HomeMy WebLinkAbout25-085.01ColvilleConstructionCompanySullivanParkWaterline„0;oo0u11[e CHANGE ORDER NO: 1
ENGINEERING DIVISION CONSTRUCTION CONTRACT NO: 25-085.1
PROJECT: Sullivan Park Waterline CONTRACT DATE: 5/2/2025
PRIME CONTRACTOR: Colville Construction Company, Inc. CIP NO: 328
his change order provides compensation to the Contractor for the additional work to extend the water main and install a
ew hydrant.
Item No.
Description
Unit
119
Ductile Iron Pipe for Water Main, 6 In. Diam.
LF
120
C900 PVC Pipe for Water Main, 12 In. Diam.
LF
126
Gate Valve 12 In.
EA
128
Hydrant Assembly
EA
130
Erosion Control Blanket
SY
135 (New)
Seeding and Fertilizing (CO#1)
LS
136 (New)
Water Main Appurtenances (CO#1)
LS
137 (New)
Construction Surveying (CO #1)
LS
Total Amount of this Char
uantit
Unit Price
Total ,
7
$ 60.00
420.00
145
$ 65.00
9,425.00
1
$ 4,500.00
4,500.00
1
$ 8,500.00
8,500.00
340
$ 3.00
1,020.00
1
$ 1,500.00
$
1,500.00
1
$ 7,500.00
$
7,500.00
1
$ 500.00
$
500.00
ge Order (not incl. Tax):
$
33,365.00
APPROVALVERBAL •
Independent Justification on File Yes
Verbal Approval N/A Verbal Approval by N/A
Original Contract Working Days: 35
Revisions by Prior Change Orders: 0
Revision By This Change Order: 0
Total Revised Contract Working Days: 35
CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT:
ORIGINAL TOTAL CONTRACT AMOUNT $ 1,250,712.00
...............................................................................................................................
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 0.00
TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 1,250,712.00
........................ --...................................
NET THIS CHANGE ORDER $ 33,365.00
.........................................................................................................................................................
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,284,077.00
CONTRACTOR ACCEPTANCE: `—/; , , DATE: ZUI
The contractor hereby accepts this adjustment underthe e� Section 1-04.4 of the original contract.
RECOMMENDED BY: j `” 2S� DATE: 6/23/25
�/Projject Mane er
RECOMMENDED BY: Ol -4 DATE: 06/24/2025
Engin ring Manager
APPROVED BY: DATE: 6/24/2025
Public Works Director
APPROVED BY: N/A -Within PW Director's Delegation DATE:
City Manager
ATTACHMENTS: Update Plan Sheet 3 and Exhibit A detailing hydrant and 12" watermain extension
Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office
COPIES TO: Contractor, PW Project File, Project Inspector, Finance Department
COSV Form 9/5/2014
Spokane
,oOValley
THE CONTRACT IS MODIFIED AS FOLLOWS:
WORK TO INCLUDE
Background:
Change Order No: 1
Construction Contract No: 25-085.1
As part of the waterline project, the City decided to install a fire hydrant on City parcel 45114.9009, along
Sullivan Road, approximately 540 feet north of the Sullivan Park entrance, to provide fire protection in this area.
Description of Change:
This change order provides compensation to the Contractor for the additional work to extend the water main and
install a new hydrant. Work includes installation of 145 LF of 12" water main, appurtenances, and one fire hydrant.
Additional surveying and erosion control is also included in the change order for this work.
Specification:
There are no changes to the specifications because of this change.
Plans:
Sheet 3 of the Contract Plan is revised and the following sheets are added to the Contract:
Sheet 1/2 — Change Order No. 1 Exhibit A, Kemira Hydrant Extension Plan & Profile
Sheet 2/2 — Change Order No. 1 Exhibit A, Kemira Hydrant Detail
Time:
No additional working days are added to the Contract for this change.
Measurement:
There is no specific measurement for lump sum items.
Payment:
This change order increases the quantity of existing bid items #119, 120, 126, 128, 130 and 133 and will be paid
using the bid unit price.
This change order creates three pay items:
"Seeding and Fertilizing (CO#1)" per lump sum.
The lump sum price for "Seeding and Fertilizing (CO#1)" shall be full compensation for all costs incurred by the
Contractor for seeding and fertilizing the areas disturbed by the installation of the water main and hydrant work
associated with Change Order # 1.
"Water Main Appurtenances (CO#1)" per lump sum.
okane
Valley
Change Order No: 1
Construction Contract No: 25-085.1
The lump sum price for "Water Main Appurtenances (CO#1)" shall be full compensation for all costs incurred by
the Contractor for installation of all the water main fittings, joint restraints, and thrust blocking needed for the
installation of the water main and hydrant work associated with Change Order #1.
"Construction Surveying (CO41)" per lump sum.
The lump sum price for "Construction Surveying (CO#1)" shall be full compensation for all costs incurred by the
Contractor for providing additional survey following the requirements of Section 1-05.4 of the Standard
Specifications for the installation of the water main and hydrant associated with Change Order # 1.
Summary of Quantities:
Bid
Previous
New
Estimated
Item
Description
p
Unit
Qty.
Qty
Qty
Unit Price
Amount
Change
119
Ductile Iron Pipe for Water
L.F.
10
17
+7
S60.00
$420.00
Main, 6 In. Diam.
120
C900 PVC Pipe for Water Main,
L.F.
690
835
+145
$65.00
$9,425.00
12 In. Diam.
126
Gate Valve 12 In.
EA.
1
2
+l
$4,500.00
$4,500.00
128
Hydrant Assembly
EA.
1
2
+1
$8,500.00
$8,500.00
130
Erosion Control Blanket
S.Y.
1,600
1,940
+340
$3.00
$1,020.00
135
(New)
Seeding and Fertilizing (CO#1)
L.S.
0
1
+1
$1,500.00
$1,500.00
136
Water Main Appurtenances
L.S.
0
1
+1
$7,500.00
$7,500.00
(New)
(CO#I)
137
(New)
Construction Surveying (CO#1)
L.S.
0
1
+1
$500.00
$500.00
TOTAL
$33,365.00
N. SULLUAN RD.
------------------ ----------- ---------------------- -No
Z4
- -- - - - - - - - - - - - - - - - - z
------- ---------------- 0
- ------- ---------
z
:3
- -------- -- - -
PROFILE - 0+00 TO 11�00
E "E"oiwee Ai"o i CHANDE ORDER N0.IIXHIBfTA
����KEMIRA HYDRANT EXTENSION PUN6 PROFILE
�ArF.R n 2 u -
I6" D.1. P1PE
ADAPTER W/
10
=W
F-
MEGALIYsS.
b" F.E, FLJ. GATE
VALVE W/ MEGALU!i5
12" F.E. TEE W/ TBLK.
ib"xi?"F.E. ______
REDUCER
12" F.E.x M.J. GATE
VE W/ MEGALUGS.
F.E.
�VAL
I1PVC C
TEE W/ T.BLK
PIPE, TYP.
11" F.E.x H.J. ADAPTER
W/ h1EGALUGS.
---- 12" M.J. II s' ELL.
W/ MEGALUGS,
12" F.E.x M.J. GATE SEE PROFILE.
VALVE W/ ME63AL1.46.
- b" RJD.I. PIPE
12" BLIND FLG. W/
TBLKS PER TABLE.
12" PVC
C-900 PIPE
NOTE:
INSTALL HYDRANT APPROX. 12' WEST OF HP GAS MAIN
THAT IS APPROX. BENEATH CURB, FIELD LOCATE.
THE SIDEWALK WILL BE WIDENED TO 10' IN THIS
LOCATION. ALLOW AT LEAST 2' BEYOND BACK OF
FUTURE SIDEWALK. HYDRANT BURY LINE SHALL BE SET
0.2' ABOVE TOP -BACK -OF -CURB.
nunivc uo.
E es.4 eti071Nc[R1No, Ir�c. CHANGE ORDER NO. Y EXHIBIT
12611 W. su t Mry., Suite 8 KEMIRA HYDRANT EXTENSION DETAIL
�...� w 9e9v, WA 9900
(509) 744-0245 CITY OF SPOKANE VALLEY �7
E.- F":(509)744-0092 SULLNAN PARK WATERLINE PROJECT-2025 L