Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
24-159.04WalkerConstructionFloraParkCrossCountry
Rn �l` 24-159.04 �y� Public Works Department '�[�'� 10210 E Sprague Ave • Spokane Valley WA 99206 Phone: (509)720-5000 • Fax: (509) 720-5075♦ www.spokaneval leywa.gov Phase 2 Contract Change Order#2 City of Spokane Valley Cross Country Complex City of Spokane Valley Walker Construction See above for address PO Box 3901 Spokane, WA 99220 Project Name: Cross County Complex Change Order#: 01 Item# Description of Change Change in Change in Contract Time GMP 6 Paved spectator path —1,900'X10'wide&extend access road paving to N/A $145,833.00 path. 7 Connections &sleeves under path for future OFCI Trees— Items 1 &2. N/A $5,697.00 8 Existing tree well in start chute—remove topsoil, grade slope, adjust N/A $2,509.00 irrigation and place mulch. Original Guaranteed Maximum Price (w/o Sales Tax) $ 5,588,118.00 Net change by previous authorized Change Orders $ 238,254.00 Total net[check oneJ X Increase/ ['Decrease in the GMP by this Change $154,039.00 Order(w/o Sales Tax) New Guaranteed Maximum Price including this Change Order $ 5,980,411.00 (w/o Sales Tax) The new Contract Time including this Change Order is: New Scheduled Substantial Completion Date No Change New Scheduled Interim Milestone Dates: No Change New Final Completion Date No Change The changes in the GMP and Contract Time identified in this Change Order include all costs and time extensions associated with performing the changes set forth herein. City of Spokane Valley Walker Construction ul�L u By: By: J n Hohman, City Manager Josh Chrisman, Vice President Date: ` ' y-z3 Date: 8/29/2025 WALKER CONSTRUCTION INC. JOB NAME:CoSV Cross Country Complex BID DATE&TIME:Gravel Path Betterment=Updated per ASI-02 routing. 6-18-25 WALKER CONSTRUCTION Section DESCRIPTION LABOR MATERIALS SUB TOTAL 1 Div 01 Sales Tax-Excluded 0 0 0 0 2 Div 02 AM Landshaper-Gravel spectator path. 1,9201f of 10'wide graded with 4"of gravel base. 0 0 87,100 87,100 3 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS 0 0 87,100 87,100 0 0 87,100 87,100 INSURANCE RATE 1.5% 1.5% 1.5% INSURANCE BURDEN - - 1,306.50 1,307 TOTAL 0 0 88,407 88,406.50 Perdiem PERDIEM - 88,406.50 CONTINGENCY 0% - 88,406.50 OH&P 6.00% 5,304.39 BOND 1.11% 1,134.85 TOTAL S94,846 Page 1 1 LANDSHAPER INC. Contractors AMLAND*971 DO 8004 N. Market Spokane, WA 99217 PHONE (509)468-4335 FAX(509)468-4225 Date: 04-17-2025 (revised 6-18-25) Walker Construction Attn: Josh Crisman 1800 E. Trent Ave. Spokane, WA 99202 Project Description: Below is our pricing for the Flora Park Cross Country revised access path and to place boulder markers only with no sand blasting. Course Gravel Path: • Provide 1,920 LF x 10' wide gravel path in center of track • Compact sub grade • Grade and dispose rock, dirt on site • Provide compacted 4" gravel base Gravel Path Price = $ 87,100.00 rse Markers Pricingj • • 7 Course Markers O o installed around track ■ Onsite — 17 flat faced boulders will be needed o Sand Blasting Not Include Rock Marker— No Sand Blast = $ 7,975. Exclusions • Washington State Sales Tax • Construction Bond Thank You, Justin Carr, Project Manager Phone number: 509-468-4335 WALKER CONSTRUCTION INC. JOB NAME:CoSV Cross Country Complex BID DATE&TIME:Pave Gravel Path Betterment-Updated 6/20/25 WALKER CONSTRUCTION Section DESCRIPTION LABOR MATERIALS SUB TOTAL 1 Div 01 Sales Tax-Excluded 0 0 0 0 Paving add price for 2"HMA with no curbing on the pedestrian path betterment. (Note with reduced thickness it was suggested to go with industry standard 92%compaction vs 2 Div 02 the called out 95%.) 0 0 38,340 38,340 3 0 0 0 0 O 0 0 0 O 0 0 0 SUBCONTRACTORS 0 0 38,340 38,340 O 0 38,340 38,340 INSURANCE RATE 1.5% 1.5% 1.5% INSURANCE BURDEN - - 575.10 575 TOTAL 0 0 38,915 38,915.10 Perdiem PERDIEM - 38,915.10 CONTINGENCY 0% - 38,915.10 OH&P 6.00% 2,334.91 BOND 1.11% 499.54 TOTAL $41,750 Page 1 _ Inland Asphalt Company • * An Equal Opportunity Employer Pahl PO Box 3366 Is GO C'O Spokane, 509.534.2657-3366 Contractor Registration#1NLAN.AC984OK Fax: 509.536.3137 To: Walker Construction Inc. Contact: Josh Chrisman Address: P.O. Box 3901 Phone: 535-3354 Spokane,WA 99220 Fax: 534-1440 Project Name: COSV-Cross Country Complex Bid Number: 254023 Project Location: 2697 Flora Rd,Spokane Valley,WA Bid Date: 2/14/2025 CO#2 6/19/25 Item 802.1:Pave 10"HMA Pathway Pave Only 2"Thick Pathway Using 3/8" PG64H-28 HMA. Price Includes Weedkill. Includes 1 Additional Paving Mobilization. *Price Assumes 92%Compaction Specification Item # Item Description Estimated Quantity Unit Unit Price Total Price 802.1 Pave 10" HMA Pathway 2,130.00 SY $18.00 $38,340.00 Total Bid Price: $38,340.00 Notes: • DUE TO THE VOLATILITY OF ASPHALT OIL PRICES AND OUR CURRENT WORKLOAD,THIS PRICE SHALL BE WITHDRAWN IF NOT ACCEPTED WITHIN 15 DAYS. • This price is contingent on asphalt oil availability and assumes that this project work will be completed within the 2025 construction season. All pricing subject to adjustment for projects that have not been completed within the timeframe for which they were quoted. • If this is a"pave only"quote,Inland Asphalt will not be responsible for asphalt over-runs or drainage problems. • Exclusions: Striping,Traffic Control,Sawcutting,Utility Adjustments, Bond,Permits,Engineering,Testing,Sales Tax,Use Tax, • If project access is across concrete,Inland Asphalt will not be responsible for damage. • A copy of this proposal must be included as an attachment to any subcontract. • Inland Asphalt's warranty is void if we are directed to grade and/or pave your project in inclement weather or other unsuitable conditions.Work performed outside of favorable weather and after October 1st may affect the quality and finish(Aesthetics)of the delivered product. Payment Terms: Payment will be based on terms of mutually agreed subcontract. ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and Inland Asphalt Company are hereby accepted. Buyer: Signature: Authorized Signature: Date of Acceptance: Estimator: Zac Smith/509-828-8107 Page 1 of 1 WALKER CONSTRUCTION INC. JOB NAME:CoSV Cross Country Complex BID DATE&TIME:Paving Extension at Fieldhouse Roadway-Option 1 Betterment 7-21-25 / WALKER CONSTRUCTION Section DESCRIPTION LABOR MATERIALS SUB TOTAL 1 Div 01 Safes Tax-Excluded 0 0 0 0 Inland Ashpalt-Fieldhouse Roadway Paving Betterment. Reduce gravel depth by 3"and add 3"asphalt roadway for an additional 77'. The excess gravel will be spread on remainder of gravel road towards future fieldhouse causing the roadway to become 2 Div 02 slightly wider. 0 0 8,483 8,483 3 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS 0 0 8,483 8,483 0 0 8,483 8,483 INSURANCE RATE 1.5% 1.5% 1.5% INSURANCE BURDEN - - 127.24 127 TOTAL 0 0 8,610 8,609.74 Perdiem PERDIEM - 8,609.74 CONTINGENCY 0% - 8,609.74 OH&P 6.00% 516.58 BOND 1.11% 110.52 $9;237 Page 1 Inland Asphalt Company 'An Equal Opportunity Employer' 4 PO Box 3366 -� _SpHA LT Spokane, WA 99220 3366 C' ' 509.534.2657 Contractor Registration#INLANAC984OK Fax: 509.536.3137 To: Walker Construction Inc. Contact: Josh Chrisman Address: P.O. Box 3901 Phone: 535-3354 Spokane,WA 99220 Fax: 534-1440 Project Name: COSV-Cross Country Complex Bid Number: 254023 Project Location: 2697 Flora Rd,Spokane Valley,WA Bid Date: 2/14/2025 CO#3 7/21/25 Item 803.1:Grade&Pave 3"HMA Road Extension Option 1 Excavate And Prep Existing CSTC For 3" Paving Using 1/2"64H-28 HMA.Assumes Existing CSTC Can Be Dispersed On Site. Includes Weedkill And 1 Additional Grading&Paving Mobilization. Blue area on map Item 803.2:Grade&Pave 3"HMA Road Extension Option 1&2 Excavate&Prep Existing CSTC For 3"Paving Using 1/2"64H-28 HMA.Assumes Existing CSTC Can Be Dispersed On Site. Includes Weedkill And 1 Additional Grading&Paving Mobilization To Complete The Area Of Option 1&2. 'Item# Item Description Estimated Quantity Unit Unit Price Total Price' 803.1 Grade&Pave 3"HMA Road Extension Option 1 195.00 SY $43.50 $8,482.50 803.2 Grade&Pave 3"HMA Road Extension Option 1&2 390.00 SY $38.00 $14,820.00 Notes: • DUE TO THE VOLATILITY OF ASPHALT OIL PRICES AND OUR CURRENT WORKLOAD,THIS PRICE SHALL BE WITHDRAWN IF NOT ACCEPTED WITHIN 15 DAYS. • This price is contingent on asphalt oil availability and assumes that this project work will be completed within the 2025 construction season. All pricing subject to adjustment for projects that have not been completed within the timeframe for which they were quoted. • Exclusions: Striping,Traffic Control,Sawcutting,Utility Adjustments, Bond,Permits, Engineering,Testing,Sales Tax,Use Tax • If project access is across concrete,Inland Asphalt will not be responsible for damage. • Inland Asphalt will not schedule this work until a signed proposal is received. • A copy of this proposal must be included as an attachment to any subcontract. • Inland Asphalt's warranty is void if we are directed to grade and/or pave your project in inclement weather or other unsuitable conditions.Work performed outside of favorable weather and after October 1st may affect the quality and finish(Aesthetics)of the delivered product. Payment Terms: Payment will be based on terms of mutually agreed subcontract. ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and Inland Asphalt Company are hereby accepted. Buyer: Signature: Authorized Signature: Date of Acceptance: Estimator: Zac Smith/509-828-8107 Page 1 of 1 © P A El© REFERENCE NOTES SCHEDULE � \ - ARCHITECTS - SY4B�1 DESCRIPTION DETAIL I- 1+J ( /\ \ ,•a 449„, `L s. \ L.4 z \C-\ti - IYI�MA. MUMS O t t� 1 \••• �._a�e� ♦a�aZc♦♦\♦1\a>,�1��•�Lr ♦ u� moron ..,t~11E.fPOw..,Ew..aEO.aa. k,-' _��_ �_.�.\ p0 uk .E..�66.1.114161.1464968,461.6.111114 nm, ,`/1/ i f/ f/ // ._j, �. • I� `I [ 1 • 9 /J/(1 + -..':r:?• -- -'` - --ti•'I:'• -- l& Y•"wu,s1n PMEP.x.w..rE9,E610116,E P.uc,a,E + / ' '�'' -A. ' _ -'r:�'• -��•,• �• mx s rr..,w.w.rcue.arwalfn l \ rrwEnoln 1 .� • wo prima am SW ' _.I.O.ata 04.".:.W% `°° ,,• E . •.: ` sll AO..awns•. J. -- �-e. Ew 6 ro„a, Ya p : PLANT SCHEDULE + 'Qrl y �,1!I ' 'r , w itl -- CODE +9DTNJI'J.LICOMMDN NAME CONE GL. DETNL E \- '� j� --- bstlannont , � U V li%IT,..,, .oan`:,E611111 U...,P�.m,.aa E. •.. :u. 9 `71411114„DD wail pi 011P - �.�"' �i ----• '-i' _ " -, i�.•8 rve. gK CODE EOTANCALICCNMON NAME , SEE pETNL + " ....wail -� .,. ''''' `/ �� _ _ �.c°�`1R k' ..r�uc,na O.Or41. •ull..I..nva BMW..11ENCE.P.+ a IP' '� tits _ 64 ..P roueam MAIM iwwl.wwrwEw w. P nyP., p%/I/../�•�,!�(• I4T •"' .,'_ `. • .m,o.cuw 1 ,�JI�u �r % .�*n i �r 1i! \\♦.\\� m • �,, 1,Y} , 0 GENERAL PLANTING NOTES: ! ifilli'r_. ��.i•- k / ! �,` � L.1 \,.., C,. «. _ 1,f,;+' i 0 .aE«611014 EL-1.1 Ew.E.,E.EOa.m,E9E ! /Alit / y% � e ., . 1 ,:rerewPiEe .unrogrnlEEMI..>:tlewaoerEioeEowP.rW I / ! i,..-; n I 'I {'. +:} 1Pwcn P.vrw,Psufa.Ommuu mK 0 (, . CI`?an,«a,or.ofu.E.a,.mwmP1mneeuunrtcaenxEP.ewE n• ! �! % `I - ' 4r \� i tl; 9�cxnce PPwroeEmlMgnw w)lu.WOPO.M,ew,waPu,ux i \, . ' .o"wrocor4110secmEwlaio",oxmw.EN,.w lJ1,�s \ ` 3 0.,; f�:} �•. E,/�5� VE 1S.eaPinEP.EP..nao..w••E.nm.v..,mro. 444664 / R'1 �f r ! V\D ' t3 o t, 116161111611/1..6466 ,O.E•IrtPCE.PPm•ro1Eat.sm utt w+PR �., .O.w,En0 a.•u11E aw.Pur.m PEn.PErnee,wa 1 -a� �j,4, "- ,! �0�! , rl . 01. Nw+�cm.Pw,n acEr.E.a.wPn.�nraeoEauw.f.EP•um ( �. �` I !! l �e �` + i +E i ( , 1 11631166/ _ .eN nw.64/6.6a•«,u wEorctcw.oO,o.x+. l lr ett Y, i / \� N r, i' 47 ti LIN .. PPT.TEJOE,.u.o..pw<EouPmPf"a.cwu.PwrtnneEre \` �.�P.,E,.6.6P61.I.�.,11 ,a ,� ,P.,,a.f,m , f ,gyp „�i Chilli �&a y., , I � '; Cso , w,i.XOOfEO Wrt ,N PIMP011A,pM 3vTELb �,',�r , • P,bGPl148.•wlHwnc.lnwm>•af VMWfOM•.liW 1*0 4.` �I '� i\ 1 I `\ //}y ,,, ,i,• /} ▪o•1aa.O..Eb M] NEW.00 ro..:',3Eh OR1NNO.Q0. I Z ` i I' ( \ �./ •'✓- ` •+r.r 1.1. • 11.�urt•PN.ueoE,LL an4111114/ ` `I!� 1 .' `,I 1 , 1 fyY. ?v}, r< rlec•vws., �..ca oncPErf.,nEe.ncl.P.m..Pa•aPuxumerssr.*mu _ I,`\ ` Li �' i I � i.r'Preie.�'mw ,..:uaP. wc,NEo1Mu"Pnr >cw,..-... ,�, •`.11....,w..n.,vreEau40a.Pnm�Of,wm.,,•.c..wueE EEEceowm '(�t� ��1 ' r\\r - .,, I I i i'y�� , �' M ,� -i :.'}�-�am.r 2 wE .40111E in,.aE. 2 • / R V 33 Q L-201 WALKER CONSTRUCTION INC. JOB NAME:CoSV Cross Country Complex BID DATE&TIME:Irrigation Tap and Sleeve Only Approach for Future Donated Trees WALKER CONSTRUCTION Section DESCRIPTION LABOR MATERIALS SUB TOTAL 1 Div 01 Sales Tax-Excluded 0 0 0 0 AM Landshaper-Provide and install scope items#1 and#2 on attached proposal which 2 Div 02 provides 2 taps and some sleeveing for future trees. 0 0 5,245 5,245 3 Walker Fee Reduction 0 0 -13 -13 0 0 0 0 0 0 0 0 SUBCONTRACTORS 0 0 5,232 5,232 0 0 5,232 5,232 INSURANCE RATE 1.5% 1.5% 1.5% INSURANCE BURDEN - - 78.48 78 TOTAL 0 0 5,310 5,310.48 Perdiem PERDIEM - 5,310.48 CONTINGENCY 0% - 5,310.48 OH&P 6.00% 318.63 BOND 1.11% 68.17 TOTAL $5,697 Page 1 A.M. LANDSHAPER INC. Contractors AMLAND*971 DO 8004 N. Market Spokane, WA 99217 PHONE (509)468-4335 FAX(509)468-4225 Date: 07-03-2025 (revised 7-10-25) Walker Construction Attn: Josh Crisman 1800 E. Trent Ave. Spokane, WA 99202 Project Description: Below is our extra pricing for the Flora Park Cross Country track for planting of Free Trees and provide and install of irrigation. Irrigation system will be connected to existing new system in 2 spots. Tree Irrigation Main will connect via existing QC for eastern trees and valve 50 for western trees. Laterals will be installed with 2 bubblers to each tree. Scope of Work: o • ' • • ••• - i I se - I. so -• '• - a•• • . -r.l o r•i • the above desc iption of he b.se bi•. Item 1 — 1" connection only: • Install 1" connection from existing qc • Add isolation valve to serve eastern trees on 1" stub Item 1 Price= $ 1,880.00 Item 2 — 1" main line and sleeving: • Install 1" main line from existing qc • Provide and install sleeving for pedestrian path Item 1 Price= $ 3,365.00 Item 3—3/4" laterals and western tree to• • Provide and install 2 new control valves o Western tree control valve tapped off valve 50 • Pr. '•e and install new lateral piping Tree Irrigation Price = $ 23,025.00 Item 4 -Tree install and irri•a ', . • Install 37 Trees w/tree stake o Trees provided by others • Provide and install 2 bubblers per tree • Site Clean up Tree Install Price = $ 10,075.• 4 Exclusions • Washington State Sales Tax • Construction Bond • 2" caliper trees supplied by others Thank You, Justin Carr, Project Manager Phone number: 509-468-4335 WALKER CONSTRUCTION INC. JOB NAME:CoSV Cross Country Complex BID DATE&TIME:Tree Well Landscaping Modification 8-7-25 WALKER CONSTRUCTION Section DESCRIPTION LABOR MATERIALS SUB TOTAL 1 Div 01 Sales Tax-Excluded 0 0 0 0 AM Landshaper-Modify Grading at existing tree due to expanded starting line to account 2 Div 02 for tree well and associated mulch. 0 0 2,310 2,310 3 Walker Fee Reduction 0 0 -6 -6 0 0 0 0 0 0 0 0 SUBCONTRACTORS 0 0 2,304 2,304 0 0 2,304 2,304 INSURANCE RATE 1.5% 1.5% 1.5% INSURANCE BURDEN - - 34.56 35 TOTAL 0 0 2,339 2,338.56 Perdiem PERDIEM - 2,338.56 CONTINGENCY 0% - 2,338.56 OH&P 6.00% 140.31 BOND 1.11% 30.02 TOTAL $2,509 Page 1 A.M. LANDSHAPER INC. Contractors AMLAND*971 DO 8004 N. Market Spokane, WA 99217 PHONE (509)468-4335 FAX (509)468-4225 Date: 08-07-2025 Walker Construction Attn: Josh Crisman 1800 E. Trent Ave. Spokane, WA 99202 Project Description: Below is our pricing for the Flora Park Cross Country track extras for to uncover the truck of the existing pine tree near the starting shoot. Per SPVV's direction, AM Landshaper will excavate 2' down to expose roots. Provide 5' bark mulch circle with not border or mow curbing. Grading will be steeper on North and East side of tree to keep starting area as flat as possible and South and west will have 5:1 slope. Scope of Work: Following proposal includes all labor, equipment and materials to furnish the above description of the base bid. Tree Well Grading: • Remove 2' of topsoil to expose tree roots • Modify irrigation based on new grades • Install and provide 5' bark mulch circle around tree o Now edging or concrete mow curb is included • Grade slope per SPW's recommendations o North and East to be steep to keep starting shoot flat ■ Will try to have 4:1 slope to grass can be mowed o South and West to be at 5:1 slope • Apply sod per plans • Site clean up Tree Well Grading Price = $ 2,310.00 Exclusions • Washington State Sales Tax • Construction Bond • Edging and Mow Curb Thank You, Justin Carr, Project Manager Phone number: 509-468-4335 GENERAL SURETY RIDER To be attached and form a part of Type of Bond: Performance&Payment Bond Bond No.: K41904434 Dated effective: 10/9/2024 (MONTH,DAY,YEAR) executed by: Walker Construction, Inc.,as Principal, (PRINCIPAL) and by: Federal Insurance Company,as surety, (SURETY) and in favor of: City of Spokane Valley (OBLIGEE) In consideration of the mutual agreements herein contained the Principal and the Surety hereby consent to changing INFORMATION FROM TO Increase Bond Amount $6,344,919.11 $6,512,667.58 Nothing herein contained shall vary,alter or extend any provision or condition of this bond except as herein expressly stated. This rider is effective 8/25/2025 (MONTH,DAY,YEAR) Signed and Sealed 8/26/2025 (MONTH,DAY,YEAR) Walker Construction, Inc. PRINCIPAL BY: TITLE Federal Insurance Company SURETY BY: Shelby Groth, ac Surety Phone No. 509-747-3121 CHUBS Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Westchester Fire Insurance Company I ACE American Insurance Company Know All by These Presents,that FEDERAL INSURANCE COMPANY,an Indiana corporation,VIGILANT INSURANCE COMPANY,a New York corporation,PACIFIC INDEMNITY COMPANY,a Delaware corporation,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do each hereby constitute and appoint Wm.Dinneen,Shelby Groth,Scott Jones,Kirsten Jordan,Travis Long,Keith H.McNally,Ryan J.Pugh,Sydney Schmidt and Daniel J.Stowe of Spokane,Washington — --- — --—each as their true and lawful Attorney-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed in the course of business,and any instruments amending or altering the same,and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof,said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this 8th day of July,2024. Warren Eichhorn.Vice President Rupert HD Swindells,Assistant Secretary 4 ' ) . 4,„ •.".; 4110) tVi&!;) STATE OF NEW JERSEY County of Hunterdon ss. On this 8th day of July,2024 before me,a Notary Public of New Jersey,personally came Rupert HI)Swindells and Warren Eichhorn,to me known to be Assistant Secretary and Vice President,respectively,of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY,the companies which executed the foregoing Power of Attorney,and the said Rupert HD Swindells and Warren Eichhorn,being by me duly sworn, severally and each for himself did depose and say that they are Assistant Secretary and Vice President,respectively,of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof,that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies;and that their signatures as such officers were duly affixed and subscribed by like authority. Notarial Seal ,a;c Atbert Conners' an 6,e NOTARY PUBIJC OFOF NEW JERSEY No 50202369 Commission Expires August 22,2027 Notary Public CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY on August 30,2016; WESTCHESTER FIRE INSURANCE COMPANY on December 11,2006;and ACE AMERICAN INSURANCE COMPANY on March 20,2009: "RESOLVED,that the following authorizations relate to the execution,for and on behalf of the Company,of bonds,undertakings,recognizances,contracts and other written commitments of the Company entered into in the ordinary course of business(each a"Written Commitment"): (1) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise. ' (2) Each duly appointed attorney-in-fact of the Company is hereby authorized to execute any Written Commitment For and on behallof the Company under the seal of the Company or otherwise, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney-In-fact. (3) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized,for and on behalf of the Company,to appoint In writing any person the attorney-In- fact of the Company with full power and authority to execute,for and on behalf of the Company,under the seal of the Company or otherwise,such Written Commitments of the Company as may be specified In such written appointment,which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman, the President and the Vice Presidents of the Company Is hereby authorized,for and on behalf of the Company,to delegate in writing to any other officer of the Company the authority to execute,for and on behalf of the Company,under the Company's seal or otherwise,such Written Commitments of the Company as are specified in such written delegation,which specification may be by general type or class of Written Commitments or by specification alone or more particular Written Commitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution,and the seal of the Company,may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED,that the foregoing Resolution shall not be deemed to bean exclusive statement of the powers and authority of officers,employees and other persons to act for and on behalf of the Company,and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested.' I,Rupert HD Swindells,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY(the"Companies')do hereby certify that (I) the foregoing Resolutions adopted by the Board of Directors of the Companies are true,correct and in full force and effect, (ii) the foregoing Power of Attorney is true,correct and in full force and effect. Given under my hand and seals of said Companies at Whitehouse Station,NJ,this 26th day of August, 2202 5 iik . '' Rupert HD Swindells,Assistant Secretary IN THE EVENT YOU WISH TO VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER PLEASE CONTACT US AT: Telephone(908)903.3493 Fax(908)903-3656 e-mail:surety@achubb.com Combined:FED-VIG-Pi-V FIC-AAIC(rev.11-19) . a •• GENERAL SURETY RIDER To be attached and form a part of Type of Bond: Retainage Bond Bond No. : K41904446 Dated effective: 10/9/2024 (MONTH,DAY,YEAR) executed by: Walker Construction, Inc. ,as Principal, (PRINCIPAL) and by: Federal Insurance Company ,as Surety, (SURETY) and in favor of: The City of Spokane Valley (OBLIGEE) In consideration of the mutual agreements herein contained the Principal and the Surety hereby consent to changing INFORMATION FROM TO Increase Bond $279,405.90 $299,020.55 Amount Nothing herein contained shall vary,alter or extend any provision or condition of this bond except as herein expressly stated. This rider is effective August 29, 2025 (MONTH,DAY,YEAR) Signed and Sealed August 29, 2025 (MONTH,DAY,YEAR) Walker Construction, Inc. PRINCIPAL BY: /� ` J(?S V 1) /I 16/•y�` i V! TITLE Federal Insurance Company _ SURETY BY: Shelby Groth,A orney-in- ac Surety Phone No.509-747-3121 CHUBB Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Westchester Fire Insurance Company I ACE American Insurance Company Know All by These Presents,that FEDERAL INSURANCE COMPANY,an Indiana corporation,VIGILANT INSURANCE COMPANY,a New York corporation,PACIFIC INDEMNITY COMPANY,a Delaware corporation,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do each hereby constitute and appoint Wm.Dinneen,Shelby Groth,Scott Jones,Kirsten Jordan,Travis Long,Keith H.McNally,Ryan J.Pugh,Sydney Schmidt and Daniel J.Stowe of Spokane,Washington-------------------- — --- -~- —--- ----_____ each as their true and lawful Attorney-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed In the course of business,and any instruments amending or altering the same,and consents to the modification or alteration of any instrument referred to In said bonds or obligations. In Witness Whereof,said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this 8th day of July,2024. cZ� N 4aa�� Warren Eichhorn.Vice President R,Iper HD S:rir_ce]ts 3s1:istar.t Secretary if ® I/�1. \ ® �I Ili � b:J�)i iii f ' 1 L�J/// "4" "I" feu STATE OF NEW JERSEY County of Hunterdon SS. On this 8u day of July,2024 before me,a Notary Public of New Jersey,personally came Rupert HD Swindells and Warren Eichhorn,to me known to be Assistant Secretary and Vice President,respectively,of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COM PANY,the companies which executed the foregoing Power of Attorney,and the said Rupert HD Swindells and Warren Eichhorn,being by me duly sworn, severally and each for himself did depose and say that they are Assistant Secretary and Vice President,respectively,of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof,that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies;and that their signatures as such officers were duly affixed and subscribed by like authority. Notarial Seal 1 Albert Contursi m'�0. lGA NOTARY PUBLIC OF NEW JERSEY "�'•a, Y�I No S0202369 S e�lc Commission Expires August 22,2027 Newry Public CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY on August 30,2016; WESTCHESTER FIRE INSURANCE COMPANY on December 11,2006;and ACE AMERICAN INSURANCE COMPANY on March 20,2009; "RESOLVED,that the following authorizations relate to the execution,for and on behalf of the Company,of bonds,undertakings,recognlzances,contracts and other written commitments of the Company entered into in the ordinary course of business(each a"Written Commitment"): (1) Each of the Chairman,the President and the Vice Presidents of the Company Is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise. (2) Each duly appointed attorney-In-fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise, to the extent that such action Is authorized by the grant of powers provided for In such person's written appointment as such attorney-In-fact. (3) Each of the Chairman,the President and the Vice Presidents of the Company Is hereby authorized,for and on behalf of the Company,to appoint in writing any person the attorney-in- fact of the Company with full power and authority to execute,for and on behalf of the Company,under the seal of the Company or otherwise,such Written Commitments of the Company as may be specified in such written appointment,which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman, the President and the Vice Presidents of the Company Is hereby authorized,for and on behalf of the Company,to delegate In writing to any other officer of the Company the authority to execute,for and on behalf of the Company,under the Company's seal or otherwise,such Written Commitments of the Company as are specified in such written delegation,which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution,and the seal of the Company,may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED,that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers,employees and other persons to act for and on behalf of the Company,and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested." I,Rupert HD Swindells,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY(the"Companies")do hereby certify that (I) the foregoing Resolutions adopted by the Board of Directors of the Companies are true,correct and in full force and effect, (ii) the foregoing Power of Attorney is true,correct and in full force and effect. Given under my hand and seals of said Companies at Whitehouse Station,NJ,this 29th day of August, 2025_', 4, 41101) Q . RupertHD Swindells.Assistant Se:tvtary IN THE EVENT YOU WISH TO VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OT(1ERMATTER,PLEASE CONTACT US AT Telephone(908)903-3493 Fax(908)903-3656 e-mail:suretyWchubb.com Combined:FED-VIG-PI-VvFIC-AAIC(rev.11-19) �--.IN WALKCON-04 BGARCIA A`�R� CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDDmYY) 6/18/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). CONTACT Gigi Draggoo PRODUCER NAME: Hub International Northwest LLC (A/cC,No,Ext):(509)462-7896 �FAX No):(509)623-1073 PO Box 3144 E-MAIL I t draggoo hubinternational.com Spokane,WA 99220 E-MAIL n S: 9 INSURER(S)AFFORDING COVERAGE NAIC M INSURER A:Liberty Mutual Fire Insurance Company 23035 II INSURED INSURER a:Liberty Insurance Corporation 42404 Walker Construction,Inc. INSURER C:Pacific Insurance Company 10046 P.O.Box 3901 INSURERD: Spokane,WA 99220 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POUCY EXP LIMITSLTR TYPE OF INSURANCE INSD W M/ VD POLICY NUMBER IMDD/YYYY1 IMMIDD!YYYYI A X COMMERCIAL GENERAL LIABILITY 1,000,000 EACH OCCURRENCE S CLAIMS-MADE X OCCUR X X TB2Z91464284085 7/1/2025 7/1/2026 PREM SES(EaEoccurrencel $ 100,000 MED EXP(Any one person) $ 10,000 PERSONAL&ADVINJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER- GENERAL AGGREGATE $ 2,000,000 POUCY X JEi LOC PRODUCTS-COMP/OPAGG $ 2,000,000 $ Included OTHER: COMBINED SINGLE LIMIT 1,000,000 B AUTOMOBILE LIABILITY (Ea accident) $ X ANY AUTO X X AS7Z91464284075 7/1/2025 7/1/2026 BODILY INJURY(Per person) $ OWNED AUTOS ONLY _ SCHEDULED SSWULNEEDp BODILY INJURYp (Per accident) $ . AUTOS ONLY _ AUTOS ONLY (I'eraeudent)AMAGE $ $ B X UMBRELLAUAB X OCCUR EACH OCCURRENCE S 10,000,000 EXCESSLIAB CLAIMS-MADE X X TH7Z91464284115 7/1/2025 711/2026 AGGREGATE $ 10,000,000 DED RETENTION$ $ A WORKERS COMPENSATION PER X SR AND EMPLOYERS'LIABILITY Y/N EL2Z 91464284065 7/1/2025 7/1/2026 1,000,000 ANY PROPRIETOEER/PARTNERIEXECUTIVE E.L.EACH ACCIDENT $ andatory in NHj EXCLUDED? N f A E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ C Prof/Poll Liability 52CPIHA0276 7/1/2025 7/1/2026 Each Condition/AGG 2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space is required) CITY OF SPOKANE VALLEY CROSS COUNTRY COMPLEX PROJECT TITLE:CITY OF SPOKANE VALLEY CROSS COUNTRY COMPLEX CITY OF SPOKANE VALLEY,ITS OFFICERS,DIRECTORS AND EMPLOYEES ARE ADDITIONAL INSURED IN REGARD TO THE GENERAL AND AUTOMOBILE LIABILITY,ALONG WITH A WAIVER OF SUBROGATION FOR ON-GOING AND COMPLETED OPERATIONS PER THE FORM(S)ATTACHED. THE COVERAGE IS PRIMARY AND NON-CONTRIBUTORY WHERE REQUIRED BY A WRITTEN CONTRACT. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN CITY OF SPOKANE VALLEY ACCORDANCE WITH THE POLICY PROVISIONS. 10210 E SPRAGUE AVE. SPOKANE,WA 99206 AUTHORIZED REPRESENTATIVE I —7-0?-- ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD