Loading...
Resolution 25-012 Adopting 6yr Transportation Improvement Program (TIP)CITY OF SPOKANE VALLEY SPOKANE COUNTY, WASHINGTON RESOLUTION 25-012 A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON, ADOPTING THE 2026-2031 TRANSPORTATION IMPROVEMENT PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS RELATING THERETO. WHEREAS, to provide for the proper and necessary development of the street system within the City of Spokane Valley, the City shall, pursuant to RCW 35.77.010, develop and adopt annually a Six -Year Transportation Improvement Program (Six -Year TIP) with such program acting as a guide for the coordinated development of the City's transportation system; and WHEREAS, the Six -Year TIP of the City shall specifically set forth those projects and programs of both City and regional significance that benefit the transportation system and promote public safety and efficient vehicle movements; and WHEREAS, the Six -Year TIP shall be consistent with the City's Comprehensive Plan and be adopted following one or more public hearings before the City Council; and WHEREAS, a draft copy of the Six -Year TIP was submitted to the Washington State Department of Commerce and has been reviewed and approved prior to the scheduled adoption of the TIP in accordance with RCW 36.70A.106; and WHEREAS, following adoption of the Six -Year TIP, the City will forward a copy to the Washington State Secretary of Transportation; and WHEREAS, the City Council conducted a public hearing on June 17, 2025, for the purpose of inviting and receiving public comment on the proposed Six -Year TIP. NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane County, Washington, as follows: Section 1. The City Council hereby adopts the attached Six -Year TIP for the City of Spokane Valley for the purpose of guiding the design, development and construction of local and regional transportation improvements for the years 2026 through 2031. The City Clerk is directed to file the 2026- 2031 Six -Year TIP with the Washington State Secretary of Transportation before June 30, 2025. The Six - Year TIP shall be reviewed at least annually for the purpose of determining the work to be accomplished under the program and the City's transportation requirements. Projects and timeframes identified in the Six -Year TIP are to be considered estimates only that may change due to a variety of circumstances, and are not intended by the City to be relied upon by property owners or developers in making development decisions. In the event a railroad ceases to use rail right-of-way within the City, the City will utilize all reasonable options available under state or federal law to preserve the right-of-way for future rail purposes pursuant to RCW 35.77.010(3), Resolution 25-012, Adopting Six -Year TIP Section 2. Effective Date. This Resolution shall be in full force and effect upon adoption. Adopted this 171h day of June, 2025. i ATE T: I City t l k, marci Patterson City of Spokane V ley Pam Ha cy, Mayor - - Resolution 25-012, Adopting Six -Year TIP AARf ;._%tk\ t � s � 4 " �' • 1si:r' ' X F 4 �Z a v // / �• •fi f+��r�'fIJ C > CL 0 cu r� O �- 0 . GEL O a. C 0 7 O CL E 0 t� O CL r�7 0 ry [V c L w CD 4� F a- CE C) j� p� Yf C6L1°{� eil L' U 0 cr LU LL tm CL LL 0 c 20 +� a 72 3 o — C €n t m cry a) � E 2 c C LL as .- rn C r� i13 cep c v Gem I= C L cCY m a q °- E cn < E L. -0 a M •<!' v im, W 03 'C3i CL ,= 7 �] Q} 0) CD C:- x crs o � � v M Co � s `� (aE (7 a �I0 In o chi ,td 07 47 �i ` C,�LL LlJ C JU7 70 .(n 4 va _ CO = = C 0 act O m � � w 0 4 �, ua su vy ax a� � ,o .o ti ooacv .` u 0asp {'—'0���'��������a ca ML)00 7 0n-LLL-LI_LL.Z CLIL C]:U}C7COC 0E- 0 1 7 CL L H C7 t Cam] . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 4 N In e� as a E c L o c tL EO E w E (1} ° H 7 T 0 co EL C N [V E i V 0 L o %P 3 C] L L W x d1 7 {C L L C 6 d y� �O a` n to Q CL CA ul m lL C _C t3 o. iS 6 C LL c U - 10 ul £ 41 ,C w � C LL 13 41 A} � a C � 3 m CL a a a U� r yy Cf C U +FY {V 0CD2 I" ;E r k L u li s O K m C � L N o �aa r CL a" U] d UI N J ow LL G IC,'mwIt a IX C 7 4 tat c�i GO (0 CO 7 LL RS (1} EL d O � � 4 0 CL � U7 IC C b C � Sl1 � F1 3 Q O 3 2 C N 4 C 4 e �} 0 j Q s+'r r 6 Q I L7r N O U" ® es 4 LiQ G Li1 Ci iO O Nf 01 Ln d LI] O Q N N W N CR r w 40 SV Ln Y� LL3 O LC7 cv o '¢ a r ti a � a A a a C�1 N CD N m mIn(A ul G L LP C"} r La Q O N 0 e- � C L LL Z Fl c l4 � C G Q LL a v z w � a � M SN C N Lll CL LO to N r W CL a t1 03 ice) J It � a a G7 Q 4 C 7 � 7 � � Q Q. fl Ln Ln u� co r ry 17 q} 4"} wt I S on LLn co 0 0�+ CK4ui m Rl toinE* a hs C a c N 0 es C t P3 w� O. 4 a 4 �,y N G � Ul N - L CL F C d � c as m ❑ � > Q aa p E N LL U) ci m E a 2a U� in a en �r to r fw � 47�] CST N Q d st YF 9" F I vgo a 11 II .yr O H C 0 �_ � L W } le d! a, � C � 0 C CL 4l } a 13 p C '� Y1 L t- f77 is 1i7 1[1 LO h� Y1 � M N P7 N �ly W z vs H 6 d1 � to W3 M I� m G 7 C � 6 0 cfi 'C a1 � is w D C d Q] C C � c � a � W i pO 4J Q] m 'sr �Q Ra1 W m y f 0 i+ eN-a 1067 y C ei3 m O n- u7 0- 1 on G T 'd Uca N C7 04 r W z m- L] CU v CLL ca t C LL LL w'r O H N b K d � Q Y C � LG a C o 4} q} ff 3 CL � r � E r C ++ cn vn LO w 4Y7 �77 O LL � o' > Q6 (n cV C Q � � 47 N � � e CL a) cu �} � a J f] Vj G F a m x m rs` CD o an (ri W rsa` LO q} o v CD ui 0. CC L) aLD H a e's us m r«q 47 ai C a 4r. 9E7 C m a E 4 a 47 m 0 a [4 O G e V1 E p 9 y d o Od E pE 8 d C N L C7 s9 �+ r � � d e m � e to 7 4Y 47 r m Vr N C � L i4 N t a 3 � a C L � � CC 41 - "d T l6 S9 cq c G cx " na H 4 Ic m 9F S O N s W z m a6 tits a W M N iL CS i� o L M .1U � dl C Ib d C L m u c M U1 oo d ❑ r+�� uJ ® J r5 T" c IQ c � a .�j C3 �[adl m V7 is � tv OM 0 9i l2 d L goCL O 0) r 4D L � U �3C �s r -13 E 0) C a to co U. J 4+5 LO rn r5 CL � � a � c � N a } 1) C � � a e r U} 4 [9 AL LO r In 95 I4 iV t5 t+i N Q? C4 Q Q E 12 I2 N C4 L m o C CL C :3 LL W_ F— T.- O L. CL cw E A = ' t l L o L N (13 Q O CL U) r— L H �G r�x VJ � Cl C M 71 4! C GF L 61 4 G O 4 O It O CI O M r-R Q� t- 0 m g SD iV G C 0 O apv w ti +r- r 6. o fl � fl O O {3 cmO cm Is o IO Y r CN � � o CV CY �m � a � � o CL [i (U Vp � ❑ c a o L5 L e � Y C� C � a a `m c 13 u 2 m C a 0 19 : V W V LLP :3 C ep r La 8 2 Ill un (a ZM V ,c 2 O V d 4D E m rh L !: m 3 al {g dl a r 1 O O C R IN O Q O o Ill � IR i41{W lC➢ c:, ID C, 3 fn JM LL c*a r*s r-I C E a CL t7 � SV � C C � 4 U5 d) to o a tfi o $ °° E �. 0 hF o m H 4+ PL L] co a J 4Y7 r co O Go " dr In F�- c0 n tO N I� 4�i ¢ C r W OI 6t9 49 M 47 YD f] Q N Y�' w ny C. CO �[d r to r.. O O CCV N � SF7 iPi w LO (°7 r � � S4 M uu M. � A {G m EL U- a e t� �l % ea "C ea 61 ti D E �o a ap o iG v y j CL C g� ts m m $ d LL a O 3 49 ru CS CS U °�° va co UB I m r m 43 N M t�7 UE [} 41 41 47 Kb a a m 4�J -ems tp a � Pi Vs 3 CL _ f�} 0am� m � 7 rn c � m mom- L LV N � L } = L � pp di •F r L FA 03 fj 47 U) O .# W CO Co Q J a 3 12 C"5 N 03 C � H b 2 C 4s o W a � � � C � O � � E E U} Z 61 07 3 s cn •u G ;•7N_ti 6 4' n C {j O Q to CL CL J T L N fi 6i 19 `a t1} O M G ty N hl hJ co N O d1 N co N E N C7 L m OLlu .00 ILto E w � F co CL t c-i E N O_ c n G Q 0- U) L cu Q} 1 rlj( VJ L 37 3 3 U C d} a` mN iV ' P. 4O dit 11S M iV o t L1 E7 � v X a 6 c c Ri' � m lL r91F �G3 W u m_ N � # L t a a.r -03 C ril z 0 0-Li❑ Uj N N w w c� M m IL u co a a 4M t IL r- 4 Q U Q,p t> S N 3 1 < a m r- a � 9 `a � O c t5 s eh a�i5 > C m 4 Ri C C (L 9aCL 8 'C d L] N 3 '+ Cis 3 oz w m 0CL 5 12 C IE D fi CL C u (U �} I ff L is .+ 8 � C > d c� cn C3 m t� C ; L � aO C _ m -y E ev } to u o iL to N G1 r O 1Y G [V 8 i4 N C�k G CL C C _ E a) Q Fw P CL n EG y4 V C 0 CL U) c m 00 C V7 7 c +� Gi to r 4e-� O.. 918 k iY Im to ~ go, C Stl M {6 EL sz a 0 6 dr R C a G CL E C L E r tO1 N i 0 {, e Ci A 2 � O � R C_ N GY a w C t5 an m U, W L � o 0 C N don ai _ In Gi C E CL 2 75 tlA g G4 cm C O G G a 45Y 47i E a Iz E -Y C C L f1 w � � O C � ?" w d C �a m t Li I E d LLqq Q t C L Q 4J � w L ❑ 4 � p � QJ ❑ L � �� F s cn a c 41 Q in 7 F t a t7 4 CD 4 = CL cn U] L3 a � � L ua a a. Q r � 6 C yGy W co A7 m co 0 14 W z CL CC {� v D H � c c c c c c +a m R CL E 0 Ln rt t, c +wd C d ICL E r� <U m L dd O a 0 C ? (7 � D C C 'wQr 0 s � O y v E u C 0® ® 0) J to Y L $E L � w O a c 6 � � R 2 a C i4 t -- O �m 3 L 3 � C LS L UI a _ E L C cn G Ln tL C m G a c r� U ¢ � C o a+ 01 C7 L ra � Ec' m+ � e ' M C ty O LA Tins N cp, � 4; LU ryL1 m U) 3 i8! �CL to L W a 4 �37 @ 0 m e W G} m J C5 m Q 0 P M. G 5^� C'7 G iV A7 Q IV W N G N M cq tv E. N Cp Cp r-j L C In LL 0) E 3 CL LY Y 41 3 O a 0 CL 0 C M L 1 67 J 3 lib Ill 7 4h! � U ul lu B � •a 44 E I'1Y Q E ❑ j u L C C U y zi o ❑ d3 D a C CL _ 00 ❑ a U) a- J L m C3 c'S b La 6 L .zli a-C.i Q iC C C 9 Al A6 a si a. C r C. 7 LL m a a 4} Y D L z ° C] {jy N AY f f E dq�a7 G_ �1 §r ( O 2. P > C 7'41 E S- to it7 03 na wno U) n- N STk 0 L 0 0 Ln LO €3 LO uw } z CL a: {} tit d� dam} C C C si7 m M a_ a a Y QS E LL 0 to LO O rr r C1 U} 7 F. Cl + U C U � CL 4 c } Q y) r 03 � O A G y S Y Q Q n �• 7 ❑] M 3 o O SV r � 4 G N Q 4 4 � N 63 N N N 00 N C? N r, N O N E Yr o CD 39 c CV E LY _ C N � e 0 CL C 1., qCIO W C Y co �{ E L N 3 tm O c � ps iL J � C L G 61 Q eV •� ti m a iSi Q a 8 Cl) M C L 05 C2 N N 4 La N N 4 r 8 W 0 N W kO 16 O® w M O At At 0 {S 8 t; ro ej w 47 N i r 01: Sprague Pedestrian Crossings: Chronicle & McKinnon (Closeout) FeEt i} 16� 334 9�90 Project Type: Safety Project Description: Install Rectangular Rapid Flashing Beacons (RRFBs} at improved crossing locations identifed in the Local Road Safety Plan, Total Funding Status: ;secured Total Project Years: 2023-202.5 Funding Source(s): Gify Funds l Transportation improvement Board Total Phase Cost. Project Year TIP Proleas Arteeidl � Brf�gra ln�erie[lirn � Pedeaerfanf6lcyrle Star mwnle r Preservallon r Reeonsiruvion Funding Status Preliminary Enginee ing JPEj: 20 2023 Secured Right of Way (R ): 26 2024 Secured Construction (CAI}: 400 2025 Secured Total Cost: (ln thousands) $ 446 Close year: 2026 Paije 1 of 34 02: Sprague Preservation. Bewdish to McDonald (Closeout) Feet 0 460 920 1,040 2,760 Project Type: Preservation Project Description: Preservation project may extend limits of work based on available funding: University to Evergreen - Total Funding Status: Secured Total Project Years: 2024-2025 Funding Sources): National HighwaySyslem Asset M aragement I City Funds I Surface Transportation Block Grant Prellmincry Engineering (PE): Right of Way (RW): Construction (iCN): Total Cost: (in thousands) Total Phase Cost, project Year 130 2024 120 2025 2958 2025 $ 3208 Close Year. 2026 TIP Rrnjeds ArlerW1 � Budge Infcrsecridr5 � Pg��plr6on�81ryde Safely Srnrmwa rer Pteservblla" Rerargl rudlo Funding Status Secured Secured Secured 0 : Barker Road Reconstruction: Sprague to ,Applewoy (Closeout) Feel 0 205 410 820 1,230 Project Type: Rc onstruction Project Description: Reconstruct to urban 3-lame section. Total Funding Status: Secured Total Project dears: 2N4-2�26 Funding Souree(s): weight Mobllily Strategic Investment Board I Surface Transportation Black Grant I Ccrigre0onnily Directed Spending (Earrrmark] I City Funds Preliminary Engineering (PE): Right of Way TRW �: Construction (CN): Total Cast: (in thousands) Total Phase Cost 150 1370 4500 $ 6020 Project Year 2024 2025 2025 Close Year: 2026 �qne � %]Iev. TIP Proiems Ar lenrd � �rEdge Inkerser lon PMesrrinn j'Bitytle sare�y Srormwater � Prescruc�rlon � Rezxsrwssrunla�r Funding Status Secured Secured Secured Page 3 of 34 04: Pines Rd. (SR27)/BNSF Grade Separation Project rye[ 0 125 250 S40 750 Project Type: Bridge Project Description: Construct Grade Separation of PInes(SR27)(BNSF RR/ Trent (SR290). Total Funding Status;. Secured Total Project Years: 2019-2027 Funding Source(&): CongressionnIly Directed Spending IEarmark) I Congestion Management ! Air Qualily I City Funds [ Washington Depariment of Transportation I Rebu1ding American irlfro structLire w[th 5ustaincbility anti Equity I Surface Transportation block Grant I Other Federal Total Phase Cast. Project Year TIP Prolcws Arlerlol � 9r�dge Iniersedian � Pcdsslrl�nf8dsysle Ssoamxroter s Preservnlian Reconsl rudion Funding Status Preliminary Engineering (PEA: 3106 2021 Secured Right of Way (R' ): 4645 2022 Secured Construction tCN): 40088 202,5 Secured Total Cast: (In thousands) $ 47839 Close Year: Page 4 of 34 05: Indiana Preservation- Sullivan to Desmet Fam 4 336 670 1,340 2,C10 Project Type: Preservation Project Description: Pavement preservation. Total Funding Status: Secured Funding Scurce(s): Total Project Years: 2024-2026 Total Phose Cost. Project Year Preliminary Engineering JPE�: 50 (fight of Way (RW): 0 Con5tructicn (CN) : 1450 Total Cost: (in thousands) $ 1500 Close Year: ��oka �f• TIP Projects Arlerlot s bridge � Per�esfrlon�/Bltytjm $afery sidefflWoTer � Presar+rblien gy � �ie44nslrVciabai Funding Status 2024 Secured 2026 Secured Page 5 of 34 06: S Sullivan Preservation: 8th to 24th Feet 4 Soo 1,000 2,000 3,400 Project Type: Preservation Project Desciiptlon: Preservation project with sidewalk infiill, midblock pedestrian crossing, stormwot r upgrades, and ITS expansion. Total Funding Status Secured Total Project Years. 2024-2026 Funding Source(s): National Highway System Asset Management I City Funds Total Phase Cost. Project Year VP Projects Arsenal � ]nrerse�llon � Fades�ridnfgieycle an— safnry Siormwoier Presery anon °• Recdnstruerlcn Funding Status Preliminary Engineering (PEJ: 252 2024 Secured Right of Way (RW+ ; 418 2025 Secured Construction (CN): 5330 2026 Secured Total Cost: (in thousands) $ 6000 Close Year: 07: N. Sullivan Preservation (Spokane River to Kierr ar) Feet 9 1,000 2.000 4,000 6,000 Project Type. Preservation Project Description: Preservation project, excluding intersections of M arietto, Euclid, and Kiernan_ Total Funding 'Status: Secured Total Project Years: 2024-2026 Funding 5ourae(s): Surface Transportation Block Grant l city Funds Preliminary Englneering'PE): Right of Way (RW). Construction (CN): Total Co5t; (In thousands) Total Phase Cost. Project Year 200 2024 100 202,E 4400 2D26 $ 4700 Close Year: TIP Projects Ariertuf a bridge mGrsecffork � Pedestrian fBleyele � $4feiy 5rormwarer preservation Remntiatr�tfien Funding Status Secured Secured Secured Page 7 of 34 08: 32nd Ave & Pines Preservafion Feet 0.1 11660 2,400 Project Type: Preservation Project Description: Phased roadways preservation on 32nd between Pines and SIR 27 and Pines between 32nd and 40th, including the evaluation of pedestrian crossing upgrades, 5term afer retrofits, and ITS expansion. Total funding Status: Secured Funding Source(s): City Funds I Scfe Routes tD School Total Project Years: 2025-2027 Total Phase Cast. Project Year 7IP Projects Arttirial Bridge Inrers�cilan � YedcsirltsnfEicyfle �. 5ei�rY Stw water Preserwation � Rceamtruetran Funding Status Preliminary Engineering (PE): 200 2025 Secured Right of Way (RW); 50 2025 Secured Construction (CIN): 4750 2026 Secured Total Cost: (in thousands) $ 5000 Close Year: Page 8 of 34 09: Argonne Rd. Concrete Pavement- Indiana to Knox Feet 0 165 390 660 990 Project Type: Reconstruction Project Description' Reconstruct with concrete and improve stormwater and signal operations. Total Funding Status: Planned Funding Source(s): Unfunded Preliminary Engineering (PEI, Right of Way (RVVI. Construction {CN}: Total Cost: (in thousands) Total Project Years: 202 - 027 Total Phase Cost, 175 000 4025 4500 Project Year Close Year: 2025 202E 2027 �po>Ecan� TIP Proieds Arter a I i 8rldge � ir��rsrachian � Pedes4rion fSlryeMe Safely 510rrnwater Prmervaplw i Qeoon#IrJN1CJ1 Funding Status Partial Planned Plan reed Page 9 of 34 10: Wellesley Preservation: Sullivan to Flora Feet 0 46G S20 1184D 2,760 Project Type: Preservation Project Description: Pavement preservation, Phased construction in 2025 and 2027. Total Fun&ng Status: Secured Funding Source(s): City Funds Prefimirary Engineering (RE): Right of Way (R ): Construction (CNN: Taini project Years: 2024-2027 Total Phase Cost. 150 a 3000 Project Year Total Cost; (in thousands) 3150 Close Year: 2024 2027 TIP Rraieds Arterial amw Bridge !! �niers®than Pecielf rf n n{Bic yrIe ScI fery Smemwoler s Rr�servatlen Reggrift* fl6h Funding Status Secured Secured Page 10 of 3A 11: Barber & Sthl Roundabout I Oct 0 50 160 3Z) 4130 Project Type: Intersection Project Description. Intersection improvement. ROW phase funded via corridordesign and acquisition. Total Funding Status: Secured Total Project Years: 2025-2027 Funding Source(s): Highwcy Safety Impr:avr n—,L:rt - rograrn i Pedestrian Bicycle Program TIP Pmie€ts Arierla9 Bridge � Ir�t�rsecntin PecLesrrian/Wy a le Safety Storm wow Presrrvdtlen �� ���nsFrrucklarl Total Phase Cost. Project Year Funding Status Preliminary Engineering {PE), 70 2025 Secured Right of Way (RW): 2027 Construc#ion (CN): 3095 Secured Total Cost: fin thousands) 31 b5 Close Year, Page t 1 of 34 12: SuIlIvaln Rd./SKI 290 Interchange Reconstruction Illillillillim Feet 0 205 410 8ZD 1,230 Project Type: Bridge Project Description: Reconstruct interchange to improve safety and copccity. Includes widening of Sullivan between Trent and Wellesley adding ITS, center turn lane, lighting, and shared use path. Total Funding Stratus: Partial Total Project Years: 2021-2028 Funding Source(s): Highwoy Improvement Program I Congressionally Directed Spending (Earmark) I National Highway Freight Program I City Funds I Surface Transportation Black Grant Total Phase Cast. Project Year Preliminary Engineering (Pr): 487.5 2021 Right of W€ay (RW): 1561 2026 Construction (CN): 47332 2027 Total Cost: (in thousands) $ 537h8 Close Year: TIP PFOlem nrl Arlerial +: Brldge � ��rlon�gl[yde Safely 570rm wale r PreSeFMfion � �ecbnstrucrlo>a Funding Status Secured Secured Partial Page 12 of 34 1 : Argonne Rd. and 1-90 Interchange Bridge Widening Fect 0 125 250 Soo 760 Project Type: Bridge Project Description: Widen Argonne Road bridge to 3 lanes and improve pedestrian and bicycle facilities. New channelization to coordinate with 2028 STA park and ride facility. Total Funding Status: Partial Total Project Years: 2025-2029 Funding Source(s): Surface Transportation Block GrQni I Freight Mobility Strategic Investment gourd I City Funds I Unfunded Total Phase Cost. Project Year S0615n Wley. TIC' Praleas + Arterdal Bridge � �nler €ed`uon � Pedesrrlcn�B7cycla �FQty SfarmsWtltCr i Pre$er+rnflan ••� Reean€�n]Glioa� Funding Status. Preliminary Engineering (PE): 42UU 2025 Partial Fight of Way (RW): 0 Construction (CNy, 24000 2028 Planned Total Cost, (in thousands) $ 28200 Close Year: Page 13 of 34 14: Barker Road Corridor (Mission Ave. to South City Limit) Fev 0 1,2:ij 2,590 5,000 7,50fl Project Type: Reconstruction Project Description: Phased improvements, Mission to 1-90 and 1-90 to A,pplewcy (5-lanes), Apple ay to Sprague to 4th to 8th (3-lanes). Roundabouts at Sprague, 4th and 81h Ave, Bikes lanes. sidewalks, ITS, and slormwater as needed. Fully funded segments identified separately. Total Funding Status: Partial Funding Source(s): City Furids l Other Federal I Unfunded Total Project Years: 2D21-2031 Total Phase Gast. Project Year 71P ProInds � �,rlerlal Bridge i 1"Nel98C1iUR i Pe4er1r1pn#61cyti9 50lei Y Shormwater Prmarvd ion �� Reco�siru�tiinn Funding Status Preliminary Er7gineering (PEI: 800 2021 Secured Right of Way (RWI, 9000 2023 Partial Construction (CN): 20200 Partial Total Cost: (in thousands) $ 30000 Close Year: Page 1 4 of 34 15: Fcincher Preservation: Sprague to Trent ` �ne � Walley Feet TIP Projects b 1.0clo 2,MO 4,000 6.000 grlerl¢i 8r'dge Project Type: Preservation Inlcrsttlror5 � PedesFrls3n�Bitytle Project Descrlption: Phased preservation project withasphalt grind and inlay with strrmwater retrofits. Broadway -Trent planned far 2026 and Sprague -Broad ayl planned for 2028. .� Prascrmrlien Rt�una reel Ian Total Funding Sfatus: Partial Total Project Years: 2424-2028 Funding Source(s): City FL1€ d5 Total Prase Coast. Project Year Funding Status Preliminary Engineering ['PE). 150 2024 Secured Right of Way [RWJ '- 150 2025 Secured Construction ( N): 380C 2026 Planned Total Cost: (in thousands) $ 41 00 Close Year: Page 15 of 34 1 G: Barker Road & 1-90 Interchange Prop cct Fee TIP Projects 0 M% 330 660 990 i ArterIUI i 0rlJge Project Type: Bridge i Intersesllon Pedestrlon/13k yde Project .Description; Develop initial Concepts frorn S. 'Barker Corridor Study — S4fakv and existing Interchange Justification Report (IJR), Includes potential 5tOr11waler intersection impacts at $oone and Broadway Avenues. � Frnermtlan —• R®egnslrvcllan Total Funding Status: Planned Total Project Years: 2026-2031 Funding Solurce(s): Unturided Total Phase Cost. Project Year Funding Status Preliminary Engineering (PE): 4000 2026 Planned Right of Way (IOW): 2000 2028 Planned Construction (CN): 34000 2030 Planned Total Cost: (in thousands) $ 40000 Close Year. Page 16 of 34 17: Sands Road Bridge °fN i P ti J I• _ Faet 0 40 80 160 240 Project Tyke: Bridge Project Description: Replace bridge structure. Total Funding Status: Planned Total Project Years: 2026-2028 Funding Source(s): Unfurlded Suokme� TIP PraJays Afierkil Bridge Inlars�elron � F+3desldmnJi�d[y[I9 � 5ufeiy Wimwaler Pfas®rvarllaaa �ReranslruCHata Total Phase Cost. Project Year Funding Status PrelimIncry EngIneering (PE), 0 2026 Pianned Right of Way (RW): Planned Construction (CNJ: 500 2028 Planned total Cost; (in th.ousards) $ 550 Close Y+eGr: Page 17 of 34 18: Pines Rd. (SR-27)/16th Ave. intersection Improvement Fee! 0 80 956 320 480 Project Type: Intersection Project Description: Add traffic control at fire -leg intersecton (potential roundabout). Total Funding Status: Partial Funding Source(s): Privale Developer Funds I Unfunded Total Project gears: 2026-2080 Total Phase Cost. Project Year TIP Protects � Arlcrle9 Brldgb Inlerse€lion Pecdeslrion/Bicycle +--.. solely Stormwaler Preservation �� �?eCBnSY r1t€Ilan Funding Status Preliminary Engineering (PEI: 250 2026 Secured Right of Woy (RW): 200 2028 Planned Construction (CNI: 6550 2029 Planned Total Cost: (in thousands) $ 7000 Close Year: Page 18 of 3A 19: Citywide Safety Projects - Biennial Feet 0 3,750 7,500 15.000 22,500 Project Type: Safety Proeect Description: Projects are consistent with the Local/Regional Safety Plans and eligible projects for WSDOT's City Safety, Pedestrian Bicycle or Safe Routes to Schools programs. Funded projects identified separately in TIP. Total Funding Status: Planned Total Project Years: 2026-2031 Funding Source{s): Sole Routes to School I Highway Safety Improvement Program I Pedestrian Bicycle Prograrn I City Funds Total Phase Cost. Project Year Preliminary Engineering (PE): ISO Right of Way (RW): U Construction (CN): 68. 0 Total CoSt: (in thousands) $ 7000 Close Year: PY00011-11 11, T1P Prel-ws Arlerlol � Brid$e � tnlerseelion � Pedeslrkanj89e}rele saFary $1®rmw3ier Preservewan � Rtrennslruellan Funding Status Planned Planned Planned rage 1 `3 of 34 20: Street Preservation Projects - $ IM Annually 0 5,000 1a,(100 20.000 Project Type: Preservation m re€t 30.000 Project Description: 4, 8, 16, 24(Dish man -Su Ilivan),Broadway (Havana- Faneherj,Dishman Mico,Appleway(F of Canklinj.Vlstn(ApplwyA- Mission),Marletta(Sullivan-Fualief),3 and 4�Havana-fancher), Thiermnn(Rth-Broadway), Ponderoso(44fh-5chater), Sprague (Fancher- Sullivan) Total Funding Status: Total Project Years: 2027-2031 Funding Source(s): Total Phase Cast. Project Year Preliminary Engineering (PE]: 5OG Right of Way (RW): 0 Construction (CN): 14500 Total Cost: (in thousands) $ 15000 Close Year. Mikan Val ley. TIP Projects Arterinl �.r Mdga � Intarsc€Gan Pedesirlon/Slcyde �aiet� Srormwoler Preservatlon d2eecnsrructlorb Funding Status Pending Pending Paro-!� 20 of 34 21 : Citywide Trail Improvements Feet a 2,600 5.OD6 10.0w 15,o0Q Project Type: Pedestrio n/Bicycle Project Descriptlon: Phased trail improvements, Appleway Trail (Farr to Dishman Mica) Millwood Trail (Connecting Spokane Valley to Millwood and Centennial Trail), and N. Sullivon Rd. Shared -Use Path. Total Funding Status: Planned Funding Source(s): Unfunded Total Project Years: 2026-2031 Total Phase Cost. Project Year TIP Projesls Arterial &rfd�e Interwalan �� Pedes4r}anfBkycla saF�y Stormw aler i Preserwahlon Reeonshruellan Funding Status preliminary Fngineerincg (PEI, 1250 2027 Planned Right of Ways (RWJ ; 600 2028 Planned Construction ( N): 22350 2029 Planned Total Cost; (in thousands) 24200 Close Year: Page 21 of 34 22: Northeast Sewer Fxtensian >Zane - Valley, Feet TIP Pfd'gesls 0 500 1'UOU 2,Qpo 3,000 : Arteriol i B.rl�ge Pwject Type: Recons ruc ion �r51GriGCil s.n Pedesfrinn�l®lcyela Project Description: Phased street reconstruction and sewer extension with Spokane Co,: 2027 Donwood community at Barker/Fucild and 2029 $torrourcrter Flora and Tschirley (Euclid -Garland), Dalton (Flora-Tschirleyj. � Fraser Orion � Raehri3rutiian Total Funding Status: Planned Total Project Years: 2026-2029 Funding Source(s): total Phase Cost. Project Year Funding Status Preliminary Engineering (PE): 100 night of Way (RW): Construction (CN): 5900 Total Cast: (in thousands) $ 6QOa Close Year: 2026 Planned 2027 Planned Page 22 4f 34 23'. Mirelbeau Parkway/Mansfield Ave. Intersection Improve enf Feel. 0 40 80 1 HO 240 Project Type: Intersecflon Project Description: New intersection control (signal or roundabout). Total Funding Status.: Flonned Funding Source(s): Priv❑ie Developer Funds I Unfunded Total Project Years: 2028-2030 Total Phase Cost. Project Year 1-0 ikane� y. TIP Pra *rs i Arlerial i l3rld4e %&s1r9an/Blcyde � Sofety 5larmvrprer Preiervatlon Reconslrmflan funding Status Preliminary Engineering JPFI: 150 2028 Partial Right of Way I;RWI: 100 2029 Planned Construction (CN): 3250 20 Planned Total Cost; (in thousands) 3500 Close Year: P❑ge 23 of 34 24: Sullivan Rd./Kiernan Ave. Intersection Improvement Feet d 40 80 160 NO Project Type: Intersection Project Descdptiori: Improve chiannelization and signal operations cat Intersection and reconstruct intersection with concrete. Total Funding Status: Planned Funding Source(s): Unfunded Preliminary Fr)gineering �PFJ: Right of Nay (R): Construction (-CNI: Total Project Years: 2028-2030 Total Phase Cast 100 500 2400 Project Year Total Gast: (in thousands 000 close Year, 2028 2029 203C 11P Pro]-mos +� Ai•ierFal amENO bridge � �nleryeclion - Pedeorionf Biryde - S.a Foy SfarmaVdw � Preserwnllerti ReconstrvOinn Funding Status Planned Planned Planned e r. Page 24 of 34 25: Sullivan Rd./Marietta Ave. Intersection Improvement Feet 0 40 81) 113C 241) Project Type: Intersection Project pescrlpfion: Improve channelization and signal operations ct intersection and reconstruct intersecticrt with concrete. Total Funding Status: Planned Funding Sources): Unfunded Total Project Years: 2028-2030 Total Phase Cost. Project Year S#66n � ,;0O VAlley. TIP Projects Medal Bridge Intersecllon � Pedeslrian�@iC)*CIe blormwaler � �4fetY •� Preservallon -- Ra onsirw lon Funding Status Preliminary Engineering (PEJ: 100 2028 Planned Right of Way {RWj: 500 2029 Planned Construction (CN): 2400 2030 Planned Total Cost: (in thousands) $ 3000 Close Year: Page 25 of 34 26, Ridgemont Estates Street & Stormwater Improvements Feel a 5001.000 2,000 3,090 Project Type: Stormwater Project Description: Stcrmwoter improvements and road re-consiruction in City's southeast neighborhood. Total Funding Stalius: Partied Funding Souree(s): Unfunded I City Stormwater Funds Total Project Years: 2029-2031 Total Phase Cost. Project Year TIP Prolacts i Arterlr�l i Bridge � Inl�rsattE��3 � Pede�irie�n�Sley�[le Safely &lorrmwa ter Prima rvallan RegoralrucFl6n Funding Status Preliminary Engineering (P'F). 200 2029 Secured Right of way ( M): 0 Construction (CNJ: 930O 2D3O Partial Total Cast: (in thousands) 9500 Close Yecr, PUge 26 ®f 3A 27: South Bowdish Rd. - Phased Corridor Improvements Fee[ :i 2,000 4.000 8,000 12,GOQ Project Type. Arterial Project Description: Phased projects to reconstruct Sprague to Dishman Mica cis Durban section. May ❑lso include intersection improvements at 32nd Ave. and ITS. Total Funding Status_ Planned Funding Source(s): Total Project Years: 2029-2031 Total Phase Cost. Project Year R �e �'L�alley TIP Projects �i Arterial Bridge InPerserPion � peGieFtelGn�l3lcycle �satesy Starmwaimr � PreservniieNS � &OC4n5tru4Rlon Funding Status Preliminary Engineering (?FJ: 1000 2029 Planned Right of Way (RW): 500 2030 Planned Construction (CN): 11500 2031 Planned Total C€)st: (in thousands) $ 13000 Close Year: Page 27 of 34 28, 8fh Ave./Carnahan Rd. Intersection Improvement Fee[ C BO 160 320 480 Project Type: Intersection Project Description: Add intersection control (turn [ones, potential signal). Total Funding Status: Planned Fending Source(s): Total Project Years: 2029-?032 Total Phase Cast. Project Year Preliminary Engineering (PE): 175 Right of Way (IOW}: 250 Construction (CN): 2575 Total Cost: (in thousand's) Close Year: �.p�ikan lVarlley TAP Pr*cis r� Ar[erial Brtdge Pedev4an%glcyde k lely Srarmvwa f eI i PreS4rvnlion — Rec4nstr4��lq.v Funding Status 2029 Planned 2031 Planned 2032 Planned Page 28 of 34 29: Flora Rd. Reconstruction: Appleway Trail Flora Park Feel 0 1,250 2,500 5,0010 7,500 Project Type: Arterial Project Description: Reconstruct corridor, including shared -use pathway (and bridges} connecting Appla way, Centennial Trail, and Flora Park. Total Funding Status: Planned funding Scurce(s}: Unfunded Total Project Years, 2029-2033 Total Phose Cast. Project Year TJP Projects Arle rlal bridge Inler secl bon Pedeslrlon f Bicycle Safery SlerniW91ter Preservalion Reconsl ruction Funding Status Preliminary Engineering �PQ, 2501) 2029 Planned Right of Wray (RW), 250 2030 Planned Construction (CND: :30000 2032 Planned Total Cast: (in thousands) $ 32750 Close Year: Page 29 of 34 30: Sprague/Pines (SR 27) Intersection Improv. Feet d] B:) 160 320 400 Project Type: Intersection Project Description: Install SB right turn lane, EB left turn lane, and intersection control (signal and charnelizationl. Total Funding Status: Planned Funding 5ource(s): Unfunded Preliminary Engineering (PEI: Fight of Way (RW); Construction (CN). Total Project Years: 2030-2033 Total Phase Gast 300 300 2000 Project Year Total Cost. (in thousands) $ 2600 Close Year: 2030 2031 2033 R11 ley TIP Projects Arterial � &ridge Intersectlan VedestrIanyDicycle Safely $tprm water PreierYGllpn — Reconstruction Funding Status Planned Planned Planned Page 30 of 34 31: Sth/Park Intersection Improvement Fftt 0 80 160 320 480 Project Type: Intersection Project Description: Provide new traffic signal or roundabout. Total Funding Status: Planned Funding Source(s): Unfunded Total Project Years: 2030-9033 Total Phase Gast. Project Year Preliminary Engineering (PE): M) Right of Way (RW): 300 Construction (CN): 2600 Total Cost: (in thousands) $ 3000 Close Year: �all+ey• JIP Pra[ecls Arierial � 6r1dg� Inlersee�la� Podeslrlari/8lcysle .� Safeiy 5�c�rrnwo leer � PresefY4lign Re conchwcllcn Funding Status 2030 Planned 2031 Planned 2033 Planned Page 31 of 34 32: Broadway Ave. Improvements. Flora to Barker Feet 0 Sa0 1,000 2,000 3,000 Project Type: Arterial Projecl Description: Extend 3-lane urban section to Barker Rd and realign connection enst of Barker. Total funding Status: Planned Funding Sourcae(s): Unfunded Total Project Years- 2020-2033 Total Phase Cost. Project Year Prelimlri ary Engineering (PEA; 100 Right of Way (RW): 500 Construction (CN),. 4400 Total Cost; (ire thousands) 5000 Close Year: S11 .,!�9%11ey- TIP Profecls � Aracraal : Bridge Inaersr:s�an � Pede�atrlanf fDacyele safety $wrm,wler - Pr�.enaptlQn Recoretrum l®n Funding Status 2030 Plarnc�d 2031 Planned 2033 Planned Page 32 of 34 33: Park Rd./Mission Ave. Intersection Improvement Feet {3 40 so 160 240 Project Type: Irtersection Project Description: improve channalization and signal operations. `fatal Funding Status: Planned Funding Source(s)- Unfunded Total Project Years: 2030-2033 Tfltal Phase Cost. project Year TIP P*eets Arfer6u bridge Intersection i PedasfrlanfBicyele ,� sa►�ly Stormwater Preservation Recornstructlon Funding Status Preliminary Engineering (PEN: 100 2030 Planned Right of Way (R'W): 100 2031 Planned Construction (CN): 2300 2033 Planned Total Cast: (in thousands) 2500 Close Year, Page 33 of 34 4: Flora Rd./SR 290 Intersection Improvement 6+ 1 Tl /+PP `4ry � ITf 6.. Ir 1 1_ 4 80 160 320 ■ Feet 480 Project Type: Intersection Project Description. Provide new signal with added turn lanes or roundabout. per adopted Planned Acfion Ordinance. Total Funding Status: Planned Funding Source(s): Unfunded Total; Project Years: 2030-2032 Total Phase Cost. Project Year rvi-- 10 oil TIP Projects Arterial Bridge � �pFrtr�etlgn PESIe31rldFl%Bi< jrcle Safely SIQFniware'r � PrESErwpflpn G - � Re>cansrru�rlan Funding Staters Prelimincry Engineering (PEJ: 100 2030 Planned Right of Woy (RW}: 100 2031 Planned Construction (CN): 3800 2032 Planned Tofol Cost: (in thousands) $ 4000 Close Year: Page 34 of 24