09-219.00 Morgen & Oswood: Barker Bridge ReplacementWashington State VFf Department of Transportation Change Order Date 111U212UUV Page 1 of 2 Pages Contract Number 08-017 (CIP-0003) Contract Title Barker Road Bridge Replacement Change Order Number 6 Prime Contractor Morgen & Oswood Construction Co., Inc. ® Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Endorsed Contractor Date 2I- Original Contract Amount Current Contract Amount Estimated Net Change This Order Estimated Contract Total After Change Federal Aid Number BRM 4123(004) Surety Consent TRAVELERS TY ANDt. ANY OF AMERICA ~l Attorne F t JOHN D. LEAF DElCHyBER 8, 2009 Date 9,449,354.75 9,320,149.07 -1,890.00 9,318,259.07 Approval Recommended ❑ Approved Jenj Npa~n~ Approved / Project Engin er 2 Approving Authority per C.A. rccment Date Date ® Approval Recommended ❑ Approved Other Approval When Required By Signature Date Date Representing DOT Form 140-005 EF Revised 4/06 Cog-24q CHANGE ORDER Project: Barker Road Bridge Replacement Contract No.: 08-017 (CIP-0003) Federal Aid Number: BRM 4123 (004) The Contract is revised as follows: Description of Work Page 2 of 2 Change Order No. 6 The painting requirement specified in Standard Specification 6-02.3(25)G is waived for welded wire fabric (WWF) projecting from the top of the girders. Materials N/A Construction Requirements See Description of Work above. Measurement Measurement will be made each girder. Payment "Change Order No. 6 - Waiver of WWF Painting Requirement", Each, deduct amount of $78.75 per each girder. Working Days The Contract time is unchanged. Attachments None.