 ~ TC 32.90 ~
ASP 32. a-0 A 1.90 ASP 32.40 ~
TC ~3.26i
ASP 32. j16 TC 33.26 1"C 33.26
~
ASP ~2.76 I ~SP ~2.76
~ 1
_ -,vn*59,t~8 w
-
~
A
i r Taylor Engineering, Ino.
- Civil Deelgn nnd Lnnd PLnn.nLng
- ~
T _
3A 6 l I\j
INLET NUMBER C LENGTH 2.0 STATION West of Future,
TQTAL PEAK DISCHARGE = 0.12 (cfs)
GUTTER SLQPE = 0.0200 FT1FT FAVEMENT CROSS SIAPE = 0.0200 FT/FT
SPREAD AT A SLOPE OF .020 (ft./ft. ) AND 0.06 (cfs) IS 2.21 (ft. )
XXXXMXXXX CURB I NLET I N A SUMP XXX~XMXX .
P EFFEC. LENGTH (ft) = 5.60 H{ft) = 0.500 DEPTH OF WATER (ft) = 0.04 SPREAD tft) = 2•21 "
~ ASP 32.76 TC 33.26 L
ASP 32.40 TC 32.40
, ASP 31.90 ASP
\CURB TRANSITION ~ 32.40
SP - j • TC 32.40
- 2.54
2032 Tc .50 % /,ASP -3" 0 2032 -
ASP. 1.50
1
I CURB TRANSITION ~
Al I ~
~SP ~ G • TC 31.50
` ~1.5Q ~ , PS -*ASP 31.50 - ,
M
o ` BO'TTW ~F SW.
~WALE EL. 2030.8 N
_
~ ASP TG 31.50 TC 31150 1 .1
31.50 Y6:1 P 31.50 I N,`C, Q ASP ,31.501
1 CURB TRANSI110N CURB TRANSITIO V ~ 1
I~ 1 1 i I # ` ~ , I 1-
~
~ 2032 ~ \ • \ 2032
.
AieA ruDw~N~ : TC 32.40
ASP 31.90\
~WLeTTC 32.90 TC 31.40 ~ ~ 7C 32.90 ~
ASP 32.40 ~ ASP ~1.9 ASP 32.40
TC 3 ~2~
L3. , ~ ~ '.3s _
2~
ASP 32.76 TC 33.26 - - TC 33.26
ASP ~2.76 ~ qSP ~2.76 _
- ~ - t . .
- - ~ 1 ?-Q-~- .
; - 489`59" !>8 W
. ,
*
Ai ',•'r Taylor En,gin e ering, Ino. .
CiYil Dosign and I,and Pl.annLng '
TAYL,OR SNGINEERING, INC.
W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
FILENAME: tdWC-{3FF.WK1 10 YSAF{ RETURN FREQtlFNCY
PROJECT: NWr Mission & Pines
DATS: 25-Aug-94
TOTAL ARBA {Ar} 0.15
DESIGxNfiD: S. Jc,hnson
CHECKFD:
BASItd: Office Bui].ding Roof
~ (2) ~ (3) ~ (4)
TYPB OF SURFACE ;SQUARE FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD 0.9 ; 0
ROOF - 208 NOT REQD ; 6635 ; 0.9 ; 5971.5
LANDSCAPE AREAS 0.25 ; 0
0
►
0
► 0
0
0
,
TOTALS 6635 5971.5
DEVEIAPED "C" = 0.90
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INT£NSI1'Y (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.44
ROADS ONLY: 0.00
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
0 CUBIC FEET
0 SQUARE FEFT C.5' DEPTH
PROJECT SWALE:
PIPE SYSTEM CAPACITIES
. '
~E3~/k L
~
. ~ ~„~,c.~•
41+~ D
.
A
~
- ~ . F"ICE ~
p . ~
~ FF ~ 2033.50
-9 ~ 24L2.U0
~ gSM
,ii►
Aft ~ 7
-rypa
-ryee,'AI
~
~
TCLYlOI' and Lnnd pL°'nn'~B
.
Ci~ Dea1Bn
~
MOMP-0000 ■
LA
_ Q~' I 47D
8`'~D~
~
► ~
1
~
1
,
. • ~ ~ ` ~ItL''
, ~ C•~'
~
~ ~rrsr~
~
~ . ,
d p
'
~
~
~
. . . e ~no. .
w frcL9lor a p1,r,,nnInB
- ~ nnd I.,an
, ~
civu
, s
Circular Channel AnalYsis & Design
Solved with Manning's Equation
Open Channel - Uniform flow
Worksheet Name : IdWC Mission & PinPs
Comment: Determine capacity of 6" storm drain Solve For Full Flow Cagacity
Given Inptit Data:
Diameter.......... 0.50 ft
Slope 0.0300 ft/ft
Manning's n....... 0.013
Discharge......... 0.97 cfs
romputed Results:
Full Flow Capacity..... 0.97 ofs
Full F1oW Depth........ 0.50 ft
Velocity.......... 4.95 fps
F3.ow Area 0.20 sf
Critical Depth.... 0.47 ft
Critical S].ope.... 0.0259 ft/ft
Percent Full...... 104.00 %
Full Capacity..... 0.97 cfs
QMAX @.94D........ 1.05 cfs
. Froude Ntimber . . . . . FULL
Open Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbtiry, Ct 06708
Circular Channel Analvsis & Design
Solved with Manning's Eguation
Open Channel - Uniform f 3ow
Worksheet N3me: IdWC Mission & Pines
Comment: Determine capacitv of 8" storm drain
Solve For Full Flow Capacity
Given Input Data:
Diameter.......... 4.67 ft
Slope 0.0250 ft/ft
Manning's n....... 0.013
Discharge......... 1.94 cfs
c'.,omputed Results :
Full Flow Capacity..... 1.94 cfs
Full Flow Depth........ 0.67 ft
Velocity.......... 5.49 fFs Flow Area......... 0.35 sf
Critical Depth.... 0.62 ft
Critzcal Slope.... 0.0216 ft/ft
Percent Full...... 100.00 %
Full Cagacity..... 1.94 cfs
QMAX @. 94D. . . . . . . . 2.08 cf s
Froude Number..... FULL
Open Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
Circular Channel Analysis u Design
Solved with Manning"s Fquation
Open Chwne1- tJniform f low
Worksheet Name: NWC Mission & Pines
Comment_ Determine capacity of 10" storm drain
So lve For Ful l F low Capd.r ity
Givpn Input Data:
Diameter.......... 0.83 ft
Slope 0.0200 ft/ft
Manning"s n....... 0.013
Discharge......... 3.07 cfs
('~c,mputed RPsults :
Full Flow Capacity..... 3.07 cfs
Full Flow Depth........ 0.83 ft
Velocity.......... 5.67 fps
Flow Area......... 0.54 sf
Critical Depth.... 0.76 ft
Critical Slo~.~e.... 0.0175 ft/ft
PPrcent Full...... 100.00 %
Full Capacity..... 3.07 cfs
QMAX @.94D........ 3.30 cfs .
' Froude Number..... FULL
Dpen Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * waterbury, Ct 06708
. .
♦
s~
.
~ fl,~~ ~ryY'q~0. ~"~Y~~v i~~ • ~a~ '°i ~ ~fr$~iP:is~~,~ ~ ~ ' • Vi.~7~~y~f~~tF1~
v • ~~yy~
~~s'~1},~t~~ ~~i?r,'tr+t~~~''{y~~ ~.,'.7~~ ,~'t • j' r,~'{~1~ r ~.~,'~~y'~' ~N~ ~ , ~ Lf,,91j`E.
~~x~a~ ~ p r . g .;,~jif~ z ( .,l 1~ ~1` ~~y ~ . ~ ~~':it' .„a+ •l~I:( ~•r
;ir/~,i;'' • ~~•.j~AQ ) Q .ili~' I . ~ ,7~ t~ '„~~y.~~1,. t:R~ o:
~ {r ~1t ^ ♦ Q 1 i41 ~ ~ j } iN ~T' ~ A~" t
~;1 2,y~.~lM,, ~ fl; .~7,~~ II ~1a~;1t'~~ 1'1) ~/'v~ 40 t~~. ~ _1* .~1~s ~~~yO~
.,y. S 1~~ i i t~ 4 I N,j•T'• ~ ; tyi i7g 5~~~'~1 ~ i ~•'~n„ ~ ~ Y, ~ ~h1 ~~1 ~'~N~ ; ~
,~1~~ A~tl~ ; ~y~ ~r',°•~yl. It:i;~:'~~•';1 ~I e : :~~~~,1~ ' ~ t' ~~►I {
~ ~ i`~+ f'~ id~ ~ ~,1~ r.~ m' r. ~ u ~ , i.~,, ~ i J~ .~;m.~•'~v~
a•~
} ~ ~ j~'.3a~ ~ -f • . ~ A:-;,w'.,,~a
II' ' ~ '~i • ~ ~Q •I,U
,j `;A„' ~;a'~' ~ 'f.G. L~~' ~~,~,~bi~f:~"., •'~,5~': ~ i~` • , ~ n~.,. ~ y~'~r t j
~j ~ 1~I. • '4~ , ~ i ~ !M ~ Ar
.r,;, ks~'', ~ ,t4, ~r'~~ {'I"~!~~t ,rt f~~'fra' `~aJ .~.i , ~~~`~,y~Miltiy ,1 y ,I.. . •!`YY ~
5 / i~r i•,+ ~i7r~ ' . . ' ~ y, 1..1 ~♦I ~v,Wk ~ ' {~i ~i,y ' 1 "~~~.v,
~'1 ~ ' ~ J. i ~ ~ f' J~4jr.. '1i?'1~'~I?i1~~YiD:4;~.~q .~'P J~•~'~~ •~t.~:iy:r~ ' ~
~ , ,r~' r a~, 't .V ,~'l . ~ W te
~ ,~'!1'.-,. '~,~r~l ' z~,~y~K,:; ~"F0: 7~; ' ~ ~,e.~~ ~;'1~:: ~1~: '.d~ , ,~~.°~'-r;'-rc ,~:'i
~ , z v~,., l',,•. :4;~~ . ~ '~~'1~~~ 1tf.' ~ • ~ Q ~ir. ir?~l~~6 ~ . ~ ' :l' .u, ~t
p J••+~ ~
JI.
~ ~ / '",+,~f~t~~&t)~` . ..,'n,•; ti ; ~~T./J Y ~r a --.~~~s~~ ~~j~~'1•,~9~ .i:,~:~~ •
,ii.i~:3s1~~ ✓~~t~a t It.~Y ~~~p~,~,,,,~il!' ~ W
00
~ . ~.!,,rg. ,'~.uj If~ ' t '::V:1!f~ ' ~ 7Yi r',(a~~ ns a r~~ ~~U• :r Y :/Q•. 11M
m 7;1 ~,lk~t,'j~r~~ ~r'~ :C" ~~tl '(ny,~'~ '(D' V1 ~ ~'.`~~~'~x,~~•ir12 i "I+~~ r^~ 1 q ~
•a
~ 'j~!1~'w(~~n~j• d~~~nry~,:
°4 1 ,1~ i f►d~~ ytt,{1Q'1 kf~:,>)~ ,~~~iJ,'~y c. ►:t:};
•S~ + .~;"q~l~) ~.ti0~ ~ . ! ~ ' tui'" ~ ti;;~~ Q
~ t ~ ~1;~ ~ U 10
u ~1 ~ .,,~e ,p, ti'1 . i . ~ ~ p ~ti%
~ 1 i!~ E~1~~} ~ ~ ) t b' .;,y~ . , 1 r ' t~.. j;;•~ r ~ r ,~i ,~;1 h , •j i ~
t~ s` ~ ~ Nt I ~i ,''~~,i .V~ '~ii~~'1 ~,~;ti~':ar' ~ "fi ~i l•~•~", ~ 1~ • ' ~t~'~i 1 ~
_ 8~"~~ - ._~'4,:~',~~,d7. ~ r, ~ I;. , . 9•~ ~ ~ • '.1.4;;~; ';i r.~~ ~1.,~~~i ,~t~`.6br ~ 'L7
~ --r~ -p,1----- ~ , ' , I' . ~ r Yl. : r• ~ _ . '
I~~ s ~~17 . G:4 ' I'e.~• ~yy~~~:~7N' : t~yy,A~~' • ~"1P ,f f ~ I ~J;~~~ v~' b . . '.L T7",
fn
~~~;ii ~ v#~„~~~~,6~,i .sY~•i,'~~~, ,.r',a~~r'~'`~ ~t.Y= i f/, ,1' •fr,j ~3~ i d a1--i ,d~~l. t~ ~ ~Y N
~r.a~t~ ~ y. G j~~vi qiy`' , „n i' ;~.~L:, 1 a~ ~ .f.~ / a ' ~~1i0 ~'p~.~ • .'~P~~t~~~n' h~t I: O ~aw~. , Q ,
~ 'r,; ~ { i',~t,: 'rr~ 4','' ~ J~P.. ~ ~ i ~Y~~l': 'h,• ~4.~~~ . ~1...'r.~; ~'(1, ~ ir ~r~
_ 1'~~tiJ.~~ N' {,~,.,rT ~~~f~' • ' 1~ i v. ' h;, r: %n ~ ~ ..41 V .
L/J
~ , ~ ^7° • t w. ' '1,,, 4 Q
.AIf•
h ~rr;-., ~ ~ j{'~~~~•~; e~ ~i
ti~~ '1 p~ 1~~ t O•~ 1i~..~ 1~ .iQi
f i.'',~~~1 ~ ~ i. ~ ' ~~r~~~ C J',~ ~fi ~ 1 '~''r ~I I • ~ ~.1~" J''` , •J 3'r i . '
V~P 'i 4i (7,a ""s fs; . fl'f''A~ ,a~ i ~ . p,s~' 3r~ •Zi P.
~ .1 t r~ '1 , ti~ , r.. ,''~~7 •''iPw.'~a~! ~ II` Q ' ~ ' r~ t,
~ 1 ~ 1 1 •r; . : t r y'~ t ,,~1~~y ~ ~ •'j,(•` . t , „j '
~'1 ' ~ ~+,e ~.~1 :l~. Y,i ` , ~ 11{11.~ '~1~~ ~ i ~ Lr~ 1tp+ ~ ~1t M .:y+'id~i.~R..rQ ~ M1S' t~,V,,~~,, ~y
- , ~ ~T:~~':~ . l:i ~ 't',.ih~• 1'~'~ kh ~M{. i 1i ~"Sf~y~~yiiY+.~+~E Y Ir Y a'R'F,;~ ~ 80
CQ ~ n • ,J •'.~~~'.f c~~ ~ i ~~J..t 1~ # ~
Q ~ ,y,~, ti~v ~1 ti'~~
~ ~ Y,~•) f~ ' 1, ~ . ri .a4•(~i~;~ftyl ~'~~~y~~l,t~~ ~~„'TY[~j~.~n1 ~ 6} ``~-~1 'yy+~a ~t~t~~ ~ ~ ^
a .r _,r 1 t~« _ wY l • y~t~~' _ r,~ v~'w'•':'l'~ ..4rw~~~~v+_ .~'w'.JY60►t17t .r W' ~ • ~
Q 1~+ • ~~1["'°'1,~~ iR~~1~r,~t ~P~~'`~~^tJ ~Yi I ( ~,~1 4" ~~~.~~•hb,'~'. wW'V~ilM~~l~'4~ ~N
ro, ,r: O u~,~~ •4 i~'tt6CCh ~ ~ ~a
~p~$ 4'~~~?~~',~,;:~~~, ~ u' y~,,~~ • d~~~. ~o «!~;pt E-{ U
` ~ . ~ Y!` A•ryri'q~.~~~r !jj,s~• ' ~ ~ y~l°.L,', , < ,'T'y~ i'';'t ...b~.~~;,~';~';~ 7
~ ~ l } •S✓,.~, ,~'?3'~~.ti'1 p~ ;.f~ _l ~
u,• x
' ~y''' 1~f'~;~ib~~'~•,'~Jt~!~ ~ti~ ~rt.. ~ ~t! ! - , ~ 1N' ~~i'~4 r!~ti, r •~"p~,p~ a~~(/~~~' F1`, q
h ~Ijp~ ~ 'r` ' ~ 1.~~~'~L +~t: ~ } ~ ~I 'wA. r ~Ij~~~ ,l ~hY~• ~~,1
.
I;~! ~,'.a„'; ~lti:?Q'i • ~f 'i, ( a,,~Y~.; ~ e ~ , -iY,~l!'!t'
~ ` a' ~ ~~d',~ ~i~.~r~~~ ~ ~~~Qi '~•4.,i , G i'~, ~7:1: ~yt~ ir ~~'.tir . ~ , Fi'
b ~ S~'; ~ ;+9'i r:r ~ P~ , s ) . . , ' ~ ' ~
1,
~ ~~5,~~ ;N ~ °''~~Ya`{Y~ ~ ~...5~~ ~ ~ u~~"~ ;~f , ~ • i ~I ''V~'~5~,j4 81r ~ «/:~'C 4~di
T ~4y.
~'y ~~+'l~il~r'iip~ ~ t,i • ~ ~ ,Y`t!k('~'!jl j,'~`~~iY;;
, N `yy, w 'c. a~ 1 , ~ . m r~~~'~ ;w ~3~+, . ,1~A U1., -db~ L,
,r'~,iu, Si~X•~L~>t i ~ t r ~ rL R~• ~.~_~.at • y~,
.Z~, y'~~q;. r, ~l:d'~w ~d(^ ~ ; ~i 'w4r1 :Vi11.Y 1~'~p77~ ~~~G?:ahi~
. ~ r:~' ~~'~.'~=x~ ~.~"(~r~ ~q,~}~ ~S"~ 9{~ ;~~`~r~~•~~~;<`~) ' ; ' ~'!l~'► '~;'-'w1..~N~;° ~ g~,~~R ~ :l~;~'~':~"~ .
t • `i '~0'1 /.w,~h ja~~ ~~~~t` (,i Iti . ~t t~~~"ta", y . ,I ' ~~I~e:
~d ~:.~C[ ~'t~~~' ~~T. i"l~ ii,l o ;"Y~~,1~~1fil (~j tI" I~~ci~~~l'~ i• •~•1•'~. ~ .
JL'~• ~ 4
4 ~ 1 1 ii,.p~ ' ~ ~L' • ~~,I+~~ . » a ~~y J,~.J 'p w 4!y • w~..~~ ia
~ p'd1 t ~ ' 3;ir ~,1' ~ , t. r r} f.,,ti1 ; ~ ,4'A v~ ~ .
1 ,t ! ~ urfr i ~j ~ ~ • , . .4'~~.., , . ~ M %:j 1
.iii' ~ ~ ly,r }~~r~~ Y~~ ~~~'1 G, ti'~ , i~ j. : ~ ' ll-.:~. " ;•~q;,a~ ~j~~1J ~ ~
~C7~,.:.yti
ti r
~R~ ~ +l~tr y ,~•.1~ g~ t h7~ 4Z'~:. ' ~ ~!'~1~1.i~i~1~~~~Q Yr~~r ~r 1',j~ I~' n ~ 5 ra ~
r'~ y ~ ~ T~~{'i/y " ~ , ~~;,y''~M ~ , •
~ ~d 4 t ~ i ~;b ~ . y1,~ ~ ~i~ ~i" ~ q Sti ~,l. 7i ~ , !
S G t [ ,t,' 'j 'tL~ ~~~►ry i~~~~,S.~lni~-1~. 'A M1
• e, 1 . ~W , i J i ~'>~~i~ W G~ ~ :C~J....~~ ~t.' f~.}~, , ~ta ~i I ~ ;3t 7
. ;
~a n ~
~
MT
lTACAM
~ A
ooe~
.
ITY MA9
fr~ r
r
_ _ lreii~~vuuu ~ . ~ ~l6 .
p 1 ~r~ • ~ • ~
+4 ~W ater'Tank
x 9/~ et ~~.'°'9':'~:•:;y'ai, ~ ~ .
~ ~
'
Su
~ • ; ~ ~-~EL_;
1993 ~ ~ i . . 't, .
£ . ~ _ . ~ . i~ ~
s ♦ ~ ~ ~ f~'J+~t 1 ~
~ `1 ~ ~ ~ Wi ~ • ~l~`I t~ i _
iS+M • i s ' • + 9y~ ~ . W~ ~ T,
. o z5a • _ I~,r r ~ . I .
~ • W e ll - 1 ~•;ti•;' ti•: :y.:. t•}
19 @ . . r.~~'•}l,`M
Ttent
5ch ~ lr,~ ' ~i;{;;;:',::,~:;
~ , ` r f~
99< : ~ _ , j ,;7'`' ~ ~,i~':;;.~:;;:~ ~_I l ~
i t y.~ ~ kf T
. ~ • J • ~ • . _ ~ ~ . t { ~~~~~r •~'•!~'I' ~
~ 1 _ \1~I ' 5~..,.t•"i'%• ~..,:c - ' ~
•~..•~~~~1 ~ ~ ~ ` v` _ ~ ` 1' ` •s.... `,V~
.tr--~'~,...• „ 1 ~ -
;'1, . . . . : i ~ ~ - y , ~ ; . - _ , ' ~ _ '
- • ti' • •~il• ~ _ '2j~sd ~ °
, . ~ . . ~ ~ Y _ ' • `
;SI' • . ' , r ~ o . : ~ ~
• •_~t" : ...~i. ..,,t ' ; _ ~ N~p_' E M P 1 R ' .'~•We , 2~
~ . . . . • • ' ~I • _ . . . J. Z d p
2COO
•M ' . "-t' ~------'1 -
~ ~ ';r,1 ' _ la
71:::: ~*.:ti ~ .Wl'~ ~ONf''
ztaa ~ di; ~RNaT ~
11 ►NT
. , ` g . , ~ ~ ~ i~' _ . ' ~ • _ ~ _ _ _ _ _ ' . . • . '
Paki~. ~ ~ =:si ~tf.:~-~_,~ J.~ ~~~i . , _
' ' ~'fraite
• . _L _ u ~ :ON
~t~-~--'~~ J' I~~~ ~ 4 Lr~ ~-~Q o--~•~• ----:1', t t ~ORTN[RN ~
n~il ~.rJ ~ ~
;Wowwwo
r' ~ v`~ U
'
,zpu~` Kti
~ ` - } ~ '1'`t' 'i,---:;` A v~ ~ a ,1~'~ 'D o r~-------,r`
Park r1 ` effey
sraN ~1 No ka
rs
. • - ~ ~ , ~ .if
- 2021
~;)5s _ _ . : ..1 i~ - _>:1 _
. : ~ , w _ . . j . ~,~.-►i< 4~
y,;;,, - " , 2 21 _ . . ~ ~ • ; i:~-.~ ° < • -f-'ti o . .
Q. AVE -
.s,.`,°. :-gOONE ~ - . • ' . ) , ' P ~ ' ~ ~ - ~
, =r-y. f~=; ; . : - . • 't ~ : ~ . ~ ` 20523~ ~
,r'~`j~;; ' " . . ■ . - - , _ - ~l_._--- ' -
,
s' . . - , _ .r~ - _ B~kQ -
~ ~ ~ Sch~ . pVENilE.
. - '°t-.~+ ~j :i: : : . • . ~
• r - . ,y~ 'ist W ' • : • , ' . '
,r••.--•' I
AY' .1,~ ` - Wetl
O
i052;
lti:( ~;orthPines _ ~ -r~~ . . - . • 1~ 1 ~ _'1`...i -
16 h Sch • ~ N , '
; t= ~1 g.. Y _ ' Cita; C , .r ~2~~~~ l~r~ ~1 ~J~ ; a ~ • '
LW AY~ -----"r' $uttpn : y ~ .1 ' _ . i~L~~~
' t£Y'~i ` . 2026 ~ . ~1 .
Q ~ IT'~ NE
. ~r . -pppg,~t~ . . r~~,. f--~1aZQ 6 LA
c3 . - ;c:-:. ~r k ,r: • , ~
~ 41 j,~- i-----' . : ` "AVe ~ ` t!'= ~
: ti~~~ ' i~~' ' "~.~ft„-~ ~ - O ~ J .ti ~
. • ==~~•r_ _ . i K• ' ~ y.~~' ` t ,
`RAGUEiT"•~''~'^ . . . , ~20~b • -l~ii
, ' • ' ~ (iv, SP qBANDOMEO '
ao,op ' ' 6 - ~ ..y,{:.i ' ~ ~ ~ i •
. ~ Pb a _ a : ~~:r-t. ■ ~
Ino
~ - j
~ ~
4..
~'`a-ylor
CiTa Da5jZn And p La anL,g ,
Y end
z II m J a N A U N=OAmJ~~AWU- ~
~ ; . ~~b~ b ~ ~ ~ o~~N~~ ~
A ; 11 gs~ ~ _ ~ ~~~~~~~z~r~ ~ ~ ~ s~~ o~~Q ~~~~57b~~{~I ~~ip~~~m~ ~~~z d
I I I ~ ~ ~ -1 ~ ~ ~ ~ ~ 1A ' I ~(~~~pA ••~v+ N Z
i ' ~ ~ ~ ~ ND• ~8'E ~ ~ 0 0~~~1 - - ~ ~S S ~ 0 ii ~ . '_974 = _ ~ ~ 1-li ~ ~ s ~ ~ ~I u ^ ~ ~~5~ ~ ~
~ ~ - - ~ m. ~ " ~~6 ~ - ~ ~ ~ / ; ~ ~ ~ ~
b ~ II-~-- \ _ \ M s~~ ~ , ~ ~ ~ N~ r IQ. ~ . ~ ~ / / ~ ~ ~ rn
~ , C~ . ~ s ~ ~ ~ ~ N ~ I I i I r \ - O II ~ N V'
~ I ~ -----------------------~------~r--- , ~~m I ~ / ~ ~ ~ ~ _ ~ _ ~ ~ ~ ~ ~i~~ ~ ~ ~ z m ~ ~ ~ ~y ~ ~ I4~ I d ~ i ~ ~p~ I~ i I ` Q ~ n V
~ I ~ ~ V l~ _ ~ . ~ Y ~ 4 ~l I I A / ~ ~ p O ~ ~
~ ~ ~ ~ m 4~~~~ ~ ~ i ~ ~w~ ~ - • ~ ~0 0~~ S~~i ~ ~ ~ ' r ~ i 'O R=9p, ~'J / ~ ~ ' ~ ~ O ol / ~ ,
9 ~ , V• I ~ , ~ ~ ~ p i ~~i/ ~ ~ " i I ' A.or~ ~ ~--------------°----------°y~....---- ; ~ c~~ ~
~ I 1 n ~ f i ~ -n..a .I~ I ~ 1 ~
n ~ , I _ ~ _ ~P O ~ I . , ; ~ ~ , ~ ~u~ aA ~ ~N ~ P. ~ I (1 y ~ , ~ T ~ Jro' LmUr r u+ r
iL I I ~ ~4 \.l. 714' I I I ~ 64'-b' / C~ kY q~~~ 7)0 ~ Q4~~45~ ~j
~ I Q i ' I I I ~ N I~ Uo .n ~ ~ "z~i~ ~ P ~11j~ ~~O~~a . ~ F ~ ~ ~ c - S ~y u . / / ~ - ~ N ~ ~ji ~ -I ~'T ' ~
O I I - I ~I~ ~ , -~~il C 0 ~ N ~ ~ 1 A~ -t~ ~c~~~ i I ~ J,~ i R'~'6 ~ ~ ~d i i / ~ s ~p ~ 6 ~ / a. ~ p r ~ ~ ~ ~i I I ~ ~Q ~ r~~ ~ z ~u Ta~ ~r ~l~ ~
~ I L a ~ rp'w'7e'E. ~ ~ ~115 ~ I~~ D rl ~ ~p~ z~~i~ P~ b-~A~ ~ ~ ~r ~
~ ~ N 73eA1' ~ i ~c ~ ~ ~ ~ ~ ~ ~ ~ ~ i - ~ g ~ ~ ' ~ ~ ~ ° ~ I~ ~ ~ ~ ~1~ /J ~ o~~ ~ ~ ~ ~p I O I ~I ~ ~ ~ . ~ , ~ ~ ~ ~ ~gro .
o ~ ~ . ~ ~ . ~ ' ~ N°' ~ ez~ ~a~ ea~ ~ .J ss~ ' ~ ~ ~ ~ ~ ~ ~ r ~ s 6 6
' ~ , ~ ~ \ , ~ J ~ s ~ ~ ~ ~C ~ -z - ' Q' _ ~ i ! W i3 ~~~11 _ Q N
~ I O I fn ND~L~D'?bf I ~ I ~ 0~ ~\~\0~,` ~ a Q~ 'C A1 ~ g Z N ~ i ' i ~ V' / ~ I ~o~ ~ ; r' , ~ ~ ~II O ~ ~ ~ ~ ~ oi n~ ~ o «~II ~ ~ III ~ Z
I ~ ~ ~ ( ~ ~ Q ~ ~ ~ ~j ' ~b ~i ~ b , ~ ~ < ~ i i _ A lo _ p ~ N \\~~q~~ 0\\~~ I 1 ~I ~ ~j,~ ~ ~ ~
~I - 8. ~ ~ ti ~ ' p .~S ~ ~ ~ ~ ~ i ~ ~ ~ ~ g I~-"y ~ ~ -p~~ ~ ~ ~ 5 0 ~
i I ~ ~ ~ p f~ ~`a~~ ~r ~ ~ ~ i I I O ~ tl~O~u.~ ` ~ ~ \ r . / ~ ~ ~ , ~ ~ ~ IQ ' ~ a~~g0~ m~l 1 ~ a~~~ ~ • ~
~ ~ I I I + I~ ~ \ f II J
~ ' ~ ~ ~ ~ I~~ ~ D' ' ~ , gb.: ~ I 1•~' . T ~ j ~ ~ 6'D L 4'-0' L I'-6' I. I II ~ ~ ,
, ~ ~ ~ ~ ~ ~ u ~ ~ I ~ ~ , , ~ ?S' ~ 7~ ~ D ~ 1 i ~ ~ ~ rn ~ fni ~ ~ N r ~ ~ , i O ~ `:J A 0 'I I
I I I l N ~ I r I ~ ~ J 6 _ ~ I ~ ~ ~ ~ ~ GS.EA4 i r ' A~ ~ ~
~ I 'i ~ ~ I I rJ J~ rnfn z ~ r - I I I~ ~ ~I + I I I ` .I I ~ I I ~ ~ p- ;J ~ • D ~___~__~===~i ,
ir r'~ ~ II V~> 116 u , I I ~ I~ I ~ ~ ~j ~ ~ . ~ . I \ ~ R~~,_~~ ~V ~ ~~j ~ l~ ~ D -ZI ~ I 'n ~~l~l{~ n ~I~ a
I ` ~ ~ _,~.(Jp _ ~ ~ ,p~ ~ ~ C# --~tr= ~^.r=~__~---~ i I I { . vn~' NO'0078_C ~ I.E-'~ ~ ~ a A ~ I1 ~1 I ~T. ~
~ u ~ i ~ , ~a~~ ; ~ , ~ ~ f ~~N ~ rn ~ i
( I I ~ p ...9a ~ ~ ~ , ~ ~ ~I~ ;I r ~ICi~ - , ~ , I~ ; ~ ~
( I P R_~'-9. ~ i ~ I I~ M'~~ b ~ D ~ D ~~Q~ ~ I ; ~ I U;j $o y 0 cn ~ ~ ~ A ~ p ~ ~
~ ~ - ~ y Q ~-~e~~-__. _a,-~ J ~ 1------- ~I ti~ z rn,~~ ~ p ~ g i I J _ ~ 'GW - ~ i ~ P-------- ~ ~ y I ~ (n ~ ~0 y
4 ~ , ~ :1 U I~ a s '~__r_~, ~ ~ ~ ~ a ~ ~ ~ ~ ~ , II 0 ~ ~ ~ _ ~ f r r- fi ~ $
. ~ / ~ ~ ~ Qg~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~I I~ I ~s i --t N ; ~ p ~ ~
I ~ ~ I , g~ ~ ~ ~ _ _ _I 62~ ~ p~~ ~b~ ~ 62~ i ~_6 ~ p ~ ~ i ~ ~ -~IF 6 d @ W m 0~
I I~ 0' ~ ~ a'~1r i i C i---- I W S N - 1 ~ ~ ~ 1A -p, 1 ~ ~ ~ V ; I ~y A \ ~
~ ~ I ° - Oe N ~ a 6 ' ~ ~ D ' w~~ n~ ~ ~
u- ~ ~ ~ ~ o , ~ ~ ; ~ ~ ~ ~ ~ m~~ ' 0 u I u I ~y~ O~ i; ; ,i' ~Ap ~ ~ S ~a• ' .0 ~ S
I O I ~ Y ~.i_~ ~ ~ ~C L q~ ~N~ . ~ I b~ ~ ~il I ~ I~ ~f~ R ~ ~ ~ ~
~ ~ I ' ~ ~ ~I~• ~ ~ ~ ~ ~ ~;I~ " - ~ ~ ~ ~ ~ ~
~ I [II I r ' " ~ ~ ~ 1 ~ I IIP , D ~ ~ X ~ I I ~ ~4. ~ . .r::~. I I IA • V~ ~ ~~J
I rI IF} m I I~ J 9 ~ ,L°~ ( I ~ ~ ~ ~ r ~I q ~U 6 ~8.~b ,q o ° ~ Qk m
I I /~g ~ ~ 'P~ ~~4 I tN~J O P
I I • - - - . - - • -fEJ b Yi- - ~q, A ,I a~ ~ ~ I ~ _ i ~ I / r ~ N~ ~ ~ aNN 1 _ A ~ - r-~ ,
~ ° ~ ~ I I I m. . 4__ -I ~~n ~~(E) I I/2' GOND. I n r -
i ~ 'B,~ ~ --~t ~ - ~5
- ~ - ~ - - _ - - - ~ 1' 198' 4 0~$ ~
I I II ~I'_~ ~ ~ 231b5' ~ "I o - V / _ 50'154'E v ~ ~
~ ~ u ~ u . u ~ u c ~ / ~
~~a~~-.~l-~~ ~o ~ C~ ~
I I L I'-0~ 4'-0'
~ I ~ V' L p,1 ~ r-~.-1~ v_--rr -r1 ~ ~ I
i m ~ ~ ~ ~ -e ~ ~ I ~ ~ .r ~ ~ ~ ~ I ; . , : , ~ ~ ,~.\r _ I I I~ ~ ~ ~ ~
• o Q ~ p~ u s
oI~ V~~v~ a~ Ii ~ b~ u~~~
~ ~ ~ ~ p =p o ~ .N .
~ ~~,~a < ' ~~l ' =r . II ~ =I ' . ~ ~
I I .o c~ ~ ~ i > u ~ ~
c°~~ ~~g R D~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~+u ~ ~ ~ ~G
~ ~ ~s € ~
~ ~ ~
I~ ` I p i. ~ ' „b-~~ , i r V ~ _ =~,'I .o-~e~ ' ~ L ~ ~ ~ u ~ .o-,ei
_I I 'x(~ ~ 1 ~ ' '~n(' P1 {6)~ `~l I i
l' ~ _"I I - ~I ~ I ~ ( ~ l, ~ V ~ i ~ ~ z ` . ' . , ~ I~I II I ~ ~ Z ~ b
~ ~ d o ~ o ~ . @ . ~ ~1~'(` ,~q ~ b , s ~ • ' ~
;~C,~~ ~ D(~ { ~ ~ ~ ~ ~ b ~ ~ A ~ ~ . ° ~i ~ ~ ~ ~ '~7~ .i.lll'li~.a - ~ 0 ~ , [ ~ @ Y .Nj ~ ~
~ ! ~ • ' ~ b rn ' a
• "Ill~r Lr ~ " N ~ ~ r ~ ~ •a ~ ~ ~
~ L, { -o ~ - ~ ~
1~.9~ ~ ~~T~ # ~ ~ ~ i ~ D ~~i i. ~ - , ° ~ rn - a ~ ~ ~u ~
s a ~8` ~ I II ~ x o$ ~ ~ ~ ~ ~ m g ~ n (1N~ rov N- rro kg ~ ~ pN~ ~N ~ V i L ~ ~ ~ ~ t7~ ~I I p{ . ~ ~ Op SD U ~ ~ ; D
o ~ ~ ~ = s ~III~,I ~ N P~ ~ ~ ~ u ~ • m - ~ ~ ~ j~ „9 .r ~ ~ ~ S ~
~ ~ L ~ ~ '>To Q p • ~ S 'I '1 k Y 91 ~ W A ~ ~ 4 ~ ~ ~
~ ~ a. ~ ~ . ~ ~ ~ ~ .
n
~ ~ ~ ~ ~ ~ ~ _ :;~';mM ~ ~m ID
i 11 z ~ ~ 1 n 7 `:r t~Tt~IL nEYE.OPMENT Q~ ~
a ° C~°.~ ~ NWG M15510N AVE. 4 PINE5 R.O. HA1~D5GAPIN6 5I~ }~~.1~1 `
~ ~ ~ ~ ~ ~ o ~ ° ~ • SPOKANE, WA. ~ ARc
' ~
~ • ~
T
ENGINEElt'S REN'IEW SHEET
( BLDG. PERMIT # -or -FILE# B94006-94
Related File # ( ZE-89-85C)
Date to Review 1-24-94 Time 11:00 # PRE-APPLICATION
Date to AA & DR Time
Date Received 1-12-94
,
Project Name RESTAURANT,OFFICr, RE'1'AIL CTR No. Lots No.Acres
Section - Township - Range
SITE ADDRESS MISSION E 12111 ,12209, 12217/W PINES PARCEL # 09544-0104+
Applicant's Nazrae GARY BERNARDO Phone # 838-4511
Address Work #
Date Conditions mailed
Contact person Pliane #
FLOOD ZONE N( NO W S SCHOOL
Engineer / Surveyor's / Architect's Name
Planning Contact Person Plione # 456-2205
Date Submitted Description Initials
s l I Z AGREEMENT TO PAY FEES OR PRIORn-Y FEE COMPLE7ED & COPY TO ACCOUNTING
FINAL PLAT FEES COMPLETED & COPY TO ACCOUNTING
NOTTCE TO PUBLIC # 1 3 4 6 COMPLETED - OR NEEDS TO BF SIGNED
G,
DESIGN DEVIATION SUBMITTED ~ j ' 9fl
AL1ERATTON TO PLAT - BLOCKS & LOTS
EIEARlNG EXAM _APPROVED _DENIED-_APPEALCD DBC / PROJECT _APPROVED _DENIFD
S- s
S~ I 9- 9 y ~~^'►'`'t S i o~? .
4+ Z
~ - I ~ - `/`r C ~ ~ 1 ro bfA_,.~ S -ratiI 40,R.
/U
~ .
I~~ r '3
~
' ~ y ~ 5 ~ Z ~ c~ •
Aet
A-r
/ ~7 ~ ~ ~I,►a~-~ S C A-1 c.S w/ ~-7-, r ,
~ - ~ 4► - ~ `'r i~J - (Jtw 7a!
2 ~30,-d YLO2~
~
f eJ °~+al r1 `r-r)
l 1 W - l Lf ~ ~ ~ ~ ~1-~-
k1p1t\review.for ' ~
WsYOR1'OF 1/24/94 PRL•-APPI,ICATIONCUNFGRL•[Y6E
12111. 12209. 12217 F Mission - Spoc. OCGce dt Warehouse, Spec. Retail dt Restaurant
I NAME I ADDRFSS I CI'TY I STA'I'B I ZIP I PHON@ ICDN1'ACT
OWNGL ~ Jsnxs A. Wotft 11407 U.S.13aok 01dg ~ Spokano ~ WA ~ 99201 ~ 621-2161 ~
ARCHITF,CT I Gery Beroarda Bemardo 1107 S. l{owatd x120 I Spolcano ~ WA ~ 99204 I 838-15I t I x
PROJECT OVERVIEW
'Ihis project will be a mixed use developmenG 'Ihe restauraot, 5S00 sq•(t.. will be single story with no bascmcnt. Applicant would (ike
a national chain restaurant to occupy. 'Ihe offce building will be 2 stories for real estatc. Icgal, or apossibility of inedicaUdental.
The retail building will be 50% retail with the remainder spoculative. Udlities will be separate; groundskeeping utill be contracted ouL
Applicant would like to beingconstruction ASAP. M addendum pursuant to WAC- 197 -11-625, to the pdsting SEPAchecldist
Addressing exact proposal aod spocific trafric impacts shall be completed.
SUMMA32Y OF PROPOSED
ocau-
LAND US@ PANT ODNST PIItB
PAACHL 7ANB ACTION3 TYPB BUILDINQ UE6 SQtiPi. OROUP TYPB PIAW WATFJt PURVBYOR / PHONR
4A191A104- I B-3 I YJ: 3U-8t ~ Ner I Restawut J4300 I A-3 I VN I 1=Reta7 I Modan 0avi Wder Cb. 928-IS/O ~
A1I1, I ITE89-BS I IOf(re& ?ndM 7.100 I H-2 I IU00Raf. I ~
Retail bsamt d nea 26= 8-2
DISCUSSION TOPICS
(elericaboro, eddtloro, and eorteetanstn wrftan eomrenta)
PI~►NNIPiG DEPARTMENt (456-2205) QONI'ACI': JIM MILI.GARD
• Written comments were prepared & a copy given to the applicapL
• Verify that no more than 60% of the site is covered wiW building footprinL
• ParFang is adequatc.
• 2 oCf-street loading spaces are required.
''Ihe more restrictive landscaping requircment Cor the west property line shall app}y.
ENGINEF-RING dt ltOADS (456-3600) CONTACI`. BOB'IVRNER
• Written commeats were prepared 8t a copy given to the applicanL
' Meet with Crary Kennaly, Fsgineers. regarding tra[Gc capaciry at Pines.
• Access to Fines is prohibited unless authorized by the State Dept. of Transportation.
•'Me EnBnecrs will accept old SEPA
WAS[QNG'PON SiA'TE DEPAR'I'bWNf OF TRANSPORTATION (456-3000) QONTACC: GREG FIGG
• Written comroeatswere prepared dt a copy Bven to the applicanL
' Submit a traffic study for Pines Road/1-90, Pincs & Mission, and norih & sout6 frceway ramps.
' North side o[interchange is at capacity.
''ihe DepL of Transportation will be part of signing off on the building permit.
I-IEAI.TH UISI'RICC (324-1560) OOKTACT: DARYL WAY
' Submit plans (or the restaurant.
• Connact to puWic sewer. Contact Billy Urhausen at UaGties Department (456-3604).
• Old on-site sewage disposal system must be removed.
' In the event a medical o[Goe bocoroes a tenant, the trash must be kcpt separate.
• ConsUvction debris must be disposed of at a licensed disposal site. No on-site burtung or burial is authorized.
•"Ihe Health District will release their portion of the building pertnit, except for restaurant.
FIRE DISIRICI' NO. 1(928-2462) OONTACI': PALJL CNASE
• 3 hydrants are required. One is aosting. Qne hydrant is required at the west end, west driveway; one hydrant is required
on the east end, east driveway.
' A vault with a Siamese connection located within 20 ft, of the hydrant is reqwred. 'fhe hydtant must be within SO ft. of
the building.
• There must be a 30 [t. inside tuming radius around the building,s.
' A Knox box is required on each building Iceated 5[t. to the right or le(t of the main entrance.
DIVISION OF BUIi.DINGS (456-3675) COKI'ACI': JUN MASCARnO
• Written comments were prepared 8c a copy given to the appGcant.
' For in[ormation on the Americans with Disabilities Act. call 1-800-435-7232.
• ' Contact Mr. Mascardo to discusswhether an elevator will be required foraccess to basement & mezzanine of retail building.
• Number of accessiWe parldng spaces is based upon required spaces lrom tfie Planning Dept. & Table 31-F of WAC 51-20.
• An accessible route of travcl must be provided beNveen buildings and the public way.
' AccessiWe parldng spaces shall complywilh WAC51-20-3107.
• Submit a soil test report dt. soil compaction test to verify the exdsting soil density.
SEE REVERSE FOR PEfitfJT RELFASE R£-OWAONBJ75
~
r
PERMI`r RL'LEASE REQUIREMI?NTS
I r
Please submit seven (7) sets ofrevised sitc, drainage, andlandscapcplansplus three (3) cornpJete sets ofconstruction drawings to
the Department ofl3uildings for acknow]dgement and distribution to alJ the appropriate agencies. In order for all agencies
to expeditiouslyprocessyourproject, it is important that submrtta/s include a/l necessary drawirigs and documents to insure
that review ofyour project is completed in the least amount of time. Documents should include: building address and legal
description of property.
Spokane County's Project Review Coordinator will be Julie Shatto at the Div. of Buildings (456-3675).
~ PIANMNG I EIYG(NEEItd EEALTH I FIRE I BUILDINGS
. . . :v •:s•:: w:::: v. ti L v.v y•. •r.y:::: ::;x:.} .tiv.};{.}w::::: r,.}}w.'ri
. ....L...x... .ti . .ti.ti.......r.ti .~{~..L..y.;;.. ~
. ~ . . . . . w.:. v:' , ti . . , . t v:.
. . . . ~ . . . ti . ......ti.r. ......'r}:
{ . ~i.{~`• r ~ !7.!•}~t;.
: ...ti i'r:
h
~.•rr.... ~i.. i:~ ~~J.~...
. . ti \ . f . ~ . . • . . . . . . ll:: •••1 : • l Y lf.
~rr Z> •}~?;{i
. , . ; . . . . . . .
~x• : .
- r• .:r;;:._:::<•::~::•:~::.
..,..,..ti.. •:x• 3~
~ ::.,•s.~::•.:•::<:::<:::::
: .,r.::•::::<•::
x~s. . . r•x.
. . • : .;:.;•r.: • • . v.... x::~ ::~r:•~~..... . . .
, r • . . . . . . ` ....tir.
. . :•.~,~.'~`:~;~'?`.~:..,:.._:.:~.:~:~::::::>:~~:::::.::•::.:::.:~~'<~<<::.::.~
. I I I I I
1 ~ Bicycle racks (location & number) x
2 I Building height in stories & feet ~ X
31 1 Clear view triangle at ingress/egress X
41 1 Curbing around landscaping X
51 1 Exterior lighting/direction of illumination ~ X
61 1 Exterior refuge areas + screening ~ X
71 1 Exterior storage areas ~ X
81 1 Fence location, height. & type X
91 1 Landscaping of parking lot - X
101 15 feet Type III landscaping along Mission & Pines ~ X
111 1 Landscaping (location, species, size) X
121 1 Parking & traffic circulation plan ~ X
13 ~ Parking stalls (nurnber, striping, dimension, directional arrows) ~ X
14 ~ Paving ~ X ~ X
151 !Traffic control devices ~ X
161 i Utility location X
171 1 Drainage plan (swales, drywells, calculations) I X I I ~
181 1 Fire lanes/access 30 ft. inside turning radius X ~
~n stalls & accesswa s nto & within bld
19 ~ ( Handicap p ark' g y~i g1 X
,
. . ............1..:... ..::::r:• .r. .,:~.r.:,
.r.. r:: . , . • c:?N• r z:~•~:
~ ~ :
. . . ti • :.:........v. ......L . . .v.........: • •7~ 1:5.•: r.. r~p • . v r: f•.d~.} .vr: r r:: x r. ~ {S•.:.};
..ti ti.rn..... v } . titi } . .ti:•.rvn:r .}h..........r...r..}........~rn
} . . . ~d`.. . . rr ......r , . ..r w::::: Y '~i$:r1. '
a . . . . ~ . 7~$.'t v:. , ~ f .'~,Y'~„~.,'r,`.',:' v»y't•svt; .
ri.... :.~{•.v.C•..; 4+..%:. r . . . . . {iv..:.. :iti . ~'r'.ti
. . . . . . . : • • . r.::r... ::f.~:.L•:.~::.::::.tiv :.~.ti:•.ti..:: r~}:.
. . . . . . . . . ..L~ . . . v.::}'. ...r..
. . . . . . . . . . ti ..1 ti ..1{ J' tf.d:...... • . :.L f•~{{.: N: ~:•.~.•}.K~.1{_:N'• .........5}.
L. . ' ii : + V . } . . . . . : •:i : ••............~V:}:::::: ~ . .1.... :.ti K.J...\..:{k}::~•::: ..........:.V....f _ _
; .
20 ~ Aggregate the parcels into 1 parcel ~ X
21 Certificate of Exemption ~ X
221 I Irrigation system ~ X
231 1 Nursery estimate ~ X
241 1 Promissory letter for landscape requirecuents ~ X
251 1 Copy of recorded property deed x
261 1 Road plans X
271 1 Agreenient to pay fees X
281 I Approach permit for access to Mission X
29 ~ Right of way dedication 2 ft. on Mission X ~ I I
30 ~ Sewer permit X I I
311 I Lock (Knox) box entry system ~ ~ ~
. . : •r:::::.~.::::::::. : ~ :.,.•.~~h::•::.:::::.:: .rr:::.... . :~:<I
uln.ti:.;;... ~.}y~ rnv.}:•::'
..~..ti ::::•:-.:~X
. . . . • }~{.}_{;.v:r.:
. .
. . r . . . . . ~ . . . . . . . . . . . . . r.'{'~...w:: :•:~.v : ~
r~ ti...... . . 1 .ti . ~ . . . . . . . . . . . v ~r....................... •r i:•' • M1:.::. ~ ~.:.:ti
~ L. . . . . . . . . , . •;r
. . . . .
r r . . • ~
. :
. . . . . . . . . ........................r.............. : • .
. . . . . . . • .v:;
. . . . . . . . .r..... r:.t:•:::.:: .
. . . .
. . . . . . . . . . . r :•.~~.,~r. i~s
•
. . . . . . . . . .
. . . . . . . . . . . . . . ....r........... : : •.~~:.''~i~;i~i<~:c~::<a:
.
..................::r::::~.~~~: .
32
: - 1 1 I N Barrier-Free Requirements (WAC 51-20) X
~ I
331 I Electrical details X
341 Energy details/calculations & heat loss X
351 Hcating, ventilation & air conditioning drawings X
361 Lighting budgets X
371 1 Plumbing details X
381 I Structural drawings with wet stam s& calc ations X (
. ~
. (
a re of Coordinator
I ~
f
` Page 1
OFFICE OF THE COUNTY ENGINEER
SPOKANE COUNTY, WASHINGTON
Project: Restaurant/Office/Retail Center Date 1-24-94
Address: E. 12111 Mission
Parcel No: 09544-0104+ Ref No. B94006
The County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
a roof containing HVAC machinery, a drainage plan
for the site shall be prepared in compliance with
Spokane County "Guidelines for Stormwater Management". At
a minimum the plan must contain:
1. Drainage calculations for stormwater volumes
generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
8. Copy of the proposed landscape plan.
B) The subject property is affected by the "Findings and
Order" and the "Conditions of Approval" for the following
land use action:
Spokane County Zone Change No. ZE-89-85
C) The following improvements within adjacent Right of way
are required prior to the release of a building permit:
1. You must submit road and drainage plans for street
improvements. These must be prepared by an
engineer. Plans must be prepared for the following
streets:
a. Mission Avenue, Typical Roadway Section No. 1, ~
Secondary Arterial Standard.
b. Pines Road, applicant shall construct Portland
cement concrete sidewalk.
All required construction (sidewalk/curbing/pavement) within
the Public Road Right of Way is to be completed prior to the
release of a building permit or a financial guaranty in an amount
estimated by the County Engineer to cover the cost of
construction or improvements shall be filed with the County
Engineer. Required plans are to be submitted prior to estimating
the amount of the financial guaranty or permit release.
Paqe 2
,
,
feet on Mission
eed
dedlcate a 2 ropp
rtY d e tY'
s h a l d e d` p• r° p e
p p pllcant o o f ar r~ he su~,qi i p~epare t h
2 . AVe r 5e. submi t tors of f i ~ e oo~r Sta f f w 1 lte
3- P rom tYle Au tl o f the deed , ~ a.f t~r s S uance of
f
Upon ht o f W aY ts must be and be f or e En~ lneer inq
recelp deed' °btalned the 15
rlg ch Perml roved' ec°unty ivewaY
A'Ppr°a 5 been app fram th• roved dr
4• plan i dinq per~` anY neW ~ ing st~reetS '
o-c
D partment to
the fo1~ow appr°aches e pr°p°sal.
, ss lon p, v e nUe itted W i t h ti il l n eed
a • Ml
~tion `'`las s our re`~leW -
inf °rm ed ``'i ith ed •
InSU~ f iC nat le to p~ecwe Car► pr°ce
D) We ar olloW inq bef o
the f ecif led.
te plan- as Sp s~all
. c ir ~ulat ion ~lan The
1• Dr a in~q e f rmat lon.
. , er • .
3• Other ln and traf f 1 e c°untY E s 5all ~e i~ as
inq okan stall Fav
a, A ParK' bY the Sp ark,inq ractices • r,d f or
apPr°ved ement °f p eerlnq p be requleled bY
ltted and ~nd arr anq a f~ i~ enq in w i 11 or tr av
be subm ocatl°n andard tr ing Qralnanbe, °,,uplnt Of ~aY d,~s iqn a ri w ith County P l.ann ch is t° the Rlg ch
a~~°rdcbY the pr°~ect w k °ut ~nt~ ,blted untll Su
requ~-o tlon of tie lleqal t° ba~ Road is pr° ton gtate
anh p l~s . It is e5s to Pin the washx.ngve b , p,cc ~riZed Y
,
auth t
s eclf 1Ca nsl~°rtatl°n - te Departm~ion 0n th ~K on
time tTnen °f Tra shingt°n St of 7urlsdlC natu
re blo
Depar The wa b~ agency 1r oWn S ig
. n appears efore have the for arranqinq
Transport ri 5.ho,uld t2zer S respons ib r~loCati°n as
pr Q7 e erm it • n • P ermitt aa~ ustmen ov ement •
the p Condit. ~o• utility e i~npr
E) Ut~"llt 1 neCessarY letl°n ~f th thorlZed County e
for ~1 for comP the au 5 oKane ,~ust b
requlred e pr°pertY ete and S1This d°~~mer view W111
er ~f tn t C°mpl Fees' • Plan This
F~ `~he °wn tiv, mU`s ~ to PaY pf f lce . 'ated'
representa ~ ~ Aqreem`ennty Enqlne o~u~ent 15 glease retur
tr.e
Enqlne a to the C ntil thl ese commeri aCt person at
r etv, be Comple ~et Ched to t Y our cont
do ument e ed Aqreement
the C°mp s Department.
Eng inee
~
~
' Page 3
The applicant or his representative has been given a minimum
requirements list. This list is not inclusive of all the
requirements needed but should be used as a minimum guideline.
Without the "minimum" requirements the Engineers Department may
not be able to perform a complete review of the project and could
result in prolonging the period before permit issuance. Only
after all the information and requirements listed above are
supplied or completed and the necessary review has been
accomplished will your building permit be released.
Your contact person at the County Engineering Department is
Robert Turner, 456-3600.
1 r
REVIEW.COMMENTS
SPOKANE COUNTY ENGINEER
DEVELOPMENT ENGINEERING SERVICES
PROJECT B94006 REVIEWER: Bob Turner
PROJECT NAME: Mission and Pines DATE: 19 May 94
ADDRESS: E. 12111 Mission Ave REVIEW 1
CObMNTS .
Total improvement length should include all of the parcels used in
the permit. Please verify the length of improvement.
Taper length should be 100' or greater.
Show new approaches on Road Plans. Approach Permits are required
on all new approaches as well as all approaches that will be
altered. Contact Sylvia Lightfoot at the County Engineer's
Department. Approach permits for county roads will not be issued
until a site plan is approved.
Grade sheet has multiple sections which are out of Spokane County
Si?ecifications.
Please correct Street Section and include drywell detail.
1
,
ADAMS & CLARK, INC. . .
1720 w. Fourth Avenue LETTER OF TRAl\TSMITTAL
Spokane, WA 99204-1702
(509) 747-4600 fax: (509) 747-8913
TO: Date: May 5, 199a Job No:94-obo
Spokane County Engineers Attention: Bob Turner
Re: Mission Avenue Widening
1026 W. Broadway (Bernardo-Wills Architects)
_ - _ _ ~ -
~ Li
Spokane, WA 99260
~
WE ARE SENDING YOU:
~ Attached Under separate cover via the following items:
Shop Drawings X Prints Plans Samples
Copy of Letter Change Order Specifications Mylar
Copies ~ Date ~ No. ~ Description
1 Drainage Calculations
1 Curb EmTelope Calculations
1 Mission Avenue Widening Plan
THESE ARE TRANSMITTED AS CHECKED BELOW:
X For approval Approved as submitted Resubmit copies for approval
For your use Approved as noted Submit copies for distribution
As requested Returned for correction Return corrected prints
For review and comment For bids due Prints returned after loan to us
COMMENTS: Approval of the enclosed plan is requested. Please contact me if you have any questions or
comments.
COPY TO: Ga , Bernardo SI
r~ GNED.
Joel. Lee, P.E.`,
05•'10.')4 00120 $ 509 '4' 0913 RDfif156CLRRIC Gf'0. 02
~
~ IVIISSION AVENUE WIllENINC
nRAWACE CALCULATION9
A&C pRwECT No. 94-060
Bcrnardo-Wi[!s Archjtccts
Spokanc, WA
~ 0~ WAJJy~~O
~
May, 1994
~ t
4t
U1.cT
S"ONAL
aXOIAiO 2/211 ~
P r rpti rtx! by :
i1 donrs d ClarA, Inr.
1720 West fiotinli Ave.
Spokene, WA 992114-17U1
(509) 737-46cx► • rax (509) 747-s913
OFFICIAL N~
SPOKANE COU ENG NEER'S OFFIEE
OR P ROJECT # 9~Nkmw
DO
SUBMITTAL #
RETURN TO COUNTY ENGINEER
05••10••94 00s20 $ 509 747 0913 aoanStfCLARI< 5ro. oa
,
, MISSION AVENUE WIDENING
A & C Project No. 94-060
De9ign Menio
Plcasc rtference attachcd bssin nwp,
1'he drainage frnm Missiojt Avenue, oncc curbs are added and a sm311 ainount of widcning is donc, will bc
hwldiod W;ch scanaara spokanc Co«,ity a,-yWclls, Cu«cntly llicrc an; no drainage Strucwres alonE the north
side of Misslon, and the drainage flows ofl'thc acphalt. With the widening wid strect improvements there
ivi11 br three low points, therefora, the nocd for thrcc drywclls.
RatinnAl Mcihocl calculations werc raii on the three basins (A, B, C). Tho calculations arc attached. A[1 tltc
bu9ins arc rclativc;ly small witli the laigcst Uilsiii bcirig 0.16 acres, A1S0, alt the basins havc lcss dlan a fivc
minute time of t;oncentration. We will incliide the entire right-of-way in our drainage calculations; therefore,
28 feet will bc impervious and four fcct will bc pc:rvious. Thc majoi'icy of llic Uiuc ltEC four fc:ct will noi
drain onto the street but, conservatively, wc will include it. Wirh rhe drainage calculations, flows vary froni
0.33 cfs to 0,42 cfs. T]ie capacity oftha sttuidard Typc A drywcll is 0,3 cfa. Thcrofore, Bowstii»g
cnlculac;ons wccr. alsu run tu sc,~c wllat the requirul storage would be if ihere were an outtlow of 0.3 cfs
al loweci.
1n the worst condition, that bcing in tiasin A, dic-reqiiire.d ctorAEc would be 77 cubic !'ect to handle tha 10-
ycar peak storm. Thu c3pacity of a drywcll btkrrcl, not includirg drainivck, is apyroxiiitatCly 80 c;ubic fcet.
77iurc;furc;, ic is proposed that 7'vpe A diywells be uscd to provide the dramage diccharge.
Duc to dic limltaj x,iwunt u!'twphale pavemeiit that we src adding, there wiU noi bc a"lUX" requirement
05•'10••94 00,20 $ 509 7 4' 09 13 RDRn5&CLRRIC Sf'0. 04
0
, .
Pt'-'Wr tmir4 a FnPri i ii a HY D P ri I r.~GY
C'CS1G1•JC:R, - JfJC:L l..EE W'o; 11•J 6
h-' 1~: i_j ~1 FC:'r raF~l1 M 1~: 1~J►•~ W".)t tAl.i k OJ1 u t NI N6
I f, -f I,=,t,1
F LI~`iAF'Eri 1~-- . 14Zi r",C:F:E~~ SUBAF?EA 1 RU~~~Qrr nCrrI G I~f~~l' _ . s
~-.0156 6 r, RE c SUEPPE4 2 FUNp~'F CUEPf= I C:I FNT
TOTF:il., FiF.Ea = . 1583 HC:REy cOr1NOSi 7'E P,UHOrr CQCFf' 1 G-I ENT .el,61 sl'~965?
i iOF'F;L.ANCi FLO1.4 YALIJES
C: t - C+
l.. - 6
C:Hi:;t•ll•!EL FLOlJ LUES
L 1 bU
r
r_ 1
i'2 _ .1?2
t•1 - . l~ 16
r: . s
~ ~ • ~ ~l :~.ti
c::or~lPUTE[:, l!ALUES
D U k = ti. u 0
1ic~ ~ 3.f~
►~2 f~ ~ .42
I.;jA .42
05/18i94 08:29 a 509 747 8913 ADAMS&CLARK-SPO. 05
r
eOWISIr k t NG GALCULATI OI'dS
DA7*E DESI GF•lER = JnEL I..EF
F' ROJ E C1' r-491-1 E= M I r---`.*i r~rJ A1,' ENla F t,J I DEIJ I NG
C:~t 1 F'`s i r_~r~ ~
+ t I r-► t e ri s i~~. Odev . i r-i S t r•, ~ e
i~'c.? CseC.) ir-I.il'~~'•.? ft.') CCU. ft:. c u, ft, i
. 0 .442 167
~ i
0 .6 16
~/~,~1 Z . i .2 J i3G ~ : !.S , 0 J 200 .19 t ~ 7 :7 ti 0 - L 1 L
1: • 1 500 1 . 1 . 1 ~6
s 4
5
~J. 1
~ i a !7 1 L' L' 8 1 ~ E:1 `t . 1 `t ~ C• .940
N ?1 6g .'~'f . I 2- 2 62
1
40 .0 :240 11 . 621 .1 2 264 r'LC
, Cl 170 0 0 `3 72 LI
`,:-i 13 . C'► 31000 . 6 E; .99 6 9(3[1 -624
2t3E~0 . 61 . ~-15 7fi5
2!'~,< 2 rt S, g 4
9 0 0 1;0
S .
4
~ ~ r ) p 4 ~
4500 .56 . C, 17 _:3 4 1 C? 5 G 1 01 b
4oci S' 1 44C.I -Z 1 ~10
5 iC't 0 .0~ ,.~5 1 I53E, -I 171?
51 Ci . 0 5400 .50 .07 36(1 i ,6:'6 1 269
Ei 5?8E~ .114 .p~
~ 71 El --1 3;38
5080 ,f1r, a -1416
TN E MA.XHIMI ST 0RA G E I'S ? 7.40l< 41 C: U, FT.
Trie time of GQf1reRtf'c+.t+on i= minut?.,.
Tti c- I_!r~~~e Y E- lciped f1Qw Cut i„ c.f.~.
! E~~J ~•CAR So T"URM CALC
. r
RATI OP-.tAL Fl?RFtULA HYUROi_GCY
L,HTE GESI GNER -J'IDFl LEE E►~ASN I N C
PF:OJECT NAt•1E ~ M I SS I ON HVENUF t•J 1 QENING
C~1 F''I ION =
S. LiF'EA t=. 1 1 25 "CF'E S =,1..iErikEH 1 FUttilOFF COEF FI io I ENT = .9
TS, 2, w. 6 161 ACREE; SIJ6(-iF:EA 2 RUNoFF r:riFFFi CI EI4T . 1 S
TOTHI. F:,,,REA _ .1286 AC:RES C:GMF~~isI"m RLfNOFF C:UEPF I C-i EN'T = .80 610 4199067
01,1-F.:l, caNG F L0W VALUE~
Gt - 0
L ~
N
= A
i_ HAP,lt-.I E L F L nW VFi L_ U E S
L. 150
G 1 ~ 50
2 2 - .1?j
~•J = . 1 6
Tr - . 05Q5
t:.Ctr1F'UTCD kJALIJES
[~I.1P - 5 . 0 k'~
I 1
G1 •
. J
05••10••94 00o2l) $ 509 74' 0713 fiDRM'SpQcCLfil:l< -ro1'0. OG
ci iw,s'tR I I'•1G CAI.,GIJt_HT I 01,~15
UF''-:1, f;INE:I? - JOEL LEE eHS1 N 6
F'F':i:iEt:"f NHME = MI ~~~I Ocd r~~~CIJUC l..iI C~CI~JIrJC~
t ti Ir,tip n c- i t l!d(;,.-. Q i r, Vaut S-1 tc. r•aqe
ri.? ~.Sec.i Ci n.ft-rr.? ;CU. +t.) tcu. tt.? (CU. ft.)
C:~ . Ei i• (16 4 • a
1~t.N 600 ~.2-1 4 163' 1~i 0 •-17
15.0 9►3 c~ i. 7- . s a 1,94 7 E~ -56
1. u` .15 19,16 1.? .61 0 i s4
4 5 0 L 4'-'
1.04 ~i4El •"ti~~S
.91 ci 9 2 t~b ..4 12 2
4 tt . 0 2:4 E1►3 . C~i. . 4t5' --'507
c} ~i ~ 11 L~ F1 ~ .03 ~ 25 cS 1 l~ ~ J S'5
il _ P+ n 0 A .0 ' 219, 900 68 1
G• ~ . Ci J 3 Q O ~ L~"t • ~ ~ L: C~ y".', L~ - ( 6 4
`;h . r► 3600 .61 2 c; 4 1 tis0 -SL4e
65 . 8 ? 9 C P A 4 7 1 1 n - 9 12:4
V 42U0 . ti~+ , H;• 2S~' 12 ,_'.g ta~ 1
r'~'►Cl 4500 .~:.t ~.u~ l.?~~,1 -119~~
6.Fl 4 F0 B .~.9 9 1440
C~ 5 1 UC . f:~ :-n . i~5 SE,, -i 252
F0 .0 5400 ~.N 0 'i 2 8 ='i
~ ~ • `
5%0E1 .44 .85 r95 1710 -I415
I 12~ . So~a:~ 1 S;r~~ -i ~lY~•
T FiE tlH;~: I V1UV1 STOFHGE 18 -i L.i i8?4 Gl.i . F'T.
~ l~,r t im~ r•~f rr~nrFntr..~tinn R. i n i it:--..
T 1 U ri c:1 t• v c 1 G p0 d + 1 tit'i a u t i s~. t.+._.
TErv ,,*&4R' Src+RI°l cALC
. OS••!0••94 (301 30 $ 509 747 0913 RDAnSCcCLRf.'I( sr0. p;
J kHT 1. Ot••t01L PCiRMUl.fa NYDRt7L, f1F~1r`
r~~aTF _~•~~Y4 roF:,I~r•,Ls: - JDE ~.Cc e::ti~:~~,~ c
NF=;1-1E - M I S:S I GIA G'iL.JENUE l,.l T f,)FI"J I('•1Li
~~~L~F,a~:E:~ 1=. l~21 F~I:F:E S ~~BHf?EH 1 f?UI~OFf' C~O-~F I C I Eh•1'` ~
~
;;L►h~F~'Er~j . O 1 i a r~c r~r C. cU6AkEA 2 RElNf1FF CUEFr 1 i~I Et•~T
13 9lr5 Ht,: N.ES GDt-1P0,,',I TE r•.Lit•40FF COEFF 1 CI ErTT = . G0 64~i6 15'6 2
F-LOI•,l V►LUES
L - Q
r.! . N
C: Hi:~r•.!I.1F I ~ I..UW VALUkS
t~ - 150
~ s = .171
G J B
I•~ - . O 1
F, - d
T O - .06
C.UI'lF-i-ITFU VHL.UES
[)UP = 5. 00
05••10••94 00130 g sor) 747 0013 RDAne;&CLRrIC sro. 00
.
,
'
tiLIW;,'1' 'k. I f,1V GALGULF,1' I Of•JS
GA'r E 5; /S• 4 DESI Gh! ER-= J t7 F L L FF Esh S i N C
FF:O.jE_GT Nr41E - rt t SS I ON avEN(.iE 14I GFf~JI NG
F:=. F' 1 PT 1 01-J =
t fi I ri t F ri,5 i t; GJI dF -,j . Vi ri 4'ou t E-3 t c. r a 9 F
(in.!hr•. ~(c..t.s.'~ icu. tt.) Ccu. tt.) ~cu. +t.~
: El C~ ~ , i ,1 .01 6 144 yf1 54
1c,,c, 61D E1 2,214 ,25 1'-7 14Li -J
9~~C1 1 . . 21l ~~~i 7ri -70
- I e} ~
46, 7.i.0 n 1 .ti .14 2 iIS
1 80 0 1 . A4 . y : 2 2 3 754•0 "31 7
Lc~.0 Ll l~ l~ 14., _0.0.5 -SJI~ -4E+J
. ~~e o . s~ . ~ ~ ~~i 'r ~r~ -a~p
4r=i . i9 2700 . % . !l C., 2 i.=~ IS 10 - t~ ; ;
,c, 30ee .16~ e2 2311, 00e -4 5_"
i
,55, . 33V l~ . 6Q L4J S':il,f '4rJ
U J. 6 l1 H , k~ 1 254 10,80 •°:52.6,
SL'Q' 0 0 77 2v2 1 1 '7 O -IP 8 2
%E+ ~ Ef 4 2C, 0 . 0-11 L` 1 1 ctiC~+ -974
:'rl . C1 4JOCJ .56 .06 187 1 tiLi -1 Li bi~-l
, 0 ~~GO F . 6b 2S~ 1~~E~ 1 1 4£~
..'6 1 1~:R~ I 25
-'C,.9 15, 4d13 ,A0 bS' 16 2. tl -1311
Ci C78E~ , 4•:% .Oc 32 0 1"l10 -1 :3310
.C-1 6000 . 4~ .►a~ D 1ol+0 1 4? a
! Hh I'11:;'1 l°lU(`1 '--`.I UKAlit 1b L:U. FT.
T Tfir t itnE of cc,ncEntt••ati i orr is 7- fTll r1UtGt .
T'i+r UrI U ivc- lup rC1 flutri uUf it~ C.{.s.
TF. rJ Y'k.AK S'I (1KM CALC:
Spokane County Engineers Project: RETAIL CENTER
N. 811 Jefferson 456-3600 Job No.: 94006
Spokane, WA 99201 Disc.No.:
File Name: MISSION
TYPICAL SECTION DATA 18-May-94
Roadway half width ENTER--> 22 09:49 AM
Road Name ENTER--> MISSION '
Left or Right ENTER--> LEFT
Curb Type TYPE B COUNTY .
Station Interval ENTER--> 25
MINIMUM MAXIMUM
Curb EL Curb EL Edge Pave,
CENTER % SLOPE EDGE DIST. % SLOPE EDGE DIST FROM (4.5% (-2% to Gutter
LINE CENTER- PAVEMENT C1L TO C/L TO PAVEMEN EDGE PVMT from E!P + FROM EIP + SELECT- Design Top Curb
STATION ELEVATION LINE ELEVATION EIP EDGE PAVE % SLOPE TO CURB CURB HGT) CURB HGT) ED ELEV % GRADE % Grade
350.001 32.551 1 32.141 17.501 -2.34 1 0.001 4.501 32, 39 1 32.471 -1084.17
379.321 32.631 0.271 32.231 17.501 -2.29 1 0.311 4.501 . 32.48 1 32.561 32.54 -2.40 110,991
.
400.00 32.691 0.291 32.331 17.501 -2.06 1 0.481 4.501 32.581 32.651 32.61 -3.67 1 0.30
~ 425.00 32.77 i 0.311 32.451 17.501 -1.83 1 0.481 4.501 32.70 32.781 32.68 i -5.17 1 0.30
450.001 32.831 0.241 32.52 17.501 -1.77 1 0.281 4,501 32,77 32.851 32.761 -5.00 1 0,30
- 475.001 32.89 0.241 32.57 17.501 -1.83 1 0.201 4.501 32.821 32.901 32.831 -4.17 1 0.30
500.00 32.95 0.241 32.611 17.501 -1.94 1 0.161 4.501 32.86 32, 93 1 32.911 -3.00 1 0.30
525.00 33.021 0.281 32.661 17.501 -2.06 1 0.201 4.50 32.91 32.991 32.981 -2.17 1 0.30
, 1 550.001 33.081 0.241 32.82 17.501 -1.49 0.641 4.50 33.071 33.151 33.061 -5.00 1 0.30
1 575.001 33.161 0.321 32.89 17.501 -1.54 0.281 4.501 33.141 33.221 33.131 -4.83 1 0.30
1 600.001 33.231 0.281 32.741 17.501 -2.80 1 -0.60 1 4.501 32.991 33.071 33.001 -4.17 1 -0.52
1 625.001 33.261 0.121 32.73 i 17.501 -3.03 1 -0.04 1 4, 50 1 32.981 33.061 33.061 -1.90 1 0.23
1 650.001 33.291 0.121 32.791 17.501 -2.86 1 0.241 4.501 33.041 33.111 33.121 -1.93 1 0.24
1 675.001 33.311 0.081 32.891 17.501 -2.40 1 0.401 4.501 33.141 33.22 33.181 -3.33 1 0.23
1 700.001 33.341 0.121 32.981 17.501 -2.06 1 0.361 4.501 33.23 33.31 33.231 -4.40 1 0.23
~ 725.001 33.361 0.081 33.021 17.501 -1.94 1 0.161 4.501 33.27 33.351 33.291 -3.77 1 0.24
750.00 33.391 0.121 33.071 17.501 -1, 83 1 0.201 4.501 33.321 33.40 33.35 -3.50 0.23
775.00 33.421 0.121 32.87 i 17.501 -3.14 1 -0.80 ( 4.501 33.121 33.20 33.21 -1.50 -0.56
800.00 33.461 0.161 32.821 17.501 -3.66 1 -0.20 1 4.501 33.071 33.151 33.06 -4.83 1 -0.60
825.00 33.501 0.161 32.911 17.501 -3.37 1 0.361 4.501 33.161 33.241 33.161 -4.63 1 0.381
850.00 33.551 0.201 33.001 17.501 -3.14 1 0.361 4.50 33.251 33.331 33.251 -4.43 1 0.381
875.00 33.631 0.321 33.111 17.501 -2.97 1 0.441 4.50 33.361 33.431 33.351 -4.90 i 0.381
900.00 33.751 0.481 33.19 17.501 -3.20 1 0.321 4.501 33.44 ~ 33.521 33.441 -4.37 1 0.381
925.00 33.881 0.521 33.23 21.00 -3.10 1 0.161 3.001 33.551 33.591 33.541 4.931 0.39
940,47 33.951 0.451 33.261 25.00 -2.76 1 0.191 0.001 33.711 33.681 33.601 3.001 0.38
OFFICIAt PllBLlC DOCUti10V 0~ -
SPOKANE COU~JTY ENGINEEp S 0~CE G~ hhV /
A120
PROJECT
SUBMII°tAL #
RETURN TO COUNTY ENG9NEEp
PROJECT NUMBER= 94006366( APPLICATION ' DAg' 09/26/94 PAGE= 01
THIS IS NOT A PERMIT
PENALTIES WILL BE ASSESSED FOR CONIlMENCING WORK WITHOUT A PERMIT
SITE STREET= 12209 E MISSION AVE PARCEL#= 45094.0107
ADDRESS= SPOKANE WA 99206 Cl~j
PERMIT USE= 2-STORY OFFICE BUILDING ~~-U J-55T
PLAT#= 001837 PLAT NAME= OPP.TR. 1-354
BLOCK= LOT= ZONE= B-3 DIST#= F
AREA= 00000000 F/A= F WIDTH= DEPTH= R/W=
# OF BLDGS= 1 # DWELLINGS= WATER DIST = MODERN
OWNER= FRED MEYER/JAMES WOLFF PHONE= 509 623 1000
STREET= 12209 E MISSION AVE
ADDRESS= SPOKANE WA 99206
CONTACT NAME= JIM PARAS PHONE NUMBER= 509 535 8377
BUILDING SETBACKS: FRONT= UNKN LEFT= UNKN RIGHT= UNKN REAR= UNKN
REVIEW INFORMATION
DEPARTMENT REVIEW REQUIREMENT
BUILDING REVIEW COORDINATOR - J SHATTO
COMMENTS:
f NSPE,,:;-tt~i.s3
`
BUILDING PLAN REVIEW REQUIRED
FiNAL FIP•s-" Fc.ooR E)eIT~a>R~cp~- N to BE .sue~rr~ roR. ~t6~1/EW AND AP~'~IQ,oI~/K. Dy ~ v~PA~271»b7~T
COMMENT S- or a urw,Ny P9 F u Bc c IrPTFXt 33 Ra O1~ To 'frN~'f I NT~s21o(Z co'~1 Ot..ET/blj,
• S1H oQ DpAW 1Nq S FoV, "T'14f- FOU-6 w 1►J q /Tf M.s slfqLl, BE.SUahtRT)ED To TYI£ Dl V1s1oU 6 F BWiD *lQr
f-oR RCVtsEvtl a"p RPf(ZaVA'L PR(oR Ta lN5TAU.A7toN IvooG TR-t4SSES Z.• FABOZICiItYtoN s~L 61~JZ'S
3. fl.oo~t J~t 6Ts
ENGINEER APPROACH/FLOOD PLAIN/DRAINAGE
COMMENTS:
f
~ q Q(~
ENGINEER DRAINAGE PLAN REQ' D
COMMENT S :
HEALTHDIST NEW OR ADDITIONAL WASTE WATER
P
v L f
COMMENTS : (~J /
PLANNING SITE PLAN REVIEW REQUIRED
COMMENTS :
0 ~Q S
.
UTILITIES W/IN PRIORITY SEWER AREA
I NOTICE OF TRAN1._J~ITTAL
nuDRF.SS: PizoJt:C"r
9 s'- 63 4 6
C3US(NCSS N AMI1: PnRGCL NO./LEGAL
DLSCRII'T[ON:
PROPOSI;D USE: x
,
CONTACT: PHONE:
REASON FOI2 TRANSMIT'I'AL.
PREAPPLICATION CONFERENCE PRECONSTRUCTION CONFEKENCE OTHER:
DATE: TIME:
,
DOCUMENTS CIRCULATED
DISTRIBUTED TO:
KccD DESCRtPTtON BUILDINGS PLANNING ENGINEERS HEALTH SCAPCA FIRE DIST # OTHER:
',><JSite Plan (new) (revisecl) ~ I I I I'. I I
_
~::,..r~i._}:
'i~w:. :.p. •.:k~:;•:;?:;;s:~:'~:~: ~
IC ii;3'i:::`'~ "•,ti r.: ~r
: .
ritical Materials LiC ,t
• . w:
:~~Y:: :•:<•:::<.:•..
~ • • ' . .
'{vY •
x.. ~ :v.{v.: ~ vk }w:::::: . v't: ii ~ .
( ' " ' . . _
~?n .
.
• -
• 1.}::}: v? }i•
.}}i:{}ix ~:i}::;.}: ~'•i :v:'?'r::~:
,..::~:rr
.
ParkinS Pian
' . : . . : ,r......... . .....,..r.....
:
:r,:..::.... .~.L..
. ~ : r: : '
. .
.
. . :.r~::.:
~ . •!l yi::•~%tif.ti~i.•::.~y ~ J.•.
• r::.:v.::
:'~.~:::•:•:r :.1:Y..:.~...~ ry:l.:.::::.lK.. ~
.
f:.. .ti~•}
a
:~:ti~. ~ ti•:::.
• ~
ISin e P lan
. ~?.v'•:--. n~'.
~ ~ :...................y::>:::::':::::~~::~::~:::::.:::<:.....::::v:~::>:::
.:~.J.4.... ~.,L_. . tix•r,•.;--;•.M~:•~; :
. ;
.tir.}~••: • :Y.ti•.'•. ¢ ••'•Jh~ • ~ l~1
: r..:: :•::%ir'. ~ • ~i~? }:'•i::~:Sfih ~:wv+."} `::::•r % i:tii? :
~'r:~~}' v1' 1r{.}:' ..?fi:}i~:: _ . . . : .;•?y;c:
ILig
. . : .
hting Plan
:.r, :r~: •r:::: . :::v-y::::•: :•x+:
. •
~ ~ . . ~~:r . - :
- . • - :~t. : ti.... . .
:.:::.;.y;.: ~ . • :.r : • • • • ::'aa~~'
.
:
_ _ iti}?i ~ :•'C: ~:~i'r.~Si: ::ti: ~
SC`.` -..~::i' ;,.v_ i ..'f,.'. ~ •'t ~ vrv,.v: .•.'r:
: . .
rainage Plan
D
l
.
. ~
.
.
: :,r ;r...._...:::::•:
. . i :
na e C c I :•1:~:':•V..::~..4;.:.~~ ...........L. . L."" • ~ :'f•:.•::•~:
':.Y::: i:::•.V
.......~:..f::.~ .::ii':. •:i•.::: .
•
:•!'f.'::: `.}li ':::.W:.:
•.1•:::.. .f.1 . ::lY::...~ ' . . . .
.:::.:::xi.;::::;o- •
ra~ al u ation s
• • - , : . . .
. : -
ID
~ ~ •r. . . •::::::;-..:;;N.::-:.:~:::~ : ~:;f: . ~ .
......s~c... .x...._..,~ .r:t. . . . .r . ...fr:~
Y.. . .
J.. 'A••.'::••:::' .lJJJJ.:l.Yy'.'~:.L~•.' :.1f.`
...Vl..':...-:~:.::::t••.;•:~.\.v:'::.•.. ..f.1~ .~..~1:.~~.:•f.':•::.iYJ~•.`.'..:1. .
'•'f.......1V..__ t•••"• • :1.: • .YJ . '.''J}.: . ...••.'f
h.; - :.ti , " • . : ::ti.•.?:•::~ .YI ti•.~.ti•.~::.~
.tK:,
ay :
. .
~
As reement to P F~s . :~v:.
:.v:::: r
~.~....1 .._....::::.:..:v>:.........::..:.<:::::<:.:::.::...........
. .
x~;•y;:2: ~:f:: ' ::~3:: ::':v:`:'F;~'r:;<;::;:.ao-:.•:;:;,
~ r . ~:;:;n:>'-:::• ~~ia5.`;=r::~:~:;~:~ • . . .r~t•: . n.r.; :
.
.
. .
lIrrigation Plan
I - • . ~~r ~ ' . . ~ .
. f~::.:::~:.::~:.;:~r::::<::
.
.
_ .
~}'r,:•$ : ' ::;Y:~`i:~$i-:i{i~:.:
~
:`;a~`~
. ~
~r: ~ i::::r ~ x,tiz•.
ILan
dscaPe Plan
:w::::
i:~<:--:r •:t•::---}vr. - ~~e-~::.;•.:•:: ' ::;rn'
:v
'::c... _ •:t::=; .;:jc . :'v'~. t... :~:{t•T:t~i::~?: }i5::.}: r. ..v
~:+i.^~.. }a:• ••x•. ::{t~::}:::i{::::~':}:'
• :`o+. v ti..:•.; t?' t=: t..
::;?trx,j.:.v • :~t k: . . • n{_I~:~: i: : :•Y.:
` .•L::. ..%G:'.v:: •:;:f:;iti?' .:•>:•s:2::: ~
::•}iti+i}.::.;:•:.'.• ~.::.;i:C:•:- .
ProRUSSOry LeFter -
x:::: • 4}: }t.'•:i i' ~r{C. ~:tititi,7:} ~i~.h}}:: i
. .
A: .
._:..rn•::.:.~:>fi::.;:.:.-. ~ ar..::.::....:... .11c:::.~
.
. , { . . ~
• :::::~'i:~i'::~`i
:~:a:;-::: : ::v ~:;•s'
. • _ [
'.'}t:..::~~ yt~Y ..1...,..:.:•f.•.:'.~}l{L ~ ..{.J
•.`hJY. L...::.i':::: •:rl:.v.':.v.~
. ~f. . ~
. }.:ii; ?:5.; r t{.}-. ~..7i:
Lanc!s K: i•: 'r>.•: $i: w:::..:.5.}. •}}vi
.:,v;;~::::;::<:::::;
ca e Cost Estimate
..rr......::. :
. .
~ ~ ~ ...::::::r... . . . . ~ . : r. . ..r>..~........:.~~~~~::;.,.........
rXn •.ls• •:nr
Ir.
a fc C'irculation Plan
ITrf
rt~r:{ S~'i:? -T:: r :l LY•::r•'>.;: ;;:;i??Y.'-'..: :S?{FN_}
I I ~ w'" ' i. I•'~''
. • . ~ ~ ...,r ; ~ • .
_ i • - _ - :{vi: 4?:'v:: '4::•ii}ii ?:{v::. 4}r:'i~ ri}}i:'., ; •v': y'• ; •{•i::
.~r.~::i$:{
I ?C;ri:{•}:::....~.
:
.~•.~.w:....:-:•:}• T:{.....::::ti:t:..( ::j ;irsy<:
, L; '•}}:ti~~..... rJv.~ ':f{::w:._u:• : {~'::.::.ry}v: :::v.
•.•'r..{'r
ii$ ` • a. • t•: ~r.:::: ~ :v..: v.:. $ .
Construction DraW~ngs
-;ri::~~~ . x.-.:::. . . : :::::~<:~:~:i
r:
I .^~:.;•:.:::::::rrf<~~.~..H•::.:::•r:•::;}:rf:~:~r:;;::;::::;: . ::N::.:.:.,,~::::.:~:::::'~:!~:.=~::::•::.
•.t•.}}}"'•'•'r'+ i;i:~7.i::•:~::'~:ii •Y.~i:::i•}}i
}:,'w,',y;:ti:y}:::});ti:~ :4:::. i:titi~:ti:::i'~i;~C4{:. ~:•r}}Y~i:;;
;
~
^r: ~ } -'rr ti'ti'i:ii. J~ti:`:'~ :q+Yl.~.~':-. .}vK ~:-•;:,::;.y.•:~ : •
-
: r ~ ~ :
(Floor Plan
. - , . - h•:.. ~ .
~ N r{~~~
, ~ •
r..~:::::
.
. .
n. , .::4•} ..................h..
X 1~)c ?~,fc ~ ~ ~ I
Thc abovc irettts havc bc6n ,
recei ved:
Date of Transmittal: _ ._Revizw_ Coocc4inator:
4111
i9n~ ~j Circulacecl t,y:
~~t
SPnkonc Couitiy Divi.ciori uf f3uildrlig.r ~.,1026 Wc~.~it ~f3i'•~ ti~l~~~ay Avcncre * Stiuknite, WA 99260 (509)456-3575
! It
NOTICE OF TRANSMITTAL
nDDRESS: PROJECT f#: ~
13USINESS NAME: PARCEL NO./LEGAI_
DESCRIPTION:
i'IZOPOSED USE:
CONTACT: I PHONC•
r
,
REASON FOR TRANSMITTAL
PREAPPI.,ICATION CONFERENCE PRECONSTRUCTION CONFERENCE OTHER:
DATE: TIME:
DOCU'MENTS CIRCULATED
~ DISTRIBUTED TO:
k[Ca DESCRIPTION BU[LDINGS PI..ANNING ENGINEERS HEALTH SCAPCA F(RE DIST # IOTWER:
_2c >
XlSite Plan ne~v~(revisec.f') I X I x ( I A I
,
.h. . . .
:
LXJ•:: ~ .
ncal Materials List
IC
n};: • " ~ 1' .
_ _
. { • T:jY}}i:•: "r"..:::
-ti%{t_- :{{{4}:
" i
~ I _
. : .
- ~ . .
. ''ti~:}'i.`'i:}{ti;;':;{::'-?""':5~:•ttiti~{'.•
r.::
i:v:•'r}::: ' " • ' . " ' .
.
iParking Plan
.
.
, . ti-~::: r • . .
~x
~:•s::-: r: =N f +s::; ; :.2 .
v: :v: •
n:,••r::•::• : :.k
. • ~ • -
_
:•r:: ti•::::::--
:~•"•r•r•'v'•... ;i.., . •:::.~::~`:ti:i..,~:•:
.....t.'.Y:
•:.!tiw::.:: =
I
..,r.ti..... ~ tXh+:~>:~::•{':ti:i~:•>
: ...::XJh::.:•::: •.•l.•~.:. :
~ nage Plan .
~
- , :
~
.
SS
.
• . ,
::..:v:--:;::} :.:<.r:::-_ . :
# vnw ~'i r}j; • -:•i}'f.{v'
j'v} .
i r:{•:vii - :
. . r _
_ _
~ 1~=.
a . . .
ting Plan
h
~Li
~
~
::~r=.:=:<:;:;: ~ .
ra~ . -
: . _ . .
Plan . . .
. .
D.nas
e
.
- .
. . . . . . -
rkvr ~ : i:.
.:::}~i:~:~.`•:~ :
,
;~r .vr}i:: ii}i?}}: .
. "
' }Y.'L • -
'vii?::-i?:
. : i: ~ . ; - . .
'
n•?•..""" r.ti i}iiii:: F•: ~ :titi
. . . Y. L•::.:_•:._ '
:'•.1...'_. . : . . ..k.... ~::.Y.:•..~::.:...::~:'f..... . • . . ''f'}~:i:.•:.:•.•.•:}.~'..:'.
Drainage Calculations '
............r. . . ~
~ . ~ . ~ ~ . ~ ..-------.....r:.~.:. .
• . . . :Y::.::
•
- ....i:. ~ .
w... 3::.~::::.~:.;.i}} ;:_v?T:.•.~.~::.: 4i{::: :}'I.~ti•::..
t to Pa ....::::.:.~-.....rr.~::_ :
en .
x:}i`' . 1 •:..'.'~:ti}}}.:
i.ti
~ii
A r
t -
. :i}}:}}:
~J .
.}i .
~
. . . '
~ ~eem y FM~r::::_:_::~:.:::::>:_: Y:::.:.:...
.
_
lIrrir~..~
• R ::ti:'J:...• _.•::::ti . ...}.4•.'.'i:.:'.
~ation Plan ~ ~ ~ - . . . . . .
~ M1~•.~•!:': 1:f}~::::
: .
I
. . : ........:....r~,,:.r:.
:•fi : ~
:':1•~
.
: . .
• ~ . . . .
. .
e Plan
I
.
~
ILanciscaP . . - ~
. ;
~
.
. ..Y:: ' 1..i ~ .:f'K.~ _
. ...n:.. . :4..
. . . . •:.•.:''•"::'•:i?i: ,
..rb.~~.-^~ . • : 5..: _ ~ v: ~:.:;•:..vx i:_:... ~':~i::?;r•y..:'r .:~?}:•:;:y~{;:
"
" ' •
. ,w<«:;.,::~ v.:: - r.<k.,..
. . • - -
ssorY Letter
;,;,;;~;:r--:..:~.~ .
lProcni •
• ,
; -
. .
- ~ ~
-
. .
.
: :•.ti~:.:.-:.:.::• -
p
- . :..:...r
.:...Y :•::::::h..._.._. .
.
.v• ;•r•
. ' ''~:•~:..;':;t:;=~.=:;:i:c~f
?4:.
.}n•. ' Y•:~
---:v •r. • . •
• ~x
. . : ?r:::-:::::
~ ~ r.~~ = - . . .
:::-~:-r,
Landsca e Cost Estimate
. "
` ~ ~ •
~'r~C ?iI. -
:::fri%.•: x.
. . .
Plan
'rculation PI
:•n-. . .
raffic Ct .
T .r:~
I •f r,.w..} . r . {•i;
..~r..
~ :v
""""r:..
{}.i:_:j.{:r~: }}i:}v•}:: ~i:~
. ~ ~ .;;y:
r.{ •
.._:::.v - •"':._.}}:~:}v; y , "
;;•?,v,<.i„r""v: ~ ' :.v •
~}}r.
~ , ,
I } :~::•:::::~..::::r.....:..-:~.:t:;:;~:el.:
~::•t~~s:+.•.~ :.~:•:~:::i::::=>:::;
=
~ :~:::~::::::=w>: : ::?:,,:~=::===:-::;;r~: n..- ::,:..v:.;.:
~ - -
~ ~ . .
Construction Drawin~s
. . .
:
-
•
;.r - •
.
tivx. • :~i:• '
~-.;:~i:~::•'t:
ri'...... :
: ~ 4:i•: ii:•:
- -
t~r:; k•........ . ::a:: . f
i'
. .
- . : . . -
.
I Floor Plan ~ :~v~~:; ,..r.r;.:.r.:::. . . . . . ~ .
. :
. . ~
The above itenrs hnve becil
recei ved:
L• j ~ / I '\L - s~
view Coordinator ~I~~~~ 1
Date of Transmittal: Rz t"~ Li
''-T
i
Circulated by: 1994 ~
Spnkti►re Couuiy Divi.cion of 13uildingx * 1026 Wc:ci Broadiva~~ Avenuc * Spokauic, WA 99260z'`-(509)-456-3675
1 ~
r-
B- ~ ~
I3ert1arclo •-Will_s
Arcllitects, rc,
P _I
A r c 1, 1 1 c c I ti I- c
. C~~ ~l
~ ! 1 C l' I' I l1 f' S
November 9, 1994
~ J
Spokane County Utilities Division ~
N. 811 Jefferson Sp R
Spokane, WA 99260
Attn: BillY Urhausen *011, 0 c04N
11-
Re: NWC Mission & Pines pp
E. 12209 Mission Ave. 4/i~0N,
0
Billy:
Enclosed you will find a reduced copy of the parking lot area, nearest the existing pump station for the
referenced project. You will notice that the items discussed in our phone conversation of November 8, 1994
have been addressed and are inciuded in the final document.
The curb drop noted on the facsimile your office sent to Taylor Engineering, Inc., dated November 7, 1994 is
not necessary since the edge of the asphalt at that location does not have a concrete curb. It is finished with a
metal edging and the area betweea the edge of concrete and the pwnp station fence is back filled with gravel.
This assures you have complete access to your pump station along the entire south side.
As was discussed and accepted during our phone conversation, we will pave the entire parking lot as shown.
We are making the two stalls in the upper northeast corner unavailable for use until the County abandons the
pump station and no loager needs access to the station. These stalls will be striped and painted with a`Wo
Parking" sign. One additaonal sign is supplied at the head of the south end of the "No Parking Zone" for
clarity in the event the parking lot striping is obscured due to snow accumulation,
A"Coatractors General Note" has been added to the document stating that access to the pump station must
be maintained at all times during construction. , .
' This addressses all of the concerns put forth by your department Your timely response on this matter is greatly appreciated. I will be in contact with Julie Shatto of the Buildi.ng Department to conf.um that you
have received this package and that we have satisfied your departments requirements for permit.
Sincerely,
Keith Ballantyne,
BernardaWills Architects
Enciosure
107 SOuth Hoivard 0 Suitc 420 • Spokane, WA 99204 •(509) 838-451 1 • Fax: (509) 83$-4605
c:
Y ~
G0NTRAkGTOR NOTE: -
: GONTRAGTOR IS RE5PON515LE TD PROVIDE R~=50.00'
~ GO~ITINUOUS AGGE55 FOR GOUNTY UTILITY L=46,36'
MaINTENANGE VEHIGLES TO THE PUMP ~-~3~ 4q~
STAYION AT ALL TIMES DURIN6 GONSTRUGTION
~ q 8
N8q °58'6 "E
- ' ~ ~
' r~ ~ _
Q.22
~ ~ ~5~'4~~ •
o
O ~ Zn + r , ' ' . ~ I +
0 mm
•,-n Q n<
m Om ~ C • ~ GOUNTY STD., 05T MTD. ~
oP3 Z ~ NO PARKIN6" 16N
f~E~ 5T/4URA N T
~ (r=u-ruRM) L- 10 32
~
I sto , no basement , 15' ~
; biag~,t.: 201_811 2~ 2 .~p
~ bldg. area: 53~6 s.f. , a
; park5 req,'d: 54 28 i ; 0 ~
~ parka provided: 8q
- ' ~
21
;h, ~ 1. N ~
,
_
~ _ . ~ ~ . ~
25
20 ri W
32
, , ~aat%
- i - ~i i
. •
J'
~J , .
. - ~ .
.
- -
STERLING
SAVINGS
October 28,1994
Association
120 N Wall • Spokane, WA 99201-0696
Mr. Ronald C. Horman, P.E.
Spokane County Engineer
North 811 Jefferson SP4KqNE C~jt
Spokane, WA 99260
No~~ ~ 19~;
DI VISION OF
RE: Developer/Borrower: 3ames Wolff gYBUrLp11vc•
Our Land Loan No: 254-015243-7
Dear Sir,
Funds in the amount of $21, 700 . 00 are being held in a special non-interest bearing account in the name
of James Wolff, etux for the purpose of assuring completion of installation on roadway surfacing, including
grading and gravel, storm drainage and monuments on the north west comer of Pines and Mission, Spokane,
WA, in accordance with the drawings and specifications as submitted to and approved by the County of
Spokane Engineer's Office on October 27, 1994. No funds will be disbursed from this account without the
prior written authorization of the Spokane County Engineer. This set aside of funds will not be revoked
without the consent of the County Engineer.
In the event that the completion and acceptance of the above-named improvements for maintenance by
the County of Spokane are not accomplished within a period of one year from the date of this agreement, all
funds remaining in the account will be forfeited to the County of Spokane upon written request by the Spokane
County Engineer's Office to Sterling Savings Association. It is understood and agreed that upon the forfeiture
of the funds to the subdivision to be accomplished within twelve (12) months from the date of forfeiture of
funds. Is further understood and agreed that in the event of any shortage of funds to complete improvements,
the County of Spokane may have recourse against James Wolff.
Ir is snecifically understood and agreed by the parties, that in holding funds for this development,
Sterling Savings Association in not serving as buarantor for any additional ccsts incurred hy the County of
Spokane in the completion and acceptance of the above-named unprovements.
ACCEPTED AND APPROVED this Sterling Sav' bs Ass ation
day of 6 t.°trit~& 19q ~
~
.
Ken~ chultz, A ,
BY : ` c.,~/~ ` . . , ~ t. .
.1 . 1 ♦
James W olff v . A . • • , , ' • ~d~ . ~r "SEtH , ^'~y ~
OFFICE OF SPOK:ANE COUNTY ENGINEER
BY:
G `L.► Y ,as' _ ~•{I ~J v
~ do•~t~
j3elr,~~ p CY 25 i994
p~ 1 ncr~ NTY E~`1GlNEER
b` 1 5 S P O KANE C O U
c
I n t
Yfl i
.
oF T~ lo ~
/Vt ~V&O • . :
To p~ ~ . .
0
via _ -
~nclos~ ~ban$e psder
. . are seudlu$ Sh°p ~Ia~gS .
pflnts
_ G~
- - D~~lp~o~
0 ate
Copies 2
~ -
~
~ -
.
d coulment
~ • ~ ~ot teview an
' • ' _ - _
ljse -
'Ihese pae RequeSt~`
~
c~ -
0I ~ 1~
01
v ~
~ - - ; ~ -
. - -
- - . ~ . ~05
si~~-_
~
cop~Y to' 5()9) g39-4511
~ C
- y,TA, 992~ .
424
.
~
r ~j
, .
. ~ . .
J 'i'ICAR TITIE INSURANCE
Commitment for Title Insurance
American Land TICOR TITLE INSURANCE COMPANY, a by the Company, either at the time of the
Title Association California corporation, herein called the issuance of this Commitment or by subsecNent
Commitment - 1966 Company, for a valuable consideration, hereby endorsement. commits to issue its policy or policies of title
insurance, as identified in Schedule A, in favor This Commitment is preliminary tr the is-
of the proposed Insured named in Schedule A, suance of such policy or policies of ti:1e insur-
as owner or mortgagee of the estate or interest ance and all liability and obligations hereunder
covered hereby in the land described or shall cease and terminate six months after the
referred to in Schedule A, upon payment of the effective date hereof or when the policy or
premiums and charges therefor; all subject to policies committed for shall issue, uNhichever
the provisions of Schedules A and B, to the first occurs, provided that the failure to issue
Exclusions from Coverage (appearing herein) such policy or policies is not the fault of the
and to the Conditions and Stipulations hereof. Company.
This Commitment shall be effective only This policy shall not be valid or binding until
. when the identity of the proposed Insured and countersigned below by an authorized ;igna-
the amount of the policy or policies committed tory of the Company.
for have been inserted in Schedule A hereof
Issued by: TICOR TITLE INSURANCE COMPANY
PIONEER TITLE COMPANY .
e P , ' ~ ~a
OF WASHINGTON
521 West lst Avenue gy President
Spokane, WA 99204
(509) 838 5281 Attest
Secretary
Countersigned: '~-,,`,aA~'•~,..~..~~';~Q,.`.
gy
Autfi riz d ' natory
~ J~JJJ J~JJ~JJ~JJJJJ JJJJJJJ J JJ J~J..r~~JJJ J~JJJJJJJJJJJJJJJJ
• ALTA COMMITMENT - 1966 .
Reorder Form No. 996 (Rev. 4/90)
~1
T I . f '
Fr?paI'ed f0r:
Casey Sc Pl'11Z8II
720 Thircl Av+e. Paaific B1dq. Floor 18
Seattle, MA 98104-1866
AZ'I'IIJI'I(~I: Wi11iam J. Mozzis -
Ccmnitment No. : F-218094-t'S
Effective Date of Ccuaitaient: EECEMBER 21 1993 AT 8:00 a.m.
Customer Reference : Spokane Inn Assoc/Wolff
Tnqui ries shauld be directed to:
Pioneer Tit1e Company
521 West First
Spokane, WA 99204
Attn: Zbm Sp~lrgeou (509) 838-5281
A
1. Pelicy or policies to be issued:
American Iand Tit1e Association
Owners/ Iblicy - (4/6/90)
Coverage : Standard
T.TARIII'I'Y : $900, 000. 00 FRIIMIUM : $2 ,105 . 00
TAX : $168.40
PRJPOSID INSIJRID:
Ja~es A. Aolff.
2. The estate or intereSt in the land described or referred to in this
cvnmitment and covered herein is :
FEE SIMPLE ESTATE
3. Title to said estate or interest in said land i.s at the effective date hereof
vest.ed in:
C1irt W. Campbe,ll, a single man, arx3 Jahn Lilly, a single man, as j oint tenants
with right of survivorship and nat as tenants in oammon, as to Parce1 A; AND
Spokane Inn Associates, a general nartn~e,rship, wherein Jan J. Jamieson, whose
wife is Sharon- Jamieson, and Robert Spaz-ling, whose wife is Ginger Sparling, are
the partners, as to Parcels B and C.
P-218094-I'S .
- 1 -
• . . .
, .
. ,
.
4. 'Ihe land refezred to in this omunitrnent is described as follvws:
PA2CEL A: Zhe East 88.78 feet of Tract 353, Opportunity, aocording to Plat reoorded in
Voltmtie 'V' of Plats, Pages 20, 22 and 23, in Spokane County, Washington,
EXCEFr that part' coriveyed to the State of W ' n, b'Y deed dated Noventer.19 ,
1953, and recorded January 4, 1954, under Auditor's File No. 214951B.
PAFtCEL B:
Zhe East 88.77 feet of the West 355.08 feet of Tract 353, Opportunity, according
to Plat zerorded in Voltnne 'K' of Plats, Pages 2 0, 22 arid 23, in Spokane Gounty,
W ' n,
EXCEP'r portion conveyed to State of Trifashington for highway by Deed No. 229651B.
PAFZCEL C: -
All of that portion of Tract 352, Oploortun.ity, aacording to Plat recorded in
Volume "K" of Plats, Pages 20, 22 and 23, in Spokane Caunty, Washington, lyixlg
Southerly of State Highway SR 90,
F,XC= the East 10 feet th,ereof ;
ALSO F,XCEFr any portion lying Ea.sterly of a line drawn parallel with ard 60 feet
Westerly frcIIn the SR 27 llne of SR 90, Spokane to Greenacres, as oondenmed in
Civil Action 84201466-5.
- P-218094-'I'S
- 2 -
.
a .
. B
File No. P-218094-TS
Schedule B of the policy or policies to be issued will contain exceptions to the
followirig matters unlelcs the same are disposed of to the satisfaction of the
CcupanY:
GENERAL E~DCE~TI~ : . .
A. Rights or claims disclosei only by possP,zsivn, or claiaved possPmsion, of
the pri-fnises .
B. IIncroachazents and questicns of locatiari, b=nd,azy anr3 area disclosed only
by inspectian of the prvmises or by sutvey.
C. Easements, Prescr'iptive riqhts, ripts-of-way, streets, roads, alleys or
highways not disclosed by the public records.
D. Any lien, or right to a lien, for oontributions to enployee benefit fund.s,
or for state work,ers' oca)etLSatian, or for sezvices, labor, or material
heretofore or hereafter fi?snished, all as iuposed by law, and not shoum by
the public records.
E. Taxes or special assp,:zczments which are not yet payable or which are nat
shown as exastang liens by the public records.
F. Ar1y sezvice, installation, connection, maintenance, tap, capacity or
oonstruction charges for sewer, water, electricity, natural gas or other
utilities, or garbage collection and disposal.
G. Reservations and exceptions in United States Patents or in Acts
authorizing the issuance thereof. .
H. Indian triba.l codes or regulations, Indian treaty or aboriginal rights,
including easem~s or equitable servitues.
I. Water rights, claims or title to water.
J. Defects, liens, encinnbrances, adverse claims or other matters, if anY,
created, first appearing in the public records, or attaching subsequent
to the effective date hereof but prior to the date the proposed Insured
acquires of reoon3 for value the estate or int.erest or mortgage thereon ~
covex-ed by this C.Qnunitment. ~
SPEX= FOCEM~.S:
1. Lien of rea,l estate excise sales tax upon arly sale of said property if unpaid.
Changes in the real estate excise tax laws codified in Chapte.r 82.45 of the
R.C.W. and Chapter 458-61 of the Washington Admixdstrati-ve Code, beccnne
effective on July 1, 1993. Coriveyanoe docuunents dated on or after that date
rmist be accampanied by the new Real Estate Excise Tax Affidavit form.
Please be aware that th,e changes effective on Jtiily 1, 1993, include a
rez »rement that the affidavit be sign,ed by both the grantor an3 the grantee or
their agent.
P-218094-I'S
- 3 -
~ ~
' ~ / • ' •
Tax Code : 212 Rate : .0178
2. Said premi.se.s lie within the bcxundaries of Mode1 Irrigation Di.strict No. 18, and
are subject to by said district. For infozmation corYtact:
South 1506 Pieroe R,oad -
, . Spo}cane, Washington 99206 , .
926-5759
3. An asspccment payable in anrrual installtnerYt (s) plus ' .
Urqa.id Balanoe : $927.50
For : ITLZD
District No. : 501
In_stalltnerYt (s)
Unpaid : 14
Next Installment(s)
Delinquent : May 1, 1994
4. An assa:snent payable in annual installnent (s) plus interest.
Unpaid Balance : $1,327.06
For : ULID
District No. : 501
Installm~ent (s)
Unpaid : 14
Next Installment ( s )
Deli.nquent : May 1, 1994 -
5. An easement affecting the portion of sa.id premises and for the purposes stated
herein, and incidental purpose.s.
For : One guy anchor
In Favor of : Pacific Telephone and Telegragh Ccatpany .
Recorded : Voluane 437 of Ueed.s, Page 446
Affect.s : Paroel C
6. Rights-of-aay for Ditches and Pipelines, provided for in Contract dated
November 4, 1905, with Modern Electric Water Ccmpany, recon3ed in Volune "E"
of Contracts, Page 267.
7. Relinquishment of right of accPcq to state highway and of light, view and air,
under terms of Deed to the State of Washington.
Aud.itor's Nas.: 227268B, 227291B, 234249B and 7602060021
Affects : Parcel C
8. Relinquishnent of right of accp-czq to state ~.ighway and of light,
view and air, under t2nns of Deed to the State of W n.
Recorded : Marriz 25, 1954
Awditor's No. : 229651B
Affect.s : Parcel A
9. Corxlenmaticn by the State of W ' n of right of aocess to ghway and of light, view ar~d air, by decree
:
Ca.se No. : 84201466-5 F-218094-II'S .
- 4 -
~ ;
10. rIhe right to enter ufon the herein described land.s, where neoP~=;uy, to re.move
inmilp ove.ments, if any, located wholly or partially upon the right of way, as set
forth in case no. 84201466-5
11. Agreement exeoxted by and between the parties herein named tpon the conditions
therein provid,ed:
Between : Spokane Inn Associates, a partnership cmposed of Jon J.
Jamieson and Rabert Sparling: and, Spokarze° CountY,
W ' n
Dated : .April 29, 1986
Reoorded : May 23, 1986
Auditor's No. : 8605230135
Providing : Sewer and Ca 'on AgreemerTt for a sewer lift
station
12. An easement affecting the portion of said pzemises and for the puYpo.ses stated
herein, and incidental purposes.
For : Interi.m sewage lift station
In Favor of : Spokane CotuYty
Reoon3ed : May 23 , 1986
Auditor's No. : 8605230136
Affects : A portion of Pamel C
13. An easement affecting the portion of said premises and for the purposes stated
herein, and incidental purposes.
For : Interim sewer syste.m
In Favor of : Spokane Caunty
Recorded : May 23, 1986 .
Ajiditor's No. : 8605230137
Affect_s : A portion of Parael C
14. Agreement executed by and between the parties herein named upon the oonditions
therein provided. .
Between : Spokane Inn Associates, a partnership, ccuposed of Jon J.
Jaiaieson and Robert Sparling; and, Spokane Caunty,
W n
Dated : Apri1 29, 1986 ,
Recorded : May 30, 1986
Auditor's No. : 8605300446
Praviding : Sewer E;asement and Construction - Agree2nent for a sewer lift
station
15. Notice to the Public
F2ecorded : August 26, 1986 Audi.tor's No. : 8608260338 Affects : Said premises
Said Notioe states as follvws:
Prior to the issuance of ariy bUilding pezmit or Certificate of oocupancy for any
buildirig or arYy use on the prv)erty described hereinafter,'_ the applicant shall
be resporsible for ocmplying with the provisions of Spokane County Zoning
Ordance, Chaptex 4.16A (Acquifer Sensitive Arna Overlay Zone).
16. Contract of Sale terms, conditions and cavenants, and the effect of any failure
. to ccxply therewith.
Seller : Ctiirt Caupbell, a single man, and John Lilly, a single man, as
P-218094-I'S .
- 5 -
~ ~
, • ~ . . • ' ~ . joint tenants, with right of suYVivorship, and nat as t:enants
in ocmon
Purchaser : Grant F. Groe.sbecJc and Nanc.~ S. Groesbec.k, husband and wife;
R. C. Eaiezy and Kathy L. Ilnery, husband and wife; Antone
Plese and Sundena Plese, husbarxd and wife; and Karl B. Emexy
and Margaret Emeiy, husband and wife, as Atritnn Partnership
Dated : August 6, 1979
Recorded : P.ugust 16, 1979
Aiulitor's No. : 7908160169 'Receipt No. : 212285 Affects : Paroel A
Zhe Veridee's interest thereunder assigned by instnmient
Uated : October 30, 1981
' Ftecoried : June 17, 1985
Auditor's No. : 8506170012
Assirigee : Spokane Inn Associates, a general partnership, wherein Jon J.
Jamieson, whose wife is 5haron Jamieson, arxi Robert Sparlirlg,
whase wife i.s Ginger Sparling, are the partners
17. ArYy right, title or interest of Dataoore as disclosed by the Spokane County 1993
tax roll.
NOrI'ES:
1. General taxes for 1993, are paid in full.
Anlaunt : $626 . 80
AssP~-,or's Parce.l No. : 45094.0104 General taxes for 1993, are paid in full.
Amount : $626.80
As.sPczc,or's Parcel No. : 45094.0105
General taxes for 1993, are pa.id in full.
Amount : $3,295.95
AssPcvc,-or's Parcel No. : 45094.0106
General taxes for 1993, are paid in full.
- Amount : $2,406.23
AssP=-,or's Parcel No. : 45094.0107
General taxes for 1993, are pa.id in full.
Amount : $1,160.64
Assessor's Parcel No. : 45094.0108
General taxes for 1993, are paid in ful-L.
Amount : $715.78
As_sp,zc;or's Parcel No. : 45094.0109
General taxes for 1993, are paid in full.
Amount : $1, 427.54 •t]ss-_-,or's Parce.l No. : 45094.0110
General taxes for 1993, are pa.id in full.
Amount : $1,605.49
'AssPc-sor's Parcel No. : 45094.0111
P-218094JI'S
- 6 -
. . • .
, ° . . • ' ;
2. 1993 Stonu Water has bee.n paid in the s-uom of $10.00.
1993 Stozm Water assp<=ment has been paid in the sLmt of $7.00.
1993 Stonn Water assessment has been paid in the slnn of $8.00.
3.Aquifer protection fees that may be due and payable in accordance with Ch,aprtex
36.36 RCW. (Specific ammnts may be obtained frc~ the Caunty Utility
Department, Phone #458-2538).
4. rlh,e HCU70WNER' S ADDIfiIONAL PRdI=CJ endoYSement will not be issued with the
fozthoming Owner's Folicy.
5. In the event this transaction fails to close, a canoe,llation fee will be ctarged
for servioes rendered in aooordanoe with our schedule.
(End of Schedule B)
cc: James A. Wolff
cc: Pinnacle Realty, Inc.
cc: James S. Black
Randy Franzen
END OF SCHtedII7~ B
7 MID1TIQIS ArID b`I~PULATIOJ AS HERET0 ATTACEM
P-218094-1I'S
-
- 7
. ' . .
. ~
t
scoo3ulz F~-e N . to ~ . or
C , a, P.'218fJ94~ ~li~ ge t~O ,
Xgme for
the ee,,t,a.t,e or ~ du7-Y f~'~
~e ~1-~e th ~Bid, ~lve~r~ ► BssarY rveo
~ ~ p~erlY
1• ~ ~
rp
,Wrd.
,
g-
.
p-218094-TS
~
d' '
- - ~
-•r
36
~ ~~°P ► , ~ ~ ► ~ ,
~ ~ ~ ~ z ~ ~ .
;N ~ .
)le
)~6. . L~
*7 , 3 6 - - - ¢~r - - - 4~ ~
4 3 4-t8
~
v
~ ~
~ ~7'
j I
No
• i r , . f,'~V~el~'_ _ ; #41J.14F 1 1J71 . /J ? -r'. f:
~a 7.•j ' NJhh Av:. '
ry' . ~I.~jy`- - ~r~~,~~ ~
U
. ~
11j.o3 ~oc "o VI-
~ ,
WILBUR
,Gj ~ . . ~ ~ ~1: 71 - - - 4 - - - - - - ~l '-T ' - - - - ~ .
nbR~t Rm.
roc
~ 0 z O N O
ADD
/04 104•
Q'o . ~ ~ ~3S{3 f3
4~ ~ v . , 3 I ~ A
Co.
4 ~
g,
~~o ~ ~ao ~.o• a f°.~'"~S.' ~_9~3~a~.~Z11 ee.771
~
. ~.~..~~T...... • . . iCJ~~'lA7..a~.~. . ~ • w 4/0
, MB Canpny has not surveYeo tae nremises sketcfwa.
;C The SMMth btlow ;s lurn s`ed wie~oul charqe soklv lor the Durrook
OI afSiSting In Io,'AIif1P. ~airl :,temts- ind the rompmy assumes nr• ~
gapMlty tor mar,"racies lherein li dnes noi puroort tn et+uw All ,
~ hi,thway5. r,l-v inn -ttamRnls :mmninQ nr irla linp caiA nrrMleos,. I
►
NOTICE OF TRANSMITTAL
ADD[tC-SS: PROILC'I' J/-qjj
BUSINF~,SS NAMC: PARCEL NO./LCGAL
DESCR[PTION:
PROPOSCD USE: SPV,~. OFF! C~,-C I ;.Ca~r' ~5oc?zl
15ml RUA _ ~ ~ ~ IFISTAr d...k ot A ~•l
CONTACT: PHONE:
. REASON FOR TIZANSMZT'TA L
PREAPPi.ICATION CONFERENCE PRECONS7RUCT10N CONEERENCE OTHER: ~
LIATE: TIME:
UOCUMENTS CZRCULATED .
DZS'I'RIBU'ICED TO: '
REM DESCRIPTION BUILDINGS PLANNING ENGINEFRS HEALTH SCAPCA FgtE D1ST X~ OTHER:
(Site Plan (new) (revised)
;:;;t:~+• ' ti -,-~~fa j~:Y•>^~'-`.'~~~t j<•xc;•;.~.~'y``v `C.c: ~~i.o~~,::ti r ,
Criticai Materiats List t~Y~,~ ,s ,x?~~,~~,~,, ~ , t~<~;;M r'~• ~~4'oy~<.iaa'~o.
~ 1'«i.~ Y:~S>y~n~~•~.~•,~0.~.`~`~+,.,7J~h:• / '~?f~.i?+9xc~~o~ i~~a ~.~..r:~•: ::_•:nS~)?i~r..~.bW.~~=.
so•1ec,•u.
J• \,.,~t.:;,. c'~~~J%`'~rr ~ ~~c Z
iParking Plan. I ~ . I ~~~....2~~i;~~'' •y~~~~~~3.~~~~~~~
. ~ . , ,
.
' v> . P : v ` ~ot~oast• ~ , i. Y;t >.`e N~t
,
•~i' ~ ~t~ ~;y ~ :i,o~;~v'- 7 ' ..,f'-a ~'~y' ?~2~~ • o~
ISignage Plan . I (
<.>`.o. ...<J..~~<C~ ~ <-.'9~i~~,a~3 a~.~is.~:n ~~.3r~. ~.:v~c 6i:•S~ r ' :~_S~V.."`~:oSi.::ObX.:.tS
`1 ~ ,a`Sy ♦ ~w vw~~v • ~.r`{A.• '~`Qt ~•..v.:: •:!?~Yt•' ..r Q. •}~2;~;~,~, v~. 3~ h~ .
LI lltlng Pi~ I ~ \4~~~i~ ,~,h~r; ~Zc;'S~C.•. ~'r E~~, 3.~~~'' cAa~l'<:~~ .!~i•;f~~•~b'~\~'-`M`1:~~;`.'~,j ~s~c3~~"'`v:'~ ~d < ~ ~ 'o..;f~'; v•:=o~~;- • ° ."t33. . '''$~::c~i.~'.~x.
Ig
;:SiX a >.n~:~-~ ~ci~ia'.i-k~• fl.._..~,c'?S~f:.i*f:tC.~...:~~ ~ .oN,s
~~;Lir.`•:\wi~' f~jis~.tli:`e~iiA~ fi:v.t'}ri`~~;~~.::,:; riMcr :A..S,~C~C~cc<.. ..;~~;1` a,.•
iDrainage Plan
IDrat ~r~h•.t:::it(t!lt'~!- `aJ~ •,'cA'2>~ 3Cr~'."f4:`~;:~5 , ,..y••<~.~r.k ~~•~:=x::%tioar? *ak:v ~YaR`i`~:f~ iut~ ""ai~c3'''w`
t~.. ~':~c7 c~:,, o~•r.y; o i~.•.~ ->r,:,, r. ~~.~;°E,.,~~. 4~,.:, `:f~'~~~.. ~ ,,~C~ `'E'~
na e Calculat.ons
~ ~ ~ i`'~- V. Y~ {f• c~X`?Y r.•, ~.y M • 2~•• rv~
! g ~>ntioii3i~~~~o3.ti`s .~/..~~2-.ss.ta`?~:~c;~~ori ~~.X•~ •de~Ki,
:~f' ~Z+).' .vs~rw ~n; a-~4~wr v~~- a-~d~ v~ o~'`.~4'>.v14r y^!~.s~~:'•:~`~ al;;~``~~,?ti~C~ti~?~~^~, v` ~f?~
lAgreement to PaY Fees a,Z'~~,.z~~: , ~ ~ s~ ~
ir... -r.d~O~S~if~i'~:r~t ~5~;..3~4~'>,~..•_,r~?.3 A~:S~:4~ f~~Yir~~4i`~ ~;.C~~r~~+5.3•ir:.a: ~+*.~~~;.ia~ ~~C2~~lJaCcf t,'~;c' .61a~~~cc
~ 1~....;:r..c~r~; ~ w.~r^r.rf;r-•ca,.k w~♦,,-~ r>y~mt
o~
Im ation Plan
• 6 ~;?i~,.~,~ i,: `rs ~""i~X+v.r i~~. t~;•` ~'i~.~`Sr << :°%~C~ ~i-:'6.+iv:~~tc `s: ~<%~< t~~. ~
, h.. 's
g!! ~3~%+c • •cc v,~{ ,.....y~. •
I.andscape Ptasi - - . ~ ~ ~<< _ y~
- ~ ~ ~«1P}n+~.~ E3zkvtii:'~~.:^~$ • ?::..~.{{'~'.{>.al~~./J~•,~J,¢ ,oQ,;., ...~>1i31V/~+.~.`-~.s~?^.:~i'~
ii: "a c'f ~S SYC <~:t •~3 st:~ g. ` f.. yo• "9; 't `ra<i'%S~ ~Kt~i t~ • a~.' Q
~:~`c' N~'• ~ ..a- . >Ru~~S:• r- ~ ~Zi~°?.~. A~;- :c va ct Q
. Promissocy Letter b• s ~ a r l<%~~c
~~a~ ~*,,`>2' ~ ! ~c~•{ i ~ ry~;~ xt?~w~o`', ~ f. ~~F; `t>t;~ rF`!~:`~~C y~dQ
Landsca{~p Cost Estimate ~n...:r
1'- I:w~ ~~'~:~~..k-...cao • ~u•b>•SS.`$`.<l.~.s..~. .1~~t ~~Y"stt~ ~:a~~ti►~ ~~a.3.~?. ~.w~•r.~~~~-~L.,Goo:i3~,~.e~~Yc'G~ck35Y~hSC~
` 'fi":~'a~ • k; • ' ,c"c• ~i-. a ~~0'4`2~rr f . C ~t. ~
~ ~t:f• = ~c..~; ~'-~'~C~ r, • x' ~at~'o~~A~
Traffic Circulation Plan
C;y%Si•'."~.t~io~;F:~; ~try. ~`~Zi~~',Y ~ O•ia;A; ~;$rnYia:,td~~i`.~C:t{R='~ Y<a.fi;,2 ,/yt;:?:~•~%`~~ ~i~dti.~ca oy:
IConstcvction Drawings I :~~s~p/~,~ "~''.~<y~y~j ~,~Q~~g(~`~,~•~<:,~,~<~~ y~y,~-L<t ~nv~ ~p: ~ ~5~~
W..~1,.~~<..::4....1Y.{:~~..,f!•Y:?9:~.~. t'`~N~., ,~~.~✓.SfiSG`i~;;<Lv,•....~;
1 I
( :C4V~.r~.+J7?^CCV~:<^.~'./}~~AQ
Floor Plan 1y'.'.~~,~ ~<S~~iv`•;~~~:::.>.}\'r
I • I ~:•~~.c•:.=-.:.'•;:f>~a;.:,~~~k2y~~.>..c%:t?~?
;•:Sn.~::;n'~x.;~;;~.r•a: :2$f:•>:k~~+,~`~,•s~~~'%-`~.~,W;'•?+:.:<2~.0:•,~4~:.~~
i - I II 1 I ! I .
I I I I I I I .
I I I i ! I I
Thc abovc itcrns havc bccii .
rccci vct1: '
Datc of Trarismittal: Rc:view Coordinator. V UG
, . .
~
Circ~il:it•c:cl 91,0
~ ±s 4
S P O K A N E fl ~-,1, C O U N T Y
da3
OFFICE OF THE COLJNTY ENGNEER • A DNISION OF THE PUBLIC WORKS DEPARTMENT
Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director
FAX COVER SHEE~
QO'l, 1994
31g- z`~
TO. SAIjor Q. SDbltiiSv~.J f GA~'~ B2/'NA~O 83fs~41 cw 06-
'COMPANY: TAr~le.f' &)n
C iTY/STATE: 5pr-*,a~je-
NUMBER OF PAGES (incfuding cover sheet): Sb~*
~ FROM: Paul Lennemann E.I.T.
.
REGARDiNG: AA;-sf>;f).-,j
CTC./E Lak- 7!7' vI/A INGI~,A! ~iF+y✓r4~C if,L(,Jad a4-.J Jr,w12Io-
-iJ
W~ b.j.I o Pe~,S Qpptaia'l. loo' TApnr,
~
1026 W. Broadway Ave. • 5pokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-347S TDD: (509) 324-3160
~ -
REVIEW COMMENTS
SPOKANE COUNTY ENGINEER
DEVELOPMENT ENGINEERING SERVICES
PROJECT B94006 REVIEWER: Paul Lennemann
PROJECT NAME: Mission and Pines DATE: 3 Oct 94
ADDRESS: E. 12111 Mission Ave REVIEW 2
CONN3:NTS
Provide contours or sufficient spot elevations to check site
grades. One-percent is the minimum requirement without special
construction requirements by a licensed engineer.
All plans submitted to this department are required to have a
professional engineer's stamp or registered architects stamp by
state law. Architect stamp must include a signature and date.
Professional Engineer stamps must include the current seal and
expiration date as well as signature and date.
The County requires a Spokane County Type 4 drywell lid for
drywells in 208 swales. Specify on the drawings this type of lid.
Ap~~o~.~►. P~~.: Ts R~ ~~~i ,
b
1 70o. 00 ;s Acto;IJ -Cola PJ.
~~b J e ~y a,~.~c1
A licensed surveyor hired by the owner or contractor will check the curb forms
for all grades less than 1.0% before pouring concrete.
Spokane County will water test all curb and gutter for proper drainage.
Any curb and gutter which does not drain properly will be removed and
replaced at owners expense until proper drainage is achieved.
• .
BOND ESTIMATE '
- - -
PROJECT Gensco NAME pl DATE 04-Oct-94
- - - - -
DRAINAGE ITEMS UNITS QUANITY PRICE COST
1) Drywell - Type A EA 3 1200.00 3600.00
2) Drywell - Type B EA 1600.00 0.00
3) Grate - Type 1 EA 300.00 0.00
4) Grate Type 2 EA 330.00 0.00
5) Grate - Type 4 EA 3 300.00 900.00
6) Backfill For DW CY 90 15.50 1395.00
7) Concrete Inlet EA 700.00 0.00
8) C.M. Pipe 10" Dia. LF 22.00 0.00
9) C.M. Pipe 12" Dia. LF 25.50 0.00
10) C.M. Pipe 15" Dia. LF 27.50 0.00
11) C. M. Pipe 18" Dia. LF 29.00 0.00
12) Precast Manhole EA 1450.00 0.00
13) Solid lid EA 300.00 0.00
14) Ditch Excavation CY 10.00 0.00
15) Sod SF 0.70 0.00
- -
NON STANDARD DRAINAGE ITEMS
- - - - -
1) Wilbert Vault Curb Inlet EA 250.00 0.00
2) 0.00
3) 0.00
4) 0.00
5) 0.00
6) 0.00
- -
DRAINAGE SUBTOTAL 5895.00
16) Monuments EA 180.00 0.00
17) Barricade LF 30.00 0.00
18) Street Signs EA 80.00 0.00
- - - - - - - - -
OTHER SUBTOTAL 0.00
- - - - - - - - - - - - - - - -
GRADING, SURFACING, CURB, AND SIDEWALK
19) Rough Grade CY 136 10.00 1360.00
20) Top Course CY 51 14.00 714.00
21) Base Course CY 14.00 0.00
22) Asphalt Concrete Tons 70 44.00 3080.00
23) Curb Type A LF 6.60 0.00
24) Curb Type B LF 561 7.90 4431.90
25) Curb Type R LF 7.60 0.00
26) Sidewalk SQ YD 374 16.40 6133.60
-
NON-STANDARD ROAD ITEMS
- -
1 ) 0.00
2) 0.00
3) 0.00
4) 0.00
- - - - - - - - -
GRADING AND SURFACING 15719.50
-
GRAND TOTAL 21,614.50
STREET QUANTITIES
PROJECT NO.- DESIGNER- DATE- 10/ 4/94
PROJECT DESCRIPTION-
STREET # 1
NAME- LENGTH- 561.28 FT. WIDTH- 4.50 FT.
BEGINNING STATION = 379.32 ENDING STATION = 940.60
ONE SIDE ONLY PWIDTH= 22.00 EWIDTH= 17.50 QWIDTH= 0.00
TERM # 1 : CHOPPED
TERM # 2: TAPER TAPER LENGTH = 100.00
ITEM MEASUREMENT QUANTITY
SURFACE AREA- 2750.76 S.F.
ROADWAY EXCAVATION 1.33 FT. 135.8 C.Y.
CRUSHED SURFACING TOP COURSE 0.50 FT. 50.9 C.Y.
CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y.
ASPHALT CONCRETE 0.33 FT. 69.6 TONS
CURB TYPE B EXISTING 0.00 FT. PROPOSED 561.3 FT.
SIDEWALK EXISTING 0.00 S.Y. PROPOSED 374.2 S.Y.
TOTALS
ROADWAY EXCAVATION 135.8 C.Y.
CRUSHED SURFACING TOP COURSE 50.9 C.Y.
CRUSHED SURFACING BASE COURSE 0.0 C.Y.
ASPHALT CONCRETE 69.6 TONS
CURB TYPE B 561.3 FT.
S I D FAjplALY 374.2 S. Y.
f
F i
OG't0~er 10, 1994
Mr, Paul Lenriemarin
~~~kane County
Divisi~~ Engineering ~ Roads
1026 West Broarlwr-ty
Spokane, WA 99260-0710
Re: Mission & Pines
FroJect # 894006
~ear Paul,
~evi5ion5 were mad~ to the plans per yaur reuiew comments dated
October 3} 1994 and hIghlighted on the plans, ?'hree sets
of the plans wer~ ~~bmitted to Ju3ie Shattv th~ Building
Department along with this letter for distribution tv you. The
chan$es made are i~entified a5 follQws:
1. Sheet C-0.1: Grades alQng the west sid+e of ~he office
buildi~g were revised slightly to create a 1% s1ope to the
narth a long th~ curb line;
2. Sheet C-0. L : The top of grate elevatior~ ~~e bott~~ of
swale elevation for the swale in the north west cariner of the
site were revised to reflect elevations of 2028-8 and 2028_3
respectively.
3. Sheet C-0. 2: The drywell lid identified an each af the
drywe11 det~~~~ wa~ changed to r~~~~~~ ~ Type 4 lid fox~ 0-Va1e
installations.
4. A1 ~ Sh~ets: ~~~ineer l s stamp and date~ signature has
been added..
Please let us know when you need to have original mylars 'brought to
the engineer's office. Thank you for yaur attention o~ ~his
project and if we can be of further assistance Please do not
hesitate to ca1l.
Sincerel~,
TAYLOR ENGINEERI NG, INC.
~DFFiCIAI. PUBLiC f]OCU~~ENT
SPOKANE C{~UNTY ENGINEERS OFFICE
Sa~ndra Joh~.son 0 1 ~
~'roj ect Engineer PRO,~ECT # ~
SUBMITTAL # RF-TURN TO COUNTY ENGIIVEER
r . ~ .
NOrfICE OF TRANSMITrl'AL
nD[) 121---SS: P1Z01I:C"I' #f:
13USINLSS NAML=: I'ARCLL NO./LEGAL
DESCIZIPTION:
PROPOSED USE:
CONTACT: PHONE:
U'
REASON FOR TRANSMITTAL
PREAPPLICATION CONFERENCE PRECONSTRUCTION CONFERENCE OTHER: -
DATE: TIME:
DOCtJMENTS CfRCULATED
DISTRIBUTED TO:
Kcco DFSCRIPT[ON BUILDINGS PLANNWG ENGINEERS HEALTH SCAPCA F(RE DIST # OTHER:
ISite Plan (new) (revisecl)
` ~ :rr ~ :
.
~als L. ~st
ICrit.cal Mater .
. ~
~
~
. :
n~•.::.:: -
' ~ `
~
•r~
. - . . .
IPark.ng PIan : : ~
: tit.:
~ .
:.;;ti.:.~.::::::. . .
. ~
. - . .
:::r~:
. . - . -
. ~ - . .
. . . ~
. .
. .
IS~gnage Plan ~ ~ _
.
:
..~:::.:~_::.v..
. . .
, .
- - :
: . .
.
.
. ~
•
. . . .
IL. . . "•::f
; - . ..::.:::c=:•:r:yx ':r:t
hting Plan .
b . :.c~: • - ~ - = •
. • . .
. i:::: r'•"'....
'ti~: i..:...; :'::ti;: :
f........... _ ~.~:~::'{ti~;.ti~l:?~::{:•"
.
~ . ~ .
Draina e Plan :v
:...:•i
: ~~::?~,~;,~•N.~•:::::= .r..~.......
~ _ :~r.; •
• ' •i::.~.:':' .:.:::i.i~...
V.~.'.... . .
•.y .....::•~ti
::l.
•.~.h:.:'•.:•.
. :~;<:'~2:; :;,>.i2 :`-i • .
• ~ ~ ' . ~ . . . • .
:.r::c
::i.:r..~V..'....':. .
>:;~...r..
~
. , . : - -
. .
CU~~CIOIIS .
. .
na e Cal ..,r::.: . _ rr:::.:.
. .
IDra~ . v . .
~ r..,.... . .
-
. . .
.
.
.
.
lA r . :
~ . ~ .
.
m.:,.•:::..:.;:... . . . .
~
eement to Pay Fees
- •
• .:r .
. . , .
~ .,..+*x.. `•r~• ':`~::=.'=i' ~
;t.;:: ~?.~;i?f~ : t:
IIrrination Plan
• 'v 'v"r"•
.
: i
"r.:.. ?-,~•~,~•'„~r'~~:~j!'t.{-:'.~. :SK:,~ry,~_~'~,_~ ~
;•.;iij~S:v::'
. . ~Il.~'
p ~ ~ ~ . . .
Landsca e Plan . .
~ . . . ~
- - - -
' ':..v.L.. ' ' "r,..v.. . " :
. x: .
:Lv
"'r • ' _
•sso : : r.w: ~ . v.; ; • v :
' v~i
:
: fir -
.
•r.vi:
. '•1'fS
t tef in+:'t>:^~.'•r:
•~h
m
:v .
jP ro
1 CY ~
.
~
. I::
= ~
. .
,
. - ~
:
~ . .
t.; • ::?rr~::•:::•_::.; . ::5i>:
. ....r. . ;
. . . . . .
. . .
r,:.:..
timata .
ILandscape Cost Es ~ -
ti:::::.;_: .
x>.~>.: • --......3'•:: .
•:{ti:.:: . • • ~
. ~
~ . .
ulation P1an ~ ~~n.,. ~~:::<:r; : :.::r
ITr .
:
irc
affc C
.
i
•,t} .~,a~ : }~r~n'r'~~; ~ ~,s~,4~.~.~,::ti• ;i:.{ r ;.;•~Y =Y i`'. 3
- :.~~y::.::.~ .
~ ~ ~ .
ICons
#
:.'t~'.C.
~ . . ~
.
;
•,~,~:coi~
•.,::r::" i;;i' ..~srsr~%~ ~eat:::.
~ .
,.:..sii'wia=:=.::,y~~.y-•
. . ~ r.:: .
truction Draw.ings . :r. .
• ~ :~x~:x:. ;`•,::.,~i: >:{~•Nk•: :.:v.:.
::'....r::~::: ~rr::-:: : •
x.
;i
.
~ r.: ~
>:a.•::-. ~i
.
~ ~ ~-.:::.,.:::<>~.<:..,~ r.:::.-
IFloor Pl...
an
- .
~1 ~~,4r-/.,,~• O/•o,<,~ I I I I I I l
N' N I I ~ I I ~ ,
The above itertis have beeti
reccived: 7FF1(`IAt p► 101 11- 1, OCUMENT
~ COUNTY ENGINEER'S OFFIC
Date of Transmittal: Review Coorclinator: r~h A.
~
-
PROJFCT `l00(o
Circulated by: SJBMITTAL #
RETURN TO COUNTY ENGINF,EF,
S/~~~kaue CocrirtY Divi.cion uf 1.31ii1dings * 1026 Wc.vt Qruadway Avenuc Spukanc, WA 99260 * (509)456-3675
.
. ,
REQvEsT FOR n~~~GN ~EVIATION
- - $30.00
lgq
~OAD NAMIE ~5 ia.j 4►JE- CRP/RlD # 1v
NAVFE C3F PI-,AT MIA Plat # ~
. ADDRE55 OF BLDG ~ ~
~
Casil►]ry f2s.~ sp-cr ~Qe)0CP BLD G# B9 ~V~,S ~ T,2' C= R ~
FEDERALfSTA'I'E PROJECT # PRO1ECT LIIMM
FXISTTNG CONDTTION5: PROPOSED IMEPROVEMENTS:
ROAD VViDT~ ~A46.6 z r
ROAD SURFACE AGP 14 cp
AVG. DA,iLY TRAFFIC
Current 7"raf~'ic C:ount Desigu Year `i"raffic Count
~OJEC-7'DESCRIPTION in4!,11,4L~L, C~~& An!D !SjorrWAa44_. AL0AC, t+~o"4
5aok- ap MwtAs+o.J f4j"j~ ftm^ uJesT E'p'. 4~ a6g> Tim 4eloy, a4T '6A5"r%__
PROPOSED DESIGN DEVIATION 'r~ ALL.o,_,.~ ~p:rp Csqnr
ke
14.5 9ap 9,Apa4 ia__ . 61p -6"&- fts out- op ~#A~1 D.o } ~
.IUSTIFICATION.
,J'~ E J5Xj;5rr►,s ~ ~D(oE 01- PAJE.n+'t E.►r'7' C~ ~6-5. 'Lo-r 90c...~...+v '.j C_9ATvAt..►eJ& &L&o~5 \1fif-y
$r~--~ ~ ~
EPW mAwY mQAE-
W~ QkS_L4_p1,rE-~D T-14rr- ~ruf~~ As ~A4'v-s .fS
~ ~~o~ D,Ga ~ ~ r~ . ~ ~ ~ ~~.~a~rc~
$4 cE1s~ ~#04.J o. 01 F&o L, DNrs otmtLoSs A 5rnorl~ --C Qr _
GO-rJEL_ WO&I#.,S 0. C)LfmT OF AL.L 5cctca;.S UfVctJ E..EJAIr~o,J,S ~
'UBMITTED B~ ~EJEA:~ DATE
kDD,zEs5 ►~o".s C"tew- 1++~C . 1?zv La. q7~ ~~p :5~'ae_#%'qrr . wA- ZIP CODE
.
P~ONE # ~5Ct 7-V - q_(0 pc] f-4K -7z~
AUNMNlSTRA1~~ VARIkN+CE FEE 0F S30.00 PAID TO SFOKANE COUN1Y
-REQl7FST Ill. NO =_EED WI'I~-IO~J7' FUI~1DS-
~ # ~~~D DA7'E
DESICtN DEVUTION
STAFF RECOMMENDATIONS . .
~ E t.o,M w+ EN ~►°~'P? QO ~ A L... . ,
Approved Approved w/conditions Not Approved
( /7 ( ) ( ) -
Project Manager Date
/4 Pfl ~b ~~2r L 4~ G ~=cf) C.r .~il ~ Tco.✓S • .
Approved Approved w/conditions Not Approved
c
, Plaaning & Traff'ic Eagineer Date
Ap pro d Approved w/conditions Not Approved ~
✓ ~ ~ 9- 9~
Project Manageaent En&/eer Date
Approved Approved w/condidons Not Approved
( ) ( ) ~ ~ ,
~
Operations Engineer Date
iPOKANE COUNTY ENGINEER'S
E'TERMIlNATION:
..)proved w/no coadirioas Approved as recommended above Not Approved
Spokane Couaty Engineer . , Date
. ~ n .
t
S .P C) N T=- { , ~ c7 Ij ~T ''~c
OFFTcE C}F THE C{3LJNTY ENGINERR + ADIVISION OF THE Pi]BLIC WC7RaC5 DEPARTMENT
Ramald C. Normannl P.E., County Engineer Dennis M. Scott, 1'.E., Directcrr
~~~ORANDUM
DATE: September 8, 1994
T0: Bill H.
FROM: Paul L.
SUBJECT: 12111 E Mission Design Deviation
The cross slope grades are out of specifications due ta rounding errors. The gutter slopes
need the surveyors" instaliation language. I recommend approval af the design deviation.
1026 W. BrQadway Aue. • 5pokane, WA 99260-0170 , (509) 456-360D FAX, (509) 324-3478 TDD: (509) 324-3166
- - - - - - - - -
I Adams 6 Clark, Inc. Project: MI
I W.1720 4th Ave. Job No.: 99
I Spokane, WA 99204 Disc.No.:
I 15091 747-9600 File Name:
I TYPICAL SEGTION DATA
I Roadway half width ENTER--> 22 Designed by: S3S
I Road Name ENTER--> Checked By: DMS
I Left or Right ENTER-->
I Curb Type TYPE B COUNTY
I Station Interval ENTER--> 25
, I I I DISTANCE I 9 SLOPE I I DISTANCE I TOP (
I I% SLOPE I CENTER- I CENTER- I % SLOPE I iROM I CURB ~
I I I OF EDGE OF I LIP'E I LINE I OF I EDGE 1 (-9.5%
I I CENTERLINE- I CENTER PAVEMEN7' I TO EDGE I TO EDGE I EDGE I PAVEMENT I FROM E/P + ~ FR
I STATION I ELEVRTION I LINE ELEVATION ~ PAVEMENT I PAVEMENT I PAVEMENT ~ TO CURE I CURB NGT) ~ CU
I 350.00 ~ 32.55 I 32.14 I 17.5 I 2.34 I I 9.50 I 32.380 1
~ 379.32 I 32.63 1 0.27 32.23 I 17.5 I 2•29 I 0.31 ~ 9.50 I 32.970 I.
I900.00 I 32.69 1 0.29 32.33 1 17.5 1 2.06 1 0.48 I 9.50 I 32.570 I
~ 425.00 I 32.77 I 0.32 32.95 I 17.5 I 1.83 1 0.98 I 9.50 1 32.690 I
~ 950.00 I 32.83 I 0.29 32.52 1 17.5 1 1.71 I 0.28 I 9.50 I 32.760 1
I~ 975.00 I 32.89 I 0.29 32.57 I 17.5 1 1.83 I 0.20 I 4.50 I 32.810 1
I 500.00 I 32.95 I 0.29 32.61 I 17.5 1 1.99 I 0.16 1 9.50 I 32.850 I
I 525.00 I 33.02 I 0.28 32.66 I 17.5 1 2.06 I 0.20 1 9.50 I 32.900 I
I 550.00 I 33.08 I 0.29 32.82 I 17.5 1 1.49 I 0.69 I 9.50 I 33.060 1
I 574.07 I 33.15 I 0,29 32.89 I 17.5 1 1.49 I 0.29 I 9.50 I 33.130 1
I 600.00 I 33.23 I 0,31 32.74 1 17.5 1 2.80 I -0.56 1 9.50 I 32.980 I '
f 618.21 i 33,25 I 0.11 32.73 I 17.5 I 2•97 I -0.36 1 9.50 I 32.970 I
I 650.00 I 33.29 I 0.13 32.79 I 17.5 1 2.86 I 0.19 1 9.50 I 33.030 I
I 675.00 I 33.31 1 0.08 32.89 1 17.5 1 2.40 I 0.40 1 9.50 I 33.130 I
I 700.00 I 33.39 I 0,12 32.98 1 17.5 1 2.06 1 0.36 I 4.50 I 33.220 I
I 725.00 I 33.36 I 0.08 33.02 ~ 17.5 1 1.94 I 0.16 I 9.50 I 33.260 1
~ 739.29 I 33.39 I 0.21 33.07 I 17.5 1 1.83 1 0.35 I 9.50 1 33.310 I .
I 775.00 I 33,92 I 0.08 32.87 I 17.5 1 3.14 I -0.56 I 9.50 I 33.110 I
I 790.96 ~ 33.96 I 0.25 32.82 I 17.5 1 3.66 I -0.31 1 4.50 I 33.060 1
I 825.00 I 33.50 1 0.12 32.91 1 17.5 1 3.31 1 0.26 1 4.50 I 33.150 I
I 850.00 I 33.55 1 0.20 33.04 I 17.5 I 3.19 1 0.36 I 4.50 I 33.240 I
I 875.00 I 33.63 I 0.32 33.11 1 17.5 I 2•97 I 0.94 I 4.50 I 33.350 1
I 900.00 I 33.75 1 0.48 33.19 1 17.5 I 3.20 I 0.32 I 9,50 I 33.930 I
I 925.00 I 33.68 1 0.52 33.23 I 21.0 I 3.10 I 0.16 I 3.00 I 33.540 I
I' 940.97 I 33.95 ~ 0.45 33.26 I 25.0 I 2.76 I 0.19 I 0.00 I 33.700 I
`
, . .
. b3a~o , 3na < .
Ag 1l3NOW . 3:)tvvtv9~ - •
Y~3!4:) (3lVd 'LWV •
~ iNftO:)Jd '
- HSVD
.o
40 '!Wd
3 ~
~ Ol!/d MON ~ 1Nf10»d
. ~ s.
.
~ ~ JoA
~
$ S,0110a-/~ tJnc~
„ . o. ssaaPPd y~
. , .
. ~ woj~ paniaDaN
~
'oN bl ~ a~°a ~,~Id ~ ~ ~ ~ N zn
ADA.MS & CLARK, INC. FARNAERS 8 MERCHANTS BANK ENGINEERING & LAND SURVEYING ~ Lfncoln eldg. Office 0004889
1720 W. 4TH Spokane, WA g920t
SPOKANE, WASHINGTON 99204-1702 '
(509) 747-4600 98-574/1251 NO. DATE VEND0R NO.
~
4889 9/07/94
,
DAY AMOUNT
• yM ~ _ , , . . . •:i r,.-.
. ~:a~ . • ~ . . . ~ : - -a ***$30 . 00***
_ . . . • ~ i . - - - ~
O THE ~
MER
oF Spokane County Engineers •
I ~ j.6'1 f • . ~ N
~ AUTHORIIED Sffit+fATLJkiE-
~~'00 4 813 9~~' i: L 2 5 LO 5? 4 Li; 800sol 34 3es, 6il'
'
~ 4 O •
~ - A.DAMS & CLARK, INC.
1720 W. Fourth Avenue LETTER OF T'RANSMITTAL
Spokane, WA 99204-1702
(509) 747-4600 Fax: (509) 747-8913
TO: Spokane County Engineers Date: 09/07/94 Job No:94-060
Attention: Bob Turner
1026 W. Broadway Re: Mission Avenue Widening (Bernardo-Wills
Architects), County Project #B94006
Spokane, WA 99260
WE ARE SENDING YOU:
~ X~ Attached Under separate cover via the following items:
Shop Drawings Prints ~ Plans Samples
Copy of Letter Change Order ~ Specifications
Copies ~ Date ~ No. ~ Description 1 Revised Curb Envelope Calculations
1 Revised Mission Avenue Widening Plan
1 Design Deviation Request
THESE ARE TRANSMITTED AS CHECKED BELOW:
For approval ~ Approved as submitted Resubmit copies for approval
X For your use Approved as noted Submit copies for distribution
X As requested Returned for correction Retucn corrected prints
For review and comment ~ For bids due Prints returned after loan to us
REMARKS:
Approval of the enclosed plan is requested. Please contact me if you have a.ny questions or comments.
vfYilSC , 9 , . \
COPY TO: Gary Ber.ia#Wo"~ ~~Frl : SIGNED:
1 teven J. matoplos, Proje t Mgr.
~ SFIP 07 1994 ~
SPOKAidE C~UNiY ENGlNEER
,.,,o:. _ . . . . . . . .
- ~ - ~ !
NOTICE OF YRANSMITTALA~~~~
AL7DTZLSS: • ' PIZO.ILC"l'
~ . D-~-D9 &~4 1 &71
V
t3USINESS NAME: ('ARCCL NO./LEGAL
- DESCR[P"I'[ON:
PROPOSED US ~
l~ 1 C~~~ •
ONTA T: g ~ PHONr:
~
REASON FOI2 TRANSMIT'rAL . ~
PREAPPLICAT[ON CONFERENCE PRECONSTRUCTION CONFERENCE OTHER:
DATE: TIME:
DOCUMENTS CITtCULATED
DISTRIBUTED TO:
kEcD DESCR[PTION BU[LDINGS PLANN[NG ENGfNEERS HEALTH SCAPCA FiRE D1ST # OTHER:
ISite Plan (new) (revised) I I I I I I ~ ~
: _
'tical Materials List .
:
: .
ICn
. . . -
. . . . : :
IParking Plan
S. ~Sna Plan
r_}. ;:vn.>::rr:i::~:;:..::i::•::'...r •:t•::~~'
.
:_x.:.~:- _
~ ~r::•:: -
e
. ,
~
~ - . .
•
. - .
' ~.'¢Y!• I•••~}'.~ J~Y•.V:.~::.
L•S. ~M1~.':. ...~~~.4~ . ~ ~i.:.
r •
rh.:
}ti ~~.Y.I'! ~ •~~1K'.•.•::•
' :i~::= ~ . . n .
- - . - .
. . .
- .
.
•
•
an
~ ting P1
h
. :r""'..... , , . .
-ti~r,.-.-""'..v • ti:~':::::::
. . r v: }xs v.:::. v:::..: w.. " "'r'v:~i.~:4'-i:•}?:: ~ r.: r"'r"' : . •.v.•: rr.:•: }'v?'•}: }';v'r:•: '
. ; ' {Yi :;:ti•:::: ?:tvr"r: .
'^.'t:•'':' ` 'r'r:X . ?3n:t.: ~:.'{•i::?.....
DrainaSe Plan
. ::r.::~..:
. . .
. .-:.....r...:....
. .
: .
• . .
::.k : .~'i:=::. ~:~.c,r ~ ~
~ ..::::::........r
$ :'vr:r•:::•:~.: ••tr•:>::r::::.~
r .::..........fi:.::::. :
a e c Cal ulat~ n
.....,..-.1t.4. '
•r~{: J' r h;:•: ,
IDain o
. -..:Y.~~.vvv " ••fJ:: ":::•:.•.O . • Y.'...:-:::::l:?!L
I . ; : :~:::lf: ~ f.•. I I \ ....I .......I ~ I f • : . : J . . •'tJf::
~ .~..•J~:1:•: ' . . . , _ . :`~l... _.:•N•
f::: • • . . : .
_....1:.:: . ~ .:~{i:. ~ . .
~ ~r~ .
.
.
. .
..i•l.::~ .:~:.Y:::::•.::i~:'::.~ :...1.: -•:..~l,.~i .
:•:•Y.:{
. ~
ASreement to PaY Fees
~.;:.:.:r
:.::rr
I 1 _ . ' I .J.1:._.j.:. ~ . ~ , , .,I••.:........... 1........... 1...
1
v~.~~~._ _•::f• ' :.h•.ti:'.. •.:J.~.••'•::::::
- . : •
• .
- • . • r':':: _ f J.•:: ~ . . .
Irrigation Pldn . ~
=1 = ~ ~ ~ ~ :r:~::::.::::
. . .
~~:t::::::=
La a n
. _ .
ndscne Pla
~ _
I I I f.~ -
.
..v:.>:.. r~:.
,
,l .
F.: .
.....4. -
. •
^1: :;:y{:$•i:i
...~.~:r.::.• . .r...
. . ; . nv. _ •'r,:; ; • . : `i •rS:%..
Promissory L,etter
r.
~ ~ i<~.::.::::.:~:,..::--~::,,<: -
. .
. .
. . .
.
. .
. .
• • i.:; :tv::~: : •
i:: : ~ :x'
:":::~:>:•r.: . : : -.._:.:r.:,,
r: • :~:,r::::;•:
'v. ?ii:' .:;i.S:: r"".: w_:::.
Landsca e Cost Estimate
. . ~ . .
~ P ~:::~:::.;:r.~
: 1•'JJ:.: • l.~ h :~l.':.. ~ :.:.Y.
. . ~ .
.
.:::r.N~::>: •
Traffic Cicculation Plan
; : •.;•rr:~:::>::_:.
.
- -
. ~ : ; . • . . ~ : •.'i : . .
~ ~i.. •y .
~
'.f:: '~A' }.ti i~•:::JJ.;:'i::..
w:::. . .v. --~'??:Y}:.r.....ii:•. . :'7~::~ ~:`•`~~-:ir~':'~~
r..:....
Construct• ~on Drawings
iri; '.~::~.;y..
.
I I ~Yi .~1i'~~i::i.~dk'.. j:~`~~j.:~: :~I:•:.::w~'~Y:~W:~~+i.~:
. .
_:::-r•in: }
.S,S•.,~s,~i a~ ~ ;p"ridZ.: S.t....:......
.
. : ..y ..'r: ' : _
Floor Plan . . -a• . _
r .
I ~..y . . x. .
' :4;~~.. :i. - L : ~ .
. :
.~.~•f... . . .:iikv: ' ~
~ I ~ ~ ~ ~ ~•i:'~.~. ~
I I I 1 I ~~i~ AL...
I I 1 I I I~1~ 'Ali: ~r'Ti L\ s i t
7he ahovc irems have bectr
~S~ ~NEt".
reccivcd: ''o
~
}
Date of Transmitta) .e~" Review Coordinato . ~
.z.~ . .
c«cuiaced c,y:
S F, P ~ 9 1994 ;
SPokatie Couriit), Drvi.crum uf Bciiltling.r 1026 We.%t Brua(livan, Avcmic ~ Spok(mv, WA 99~60 (509)456-3675 ~
? SPOKAtlE COUNiY ENGINEER ~
i
. ~ .
. . NOTICE OF TRANSMITTAL
A D DRCSS: ' I'RQJl1C~l' /l:
~2~~ ~ M~ss1 c) n lz/- .,365)C~
BU.SINE,SS NAML: E'AIZCEL NO./LCGAL
DESC[2[ PT[ON:
PROPOSLD USE:
g--5 PC, c.
CONTACT: PHONC:
RE, ASON riOR TRANSMI'1."TAL ~
PREAPPLICATION CONFER6NCE PRECONS'i'RUCTION CONFERENCE OTHER: V-,
DA'Y'E: TIME:
DOC'UMENTS CIRCULATED
;
pISTRIBUT',ED TO:
Aem DESCRIPTION BUII.DINGS PLANN[NG ENGINEERS HEALTH SCAPCA FQtE DiST XJ OTHER:
L.
~ ISite Plan (new) (revised)
- : M.
iCritical Materials List ~ ~N~
iParking Plan.
~ i~ ~ ~M ~ MM AWI~MMI~h
ISignage Plaa . ~ • ~ . fki'".. .
,
ILighting Plan
~ -
lDrainage Plan
'Dcainage Calculations "~*~J~~ ~ ~~)o~°~ ~ ~ E■ ~ ~
Y/i~ VP~ ~ ' I~ I ~ ~ I ~ • N~ ♦ ~M ~MVM ~ ~ w~M C~
IAgreement to Pay Fees
`Irrigation Plan
iLandscape Plan.-
. lProcnissocy Letter WI
+ 'tM~ YY ~1 ~N1MM YMxM 1 MI~~~~M~
ILandsc:ape Cost Estimate~jG'~--~~~~
ITraffic Circuiation Plan u,,~.~ ~i
,Constcuction Dcawings I g` .
~ A ~~fit3c~O Il.
iFloor Plan
LTrash En .(a.5or _ I X 1 )C ! I X l 1 _X . I . ~ ~ .
~ s~~c~~ 1.~ I~ I X, I u I l X~ I X
Thc abovc iccros havc becn
rccci ved: R F,
Date of Transmittal: q~ Review Coordinator: ~ ~~~'P
t 9 ~09
~ 1 - ...1 . .r w65/4
•
SPOMId
Circulalccl lly: ~ c~uWEER
N07 -,,--"E OE, TRANSM'i TAL ~
~q~
ADDRESS: PROJECT ~
BUSINESS NAME: PARCEL NO./LEGAL
DESCRIPTIO :
PRQPOSED US : ~ • 0104 . v-a , D-~'►
8
o /1r
~e c
CONTA T: PHONE:
&,t n-al c;v !1s ~ - 468
~
0~ L-L A42;~L.
REASON FOR TRANSMITTAL
PREAPPLICATION CONFERENCE X, PRECONSTRUCTION CONFERENCE OTHER: -
DATE: TIME: 1 ~ QD
DOCUMENTS CIRCULATED
DISTRIBUTED TO: ~
RECD DESCRIPTION BUILDINGS PLANNING ENGINEERS HEALTH SCAPCA FiRE DIST f/ ~ OTH i
R
.
~
. . . ~ t-~. i
~ ISite Pla new (revised) ~ x ! X, I x I~ I ~
~
.
. ~ . . ~ .
~ fi ~•i ~ ~ : } ~ ::f:.•~ •~ti •
. .
Critical Materials List . .
. . . ,
: . .
~
. . . .
'
~
r. .
. . .
~ ~
arki
P ng Plan
.
. . ~
f:~ :
;.;:v.~~:.. . .
.r..::
. •:{ri:: •-i-~ --'•::'r v::: • ......rr... • . ..•-..-1
~ . ~
.
.
.
..ti
. -
Si
g gna e Plan .r .
. .
. .r.::.... . . .
.
~ . . . . . . .
. . . ...........:.:ffr:>:•»: .
'
••x••-r:: ~ •.•rr.~•:. ~ ~
~ ~ •::;t:•:: ~
- . . .
-
a>..c :ti~.: -,,c-:: •rf:•:::•::t:_:•::•>:;•:'•Ji
I -
: . . - .
. . . .
Lighting Pian . ..~:.ti.::.:.:
.
I . . .
~ ~
;
. .
. . . .
.
~.r::~>
~ .,r
. -
Drainage Plan
(
~
..r::r
.
. . .
,::f. ~
.:.::.::.::.:~c .
' - :•...L....~-. :•.'}r~:::.~.~.•:::•}.1•J.•.'t.••
......1 f:..• •.•R • • _...1. . . i i i : l . •
. . : -
Draina e Calculat. ~ons
l
g ~.._:._:-:;...~:?:t•:
.
: ;v..y:•::t~ • : _ . r . ;.x:~:: s' ; rti~:;~:::::'.`•'~~
.
: . •
I :.ti•::..:: .
. ....:.:.~`a:•::t ' . .
. - . ~ . . . . . ::nt;:;:; t;~;: ~::.at . .
:;~i . . r ti.....
'•'•:•::•::~>:t.~: .
_
. ~.ti•:.; . ;
. k~•."::
.
~ . : . . : . : : . ; . ; : • :•.<t•x~::•::• . . .
: ~ ~ :t
o Pay Fees
Agreement t ~ .
I :
. : . .
. . . . ~
:
. ~ . . I ~.:r.:.
. . . . .
~
. .
.
lIrrigation Plan
. r~~rrr
. :{r::r_:;:<:::::
--....r.:::. . .
~ ~ r.: r:::.. -
~ v..~:.: •
.
iLandscaPe Plan
. :
.
. . . .
. . .
. .
. ::frr::::
. . .
.
, • r.
.
;
• ; r::. . .
.sso
~
I
. .
.r
~:::~t~ . • '
. . ~
Prottu rY Le tter
, _ .
.
..f~...-••-•......... .::y.;;::
..::~:r .
........t~ - •
i.'
. . .
~ .
. . .
:tix.'•> .:c; :o-: ~ c: : h,-:
~ •rx••:a:x;•:<:;;.:..
r.. - : , . ; • ...."f,t::
I
.
~ 1
.
. ~ .
LandscaPe Cost Esti~nate
r . •:ii:
~
F.:. '.k.. .
':.:~ii.:!
-
. • . 1 . : • •
. 1 ' ..V:::: .
~ ~ N N
.....,.............~::::.>:`:::~..~:<:<::~::ti: :
. . ....i 'ii: . . .
. . f:~ 'Y': •
.
r
ITraffic Circulation Plan
~ . _
. .
. o- . . . , .
•
. :..:;z..: ;i.,:, ~ . r ~ ~ : • ~ ~
. • ~ .
. , : . t<...
I ..::..:.:::.v. ~7}t:••>:;:?:?.
3
; :t;:::'•[.. . ::.i?;~?::...: . ~ 4:.~.;.;:.: {:.i :
Construchon Drawings
r.y.ti.:•: •{.a...~.;i.. ....:ti i:4.ti•}::-::• : ~ :ti4::•}:•; 1 i+ti,~l,•~:•'
I ~--~,:.:r r .:::.::;::;<~~<•:
• ......i.......:. . ' . .f - ~ : ~~.ci ~:'~'i ~.:~.:.-1'..,r'~::~{:k
-..."'....i::: . .
}\1Y.Y::. ~ }y' _
. . ~
.~/I :.^.P~fi:{'. {i.:.•..... •..'C',}~} n.'~•:'. ' •
Floor Plan
~
. : ~ ~ ~ . .....::{:>r
( ~
1~
~ ~ ~ . . . ( ~
I I I I r~~( I I I I
The above items have been
recei ved:
O N ' ` • ~ r
Date of Transmittal: Review Coord1natoi:7,'
~ -
Circulated by:
Spakane Cou»ty Divi.cin►1 of Builditiss * 1026 Wesr Brnathvny A%,eitue * Spokculc, WA 99260 (509)456-3675
~~?•'20••94 1G~;~'- $ 509 74' 0913 RORIIGQXLRRK Si'0. o1
~
Adams & Clark, Inc. llANil.:1 . ~:~..,~~K. ~
Lf:ti,.,t•: 1). xIMANU,WOirT11. Kr:.
(:ivi) lsiwinr.rrs • Iauu1 tiurvevi,i•y • WII[i 1•'M111101'• • I{111(is<:;ilur Rrc:hii,eM, ti'I'tjAlt'1' A. Dh:Ytil:NiiO7'11, A.c;.I,.A.
Juiy 20, 199-1
.
bpokano County Engtnccrs
102G W. RmAdwAy
SpulcAne, WA Q9260
ATI'ENT10N: Y'tiulLc;nncmttn
R.R. Miaminn AvAntin Widening -(;ounLy !'roject # 1394006
i
' 1)u~~• ]'t~~~l:
Regeircling uur u;lephurm ci,rtvc:r:+uLion Lhis morning, p1oARn conRider tho folluwii-ig rr.H4ruling fur 1.1m.
cur!) grndCs no ruUmitted:
1. Thc euxh grades Lis designed rrnviriP I.hP tPwpgl: Iirmikx rea:4cmable. lf we uarHlleled the 4.5°rb or
j.()~i„ er(1AR-a1npP protilprc, 1.herr, wa«ld be 12 or mure grRd(.% breakR riither than the 4 wa have sfiown.
{t wns felt L118L A b8tter DroduCl, would iC9U1C,
'l. 'i'!le flow11718 gTEtdeK firo minimtil rvcn wil.ti utu deai~;u. t1ciJ wi: pAralleled the edge uf pavcmunt.
or t'rus:i-slupr grtitles, iitauy ul 1.1ie. flowline grAdes woiilci bc Ticnrf,y fIHL, ri pptentiul auurcc ci{'
tIraiiia6u prvblGlnb.
7'hc width from tho auv►CuL cclgc 1,0 ilowlinc ie un]y 4.6'. 7'hiR clearly docas nut lcav(l muCh rix)m ici
wc,rk in 6o bnlance crncu-tslopo cuniditl<+r.4tione with flawlino cons6clerations. For eYt+►nplr., l,hw
di(Yoronce hetwAOn ti 2.0% and 4.5% cross•s1ope ia onl,y U.O&. '1?io dc4ign tlow•line grmlew xrf- in I.hc
ralige botwecn 0.23°r6 And U.G()%.
h. As we digc»gowd on I.hn phrnnA, it is unri-myuciable I.t, exuect mosl cemvnt contracl,ora t.o
o~nncictPntly cxonr;trucf. l.hr curbs tu wii,hin nny clc,ser than a cUUUlcP ubindr0(lLhk OF A foOL. lf y0U wiu
nol.ieP the culumri 1 hHvr. Afideci w Lho grKde sheeL wP resubmitted, une uf thc 4i>j I.iuti:+ iti uul, uf spec
bv 0.02', three bv U.UI', And slx b.y less thfin 0.01'. Wc!(lu tiuL feL-l 61ta1, tnv.-j6 t:uii(.i'ticU')ta could uteet•
I.hF deslgn specS wiLhin (.}ie .4mnt. rriiibe uf crrur.
If yrni havc nRy quC3Liong or commentx; iibuul, t,},;ci prc,jccl,, pIcaec ca11 mp Al. 717-4600.
Sincorel3►,
Addms & Clarh. Inc.
Sl,L-veil J. Sl,iI111,41-c,plos
Projoct Mannger
AC
Y,U. 13ux J08 • (;uupevilk', WA 98209 • ('c'.t)(i) 678-37]E'i • }''ti.x (206) 678 (i:3f'>G
l + 1
Adams ~ Clark, DANIEL B. C~K, P.L.S.
LESLIE D. KILLINGSWORT,d-i$ P.E.
Civil F~i-igineers ~La-iid Suuveyozs • Latid Plannets 0 Laneisca,pe Architects STUART A. I3EYSENROTH, A.S.L.A.
,J`uly 13, 1994
,
~
L F
Spvkane Ct~unty Eagineers ~ Em I ~
1026 FY .Broi~dway r. U~ ~ ~1994
Spokar~e, ~1LFA 99260 4~
F ,
~ I
ATT-ENTION. Robert Tu-rnex, E1T. !~OKAANE CDU#iTY F-NGIMEER
R.E: Mission Avenue Widening -County Froject #B94006
Dea.r Bab:
Enclosed please find resubmittal to address yaur review comments an the above named project, We
have number.ed your comxnents for easc i'n. rcferral. You may recall we discussed this praject on the
phane several, weeks ag;o.
1_ The ericlosed improvemenfl plan has been revised to reflect fhe total frontage of the affected
parcels. The grade spreadsheet has also been revised accaxd.i.nglY-
2. A taper lengtli of 25 feet seor-ns to be more suitable £or atr.ansxtion w,i,cit;h o#' 2.00 feet and wpuld
present less of a problem in constructing athin sliver of pavement at the naarrow end.
3_ rme enclosed revised impravernent, plan haS bEen amended t0 indicate the Iocatzons and sizes qf
new approaches to he constructed. 7nformation was received from Bernarda-Wills Architects.
4. We have added a column to the grade spreadsheet to emphasize the deviation from the desired
range afcross slopes (2.0% ta 4.5°lo). As you can see, one of the stations identified as being
nutside the s~~e6fi-cations is 0.0245' out af tolexance, with the balance kreing 0.0129' ar'less. We
have a.lso revised the last station to reflect the plan change (sce 41 above).
5. P].ease see the enca.osed aeevIsed improvement plan.
_If you have any quesl;ions or commenl;s about t;his project, pi_ease cafl, me at 747-4600.
Si.neer.ely,
Adams & Clark, Inc. ~~~~OAL ?UBLIG DX-ULIEN'I`
L~ :.~r(ANE COUf~T`~' E1~G4I~ER'g ~fICE
Steven J. Stamatop]as
Pro)'ect Manager
Enclosures
Capy ta Gary Berna,rda C~ Bernardo-Wills Architects RE-rURN TO COUN'TY EN~`al~~~R
ikc
1720 W. Fourtlt Ave. • Spokalle, WA 99204-1702 0 (509) 747-4600 0 Fax (509) 747-8913
. ~ . _
~
REVIEW COMMENTS
SPOF{ANE COUNTY ENGINEER
_ __DEVELOPMENT ENGINEERING SERVICES
PROJECT B94006 REVIEWER: Bob Turner
PROJECT NAME: Mission and Pines DATE: 19 May 94
ADDRESS: E. 12111 Mission Ave REVIEW 1 COIrMENTS
( Total improvement length should include all of the parcels used in
O the permit. Please verifY the len9th of imProvement. O Taper length should be 160' or greater.
Show new approaches on Road Plans. Approach Permits are required
O on all ne-w approaches as well as all approaches that will be
altered. Contact Sylvia Lightfoot at the County Engineer's
Department. Approach permits for county roads will not be issued
until a site plan is approved.
O Grade sheet has multiple sections which are out of Spokane County
Specifications.
Please correct Street Section and include drywell detail.
y
~
w
C,Q,0JZ .
1
.
.y
------------------------------------------__---••--------------------------_M--------------------------_--__ •
. Rdars ~ Clai-k, Ync. Projecl: MI55ION RI,'E. W1VEN(HC
. k.1720 9+.h Rva. Jub 140 94-9)60
. Sporsng, , uR `_92Q9 Oisc.Na.: .
• <SD Tq7-96U0 Fi l a ^lene : :
:TF'PiCAL SECTIOM DATR UATE• 05-1'tay-9'!
,
: Roed"ay he2i widih CNI'ER 22 O4siQnRd by= JGL TINE: I1:99 R►°~ .
: Road Naho ENTER--> Checkad By: ,
. lQft ar Right ENTER--> ;
. Curd typp fyFE B CUi3MTe ,
. Stelion lnto-e2 ENTER--> 25 ,
~ • : :'JiSTANCE:% SLOPE : ;p[STR"CE: TOp , TQP : D E S L G N o
SLOPE ;CEIITER- :CENrER- SLOPE : FROM : CIRB ; CUR6
. : OF E06E OF : LINE : t[hE : OF : EOGE ::C-2.OI :SELECTEQ: EDG£ Pflt1E : rOF :CCNfERI.]NE:CENrER PAVEnEMT :f0 EOGE :TO EDGE : EpGE :1PRJEf4ENr:fP,G11 EeP : FROt1 E!? :TOP ClJRB: rO GUrfER : Cl1RB
: STATI ON : ElEvAr: or. ~ LI NE ELEVRf I CN: ?AUEl1EN": PAVEIIENT ~?AVEHENT : T0 CURB : CUF6 N61') :C-JP.B HGf EIEV : Y GiiROE : G GRRDE : ~
~
. 350.00 . 32.5S , 32.1'q : 17.5 : 2.39 . ; 9.50 : 32.36 ; 32.90
. 379.32 . 32.6? , 0.27 32.23 : 17.5 : 2.2 9 0
;
32.55 : 32,5~3
. .31 . 9.5D ; 32.97 . : 2.08- 0.30
s
0 --900.00 : 32.6; 0.29 32.33 : 17_5 : 2.06 : 0.96 : 9.50 : 32.57 ; 32.65 : 32.605 : 3.35 ~ 0.30
WN r1c5~:~•?~14l~18~U1.~1f8i1~.'1e~"~-4~S0. -~k~•32,R46~9'~4~~32~lt7~T~4~,!-j2F~6~B0 ,9918i-Sll6WO Fl~Fl~:OW -
45~R0'0!~'i"'~32~8~ii~~10~21~2~5~2~1k7~5~'►: , Lr+~+7,~,~~..,C~.2aB►~'.+,: . 1~-SOab;r:~rp-32~7~da~r~.~32~g~1~,32:'5~~":4' q~6'~8 ;`-'n""O~U'!"~
: 1475.00 ; 32.8S : 0.21 32.57 : 17.5 : 1.89 : 0.20 : 4.50 ; 32.91 : 32.83 ~ 32.930 : 3.95 ~ 0.30 :
' 50-3.00 ' 32.45 ' _0 .w32~61 : 17.5 : 1.99 : 0.16 : 9.50 ; 92.85 ; 32.93 ~ 32.905 ' 2.68 ' 0.30 ,
0.28,. 1-7:-5=-: 2.-06-' U-_-20_: 4. 50 3'2._~90_~_?`°'"'r'43~9r9~'•:'"""32~`''-46"0~';`~~ 1.-~ -~'"0~-~.-3`0~"t~
IQ'E~ .,-0~21k~•~_32~62'{4::'- '1`7~5~~~~1r.~~~' Y.~L~6~1~:`:'.K'. ' _,~1~F5'0_'~ -'~'•r.~°4~.331M~tid~~3~-3~2~:"~!"33*"OSS~: ?~!`,'_:~~.F168 _ 0l.~30~`~'= ,
~-1,~5~~~'.` rM~32~;"8r9~;, ;~,~~~~2d8F :-50;~ro ~J~-3_1:a2~1F".~?W;~33r`''l'30"_~ 2~~
' 600.00 ; 33.23 : 4.29 32.7 9 : 17.5 ~ 2.80 : -C~_60 ' 9 50 ; 32.96 ' 33,06 : 33.000 : 3.85 ; -0.52 ;
,~0~~',~~ •"~2:?"3E~': - `~1k~~S~~u# ~'+-31~Q3F~~r'~"C~9~;a:~-r4:'~SQ~: > .,s; ~.32 9~ 7~,t~t~3X3~05 ~;'v_,;33':,658~''- ` #~D~5~7~~4~2~3►~.~~*~ ~
: 675.40 : 33.31 : 0.08 32.89 : 17.5 ~ 2.10 : G.90 : 9.50 ~ 33.13 ~ 33.21 : 33_i75 : 3.02 ~ 0.23 ~ o
; 700.00 : 33.31 : 0.12 32.96 : 17.5 ~ 2.06 : 0.35 ; 9.50 : 33.22 ; 33.30 : 33.233 : 9,07 ~ 0.23
; 725.00 : 33.36 : 0.00 33.02 : 17.5 ; 1.91 ~ 0.15 : 4.50 : 33.26 : 33.39 : 33.292 ; 3.96 : 0.23 :
' 750.0G : 33.39_: 0.12 '33.07 ; 17.5 ; 1.133 ' 0.20 : 9.50 : 33_31 ; 33.39 : 33.350 : 3.18 ; 0.23
r9t2x 2 <-.:rl5W4W7u _ ~-AV:R59~- ; `W11=0~d'80V1*: 33:~-Lt~l~~'~7;- •1
~0 C 0 O _qjr '1 ~4 ~ a , ~ NM1P~
~8 _,~30-i~; • ~2~e2 : ~ S-; 3~6b~, ~ , ..~*3r3~i~~~-'3~3:~060~_.. ~ 0`~ ~
; 825.00 : 33.50 : 0.16 32.91 : 17.5 : 3.3? : C.36 : 9.50 : W 33.15 ~ 33.23 : 33.156 :
~ 850.00 : 33.55 ; 0.20 33.00 : 17.5 ; 3.1q : 0.35 : 9.50 : 39.29 ~ 33.32 ~ 33.252 : 4.1: ' 0.38 '
~;-;-6'T,-,.oUA~.3 . . 3~:6~';-.,~0'~~.. • , ;.~3~, ~l~l~" : 17':S-'„ , Z~f:47Er ~ : ~Oi~9C4~ ~4~5a~;, : .,,1~~,:'~3~5~,~, °"~3~.93~~,t='331:~-3~~8' e: : , ~.9i:i~~~4lDF.k3~8~:~ D
u; 900.00 : 33.75 ; 0.98 33.19 : 17_5 ; 3.20 : 0.32 : 9.50 : 33.93 ~ 33.51 : 33.999 ; 9.0l ; 0.3@ ; D
; 925.00 : 33.88 ; 0.52 33.23 : 21.0 ; 3,10 : 0.16 : 3.00 ; 33.59 ; 33.58 : 33_591 : 9.33 : 0.38 : 3
: 910.47 : 33.95 : 0.115 33.26 ; 2S.0 ; 2.76 ; 10.19 ; 23.T0 : 33.67 ; 33.600 ; , 0.38 : Q
. r
1v~k- %taAa. o~ t~••- , '2'
~
L.:NSS S~'o~aa RRe ~
0
Pftt•14"braad fax transmittal mem:) 7671 Kotpyes• ~ y 0-A-T
~F~I~1 j'~f , 1'olt~aNCOS.
r
c~. - O FrICIAL PUBUC DOCUMtNt
p,,o,m M il SpOKANE GOUIVTY ENGINtEg'5 OFFICk
F811! ORG LA. 0
PRQJECT # "
SUBMITtAL # ~
RETURN TO COUNTY ENGINEER
- - - - - - - - - - - - -
( Adams & Clark, Inc. Project: MISSION AVE. WIDENING ~
I W.1720 4th Ave. Job No.: 99-060 ~
I Spokane, WA 99209 Disc.No.:
I
I (509) 747-9600 File Name:
I
I TYPICAL SECTION DATA
DATE: 8-Jun-99 ~
( Roadway half width ENTER--> 22 Designed by: JGL TIME: 3:53 PM ~
~ Road Name ENTER--> ChecY.ed By: SJS ~
I Left or Right ENTER--> ~
I Curb Type TYPE B COUNTY
I
~ Station Interval ENTER--> 25 ~
• I I I DISTANCE I % SLOPE I I DISTANCE I TOP TOP D E S I G N
I I I% SLOPE I CENTER- ~ CENTER- I 8 SLOPE ~ FROM I CURB I CURB I---------- ~ DEVIATION
I I I Of EDGE OF ~ LINE ~ LINE I OF ~ EDGE I(-9.5$ I(-2.0$ ~ SELECPED I EDGE PAVE I TOP I FROM
I I CENTERLINE- I CENTER PAVEMENT ( TO EDGE ~ Ta EDGE ~ EDGE ~ PAVEMENT I FR(:hE/P + ~ FROM E/P + ~ TOP CURB I TO GUTTER I CURB I ENVELOPE
I STATION I ELEVRTION ~ LINE ELEVATION ~ PAVEMENT ~ PAVEMENT ~ PAVEMENT I TO CURB I CURB HGT) I CURB HGT) ~ ELEV GRADE I~ GRADE I (IN FT)
I. 350.00 I 32.55 1 32.19 1 17.5 I 2•39 I I 4.50 1 32.381 I 32.956 I I I I
~ 379.32 I 32.63 ~ 0.27 32.23 1 17.5 I 2•29 I 0.31 1 4.50 1 32.971 I 32.546 I 32.543 I 2.083 1 0.30 1
I 900.00 I 32.69 ~ 0.29 32.33 I 17.5 I 2.06 1 0.48 I 4.50 1 32.571 1 32.646 I 32.605 1 3.350 I 0.30 I
I 925.00 I 32.77 1 0.32 32.45 1 17.5 1 1.83 1 0.48 I 4.50 1 32.691 1 32.766 1 32.680 I 9.~8.~59 I 0.30 I 0.0105
.
I 450.00 I 32.83 I 0.29 32.52 1 17.5 I 1.77 1 0.28 1 4.50 1 32.761 1 32.836 I 32.755 I 4 8 I 0.30 1 0.0055
I 975.00 I 32.89 I 0.29 32.57 1 17.5 I 1.83 1 0.20 1 4.50 1 32.811 1 32.886 I 32.830 I 3.850 I 0.30 I
I 500.00 I 32.95 I 0.29 32.61 1 17.5 I 1.99 1 0.16 1 4.50 I 32.851 1 32.926 1 32.905 I 2.683 I 0.30 I
I 525.00 I 33.02 I 0.28 32.66 1 17.5 I 2.06 1 0.20 1 4.50 I 32.901 I 32.976 1 32.980 I 401 W-MO I 0.30 I 0.0045
I 550.00 I 33.06 I 0.29 32.82 1 17.5 I 1.99 1 0.64 1 4.50 1 33.061 1 33.136 1 33.055 I ACHl3~,"f 0.30 I 0.0055
I 575.00 I 33.16 I 0.32 32.89 I 17.5 I 1.54 1 0.28 1 4.50 1 33.131 1 33.206 1 33.130 I r° I 0.30 I 0.0005
600.00 I 33.23 I 0.26 32.74 1 17.5 I 2.80 I -0.60 1 9.50 1 32.981 1 33.056 I 33.000 I 3.850 I -0.52 I
i 625.00 I 33.26 1 0.12 32.73 I 17.5 I 3.03 1 -0.04 I 4.50 1 32.971 1 33,096 I 33.058 I 7rZ I 0.23 I 0.0129
I 650.00 I 33.29 1 0.12 32.79 I 17.5 I 2•86 I 0.29 1 4.50 1 33.031 1 33.106 I 33.117114 Aw. W7 1 0.23 I 0.0112
I 675.00 I 33.31 I 0.08 32.89 I 17.5 I 2•90 1 0.90 I 9.50 1 33.131 1 33.206 I 33.175 I 3.016 1 0.23 I
I 700.00 I 33.39 1 0.12 32.98 I 17.5 1 2.06 1 0.36 I 4.50 1 33.221 I 33.296 I 33.233 I 9•072 1 0.23 I
I 725.00 I 33.36 I 0.06 33.02 I 17.5 1 1.94 1 0.16 I 9.50 1 33.261 I 33.336 1 33.292 I 3.461 I 0.23 I
I 750.00 1 33.39 I 0.12 33.07 1 11.5 1 1.83 1 0.20 1 9.50 1 33.311 I 33.386 I 33.350 1 3.183 I 0.23 I
~ 775.00 I 33.92 ~ 0.12 32.87 I 17.5 1 3.14 1 -0.80 1 9.50 1 33.111 ~ 33.186 I 33.210 I AKWX~p I -0.56 I 0.0245
~ 800.00 I 33.96 I 0.16 32.82 1 17.5 1 3.66 1 -0.20 I 4.50 1 33.061 I 33.136 I 33.060 1 4.517 1 -0.60 I 0.0005
~ 625.00 I 33.50 ~ 0.16 32.91 1 17.5 1 3.37 1 0.36 1 4.50 1 33.151 ~ 33.226 I 33.156 I 9.313 1 0.38 I
~ 850.00 I 33.55 ~ 0.20 33.00 1 17.5 1 3.19 1 0.36 1 4.50 1 33.291 ~ 33.316 1 33.252 I 9.110 1 0.38 I
~ 875.00 1 33.63 ~ 0.32 33.11 1 17.5 I 2.97 I 0.49 1 4.50 I 33.351 ~ 33.926 I 33.348 Ok ALJP.KP9_91a&~ 0.38 I 0.0022
I 900.00 1 33.75 ~ 0.48 33.19 I 17.5 I 3.20 I 0.32 1 4.50 I 33.931 ~ 33.506 I 33.949 ~ 9.037 ~ 0.38 I
I 925.00 I 33.88 ~ 0.52 33.23 I 21.0 1 3.10 1 0.16 1 3.00 I 33.538 ~ 33.576 I 33.541 ~ 9.333 ~ 0.38 I
I 940A7 I 33.95 ~ 0.45 33.26 I 25.0 I 2.76 I 0.19 1 0.00 I 33.703 ~ 33.666 I 33.600 1 0.38 I
I
s
I
' ~ .
Washington State District 6
Departmen# of Transportation 271-i (\lOrtli Ma;~{air street
Duane Berentson Spokane, WA 99207-2090
SecrEtary of Transportation (509) 456-3000
Fax(509) 456-3089
January 24, 1994
Ms. Julie Shatto
Spokane County Building Dept.
W. 1026 Broadway Ave.
Spokane, WA 99260-0240
Re: SR-27 Spec Office Bldg. (ZE-89-85)
Dear Ms. Shatto:
After reviewing the above development which is located adjacent to the Pines Road (SR-
27)/I-90 Interchange, the Washington State Department of Transportation (WSDOT) has
the following comments concerning this proposal:
1. WSDOT requests that the County require the proponent to prepare the needed
supplemental SEPA documentation to address the substantial change in traffic
conditions at this interchange that have occurred since this zone change in 1985. Zt is the opinion of WSDOT that this interchange will be at capacity once the
' developments that are already under construction are built out. In addition to these problems at the interchange area, the intersection of Pines Road and Mission
Avenue' has also experienced one of the highest intersection accident rates for
signa(ized intersections in our district. It is because of this lack of capacity to safely
accommodate additional traffic that we request that this development not go
forward until it can be demonstrated thru SEPA that adequate facilities exist to
accommodate this develop►nent.
2. To address these SEPA concerns WSDOT requests that the applicant conduct a
traffic analysis for the Pines Road/I-90 Interchange area anci for the intersection of
Pines Road and Mission Avenue. This traffic analysis needs to addr-ess the elements
shown in the attached "Traffic Study Requirements" form. The applicant should
also be aware that Spokane County Engineers may have additional requirements as
the above only addresses WSDOT's concerns.
3. Because of the above issues WSDOT requests that a sign off block be provided to
WSDOT on the building permit release form.
• •
~ - ,
t•• Ms. Shatto January 24, 1994 . .
Page 2 If you should have any questions regarding the above subject please feel free to contact
. Leonard Cash in our District Planning Office at 456-3996.
Sincerely,
J.C. LENZI
Dis rict Administrator
' ,6
e. .
By: LEONARD CASH, PE
District PlanningEngineer
JCL
LCC/gjf
attachment: cc: Bob Turner, Spokane County Engineers
02/22 '94 10:26 ID:WSDOT D:" _-ICT 6 FAX:509-456-30r^ PAGE 1
• ~ ~ . « ►
~ I
Post-1t'' brand fax transmittal memo 7671 or p0946
FA / lrY ~
~ Cv. Co.
J7-
hone A
Washington State vP.'~~~~
Department of "iYansportation Fax 0 F,x e
Duan• Berentson
Secretery of Transporiat;on
Fax (509) 456-3089
February 17, 1994
Mr. Thomas L. Davis
Spokane County Building Dept. W. 1026 Broadway Ave. .
Spokane WA 99260
Re: Pines Road Development
Dear Mr. Davis: .
After receiving your February 7, 1994 letter on the E. 12111 Mission Restaurantlretail
- ' development, we are somewhat puzzled and dismayed by your response. To simply say
that there is no significant new information available is a statement we strongly disagree
with. In our January 24, 19941etter we pointed out areas where there is significant new
infonnation availabte. The original SEPA documentation was prepared in 1981 and was
. subsequently revised in 1985. To say no new information is available and the existing 9
year old SEPA is adequate is unacceptable to us, as the following new informdtion is available.
1, This particular area has experienced very rapid growth in the last 13 years. As a
result of this rapid traffic growth the traffic impacts this development will have on
Pines Road and the I-90 Interchange will have significantly changed and need to be
addressed. 7he following is a summary of traffic growth in this area:
SR 90 at Pines Rd.(7ust west of Pines Interchange)
Daily Traffic
. N1P 288,06 J'ct ofF ramp to Argonne Rd. (1981) 35)700
. MP 288.10 Jct on ramp From Atgonne Rd. (1985) 45,300
MP 288,25 on ta.mp Argonne Rd. (1992) 57,542
Perccnt9ge of growth between 1981 to 1992 - 61 %I'ercentage of growth between 1985 to 1992 27%
Sk 27 Pines Rd,(Just north of Mission Ave.)
Daily Traffic
MP 86.54 Jct on/off ramps from/to SR 90 (1981) 245000
MP 86.54 On/off ramps SR 90 (1985) 24)500
MP 86.54 On ramp SR 90 (1992) 371130
Percentage of growth between 1981 to 1992 . SS%
, Percentage of growth between 1985 to 1992 52%
02/22 '94 10:27 ID:WSDOT D'' ICT 6 FAX:509-456-307 - PAGE 2
~ .
. ,
,
Mr. Davis
Febcuary 17, 1994 .
Pagc 2 2, The intersection at Pines and Mission has been experiencing one of the highest
intersection accident rates of any signalized intersection in our district. This is a
definite safety concern to us and the county.. This is a significant pTOblem that needs
to be addressed, as this development will add additional traffic to this intersection .
fi,rther aggravating this condition. This was not even previously ntentioned in the
existing' SEPA. We have also attached a summary of this accident data for your
information.
. 3 A fecent traffic study conducted fot an apartment complex on the north side of the '
Pines Road Interchange has identified significani capacity deficiencies in this
interchange area. This interchange area will be further impacted by ihis development
as the existing SEPA checklist identifies Pines and I-90 as routes that traffic from this
development will use. Since the background traffic volumes have significantly
changed since 1985, the impacts this development will have on the interchange will
have also significantjy changed. Attached is a summary letter from this traffic study.
. 4. Air quality conformity should be addressed under thc new SEPA as this was not done
in the present SEPA.
Because of these above mentioned significant changes since the existing SEPA ,
documentation was prepared, WSDOT requests that Spokane County readdress these
probable impacts in the form of a trafTc study for this development. If after reviewing this
material it still is the position of Spokane County not to open SL-PA on this development
we would like to know your reasons for doing so along with what traf~ic engineering
judgment that was used in determining that these impacts are not significant or why they
do not constitute new information. In addition to this, we would also like to -know if this
decision can be appealed and to whom -we would appeal it to. This would be vety helpful
in dealing with this and future developments which may fall into a similar situation.
02/22 '94 10:27 ID: WSDOT D' N CT 6 FAX:509-456-30-~. PAGE 3
.
Mr. Davis
February 17, 1994
Page 3 We do appreciate your wiliingness to work with us on this issue as your cooperation in the
, past has been greatly appreciated. I also look forward to discussing this matter further
with you as I would welcome a chance to meet with you or your staff in the near future.
Please feel free to contact Leonard Cash in our District Planning Office at 456-3996
regarding this matter.
, Sincerely,
. J. C. LENZI .
District Administrator
~a,~•~,
. 4v(NARD CASH, pE District Planning Engineer '
JCL
LCC/gjf .
attachments:
cc: Dennis Scott, Spokane County Public Works .
Bob Turner, Spokane County Engineers
Steve Horobiowski, Spokane County Planning
02/22 '94 10:27 ID:WSDOT I° .RICT 6 FAX:509-456-3C"-" PAGE 4
' r , ' . . .
Pines Center
SUMMARY OF AVERAGE VEHICLE TRIP GENERATION
AvERAGE WEEKDAY DRIVEWAY voLUMES
Ol/18/94
24 HOUR AM PK HOUR PM PK HOUR
TWO-WAY
LAND USE . SIZE VOLUME ENTER EXIT ENTER EXIT
GENERAL MERCHANDICE 20 TH.GR.SQ.FT. 0 0 0 48 48
GENERAL OFFICE 7.4 TH.GR.SQ.FT. ' 196 22 3 5 23
HIGH TURNOVER RESTAURANT 5.5 TH.GR.SQ.FT. 1129 43 43 48 41
_ TOTAL 1325 65 46 101 112
NotE: A Zero rate indicates no rate data available .
~ Y /h+lS 1~t" l/,EL C>~ rn E N~ = 2. 13 r~2 / PS
TRIP GENERATION BY MICROTRANS
02/22 '94 10:28 ID:WSDOT IR ICT 6 FAX:509-456-2`- PAGE 5
TFiose Locqnto,,, w t4tct+ I*" .
02 rr*rtA.. I~E'c % *cko... r-,P,)'ne•)'~
CAa•aArt. y eM.
Lo r24 QS ~
v~
S~ ,.LOoO 41EIML .4y~t, u~~~~esr Type 4N PS
, 27 klmi,+jwh" ~t rw'd t 5
> 27 . ; f) 4o~ 45 1 Z.zg ol 5 ~ ~ ~s w a 14- ~ -1 5
Sf'~,t ~e 4 lt.50 ~ t b N P, IeM- 54ci 13 . - ~ .
N 6 Rek- &4.0
y .
38 9.7a 14 vs w 8
..lVv.e,.- 31 7,8~3 ~ N g ReA4. a~ ~ t 1 +3
w
~ 17 29 7.z5 a 0 515 vs F- g to +7
~ 250 .(~iktr 2g -7,00 ~l1 w ggeA2 tri0 9 4
,C4.6ort` 22 S. ~jo N ~ out twa l l ~ ~o
-X 290 . $ri Ya ?o 3,ao 4 t6 vs wg LT
26& 19 4.16 v 56 ),r 7
~ 190 . : U N ~ vot~,,.~ 19 4,15 (a A16 ildd crid 7 + 5
.;:'A,&N~tt) L8 Q,5o vs W swT.
7. ~ g .
,r1~ 3`15 . . ~i ~s 1$ 4.5 b 4 N ~ Ae~+rL ~ ~o ' ~ .
~ 2. C e~. 2~ . l C~ ~.Ud 7 + g .
.
~y 395 ; , Nlcaeoe ltO 446 ► 2~ . . 3z ~d l 5 3..s . . -r ~ ~
~ .
~ z5G . ► +Mc ~a~ n 1 ~ 3.56
S . ~
~ .
~ 9o4- 3 s5° . 5 ~
'9 ' ' ~1.4~a ~3..._ ..3.•25 ~ . . . . . ~ 7 . . ..__.r
- -t.
-A 2 10 12,25 ~ . .
~ .
~ 395 2 26 8 C.>o ' . 5 4.7 .
9 WkR 7 . 1.15 -5. .
. . . , . ' .
02/22 '94 10:25 ID:WSDOT D ~1ICT 6 FAX:509-456-3C"-",PAGE 6
1NLAND PACIFIC ENGINEERiNG, INC.
January 31, 1994
Theodore J. Trepanier
District Planning Engineer
2714 'N. Mayfafr St.
S.pokane, WA 99207-2090
RE: Lawson/Gunning Rezone (SR-27)
Dear Mr. Trepanier:
This letter has been written in response to your request for
further information aB outlined in the letter of July 13, 1993.
The information you asked for Was an analysis of the intersection
oP Indiana and Pines including the R.A. Hanson/Price Development
and the HCS data which led to the levels of service calculated in
the TIA.
The Everqreen Interchange report, an official WSD4T document, was
used to generate the traffic volumes associated with the
Kanson/Price Development. Volume data was only available for the
PM peak hour, so we reanalyzed only the PM peak hour. That report
was based on the assumption that creating an Evergreen Interchange
will lower traff ic on Pines Road. That assumption was carried
through the analyais done in this letter; thus, the through volumes
on Pines Road are lower than in the TIA previously eubmitted to
you.
An additional assumption was made for the analysis of Indiana and
Pines with the Lawson/Gunning project in p1acE. Due to the
addition of the Evergreen Interchange, it was assumed that all of
the weetbound off ramp traffic would use Evergreen, and thus would
not use this intersection.
Existinq geometric conditions at Indiana & Pines Road are
inadequate to handle the traffic projected in the Evergraen
Interchange report, =egardless og whether the Lawson/Gunning
project is rezoned. To brinq this intersection to a Level of
Service D xiil require an extra left turn lane and a dedicated
right turn lane for southbound Pines Road. Northbound Pines Road
. will require two dedicated riqht turn lanes. Westbound Indfana
will also requfre two dedicated left turn lanes. Adding the
traf f ic generated by the LaWSOn/Gunning project will not af fect the
Level of Service of aither the improved on unimproved intersection.
(See attachments for details.)
707 West 7th • Suite 200
Spokane, Washington 94204
cno_eSA_lR4A
02/22 ' 94 10• 29 I D• ~~~~T 1, ~ 1 CY 6 FpX • 549-456-:30..., PAfaE 7
r
. .
ille {.roLl{..r~~~~ons thiC7 av4L~itiL+ilal analysis s#io7R aie 4.11aV ,Perio'S.is
revisions ta the intersection of Pines Raad &Indiaria are needed to
adequately handle the traff ic generated by the Hanson/Price
Develvgment. The Lawson fGunning project will hsve minimal impact f
and daes nat effect the Level of Service of Indiana &Pines Rd.
with or xithout the mitigation needed by the Hansvn/Price
Develepment. We therefore ask that you apprvve the rezone of tha
Lawsan/Gunning pr~~erty and the prevfausly grepared TIA.
I#' you have angt questions, please give me a call.
Sinc rely,
r ~
Todd R. Rh1~~lef P.
'CC : Pd~ ~ar~~~ ~ Spok21ne CouI3ty ET1gi71eer3f]G] ,
. .
~ RECErvtu
Washington State District 6 FEB 23
~ Department of Transportation 2714 iJorth ~rtayfair Street
, Spokane. WA 99207-2090
Duane Berentson
Secretary of Transportaiion (509) 456-3000 ~ON* Engineerie
Fax (509) 456-3089
. February 17, 1994
Mr. Thomas L. Davis
Spokane County Building Dept. W. 1026 Broadway Ave.
Spokane WA 99260
Re: Pines Road Development
Dear Mr. Davis:
After receiving your February 7, 19941etter on the E. 12111 Mission Restaurant/retail
development, we are somewhat puzzled and dismayed by your response. To simply say
that there is no significant new information available is a statement we strongly disagree
with. In our 7anuary'24, 19941etter we pointed out areas where there is significant new
information available. The original SEPA documentation was prepared in 1981 and was
. subsequently revised in 1985. To say no new information is available and the existing 9
year old SEPA is adequate is unacceptable to us, as the following new information is
available. .
1. This particular area has experienced very rapid growth in the last 13 years. As a
result of this rapid traffic growth the traffic impacts this development will have on
Pines Road and the I-90 Interchange will have significantly changed and need to be
addressed. The following is a summary of traffic growth in this area:
SR 90 at Pines Rd.(Just west of Pines Interchange)
Daily Traffic
MP 288.06 Jct offramp to Argonne Rd. (1981) 35,700
MP 288.10 Jct on ramp From Argonne Rd. (1985) 45,300
MP 288.25 on ramp Argonne Rd. (1992) 57,542
Percentage of growth between 1981 to 1992 61 %
Percentage of growth between 1985 to 1992 27%
SR 27 Pines Rd.(Just north of Mission Ave.)
, Daily Traffic
MP 86.54 Jct on/offramps from/to SR 90 (1981) 243-000
MP 86.54 On/offramps SR 90 (1985) 247500
MP 86.54 On ramp SR 90 (1992) 37,130
Percentage of growth between 1981 to 1992 55%
Percentage of growth between 1985 to 1992 52%
.y. -
~ Mr. Davis February 17, 1994
Page 2 2. The intersection at Pines and Mission has been experiencing one of the highest
intersection accident rates of any signalized intersection in our district. This is a
definite safety concern to us and the county. This is a signif cant problem that needs
to be addressed, as this development will add additional traffic to this intersection
further aggravating this condition. This was not even previously mentioned in the
existing SEPA. We have also attached a summary of this accident data for your
information. 3 A recent traffic study conducted for an apartment complex on the north side of the
Pines Road Interchange has identified significant capacity deficiencies in this
, interchange area. This interchange area will be further impacted by this development
as the existing SEPA checklist identifies Pines and I-90 as routes that traffic from this
development will use. Since the background traffic volumes have significantly
changed since 1985, the impacts this development will have on the interchange will
have also significantly changed. Attached is a summary letter from this traffic study.
,
4. Air quality conformity should be addressed under the new SEPA as this was not done
in the present SEPA. Because of these above mentioned significant changes since the existing SEPA .
documentation was prepared,'WSDOT requests that Spokane County readdress these
probable impacts in the form of a traffic study for this development. If after reviewing this
material it still is the position of Spokane County not to open SEPA on this development .
we would like to know your reasons for doing so along with what traffic engineering
judgment that was used in determining that these impacts are not significant or why they
do not constitute new information. In addition to this, we would also like to know if this
decision can be appealed and to whom we would appeal it to. This would be very helpful
in dealing with this and future developments which may fa11 into a similar situation.
Mr. Davis
February 17, 1994
Page 3
. We do appreciate your willingness to work with us on this issue as your cooperation in the
past has been greatly appreciated. I also look forward to discussing this matter further
with you as I would welcome a chance to meet with you or your staff in the near future.
Please feel free to contact Leonard Cash in our District Planning Office at 456-3996
regarding this matter.
Sincerely,
J.C. LENZI .
District Administrator
By: IEONARD CASH, PE -
District Planning Engineer
JCL
LCC/gjf
attachments:
• cc: Dennis Scott, Spokane County Public Works ,
Bob Turner, Spokane County Engineers
Steve Horobiowski, Spokane County Planning -
■
,
~ - • .
Pines Center
SUMMARY OF AVERAGE VEHICLE TRIP GENERATION
AVERAGE WEEKDAY DRIVEWAY VOLUMES
O1/18/94
24 HOUR AM PK HOUR PM PK HOUR
TWO-WAY
LAND USE SIZE VOLUME ENTER EXIT ENTER EXIT
GENERAL MERCHANDICE 20 TH.GR.SQ.FT. 0 0 0 48 48
GENERAL OFFICE 7.4 TH.GR.SQ.FT. 196 22 3 5 23
HIGH TURNOVER RESTAURANT 5.5 TH.GR.SQ.FT. 1129 43 43 48 41
TOTAL 1325 65 46 101 112
Note: A zero rate indicates no rate data available ~
,~~~5 171U0R TiE7 O
I l 3 ~2 ~ PS
.
TRIP GENER.ATION BY MICROTRANS
~
REQUEST FOR DESIGN DF;VIA'ITION
$30.00 . . .
- DATE '47
ROAD NAME ~[SS Io.J AJ~ . CRP/RID #
NAME OF PLAT N I A Plat # N
.
ADDRESS OF BLDG
Cc~uljrq 121.0sg:c7 # g 9400Cv BLDG# B9 'Z-,V~,S~ T2 S~- R15:ec/ ~
FEDERAI../STATE PROJECT # PROJECT LIMTTS
EXISTING CONDTITONS: PROPOSED IMPROVEMENTS:
ROAD WIDTH VAitaf,S z2 I
ROAD SURFACE j4G~ ~cp
AVG. DA.ILY TRAFFIC
Current Traffic Count Design Year Traffic Count
2'.10JECT DESCRIl'TION WID ,4ao t.4snAL-L, CojZB Pyv,Q A,.~Ajoi, nj o44~
5:ck- oP 1~►5►S+O,J 14JE.~JJF- Fjc,^ WESf ~I~.. ~,T gbleS Tc 8ve-0x ~ (10 akf 6hS4-
PROPflSED DESIGN DEVIATION T'm .4 t.~o~ ~oP T~ &%)rT&fL Co2"&5 Ilo F444, oatS/~,9-
-r,4E z?o - 4.s7o QA„, vP, ovr mG f~ 0•01 F-T.
USTIFICaTION:
_ Tt4E eD~. Qrr PAJEMEWT DoEs 4DT Fot.{.aJ C.E~tl~Rta.J~ ro444E5 -\I 64,)
cv%jrrh4 L&jE PsaL_ &wr majY nlQar_- a orrs4 ca460E. B~a~c-s Wov c..p
ul6- QfL6Lg. E-0 7
.6re-
&4jP SZ[~L- PAgUlAF, QtAInt.4c.E. .~,~4• 4F tde- pF
AA4--' WT S-4 LL-SS -rM4.J 0.01
Feo , ~'c~ ~J ~0E S Q SAtQo,~1+E~ .~Q ,nJ ta ~O ~
IL o ~ W c~s~ C~AQ.L`~ C.U t't Fs,~- ~I~ CohtT~~Q~ To C~~~C ~
Q-rTEZ_ wa~+ia 0.01 ~-e,o t o F acrL. 3t.c.-re as S pE5 upn} Fuct,a710.J4
.IBMITTED BY StE3U-~ T. :~r,4mmfW105 DATE
DDRESS A0An►S ~ CLAt- +c- 1NC . 172o w. 4i7~% 4tJE S4e.s44F WA- ZIP CODE ~ZD 4~
,
iONE # ~O.C> F-4x -ZL17- S~
ADMIlNIST'RATIVE VARIANCE FEE OF 130.00 PAID TO SPOK;ANE COUNTY
-REQUES NOT BE REVIEWED WITHOUT FUNDS-
~ 3 S WI ~
k cv Ir-crrrv 44 n T2 f~.-.T r.-,r. T,.,
BUILDINC, PERMIT CHECKLIST
.
.
.
. . . .
~
.
'~i~.~`.•i: •
b'.:. : . : . ~ . ~ : - . . . .
. . . . . '
. . ...r . . • " " : .
. .
. . :.ti..~ ' . . . .
....r. I...:
ERMIT . ~
.
M P - ~ . ADDREv.S:;::: ETI .
. .
.ME NG::.
I j N
. ~N REQUIREqI COMPLETED ~
. . .
~.:.1.;;_;
• . ; • . -
' . - .
: ~ . ~ r.
• • .
::•:r~.::.:: • -•.~::...~,1 ~et•::~ :'t2•:::~::•~::•::•:•>:f:::::•=:::::.:`::::;
• - ~ ~r t} •
. .
. . : " . v:~ :ti::,::: - . ~ ~ . , .:vt:::. v.:;..:;::.
. . . . .
r . .
I . ....r .....::.:::.:..::.>.:.:..:....MANAGEMENT.: ...::r~:~'''"°. . f~ . .
. . . . .....».r. . ..r..~ r.
AGREEMENT TO PAY FEES
RIGHT OF WAY DEPARTMENT
DEED
EASEMENTS
R/W
RID
LEGAL DESCRIPTION CHECK
LETTER FROM SCAPCA
RECIPROCAL USE AGREEMENT
~ I
_ :..~i .
- . : • ~ ~ : • . . . . . . ~•.L'. . : ~ : - .X ^J.'.•. . . . . . . ' .
. ' ..'1..
i : . •
..1''•••
.Y•V. '
..:••':.l':.:•::. . ' :\'j':f~`•:i ..•l`• .
•
. '
•~i~':•
. . : . . .:Yd.W...ti'•:~ti.:': ~..1:..:~::'.•:~:Y:~•.
~ l -
. . . . . . . . . . • • . • . ' •'.:.4'.:. . t.
. r .
SIT .
. . . . . . . . . . - - . . . .
. . . . . E.
I . . _ . . . 4.. . . . . . . - . . . . . . I
NORTH ARROW
SCALE
BENCHMARK
ROAD NAM ES
R/W DIMENSIONS
PROPERTY LINES
SET-ASIDE
GRADES
STAM P
PAVING
TRAFFIC CIRCULATION PLAN
APPROACH PERMIT
. ~ ~
I I
, . . . . .
~
.
- .
~ . .
~ . . . . . . . . . . . . .
. . .
~ ~ . . . . . : . . . DRAIN .
I . . . . . . . AGE . . . r... . . . - - . . . ~ ~
208 CALCULATIONS
SWALE CROSS-SECTION
SPECIAL SOIL TESTS
ROOF CONSTRUCTION I (
HVAC ON ROOF
LANDSCAPE PLAN (208 CONFLICT)
DITCH CALULATIONS I I
BACKWATER CALCULATIONS ~
GRATE CALCULATIONS ~
PIPE CALCULATIONS
RETENTION/DETENTION CALCS
10/50/100 YEAR STORM
TR-55 ANALYSIS
I I
- ~ I
I I
I I
. . . .
"
. ~
, ~ . . . . : •:;5.. - '
~ ~ : . . .
, • . .
.......:""r"•?r.:. .
. . r : r.; , . :
. . . -.i:. : . ~ , r"... ,
. . . : : : • ' • ~ , , ~
: • • . Sr .1 ; . . : : '
. .r .
. . . ' ' ' . . . . }ti . . . • ~ ~:~v.:'ri::.r:i-?t''rr7?_'::: •
- , . . : .
M _ ,h . - ....,...r...... . . R ~ ADS.:. - - ~ . . . . . - ~
GRADE SHEET (EXISTING ROAD)
STAM P
OWNERS SIGNATURE ~
ROAD DRAINAGE (SWALES, STRUCTURES,..) ~
"R" VALUE TESTS
NEW ROAD DESIGN
BOND
MYLAR
COUNTY STAMP
I I
~ I
E:u.oTVSU.vtvs unT\ctitcs t[Err.WKI
~
,
f ~ . `~~~+~U► v 19 Y l~ ~ ` ' , , _ - I
,
S P O K A I~I I~ i , . C a LI N "f' 'Y
.
OFFICE OF TI IE COUN7Y ENGWEER • A DIVISIQN OF TI1L• I'UBI.IC WORKS DEf ARTTv1ENT
Ronald C. J lormann, f.G., Coun(y Cnglneer pennis M. Scott, I'.C., Director
AGRErMENT TU PAY FErS
ENGINEER'S AGREEMCNT NUMI3CR .
u ~J ~ ~ • ~ ~ ~
Tliis agreement uetween Srok~ne Conty and
kname oi person)
whose intcrest in the project is LAN~~- '
~ ~ (i.e. ovrner, agcnr, ctc.) ~
19 ~ . Tliis agreement is anplicable to the project
's enterecl 'nto tl~i 's day of ~
~ ~
known as:
O'd I 040-A C> ~
_
(rrojcc c re sMr-McnaniZ& ii c m cr
That the inelividuals ancl rarties namecl herein as having an interest in the above cleseribecl rrarerty or
project agrce to the following:
l. Reimburse Srokane County for project review ancl insrection fees as sreciCecl in
Charter 9.14 of the Spokane County Cocle. Tlle fees will b:, based oii actual salary
costs incurrecl by Spokane County for project reviews ancl / or inspections pItls a ten
rercent aclministrative cliarge, ancf will lie billecl montllly as accrilecl. Any final
billing amounts, tu inclucfe any late fees or any otlier expcnscs incurrecf in tlle
collection of an overclue account must be paic1 rrior to the County's accertance of
the project fur filiiig.
2. The undersignecl agrees that these fees are ctue and payable upon receirt of the
billing as specifieci abave.
3. Any :^VJlGeS SZflt pald w:11!i►; 1-0 d's?ys OF the 1livcire dale E~►~~I lie S!!bjeCled tQ iat late
fec ciiarge of l% rcr month (12°Io rer year) on tlte uiiraicl balance of the account
and any accrtiecl late fee cliarges. In aclclilion, if any outstancling balance on the
account for this project is not raid witliin 30 days of tlie invoice date, tto fiirtlier
reviews of the project cl4cutnents will be conductecf until the entire account balance
is raicl. Any balarice on the account for this project not raicf within 65 clays of the
invoice clate may result in legal action ar the initalion of otlier collection rroceclures,
inclucling referral to a collection agency. 77ie Sponsor will be liable for any arlci ali
expenses incurrecl by the County for tlie calicctioti of overclue accounts.
5ltL
~
4. The montlily billing shotilcl be sent to the altention of:
, I LkA
NAME:
ADDRESS:
CITY, STATE:
1 3 1994
~=p°,r ,•w;
ZIP CODE:
^ P' i r
nr ~0!, ,1r ,
I uncferstand that failure to ray these fees may result in clelay in conipletion or arprovat of the project or
otiier possible sanctions.
❑ tf tiiis fee agreemcnt is complctecl by someone other th1n tlie Sponsor (i.e., the
project owncr or aprinciral in the firm srunsoring the rroject), stich as tlle Engineer
clesigning thc projcct, tlien written autliorization froiii the Sponsor speciticnlly
utitlioc•iziiig tlie Abcnt to cxccute lhis ree A6reenient is attachecl to tllis Fee
Agreement.
. . .
SiGNAI'URr I3y: VA✓\O
C; . aweS iq. /v C-~ f
(PRINT NAML) ,
RETURN YEi.I.OW CnPY T() SI"()KANC COUN`I'Y I:NGINCI:i2S
k\pll\agrccmcn.[cc 8t2O/R3
- ir.r.• ri linn t!A V/CAA\ AC! A'71r.
~ -
• •
raylor Engineermg, Inc.
, .
Civil Design and Land Plannin
~ g Principals:
September 7, 1994 Perry M. Taylor, P.E.
Stattley R. Sdrling
Mark A. Aronson, P.E.
Mr. Bill Hemmings David C. Larsen, PE.
Spokane County Engineers
West 1026 Broadway A.ssociates:
Spokane, Washington 99260 scoa M. Busch, PE.
Subject: Drainage Report for Northwest Corner of Mission & Pines
Dear Mr. Hemmings:
Enclosed are the calculations and data for the drainage report for the subject project. Procedures
used are as outlined in the "Guidelines for Stormwater Management" as published by the
Spokane County Engineers with revisions as of 4-15-86. The format used is as follows:
Project Description
Methodology
Soils
Topographic Data
Demographic Data
Rainfall Data
Proposed Runoff Control
Methods of Disposal
Peak Flow, Volume and Disposal Calculations OFFICIAL PUBLIC DOCUMENT
SflOKANE COUNTY ENGINEER'S OFFICE
a. Hydrology Computations
i
b. Inlet CaPacities
c. Detention/Retention Storage Capacities PROJECT #
d. Pipe System Capacities SUBMITTAL # 075
RETURN TO COUNTY ENGINEEK
Remarks
Following your review, I would be happy to answer any questions you may have regarding this
report.
Sincerely, RECEIVEp
TAYLOR ENGINEERING, INC. SEP 0 9 1994
Mark Aronson, P.E. CODE E~1~ORCEMENT
. Project Manager ,
•
ME ~ EVVF. D
Enclosures , j
SAJ/try/94-110AIHemmings/090794 SEp 1 31994 ~
W. 106 Mission Ave. • Spokane, WA 99201 0 (509) 328-3371
FAX (509) 328-8224
~ SpOKAHE C4~1j1f ENGMEER
~ raylor Engineermg, Inc.
Civil Design and Land Plaruiing ~ Principals.
Perry M. TNylor, P. E.
Stanley R. Stirling
Mark A. Aronson, P.E.
David C. Larsen, P.E.
DRAINAGE REPORT Associates:
FOR scorr M. Busch, PE.
NORTHWEST CORNER'OF MISSION AND PINES
Prepared : September 7, 1994 By: Sandra Johnson
Taylor Engineering, Inc.
West lOb Mission Avenue
Spokane, Washington 99201
(509) 328-3371
:
W. 106 Mission Ave. • Spokane, WA 99201 0 (509) 328-3371
FAX (509) 328-8224
~ TABLE OF CONTENTS
Project Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Soils . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Topographic Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Demographic Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1
Rainfall Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Methods of Runoff Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Methods of Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Peak Flow, Volume and Disposal Calculations . . . . . . . . . . . . . . . . . . . . . . Page 2-3
a. Hydrology Computation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
b. Inlet Capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 .
c. Detention/Retention Storage Capacities . . . . . . . . . . . . . . . . . . . . Page 3
d. Pipe System Capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
ATTACHMENTS
Soils Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment "A"
Vicinity Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment "B"
Drainage Basin Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attachment "C"
. DRAINAGE REPORT
for
NORTH'~dVEST CORNER OF MISSION AND PINES
Project Description:
This project is a commercial development of 3.6 acres. It includes one retail building,
one offce building and one future pad site. The project is on the west side of Pines
Road, north of Mission Avenue. The site was previously unoccupied.
Methodology:
The procedures as outlined in "Guidelines for Stormwater Management" as published by
Spokane County Engineers was followed. The rational method is used with a 10 year
return frequency for on site drainage. No off site drainage flows onto the site.
Soils: (See map, Attachment "A
Soils are classiied as GgA - Garrison Gravelly Loam in accordance with the "Soil
Survey, Spokane County Washington, 1968".
GgA - 0 to 5 percent slopes. Gravelly, medium-textured, somewhat excessively drained
- soils formed in gravelly glacial outwash material from a variety of acid, igneous
parent rock; on nearly level to moderately sloping terraces; depth to mixture of
sand, gravel, and cobblestones ranges from 2 1/2 to 5 feet. This soil group is
acceptable for drywells per the GSM.
Topographic Data: (See map, Attachment "B")
The site generally slopes to the north with grades varying from 1% to 5%.
Demographic Data:
The site is currently unoccupied. Upon completion this site will contain a retail building,
an office building and a future pad site.
Drainage Report, Northwest Corner of Mission and Pines Page 1
September 7, 1994
Rainfall Data:
- Data used is in accordance with Figure 2, page 6-3 of the "Guidelines for Stormwater
Management", by Spokane County Engineers. A 10 year return frequency event was
used. This chart is included with the calculations of this report.
Methods of Runoff Control:
Control will be by four drainage basins which flow overland to grass percolation areas
(GPA's) and drywells located in the landscaped areas of the site. Roof areas will be
piped directly to drywells. All GPA's will be sodded for treatment.
Methods of Disposal:
Four (4) grass percolation areas, one for each drainage basin, will be utilized. All
swales contain one (1) each Spokane County Standard single depth drywell. Swales and
drywell capacities were sized using the 10 year on-site storm.
Peak Flow, Volume and Disposal Calculations:
a. Hydrology Computations:
The site has been divided into four (4) basins labeled alphabetically.
' o Basin A lies on the western side of the site and includes parking and sidewalk
areas around north and east sides of the retail building and landscaped areas along
the west and north.
o Basin B is just east of Basin A and contains parking, sidewalk and landscapes
areas in front of the office building.
o Basin C lies just east of Basin B and contains the same surface types as Basin
B, but sits in front of the future pad site.
o Basin D, lying east of Basin C and the future pad site, contains parking and
landscaped areas. All basins flow overland and deposit directly into the GPA's
for disposal. (See attached calculations).
Hydrology calculations were also performed on the roof areas. The retail
building roof generated 0.95 cfs and is disposed of by one (1) double depth
drywell. The office building roof generated 0.44 cfs and is disposed of by two
(2) single depth drywells. Flows were estimated for the future pad site assuming
a conservative 10730 sf roof would generate 0.70 cfs and would require one (1)
double depth drywell for disposal. The drywell and piping to the future pad site
will be installed with this development for future connection.
Drainage Report, Northwest Corner of Mission and Pines Page 2
September 7, 1994
b. Inlet Capacities:
Three (3) curb inlets are utilized with this design, two in Basin B and one in
Basin C. Individual calculations for each inlet show that widths of two (2) feet
will sufficiently pass the generated flow. Curb inlets are located at the low spot
of each basin area and any flow surpassing the capacity of the inlet will flow over
the curb and still flow to the GPA's.
c. Detention/Retention Storage Capacities:
Grassed percolation areas were calculated to hold the first 1/2" of runoff over the
entire parking lot area. See Calculations on the following pages. Grass
percolation areas are a minimum of 6 inches deep and will be sodded.
d. Pipe System Capacities:
Pipe diameters were calculated to handle each roof basins peak runoff for a 10
year storm event. Connecting to the building roof drains just outside the
building, runoff is routed to collection pipes for conveyance to the drywells.
Piping was designed for the retail and office buildings only. Each building
required a small closed conduit system which did not appear to warrant back
water calculations. Manning's equation was used to size roof drain piping and
- velocities of greater than 4 feet per second were maintained throughout. All
pipes are sized conservatively, with capacities well above the calculated 10 year
storm flow rates.
A roof schematic for each building and sizing information can be found on the
attached pages.
Remarks:
The above described system of stormwater control will provide the quality and quantity
controls as outlined in the "Spokane County Stormwater Management Guide" for the
Northwest corner of Mission and Pines.
; Drainage Report, Northwest Corner of Mission and Pines Page 3
' - September 7, 1994
,
dff w ,
- r- r - ~ifl-
-
- r'-
i~-F
7?=
-
- - -
5 ~ t _
- -
" ~ .
~ ~ - ~c_---- - --l ~-i~ _
~ - cl------ - _
F"r '
t7 4
o ~ -~-_L----___------ - - -
~ y - L
d
-:t«~;------- ;=~C---r,~<ir ~
~ 3 -
17--.-_=:_-~ - - - - " - ~ - I~ ----1----
~
L
I
~ - - - --oGi-------------------------------------~-__---c-~--`I----- - -
l------ _ :CL
~ - _ -----------------i
~ L--------- ---r,
~ -
ro Z =
~ - ~ ~ - _
~ ~p,' --1~- j--------- _
- i.~...
-====w-"
~ _ " " - J
:i..
~ - r~-r------ -
=
, - - - - -
. = - - = _ _ - _ _ _ _
_
60 70 80 90 /00
~
, a~a
HYDROLOGY COMPUTATIONS
AND
DETENTION/RETENTION STORAGE CAPACITIES
, TAYLOR ENGINEERING, INC_
W. 106 MISSiON AVE., St1ITB 206
SPOKANE, WA. 99201
RATIONAL METHOD
FILENAMB : N6dC-A. WK1 10 YBAR RETtJKN FKEQUEt1CY
PROJBC'T: NWC, Mission & Pines
DATE : 2 5-Aug-94
TOTAL AkFP. (AC ) 0.53
DESIGNED: S. •Johnson
CHECKED:
BASIN: A
~ (2) ~ (3) ~ (4)
TYPE OF SURFACF ;SQUAPE FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQP ; 12790 ; 0.9 ; 11511
SIDEWALK - 208 NOT REG?A ; 1794 ; 0.9 ; 1611
LANDSCAPE AREAS ; 8320 ; 0.25 ; 2080
0
p
0
► 0
, - 0
TY)TALS 22900 15202
DEVELOPED "C" = 0.66
:
1 iV: TIME OF CONCENTRATION (MIN): ESS THAId 5 MIN.
RAINFALL INTENSITY (IAl/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 1.11
ROADS ONLY: 0.84
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
533 CUBIC FEFT
1066 SQUARE FEET C.5' DEP1'H
PROJECT SWALB :
BOWSTRING METHOL►
_ DETENTION BASIN DSSIrN
Date: 02-Sep-94
PRQJECT- NW Corner of Missicsn & Pines Filename: M&Pbow-A
BAS I N NO A Prepar•ed by :
TAYL,OR ENGINEfiRING, INC.
Time IncremPnt (min) ; 5.00 ~
Time of t',oncentration (min) ; 5.00 ;
4utflow (cfs) ~ 0.30 ;
;
Iesign year f low (Yr ) ; 10.00
ArFa (acres) ► 0-53 ~
De v pl~) p e d „C factor ; 0.65 ;
#1 ; #2 ; #3 ; #4 t#6 ; #7 ;
Time inr. ; Time inc. ; Intensit,y ; "Q" dev. ~ „v irl ~ V" out ; 5tora.ge ;
(min) ; (min) ; (min) ; (c.f.s. ) ; (cu. ft. ) ; (cu. ft. ) ; (cu, ft. ) ;
; (#i * 60) ; ; (A * C * #3) ; (see below) ; (c,utflow*-#2) ; (05 - 06) ;
, 5 ; 300 ; 3.18 ; 1.11 ; 447 ; 90 ; 357 ;
10 ; 600 ; 2.24 ; 0.78 ; 550 ; 180 ; 370 ;
15 ; 900 ; 1.77 ; 0.62 ; 620 ; 270 ; 350 ;
20 ; 1200 ; 1.45 ; 0.51 ; 650 ; 360 ; 300 ;
25 ; 1504 ; 1.21 ; 0.42 ; 678 ; 450 ; 228 ;
30 ; 1800 ; 1.04 ; 0.35 ; 692 ; 540 ; 152 ;
;
. 35 ; 2100 ; 0.91 ; 0.32 ; 701 ; 530 ; 71
40 ; 2400 ; 0_82 ; 0.29 ; 718 ; 720 ; -2 ;
45 ; 2700 ; 0.74 ; 0.26 ; 725 ; 810 ; -85 ;
50 ; 3000 ; 0.68 ; 0.24 ; 738 ; 900 ; -152 ;
55 ; 3300 ; 0.64 ; 0.22 ; 752 ; 990 ; -228 ;
50 ~ 3500 ; 0.61 ; 0.21 ; 794 ; 1080 ; -290 ;
65 ; 3900 ; 0.60 ; 0.21 ; 840 ; 1170 ; -330 ;
70 ; 4200 ; 0.58 ; 0.24 ; 873 ; 1260 ; -387 ;
75 ; 4500 ; 0.56 ; 0.20 ; 901 ; 1350 ; -449 ;
80 ; 4800 ; 0.53 ; 0.19 ; 909 ; 1440 ; -531 ;
85 ; 5100 ; 0.52 ; 0.18 ; 946 ; 1530 ; -584 ;
90 ; 5400 ; 0.50 ; 0.17 ; 952 ; 1620 ; -558 ;
95 ; 5700 ; 0.49 ; 0.17 ; 994 ; 1710 ; -716 ;
100 ; 6000 ; 0.48 ; 0.17 ; 1425 ; 1840 ; -775 ;
V in = (1.34 ~ Q dFv. * t ) f or t : Tc
V in = (Q clev _ * t + .34 * Q dev. _ * Tr ) f or t > Tc
, TAYLAR ENGINBERING, INC.
W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METNOD
FI LENPM: RWC-B. wK1 10 YEAR Rh'TtJRN FkEQtlSIdCY
PRO-7ECT: NWC Mission & Pines
UATE : 2 }-Au.g-94
1'OTAL ARSA (AC ) 0.87
vESIGNED: S. •Iorinson
CHECKED:
BASIN: B
~ (2) ~ (3) ~ (4)
TYPE OF SURFACE ;SQ1JARE F40TAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-248 REQD ; 34600 ; 0.9 ; 27540
SIDEWALK - 208 NOT REQD ; 1174 ; 0.9 ; 1056.6
LANDSCAPE AREAS ; 6283 ; 0.25 ; 1570.75
0
0
0
0
0
TOTALS 38057 30167.35
DEVELOPED "C" = 0.79
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q = CiA
OVERALL: 2.20
ROADS ONLY: 2.01
SwALE VOLUME REQUIRED: ASHALT AREA x 1/2"
1275 CUBIC FEET
2550 SQUAR.E FEET @ .5' DEPTH
PROJECT SWALE:
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 94006 TIME OF CONCENTRATION (minutes)
DETENTION BASIN DESIGN BASIN: b
REVIEWER: Lennemann Tc (overland) Tc (gutter) Areas 'C" A'C
NUMBER OF DRYWELLS PROPOSED DATE: 03-Oct-94
1 Single (type A) 0 Double (iype B) Ct = 0.15 L2 = 0 36600 0.70 0.90 0.632231
Total Area (calc.) (see H1) 0.81 Z1 = 0 6283 0.14 0.17 0.02452
Time of Conc. (calc.) (see H1) 5.00 L1(A) = 0 Z2 = 0 1174 0.03 0.90 0,024256
Composite °C" (calc.) (see 1-11) 0,78 N(A) = 0 B= 0 0.00 0.00 0
Time of Conc. (min) 5.00 S(A) = 0 n= 0 0.00 0.00 0
Area (Acres) 0.87 s= 0 0.00 0.00 0
C' Factor 0.78 Tc (A) = 0.00 d= 0 0,00 0.00 0
Impenrious Area (sq, ft.) 31174 Total A Camp "C°
Valume Provided 208: 1215 starm: 1275 L1(B) = 0 Tc (gu) = 0.00 0.87 0.78
Outflow (cfs) 0.3 N(B) = 0 Tc(A+g) = 0.00
Area' C" Factor 0.68 S(B) = 0 Q=C'I'A= 2.17
Tc(tot.) = 5.00 Q(est.) = 0.00
#1 #2 #3 #4 #5 #6 #7 Tc (B) = 0.0 Intensity = 3.18
Time Time Intensity Q dev. V in V out Storage A= 0
Inc. Inc. WP = ERR
(min.) (sec.) (inJhr.) (cfs) (cu. ft.) {cu. ft.} (cu, ft.) R = ERR
(#1'60) (A"C'#3) (Outf.'#2) (#5-#6) V = ERR
Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = ERR
5.00 300.00 3.18 2.17 871 90.00 781 Tc (overland) = CY(L1'WS"0.5)"0.6) Q(est) = ERR
Ct = 0.15
5 300 3.18 2,17 871 90 781 L1 = Length of Overland Flow Holding = 0.00
10 606 2,24 1.53 1011 180 891 N= fric4on factor of overland flow (.4 for average grass cover)
15 900 1.77 1.21 1208 270 938 S= average slope of overland flow
20 1200 1.45 0.99 1286 360 926 Tc (gutter) = Length (ft.)Nelocity (ftJsec.)160
25 1500 1.21 0.82 1320 450 870 6= Battom width oi guaer or ditch
30 1800 1.04 0.71 1347 540 807 Z1= inverse of cross slope one of ditch
35 2100 0.91 0.62 1365 630 735 Z2 = inverse of cross slope two of ditch
40 2400 0.82 0.56 1397 720 677 d= depth of flow in gutter (estimate, check esdmate with Flow)
45 2700 0J4 0.50 1412 810 602 Area = d`B+d"2J2'(Z1+Z2)
50 3000 0.68 0.46 1436 900 536 Wetted perimeter= B'd+(11sin(atn(121))+iJsin(atn(122))} 55 3300 0.64 0.44 1483 990 493 Hydraulic Radius = R= AreaMletted Perimeter
60 3600 0.61 0.42 1538 1080 458 Velocity =1.4861n'R".667's".5
65 3900 0.60 0.41 1635 1170 465 Flow = Velocity'Area
70 4200 0.58 0.39 1699 1260 439 n= 0.016 for asphalt
75 4500 0.56 0.38 1755 1350 405 s= longitudinal slope of guaer
80 4800 0.53 0.36 1769 1440 329
85 5100 0.52 0.35 1842 1530 312
90 5400 0.50 0.34 1873 1620 253
95 5700 0.49 0.33 1936 1710 226
100 6000 0.48 0.33 1995 1800 195
DRAINAGE POND CALCULATIONS
Required grassy swale pond storage volume
= Imperoious Area x.5 in.! 12 inJft. = 1324 cu. ft.
provided: 1275 cu. ft. No Good
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum storage required by Bovvstring = 938 cu. ft.
provided: 1275 cu. ft. OK!
Number and type of Drywells Required = t Single 0 Double
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 94006 TIME OF CONCENTRATION (minutes)
DETENTION BASIN DESIGN BASIN: a
REVIEWER: Lennemann Tc (averland) Tc (gutter) Areas C. A'C
NUMBER OF DRYWELLS PROPOSED DATE: 03-Oct-94
1 Single (type A) 0 Double (type B) Ct = 0.15 L2 = 0 12790 0.29 0.90 0.264256
Total Area (calc.) (see Hi) 0.53 Z1 = 0 8320 0.19 0.17 0.03247
Time of Conc. (calc.) (see H1) 5.00 L1(A) = 0 Z2 = 0 1790 0.04 0.90 0.036983
Composite "C" (calc.) (see H1) 0.63 N(A) = 0 B= 0 0.00 0.00 0
Time of Conc. (min) 5.00 S(A) = 0 n= 0 0.00 0.00 0
Area (Acres) 0.53 s= 0 0.00 0.00 0
C' Factor 0.63 Tc (A) = 0.00 d= 0 0.00 0.00 0
Imperoious Area (sq. ft.) 14580 Total A Comp °C°
Uolume Provided 208: 533 storm: 533 L1(B) = 0 Tc (gu) = 0,00 0.53 0.63
Outflow (cfs) 0.3 N(B) = 0 Tc(A+B) = 0,00
Area' C" Factor 0.33 S(B) = 0 Q=C'I"A= 1.06
Tc(tot.) = 5.00 Q(est.) = 0.00
#t #2 #3 #4 #5 #6 #7 Tc (B) = 0.0 Intensity = 3.18
Time Time Intensity Q dev. V in V out Storage A= 0
Inc. Inc. WP = ERR
(min.) (sec.) (inJhr.) (cfs) {cu. ft.} (cu. ft.) (cu, ft.) R = ERR
(#1'60) (A'C'#3) (Outf.`#2) (#5-#6) V = ERR
Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = ERR
5.00 300.00 3.18 1.06 427 90.00 337 Tc (overland) = Ct'(L1'N1S"0.5)"0.6} Q(est) = ERR
Ct = 0.15
5 300 3.18 1.06 427 90 337 L1= Length of Overland Flow Holding = 0.00
10 600 2.24 0.75 525 180 345 N= friction factor of overland flow (.4 for average grass cover)
15 900 1.77 0.59 592 270 322 S= average slope of overland flow
20 1200 1.45 0.48 630 360 270 Tc (gutter) = Length (ft.)Nelocity (ftJsec.)J60
25 1500 1.21 0.40 641 450 197 B= Bottom width of gutter or ditch
30 1800 1.04 0.35 660 540 120 Z1= inverse of cross slope one of ditch
35 2100 0.91 0.30 669 630 39 Z2 = inverse of crass slope two of ditch
40 2400 0.82 0.21 685 720 -35 d= depth of flow in gutter (esGmate, check estimate with Flow)
45 2700 0.74 0.25 692 810 -118 Area = d'B+d"2!2'(Z1+Z2)
50 3000 0.68 0.23 704 900 -196 Wetted perimeter = B'd+(11sin(atn(121))+1/sin(atn(122)))
55 3300 0.64 0.21 121 990 •263 Hydraulic Radius = R= AreaMletted Perimeter
60 3600 0.61 0.20 754 1080 •326 Velocity =1.4861n`R".667's".5
65 3900 0.60 0.20 801 1170 -369 Flow = Velociiy'Area
70 4200 0.58 0,19 833 1260 -427 n= 0.016 for asphaft
75 4500 0.56 0.19 860 1350 -490 s= longitudinal slope of gutter
80 4800 0.53 0.18 867 1440 •573
85 5100 0.52 0.17 903 1530 -627
90 5400 0.50 0.17 918 1620 -702
95 5700 0.49 0,16 949 1710 •761
100 6000 0.48 0,16 977 1800 -823
DRAINAGE POND CALCULATIONS
Required grassy swale pond storage volume
= Imperoious Area x,5 inJ 12 inJft. = 608 cu. ft.
provided: 533 cu. ft. No Good
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum storage required by Bawstring = 345 cu. ft.
provided: 533 cu. ft. OK!
Number and type of Drywells Required = 1 Single 0 Double
BOWSTRING METH00 (TEN YEAR STORM DESIGM PROJECT: 94006 TIME OF CONCENTRATION (minutes)
DETENTION BASIN DESIGN BASIN: d
REVIEWER: Lennemann Tc (overland) Tc (gutter) Areas C. A'C
NUMBER OF DRYWELLS PROPOSED DATE: 03-Oct-94
i Single (type A) 0 Double (type B) Ct = 0.15 L2 = 0 11442 0.26 0.90 0236405
Total Area (calc.) (see H1) 0.36 Z1 = 0 4285 0.10 0.17 0.016723
Time of Conc. (calc.) (see H1) 5.00 L1(A) = 0 Z2 = 0 0.00 0.90 0
Composite'C° (calc,) (see H1) 0.70 N(A) = 0 B= 0 0.00 0.00 0
Time of Conc. (min) 5.00 S(A) = 0 n= 0 0.00 0.00 0
Area (Acres) 0,36 s= 0 0.00 0.00 0
C' Factor 0.70 Tc (A) = 0,00 d= 0 0.00 0.00 0
Imperoious Area (sq. ft.) 11442 Total A Comp °C"
Volume Provided 208; 477 storm: 477 L1(B) = 0 Tc (gu) = 0.00 0.36 0.70
Outtlow (cfs) 0.3 N(B) = 0 Tc(A+B) = 0.00
Area' C" Factor 0,25 S(B) = 0 Q=C'I'A= 0.80
Tc(tot.) = 5.00 Q(est.) = 0.00
#1 #2 #3 #4 #5 #6 #7 Tc (B) = 0.0 Intensity = 3.18
Time Time Intensity Q dev. V in V out Storage A= 0
Inc. Inc. WP = ERR
(min.) (sec.) (in.lhr.) (cfs) (cu, ft.) (cu. ft.) (cu. ft,) R= ERR
(#1'60) (A'C'#3) (Ouff,'#2) (#5-#6) V = ERR
Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = ERR
5.00 300.00 3.18 0.80 324 90.00 234 Tc (overland) = Ct'(Lt •NIS"0.5)"0.6) a(est) = ERR
Ct=0,15
5 300 3.18 0.80 324 90 234 L1 = Length of Overland Flow Holding = 0.00
10 600 2.24 0.57 398 180 218 N= friction factor of overland flow (.4 far average grass cover)
15 900 1.77 0.45 449 270 179 S= average slope of overland flow
20 1200 1.45 0.31 478 360 118 Tc (gutter) = Lengtlh (ft.)Nelocity (ftJsec.)!60
25 1500 1.21 0.31 491 450 41 B= Bottom width of gutter or ditch
30 1800 1.04 0.26 501 540 -39 Z1= inverse of cross slope one of ditch
35 2100 0.91 0.23 507 630 -123 22 = inverse of cross slope lwo of ditch
40 2400 0.82 021 519 720 -201 d= depth of flow in gutter (estimate, check estimate with Flow)
45 2700 0.74 0.19 525 810 -285 Area = d'B+d"212'(Z1+Z2)
50 3000 0.68 0.11 534 900 -366 Wetted perimeter= B'd+(11sin(atn(1R1))+11sin(atn(1lZ2)))
55 3300 0.64 0,16 551 990 -439 Hydraulic Radius = R= ArealWetted Perimeter
60 3600 0.61 0.15 572 1080 -508 Velociry =1.486ln'R".667's".5
65 3900 0.60 0.15 608 1170 -562 Flow = Velocity'Area
70 4200 0.58 0.15 632 1260 -628 n= 0.016 for asphalt
75 4500 0.56 0,14 652 1350 -698 s= longitudinal slope of gutter
80 4800 0.53 0,13 658 1440 •782
85 5100 0.52 0.13 685 1530 •845
80 5400 0.50 0.13 696 1620 -924
95 5700 0.49 0,12 720 1710 -990
100 6000 0.48 0.12 741 1800 -1059
DRAINAGE POND CALCULATIONS
Required grassy swale pond storage volume
= Impervious Area x.5 in.112 in.Ht. = 477 cu, ft.
provided: 477 cu. ft, OK!
DRYWEIL REQUIREMENTS -10 YEAR QESIGN STORM
Maximum storage required by Bowsaing = 234 cu. ft.
provided: 477 cu. ft. OK!
Number and type of Drywells Required = 1 Single 0 Double
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 94006 TIME OF CONCENTRATION (minutas)
DETENTION BASIN DESIGN BASIN: c
REVIEWER: Lennemann Tc (overland) Tc (gutter) Areas C. A'C
NUMBER OF DRYWELLS PROPOSED DATE: 03-Oct-94
1 Single (type A) 0 Double (type B) Ct = 0.15 L2 = 0 18587 0.43 0.90 0.384029
Total Area (calc.) (see H1) 0.52 Z1 = 0 3900 0.09 0.17 0.01522
Time of Conc, (calc.) (see 1-11) 5,00 L1 (A) = 0 Z2 = 0 320 0.01 0,90 0.006612
Composite °C" (calc.) (see H1) 0.78 N(A) = 0 B= 0 0.00 0,00 0
Time of Conc. (min) 5.00 S(A) = 0 n= 0 0.00 0.00 0
Area (Acres) 0.52 s= 0 0.00 0,00 0
C' Factor 0.78 Tc (A) = 0.00 d= 0 0.00 0,00 0
Impervious Area (sq. ft.) 18907 Total A Comp'C'
Volume Provided 208; 780 storm: 780 L1(B) = 0 Tc (gu) = 0.00 0.52 0.78
Oulflow (cfs) 0.3 N(B) = 0 Tc(A+B) = 0.00
Area' C° Factor 0.41 S(B) = 0 Q=C'I'A= 1,29
Tc(tot.) = 5.00 Q(est.) = 0.00
#1 #2 #3 #4 #5 #6 #7 Tc (B) = 0.0 Intensity = 3.18
Time Time Intensity Q dev. V in V out Storage A= 0
Inc. Inc. WP = ERR
(min.) (sec,) (in,lhr.) (cfs) (cu. ft.) (cu, ft.) (cu. ft.) R = ERR
(#1'60) (A'C'#3) (Ou#."#2) (#5-#6) V = ERR
= Tc (totaD = Tc (overland) + Tc (gutter) Tc(gu) = ERR
5.00 300.00 3.18 129 519 90.00 429 Tc (overland) = Ct"(L1'IVIS"0.5)"0.6) Q(est) = ERR
Ct = 0.15
5 300 3.18 1.29 519 90 429 L1 = Length of Overland Flow Holding = 0,00
10 600 2,24 0.91 638 180 458 N= ftictian factor of overland flow (.4 for average grass cover)
15 900 1.17 0.72 720 270 450 S= average slope of overland flow
20 1200 1.45 0.59 766 360 406 Tc (gutter) = Length (ft.)Nelocity (ft.lsec.)!60
25 1500 1.21 0.49 787 450 337 B= Bottom width of gutter or ditch
30 18U0 1.04 0.42 803 540 263 Z1= inverse of cross slope one oi ditch
35 2100 0.91 0.31 813 630 183 Z2 = inverse of cross slope two of ditch
40 2400 0.82 0.33 833 720 113 d= depth of flow in gutter (estimate, check estimate with Flow)
45 2700 0.74 0.30 842 810 32 Area = d"B+d"2l2'(L1+Z2)
50 3000 0.68 0.28 856 900 -04 Wetted perimeter= B`d+(lfsin(atn(11Z1))+1lsin(atn(1fZ2)))
55 3300 0.64 026 884 990 -106 Hydraulic Radius = R= ArealWetted Perimeter
60 3600 0.61 0.25 917 1080 -163 Velceiiy =1,486ln'R".667's".5
65 3900 0.60 0.24 975 1170 -195 Flow = Velocity'Area
70 4200 0.58 024 1013 1260 -247 n= 0.016 for asphalt
75 4500 0.56 023 1046 1350 -304 s= longitudinal slope of gutter
80 4800 0.53 022 1054 1444 -386
85 5100 0.52 0.21 1098 1530 432
90 5400 0.50 0.20 1117 1620 -503
95 5700 0.49 020 1154 1710 -556
100 6000 0.48 0.19 1189 1800 -611
DRAINAGE POND CALCULATIONS
Required grassy swale pond storage volume
= Impervious Area x.5 in.! 12 in.lft. = 788 cu. ft.
provided: 780 cu. ft. No Good
DRYWELL REDUIREMENTS -10 YEAR DESIGN STORM
Maximum storage required by Bowstring = 458 cu, ft.
provided: 764 cu. ft. OK!
Number and type of Drywells Required = 1 Single 0 Double
~
BUWSTRING METHOD
DETENTION BASIN DFSIGt1
Date: 02-Sep-94
PROJfi(-',T- NW ~~,rner of Missirin & PinFs Filename: Ni&Pbow-B
BASIN NO.- g Prepared by:
TAYLOR ENGINEERING, INC.
Time IncremFnt, (miri) ; 5.00
;
Time of Concentration (min) ; 5.00
;
Qutflow (rfs) ; 0.30 ;
De°vign j'Fa1^ ~loW (yr) i 10.00 j
Area (acres) ; 0.87 ;
I?eveloped .'tC" factor ; 0.79 ;
#l ; #2 ; #3 ; 04 ; #5 ; #6 ; #7 ;
Timp- inc. ; Timp. inc, ; Intensit,y ; "Q" dev. ; "V " in ; "V" out ; Storage ;
(min) ~ (min) ~ (rairL) ~ (c.f.s. ) ~ (cu, ft,. ) ; (<•u. ft,. (cu- ft- ) ~
; 01 * 50) ~ :(A * r * #3) : (sFF bFlrjw) ► (n>>tflrjw*~2) ~ (05 - #6) ~
, ------I -5 ; 300 ; 3.18 ; 2.19 ; 879 ; 90 ; 789 ;
10 ; 600 ; 2.24 ; 1.54 ; 1081 ; 180 ; 901 ;
15 ; 900 ; 1.77 ; 1.22 ; 1219 ; 270 ; 949 ;
ZO ; 1200 ; 1.45 ; 1.00 ; 1298 ; 350 ; 938 ;
25 ; 1500 ; 1.21 ; 0.83 ; 1332 ; 450 ; 882 ;
30 ; 1800 ; 1.04 ; 0_71 ; 1360 ; 540 ; 820 ;
. 35 ; 2100 ; 0.91 ; t'~.63 ; 1377 ; 530 ; 747 ;
- - 40 ; 2400 ; 0.82 ; 0.56 ; 1410 ; 720 ; 690 ;
45 ; 2700 ; 0.74 ; 0.51 ; 1425 ; 810 ; 615 ;
50 ; 3000 ; 0.68 ; 0.47 ; 1450 ; ~?oo ; 550 ;
55 ; 3300 ; 0.54 ; 0_44 ; 1495 ; 990 ; 506 ;
50 ; 3500 ; 0.51 ; 0.42 ; 1552 ; 1080 ; 472 ;
65 ; 3900 ; 0 . 60 ; 0.41 ; 1650 ; 1170 ; 480 ;
70 ; 4200 ; 0.58 ; 0.40 ; 1715 ; 1260 ; 455 ;
75 ; 4500 ; 0.56 ; 0.38 ; 1771 ; 1350 ; 421 ;
80 ; 4800 ; 0.53 ; 0.36 ; 1785 ; 1440 ; 346 ;
85 ; 5100 ; 0.52 ; 0.35 ; 1859 ; 1530 ; 329 ;
90 ; 5400 ; 0.50 ; 4.34 ; 2891 ; 1624 ; 271 ;
95 ; 5700 ; 0.49 ; 0.34 ; 1954 ; 1710 ; 244 ;
100 ; 6000 ; 0.48 ; 0.33 ; 2013 ; 1800 ; 213 ;
V in = (1.34 dev. * t ) f or t. ! Tc
V in = (Q dev. * t + .34 * Q dev. * Tc ) f or t > To
TAYLOR ENGINEERING, INC.
w. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
FILFNAMS: NWC-C.WKl 10 YFAR RFTi1KN FREQ1JfiNCY
PROJECT: NWC Mission & Pines
DATE: 25-Aug-94
TOTAL AREA (AC) 0.52
DESIGNBD: S. Johnson
CHECKED:
BASIN: C
; (2) ~ (3) ~ (4)
TYPE OF SURFAGE ;SQUARE FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD ; 18587 ; 0.9 ; 16728.3
SIDEWALK - 208 NOT REQD ; 320 ; 0.9 ; 288
LANDSCAPF AREAS ; 3900 ; 0.25 ; 975
0
0
0
0
. 0
TOTALS 22807 17991.3
DEVELOPED "C" = 0.79
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 1.31
ROADS ONLY: 1.22
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
774 CUBIC FEET
1549 SQUARE FEET C.5" DEPTH
PROJECT SWALE:
BOWSTRING METHOD
-UETENTION BASIN DESIGN
Date : 02-Sep-94
PROJECT- NW t'.,rjrnr--r of Mission & Pines Filename_ MPbow-C"
BAS I N NO.- C Prepar•ed bv :
TAYLOR ENGINEERING, INC.
Time Inc•rFmerit (min ) ' 5.00
'
TimP of t'.oncentration (min) ; 5.04 ;
Outf low ( r.f s) ; 0.30
;
Uesign yFar f low (y'r ) ; 10.00 ;
Area (acres) ' 0.52 '
,
I}evp-loped "C" f af•tor ; 0.79
;
#1 ; #2 ~ #:3 ; #4 #6 ; 07 ;
Time inc, ; Timp- inc. ; IntFnsit,y ; "Q" dev. ; "TI" iri ; V. f,ut ; Stor•age ;
(min) ~ (min) ~ (min) ~ (c.t.s.) ~ (ou. ft. ) ; (cu, ft,. ) ~ (cu. ft. )
~
~ (#1 * 50) ~ :(A * C * #3) ~ (see below) ~ (outflow*4L) ~ (05 - #6) ~
; 300 ; 3.18 ; 1.31 ; 525 ; 90 ; 435 ;
10 ; 600 ~ 2.24 ; 0.92 ; 646 ; 180 ; 466
;
15 ; 904 ; 1.77 ; 0.73 ; 729 ; 270 ; 459 ;
20 ; 1 L00 ; 1.45 ; 0.60 ; 776 ; 350 ; 415 ;
25 ; 1500 ; 1.21 ; 0.50 ; 796 ; 450 ; 346 ;
30 ; 1800 ; 1.04 ; 0.43 ; 813 ; 540 ; 273 ;
, 35 ; 2100 ; 0.91 ; 0.37 ; 823 ; 630 ; 193
;
- 40 ; 2400 ; 0.82 ; 0.34 ; 843 ~ 720 ; 123 ;
45 ; 2700 ; 0.74 ; 0.30 ; 852 ; 810 ; 42 ;
50 ; 3000 ; 0.68 ; 0.28 ; a67 ; 900 ; -33 ;
55 ; 3300 ; 0.54 ; 0.26 ; 894 ; 990 ; -96 ;
60 ; 3600 ; 0_61 ; 0.25 ; 928 ; 1080 ; -152 ;
65 ; 3900 ; 0.60 ; 0.25 ; 985 ; 1170 ; -184 ;
70 ; 4200 ; 0.58 ; 0.24 ; 1025 ; 1260 ; -235 ;
75 ; 4500 ; 0.56 ; 0.23 ; 1059 ; 1350 ; -291 ;
80 ; 4800 ; 0.53 ; 0.22 ; 1067 ; 1440 ; -373 ;
85 ; 5100 ; 0_52 ; 0_21 ; 1111 ; 1530 ' -419 '
90 ; 5404 ; 0 _ a0 ; 0 _ 21 ; 1130 ; 1620 ? -490 ~
95 ; 5700 ; 0_49 ; 0_20 ; 1163 ; 1710 ; -542 ;
100 ; 6000 ; 0 _ 48 ; 0.20 ; 1203 ; 1800 ; -597 ;
V in =(1.34 Q drv t) f ar t< Tr_.
V in = (Q dFv. * t, + .34 * Q dFv. . * To) for t > Tc
;
TAYLOR ENGINEERING, INC.
W. 106 MISSION AVE., SUITE 206
SFOKANE, WA. 99201
RATIONAL METHOD
FILENAMB: NWC-D.h1K1 10 YEAR k8T1JKN FRFQi1BNrY
PROJECT: NWC Missian & Pines
DATE: 25-Aug-94
TOTAL A.RSA (AC) 0.36
DESIGNED: S. ►Johnson
CHECKED:
BASIN: D
~ (2) ~ (3) ~ (4)
TYPS OF SURFACE ;SQUARE FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD ; 11442 ; 0.9 ; 10297.8
SIDEWALK - 208 NOT REQD 0.9 ; 0
LANDSCAPE AREAS ; 4285 ; 0_25 ; 1071.25
0
,
0
0
0
' ' ' 0
--------------TOTALS 15727 11369.05
DEVELOPFD "C" = 0.72
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.83
ROADS ONLY: 0.75
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
477 G`tJBIC FEET
954 SQUARE FEE'T @ .5' DEPTH
PROJECT SWALS:
' B014STRING METHOD
- DETENTION BASIN DESIGN
Date: 02-Sep-94
PROJECT- NW Corner r,f Mission & Pines Filename: MRzPbaw-U
BASIN N0.- U Prepared by:
TAYL,OR ENGiAiEBRING, INC.
Time Inr.:rFment (min ) ; 5.00
;
Time of !'oncentratian (min) ; 5.40 ;
Outflow (cfs) ; 0.30 ;
Design year flow (Yr) ~ 10-00 ~
Area (arres) ; 0.36 ;
Developed "C" factor ; 0.72
;
#1 ; #2 ; #3 ; #4 ; #5 ; #6 ; #7 ;
Time inr . ; Time inc. ; IntenBity ; "Q" dev_ ; "V " in ; "V" out ; Stor•age ;
(min) ~ (min) ; (min) ~ (f..f.s. ) ' (f.u, ft,. (c>>. ft. t'r-'u- ft.
~ (#1 * 60) ~ ; (A * r * #3) ► (see below) i (UUtf lrJW*#L) ; (#5 - #6) ~
i
5 ; 300 ; 3.18 ; 0.82 ; 331 ; 90 ; 241 ;
10 ; 500 ; 2.24 ; 0.58 ; 408 ; 180 ; 228 ;
15 ; 0000 ; 1.77 ; 0.45 ; 450 ; 270 ; 190 ;
20 ; 1200 ; 1.45 ; 0.38 ; 489 ; 350 ; 129 ;
25 ; 1500 ; 1.21 ; 0.31 ; 502 ; 450 ; 52 ;
_ 30 ; 1800 ; 1.04 ; 0.27 ; 513 ; 540 ; -27 ;
, 35 ; 2100 ; 0.91 ; 0.24 ; 519 ; 630 ; -111 ;
40 ; 2400 ; 0.82 ; 0.21 ; 532 ; 720 ; -188 ;
45 ; 2700 ; 0.74 ; 0.19 ; 537 ; 810 ; -273 ;
50 ; 3000 ; 0.68 ; 0.18 ; 547 ; 900 ; -353 ;
55 ; 3300 ; 0.64 ; 0.17 ; 564 ; 990 ; -426 ;
60 ; 3500 ; 0.61 ; 0.15 ; 585 ; 1080 ; -495 ;
65 ; 3900 ; 0.60 ; 0.16 ; 622 ; 1170 ~ - 54F3 ;
70 ; 4200 ; 0.58 ; 0.15 ; 647 ; 1260 ; -613 ;
75 ; 4500 ; 0.56 ; 0.15 ; 568 ; 1350 ; -682 ;
80 ; 4800 ; 0.53 ; 0.14 ; 573 ; 1440 ; -757
;
85 ; 5100 ; 0.52 ; 0.13 ; 701 ; 1530 ; -829 ;
90 ; 5400 ; 0.50 ; 0.13 ; 713 ; 1620 ; -907
;
95 ; 5700 ; 0.49 ; 0.13 ; 737 ; 1710 ; -973 ;
100 ; 5040 ; 0.48 ; 0.12 ; 759 ; 1840 ; -1041 ;
V in = (1.34 dFv. . ~ t ) f or t : Tc
V in = (Q dev. ~ t + .34 * Q dev. * Tr_ ) f or t > Tc
TAYLOR ENGINEERINU, INC_
W. lOf MISSION AVg., St1ITB 246
SFOKANE, WA. 99201
P,ATIONAL METHOD
FILFNAIIfi: N4AtC-RFT.WK1 10 YEAR PBTIIkN FREQt1ENCY
PROJErT: NWl: Mission & Pines
DATE : 2 5-Aug-94
TOTAI, AREA ( PL) 0.33
DESIGATFU: S. JUhI18oT1
CHEr.KFD:
BASIN: Retail Building Roof
~ (2) ~ (3) ~ (4)
TYPF OF SURFACE ;SQUARE F00'TAGE;PUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD 0.9 ; 0
ROOF - 208 NOT REQD ; 14470 ; 0.9 ; 13023
LANDSCAPE AREAS 0.25 ; 0
0
0
0
Q
. 0
-----TOTALS 14470 13023
DEVELOPED "C" = 0.90
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.95
ROADS ONLY: 0.00
SwALE VOLUME REQUIRED: ASHALT AREA x 1/2"
0 CUBIC FEET
0 SQUARE FEET @ .5' DEPTH
PROJECT SWALE:
TAYLOR ENGINEERING, INC.
W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
FILBNAMF: idWC-43FF.WK1 10 YBAR Rh'TURt1 FR~QUFNCY
PROJBCT: NwC Mission & PinPs
DATB: 25-Aug-94
TOTAL ARSA (P.C) 0.15
DESIGNSD: S. ►JalinufJYl
CHECKED:
BASIN: Office Building RQOf
~ ~ (3) ~ (4)
TYPE OF SURFACF ;SQLIARE FOOTAGE;RUNOFF COEFF. ; (2 x 3)
ROADS & ASPHALT-208 REQD 0.9 ; 0
ROOF - 208 NOT REQD ; 6635 ; 0.9 ; 5971.5
LANDSCAPE AREAS 0.25 ; 0
0
0
0
0
0
TOTALS 6635 5971.5
DEVEIAPED "C" = 0.90
TIME OF CONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTFNSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.44
ROADS ONLY: 0.00
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
0 CUBIC FEET
0 SQUARE FEh'T @ .5' DEPTH
PROJEC7 SWALE:
,
TAYLOR ENGINEERING, INC.
W. 106 MISSION AVE., SUITE 206
SPOKANE, WA. 99201
RATIONAL METHOD
F I LENAMB : t1WC- FUT . WK 1 10 YEAK RETtJRN FREQIJENCY
PROJECT: NWC Mission & Pines
DATE: 25-Aug-94
TOTAL AREA (AC) 0.25
DESIGNED: S. Johnson
CHECKED:
BASIid: Future Building Roof
~ (2) ~ (3) ~ (4)
TYPF OF SURFACF ;SQUARE FOOTAGE;RUNOFF CAEFF. ; (2 x 3)
,
ROADS & ASPHALT-208 REQD 0.9 ; 0
ROOF - 208 NOT REQD ; 10730 ; 0.9 ; 9657
LANDSCAPE AREAS 0.25 ; 0
0
0
0
0
0
,
'I'OTALS 10730 9657
DETEIAPED "C" = 0.90
TIME OF OONCENTRATION (MIN): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) Q= CiA
OVERALL: 0.70
ROADS ONLY: 0.00
SWALE VOLUME REQUIRED: ASHALT AR.EA x 1/2"
0 CUBIG FEET
0 SQUARE FEET @ .5' DEPTH
PROJEt,T SWALS :
INLET CAPACITIES
' T ' '
~
/00~ 13AS
INLFT Nt1MBFP, B LBNrzTH 2.0 STATION East of RPtai I
TOTAL PEAK DI SC[-IAFcGE = 0.04 ( cf s)
GUTTER SLOPE = 0.0240 FT/FT PAVEMENT CROSS SLOPE _0.Q200 FT/FT
SPREAD AT A SLOPE OF .020 {ft_/ft_ } AND 0.02 (cfs) IS 1_47 (ft_ )
XXXXXXXMY, CilRB I N LET I NA SI1MP XxXXXXYXXX
~ P SFFBC. LENrTH (ft) = 5_50 H(ft) = 0.500
DEPTH OF WATER (ft) = 11.02 SPRSAU (ft) = 1.06
TC 32.56 /
~ ASP 32.56 ~ / .
' TC 34.30 qsp
ASP 33.80 ~ 32.92 ~ ~ .
~
ASP
} -cx ~ TC 33.42
TC 33.80' A";P 32.92 ;
TW ~~,~G p6 TC 33.0f
`l SP3380~
ASP
32.'
0 \-7n
TC 34.30 3.TC 3 2.51
ASP 33.80 ~ ASP 32.
ASP 32.20
~ TC 32.00
~
TC 33.30 ASP 32.00 i f
/
/ ASP 32.80 ~
~ RETAI I CURB fRANS1T10
FF = 2034.50
~
BSM T = 2022.00 2.9
qSP 32 9 ~
~ 2 B
A
~ TC 32.OL2 I c
asP 32.00 - - - `
~T ~ 3 ao
PSQ
1 ,
CURB TRANSITION r-
TCM. 50 TC 33.00
~
ASP 33.00 SP 32.50
331-26J .
i . . .
.
Ar, r Taylor e e ring, Lno.
• ' ~ n, CIYil Doaign and Lnnd P1.nnning
T T . . . . . . . OAS 13Q
0000 INLET NUMBER BB LENGTH 2.4 STATION East of Office
TOTAL PEAK DISCHARGE = 0.06 (efs)
GUTTER SLOPE = 0.0200 FT/FT PAVEMENT CROSS SLOPE = 0.0200 FT/FT
SPREAD AT A SIAPE OF .020 ( f t./f t.) AND 0.03 ( cf s) I S 1.71 ( f t.)
XXXXXXh7M CURB I NLET I N A SEItIF XYMMYYM
P EFFEC. LENGTH (ft) = 5_60 H(ft) = 0.500
DEPTH OF wATER (ft) _ 0.03 SPREAD (ft) = 1.39
ASP 32.76 "J~ L~ ~ - ~ TC 33.2
ASP 32.40
TC 32.40
. ASP 31.90
~ 1 CURB TRANSITION ASP
ASP 32.40
32.54 0 TC 32.40
2~32 ~ AS s /,ASP ~0
20
' I 31.50
ASP Af I CURB TRANSI
31.59 ~ G • TC 31.50
~A~P 31.50 - z
OF SWALE 0.8 ~BOITTOM Of
1~ ~ .
- L~ f
\ Oh0 -
N
~ ASP TC~~,31.,50 1/ _ t'~ •y'~' ' ~--,TC 31150 I
3'.50 _A SP 31.501 ,`G Q ASP ,31.50~
~ CURB TRANSITION CURB TRANSITIC
` i_ I I i t \ ~ ~ ►
2032 T \40 2032 ' ~
- A~A ~WiQ~ ~ SP331.90\
~
~ I t4jPT TC 32.90 .40 \ TC 32.90 ~
ASP 32.40 A ~ 1.90 ~/~ASP 32.40 ~
TC ~3.26 1
ASP 32.76 TC 33.26 ~TC 33.26
ASP ~2.76 ~ ~SP ~2.76 ~
i ~
~ ri R 1 rir.'" ~ ' •~LL.~.~
a -,N89'59"58' W - - - 1
~
A
~ Taylor e ering, Ino.
••Ciyil Deetgn and L.and Plnn.ning
7 T • _ . . . . . . . , .
-
INLET NUPBER C LENGTH 2.0 STATION West of Future,
TaTAL PEAK DISCHARGE _ 0.12 (cfs)
GUTTER SLOFE = 0.0200 FT/FT FAVEMENT CROSS SLiOPE = 0.0200 FT/FT
SPREAD AT A SIAPE OF .020 ( f t./f t.) AND 0.06 ( cf s) I S 2.21( f t.)
XXXXXX?XXX CURB I N LET I N A SUMP XXX~~XXX
P EFFEC. LENGTH (ft) = 5.60 H(ft) = 0.500 ' DEPTH OF WATER (ft) = 4.04 SPREAD (ft) _ 2.21
.,...A- „ - 11 i -:,---i-J-
\ ASP 32.76 ~ TC 33.26 ~
L
= TC 32.90 \V
y~\ = ASP 32.40
~ TC 32.40
ASP
^ . 31.90 ASP
ICURB TRANSITION ~ j 32.40
. _ SP •
4 TC 32.40
`
2032 TC .50 • /,ASP 317-90
ASP, 1.50 ~ 2032 -
~
A1 # I CURB TRANSITION ~
.ASP l G TC 31. 50 \
i~ASP 31..50-, ~
-30WALE EL. 2030.8 o( B0, ~ ^ F SW.
N ~
_ ~J \ o IN _
~ ASP Td 31.50 TC 31 I50 c
X.50 _,&S, P 3 1. 5 0 I N,`~, Q A S P , 3 1. 5 0f
~~-CURB TRANSITION CURB TRAN SIT10fJ (1
2032 2032 ' ~ ~
AIEA F-LOWIN61 TC 32.40 ~
ASP 31.90\ '
~ pt4L6TTC 32.90 TC A 40 TC 32.90~
ASP 32.a0 ASP Z1A ASP 32.40
TC 33.26 • r)i S
ASP 32.p6 TC 33.26 TC 33.26
~ASP 32.7f * j ASP ~2.76
1 ,
r, R 1
~ .
- - 1 S:LL'
. 489'59"b8 W
. ~
. -
.
~i s'r Taylor ~,grineering, Ino.
~ , Civil Doeign and Land Pl.nn.ning '
PIPE SYSTEM CA.PACITlES
r
r •
~ or~
ooe~
~
. . ~
►
,l 4~~~ J
. 4
w`"".... A
~
OFFICE ~
Q , 2033,50
~F
~
BSMT ~ 202-2.00
,
TyP&~A
D~,/`,F`!E C.L ' .
I
. . • e Q1,& Ia,a. .
W xOLylor a p~,~ing ,
~ /w ~ CI~ n nnd 1-.an
pea~'8
~ ~LA
1 ~ ~ ti~ ► ~ t
0.0. e7P '
D/ ~
i+c
lum
~
~
. ~ ~
„
-
~
~ ~ ~ C-~ •
~ ' .
.
u CN
~
~
~o
1 •
4 ,t
~
~►c.o-
~
~ e er~l.aa~• i?o. .
. JW ~ xaylor ~ d pl~►nnLnB
Clvil D°siBD' ond ~n
~
Circxilar Channel l~~lysis & Deaign
Solved wit~ Maming's Equation
~~n Channel - Unifarn flow
~~~~sheet Name: NWG Mission & Pines
Carrment: 3)eterymine capacity of G" atar-m drain 5olve For Full Flow Capacity
Given Input Data:
Diameter 0.50 ft
Slope............. 0.0300 ft/ft
Main ing' s n . . . . . . . 0.013
DischeLrge 0.97 cfs
~"~smputed Results:
FtxlI Flow Gapacity..... 0.97 ofs
Ful1 Flow Depth 0.50 ft
T elo'.r l L+y r r . . . a • ■ r • 4.95 fpiJ
FloW ArE3......... 0.20 9f
Critical Depth.... 0.47 ft
Critical S1ope.. 0.4259 ft/ft
Fercent Full 100.00 'WI
Full capacity..... 0.97 cfa
Q M @.94D 1.05 cfs
Froude Nunber.. . , . Ft]LL
Open Channel Flow Module, Version 3.21 (c ) 1990
Haestad liethadsa Inc. * 37 Brookside Rd * Waterburv, Ct 06708
Circular Channel Analysis & Design
Solved with Manning"s Equation
Open Channel - Uniform flow
Worksheet Name: NWC Mission & Pines
Comment: Determine capacity of 8" storm drain
Solve For Full Flow Capacity
Given Input Data:
Diameter.......... 0.67 ft
Slope.. 0.0250 ft/ft
Manning s n....... 0.013
Discharge......... 1.94 cfs
Gomputed Results:
Full Flow Capacity..... 1.94 cfs
Full Flow I}epth........ 0.67 ft
Velocity.......... 5.49 fps
Flow Area......... 0.35 sf
_ Critical Depth.... 0.62 ft
Critical Slope.... 0.0216 ft/ft
Percent Full...... 100.00 %
Full Capacity._... 1.94 cfs
QMAX C.94D........ 2.08 cfs
Froude Ntimber..... FULL
Open Ghannel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
Circular Channel Analysis & Design
Solved with Manning's Fquation
. . Open t.'hannF 1- Unif orm f low
Worksheet Name: NWC Mission & Pines
Comment: Determine capacity af 10" storm drain
So lve For F.il l F low C,apar ity
Given Input Data_
Diameter.......... 0.83 ft
Slope.. ' 0.0200 ft/ft
Mannings n....... 0.013
Discharge......... 3.07 cfs
r-xjTi1pUt.Pd RPSUltB:
Full Flow Gagacity..... 3.07 cfs
Full Flow Depth........ 0.83 ft
Velocity.......... 5.67 fps
Flow Area......... 0.54 sf
Critical Depth.... 0.76 ft
Critical Slope 0.0175 ft/ft
Percent Fu31...... 100.00 %
Full Capacity..... 3.07 cfs
9M C . 94D. . . . . . . . 3.30 cfs .
, Froude Ntimber . . . . . FULL
apen Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
~ .
mmdft~
~
S~
V'p`M•"~r•~ '•:S ~ ~~~;;f~~11~ ;I 1 i~ I ' p~/`~L ..%`~`jltji~p`uiti~~ "~J'
1 1P.7'•~l ..l'. • ~j '~ft~ y ~:'s '.W I1 I ~.~y4r. ~?1 ~ r `~A
~5~`,~',~ rl.jn ~ ~ ~Y',R.~ ~n`P' 1 Nf4 0 j,Y' „1~ (
lrkrri4l A ~'y~VV'r~ ~ y ~ ~ f~.• P ~
1
I; 1 4 ;N~'' jq:} A%6 ? d;•!~
'`~s~,%~`~~
h a~;,~ a ' ~ ei ~ 7~ a~ ' 4" ~ H ~
~`'~t•~l~l~l~
6 ,U' .~,~y/~1~ ~1•~ ~1„ Y~~~ ~~r, ~'~r,~~ i~,~.~~,'~~~y ~ i~~,.
J •4.`.fY4S~F~T S ,a; ~ ir~ ~ ,p0 r irt, ~~r ~ t:i ~ gm ~
e!
~r ,7 ~ ~ 'q•~ . f~ ~:,rY.1~~t ,~t~.A ~(~1~ - 1 - ~I ~ 1~
,j~~ ~ , i l !1 • . . 5 ~ ? I '+1 ~Y'~ ~ ` 4* ; j ~ j~.~~ ,~j' _
~ ~ii+] ~ I . I~ • 1. ~ .~r .Q . ~ ~ V . . ~ .1~ c~~ ` 1
ItTe' / , ~ '~~ul .i•.Y~ 'o'~~ , 4 ~ ~ tlt~. • ''jf_ . 1 ,r"n! . SlM t,': y ~L ry~ 1~,.
p't{~".
.1 i1.~ ; ~ ~ .t , , t/:''. ~ °•:li~? 4 :~~,r.. Q1 , b,v.r. In~`'~ '1~';. w ~41; . "k~ ti~ •
~ ~ U ~ ~S ~ > , ` a ~ . Z.:w,
I,d ~~i',,~ .,r~ '4•FkYv,~L , ~;~.~~'9 N: • ~ ~ ~ ,
VJ •i t: *fl~•~~~;? i1• , rv. ~ ~
~ ~x , C'F • . ~ Cf" Ti~;'t'~, W!~~ ti.. n.~ ~i,~, "~1;;• • '•,I Y,~t}
i ,a;t,,n i~ i ~~I !~~'1 f~ie'•{I ~ y
~ ~j, :~e~ko,~f r.l~~~~r .v~~f~ ~i~~• Y3,.Y'►W'L/Sy i;~ . • ~li~• ~ 1~ ~~ly,.dr~t~~1~.,i''i~Tt.' :s.~:.~a;t " ~i
~ ~ i. y~ ;;Y~i~~I..~,,'', ~ ~~ti•~:,;:~~.~ fIlr• ' ~ : Y ~C7t'. e _..l~, ' I!j'r,~;~.rfkJ~~ • 'r , ~ +Ci~.) ~
'•J?~~,C. ~jJI,~f2 r~ K~, r•~ r1. / w e' ~ r Y. rY• . ~t,... ~/hY. 4r~~
a ~ ry~~.. i. ~ . • ~ ~tiA f~ w.~
Q ~.I t W ~:a71 I ~i~F+dj ~ i•, . t Y ~:~!'..j~~~~ . (A .i F~v~i
~1,il ~ ~.~'tia,r4~{~1~y'~,~ ~,~..`~~,,,,~l~;•~~ip v~ p"~
~~k °i,~ fr' ;~A~~~nm ~ "~~~A' ~ ' ~a ~~'r'dtty,~,} I~ ~
St ~ 1 ?~~~tlf Wy ' i~ ~ q. ~ ~ ` G., 'F• ~ ' •i^ ~
,t ~ ~.i~';~k; ; , .,,•It ' , ~ ~ ~ b~ • j ~R'~'r~r~ .i.:1~~ ~-w.
+~*t ~1 !~I: ~ ~'~i..`' b ~.4~~ ~ ~ • ~I',i ~,y'~Nr' ~M ~ ~ ~,~l~~~y'~ ►;~!J~ W
~ • ~ ~ y , i ar~. (I ;f ; ~ ' . , ' ~ . .
~t1~f a y t `E',~;' US~ ' ~ r:~ ~ r~' ~ ' I ~ L.•`, ~ 'J' 4 , ~.,'+q J, ~
~ i ~ i ~ • , 'l'i..::«t.~ 4,'to~~ 4 • 1 ' ~I,~~ ~Z~' i;'~ ~I' { ~ '1 ~f~ ~.I
~ , ~r~;..' ~ : , . - . , , ~ .u'1 , ~ ~ „ e ^'SL~~' qa~ ~
~~,~~9 Y ~ I~ r . , ~J'~ . L ; ~ •'t t ~ l~r. - ~~~-'t'. ~ ~1~
L~
yi' ~4 1•~} b ir~;.;t7'~r~N..M`~~~~~~n5r,' t~i.~{U.~... Yi~ ~!T~~ E~J~ ;'~:~~:•r'~ 1~~~ ~►117TT i~tf ~ 4
r~ 0
~y~~"yyV.,~, ~t{' ~~i:,•:',~t~;W1 :~'~~+~~~r~ f''r l~ x~l, j .~j,^ L,~,`3Y"' ~i~i;V ' ' ~•~~',~~.'n,.~1 L ri61
4' ~^~t~+
'17i0
f r 1 r''01i0 S•~fr h'" ~'~~'~~'~'tl.~a't7` Cip~a4J.~ . . I :1- . ? l94'r.n~ I , a«~~• .L3 'i y y~,
; 1~~~••{Q. ~
1;~ '~~,~,~i~ / A1:.2i~~fC";'1 (f ii~ti~t~: A iia o, ~ ~ .*r„ '~e ,ii~ ~ ~ ~ 1. • ~ U~ ,•5...~ ~
~ V ~ ~ ~~~~~~„9~~i 1. ~ , ~ 1; ':•d. ; C,~ ~ .12a- ,
' ! :3~/~ ; ~'};„•'t~ iy • '~t~nl~. '<t ~ . , . . ' ~ „ ' x.; Q
iM~'1'~ •..e1~ i~' il~~~~~ljll . 1~~,.. ~ i.: Ci~7
~f l. 1~~ ; t ' t , ,,1~~'."~ ~ ~yO 5~ t '
r ~q' ~``.,V~ ~~q 1:•SPM~ ml~
~ ~ i ~ . r }'i~l r,~~ ~!r Y I~~ r;~, A;`~d~, ~("~r• d'~ ~ ,i. ~'~~~ny!'s °r ~ ~ ~ ^ s~l ~~~t N i,.: E~"•iV'i , r ~ ~ ~ Q
•l , ! , iM'' , ~ ~Jle 1~. •w'J,~ ~ i ~ ~ Yb Q . . ir,.~l~t~' ~ , ,H ~ f y 6T~ : ~ p~
~ +,~~r,"~ { '1 f ~ ~u~~"f•~ t;,k~~.:~ ~1 , ~,~~1 ~~j,,~~ ~ ~ s;. , :~ii6:~r..tr
r~ ,`W~~ ,Yi ~f ~x, 't~j ~li~y:+,',:p ,,~i L„ }~.i•" ~1. 's; M.' P, I 'v e.~,r.• S= ye J:-~}~° ~
' I r ~'F~• l.~y~, ' ,ir1~' • i:;d ~~~v,.r iP f ~ pG ~'~;T~'. ,~;.p~'y+~' ~i~6 e~~~,l ; ~ir:'~h~r 1• ~ Q
~A► - F'~ -"Q ~1~~•+ 4;~• p
~ ~ . '..i:~ i' oa r ~e~ rld ~ 1 ~f ~ ~ y " ~"~^'~Fy~1••'' • ~ 1'~ t ~ 7~~ O 1-i
qM,.»...~
~ h ~ ~ 1 i° Iu,7.' ,~A1AI~,.Nt ~ '•'T,N~ ~ { ~ 7 ' M ,~~1 •~1~'~!•~~Ir ~ ~
n ~ , i Y .
L ~ , • ~ P t~l! ~~~hti„, ,,'r ,v~~ ,.i rt ~ ii 1,L ~t•!,t
_ - M ( ,.P~~)~4f'~.' ~'~'ul~j ~'{~j~ .11 ' . ;~/i4`~~.'~'u~+,~ ~ ~
ra
i ~ ~ ~ ~lf~ •:r "H' ~ 6K.'~"' ~
R ~ t ~ ~ . ~•i ' ~ ~ ~ V
~ , r,4 ' i~, t,, ± ",L~~' r ~ V .
.r~.~ ~ ;j,~,~:. .r=,;;-;,.;,~.~ i~ -:~~Y ~,g, M{~
i e ~ r~"~ d~ ~i~tii~k,~ .,y„it 1 ~~i^~7 ~ ~U {r~" ~ ~I~, U~ ~ ~~r'J. ~i l+J~, ~ i •J4~ ~,~4"_ i~l~~~'I. ;"'Z~
' ~ ,~Y ;~~;i ~ , :i,; w;=;H'1 ~ Z w,~ ~ ~~~~f. ~ ~
, • ' a~h 4 ,~j sf ~E, ir~."~~.,•~Z~ ,~~i .L a.'~` r w I
D '
Q~~ •,~rjt~...~ ,a...'~
L S '1~ ~ ~j~1.i i, . 1 711~ `!-1 ~j V 14•i'Y ' ~~1,; ~„tt~ ;~•.Y "~'~i~ v%
( 1.;4' L
r•
~ .yt ~1 ~,1.'3 ~~~";i~ i'~ ~ ~r~ aP~,21 .°'h, .cb j • j~~ i If"~'" I{• '^✓::a~ 7t.~':O"; a,~ ~ ~ ~
t ~ ~ 1~' ; ~ 1' l'~~ ~f "~'y);'. , ~~.~.:~:i~b,~I' rr.. ! ry~'il I ~ 7Y I~ ~~~•~l~_ ~ , a.l {'•~N'~~ry •M~ I~ ~r ~.±Y~" ,4~ ; ~ ~
. A„. ~ '~El.~.,. ~ 'Y.. Qy, 'C!" 1 . 1 ~ ~.rb~ i:, ~'r'ly
;4~ ~ 1(t44Vti• ~~b 1 . ~l1►ri!
7 ~V,+j~~,~~ 'r~ it ~ ~''~,y~ w.;q`/''`~'j'~t~Tl~ ~,i•a si;W' ' m' ~ .
y." i Sy`! ~ ~ ~4r'~~~~• f ~ D ~y' UQ ' ~r~{c _tu ~r ~~^,:i~ .
~y 4Sir '7:~ ~b ,,,,•~'`r~s4r;~i~~~~'L.h'9..v..}f p~'
~ ,i~. . ~9~ ' ~:►•tr•.Ii17~~,t./•.il' _""t'~'`!?i~,r';~~''i(~j ..'~i+±,ky~!'1* ~tf'1~1
. Z Y'~Pi). ~`'f: pt;~ ~j~~J '~'4AY ~J~~~~ i~~:~i4 ° ~ .I" t,~s t~~ ~,ia~^ . ~ 1 ~I ';P7"r y~, ~
r✓t, ~;~1 ~,t yyi~, 1~" ~ ~~I}i' i~ n • ;,es~~.~M( ~
~ • ~ y ~P, s p~y ~ ~ d * y i ~ d (1' ~ ~ a; I ~ ,~l. '
~ ,4 .f~ ,~i rso ~~~{J „\~t~ ,c r~ti,l,•,llyl ~+1;~- t ~ t~4,~~'~Ij~~M~q,l~x'~(il" •i• ~~~,./~~~'1 ~ .
~ ~ N w ~
t, jF ~r
r~ Q h• I' k ~ tb ~~Ery • i ~ ~
•y, ~ ~y ,~,~:~y~[c.r~3t{Y~f;.~'~,. i1~tv,,~t m~~ ir1~ ,.i•, ,1f4t~.:
1• ~~i ~J ~
r.C j1~ ~ t,}! ~i~,'t 3~ti' 4.y ~i SI(i/C~ 7~' ~.t~~'~ F'. ~ ~y Y/il~ ~ 1~, ~
d~ ~l i{ r'1 ~('t{j Y11~ ~',I ,~J~~ rt V ~ , G''~~ 1~ N+ ~ i 1~ 1'•~'~--•y ~•I ~~~'1 ~ j yJ
e~~ ~f i~ h A 7/,d 1 ~ ~ ~ ~E 4 :1 ~ ~ ~ ~ 1 ~ •7
~4t ~ 'V, 'i1 1 ~ •t ~ ~ ~ I~;~ ~t~,p« f '~~,P ~ r~ ~ ~11 ...i~. t S
~'ir.. ;,r. a V t t~~,, ~ ~::J,•'• . , ,,~Y ;,~,~n,r=~,~ ~ ~1 ' ~
i~%; y1.~ ,~~d~ e'`''~{" ~,L' ~1~'~t~~if~t ~~..1~.~1~if^~w"~-~~'~~~''' _ A
: ~ ~y Qr• ~1 ~ -.~ii~' • ~.,e , r ~ 'i;i.l~.:y ~r ~~11 '1 ~ v y f .
~ , L;~l ~I ~1 ~ ' ~~fP ~.~1 ~ ~ b'~~~ f,
~
~ ~
. /~1Tiq;C~tM~NT 8
.
VICI N I T MAP
~
f li-eiiL%ti
r ` ~ uuu Z ~
x 9~0 Pit vel.~!l~ein
~M l R~ ! . ~ 1~~ • ' ~y~~\ N E R N .
$M~ ~R7 r WaterTank ~ . a\
2 •
. f ' ~ • i ~ ~ 9 9 3 \ ta U ..:..;:Y-~~;;%<;•:~:y'•`.'~ ~r:;:~' d . .
o ~ . ~ ,
~,r . ~ , ~ W' r:; " J ! „ •
- yyeii ~ i'. ~ ~ ?:r''~ ° „
,G~"~, - • . + • r ~ i•~• Su
-
R~S~N'v • /98~~Trent ~ Wt
~ : ' ~lSch ~ u.~~ ~ :r~I~f I
. . 4, . , ~ ~1 ~{ti ~ ~~r: •:~:4ii 1
ys • tiv:, i v. r..t_.
.I'....... • ~ ~ ` _ I' ~.A v ~ i~ I ,
A • • . Y.ti~ I
7 ~.~':Y.1•.1'.~1:: ~
• ~ • ~ ~ ~ ~ • . . . . • • • • ~ " t\~{;:; •.~~fi
: ~ • . . . . . 1 . , ~ Y::n;.ti•. 4 . .
r • ~ •..:•:.}ti ~
•I • . . . •'I ~ ' . ~ . . ~ . , ~ _ -1, Y-_ ` - ~ ~ T ~:T-;i'"+~~ ^ . v::: ~ I
~ • • r - _ ~ ~ti~v}.,.v • x_ . ~t
.(i~ ` 1 ~
~21e6p
- . o- • - j
.
, - ~y~~ ~i ~l 1 O ~\~o i~ ' I •~a~`
N~L A N D'Y E M P. I,R ~ I
~ ' : . . • -
; ~Q.~( zo0 I 961-w J .
]~....•..:1 - . , ~ ' ~fl„
~r •`~Ic , wT
21oa~. 10 aooo \ , • ~ - 1 1
- f 9
~ , ~~i ~ •_•a,~. - '~~Y•1 .Q, ~ i ( ~
Trailer - - r'' ~ ~ ~
~
• Park~ ION A L.
'
"I,~.~L_Ct SPdKANE INTERNAT
III1111' ~ ~ ` RLIN.6 TpN
;rni~.~ ~ ~ .•4 LAN~..,.~L
n ~l a ~ N
Park ~ ORT
I . h'':f 1 ~ -Z~~ ~i ii n ~'i yERN
2021
^ MISSION ~ • V
1 AVE
, _ . • ■~~Spo ka e alle,y ; o , o -~~_-?~bo
y
H O
LLI
~,•YR • .i _ Z ~ ` ' • • , , ~ ~ _
56
.
27 ~ . t 1058!;
~BOONE" ' • I ' VE ~ , ~ . ~ _ ~
A
2~~
.r- _ , f; • . - : r1
Y;- ,"~1NT ~f ~i' • S - ~
as
. ~ : ~ • $lake
d~..:_ ' • "'f.r: ` • w ' . ~ ' , SchZ.
:t 16 ir~~l 6t I~Orth Pine ~ f'_!i~' ~~ADWAY`^ 1 J' _ ' • . --^I . 1I -AVENIlE.• • I . '1 4 .
JrHighSch ~ - ~
-i" s i ' h 1 1 '
~ . .
•{z~~':ti-~~._ . ~ ~ 'r.. =,r~ • ~ ` ~ ~ ' - . - .
.rr iWettY
µ ~`-^•i^••,• ' - • : : , - ~2~$1~'• .
~S t
VAI~Y~'~~ . _
, . ~ WAY_~%~~I: - 1 II , \1,i
. ~ . . 10415 - Substat bn
OPPOR.~L~I~'IT _IZ ~
_ ,;v~,~- . . - . 1 .S . - . . . - ' . ~ ~ ~ - . - - Q • ,
MwcEe .ii . tr _-"i . • ' ' - Q - ' _ r . . \ ' , - ~ Q
1 - i ~ I ~ ~ ! c•~,.`'.• Q.• .e:. , ~ . . ~ .
•2..aiV Bql,• ~ ,•c• J •3•~":Yaj: ~ ' Oi" .{r.~ ` ' J .
_ . SPRAG r->~a;.'•" 's~~,~ .4VE`=~ ~2020
UE LAN£
~6
P~ m ; :.L'•: t . ~-i1 . ~ • ~ ~ • i ~ a • ~ J ' 1 • ~ . • . . ~ •
€ ~..q;J• • , ~q;t,i. - . ,
~ i ^ - - i:.+Fala~'+F.r'; ; s : ' ~ •o o :o Q/6 . I _ ~4:~'i ' •V, .
! i..= ' ~ `~I ~~~::q _ ~;t~:~. ' - ~ • ~ - ' ~
ABANDONED • I • ~
Taylor Eo.g-ineerin$, Ino.
, CiTil Design and Land Plenning
~
.
PROJECT NUMBER= 95002943 APPLICATION DATE= 05I04/95 PAGE= 02
CDMMEN'T S: ! !
FIRE DISTR EIRE FLOW TO SE 1~EVIEWED
COMMENT S :
S[JILI]ING PERMIT
CQN'Z'RACTOR= Ti.]NKNOGJ1tiT PHUNE=
STREET= UNKNOWN
ADDRESS= UNKNOWN WA TJNKNfl'W'N
NEW= X REMODEL= ADDITION= CHANGE OF USE=
DWELL []NITS- {7CCC7P. LD= 198 f3LI]G HGT= 25 STORIES= 2
BLDG WX U= 70 X 90 SQ FT= 5~~65 SCRI~"~A.~=N~A~~ I~
REQ P~,RKI~IG= 59 ##HANDIGAP~
DESCRIPTYON GROUP TYPE SQ FT VALL3A"I'TDN
a5865 356650.65
RE~TAURANT A-~
ITEM DESCRIPTION QLTANTITY FEE AMOUNT
CON1MERCI~-~IAL'[~ATIDN----- _ y 1539.00
PLArr xEvYEw FEE y 1000.35
a
STA''E SUF~CHPsRGE y 457.08
CDN~IERCIAL svRcx~GE JDL 110.00
• ZOCF~~-COMM S4FT-5-10K; 128 y
PAYMENT SUMNSARY
. PAYMEAIT DATE RECEIPT# PAYMENT AMOTJNT
05/03/95 00003664 _-__~1(118~55
TDTAL DUE= 2092.38 ToTA-L PAID= 1018,55
PERMIT TY PE FEE+AMOUNT - -A'lOUN'~ TPP~I D iA1~iGUNT -OW II~IG
_--_..~--..._r~,_~,- - J~1~LJ• 9.1 1018.55 2092.38
F71J~~1.J1~1.7 F~S~i-1~~ ~ .---r-.~t-=-r.- --r--
3110.93 101e,55 2092.38
PROCEsSED BY: JaxN LARs014
PRTNTED BY : JOHN LARSON .
THRNK YOLF
,
PROJECT NUMBER= 95002943 APPLICATION DATE= 05/04/95 PAGE= 01
THIS IS NOT A PERMIT ~
PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT
SITE STREET= 12117 E MISSION AVE ' PARCEL#= 45094.0111
ADDRESS= SPOFCANE WA 99206
PERMIT USE= APPLEBEE"S RESTAURANT & LOUNGE ~
PLAT#= 001837 PLAT NAME= OPP.TR. 1-354 ~
BLOCK= LOT= ZONE= B-3 DIST#= S ~
AREA= 00000000 F/A= F WIDTH= DEPTH= R/W= ~
# OF BLDGS= 1 # DWELLINGS= WATER DIST = MODERN Q~
\
OWNER= LAL ENTERPRISES INC. PHONE= 916 427 0259 ~
\
STREET= 7311 GREEN HAVEN DR #270 ~
~
ADDRESS= SACRAMENTO CA 95831
CONTACT NAME= JOHN REEVES PHONE NUMBER= 916 488 0834
BUILDING SETBACKS: FRONT= 140 LEFT= 40 RIGHT= 81 REAR= 25
REVIEW INFORMATION
DEPARTMENT REVIEW REQUIREMENT '
BUILDING REVIEW COORDINATOR - J LARSON
COMMENTS:
BUILDING PLAN REVIEW REQUIRED
COMMENTS: BUILDING SPRINKLERED BLDG - PLAN REQ'D
COMMENTS:
BUILDING ZONING/SITE REVIEW
COMMENTS:
ENGINEER SITE DRAINAGE TO BE REVIEWED r--,~ ~E✓loJ,S ~
COMMENTS : ~r~jeodE-~D .~1~ • ~t,.~) .,,~.S~t~.~~ 7-A~~~ c.~9v~C9. 3
HEALTHDIST FOOD SERVICE REVIEW
COMMENTS:
UTILITIES GREASE/OIL WASTES (ON SEWER) ~Pe-2.
PERM T DOCIJMENT TRANSMITTAL
,
Spakane Gounty Division of Buildings - 1026 IdV Broadway Ave.
Spakane, WA, 39260
, Project Address: Projecf
BuSinesS Narrle:
COIVTACT: P one: JW
F
I-Ma111i1g AdCIreSs.
COORaINATOR: ~ ~~one: _
~ ~
~~~~ULATED
Fire .
DesCrlpf Ion $uilding zoniflfl En9[necrs Realth oisa_ Uwnti$s sCAPca
-J ~
.~~~:Mc=~~Gr--7• ~
~
. y
~ ~ -
~
Recelved By
~
Date of Tf21nsmittal: Circulated by: i~~~. .
~ , .
~ 7 1997
SPOKA~~ ~OUNTY ENG1NEfR
' `r.+~►-~ ' r
t ~
raylor Engineermg Inc.
~ Civil Design and Land Planning pr;ncipals:
~ PerrY M. Tuvlor, P.E.
December 12 1997 Sta►aley R. Stirlittg
, MarkA. Aronson, P.E.
David C. Lnrsen, !'.E.
Mr. Bill Hemmin s P. E. Sp ~~C'tzivAss°`iat`s:
g, 'fl/~ ~o Scott M. Busdi, P.E.
Spokane County Engineers /VEC~U/VFrankR.lde,,asra
1026 West Broadway Avenue !j ^
S OICaIle, Washin tOQ 99260 8 Chief Financial Officer:
P g ,99? Edwin G. Wugnild
oFB~
0N
Re: Wolff Center at Mission & Pin.es p
(Amendment to Project # 94006) 44NNING~
Dear Bill:
The Wolff Center is an addition to an existing development located at the Northwest corner of
Mission and Pines. The attached plan shows grading to accommodate a new office building
and drive-through. The civil site work for the existing development was designed by our
office in 1994 and reviewed and approved by Paul Lennemann. This letter and attached
information is intended to be an amendment to the original drainage report and the original
grading and drainage plan.
Drainage Basin "A" originally required 1066 square feet of swale area and one single depth
dcywtll for drainage disposal. The drywell was installed as required, however the swale area
shown on our original drawing and constructed in the field, had a bottom area of 2700 square
feet. Revised calculations which include the new drive-through area, show that the existing
swale and drywell are adequate to dispose of the additional drainage created by the drive-
through. No additional drainage work is required for this development. Revised calculations
are attached.
All other elements of the development were built with the original construction or are the same
as designed previously. Roof drainage for the Wolff Center building was designed with the
original development and will not change.
Please feel free to call if you have any questions or concerns.
Sincerely,
T YLOR ENGINEERING, INC.
a~LQ ~4avu.
Sandra Anthony, P. E.
Project Engineer
Enclosure
cc: Keith Ballantyne, BWA
106 W. Mission Ave. • Spokane, WA 99201-2345 •(509) 328-3371
SAA/1rt97-127/hcmmltr.wrd FAX (509) 328-8224
` Y .
. , '
~ • ° • ~ • ' ~ . ~ . • .
AOJU5TI.IENT SECTION MANfiOIE FRAME AND
4' uiN - 16' MAx COVER, SEE STD. PLAN
, 8-112 OR 8-112A
STANDARO 4*-0" MH ~ •
FROM IN1/ERT OF PlPE ~ 2'-0"
TO STREET GRADE ~ • .
~
~ p -
. • NOTE; BACKFiLL ABOVE FILTER .
o ~ FABRIC TO BASE OF ASPHALT 1M TH
• . ~ CRUSHED SURFACING BASE COURSE
A
~ ~ I I
1 I i i
P • ' a ~_L_~ . . . • d~? / ~
A _ •o r ~
~ 1 ~ o N0. 4 REBAR
. ' w
12. p
tn
Ic~
MIN. • • • SLOPE AT
.
°C4
1 /2 TO 1
OR FLATTER
~ U
FILTER f ABRIC 'o• ~ ~ _ ~ 2 ~ o Ir
~ o --j ~----Jj
tQ ~
O
t-l r) _ c- -1 EZ .o I a >1/2
F
, ~ _ .
- - . ~ . . ; . ~ . . ; .'A ' :
6" - ~ I I~ I I I 111 I I I I i i I I I I I I I I I I I~ 1„Fi2 A~IN.
~ N0. 4 REBAR
~ - o e 1 48" I.D. TW.
w o'Q
O
W ~ I
ta.~ 0.C). ~ « .
PIPE 6 • o ~ :
Q • ~ , 4 FILTER FABRIC
~----T----i
z ~ SECTION A-A
~ . ' i 6.1 i i~. ~~i • '
a ; 1---~-~----+-=~-~----- I
' _ • n p • a ~ i i i ~ o • NOZES:
~•c1 SEE STANDARD PLAI'
~ ~ic G4gDp a o ° vi -i 7 i i- No. 8-122 FOR BASc
. _ • a . . ~ ~ ~ r°:1 G ~ AND FOUNDATION OETAILS
`'r E ~ ~ i ~~O~ ~ SEE SEC. 9-12.7 FOR
--t---t- --r---- o I PRECAST SEEPAGE SECTiON
SUPPORT CRAOIE SEE SEC. 9-33 FOR
F(LTER FABRIC
SPECIFICAT10N5
- ~ .
#4 BARS O 14" EACH WAY v Iv SEE SEC.9-12.4 FOR
PRECAST MANHOIE SECTION
SEE STANOARD PLAN
- N0. Z-109 FOR S7EP OETAILS
10"
APPROVED 6Y AooPTEo:_ 2/86 _ SEEPAGE MANHOLE
- REVISED: 6/-;z FOR STORM SEWERS
SUPERScOES• jJ92 _
-
0EN EER BLECE"• P•L $CALE: NQT TO SCAIE " CONSTRUCTION SERVICES STANOARO
owC. BY: - M-P PUHUC 1h10RKS DIVJS1pN PLAN No.
Pw R. J„ R S,,,n,; v.~ REV. 8Y pTY OF SF'OKANE. WASHINGTON - 8-102E
. ~ ` -
' M ~~~;~tT~3'y+,y~.!"~.q~(v~ :.'~+rin:~'!~;•Se,',f~~ 5j
N. . : , , c a ' 1 . .
•
~ B ~ GENERAL NOTES 1, cATa eASN sHAu ec ca+srRucrco IN Acca+ou,a rnrH AsnU c4Te (AAs►+ro u 199) Asn+ c e90
UNLCSS OTNERwlSt SMpM ON PUWS OR NOTED IN 1NC PRO,lECT SoEOAI PROH90N5.
2, AS AN ACCEPTABIf AIiLRNAiC TO R(BJIR, WEIDED YARE FABRIC HAVING A uIN14W IIREA Of 0.12 SOUME
INC►IES PER I00T 11AY BE USCD. MiEIDED N4RE FABRIC SNAII COuPLY TO AS1U A/91 (AASH10 U 221).
~ MRE fABRIC SMALL HOT BE PIAUD N THE KNQ()(OUTS.
~ n A A J. PR[CASi BA9NS 91A11 BE NRMSHCD wI1N CUi0Ui5 OR KNOd(OUTS. KNOCNOUIS SHALL HAVE A WALL
iMpfN($$ OF 2' WNIYUY. ,
n J 1, KNOCI(OUiS 511AL1 BC ON AU. 4 SIDES W1H YAXI11UU DIAYEIER OF 20% KNOCKOUTS SMAll BE AOUND.
' N0. S 8MS (T191CA1) PIPE SHAll BC IHSTUIFD IN fACTORY $UPPUEO KNOCKOUTS, ,
(HORItONTAI) ~ S. KNOGCOUi OR NtOUT Hd.E 42E IS EOUAL TO PIPE OUIER qAuEtER PlUS CATCH BASIN wALL iNlpcrtESS.
~ 6. THE uAxnNU pEPTH iROu THE ►iMSH[o CRADE to TNE.PI➢E INV£ai IS s'-o'. ,
7. THE iAP(R ON THE StDES Or TNE PRCCAST BAX SfC110N AND RISER SEC11011 SHALL NOi ExCEED 1/2'/1'1,
~ I 0. CA?(,lt BA9N rRAYC ANO CRAT[ $11l1L1 BC IN ACCORDANa V+n" siA►+oAnD srtaricAna+. YARNC 5UR/ACjS
- S4Il4ll BE /RIISII(D TO ASSURC NON-ROCKINC fll.
1 y_4. I 8-*-j~~. 9, fRAA1[ AND CRA1E 4AY BE tNS1ALL[D 1MTN ILANCE DOwN OR CA51 iNTO RiSER.
. 10, W++tr+ ovc P+aE Is usco, A rvc AoAvha sHuL et insTALLEo,
~-6• 11. PvC ADAPIER 9tAll 8E CAWIED INiO CATpI BASIN.
PLAN .
-
~
~
V
N0, 3 BARS (TYPICAI) N0. 1 BARS (TY9ICA1)
(VERT1CAl) ~ L (V£R11CAl)
~
10' PIPE
' 10 o (uiN.)
i i
"
~
~
V Y1
~
«2~ ~ ~ 2- ^ • '
• 2•, 2•
I ~
.1*1 1 -10' I 41~- . . .4-1 . 2 _2• I ,
2'-6' 2'-ID'
SECTION A-A , SECTION B-8 R►NA
i SPOKANE COUNTY APPROVEO SIANOARO 3Htct
iM u DEPARTMENT OF PUBLIC WORK$ ~ ~
sraurt, u nMg 434-3oo oAn: CATCH BASiN TYPE 1 8-4
;
~ti
c~Lcu C
TAYIOR ENGINEERING, INC_
w. 106 MISSION AVE., Sl1ITE 206
SPOKANE, WA. 99201
RATIONAL r1ETHOD
F I LENP.ME: N'zqr-P.. WK1 10 YBP.K kBT(JF;N FkEQUEIICY
pP,0,1B(.T; Nwrl Mission & Pines
DATE : 25-Ai-ig-94
Tt)TAL P.kEP. ( P.C ) 0.53
UESIGNEU: S. Jahnson
CHECYFU:
BASIN: A
~ (2) ~ (3) ~ (a)
Z"fPE OF SURFACE ; SQUAP.E F00'TAGE ; P.UNOFF COEFF.; (2 x 3)
POP.DS & ASFHALT-208 RE-D ; 1'790 ; 0.9 ; 11511
SIUEWALK - 208 NCYI' REQD ; 1790 ; 0.9 ; 1511
LP.NDSCAPE AREAS ; 8320 ; 0.25 ; 2080
0
0
' 0
0
' 0
TOTP.LS 22900 15242
DEVEIAPED "C" = 0.66
TIME OF CONCENTRATION (MIN): LESS THA.N 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM P.UNOFF RATE(CFS) Q= CiA
OVERALL: 1.11
ROADS ONLY: 0.84
SWALE VOLUME REQUIRED: ASHALT AREA x 1/2"
533 CUBIC FEET
1066 SQUARE FEET C.5' DEPTH
PP.OJErT SWA.LE :
. ,
_~.......r.
~~~OD
DETE~~~~~ BASIN DESIGN
DdtE ; 02-~epr94
P~OJECT- W ('.rjr•nf:r of Mission g.z Pinp-s F i~~n; ~,mr-,; ~P1r~),,4 -A
BASIN NO_- A Prepared bY=
TAYLOR ENGINEERING} INC.
;
Time Yncrement (min ) ; 55.00
Time of Con~~entration (min) ; 5.00 ;
Outflfiw (Cfs) ~ 0.30 ;
Design Ye~ct flow (Y-P) io.00 ;
;
(acres) ; 0.53
Deve1~~ped ..C" far-ts{1r ; 0.66 ;
#t1 ~ #2 ~ ~'+;3 ; #4 F #F) ~ #6 ; #7 ;
Time inc. ; Time iric. ; I ntr-- n sit y ~ .~,deTa , ~ .,V.. ~ "V,. ~~Ut ; ~tor"a.gr ;
(min) 4 (min) (arira) ~ (r;.f ft. ) ► (rju. ft. ) ~ (r-.u. ft. ) ~
~ (#I * 60) :(A * C * 93) ~ (~~e bela~ ) 1,(out f 1(jw*#2) .5 - ~ 6
` ~ i
y^ F ~ 1 ~ r - „
, ; 3~~7 ; 3.18 ; 1.11 7
10 ; 600 } 2.24 550 ; 180 ; 370 ;
15 ~ 900 1 1.77 ; 0. 62 ; 620 ; 2710 ; 3
21) 1200 + 1.45 ; 0. 51 ; 660 ~ 360
25 ; 1500 ~ 1.21 ; t)_42 ; 678 ; 450 ; 2'7:S ~
30 ~ 1800 ~ 1,04 0.36 ; 692 ; ~'~40 ~ 152 ~
35 2100 0_91 , 0,32 , 701 630 ; 71 ;
40 2400 0.82 0.29 } 718 720 -L i
45 ; 2700 ; M4 ; 0.26 ; 725 ; ~ ~a .
50 ~ 30,00 ; 0.68 ; 0.24 ; 738 ~ 900 ; Fl- 2
55 i 3.300 ~ 0.64 j 0= ~ 762 j 790
60 3600 t 0.61 } 0,21 1 790 1080 -L,rJir .
~'3 5 ~ 3900 } 0.60 ; 0.21 ; 840 ; 1170 " -1:3 0
70 F 4200 ~ 0. 58 ; 0, 20 ~ 873 ; 1260
75 ; 4500 ; 0.56 0.20 90i:~ 50 ; -440 -
t
80 ; 4800 ; 0. 5-3 ; 0.10 ; 909 ; 1440 ; -5 31 '
85 ; 5100 ; 0,52 946 ; 1530 ; --584 ;
5400 ~ 0 .50 ; 0.17 y 962 ~ 1620 ; -658 ;
5700 ; O.49 ; 0.17 't 994 ; 1710 ; -71b
100 ; 6000 ; o . 48 ; O_ 17 ; 1025 ; 1800 ; ~ ~ ~
V in = (1.34 ~Q dev. ) f(ir t. r T r-
V in _ (Q {~ev. * t + .34 * Q {lev. . * T0 f or t > To
Taylor Engineering, Inc. RATIONAL METHOD
W. 106 Mission Ave. 10 YEAR RETURN FREQUENCY
Spokane, WA. 99201
PROJECT: Wolff Center
Date: 12-Dec-97
BASIN: A - Revised
Designed: S.A.A.
(2) (3) (4)
TYPE OF SURFACE SQUARE FOOTAGE RUNOFF COEFF. (2 x 3)
ROADS & ASPHALT-2()8 REQD 15,190.00 0.90 13,671.00
ROOF & SIDEWALKS-208 NOT REQD 1,790.00 0.90 1,611.00
LANDSCAPE AREAS 8,320.00 0.25 2,080.00
TOTALS 25,300•00 ~ 17.362•001
TOTAL AREA (AC): 0.58
DEVELOPED "C" = 0.69
TIME OF CONCENTRATION (MIN.): LESS THAN 5 MIN.
RAINFALL INTENSITY (IN/HR):(i) 3.18
MAXIMUM RUNOFF RATE(CFS) (Q = CiA)
OVERALL: 1.27 C.F.S.
ROADS ONLY: 1.00 C.F.S.
SWALE VOLUME REQUIRED:
(asphalt area x 1/2") 633 CUBIC FEET
1,266 Square feet cLD 6" depth
945 Square feet @ 8" depth
SWALE VOLUME PROVIDED: 1,350 CUBIC FEET OF STORAGE
2,700 Square feet @ 6" depth
Square feet @ 8" depth
Perimeter of 6" deep swale
Perimeter of 8" deep swale
Taylor Engineering, Inc. BOWSTRING METHOD
W. 106 Mission Ave. DETENTION BASIN DESIGN
Spokane, WA. 99201
PROJECT: Wolff Center
Date: 12-Dec-97
BASIN : A - Revised
Prepared by: S.A.A.
Time Increment (min.) ~ 5.00 Time of Concentration (min.) ~ 5.00
Outflow (cfs) ~ 0.30 1-Single Depth Drywell
Design year flow (yr.) ~ 10
Area (acres) ~ 0.58
Developed "C" factor ~ 0.69
#1 #2 #3 #4 #5 #fi #7 '
Time inc. 7ime inc. Intensity "Q" dev. "V" in "V" out Storage .
(min.) (sec.) (min.) (c.f.s.) (cu. ft.) (cu. ft.) (cu. ft.)
(#1 " 60) (A " C * #3) (see below) (outflow''#2) (#5 - #6)
5 300 3.18 1.27 510 90 420
10 600 2.24 0.89 627 180 447
15 900 1.77 0.71 707 270 437
20 1200 1.45 0.58 752 360 392
25 1500 1.21 0.48 773 450 323
30 1800 1.04 0.41 788 540 248
35 2100 0.91 0.36 799 630 169
40 2400 0.82 0.33 818 720 98
45 2700 0.74 0.29 826 810 16
50 3000 0.68 0.27 841 900 -59
55 3300 0.64 0.26 868 990 -122
60 3600 0.61 0.24 900 1080 -180
65 3900 0.60 0.24 957 1170 -213
70 4200 0.58 0.23 995 1260 -265
75 4500 0.56 0.22 1027 1350 -323
80 4800 0.53 0.21 1036 1440 -404
85 5100 0.52 0.21 1078 1530 452
90 5400 0.50 0.20 1096 1620 -524
95 5700 0.49 0.20 1133 1710 -577
100 6000 0.48 0.19 1167 1800 -633
1350 CUBIC FEET PROVIDED
"V" in =(1.34 ' Q dev. " t) for t< Tc
"V" in =(Q dev. ' t+.34 ' 0 dev. " Tc) for t> Tc
; ~
.
-
a:. -
:
,~w~ . ,
4 .
~ .T 1 .JL~
~ ~ i
i~ ,
1
1 '
I
~c ~ ,
Y~
Y
1, 1
y
, .
~ .
~ ~
~ _
~
~
~
*
4
. + ~
.
; 1
?
yvl.0 ~ ~jf~
j.
~ '
~
-.~i
~ 5
. d
_ - ~
. .r
r'
• ~~i
~
~ ~
i'~ ~ ~ ~ I
k
. ~
F
~ ~ t~' ~ a'
K ~
. 4
.
_
~
~
~em L
~ ~ t~~ ~
_
.
.
~
' ~ r ~~I~~,
r ~
~ { • ] { ~
i. ~5 D►-. .,J,'~ .
1 r°'
~
~ •
~ ~Y y
ti ry ~i
t
~
,
` •
~ ; •
. wok
, ►
i ~ . ~ ~
. !.t1~-•~.
~ • • ~
~ . +4:
/ ~ •~~~1 . ~ ~ ♦ 1
\ ♦ aA ♦ , P NT ♦ ~ ♦ ~ 0 y \ SEEPAGE MANHOLE ~ wnsh, 0 AN,o T 1 ♦ h/~yCT
\ ~ OE N • ~ . P c ti ~ , . T.G.=2030.0 ~ ~ ~ 'oti ~ \ 1P ti •
, \ . • h • ~ \ ~ js~ ,
~ 0 ~ '86' 1 ~
~ , \ ~ ' ~ , \ . -o ~ \ ~ ~ ~ \ ~ ~ ~ a ►~r ~
~ \ f ~ ♦ p 34268 ~C, - ~ ~ \ 'n Rf ~ ~ ~ CISTER \
F ~ ♦S ~ \ S C~ ♦ / E ♦
~ _ 2 4NAL ~ . ~2 ~ n ♦ ~ \ 83 ~ ~ ~ ~ fi PVC • ~ ~~29~
? ~ L=24.22 03 EXPIRES 04/11/98 1~ - :i
\ ~ 2~ ` , - o,~ . G-.0100 \ o ~ ~ ~ ~ -1-
~ ~ ~ ~ RETAINING WALLS o \ , N BUILT BY 01NERS)
~ N TOP OF WALL EL=2027.0 0 31.52 ~ ~ ~
(V ~ / . - ~ 30 i
~ 3~.~0~ ~ ~ 3 o ~ ~ ~ ~ ~ M ° ~ 29
o I 2032 r.c.32.s , 28 ~ , J N ~ ASP.32.10 ~ 9 ;
\ 31.87 ~ / ~ : ~ ~ \ \ N ~ . ~ i ; -
' ~ ~ T.C.33.15 24 - ~ ~ r- -2 G -t~ - - - ~ 2 - - ` ;
' - - - - - ~ - - - ° - - - ~ _ ASP.32,6,5 _ - _ - . . . . . , - \ ~ ~v=..:,.,.,i , _ i
T.G32J0 GAS METERS ~ ~~p" _ G _ _ ~ AsP.32.20 ~ ~ CATCH BASIN ' ~ ' ~ '
I 2033 -r , _ ~ i T.G.=2024.5 ////////Y
~ T.C.33.50 ~ ~ ~ ASP.33.00 ~ ~ , 'L
~ ~ p'h I T.C.32.88 ~ / ~'L ~ ASP.32.38 % / / ~
~ ~ ~ ' 2 STORY + FULL BASEMENT r ~ o ,
N ~ / BLDG, HT.. RIDGE ~36'-0" ~ ~
v 30 15 0 30 ! BLDG. AREA: 6910 S.F EA. FLR. / w / , I ~ ~ ~
, / / , PARKS REQ D. 56 ~ / / . ~ .
/ PARKS PROVIDED: 57 w , N / / ~ o ~ . SCALE I / , N T.C.33.00 ~ , ~ / ~
F.F.L.. 2033.50 i ~ I ASP.32.50 ~ ~ W ~ ~ , _ , ~
BASEMENT: 2022.3125 I 00 ~ ~ , / N • ~ N ~ am`) ~ ► / ASP.32.68 0 ~ ~f . o l / l/
~ ~ , . , . o _...r. - ....1 O I I ~ G". ~ ~':=5~'- e?-``.'~:Y'.:.e.,•"`S. .=.,~~'L~ f,' -"x, , . I,c':.^;''.':t': :y~:4b", i4 ~ ~ ~ ~ T.C.33.33 ri ; ~
' ~ ~ - ASP.32.8 r~ M a ~ O ~t c';~ v ~ ~ ~
Z , r~ ,~,,.H..,,, , ~n ~ , , Q ~ I°r. <,o-'[: '.rsi i:~'.:~`y i~' ' ti~:- _ t~~ti1".t I' v."~ t'+ ~ ~ Q : ~-.-:u:' ,w~~ ".':Y~ L~.. 9`,~YS':3:f;:-.~:f~l~,'=. \ a0 ~J N ~ ~ f N
~ ~ :a;~ ,n - ~ O O ' J~ ~ f N N .'~i~``i~~~j~'i'`~'~N~';~~'_xti,~,71'~ ~32.76 . i-~ r -
I ~ ~ I a ] ~ ~ „ ~
' ~ ~ -N N - - 6 SS - -6 SS - 0 , ,M ~
~ ~ ~ H 0 2 STORY ~ . , . 6 D YLINE SS , „ ~ ~ 6 )RYLINE SS ~ N N BLOG. HT.: 38 -7 ~ ~ 30 60
° BLDG. AREA: 9500 S.F, , , _
, ~ 1,5 CW 1.5 CW • ~ I PARKS REQ D: 72 ~ ~ \ FEET
PROVIDED: 51 ~ IJ ' w _ i ~ ~ _ ~ N
~ 18 AD~'L PARKS HANOtED N~ 2032 N ~ ~ o.~ ~ ~ a or n ineeri ~ ~ TRWGH RECIPROCAL PARKING Q N O c0
I ACREEMEN~ _ . N p ~ 1 0 N / Z o Civil Design and Land P, ` _L
~ ~ ~ N W. 106 Mission Av 'N O -
M N ~ Spokane, Washington c.~ ~ o ~ , N ~ L - _ , , ~ ~ _ ~ ~ ~ ~ ~ , ~ ~ _ (509) 328-3371 FAX (509 (U~~
~ ~ ,r , I N
~ ~ E BOTTOM OF SWALE EL. 2030.8 ° N i r , ss_
I ~ " _ ~ N90'W - ~
~ o~, ~ . ~ ~ , , , - , ~ - / ~ , ,r ~ ~ ~ 40.8 w ~ ~
~ ~ ~ d I ~ ~ o ~ ~ \ N .
~ ~ O ~ ~o ~ o r J . ~ •
. ~ o ~ ~ DWN: DSH aaT ~ Z ~ ~ ~ ,
`~o - - CK D: SAA DAT \ zo32 I - ~
, \ . I . . / „ ~
$ 1 -30 r nrrni IIDC
'~~aYG~t
3
2033
~ ~ - - 4, > Na~~ ~ „ . ` 54 Y~J
' . 2032 ' ; T ` ~ 2031 -3-~ ~ % , ~
~ 2030 ~ ~ ~ ~ ?02 .G~ c~ ` ~ ~ 9 'U ~
~ 20~8 ~ \ 'L ~ p 4 ti ~ , , \ J c,
0 0 ~ , ti ti ~~2 ; 0 6 p ~ 2026 ~ 2019 , ~
~ W ~ti z02q . 2025 ~ ~ ~ 2030 ~ ~ - S'ZflZ _ _ _ _ _
_ ~ ~ ~ ~ _ II III! I~ I ~ , ~ - r. , ~ ; _ . ~ I UI I~
. T . ~ ~ I W^ ~ ~
I v / ~ . ~ ~ I ~ 4
I X ~
~ 31 ~ ~ 0 2 N ~ / 0 II t ,
i ~ 2- o ~ ~
- w ~ . N _ • . o ~
I X . ~ N Cn ' N p . i ,
r ~ 2033 O • ~ E r D ~
~ I o - - . ~ ~ N
, . X - ~ ~ . 2034 ~
~ 0 ` f . - 1 < • ~ , , .
~N ~ ; ; ; , ~ ~ 1 . 2033- : ~ ~ ~ ~ ' ~ I ~ ' ; ~
I ~ ~ ~ . ; ~ ~ ~ . ~ i , ~ , , s . , ti ~ , , p y~~ , ° ~ r.
L ~ n : ~ w ~ a , . ~ ~ ~ / C ~ ~
. ~ ~
ti ~ . o ti ti w a , ~
- ~ o ~ C7 o ti, ~ ti~ ~ . , ;p 1 ,
( c„ ~ r ~ 2033 _ ~
. 1 ' 1 ~ ~ ~ , - • j ~ 8' ~ I ~ ~
' / S, ~ ~ /r _ ~.o• I I ~J ' . ; ~
• ( ~ . "j+ I r . ~ , , ; r--, 00 ;
- I ~ ~ ~ ; ` -
~ ' f , j i ~ ~ ' ~ ~ ~
i " ~ ' X ~
, ~ 2033 . ~ . ; ,m,,.~ , ~
I ; - ' ~ ,
. ~ ; . C~
; ; - ~ x i _
~ ; ~ ~ I r : ~ ~ ~ , i
~ i , ~ r~ ~ 1 e. _
~ ~ ~ , ~ M ~ ~
- x ~